Published Nationally
Western Edition
$3.00
® September 6 2026 Vol. XXVII • No. 18
“The Nation’s Best Read Construction Newspaper… Founded 1957.” 470 Maryland Drive • Ft. Washington, PA 19034 • 215-885-2900 • Toll Free 800-523-2200 • www.constructionequipmentguide.com
Inside
Route 66 Turns 100: A Look Back In History Jim Grey photos
HDOT Finishes Rebuild of Highway Hurricane Lala Damaged...8
ROMCO Celebrates Opening of Branch in Texas Panhandle...14
It’s 7:30 on a morning in early June, and Rhys Martin is getting ready to pull his borrowed 1964 wood-paneled Chevrolet station wagon out of the motel parking lot, then out of Needles, Calif., and into the Mojave Desert, heading east on U.S. Route 66. Yes, that Route 66. Martin, a travel writer and photographer from Tulsa, Okla., is here in his role
By David Holzel
CEG CORRESPONDENT
Skanska JV Wins $2.43B California Light Rail Project...28
Table of Contents. . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Paving Section . . . . . . . . . . . . . . . . . . . . . . . . . . . 31-43 Utility Equipment Section . . . . . . . . . . . . . . . . . . 55-61 Auction Section . . . . . . . . . . . . . . . . . . . . . . . . . . 64-69 Business Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . 67 Advertisers Index. . . . . . . . . . . . . . . . . . . . . . . . . . . 70
as manager of the Preserve Route 66 Initiative for the National Trust for Historic Preservation. In that capacity, he’s leading a caravan of about 15 vehicles along the 2,448-mi. length of Route 66, the most storied of the U.S. roads that came into being in the early days of the automobile. Over 20 days, the Route 66 Centennial Caravan conducted a party on wheels, see ROUTE page 18
Construction Job Placement
Vetting Firm Finds Best Workers for the Best Jobs in Data Center Infrastructure If you’re a skilled craft worker, AI infrastructure is where you need to be. The demand is strong and the pay is great. And a pivot in the way workers are fitted to the job means you get the best job with the best construction company. AI is driving mega construction projects. And AI also is driving the way construction workers are vetted and routed to positions where their specific skills are in high demand now.
By Lucy Perry
CEG CORRESPONDENT
see JOBS page 54
Adobe Stock photo
Data centers are a single hyper-skill project requiring thousands of workers over a very short time. The project scales are enormous, which heightens the need for equipment operators, electricians, welders and other skilled construction workers in a very short period of time.
Page 2 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 3
HENDRIX RENTALS LLC "In Business for over 38 Years"
www.hendrixmachineryllc.com 1-936-327-5430 • Email: sales@hendrixmachineryllc.com
Se Habla Español
2019 FreightLiner M2, Stk#: HR-1826, 4,339 hrs., 12,559 Miles, Lewell 2,000 gal. Water Tank, Auto Trans., Front, Side & Rear Spay Heads, Rear Hose Reel, 11Rx22.5 Tires, Dual Wheel Single Axle, Cummins B6.7 Eng., 26k GVW...........................................$69,500
2015 Cat TL10-55C, Stk#: HR-1058, 10,000 lbs., 43 ft., 8,836 hrs., 60” Forks, 74” Frame, Aux. Hyd., 14.00x24 Tires, 4 Cyl., Cat Eng..... ......................................................... $49,500
2019 John Deere 650K LGP, Stk#: HR-1923, EROPS, A/C & Heat, 4,644 hrs., 6 Way Blade, 70% U/C........................................... $79,500
2025 Heli CPYD25, Stk#: HR-1882, 5,000 lbs., 9 ft., 3 hrs., 48” Forks, 43” Frame - 3 Stage Mast, SideShift, 42” Solid Pneumatic Tires. LP Eng. (4 to choose from).... $26,500
2021 Komatsu D61PX-24, Stk#: HR-13393, EROPS, A/C & Heat, Radio, 7,003 hrs., 6 Way Blade, 34” Pads, 12’7” Wide... $129,500
2012.JLG 600S, Stk#: HR-1029, 500 lbs., 60 ft., 5,178 hrs., 39x15x22.5 Tires, 4 Cyl. Deutz Eng, New Paint Job........................... $22,500
2022 Linkbelt 210-4, Stk#: HR-1752, 50 Ft. Long Reach, EROPS, A/C & Heat, 1,041 hrs., Digging Bucket................................ $149,500
2017 JLG 1932R, Stk#: HR-11112, 500 lbs., 19 ft., 219 hrs., 323x100 Solid Rubber Tires, Electric Powered, Slide out Deck. (Several to Choose From)..................................... $6,950
2011 John Deere 772G, Stk#: HR-1814, EROPS, A/C & Heat, 10,165 hrs., Rear Ripper ......................................................... $79,500
2019 Cat 938M, Stk#: HR-1930, EROPS, A/C & Heat, 9,715 hrs., Quick Coupler, 28Lx26 Tires.................................................. $89,500
2023 Dynapac CA30D, Stk#: HR-1489, 84” Smooth Drum, 1,389 hrs., 23.1x26 $ Tires.... ......................................................... $89,500
2023 John Deere 75G, Stk#: HR-1465, EROPS, A/C & Heat, Radio, 1,986 hrs., 24” Bucket, 91” Blade, 17” Rubber Pads.$89,500
Page 4 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
IN THIS ISSUE
®
WESTERN EDITION Circulated Throughout
• Alaska • Arizona • California • Colorado • Hawaii • Idaho • Montana • New Mexico • Nevada • Oklahoma • Oregon • Texas • Utah • Washington • Wyoming
To read these stories and many more, visit www.constructionequipmentguide.com
8
FEATURES 8
14
16
HDOT COMPLETES REBUILD OF LALA-DAMAGED HIGHWAY
The Hawai‘i Department of Transportation (HDOT) reported on Aug. 24, 2026, that major roadway repairs to the sections of Mamalahoa Highway (Route 11) that were washed out due to heavy rains from Hurricane Lala were completed.
12
GOOGLE, BEALE INFRASTRUCTURE ANNOUNCE OKLA. DATA CENTER
28
SKANSKA WINS $2.43B CONTRACT FOR CALIF. LIGHT RAIL TRANSIT PROJECT
Google and Beale Infrastructure announced on Aug. 19, 2026, details for a new data center campus under construction in unincorporated Tulsa County, Okla., near Cherokee Industrial Park.
Skanska, in a joint venture with Stacy Witbeck, announced on Aug. 14, 2026, that it was awarded an additional contract by the Los Angeles County Metro for the East San Fernando Valley Light Rail Transit Project in Van Nuys.
12
30
CHICKASAW NATION BREAKS GROUND ON $1B MEDICAL CENTER
AED FOUNDATION CELEBRATES 150TH HIGH SCHOOL MILESTONE
Chickasaw Nation Gov. Chris Anoatubby led groundbreaking ceremonies on July 31, 2026, for the $1 billion Chickasaw Nation Health Newcastle Medical Center, marking a significant investment in First American health care access in the area.
As the equipment industry continues to face a shortage of an estimated 10,000 technicians each year, the AED Foundation (AEDF) is expanding its efforts to build the future workforce by reaching a major milestone.
14
44
ROMCO CELEBRATES GRAND OPENING OF AMARILLO BRANCH
EQUIP EXPOSITION RELEASES TIPS FOR FIRST-TIME SHOW ATTENDEES
UTILITY EQUIPMENT 56
BOBCAT EXPANDS LINEUP WITH NEW PA375V AIR COMPRESSOR
56
HIPOWER: WHAT TO KNOW BEFORE CHOOSING GENERATOR
58
CONSTRUCTION EQUIPMENT GUIDE’S LIGHT TOWER CHARTS
58
TEREX ORDERS SPECIALLY-EQUIPPED HUDDIG MACHINE
60
ATLAS COPCO UNVEILS X-AIR+ 800-20 PORTABLE AIR COMPRESSOR
61
UNDERGROUND UTILITY DAMAGE COSTS U.S. $83.2B ANNUALLY
ROMCO Equipment Co. celebrated the grand opening of its new Amarillo branch with a ribbon-cutting ceremony on July 28, 2026, marking the company’s 17th location and continued expansion across Texas.
Equip Exposition, the international landscape, outdoor living, and equipment exposition, issues advice for first-time attendees to the award-winning event Oct. 20-23, 2026, starting with planning ahead.
16
I DIG TEXAS OFFERS LANDLORD BRUSH CUTTER
46
I Dig Texas is a high-flow brush cutter built for contractors and landowners handling heavy clearing work. According to I Dig Texas, the Landlord Brush Cutter is designed for commercial-duty applications.
Volvo Construction Equipment (Volvo CE) is expanding its United States footprint, resulting in more than 50 percent of its North American machine supply being produced at its Shippensburg, Pa., facility.
16
OTA BOARD AWARDS $133M IN NEW CONSTRUCTION CONTRACTS
50
Construction contracts were awarded for the Interstate 44/Turner Turnpike interchange reconstruction; a new interchange on the Interstate 344/John Kilpatrick Turnpike; and an I-44/Will Rogers Turnpike widening near Catoosa.
Concerns about costs and workers continue to dominate conversation. While the adoption and deployment of technology can help address both concerns, technology is only effective when data silos are eliminated.
64 67
20
HAPCO BREAKS GROUND ON OKC MANUFACTURING FACILITY
68
EQUIPMENT
Hapco broke ground on Aug. 4, 2026, on a new 270,000-sq.-ft. manufacturing facility in Oklahoma City, Okla., marking a significant expansion of the company’s United States manufacturing footprint. Founder Emeritus (1930-2021) Edwin M. McKeon Sr. Executive Publisher Teddy McKeon Editor In Chief Craig Mongeau Senior Editor Andy Gotlieb Senior Editor Katherine Petrik Production Mgr. John Pinkerton Controller Judith Nixon Circulation Mgr. Cathy Printz Main office 470 Maryland Drive Fort Washington, PA 19034 215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 Web site www.constructionequipmentguide.com Advertising e-mail production@cegltd.com
Mobile
LinkedIn Facebook
X
YouTube
VOLVO ROLLS OUT FIRST U.S.-BUILT EXCAVATORS, LARGE LOADERS
DEPARTMENTS
WHY ELIMINATING DATA SILOS MAKES DIFFERENCE
I MAKE AMERICA PARTNERS WITH MIKEROWEWORKS ON CAMPAIGN
I Make America, the national grassroots program of the Association of Equipment Manufacturers (AEM), announced the launch of a new campaign featuring Mike Rowe. Rowe is a longtime advocate for skilled trades.
16 31
COMING AUCTIONS BUSINESS CALENDAR
I DIG TEXAS Landlord Brush Cutter VÖGELE Super 1800-5 X Paver
For advertising rates Contact
Kent Hogeboom
• National Sales Manager
518/221-5159 khogeboom@cegltd.com
Sharon Swanson
• Alaska • Arizona • California • Idaho • Nevada • New Mexico • Oregon • Utah • Washington Cell e-mail
760-518-4336 sswanson@cegltd.com
Construction Equipment Guide Western Edition (ISSN 2330-9792) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Western Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2026, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced (including framing) in whole or part without written permission from
Jacob Estrello
• Colorado • Louisiana • Oklahoma • Texas Cell e-mail
210/878-5650 jestrello@cegltd.com
the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide’s unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer’s errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.
Patrick Kiel
Key Accounts Manager • Montana • Wyoming Cell e-mail
952/353-1770 612/481-8557 pkiel@cegltd.com
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 5
563-872-4112
Bellevue (Dubuque), Iowa sales@jjscheckel.com
EQUIPMENT FLEET FOR RENT OR SALE NATIONWIDE WARRANTY!
SCHECKEL SERIES REMANS WARRANTY!
2025/2018 CAT D11T - Call for $
Zero hour Scheckel Series Reman w/ CPT Rebuild w/ 4 yr, 6,000 hour OEM warranty. New U/C, U Blade, SS Ripper. Full details on our website.
2026/2011 CAT D10T - $1,488,000
In process, Zero hour Scheckel Series Reman w/ CPT Rebuild w/4 yr, 6,000 hr OEM warranty. New UC, U blade, SS Ripper. Non emissions. Full details online.
2015 CAT D11T - Call for $
1 owner, Cat Dealer preventative maintenance since new. Low hour components. UC measures like new, U Blade, MS ripper. Excellent condition.
2012 CAT D11T - Call for $
2013 CAT D10T - $388,000
9,119 Hours on Cat dealer documented total rebuild. 38,710 Hours, Good using machine just off mine site, Light use tractor from power company. UC like new, U Blade, Multi-shank ripper, 80% plus UC, Dealer Rear cwt, Rippers in stock for addt’l price. inspection, Oil samples, & CAT TA2 Report available.
WARRANTY!
2007 CAT D10T - $428,000
2022 CAT D6 LGP VPAT - $368,000
2022 CAT 349 - $218,000
2014 CAT MH3059 - $228,000
2020 CAT D6 XE LGP - $268,000
2019 CAT 390FL - $648,000
2020 CAT 988K - $548,000
(2)2012 CAT 777G’s - Call for $
2008 CAT 770 - $388,000
(2)2005 CAT 637G’s - $588,000 Ea.
2019 Volvo A45G & K-Tec 1233
2014 Case IH Steiger 580 Quadtrac and 2014 K-Tec 1233 Pkg $478,000
A03321. Next Gen. 3,310 Hours, 3D Grade with assist, A03323. VPAT. Next Gen, Powershift w/ Electric drive, A03415. 5,627 Total hours, Factory warranty Good using machine just off power plant site, GPS ready. Machine is as good as they come. 6,809 hours, GPS Ready, Aux hydraulics, Heavy duty until 2027. 27’8” Boom, 14‘4” Stick, Hyd quick 85% plus UC, Hyd Ladder, Rear counterweight, Oil samples & CAT TA2 pressure testing report available. Straight, clean & original. Dealer owned since new. U/C, Straight Machine with lots of idle time recorded. coupler, Documented dealer maintenance since new.
6,980 Total hours, 2,806 Idle hours, Auxiliary Hyd Valve, A03194. 8,713 Hours, 1,038 at Idle, 7,675 Actual Cat 2D Grade Control Assist, 11’2” Stick, 72” bucket, working hours. Ground access high rise cab, Documented dealer maintenance since new. 35’ Boom, 29’ Stick, Documented history.
2020 CAT 374FL - $548,000
6,575 Total hours, 1,777 at idle, 13’6” Stick, 4.5 Yard 66” bucket. Documented service history and oil samples since new. Clean and straight.
Matching pair available. 7,000 Hour Powertrain 7,831 Total frame hours with 5,037 at idle. Only 2,798 8,525 Hours, 1 Owner w/ documented service history since new, Ride control, Quick coupler, Aux hydraulics, Rebuilds done by CAT Dealer. 25,000 Total frame hours. actual “in operation” working hours. Full History Super clean and well maintained. Buy or Rent. available, dealer preventative maintenance. Buy/rent. 9 Yard spade nose bucket, Original paint. Rent or Buy.
WARRANTY!
(6)2021 Volvo A45G’s-$388,000 Ea. 6,800 Hours, 3 Year remaining factory warranty till 2027, 1 Owner, 1 fleet trucks. Rent or Rent/ Purchase option entire pkg, $16,500/month ea.
2017 CAT 826K - $328,000
11,863 Total frame hours, 1 Owner from county municipality, Cat Dealer serviced and maintained, Original paint, Semi u blade w/ tilt. Buy or Rent.
visit
2019 Morooka MST-2200VD
$98,000 Rubber Track Carrier Dump, 1,825 Total hours, 32,000 lbs, CAT engine, 250 HP, 12 Ton carry capacity, 6.5 Ground PSI loaded.
