COLUMNS
WORKS IN PROGRESS
1221 N Street, Suite 600 Lincoln, Nebraska 68508
spring 2023
southeast community college, welding technology center | lincoln, ne The new 96,000-square foot Welding Technology Center is designed to expand the number of booths on the welding floor, increase instructional access and improve material flow and safety throughout the facility. The WTC as designed, has two main welding floors, each with 90 booths. Raw materials flow to the floors, from ‘dirty side‘ fabrication space, to “clean side’ instructional classrooms, labs, and faculty offices that have connectivity, but are buffered from the main welding floors. Student commons and gear up spaces are also given visual access to the main welding area and act as the backbone and mixing zone of students and faculty. The facility will also include a separate area for the Industrial Partners that will include it’s own entrance and classrooms. Mechanical, electrical service and welding gas distribution have been carefully thought out to provide needed support to all areas of the WTC, as well as being convenient for servicing. The WTC is estimated for completion in the fall of 2025.
MADONNA REHABILITATION HOSPITAL
ARCHITECTURE ENGINEERING INTERIOR DESIGN CONSTRUCTION ADMINISTRATION
making ideal happen level apartments | lincoln, ne This project is a 5 level apartment complex with 4 levels of apartments and an underground parking garage. The complex has 164 apartment units, 114 underground parking stalls and 87 surface stalls. Features of the complex include: lounge/game room; coffee bar; gym; gathering space; conference room; outdoor pool; party room with roof deck and a dog run. The complex also includes 2,500-square feet of commercial space. The estimated completion date is fall 2023.
Our design experts, innovators and problem solvers offer a complete spectrum of architecture, engineering, interior design and construction administration services.
davisdesign.com
making ideal happen