Skip to main content

THE_YIELD_Holly_Springs_Pad_J_Spec_Sheet

Page 1


16 ACRES PAD READY

Manufacturing Facility

Permit ready for 99,000 cGMP

Clear height: 32’

Roof: 80-150lbs/SF loading

Loading Docks: 6 doors per 100,000 SF

Stories: Single-story

Permits: Permitted and ready-to-build

Research & Development Facility

Pad-ready for 62,000 SF

Clear height: 16’

Roof: 75-150lbs/SF loading

Loading Docks: 4 doors per 100,000 SF

Stories: Multi-story

Permits: 6 months

Flexibility

Option to add a mezzanine (up to 50% of the floorplate) or a full second story (up to 100%), while maintaining 16–20 ft. clear height on the first floor

Slab-on-grade omission for end-user utility coordination

Dual entries to support multi-tenant or multi-entry configurations

Holly Springs is an intentionally-built community engaged to attract and grow the Life Science and Innovation industries.

Holly Springs powers life sciences growth, linking research, talent, and resources like NC Biotech and NC State’s BTEC at the heart of a global cluster.

Turn static files into dynamic content formats.

Create a flipbook