2006 CAT 825H - $528,000
12,375 hours, Excellent Feet, Tilt Blade, Excellent machine with Cat facts service history and oil samples. Pre-Emissions, Available for Rent.
JJScheckel.com
Extensive rebuild history, Matching pair available, Scraper Package - $588,000 Push-Pull, Erops, A/C, Super Clean Scrapers from a high 6,750 Hours on the truck, New tires. Matching pair reputation home w/ full maintenance & service history. available, rigged up and ready to go. Super clean.
2018 CAT CP56B - $168,000
960 Hours, 84” Padfoot vibratory roller, Dual amplitude, Open canopy, Front blade, Excellent condition! Rent or Buy.
2009 CAT 16M VHP - $388,000
15,526 Total hours, 16’ Moldboard, Ripper with 4 shanks, Good rubber, Selling as arrived, Priced to sell!
for detailed photos, videos, and descriptions!
3,475 Hours, New rear tracks. K-Tec 33 yard scraper. Extremely clean & well maintained units.
2009 CAT RM500 - $268,000
3,610 Hours, Reputation machine, Universal Rotor for both asphalt reclamation or soil mixing, Water emulsion system, Full service history.
The fastest growing choice for
Large Equipment Rental
Delivered Nationwide. We are easy to work with & will not be beat on price and terms! Large Dozers - Cat D8T, D9T, D10T, D11T Large Excavators - Cat 374FL, 390FL Truck Fleet - Cat 740/745, & Volvo A40G/A45G Compaction, Wheel Loaders, Scrapers, and much more.
WE OWN WHAT WE ADVERTISE! call: 563-872-4112 | email: sales@jjscheckel.com | www. jjscheckel.com | follow us for daily updates:
Page 6 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 7
GET REAL STEEL. FOR A REAL STEAL. Lock in 0% financing, big savings & premium coverage. All built to keep you working this season. LIMITED-TIME OFFERS
CTLs & Excavators Get 0% interest for up to 60 months Wheel Loaders Get 0% interest for up to 48 months OWN TAKEUCHI STEEL. OWN THE SEASON. Contact us today to find the right Takeuchi equipment for your next job. Don’t wait! Offers end September 31, 2026. WEB L AND MARKEQ.COM
TEL (972) 975- 5905
*Some restrictions apply. All offers subject to credit approval.
Page 8 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
HDOT Completes Rebuild of Lala-Damaged Highway
A Komatsu excavator rebuilds the bank of Kaalaea Hurricane Lala washed out large sections of Mamalahoa Stream along Kamehameha Highway. A Cat excavator moves roadbed materials into place Highway (Route 11).
The Hawai‘i Department of Transportation (HDOT) reported on Aug. 24, 2026, that major roadway repairs to the sections of Mamalahoa Highway (Route 11) that were washed out due to heavy rains from Hurricane Lala were completed. Approximately two weeks of finish work such as permanent striping, guardrail installation and shoulder hardening will continue at the Pāhala Hospital site. Highway users are advised that single lane closures with alternating traffic control may occur along Mamalahoa Highway (Route 11) from Ka‘ū and Nāʻālehu as
crews add signage, repair guardrails, place barriers, install signage, replace pavement markings, fill erosion areas, repair electrical and water systems, and other safety installations to the rebuilt road On Maui, Crater Road (Route 378) crews spent time chopping and clearing large fallen trees and debris from the roadway throughout the week. Crater Road was reopened to all motorists as of Aug. 24, with remaining debris cleanup continuing outside of the roadway. On O‘ahu, crews continued to
Crews repair a section of the Mamalahoa Highway (Route 11) by Pahala Hospital.
proactively clear waterways of debris and sediment along various streams throughout the system. HDOT worked with utility companies to trim problematic trees near powerlines and roadways. Drain and shoulder clearing work continued to prevent ponding along major roadways like the H-1 Freeway, Likelike Highway and Kamehameha Highway. There is one remaining airport repair for damage caused by Hurricane Lala, which was a blown off section of terminal roofing at Lānaʻi Airport. Otherwise, there were no significant impacts to any facilities,
runways or terminals. Due to the forecast associated with Moke, interim repairs were made at Lānaʻi Airport. HDOT will assess the cost and schedule of permanent repairs this week. The repair work is not expected to impact passengers. HDOT Harbors crews cleared an estimated 18 tons of debris from land and waterside facilities at ports throughout the state between Lala and Moke to keep harbors navigable. (All photos courtesy of the Hawai‘i Department of Transportation.)
A washed-out part of Route 11 Hwy. 11 is paved between Kaalaala Stream bridge and Keaiwa Stream bridge.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 9
#93542 | 2008 KOMATSU D51PX-22, PAT BLADE, REAR SCREENS, 8389 HOURS. ........................................................$67,500
#83814 | 2022 D51PXI-24, 2.0 IMC, 3,735 HOURS.................................$159,500
#93500 | 2023 KOMATSU D61PX-24, #93403 | 2019 KOMATSU D65PXI-18, RIPPER, 1200 HOURS, PREMIER RIPPER, 4833 HOURS....................$159,500 WARRANTY....................................$239,500
#83813 | 2018 KOMATSU D65EX-18, RIPPER, SWEEPS, SIGMA..............$124,500
#93550 | 2006 KOMATSU PC200LC-8, #93518 | 2021 KOMATSU D71PXI-24, #83780 | 2020 KOMATSU PC210LC-11, RIPPER, 30 INCH SHOES, PAT BLADE........... COMBO KIT, QC, 7,665 HOURS, HYD HYD, QC, 3985 HOURS .................$139,500 .......................................................$314,500 THUMB.............................................$89,500
#83748 | 2014 KOMATSU PC240LC-10, #93516 | 2019 TAKEUCHI TL8, CAB/AC, #3774 | 2023 BOMAG BW11RH-5, CAB/AC, #93521 | 2016 BOMAG BW120SL-5, 48 QC, AUX HYD, 11 FT STICK..............$99,500 76 INCH SMOOTH BUCKET, 1127 HOURS..... 521 HOURS .....................................$67,500 INCH DOUBLE DRUM ROLLER.........$17,500 .........................................................$39,500
#83799 | 2022 KOMATSU PC360LC-11, #93537 | 2012 KOMATSU PC290LC-10, 11’6” STICK, HYD THUMB, 4,715 HOURS..... 4950 HOURS, 13 FT STICK, JRB QC, .......................................................$137,500 60 INCH ESCO................................$177,500
#83801 | 2019 KOMATSU PC290LC-11, #83816 | 2019 KOMATSU WA270-8, 2,950 HOURS, ROCKLAND QC ......$144,500 3RD SPOOL, QC BUCKET AND FORKS, 4,552 HOURS ................................$129,500
Page 10 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 11
Page 12 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Google, Beale Infrastructure Announce Okla. Data Center Google and Beale Infrastructure announced on Aug. 19, 2026, details for a new data center campus under construction in unincorporated Tulsa County, Okla., near Cherokee Industrial Park. The 506-acre campus will join Google’s global network of data centers that powers technology ranging from Google search to online banking, hospitals and emergency systems. “The Tulsa Regional Chamber is thrilled that Google is deepening its footprint in northeastern Oklahoma,” said Mike Neal, president and CEO of the Tulsa Regional Chamber. “We look forward to furthering a relationship that began nearly 20 years ago when Google announced it was coming to Mid-America Industrial Park in Pryor.” Google has invested more than $15 billion statewide since setting down roots with its first data center campus in Pryor in 2011. The company said in the release that it is actively expanding its digital infrastructure footprint in the state with new facilities under construction in Stillwater and Muskogee County.
In 2025, Google’s investments and technologies helped provide more than $2.6 billion of economic activity for tens of thousands of Oklahoma businesses, publishers, nonprofits, creators and developers, according to the release. “This project is far more than an infrastructure investment; it is a long-term commitment to Tulsa County’s future,” said Trystine Payfer, Google’s public affairs manager for Oklahoma. “Building data centers the right way means being a good neighbor first. Here in Tulsa County, that means strengthening the local energy grid and creating real, lasting opportunities for local businesses, families and schools.” “This project in Tulsa County is a continued vote of confidence in Oklahoma and its future,” said Julian Kudritzki, chief operating officer for Beale Infrastructure. Google said in the release that it builds its data centers with a commitment to support local utility systems and pay its own way. Powered by Public Service Co. of Oklahoma (PSO), the Tulsa County project includes construction of a new onsite substation funded by
Kimely-Horn rendering Google and Beale Infrastructure announced details for a new data center campus under construction in unincorporated Tulsa County, Okla.
Beale. These direct investments in utility upgrades will strengthen energy reliability and grid stability across the region. Located just west of Owasso, the new campus will bring significant public infrastructure upgrades. The project will enhance PSO’s transmission and distribution system reliability across the region, ensuring robust capacity for digital infrastructure and regional power demand. Google said in the release
that it is committed to growing responsibly. Its Project Clydesdale is funding and installing 1.5 mi. of new water lines and infrastructure upgrades for Washington County Rural Water District #3, ensuring the project’s local neighbors benefit from a more robust and resilient water system. Over the last few years, Google has contributed more than $2 million to support Tulsa County community partners such as Atlas
School, The Opportunity Project, OSU-IT, Tulsa Innovation Labs, Foundation for Tulsa Schools and Tulsa Regional STEM Alliance. Google and Beale said in the release that they plan to support the region’s heritage and future by working with local leaders and elders to launch new community investments and expand existing partnerships in education, nextgeneration workforce development, small business support and digital access.
Chickasaw Nation Breaks Ground On $1B Medical Center Chickasaw Nation Gov. Chris Anoatubby led groundbreaking ceremonies on July 31, 2026, for the $1 billion Chickasaw Nation Health Newcastle Medical Center, marking a significant investment in First American health care access in the Oklahoma City area. When complete, the 160-acre Chickasaw Nation Health Newcastle Medical Center campus at the intersection of Southwest 16th Street and U.S. 62, will contain 12 buildings, including a hospital, outpatient clinic and more than 23 medical specialties. It will be one of the largest and most comprehensive First American hospitals in the United States, according to the Chickasaw Nation. “Today is the next step in our journey to provide quality, accessible health care,” Anoatubby said. “This will be more than just a hospital; this campus will propel health care forward.” Anoatubby said the medical center is another step in meeting the mission of the Chickasaw Nation, “to enhance the overall quality of life of the Chickasaw people.” “Once again, the mission extends to the community and other First Americans we will serve right here in Newcastle. When
Chickasaw Nation Rendering The Chickasaw Nation is building a 16-acre Newcastle Medical Center.
Chickasaws first arrived in this territory, they built schools, churches and hospitals so the generations coming after them would persevere and have even more,” Anoatubby said. “Today, we do the same. We build for families and communities today and for a
bright future for the generations that will follow.” The groundbreaking signified the beginning of the first phase of construction, consisting of about 700,000 sq. ft., including 50 inpatient beds, an emergency department,
surgical suites, labor and delivery, family medicine, pediatrics, specialty clinics, behavioral health, dental clinics, a full pharmacy and the beginnings of a research program. A contractor wasn’t named. Upon completion, the facility will grow to include a nearly 2.5 million-sq.-ft. medical campus with 140 inpatient beds and will employ more than 5,500. It is expected to serve more than 100,000 First Americans in the region. “This campus will do things most hospitals cannot,” Anoatubby said. “We are building medical residencies, training the next generation of doctors right here in Oklahoma, and in Newcastle. We are building a First American research center owned and operated by a tribal nation — the first of its kind anywhere in the country.” This project is a collaboration between the Chickasaw Nation and the Indian Health Service (IHS) Joint Venture Program. Through the program, the Chickasaw Nation finances the design and construction of the facility, and IHS commits to fund a portion of staffing and operational costs.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 13
Arizona Bejac Corporation www.bejac.com
Texas Nueces Power Equipment www.nuecespower.com
GLENDALE 1 (800) 772-3522
CORPUS CHRISTI (361) 687-2284
California Bejac Corporation www.bejac.com
VICTORIA (361) 433-0672
PLACENTIA (714) 528-6224
LAREDO (956) 267-1495
SACRAMENTO 1 (800) 772-3522
SAN BENITO (956) 361-0066
ANDERSON 1 (800) 772-3522
VINTON (915) 201-4115
VISALIA 1 (800) 772-3522
CONVERSE (210) 807-8216
OAKLAND (510) 746-7693
HUMBLE (713) 247-0066
Idaho Central Equipment Co. www.centralequipment.us
Engineered to do more www.liebherr.com
Earthmoving and material handling technology
Bane Machinery www.banemachinery.com DALLAS (214) 352-2468
JEROME (208) 324-8515
FORT WORTH (817) 847-5894
POCATELLO (208) 233-2850
TYLER Montana (903) 597-6641 Interstate Power Systems, Inc. www.istate.com Utah Bejac Corporation BILLINGS www.bejac.com (406) 252-4191 Nevada Bejac Corporation www.bejac.com
SALT LAKE CITY 1 (800) 772-3522
LAS VEGAS 1 (800) 772-3522
Washington Bejac Corporation www.bejac.com
RENO 1 (800) 772-3522
CHEHALIS (360) 922-3257
Oklahoma Central Power Systems & Services www.cpower.com OKLAHOMA CITY (405) 324-2330 TULSA (918) 984-6565
Nationwide distribution network --Liebherr USA, Co. offers an extensive line of earthmoving and material handling equipment and technology in the USA. Main components are developed and manufactured in-house by Liebherr or in close collaboration with our partners to ensure the highest possible quality standards. These components include the entire drive and control technology, diesel engines, and a variety of components for hydraulics, gearboxes and electronic systems. Reach out to your local Liebherr distribution partner for more information.
Page 14 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
ROMCO Celebrates Grand Opening of Amarillo Branch
ROMCO Equipment Co. leadership, employees and industry partners gather outside the company’s new Amarillo branch during the grand opening celebration.
An aerial view of ROMCO Equipment Co.’s new Amarillo branch that spans approximately 5 acres and includes three service bays, a wash bay and a dedicated demonstration area.
ROMCO Equipment Co. celebrated the grand opening of its new Amarillo branch with a ribbon-cutting ceremony on July 28, 2026, marking the company’s 17th location and continued expansion across Texas. Located at 15101 I-27 in Amarillo, Texas, the new facility strengthens ROMCO’s ability to provide equipment sales, rentals, parts and service solutions to construction, aggregate, paving, municipal˙ and agricultural customers throughout the region. The Amarillo branch represents a significant milestone in ROMCO’s continued growth strategy and investment in Texas. Leadership identified Amarillo as a critical market that would allow ROMCO to better serve customers across the Panhandle. “Amarillo was on our map from the very beginning
because it’s such an exciting market,” ROMCO President Steve Passmore said. The new location helps address one of the region’s greatest challenges: distance. Before the branch opened, many customers had to travel significant distances for equipment and service. The Amarillo facility provides a closer, more convenient resource while allowing ROMCO technicians and service personnel to respond more quickly to customer needs. “One of the biggest advantages of this facility is reducing travel time for our customers,” said Josh Adams, ROMCO’s West Texas regional manager. “Having local parts, service personnel and technicians in Amarillo means we can respond faster and help customers get back to work sooner. It’s a win for both our customers and our team.”
The ROMCO sign stands above several Volvo compact wheel loaders.
A Volvo EC60E excavator on the ROMCO lot
Opening the new branch required months of planning, coordination, hiring, facility development, inventory management and operational preparation. Teams from across ROMCO, along with support from parent company SMT, worked together to bring the vision to life. “Adding a new location is never easy, and it takes a lot of people pulling together to make it happen,” Passmore said. “Employees from across the company contributed to this effort, and it wouldn’t have been possible without the support of SMT and the many people who invested their time and energy into making this branch a reality. We’re incredibly grateful to everyone involved.” “It’s a beautiful facility, but a building is only part of what makes a branch successful,” Passmore added. “It’s the people inside who make the difference. We want to become part of this community, build relationships with our customers and local organizations, and create value beyond simply providing equipment and service.” The Amarillo branch creates new opportunities for professionals to build meaningful careers, while contributing to the long-term success of the communities they serve. (All photos courtesy of ROMCO.)
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 15
Page 16 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
I Dig Texas Offers Landlord Brush Cutter
The Landlord Brush Cutter offered by I Dig Texas is a high-flow brush cutter built for contractors and landowners handling heavy clearing work. According to I Dig Texas, the Landlord Brush Cutter is designed for commercial-duty applications involving thick brush, overgrown property maintenance, fence line maintenance and clearing trees up to 10 to 12 in. in diameter. The attachment features a four-blade cutting system with reversible 5/8-in. AR400 blades designed for durability in demanding cutting conditions. I Dig Texas said the cutter also incorporates 20 carbide mulching teeth intended to process material more efficiently during operation. According to the company, the Landlord uses a dual flywheel system weighing approximately 885 lbs., along with a direct-drive piston motor designed for high-flow skid steer applications operating between 30 and 44 gpm. I Dig Texas noted that the cutter includes a sealed bearing housing with a 3.9-in. drive shaft designed to reduce maintenance requirements. The
I Dig Texas photo
The Landlord brush cutter
company said the attachment features an onboard toolbox intended to store chains, grease guns and other jobsite tools. According to I Dig Texas, which is based in Marble Falls, Texas, the
Landlord Brush Cutter is manufactured using American-made components and steel. The company stated that major components are produced in-house. For more information, visit idigtexas. com.
OTA Board Awards $133M in New Construction Contracts
The Oklahoma Turnpike Authority Board awarded more than $133 million in construction contracts on Aug. 4, 2026, for the Interstate 44/Turner Turnpike interchange reconstruction at Chandler on the I-44/ Turner Turnpike, a new interchange on the Interstate 344/John Kilpatrick Turnpike near Oklahoma City and an I-44/Will Rogers Turnpike widening near Catoosa.
Chandler Interchange Rebuild The board awarded a $29.9 million contract to Sherwood Construction to rebuild the interchange connecting the I-44/ Turner Turnpike and State Highway 18 near Chandler in Lincoln County. The project widens the SH 18 bridge over the turnpike, adds new exit and entrance ramps with tolling equipment, and removes the current interchange infrastructure. The bridge coming down has the lowest posted vertical clearance on the turnpike network and has been struck repeatedly by over-height vehicles, said Brad Manhalter of OTA’s engineering division. Executive Director Joe Echelle said the legal load height is 14 ft., and the bridge currently clears about 14.5 ft., leaving little
margin. Raising bridges above 18 ft. vertical clearance keeps oversized loads on divided highways rather than rural two-lane roads,
$55.5M Interchange Contract C3 Construction won a $55.5 million contract for a new interchange at the I-344/John Kilpatrick Turnpike and North County Line Road, spanning Canadian and Oklahoma counties. The work includes seven bridge widenings, retaining walls, frontage and local road construction, and mainline widening between Northwest 122nd Street and North MacArthur Boulevard. Manhalter said the interchange should relieve congestion along Rockwell Avenue, Council Road and Memorial Road, while adding access north toward Piedmont and the Deer Creek Public School District. Work is expected to begin in late fall 2026.
Will Rogers Turnpike Widening Manhattan Road & Bridge won a $47.9 million contract to widen nearly 2 mi. of the Will Rogers Turnpike to three lanes in each direction near Catoosa and Verdigris in Rogers County.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 17
TWO WAYS TO TAKE ON THE WORKDAY CLASSIC
PRO
Find the loader that fits your work style Explore Bobcat Classic and Pro loaders and get the machine that’s right for your crew. Bobcat Company is a member of the Doosan Group. Doosan is a global leader in construction, grounds maintenance and material handling equipment, power and water solutions, and engineering that has proudly served customers and communities for more than a century. Bobcat ®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. ©2026 Bobcat Company. All rights reserved. | 26819
Page 18 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Route 66 Spans More Than 2,000K Miles From Chicago to L.A.
A stretch of Route 66 in Oatman, Ariz. ROUTE from page 1
following the road from west to east, from Los Angeles to Chicago, celebrating 100 years since the road was established as part of the nation’s new numbered highway system. The caravan’s route is in the opposite direction from the one laid out in the 1940s song that helped cement the road’s role in American popular culture: Well, it winds from Chicago to L.A. More than 2,000 miles all the way Get your kicks on Route 66 — “Route 66,” by Bobby Troup Starting in California had its advantages, said Martin, whose Route 66 bona fides include serving as president of the Oklahoma Route 66 Association, chair of the State Route 66 Association Working Group for the Route 66 Road Ahead Partnership, member of the Oklahoma Route 66 Centennial Commission
Jim Ross photo
and the Tulsa Route 66 Commission, and an advisor to the nonprofit Route 66 Alliance. “The advantage of driving west to east is that California gets more of a fair shake when it comes to exploration. Many travelers cross the border from Arizona and try to get to the Pacific Ocean as fast as possible. By going the opposite direction, it encourages folks to linger a bit longer and see all of the great attractions and hear more of the stories in California before continuing east.” How did they build this highway a hundred years ago? First of all, Martin and other Route 66 enthusiasts will tell you, the road wasn’t built as much as it was assembled — from pieces of Native American trails and pioneer routes westward, and from rough county and state roads to railroad lines. “One of the first myths I have to dispel with people is they think Route 66 was built,” said Seth Chalmers, chair of the American
The 1923 Rainbow Bridge in Kansas remains open to traffic.
Society of Civil Engineers’ Arizona Section History and Heritage Committee. “It was a designation of a highway system that was already existing. It granted some realignments and improvements were made, but the road itself was pretty much there. So, it was really designated and improved rather than built. “And as those improvements were made, then, of course, you had more people driving and could afford vehicles and it became more of an engine of commerce and tourism than it was when it first started,” Chalmers said. In contrast to the interstates that replaced the U.S. numbered highways beginning in the 1950s, Route 66’s heyday was brief — a scant 30 years. But America’s first motorists loved it. It offered adventure, wonder, even danger — from washouts, potholes and failed pavement. The eight states it crossed — Illinois, Missouri, Kansas, Texas, Oklahoma, New Mexico, Arizona and California — hyped
Jim Grey photo
Route 66 to bring in tourists and generate tax revenue. It became “Mother Road,” thanks to John Steinbeck and “Grapes of Wrath,” in which the highway conveyed the impoverished Joad family from Oklahoma to California. Its diagonal configuration encouraged the growing trucking industry. An expansive and exuberant popular culture gave it icon status. For the road-building industry, it was a challenge to develop better kinds of pavements and roads. “We had smart engineers,” said Mike O’Leary, who has worked in the asphalt industry since the 1980s. “They had to figure out how to build a road in the desert and how to build a road in the mountains.” Route 66 and its siblings were where engineers and builders learned how to keep those jittery early cars on the road and in one piece. see ROUTE page 24
Jim Grey photo
A once-familiar sign
Jim Grey photo
Pavement is deteriorating along many segments of the original road.
A roadside reminder of Route 66’s glory days.
Jim Grey photo
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 19
Page 20 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
www.trophytractor.com Agricultural Tractors
2023 JOHN DEERE 6R165..................................... $242,000 2022 JOHN DEERE 6R 155..................................... $189,500 2015 JOHN DEERE 6215R..................................... $120,000 (3) 2020-2023 JOHN DEERE 6130M................... From $115,000 (4) 2018-2024 JOHN DEERE 6120M.................... From $74,500 2022 JOHN DEERE 5125M .................................... $125,000 2023 JOHN DEERE 5115M...................................... $98,500 (3) 2021-2023 JOHN DEERE 5100M.................... From $81,000
Artic Trucks
(4) 2023-2025 CATERPILLAR 745..................... From $589,500 (4) 2022-2025 CATERPILLAR 725..................... From $319,500 (9) 2023-2024 ROKBAK RA30.....................................$CALL (5) 2023 ROKBAK RA40............................................$CALL (16) 2023-2024 VOLVO A45G.....................................$CALL (2) 2025 VOLVO A45J..............................................$CALL (6) 2023-2024 VOLVO A40G.......................................$CALL
Attachments
(3) CATERPILLAR 293-5556 LIFTS......................... $2,000 Ea. CATERPILLAR D6 ANGLE BLADE................................ $5,000 CATERPILLAR D8T ANGLE BLADE............................... $7,500 CATERPILLAR D10T SS RIPPER..................................$CALL CATERPILLAR ANGLE BLADE.................................... $7,500 CATERPILLAR WINCH..............................................$CALL 2022 NPK GH18 HAMMER.........................................$CALL PACCAR PA140-316V WINCH .....................................$CALL PACCAR PA110VS245 WINCH.................................... $5,000
Compactors - Padfoot/Smooth Drum
(9) 2022-2026 CATERPILLAR 815..................... From $545,000 (3) 2018-2022 CATERPILLAR CP56B................... From $82,500 (6) 2017-2022 CATERPILLAR CS56B................... From $79,500 (2) 2026 CATERPILLAR CP12.....................................$CALL 2026 CATERPILLAR CS12..........................................$CALL 2024 CATERPILLAR CS11 GC.....................................$CALL
Dozers - Wheel
2015 CATERPILLAR 834K...................................... $285,000
Telescopic Forklifts
(5) 2025 JLG AG925....................................... $169,500 Ea.
Crawler Loaders
(3) 2021-2022 CATERPILLAR 963..................... From $239,500 (2) 2024 CAT 953 LGP..............................................$CALL
Crawler Carriers
(2) 2019-2020 MOROOKA MST4000VD............... From $219,500 2018 MOROOKA MST3000VD................................. $159,500 (2) 2018-2019 MOROOKA MST2200.................. From $119,500
Dozers - Crawler
(2) 2023-2024 CATERPILLAR D10.................. From $1,650,000 (2) 2023 CATERPILLAR D9.......................... From $1,235,000 (6) 2019-2026 CATERPILLAR D8...................... From $510,000 (2) 2023-2026 2023 CATERPILLAR D7...........................$CALL (3) 2020-2025 CATERPILLAR D6...................... From $239,500 (12) 2020-2026 CATERPILLAR D6 LGP............... From $359,500 2020 CATERPILLAR D6 XL..................................... $255,000 (3) 2023-2025 CATERPILLAR D5...................... From $399,500 2023 CATERPILLAR D4......................................... $197,500 (2) 2022-2023 CATERPILLAR D3...................... From $149,500 2022 CATERPILLAR D2......................................... $157,500 2017 KOMATSU D61EXi-24.................................... $139,500 (4) 2023 KOMATSU D71PXi-24........................ From $275,000
Motor Graders
(2) 2022 CATERPILLAR 16.............................. From $825,000 2019 CATERPILLAR 14M3..................................... $295,000 (2) 2024 CATERPILLAR 14.............................. From $765,000 (5) 2022-2025 CATERPILLAR 150..................... From $409,500
Excavators - Crawlers
(2) 2022 CATERPILLAR 395-07........................ From $875,000 (3) 2020-2026 CATERPILLAR 374..................... From $469,500 (11) 2021-2026 CATERPILLAR 352.................... From $309,500 (2) 2026 CATERPILLAR 350.......................................$CALL 2019 CATERPILLAR 349FL.................................... $339,500 2022 CATERPILLAR 349....................................... $409,500 2022 CATERPILLAR 340....................................... $309,500 (4) 2025-2026 CATERPILLAR 336..................... From $425,000 2026 CATERPILLAR 335...........................................$CALL (2) 2023 CATERPILLAR 330-07........................ From $279,500 2020 CATERPILLAR 326-07................................... $239,500 2020 CATERPILLAR 320....................................... $169,500 2017 CATERPILLAR 316FL.................................... $129,500 (2) 2023 CATERPILLAR 306CR.......................... From $75,000 2021 CATERPILAR 305E2....................................... $62,500 2023 HITACHI ZX690LC-7...................................... $659,500
Rigid Frame Trucks
(2) 2017 CATERPILLAR 772G............................ $295,500 Ea.
Skid Steers - Track
(2) 2021-2024 CATERPILLAR 299D3 XE............... From $62,500 2022 CATERPILLAR 299D3 XPS............................... $72,500 2022 CATERPILLAR 299D3..................................... $67,500 2025 CATERPILLAR 285...........................................$CALL (4) 2025 CATERPILLAR 275XPS..................................$CALL (2) 2025 CATERPILLAR 275XE.............................$92,500 Ea. (6) 2026 CAT 275 SKID STEER....................................$CALL
Water Equipment - Tower/Tanks
(4) 2024-2026 KLEIN KPT-120 WATER TOWERS..... From $75,000
Authorized dealer for
Water Equipment - Trucks
(5) 2022-2026 CATERPILLAR 740GC.................. From $535,000 2026 CATERPILLAR 740...........................................$CALL (3) 2022-2026 CATERPILLAR 730-04................. From $375,000 2026 CATERPILLAR 730...........................................$CALL (2) 2026 CATERPILLAR 725-05...................................$CALL (6) 2021-2024 CATERPILLAR 725-04................. From $299,500 2024 Kenworth T480 ...............................................$CALL (10) 2018-2022 KENWORTH T370...................... From $89,500 (3) 2023-2026 INTERNATIONAL HV507............... From $169,500 (16) 2022-2025 INTERNATIONAL HV607............. From $159,500 (7) 2022-2024 INTERNATIONAL MV607............... From $99,500 (29) 2024-2027 PETERBILT 548....................... From $395,000 (8) 2020-2022 PETERBILT 348......................... From $142,500
Wheel Loaders
2023 CATERPILLAR 980....................................... $565,000 (5) 2023-2026 CATERPILLAR 966..................... From $389,500 2023 CATERPILLAR 962M..................................... $305,000 (2) CAT 950M............................................. From $259,500 2015 CATERPILLAR 938K....................................... $95,000 2025 CATERPILLAR 938...........................................$CALL 2019 CATERPILLAR 930M..................................... $149,500
Miscelleneous Equipment
2022 ROME AG-12............................................... $10,500 2023 ROME TACW-20-AG-TILLAGE TOOLS.................. $57,500 2024 ROME TACW-16........................................... $49,500 2023 ROME TAW-20S........................................... $42,500 2018 ROME TCW28.............................................. $19,750 2022 ROME TRCW-12........................................... $57,500 2022 ROME TRCW-16........................................... $74,000 (2) 2022-2023 GREAT PLAINS 1006 NT..........................$CALL
Hapco Breaks Ground On OKC Manufacturing Facility Hapco broke ground on Aug. 4, 2026, on a new 270,000-sq.-ft. manufacturing facility in Oklahoma City, Okla., marking a significant expansion of the company’s United States manufacturing footprint and reinforcing its long-term commitment to American manufacturing. Van Hoose Construction is the project’s general contractor. Completion is expected in late 2027. The new facility will expand production
capacity for aluminum lighting poles serving commercial, industrial, transportation, municipal, utility and OEM markets throughout North America. The project is expected to create more than 80 new jobs and strengthen Hapco’s ability to support growing customer demand across the Central and Western United States. “As we celebrate 75 years of American manufacturing excellence, this investment marks an important milestone in Hapco’s
continued growth,” said Tom Hardy, president and CEO. “Oklahoma City’s skilled workforce, strategic location, and business-friendly environment make it an ideal place to expand our manufacturing capabilities and better serve customers across North America.” The Oklahoma City facility will complement Hapco’s headquarters and flagship manufacturing operations in Abingdon, Va., increasing domestic
Hapco photo Hapco leaders, Oklahoma officials and project partners participate in the groundbreaking for Hapco’s new 270,000-sq.-ft. manufacturing facility in Oklahoma City.
production capacity while enhancing logistics efficiency, operational flexibility and customer service. “This investment reflects our confidence in American manufacturing and the infrastructure markets we serve,” said Chris Dyson, chairman and CEO of Dyson-KissnerMoran Corp., Hapco’s parent company. “Expanding Hapco’s manufacturing network positions the company for continued success while strengthening our ability to support customers nationwide.” The new facility is being developed at OKC 577 Commerce Park in Oklahoma City. The location provides Hapco with strategic access to major transportation networks and customer markets across the Central and Western United States. Representatives from the Oklahoma Department of Commerce, Greater Oklahoma City Chamber, The Alliance for Economic Development of Oklahoma City, Oklahoma Manufacturing Alliance, OKC 577 Commerce Park, Pascal Aughtry & Associates, Van Hoose Construction, Cooper Project Advisors and SESCO Lighting joined Hapco leadership for the ceremony.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 21
WE HAVE YOUR NEXT OFF ROAD TRUCK Niece 8,000 gallon water tanks
installed on 40 ton Articulated Off Highway chassis. This combination is the workhorse of the dust control and water needs for quarries and large construction sites
WATER. FUEL. FUEL AND LUBE. • RIGID OR ARTICULATED. CAT - KOMATSU - DEERE - VOLVO - BELL - ROKBAK NWT9500
The NWT9500 9500 Gallon water tank mounted on articulated truck. Pictured: Deere 460E with 9,500 gallon tank. Tanks come with 6X5 pumps.
NFL3000
NFL10000
The NFL3000 Off Road, Fuel and Lube Bed offers 3,000 gallons of diesel fuel.
The NFL10000 Fuel & Lube Can be mounted on any 100,000 lb rigid frame truck. Holds 10,000 gallons of diesel. 5 additional fluid tanks. Holds up to 3,000 gallons of oil.
Page 22 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Scale Models for Sale
Realistic Scale Models of Construction Equipment, ideal gifts for the Holidays, Birthdays, Graduation, etc.
Bucyrus Erie 22-B Dragline, 1:50 scale - $295
Vintage Caterpillar 977 Traxcavator, 1:50 scale - $135
Bucyrus Erie 22-B Cable Shovel, 1:50 scale - $215
Vintage Caterpillar No.12 Motor Grader, 1:50 scale - $135
Bucyrus Erie 22-B Cable Backhoe, 1:50 scale - $215
Caterpillar 374 Excavator, 1:50 scale - $200
John Deere 550G Dozer, 1:32 scale - $90
Bantam Lattice Crane on White WC22 Carrier, 1:50 scale - $160
Caterpillar 24 Motor Grader, 1:50 scale - $190
John Deere MC Crawler Dozer, 1:16 scale - $115
Caterpillar D11 Fusion Track-Type Tractor, 1:50 scale - $200
Caterpillar D7E Track-Type Tractor, 1:50 scale - $115
John Deere 200LC Excavator, 1:50 scale - $75
Case 580SR Backhoe/Loader, 1:50 scale - $160
Link Belt 210 LX Excavator, 1:50 scale - $115
Caterpillar D9T Track-Type Tractor, 1:50 scale - $165
Shipping and Handling Included
Bmckeon Collectibles 470 Maryland Drive Fort Washington, PA 19034
WE PURCHASE COLLECTIONS!!!
Contact – Barry McKeon
610-506-5961
Email – bmckeon9@gmail.com
Visit our Ebay Store – bmckeon collectibles – for a complete list with pictures.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 23
www.cpower.com 9200 Liberty Drive Liberty, MO 64068 816-781-8070 Wichita, KS 316-943-1231 Great Bend, KS 620-792-1361 Liberal, KS 620-624-7274 Salina, KS 785-825-8291 Colby, KS 785-462-8211 Springfield, MO 417-865-0505 Joplin, MO 417-726-5373 Riverside, MO 816-415-6787 Wichita, KS 316-789-7370 Yukon, OK 405-324-2330 Maryland Heights, MO 314-427-4911 Liberty, MO 806-415-6700 Tulsa, OK 918-984-6565
ALL YOU NEED. More than you expect. No two job sites are exactly alike. But no matter what your challenge, from compaction, concrete and utility to material handling and excavating, the Wacker Neuson product portfolio delivers unmatched diversity. What’s more, our quality and reliability ensure a lower total cost of ownership and higher return on investment. For more information, visit us online or contact your local Wacker Neuson dealer today.
wackerneuson.com
Page 24 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Route 66: What Began as Dirt Roads Took Decade to Pave ROUTE from page 18
History From the front window of his house, Jim Ross has a clear view of Route 66. Ross, a writer, photographer and Route 66 preservationist, modeled his red-brick house in Arcadia, Okla., after a 1930 Phillips 66 service station that still stands in nearby Chandler, Okla. Chandler was one of hundreds of small towns that Route 66 was created to connect. In 1952, he said, the original Route 66 alignment was bypassed “in favor of an improved alignment around the other side of the hill.” After nearly 100 years, the road in front of Ross’ house is in enviable shape. “Its’ survivability is a combination of the concrete base beneath the asphalt and the light traffic it has seen since its bypass in 1952,” he said. When America launched the highwaybuilding boom that created Route 66, there were about 2.5 million mi. of road. Only 1.29 percent were paved. Establishing a national network of roads was seen as a way to move military hardware and the mail around the country. The latter was a goal of the groundbreaking 1916 Federal Aid Road Act. It authorized matching federal funds for improving rural roads over five years. “The problem with the 1916 bill is that it didn’t require the highways to be connected,” Chalmers said. That was rectified in legislation which passed
in 1921. It also increased federal support for highways, including funds for improvements. “That was the first five-year federal program to give the states a certain amount of money to do road projects,” Chalmers said. “It gave the money to the states and the territories to say, ‘you can count on this money so you can plan these highways.’” The numbering system was introduced in 1926. North-south routes ended in “1,’ with east-west routes in “0.” The route that became Route 66 followed a largely diagonal course. Its fate was decided when backers prevailed in their choice of the snappy Route 66 over the bland Route 62.
Surfaces “Route 66 was mud to begin with,” said Mike O’Leary, based in New Mexico. “People got out there on the road and got stuck.” “When the Department of Highways was established, roads could not be taken for granted, especially in rainy seasons, and the speed limit often was dictated by a horse’s gallop,” Oklahoma’s Department of Transportation wrote during the department’s centenary in 2011. But improvements were already under way. “The roads Missourians drove over were mostly dirt — or mud or dust, depending on the season,” according to “Roads and their Builders,” published by the Missouri State Highway Commission in 1971. “They were mostly bad, too — until the arrival on the scene
of D. Ward King and his split log drag. And if they didn’t lift Missourians out of the mud, they at least smoothed it over.” Patented in 1908, the simple split log drag machine removed clods from the road with its first log and smoothed the road with the second log. It was a slow-motion era, Chalmers said. “Everybody was going about 15 miles per hour,” he said. “So, you didn’t have to worry about it when cars ran into each other on the road.” “Prior to paving, most were dirt roads improved with drainage. Those were followed by gravel and drain,” Ross said, adding that, early on, if a road was paved, it was likely in an urban area — “mostly in brick.” Although Route 66 was a priority, paving it still took 10 years to complete. “There was no model for these roads or pavements,” Ross says. The job went to Portland concrete, which was used largely in the east; and asphalt was favored in the west. In Arcadia, Okla., a stretch of concrete road gave way to asphalt with concrete edges — or vice versa. They were laid within a year of each other in the late 1920s. The meeting point is about one-half mile from Ross’ house. “These were two separate road projects,” he says, one concrete, one asphalt. The stretch of road carries a marker erected by the National Register of Historic Places. It notes the “unique stretch of road” beneath the
wheels of passersby. Regulations in Oklahoma called for a “uniform standard” of pavement. According to the Oklahoma State Historic Preservation Office, “The paving standard of 18 feet in 1925 was not increased to 20 feet until 1930, therefore some 18-foot-wide roadways were built, though the majority of paving projects occurred after 1930 … . Route 66 was paved piecemeal as matching federal funds became available.” “A less popular choice was a design consisting of a 2-inch asphalt driving surface over a 5-inch concrete base. The design was built in both 18- and 20-foot widths, and in most cases included 9-inch concrete edges,” according to the Oklahoma Route 66 Roadbed Documentation Project, conducted by the Oklahoma Route 66 Association in 20012002. Ross was a member consultant on the project. “Generally, selection of materials depended on sub-grade factors, availability and funding,” it added. Part of New Deal Much of the period during which Route 66 was paved coincided with the Great Depression of the 1930s. “Teams of mules and many men struggled with heavy equipment to accomplish the feat,” recalled “Route 66 in Oklahoma: An Historic Preservation Survey.” see ROUTE page 62
Jim Grey photo
Much of Route 66 was four-laned in Illinois. After the road was decommissioned, Illinois closed one set of lanes in most places, tearing out some pavement to make it difficult to use.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 25
THE NEW GENERATION EXCAVATOR
0
The all-around advanced new John Deere P-Tier mid-size excavators work harder and smarter for you. With a redesigned cab to maximize operator C O M P L bundle, I M E N Tthey’re A R Y a dream to own and operate. Get in the cab today. comfort, our 0% financing, and our warranty & maintenance
FOR 48 MONTHS
3 000 3-YEAR/HOUR ,
*Offer valid on qualifying purchases made 01 July 2026 through 30 October 2026. Subject to approved installment credit with John Deere Financial, for commercial use only. Down payment may be required. Average down payment is 10%. 0% Annual Percentage Rate for 48 months only. Taxes, freight, setup, insurance, WARRANTY PACKAGE fees, and delivery charges could increase monthly payment. Available at participating U.S. dealers. Prices and models may vary by dealer. Offer not available to customers receiving Strategic Account discounts. *Standard eligibility, participating models, regional availability, hours/months alignment, and plan-stacking rules apply. Offer is restricted to eligible machines, including new John Deere 210 P-Tier, 230 P-Tier, and 260 P-Tier Excavators. Offer valid for U.S.and Canada through Oct. 30, 2026. See your local John Deere dealer for details.
DOGGETT HEAVY MACHINERY SERVICES www.doggettequipment.com 9111 North Freeway Houston, TX 77037 713-679-6700 Beaumont, TX 409-842-1754
Bryan, TX 979-823-1905
San Juan, TX 956-787-0001
Alexandria, LA 318-442-0455
Broussard, LA 337-837-9481
Longview, TX 903-758-3326
Monroe, LA 318-343-8787
St. Rose, LA 504-466-5577
Corpus Christi, TX 361-289-0727
Victoria, TX 361-570-6666
Baton Rouge, LA 225-291-3750
Covington, LA 985-893-3005
Lufkin, TX 936-634-8801
Shreveport, LA 318-631-3090
Tyler, TX 903-592-8900
Page 26 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
apcoequipment.com
scottequip.com
ttjequipment.com
cpower.com
North Las Vegas, NV 702-871-7474
Fontana, CA 800-316-0327
Jasper, TX 409-384-4611
Midland, TX 432-248-8344
Santa Fe Springs, CA 562-777-0775
Longview, TX 903-803-3365
San Antonio, TX 210-591-6807
Temecula CA 951-355-3085
Lufkin, TX 936-634-3365
Corpus Christi, TX 361-737-0049 Oklahoma City, OK 405-324-2330 Tulsa, OK 918-984-6565
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 27
www.swjcb.com 2935 Lincoln Road Las Vegas, NV 89115 702-432-2200 461 Pioneer Place Las Cruces, NM 88005 575-524-1671 5050 East 58th Avenue Commerce City, CO 80022 720-386-6040 2950 W. Durango Street Phoenix, AZ 85009 602-454-9808
Most TRUSTED in the world doesn’t happen by accident. Not only is JCB the world’s biggest backhoe manufacturer, but we also sell as many backhoes around the globe as all other manufacturers combined. It’s not that big makes us better. Rather, we’re big because we’re better. Buy better at JCB.com.
800-899-3580 sales@berlon.com
331 Riverview Drive • Hustisford, WI 53034 18903 High Point Rd • Viola, WI 54664
LOWE® Trenchers
Skid Steer Grapples Berlon’s Skeleton Rock Grapple has dual inde-
pendent claws for complete clamping down on awkward loads. This bucket is ideal for rock picking, clearing fence lines, construction, scrap metal and other clean-up applications.
The LOWE® trenching attachments have proven to be one of the most useful tools in the attachment market. Primarily used on skid steer loaders, trenching attachments also excel on compact track loaders and a wide range of mini-loaders. With a large selection of boom lengths and digging chains available, the LOWE® trenching attachment can make your machinery investment more useful. LOWE® Augers The BP-Series planetary reduction auger drives
bring elements of performance and dependability to the attachment marketplace. -Features include: increased gear strength, stronger shaft support and through hardened alloy drive shaft.
www.berlon.com
POWER MORE. SAVE MORE. Lock in low-rate financing, big savings & premium coverage. All built to keep you working this season.
Skid Steer Buckets Berlon’s Heavy Duty Extended Lip bucket
LIMITED-TIME OFFERS
Excavators & Backhoes 0% interest up to 60 months OR 0.99% up to 72 months OR 1.99% up to 84 months
provides greater cutting edge visibility while standard heavy duty package makes it ideal for machines 75HP and greater. Features include: ¼” body, Reinforcement tube across back of bucket for added strength, Bucket bottom includes a heavyduty dimple plate *A Berlon Exclusive*, 3/4”x6” weld-on cutting edge w/holes.
Loaders 0% interest up to 48 months OR 0.99% up to 60 months OR 1.99% up to 72 months
Berlon’s Compact Articulating Loader bucket
is ideal for loading feed mixers and other heavy duty material handling equipment. Features include: ¼” body, Reinforcement tube across back of bucket for added strength, Bucket bottom includes 5 wear bars for durability, 3/4”x6” weld-on cutting edge with holes.
www.loweman.com
GET MORE WORK DONE WITH SANY. Contact us to find the right machine for your next project. Offers end 9/31/2026.
WEB L AND MARKEQ.COM
TEL (972) 975- 5905
*Some restrictions apply. All offers subject to credit approval.
Page 28 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Skanska JV Wins $2.43B Contract for Calif. Light Rail Transit Project
MECOM EQUIPMENT
www.mecomequipment.com 4546 N Wilson Way, Stockton, CA 95205 209-466-5135
JET CITY EQUIPMENT
Rendering of a new East San Fernando Valley Light Rail station
Global construction and development firm Skanska, in a joint venture with Stacy Witbeck, announced on Aug. 14, 2026, that it was awarded an additional contract by the Los Angeles County Metropolitan Transportation Authority (Metro) for the East San Fernando Valley Light Rail Transit Project in Van Nuys. Along with preconstruction and early works, the contract’s total value for the project is $2.43 billion. The East San Fernando Valley Light Rail Transit Project is designed to expand transit access and strengthen connections along the Van Nuys Boulevard corridor. The addition of new stations and connections to existing services will provide a more reliable way for people to get to work, school and other regional destinations. This added continuity to the broader Los Angeles County rail system serves the communities of Panorama City, Arleta and Pacoima while supporting long-term mobility efforts. This project is a progressive design-build, which integrated construction and design teams early in the development process. This allowed for early engagement with Metro and stakeholders to validate designs, address third-party constraints and refine construction approaches before full build-out, which will help manage risk, cost and schedule during upcoming construction.
“The East San Fernando Valley Light Rail project is an investment in mobility for the region,” said James Bailey, executive vice president of Skanska USA Civil’s West Coast operations. “The progressive design-build delivery method enabled us to collaborate closely with LA Metro from day one, bringing designers, builders, stakeholders and community members together to make informed decisions and help shape a light-rail system that will serve the East San Fernando Valley for generations to come.” “Delivering the East San Fernando Valley Light Rail requires getting every detail right, from utility coordination through revenue service, across some of the most active urban corridors in Los Angeles,” said Eric Meisgeir, project manager for Stacy Witbeck. “We will construct this project with the same focus on the work and respect for the community to deliver a project the San Fernando Valley can be proud of.” The project scope includes the construction of a 6.7-mi., at-grade light rail along Van Nuys Boulevard, a 26-acre rail and maintenance facility, 11 new stations including shade structures and utility relocations and improvements. The project began construction in July 2026 with expected completion in December 2031. (All renderings courtesy of Marino.)
The East San Fernando Valley Light Rail Transit Project is designed to expand transit access and strengthen connections along the Van Nuys Boulevard corridor.
www.jetcityequipment.com 33345 SR 20, Oak Harbor, WA • 360-675-4441 Marysville, WA • 360-651-9079
NED - TEXAS (Formerly Four Seasons Equipment) www.NEDealers.com Houston, TX • 800-234-5007 Dallas TX • 866-270-1700
NUECES POWER EQUIPMENT
www.nuecespower.com 7510 IH-37 Access Rd., Corpus Christi, TX 78409 361-289-0066 Laredo, TX • 956-725-0066 San Antonio, TX • 210-310-0066 San Benito, TX • 956-361-0066 Victoria, TX • 361-576-0066 El Paso, TX • 915-541-0066
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 29
Loved for the features. Trusted for the performance. Hyundai wheel loaders have the power and performance, not to mention top-notch interiors, accurate onboard weighing system, industry proven drivetrain durability, clear sightlines, and handy tech—that make life on the jobsite easier. So you can do more without feeling it. No wonder so many first-time Hyundai users become longtime fans. See the Hyundai difference yourself at your local dealer or na.hd-hyundaice.com.
HL985A Two-pass wheel loader
Learn more
Page 30 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
MORE POWER TO YOU
Maximized torque means greater opportunity. The diesel-powered Toro® Dingo® TX 1000 TURBO delivers the power to move heavy loads and the versatility to handle any task.
TORO.COM/DEALER
©2026 The Toro Company. All Rights Reserved.
www.turfstar.com stock.turfstar.com 800-585-8001 www.superior.com
Visit ReadyDig.com 213231 I-76 Frontage Road Hudson, CO 80642 720-679-1291
38459 County Road D Yuma, CO 90759 970-630-6116
2582 O Street Greeley, CO 80631 970-466-0995
2221 South 3270 West West Valley City, UT 84119 801-618-8551
11373 Sunrise Gold Circle Rancho Cordova, CA 95742
79-893 Country Club Drive Bermuda Dunes, CA 92203
5869 South 194th Street Kent, WA 98032
955 Beacon Street Brea, CA 92821
1750 Salem Industrial Drive NE Salem, OR 97301
2824 East Garland Spokane, WA 99207
3928 N Blattella Lane Fresno, CA 93727
Recognizing Future Workforce...
AED Foundation Celebrates 150th High School Milestone As the equipment industry continues to face a shortage of an estimated 10,000 technicians each year, the AED Foundation (AEDF) is expanding its efforts to build the future workforce by reaching a major milestone: Waukegan High School became the foundation’s 150th AEDF recognized high School. The achievement marks another significant step in the foundation’s mission to connect students with rewarding careers in the equipment industry while helping dealers and manufacturers address the growing demand for skilled technicians, the association said. “Becoming an AED Foundation recognized high school is a tremendous milestone for Waukegan High School and our new diesel mechanics program,” said David Marks, CTE academic chair/ coordinator of Waukegan High School. “This recognition validates our commitment to providing students with an industryaligned education that prepares them for high-demand careers in the equipment industry. Through our partnership with the AED Foundation, our students will have access to high-quality curriculum, industry
standards and career opportunities that will help build the next generation of skilled technicians. We are honored to be part of this growing network of recognized schools and proud to contribute to strengthening the future workforce.” The AEDF recognized high school program introduces students to careers in the equipment industry through handson technical education and industryaligned curriculum while cultivating relationships among students, educators, schools, dealers, manufacturers and industry partners to build a sustainable talent pipeline for the equipment industry. In addition to recognizing high school programs, the foundation also accredits college equipment technology programs, ensuring educational programs at both the secondary and post-secondary levels meet industry standards and prepare graduates for successful careers. The success of the program is made possible by AED members and industry partners who invest their time, expertise and resources into developing tomorrow’s workforce, the association said. “West Side Tractor is committed to
our future workforce,” said Beth Bayless, training and development specialist of West Side Tractor Sales. “Helping students learn about the great career opportunities that exist in our industry is an important mission for West Side Tractor. We’re so excited that AED has reached 150 recognized high schools. It’s a great network that provides valuable connections and support for the AED-recognized schools.” Over the past four years, the AED Foundation has transformed workforce development across the equipment industry through accomplishments that include: • 104 accredited college programs across North America; • 150 recognized high school programs introducing students to careers in the equipment industry; • More than 5,000 students connected with equipment industry employers through AED Foundation workforce events; • Eighty-six percent of AED Foundation program students enter careers within the equipment industry including 1,447 newly certified technicians; and • More than $100,000 returned to
the equipment industry through federal and state workforce grants supporting workforce development initiatives. AED Foundation Standards Committee and its evaluation team leaders, who have dedicated more than 4,000 hours to evaluating post-secondary programs and curriculum to ensure graduates, are prepared to meet the evolving technical and workforce demands of the equipment industry, according to the association. “Reaching 150 recognized high schools is an incredible milestone because every school represents new opportunities to inspire students and strengthen our industry’s future workforce,” said Brian P. McGuire, president of the AED Foundation. “The success of this program reflects the commitment of educators, industry partners and AED members who are working together to address the skilled labor shortage. By expanding our network of recognized high schools, we’re creating more opportunities for students to discover rewarding careers while helping ensure the equipment industry has the talented workforce it needs for years to come.”
Paving
S ECT I ON
Pages 31-43
For more information on paving, compaction and milling equipment, as well as comparison charts, visit CEG's Web site at www.constructionequipmentguide.com.
Dash-5 Paver Resurfaces Winding Road to German Castle Ruins
Tight hairpin turns, steep gradients and narrow passages characterize the vital access road to the Falkenstein castle ruins, located at an altitude of 4,190 ft., and the hotel with a gourmet restaurant located just below. Here, the new Vögele road paver Super 1800-5 X demonstrates why it is the right choice for difficult paving tasks.
Job Site With Many Challenges The road to the castle ruins, which is just over 1.2 mi. long, is only 10 ft. wide in sections and is already showing its age. The stretch of road is bumpy and has deep potholes. “This job site has a lot of tricky features. We are dealing with a steep gradient Wirtgen photo and very tight curves at the same time. That is a challenge for the paving and logistics,” said Sascha Böck, managing director of the contractor Josef Böck GmbH, describing the task. He planned the operation meticulously in advance. Only three-axle trucks can be used for mix delivery due to the hairpin Paver operator Tatjana Drexler benturns. In addition, there efits during paving from the optimal are only limited passing overview, the sensitive steering via places along the stretch SmartWheel and the exact screed to be covered. The trucks width adjustment of the Vögele road have to reverse over long paver. sections. A flexible and easy-to-operate road paver and precise steering — which also is crucial for a high-quality benefits the paving team given the paving result. confined space: a mountainside on one side and a steep drop-off on Super 1800-5 X: Compact, the other. Here, the paver has to be Powerful, Precise steered with millimeter precision The Vögele road paver Super to avoid hitting anything on the 1800-5 X used at Falkenstein is narrow road. comparatively compact for its high “That works very well with performance, with a length of 20.2 the new Dash-5 paver,” said ft. In addition, it offers high traction Böck. “Thanks to the optimal
overview, the responsive steering via SmartWheel and the exact screed width adjustment, asphalt paving is possible in these challenging curves. The paver keeps to the line perfectly and we get a uniform paving result, which is not something to be taken for granted given the poor condition of the existing surface and varying paving depths. The pressure bar of the screed is very helpful here for achieving high pre-compaction.” The extending screed AB 500 TP1 can be hydraulically adjusted from 8.4 ft. to 16.4 ft. By adding bolt-on extensions, an extension up to 28.7 ft. is possible.
Wirtgen photo
Hairpin turns and steep gradients characterize the narrow road to the Falkenstein castle ruins and the associated gourmet hotel.
Operating Concept Tatjana Drexler steers the Super 1800-5 X along the steep walls and the rugged drop-off. Until five years ago, she worked in hospitality at a ski hut and was looking for an see CASTLE page 34 Wirtgen photo
The Vögele road paver and the Hamm rollers had to be steered with absolute precision through the narrow serpentine to obtain an optimal result.
Page 32 • September 6, 2026 • www.constructionequipmentguide.com • Paving, Compaction & Milling Section • Construction Equipment Guide
Products shown with optional equipment.
MAULDIN Paving Products... MASTERS OF THE MAT! Designed, Manufactured and Perfected in South Carolina
Closner Equipment www.closner.com Rhome, TX 817-708-9108 Schertz, TX 210-732-2131 Manor, TX 512-272-8200 Waller, TX 936-525-9949
PacWest Machinery
Power Equipment
Company www.pacwestmachinery.com www.power-equip.com Seattle, WA 206-762-5933 Farmington, NM 505-326-1413 Spokane, WA 509-534-5933 Durango, CO 970-247-8830 Pasco, WA 509-547-5933 Denver, CO 303-288-6801 Mt Vernon, WA 360-588-3083 Colorado Springs, CO 719-392-1155 Portland, OR 503-252-5933 Eugene, OR – Branch 541-302-3762 Grand Junction, CO 970-243-0722 Greeley, CO 970-353-1224 Albuquerque, NM 505-345-7811
RDO Equipment Co. www.rdoequipment.com West Haven, UT 801-627-0049 Salt Lake City, UT 801-262-744 St. George, UT 435-652-8003 Billings, MT 406-259-5536 Kalispell, MT 406-752-2828 Missoula, MT 406-549-4171 Bozeman, MT 406-551-2141 Idaho Falls, ID 208-523-9915 Casper, WY 307-266-4474
Gillette, WY 307-685-4288 Cheyenne, WY 307-316-9800 Rock Springs, WY 307-382-5284 Phoenix, AZ 85009 602-415-4700 Chandler, AZ 602-845-1800 Prescott, AZ 928-776-8300 Riverside, CA 951-778-3700
Shafer Equipment
Boxcer Equipment
wwwshaferequipmentco.com Sparks, NV 208-801-7772
www.boxcerequipment.com Tulsa, OK 918-272-7237
Construction Equipment Guide • Paving, Compaction & Milling Section • www.constructionequipmentguide.com • September 6, 2026 • Page 33
www.closner.com San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131
Dallas/Ft. Worth Branch 6532 East Hwy 114 Rhome, TX 76078 817-708-9108
Austin Area Branch 778 US Highway 290E Elgin, TX 78621 512-272-8200
www.powermotivecorp.com Houston Area Branch 18851 GH Circle Waller, TX 77484 936-262-7299
Corporate Office 5000 Vasquez Blvd. Denver, CO 80216 303-355-5900
2340 I-70 Frontage Road Grand Junction, CO 81505 970-241-1550
2600 Center Drive Milliken, CO 80543 970-587-1188
6101 Pan American Fwy Albuquerque, NM 87109 505-345-8383
2250 Reliable Circle Colorado Springs, CO 80906 719-576-5541
7854 Hutchins Drive Cheyenne, WY 82007 307-634-5149
4304 Monica Lane Carlsbad, NM 88220 505-485-1700
Page 34 • September 6, 2026 • www.constructionequipmentguide.com • Paving, Compaction & Milling Section • Construction Equipment Guide
3517 Wayne White Rd., Climax, NC 27233
866-685-4998
Wirtgen Machines Restore Paved Access to Castle Ruins
sales@jfwequipment.com
Serving the Asphalt Industry for 35 Years 2016 Rosco Max 2B distributor, 1850 gal, Max 2B computer, 12 ft spray bar, diesel burners, PTO pump, INTL 4300 w/Cummins 6.7L, auto trans, 144,469 miles $124,000
Wirtgen photo
2017 Weiler C307 double drum static roller, Cat dsl engine, 50” drums, water system $23,000
2017 Etnyre Centennial II distributor, 2000 gal, BT-1 computer, 16 ft spray bar, spray wand & hose, propane burners, PTO pump, Kenworth T370, Paccar PX7 dsl eng, auto trans, 88,524 miles $130,000
2022 Volvo PT125C pneumatic roller, 9 wheels, Volvo dsl eng, water system, 365 hrs $62,000
2017 Freightliner Rosco Max 2B distributor, 1950 gal, Max 2B computer, 12 ft spray bar, dsl burners, PTO pump, Freightliner M2 w/Cummins 6.7L dsl eng, auto trans, 61,324 miles $120,000
New Marathon TPS250PT tack distributor, Briggs gas eng, 10GPM pump, 250 gal, spray wand w/50 ft hose, hose reel, propane burners, flushing system $18,650
www.jfwequipment.com
In the Allgäu region, the serpentine road to Germany’s highest castle ruins, Falkenstein, was successfully rehabilitated using three Wirtgen Group machines. CASTLE from page 31
activity for the summer. She would never have dreamed back then that she would one day drive a road paver. “Today, it is my dream job,” she said, describing her career choice. She has only ever operated Vögele road pavers and would not want to switch. “Why would I, when I’m already out here with the best machine,” she said with a smile. Drexler loves controlling large machines safely, even under difficult conditions, while keeping an eye on her colleagues at the paving screed and the entire working area. The further developed operating concept ErgoPlus 5 is helpful in this regard. While operators always have to get used to one or two new features on a new machine, she was able to get used to the new paver very quickly due to the operating logic being very similar to the predecessor model. Operation is even simpler and more intuitive; the SmartWheel enables very precise steering, and the new touch display offers many additional options, according to Vögele. “Visually and technically, you can see that the machine has been noticeably further developed,” she said about the new road paver.
the route, which is more than 30 percent in parts, paired with the tight hairpin turns, places high demands on the skill of the roller operator and the capabilities of the rollers. They must be driven with great sensitivity so as not to push the mix, tear it apart or cause the roller to slip. This is precisely where the 3-point articulation of the Hamm rollers proves once again to be a valuable feature.
Successful Premiere of New Super 1800-5 X After just a few days, Germany’s highest gourmet restaurant and highest castle ruins, as well as the hotel below, are easily accessible again. The use of the Vögele road paver Super 1800-5 X with the extending screed AB 500 TP1 made a significant contribution to this. For more information, visit wirtgengroup.com.
Compaction On Slope of More Than 30 Percent For final compaction, the team uses an oscillation roller HD 13 VO and an Wirtgen photo HD 10 VT from Hamm. The Vögele paver Super 1800-5 X and the tandem Above all, the gradient of rollers HD 13 VO and HD 10 VT from Hamm.
Construction Equipment Guide • Paving, Compaction & Milling Section • www.constructionequipmentguide.com • September 6, 2026 • Page 35
ARNOLD MACHINERY COMPANY www.arnoldmachinery.com Las Vegas, NV 702-642-9000 Phoenix, AZ 602-414-1900 Tucson, AZ 520-294-7677 Albuquerque, NM 505-895-1565
ASCO EQUIPMENT
CLOSNER
www.ascoeq.com
www.closner.com
Beaumont, TX 409-212-8100 Brenham, TX 979-836-6641 (North) Houston, TX 281-987-1990 (South) Houston, TX 713-649-0940
Schertz, TX 210-732-2131 Rhome, TX 817-708-9108 Elgin, TX 512-272-8200 Waller, TX 936-525-9949
ROMCO EQUIPMENT CO. www.romco.com
Artesia, NM 575-746-6592 Austin, TX 512-388-2529 Carmine, TX 979-278-3570 Corpus Christi, TX 361-881-4891 Dallas (Carrollton), TX 214-819-4100 El Paso, TX 915-772-0613 Ft. Worth, TX 817-626-2288
Houston, TX 713-937-3005 Longview, TX 903-758-5576 Lubbock, TX 806-745-1511 Midland, TX 432-234-9409 Rio Grande Valley, TX 956-565-0100 San Antonio, TX 210-648-4600 Stephenville, TX 254-266-2871
NIXON-EGLI EQUIPMENT CO. www.nixonegli.com Ontario, CA 91761 909-930-1822 Tracy, CA 95304 209-830-8600
Page 36 • September 6, 2026 • www.constructionequipmentguide.com • Paving, Compaction & Milling Section • Construction Equipment Guide
Visit one of our dealers today!
www.banemachinery.com 2449 Manana Dr. Dallas, TX 75220 (214) 352-2468 Ft. Worth, TX (817) 847-5894 Tyler, TX (903) 597-6641
Designed to perform, Built to last
www.romco.com
www.cooperequip.com
2506 Slaton Road Lubbock, TX 79404 (806) 745-1511
5210 N Loop 1604 E San Antonio, TX 78247 (210) 657-5151 201 Commerce Blvd. Georgetown, TX 78626 (512) 930-5151
Construction Equipment Guide • Paving, Compaction & Milling Section • www.constructionequipmentguide.com • September 6, 2026 • Page 37
Special Financing Programs Available
www.closner.com
www.clairemontequipment.com
6532 East Highway 114 Rhome, TX 76078 (817) 708-9108
778 US Highway 290 E Elgin, TX 78621 (512) 272-8200
7651 Ronson Road San Diego, CA 92111 (858) 278-8351
440 West Aten Road Imperial, CA 92251 (760) 355-7700
21910 FM 2252 Schertz, TX 78154 (210) 732-2131
18851 GH Circle Waller Industrial Park Waller, TX (936) 525-9949
1330 W Mission Road Escondido, CA 92029 (760) 739-9100
4726 Convoy Street San Diego, CA 92111 (858) 278-8338
dynapac.us | 800-651-0033 Follow Dynapac North America
Page 38 • September 6, 2026 • www.constructionequipmentguide.com • Paving, Compaction & Milling Section • Construction Equipment Guide
RAISING THE STANDARD
Engineered and built to exceed the demands of commercial paving, the Weiler pavers incorporate proven designs with new innovations to provide performance, reliability and outstanding mat quality in a wide range of applications.
WE’RE RIGHT THERE WITH YOU Empire Cat
empire-cat.com 30+ Locations Across AZ, NV & Eastern CA 1-800-EMPIRE-1
Holt of California holtca.com
7310 Pacific Avenue Pleasant Grove, CA 95668 916-921-8800 1521 West Charter Way Stockton, CA 95206 209-466-6000 3440 East Pacheco Blvd. Los Banos, CA 93635 209-826-4919
Mustang Cat
mustangcat.com
N C Machinery ncmachinery.com
Quinn Cat
quinncompany.com
Tractor & Equipment tractorandequipment.com
Wagner Equipment Co. wagnerequipment.com
Beaumont, TX 409-892-8412
Tukwila, WA 425-251-5800
East Wenatchee, WA 509-886-5561
Bakersfield, CA 661-393-5800
Billings, MT 406-656-0202
Albuquerque, NM 505-345-8411
Bryan, TX 979-775-0639
Chehalis, WA 360-748-8845
Yakima, WA 509-248-2371
Foothill Ranch, CA 949-768-1777
Bozeman, MT 406-585-5800
Aurora, CO 303-739-3000
Grand Junction, CO 970-242-2834
El Campo, TX 979-543-3389
Fife, WA 253-896-0878
Anchorage, AK 907-786-7500
Fresno, CA 559-896-4040
Great Falls, MT 406-761-7900
Bloomfield, NM 505-634-4500
Hayden, CO 970-276-3781
Houston, TX 713-460-2000
Monroe, WA 360-805-6000
Fairbanks, AK 907-452-7251
Los Angeles, CA 562-463-4000
Helena, MT 406-442-2990
Burlington, CO 719-346-7880
Hobbs, NM 575-393-2148
Lufkin, TX 936-639-5551
Mount Vernon, WA 360-424-4292
Juneau, AK 907-789-0181
Riverside, CA 951-686-4560
Williston, ND 701-713-2100
Colorado Springs, CO 719-390-7316
Pueblo, CO 719-544-4433
Port Angeles, WA 360-452-9222
Wasilla, AK 907-352-3400
Worland, WY 307-347-4747
Durango, CO 970-259-2001
Windsor, CO 970-278-1750
El Paso, TX 915-821-7651
Construction Equipment Guide • Paving, Compaction & Milling Section • www.constructionequipmentguide.com • September 6, 2026 • Page 39
JET CITY EQUIPMENT www.jetcityequipment.com 33345 SR 20 Oak Harbor, WA 98277 360-675-4441 10219 State Avenue Marysville, WA 98271 360-651-9079
POWER MOTIVE CORP. www.powermotivecorp.com
Corporate Office 5000 Vasquez Blvd. Denver, CO 80216 303-355-5900 Colorado Springs, CO 719-576-5541 Grand Junction, CO 970-241-1550 Milliken, CO 970-587-1188 Cheyenne, WY 307-634-5149
Durango, CO 970-259-0455 Albuquerque, NM 505-345-8383 Carlsbad, NM 505-485-1700 El Paso, TX 915-872-1001 Farmington, NM 505-324-8601 Chandler, AZ 602-986-3003
Page 40 • September 6, 2026 • www.constructionequipmentguide.com • Paving, Compaction & Milling Section • Construction Equipment Guide
BUILT TO CONNECT
High Performance, Quality A Workhorse To Depend On Results The Carlson CP100IICP100 sets theIIstandard for versatility, component lifecycle sets the standard for versatility, component and mat quality. With a powerful 100 horsepower engine, lifecycle and mat quality. With a powerful 100hp engine, anan array array of configurations and the class-leading Carlson EZCSS of configurations and the class-leading EZCSS single slide screed, single slide screed, it’s easy to see why the CP100II is the ideal it’s time for to see why the commercial CP100 II haspaving. fast become the contractor’s choice heavy-duty choice for heavy-duty commercial paver platforms.
astecindustries.com
www.cooperequip.com
www.closner.com
5210 N Loop 1604 E San Antonio, TX 78247 (210) 657-5151
6532 East Highway 114 Rhome, TX 76078 (817) 708-9108
201 Commerce Blvd. Georgetown, TX 78626 (512) 930-5151
18851 GH Circle Waller Industrial Park Waller, TX 77484 (936) 262-7299
Construction Equipment Guide • Paving, Compaction & Milling Section • www.constructionequipmentguide.com • September 6, 2026 • Page 41
A JOHN DEERE COMPANY
Well Rounded. www.wirtgen-group.com/technologies
CLOSE TO OUR CUSTOMERS
ROAD AND MINERAL TECHNOLOGIES. With leading technologies from the WIRTGEN GROUP, you can handle all jobs in the road construction cycle optimally and economically. Put your trust in the WIRTGEN GROUP team with the strong product brands WIRTGEN, VÖGELE, HAMM, KLEEMANN. www.wirtgen-group.com
KIRBY-SMITH MACHINERY INC. kirby-smith.com
Oklahoma City, OK 405-495-7820 McAlester, OK 918-310-1550 Tulsa, OK 918-438-1700 Dallas, TX 214-371-7777
Fort Worth, TX 817-378-0600 Abilene, TX 325-692-6334 Amarillo, TX 806-373-2826 Lubbock, TX 806-745-2112
Odessa, TX 432-333-7000 Hewitt, TX 254-261-1370 Chico, TX 940-678-5046 Van Alstyne, TX Coming Soon!
NUECES POWER EQUIPMENT www.nuecespower.com
Corpus Christi, TX 361-289-0066 Laredo, TX 956-725-0066 San Benito, TX 956-361-0066 Victoria, TX 361-576-0066
Vinton, TX 915-541-0066 Houston, TX 713-247-0066 San Antonio, TX 210-310-0066 Bryan, TX 346-621-0066
NIXON-EGLI EQUIPMENT CO. www.nixonegli.com Ontario, CA 909-930-1822 Tracy, CA 209-830-8600
Page 42 • September 6, 2026 • www.constructionequipmentguide.com • Paving, Compaction & Milling Section • Construction Equipment Guide
Built for the Road, Engineered for Success.
For more information, visit www.LeeBoy.com or contact your local dealer.
ascoeq.com
closner.com
nixonegli.com
6532 East Highway 114 Rhome, TX 76078 817-708-9108
5980 S M L King Jr Pkwy Beaumont, TX 77705 409-746-5102
2019 Airport Fwy Euless, TX 76040 817-283-2844
7100 SW 3rd Street Oklahoma City, OK 73128 405-789-6812
12210 E 1st Street Tulsa, OK 74128 918-437-5085
2044 S. Vineyard Avenue Ontario, CA 91761 909-930-1822
21910 FM 2252 Schertz, TX 78154 210-732-2131
202 I-35 Frontage Road Belton, TX 76513 254-613-1500
980 N Sam Houston Pkwy E Houston, TX 77032 281-987-1990
902 SE 9th Avenue Perryton, TX 79070 806-435-7773
2602 E Front Street Tyler, TX 75702 903-593-0201
800 E. Grant Line Road Tracy, CA 95304 209-830-8600
778 US Highway 290 E Elgin, TX 78621 512-272-8200
2800 Hwy 290 E Brenham, TX 77833 979-836-6641
6203 Long Drive Houston, TX 77087 713-649-0940
1920 S East Loop 410 San Antonio, TX 78220 210-333-8000
2900 Henry S Grace Fwy Wichita Falls, TX 76302 940-687-2726
2750 Marion Drive Las Vegas, NV 89115 702-342-8100
18851 GH Circle Waller Industrial Park Waller, TX 936-525-9949
1875 N Earl Rudder Fwy Bryan, TX 77803 979-779-8942
27500 E University Drive Aubrey, TX 76227 972-441-2726
3600 US-82 Sherman, TX 75090 903-893-7586
1512 Neptune Dr. #9706 Clinton, OK 580-323-3422
12805 US-290 E Manor, TX 78653 512-272-8922
401 FM 148 Terrell, TX 75160 972-563-2171
Construction Equipment Guide • Paving, Compaction & Milling Section • www.constructionequipmentguide.com • September 6, 2026 • Page 43
Hit more of your daily targets. In this business, the difference between a penalty and a bonus is razor thin. You can’t afford to guess on density or temperature while the paver’s moving. Volvo asphalt compactors give you real-time numbers right in the cab, so you know exactly when you’ve hit the spec. Start securing that extra profit on every job. Ask us how Volvo gives you a true competitive advantage, or scan below to learn more.
Arnold Machinery Company www.arnoldmachinery.com
2975 West 2100 South Salt Lake City, UT 801-972-4000 Idaho Falls, ID 208-523-0822
City
City City City www.pacwestmachinery.com Address Address Address OR WA Portland, Spokane Valley, Kent, WA 509-534-5933 City, ST 12345 206-762-5933 City, ST 12345 503-252-5933 City, ST 12345 City, ST 12345 Tucson, AZ Eugene, OR Pasco, WA Vernon, WA 123.456.7890 Mount123.456.7890 123.456.7890 123.456.7890 360-588-3083 541-343-6926 509-547-5933 520-294-7677
Address Phoenix, AZ Elko, NV DEALER LOGO602-414-1900 801-972-4000
Meridian, ID 208-887-6000 Twin Falls, ID 208-733-1715
Sparks, NV 775-356-1511 website.com Las Vegas, NV 702-642-9000
Pacwest Machinery
See our lineup:
Page 44 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Equip Exposition Releases Tips, Advice, Game Plan for First-Time Show Attendees Equip Exposition, the international landscape, outdoor living, and equipment exposition, issues advice for first-time attendees to the awardwinning event Oct. 20-23, 2026, starting with planning ahead. Last year, the show drew nearly 30,000 landscapers, dealers, contractors, hardscape experts and outdoor power equipment manufacturers and more to the Kentucky Exposition Center (KEC). The event takes up more than 1 million sq. ft. of exhibit space (the equivalent of more than 17 football fields) and has a 30-acre outdoor demo yard. “I encourage attendees to have a game plan before attending Equip,” said Kris Kiser, president and CEO of the Outdoor Power Equipment Institute (OPEI), which owns and manages Equip Exposition. “Download the app ahead of time, book your hotel room now and plan what you’ll do and see there. And definitely wear comfortable shoes.” The Equip app, a must-have guide to the show, is sponsored by Case Construction Equipment. Equip offers the following tips for the best experience possible: Before Show Register now: registrants receive Equip’s emails about event details, additions and special events. Sign up at EquipExposition.com for $30 before prices double to $60 after Sept. 10. On Oct. 20, the price doubles again. The atthe-door price is $120. Add education, certification classes and training to your registration before sessions sell out: explore ways to grow your business, address common problems, develop employees, and learn new skills and business opportunities at these sessions. Select classes, including the popular From Worker to Leader course, are also available in Spanish. Attendees can buy individual education sessions for a fee, but an Equip Academy pass for $170 will give attendees access to dozens of education sessions. Book travel arrangements and hotel reservations: last year, show attendees booked most available hotels (many on a complimentary shuttle route). Booking a room now ensures you are close to the event. Bring company teammates: bring your coworkers, service department
personnel, sales team and, if a dealer, your customers. Equip is a fantastic team-building opportunity, from shared educational experiences and testing new equipment, to having fun at concerts. Acting on new knowledge and ideas when you get home is easier with a bonded team. Download the Equip Expo app, sponsored by CASE Construction Equipment: the app, which works with any iPhone or Android phone, is your event guide. Find the Event Schedule with start times for sessions and maps for the entire facility, where the biggest giveaways are held, and more. Favorite events or locations to build a custom schedule. Determine the top three business problems you are trying to solve: identify and prioritize the speakers, exhibits, and education offerings that could help you in those areas. Plan your route: map the route from your hotel to the KEC and other venues, and look at available shuttles or rideshares to the event. Learn the main areas of the show. • The North Wing has registration, exhibits and badge pickup. • The South Wing has exhibits, Mulligan’s Mutt Madness, the Education Center and easy access to the 30-acre outdoor demo yard and the UTV Driving Experience. • The West Wing has exhibits, food options (as well as the rideshare pickup/ drop off zone) and badge pickup. • Freedom Hall hosts Tree Care Arena featuring hands-on workshops by Academy Trained and The Davey Institute. At Show Don’t get stuck in traffic: for ease of entry, don’t use the main gate at the show’s rush hour. If you are coming to the KEC later than 10 a.m. on a show day, use the Crittenden Drive or the Preston Highway gates and park on the North side, which is the best way to enter the KEC. Leave via a similar route to avoid any bottlenecks at the main gate. Parking at the KEC during the show is free. Start your day in the West Wing: ride shares and shuttles will drop off at the West Wing where attendees will find food and badge pickup. Avoid lines for badge pickup: print your badge at the Welcome Reception, sponsored by Caterpillar Inc., at
Churchill Downs’ First Turn Club or in the North Wing at the KEC. More locations are scattered throughout Louisville hotels and the airport. Talk with others: Equip is a city-wide event. People in your hotel elevator and restaurant are likely attendees. Take time to meet your colleagues as you navigate the halls, stand in line, or grab a bite to eat. Have fun at the events. Go to: • Welcome Reception at Churchill Downs sponsored by Caterpillar Inc. on Tuesday evening. • Mulligan’s 5K Fun Run and Walk, sponsored by Active Dynamics, on Wednesday morning at 6:30 a.m. • The opening keynote on Wednesday morning featuring Mike Holmes, one of North America’s most trusted contractors and star of the HGTV show, Holmes Family Rescue, sponsored by Kress. • 4th Street Live! Concert on Wednesday evening, sponsored by the Propane Education & Research Council. • The Morning Show at Expo, sponsored by Rehlko, on Thursday morning. • The Women’s Leadership Reception on Thursday at 4 p.m., sponsored by Belgard, SiteOne, and Hunter/FX Luminaire. • ENERGIZE on Thursday afternoon, sponsored by Exmark and BOSS Snowplow. • The Closing Paristown Block Party on Thursday night at Old Forester’s Paristown Hall and the surrounding block, sponsored by Gravely. After Show Follow up with the people you met: swap ideas and remind each other to do “that thing you said you would do” when you returned home. Put new ideas from the show into action: Take that leap, do the “new thing,” roll out better pricing, marketing, services and more. Register for next year’s show planned for October 19-22, 2027, at the KEC. The show will begin a two-city rotation in 2029, biannually moving between Louisville and Orlando. Equip will be held in Orlando in 2029 and 2031 and will be held in Louisville in 2030 and every other year thereafter. For more information, visit equipexposition.com.
Power Motive Corporation www.powermotivecorp.com
Corporate Office 5000 Vasquez Blvd., Denver, CO 80216 303-355-5900 Colorado Springs, CO 719-576-5541 Grand Junction, CO 970-241-1550
Milliken, CO 970-587-1188 Cheyenne, WY 307-634-5149 Durango, CO 970-259-0455 El Paso, TX 915-872-1001
TEE Kirby-Smith Machinery
kirby-smith.com 6715 W. Reno Ave 3419 E Slaton Rd. Oklahoma City, OK 73127 Lubbock, TX 79404 405-495-7820 866-289-6087 142 Powell Street McAlester, OK 74501 918-310-1550
7301 E Interstate 20 E Odessa, TX 79765 877-794-1800
12321 E. Pine St. Tulsa, OK 74116 800-375-3733
415 Enterprise Blvd. Hewitt, TX 76643 254-261-1370
12035 Interstate 20 W Abilene, TX 79601 877-577-5729
749 S Weatherford St. Chico, TX 76431 940-678-5046
3922 I-40 E Amarillo, TX 79103 800-283-1247
Van Alstyne, TX Coming Soon!
EquipmentShare www.equipmentshare.com 295 S Redwood Rd North Salt Lake, UT 84054 801-893-6388
2590 Main Street Chula Vista, CA 91911 619-510-6825
665 W 1000 N Spanish Fork, UT 84660 385-307-4335
412 E Gowan Road North Las Vegas, NV 89032 725-221-0051
7070 Niehenke Avenue Billing, MT 59101 406-601-0333
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 45
Nueces Power Equipment www.nuecespower.com 4697 FM 1516 N Converse, TX 78109 210-310-0066 7667 N Sam Houston Pkwy Humble, TX 77396 713-247-0066
Central Power Systems & Services www.cpower.com 50 Iron Horse Drive 6769 Interstate 37 Austin, TX 78634 Corpus Christi, TX 78409 512-691-5036 361-737-0049 203 South WW White Road San Antonio, TX 78219 210-591-6807
Tri-West Tractor, Inc. www.triwesttractor.com 6281 Southfront Road Livermore, CA 94551 925-455-8200 5700 88th Avenue Sacramento, CA 95828 916-553-8630
Page 46 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Volvo CE Expands U.S. Footprint With Debut of U.S.-Built Excavators, Loaders Volvo Construction Equipment (Volvo CE) is expanding its United States footprint, resulting in more than 50 percent of its North American machine supply being produced at its Shippensburg, Pa., facility. Less than a year after announcing plans to localize more machine assembly, the company is delivering its first American-built excavators and larger wheel loaders to customers. A total of 11 additional models will be produced in Shippensburg, shortening customer lead times by more than six weeks, according to Volvo. The company marked the milestone with an event attended by legislators and business and industry leaders on Aug. 19, 2026. They got an inside look at the manufacturing transformation and Volvo CE’s ongoing efforts to develop a localized supplier base. “What you see today is manufacturing resilience in action: adapting with purpose and speed to increase capacity and build more machines closer to our customers,” said Scott Young, head of region, North America. “This achievement advances Volvo CE’s long-term strategy to strengthen stability and flexibility across the North American market while supporting our employees and the regional economy.” The expansion brings Volvo CE’s North American production portfolio to 30 machine models, including excavators, wheel loaders and compactors. With the most recent investment of $40 million, Volvo CE has invested more than $1.4 billion since 2007 to triple its annual output capacity and build workforce skills to support growth and increased digitalization. Volvo CE acquired the site and its road development division from Ingersoll Rand in 2007 and established its North American headquarters there in 2012. Currently, over 750 people are employed at the location. “Volvo CE has taken seriously its commitment to investing in and revitalizing American manufacturing,” said Rep. John Joyce. “This facility right here in Shippensburg is not only building world-class construction equipment; it is creating opportunities for families and workers throughout our community.”
Thinking Globally, Executing Locally While Volvo CE has made major strides to expand its North American capabilities, building a stronger local supply chain to support has been incremental and is one of the most critical opportunities — and challenges — for Volvo CE and the equipment manufacturing industry. “Strong, mutually beneficial supplier relationships have been fundamental to how Volvo CE works with its suppliers for decades,” said Todd Papple, Volvo CE’s head of purchasing Americas. “But increasingly, success requires a broader ecosystem — where businesses, economic development organizations and communities work together.” Volvo CE announced its ambition to grow its business with Pennsylvania suppliers by 30 percent by 2030. Meeting this goal will hinge on strong partnerships with suppliers, giving them the confidence to invest in their operations to meet manufacturer specifications and volumes while remaining cost competitive, according to Volvo. To support this initiative, Volvo CE partnered with the Franklin County Area Development Corporation to support a global excavator counterweight supplier’s decision to land a regional operation. The supplier is investing more than
Volvo CE photo
Head of Region North America for Volvo CE, Scott Young, speaks to the crowd at the Aug. 19, 2026, event.
$1.5 million in a local facility, creating jobs to complete and deliver counterweights directly to the Shippensburg plant on a just-in-time basis. Growth From Within The company increased production capacity through automation, process improvements and more efficient use of existing factory space, enabling growth while maintaining its existing manufacturing space and workforce. The plant’s combined 436,000-ft. assembly and fabrication footprint was reengineered creating three flexible production lines capable of building the full range of excavator, wheel loader and compactor models while adding new excavator welding capacity. To upskill its existing workforce, Volvo CE invested in extensive onsite and offsite training with sister factories in Sweden, Korea and Brazil, equipping employees with new technical skills and expertise. In total, employees completed more than 180 hours of individual training while gaining invaluable cross-cultural experiences. The North American site also is pioneering a new “utility specialist” approach for production of large wheel loaders, which require 30 percent more parts and complexity to build on the same line. Employees were cross trained in multiple zones to provide additional support at stations requiring extra labor, helping maintain a steady workflow. Innovation around the way we work and insights from the pilot can be applied to the excavator line and shared across Volvo CE sites worldwide. “Over the past 11 months, our teams have demonstrated exceptional commitment and execution to expand our production capabilities here in Shippensburg,” said Gustavo Casagrandi, head of operations, Volvo CE Shippensburg. “Along the way, we’ve developed new technical capabilities within our workforce, making us more resilient, and competitive as a manufacturing facility.” The Shippensburg-based technology team also is evolving from a single-product focus to a more flexible operating model, deploying resources where they are needed most across the product portfolio. This more integrated approach to manufacturing and engineering enables Volvo CE to better support North American customers while laying the foundation for a more resilient, responsive and sustainable future.
Garton.Co www.garton.co Turlock, CA • 209-632-3931 Fairfield, CA • 707-425-9545 Merced, CA • 209-726-4600 Modesto, CA • 209-538-0911 Newman, CA • 209-862-3760 Santa Rosa, CA • 707-586-1790 Stockton, CA • 209-948-5401 Tulare, CA • 559-686-0054 Ukiah, CA • 707-468-5880 Woodland, CA • 530-615-2828 Madera, CA • 559-674-2496 Fresno, CA • 559-485-9090
CLM EQUIPMENT CO. INC. www.clmequipment.com Lafayette, LA 337-837-6693 Lake Charles, LA 337-625-5942 St. Rose, LA 504-433-7999
BANE MACHINERY INC. www.banemachinery.com
Dallas, TX 800-594-2263 Ft. Worth, TX 800-601-2263 Tyler, TX 800-594-2200
COLUMBIA WESTERN MACHINERY Columbiawesternmachinery.com 11125 SW Tonquin Road Sherwood, OR 97140 503-454-0902
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 47
TRI-WEST TRACTOR, INC. APCO EQUIPMENT
www.apcoequipment.com 3432 N 5th Street North Las Vegas, NV 89032 800-574-4089
Rasmussen Equipment Co.
www.triwesttractor.com
www.raseq.com
6281 Southfront Road Livermore, CA 94551 925-455-8200
3333 West 2100 South West Valley City, UT 84119 801-972-5588
Arnold Machinery
www.arnoldmachinery.com Now serving New Mexico, Colorado, Wyoming & Montana 10766 State Hwy 59 Gillette, WY 82718 307-686-7536 3800 Quentin Street Denver, CO 80239 303-573-5333
Page 48 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 49
TL100VS Compact Track Loader and SV40 Mini Excavator
Compact Equipment Built For More
For more than 50 years Yanmar compact equipment has been helping hardworking people get more done with machines that are powerful, intelligent, easy to operate, and incredibly efficient.
DISCOVER YANMAR COMPACT EQUIPMENT AT YOUR LOCAL DEALER: www.PacWestMachinery.com 8207 South 216th Street Kent, WA 98032 206-762-5933 Mount Vernon, WA 360-588-3083 Portland, OR 503-252-5933
Eugene, OR 541-302-3762 Spokane Valley, WA 509-534-5933 Pasco, WA 509-547-5933
Visit readydig.com
www.wpi.com 12320 S. Main Street Houston, TX 77035 713-723-1050
330 Vandenburg Drive Alexandria, LA 71303 318-408-3099
213231 I-76 Frontage Road Hudson, CO 80642 720-679-1291
1720 Hicks Street Tomball, TX 77375 281-351-9016
2621 Meeker Drive Baton Rouge, LA 70814 225-800-3711
38459 County Road D Yuma, CO 90759 970-630-6116
2077 N. Craig Drive Buffalo, TX 75831 903-322-7150
125 E Airline Hwy Kenner, LA 70062 888-974-0532
2582 O Street Greeley, CO 80631 970-466-0995
1315 W Cardinal Drive Beaumont, TX 77705 409-721-5305
VIEW OUR FULL LINE OF EXCAVATORS, TRACK LOADERS, WHEEL LOADERS AND TRACKED CARRIERS AT YANMARCE.COM © 2026 Yanmar Compact Equipment North America. YANMAR has a corporate policy of continuous product improvement and development; therefore data, specifications, and warranty are subject to change without any advance notice. There may be differences between the specifications and illustrations contained in this publication and the actual equipment. Equipment components produced by other manufacturers may be shown in photographs in this publication for the purpose of illustration only and is not intended as an endorsement of that particular equipment or its suitability. Inspect equipment before using it and be sure it is operating properly. The product depictions are not meant to be used or relied upon as a substitute for the safety and use information that is published in the respective operator’s manual. Before operating a machine, read, understand, and follow all instructions of the manual and on the machine. YANMAR disclaims all representations, express or implied, or any liability from the use of this publication.
Page 50 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Creating Connected Job Sites — Why Eliminating Data Silos Makes Difference Concerns about costs and attracting enough workers to complete jobs continue to dominate conversation. While the adoption and deployment of technology can help address both concerns, technology is only truly effective when data silos are eliminated. Cloud-connected collaboration platforms enable teams to share realtime data, creating a single source of truth, according to Leica Geosystems. Too often though, technology is a “bolt-on” to existing frameworks and processes, and although it can help align teams, silos remain on the job site. The real challenge is figuring out how to break them down.
Why Breaking Down Silos Matters The modern job site is more technologically enabled than ever before, whether it’s smart wearables, machine control or digital twins, according to Leica. However, many companies are reluctant to use technology to its fullest potential, which creates data silos. The tangible benefits of eliminating silos include helping organizations complete projects on time, to specification and on budget, according to Leica. When teams operate from a single source of truth, it reduces the potential for mistakes and the need for rework. Eliminating rework also leads to safer job sites, reducing both monetary and human costs associated with accidents and mishaps, according
www.wpi.com 12320 S. Main Street Houston, TX 77035 713-723-1050 Buffalo, TX 903-322-7150 Bryan, TX 979-314-1191 Corpus Christi, TX 361-884-8275 Edinburg, TX 956-386-0107 Kilgore, TX 903-984-2011 Lufkin TX 936-243-6056
Leica Geosystems photo
Working from the same information reduces the potential for mistakes and the need for costly rework.
to Leica. How to Eliminate Data Silos Making the elimination of silos a reality requires a look at the technology deployed on the job site. Technology empowers teams to capture minute details about the job site in real time. Comparing this information to project plans requires stepping back
to consider every piece of equipment and every function performed on site. According to Leica, the first step is to ask simple yet critical questions: How does this equipment or this function play into the larger effort being expended on the job site? Is every function being captured and relayed to a central database? It’s not always about new technology; often, it’s about changing old habits, requiring teams to adjust their approach. Capturing data and working from a single source of truth isn’t a hindrance. Rather, it’s what makes the job site run smoother, added the company.
Making Job Sites Fully Connected As the workforce becomes more technologically advanced and digitally connected, it is naturally eliminating silos, but the opportunity for companies is to look at their workflows, see where the holdups exist and decide how to change them, according to Leica. Often, it doesn’t require a major overhaul. Rather, it necessitates small adjustments to ensure everything is aligned and fully connected. When this happens, silos don’t just Leica Geosystems graphic disappear; they become impossible to Safer job sites reduce financial and human costs associated with accidents and mishaps. create.
Pflugerville, TX 512-251-0013 Beaumont, TX 409-721-5305 San Antonio, TX 210-648-4444 Tomball, TX 281-351-9016 Victoria, TX 361-288-7203 Laredo, TX 956-539-3718
www.powermotivecorp.com Corporate Office 5000 Vasquez Blvd., Denver, CO 80216 303-355-5900 Colorado Springs, CO 719-576-5541 Grand Junction, CO 970-241-1550 Milliken, CO 970-587-1188
Cheyenne, WY 307-634-5149 Durango, CO 970-259-0455 Albuquerque, NM 505-345-8383 Bloomfield, NM 505-324-8601 Carlsbad, NM 505-485-1700
El Paso, TX 915-872-1001 Chandler, AZ 602-986-3003 Phoenix, AZ 602-463-3772 Tucson, AZ 520-649-2858
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 51
Up to
in workload 18% increase productivity*
Up to kirby-smith.com Oklahoma City, OK 405-495-7820 McAlester, OK 918-310-1550 Tulsa, OK 918-438-1700 Abilene, TX 325-692-6334 Amarillo, TX 806-373-2826 Chico, TX 940-678-5046
Dallas, TX 214-371-7777 Ft. Worth, TX 817-378-0600 Hewitt, TX 254-261-1370 Lubbock, TX 806-745-2112 Odessa, TX 432-333-7000 Van Alstyne, TX Coming Soon!
in overall 7% increase lifting capacity* Up to
in 20% reduction maintenance
Eugene, OR 800-826-9811 Portland, OR 800-950-7779 Kent, WA 800-669-2425 Rochester, WA 800-304-4421 Spokane, WA 800-541-0754
www.clairemontequipment.com San Diego, CA 858-278-8351 Escondido, CA 760-739-9100 Fontana, CA 909-429-9100
Imperial, CA 760-355-7700 Indio, CA 760-863-5558 San Diego, CA 858-278-8338
monitor(s)
3.0 New IMC technology
costs*
28% larger cab* operator 30% more legroom*
www.modernmachinery.com Corporate Office Missoula, MT 409-842-1754 Boise, ID 208-336-8670 Jerome, ID 208-324-4522 Pocatello, ID 800-829-4450 Billings, MT 800-735-2589 Columbia Falls, MT 800-434-4190
New high-resolution, touch panel
Introducing Komatsu’s next-generation -12 excavators designed to empower operators
When your operators are happy and have what they need to perform at their best, your jobsite hums and your entire operation reaps the rewards. That’s the thinking behind the all-new Komatsu PC220LC-12 and PC220LCi-12 — to design machines that empower operators. Exceptional comfort, customizable controls and the latest intelligent machine control technology (IMC 3.0) in the PC220LCi-12 help your operators tailor the machine to get the job done easier and faster. Explore these next-level workhorses, engineered to unlock your operators’ work potential and help bring greater productivity to your jobsite.
Discover more komatsu.com/PC220LCi-12 *compared to Komatsu’s previous model PC210LC/LCi-11 © 2025 Komatsu Ltd. or one of its subsidiaries. All rights reserved.
Page 52 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
VT-75 Compact Track Loader
Better Machines Power Better Work
From small landscaping projects and residential construction jobs to acres of excavation, ASV’s all-terrain machines enable you to work in more places and in more conditions so you can get more done every day.
DISCOVER THE ASV LINE-UP OF TRACK LOADERS AND SKID STEERS AT
CLM Equipment Co. Inc. www.clmequipment.com
Jet City Equipment www.jetcityequipment.com
3135 US Hwy 90 East Broussard, LA 70518 337-837-6693
33345 SR20 Oak Harbor, WA 98277 360-675-4441
4851 E Napoleon Road Sulphur, LA 70663 337-625-5942
10219 State Avenue Marysville, WA 98271 360-651-9079
2815 N Sam Houston Pkwy E Houston, TX 77032 281-598-2500 © 2026 Yanmar Compact Equipment North America. YANMAR has a corporate policy of continuous product improvement and development; therefore data, specifications, and warranty are subject to change without any advance notice. There may be differences between the specifications and illustrations contained in this publication and the actual equipment. Equipment components produced by other manufacturers may be shown in photographs in this publication for the purpose of illustration only and is not intended as an endorsement of that particular equipment or its suitability. Inspect equipment before using it and be sure it is operating properly. The product depictions are not meant to be used or relied upon as a substitute for the safety and use information that is published in the respective operator’s manual. Before operating a machine, read, understand, and follow all instructions of the manual and on the machine. YANMAR disclaims all representations, express or implied, or any liability from the use of this publication.
For more information, visit ASVI.COM.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 53
Perfect bucket loadsloads Perfect bucket shouldn’t be a be guessing game. shouldn’t a guessing game.
Whether you’ve got a rookie or a 20-year vet in the cab, you need consistent production. Whether you’ve got a rookie or a 20-year vet in the cab, you need consistent production. Next-gen Volvo wheel loaders take the guesswork out of the equation. With new features like Next-gen Volvo wheel loaders take the guesswork out of the equation. With new features like Auto Bucket Fill, your machine handles the heavy lifting of the loading cycle for you. Auto Bucket Fill, your machine handles the heavy lifting of the loading cycle for you. We’ve simplified the repetitive stuff so your team can focus on moving more material faster. We’ve simplified the repetitive stuff so your team can focus on moving more material faster. Ask us about additional Volvo wheel loader features that boost your productivity, Ask us about additional Volvo wheel loader features that boost your productivity, or scan below to see the lineup. or scan below to see the lineup.
ARNOLD MACHINERY CO.
PACWEST MACHINERY
See our lineup: See our lineup:
City City City www.PacWestMachinery.com City www.arnoldmachinery.com City City City City Address Address Address Address Salt Lake City, UT Sparks, NV WAAddress Eugene,Address OR Address Address City,Kent, City, ST 12345 City, ST 12345 ST 12345 City, ST 12345 801-972-4000 775-356-1511 206-762-5933 541-343-6926 City, ST 12345 City, ST 12345 City, ST 12345 City, 123.456.7890 123.456.7890 123.456.7890 123.456.7890 ST 12345 Las Vegas, NV Spokane Valley, WA Mount Vernon,123.456.7890 WA website.com Idaho Falls, ID 123.456.7890 123.456.7890 123.456.7890 509-534-5933 208-523-0822 702-642-9000 360-588-3083 website.com
DEALER LOGO DEALER LOGO Meridian, ID
208-887-6000
Twin Falls, ID 208-733-1715
Phoenix, AZ
602-414-1900
Tucson, AZ
520-294-7677
Portland, OR
503-252-5933
Pasco, WA
509-534-5933
Page 54 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Hyperscalers Create Big Demand for Skilled Workers JOBS from page 1
Data center “hyperscalers” Google, Amazon and Meta are funneling millions into the construction of mammoth data centers across the country. These mega projects require infrastructure, and the demand for craft workers to build the infrastructure is inflating worker salaries as a result. According to Fortune magazine, this year upwards of $100 billion could be invested by these tech companies into the U.S. data center buildout. Bank of America estimated global hyperscale spending rose 67 percent in 2025. The company expected another 31 percent rise this year. It reported a shocking $611 billion investment has been made in the nation’s AI buildout in just two years. And Fortune reports that as a result, construction workers are experiencing a pay bump for data center projects. Finding the right workers is still a challenge, though. “The AI race is now front-page news,” said Fraser Patterson, CEO and founder of Skillit, construction’s first AI-powered hiring platform. On a mission to fix the industry’s labor shortage, Skillit has been working on the labor infrastructure for AI construction projects. Zoom Out, Challenge Comes Into Focus “We’re in a multi-trillion-dollar buildout investment cycle that’ll support the energy, semiconductor and manufacturing sectors,” Patterson said. “There’s no AI without that infrastructure and there’s no infrastructure without skilled labor.” Suddenly, the industry is seeing a huge tech shift, added Patterson. And a problem that was persistent for years is now front and center. Alongside fuel, labor is the number one challenge in our ability to build out AI infrastructure, he said. That’s why there is so much interest in this problem. “I think for many years it wasn’t just underinvesting in American skilled craft workforce, but it also was misdiagnosing the problem,” he said. “We have something like 400,000 workers missing from about 8.3 million workers on the
union hall, or ‘this worker we just hired knows of a worker.’ It’s a very inefficient, painful process to discover, assess and bring skilled workers onboard. That’s the underlying problem, we believe.” He said if the company’s AIbased system could solve just this challenge, 95 percent of the construction workforce would become available for infrastructure jobs. “We’ve never before had workers be able to digitize who they are as a nuanced craft worker,” he said. Skillit’s team developed a construction-specific, craftworker-first onboarding experience. “As a result, we’re able to find them,” Patterson said. Adobe Stock photo The types of data center projects The industry has for years tried to route skilled workers throughout a very fragmented construcon which skilled workers find jobs tion sites, wasting many of them in by not showcasing their skill levels. via Skillit’s services is across the board, he added. table. That’s one in 20 workers missing.” What Patterson means by that Extending Industry is that even if you add workers to Reach Through the labor pool, if you can’t access Strategic Partnerships the workers already there it’s like a Some 6 percent of the company’s bucket riddled with holes. network is located in Georgia. It He sees data centers as a single serves 380 metro regions across hyper-skill project requiring the United States, said Patterson. thousands of workers over a very In June, Skillit launched short time. a strategic partnership with “It’s like an arms race,” he DPR Construction and Suffolk said. “The scale of projects are Construction’s venture capital arm, enormous, so you’re having to find Suffolk Technologies. Supported equipment operators, electricians, as well by equity investments from Adobe Stock photo welders, etc., in a very short period WND Ventures, the venture capital Data center hyperscalers are investing millions into the conof time.” arm of DPR, the connections Add to that the fact that you’re struction of mega data centers across the country. These projmarked a major milestone, the ects demand craft workers to build the infrastructure and are trying to route them in an industry inflating worker salaries. company said. that’s very fragmented. “The investment deepens “Adding more workers will not improvement.” The challenge for the highly Skillit’s partnership with two simply solve the problem if you Skillit is revolutionizing the way specialized, experienced craft can’t find the ones you have,” skilled craft workers are recruited, worker is the connection of the construction industry’s largest builders, who will serve as added Patterson. vetted and placed in construction experience with recruiters. And the challenge of jobs on AI infrastructure projects. The situation flips when the national-scale design partners.” The partnerships support discovering, assessing and routing Patterson said he and his team recruiter can engage workers to continued growth of Skillit’s craft workers to remote locations have spent a couple of decades just talk, share their hopes and where they aren’t accessible can’t on both the skilled trade side and dreams, experience, availability, worker network, workflows, data, automation capabilities and be solved easily. the construction employer side pay expectation. The ability to find workers, of the equation. He’s seen the With that information, Skillit executive team, it said. It also leaves Skillet wellassess them and route them to these construction industry struggle to has built out data-rich profiles specialties is huge. And not just for find workers according to the skills of workers, said Patterson. “It’s positioned as it moves toward data center projects, he said. Other and experience they have. something you can do if you’re at onboarding the next wave of workers. huge infrastructure in energy, “Electricians, who have the a large enterprise scale.” “Skillit’s mission is to solve housing, roads and bridges and the ability to travel, want $35 an hour For contractors doing mission like needs specialty craft workers. and the opportunity to work for critical work, their recruiting team construction’s labor shortage, “But data centers are projects a month,” said Patterson. “That can search for the workers needed starting with fixing access to the millions of skilled workers who where the pay is also really position does not exist. So, if instantly. attractive for craft workers,” he you cannot find the skills you’re “That infrastructure previously already exist,” said Patterson in said. “There is huge potential looking for, it’s very hard to find never existed,” he said. “It was announcing the partnership. see JOBS page 63 for economic development and the people attached to them.” very much word of mouth, in a
Page 56 • September 6, 2026 • www.constructionequipmentguide.com • Utility Equipment Section • Construction Equipment Guide
HIPOWER: What to Know Before Choosing Generator Choosing the right generator size is essential to ensure reliability, protect your equipment and avoid unnecessary costs. Whether your genset will be used for continuous, prime or standby power, careful planning can help you avoid common pitfalls. Key factors to consider: 1. Start with the Load: The first and most critical step in sizing a generator is understanding your power requirements. Identify the loads that are essential to your operation and determine their power demands when utility power is unavailable. Create a list of all required loads, including their voltages, to size your generator correctly. Undersizing can lead to startup failures or even damage connected equipment. Conversely, oversizing can result in inefficient operation, increased maintenance and higher repair costs due to light loading. As businesses grow, power demands often increase. It’s common to oversize a genset by a margin to accommodate future expansion but avoid going too far — expansion plans that take too long
indicates their locked rotor current. Using this data helps achieve more accurate generator sizing. To manage reactive loads effectively and avoid oversizing, consider: Load sequencing: Bringing loads online in stages — allowing one motor to reach full operation before starting the next — can significantly reduce the generator’s required capacity. Advanced starters: Using soft starters or Variable Frequency Drives (VFDs) can minimize the inrush current by controlling voltage and frequency during startup, allowing for a smaller genset without sacrificing performance. 3. Match Site Requirements: Voltage and frequency stability, as well as Total Harmonic Distortion (THD), must meet the needs of your specific application. Generators used for life safety, fire prevention or other critical systems have stricter regulations, often dictated by local, state and national codes. Always verify that the engine and generator are correctly sized to meet these performance standards. 4. Choose the Right Fuel: Fuel type
HIPOWER photo
Choosing the right generator size is essential to ensure reliability, protect your equipment and avoid unnecessary costs.
to materialize can lead to unnecessary expenses. 2. Understand the Type of Load: Not all loads behave the same. Loads can be broadly divided into resistive and reactive (non-linear): Resistive loads (such as incandescent lighting or heating elements) draw the same current to start as they do to run. Reactive loads (such as motors, pumps and HVAC systems) require significantly more power to start, making them the biggest factor in generator sizing. Motors and similar equipment often list their NEMA code on data plates, which
is another important consideration for commercial and industrial generators. The three most common options are diesel, natural gas and propane, each with its own advantages: Diesel: On-site fuel storage, generally lower cost per kW (depending on emissions requirements), but higher fuel costs and emissions. Fuel must be delivered during extended outages. Natural Gas: Cleaner emissions, lower fuel costs and readily available if a gas line exists. Generators typically have a higher upfront cost, and new gas line installation may add expenses. Propane: On-site storage, relatively clean emissions and often lower fuel costs than diesel. Like diesel, fuel must be delivered during long outages and per kW costs tend to be higher. Each site has unique needs, so weigh the pros and cons carefully before deciding.
Power With Confidence The right generator sizing ensures optimal performance, protects your investment and supports future growth. For expert advice tailored to your specific application, reach out to your HIPOWER sales or support team.
Bobcat Expands Lineup With New PA375V Air Compressor Bobcat Co. is expanding its portable air compressor lineup with the introduction of the Bobcat PA375V.
Bobcat Co. is expanding its portable air compressor lineup with the introduction of the Bobcat PA375V portable air compressor. The rental-ready portable air compressor delivers reliable performance, simplified maintenance and improved operational efficiency, according to Bobcat. Performance, Durability Engineered for productivity, the PA375V delivers 350-375 cfm at 125-150 psi, offering the flexible pressure and air flow needed for a wide range of operations. With FlexAir, the compressor automatically adapts output based on real-time workload demands, ensuring optimal performance and fuel efficiency, according to Bobcat.
Bobcat photo
A 4.3-in. water resistant display provides intuitive operation with easy-to-read graphics for a user-friendly experience, according to Bobcat. Eco Mode further enhances efficiency and fuel savings during lighter workloads. Powered by a Bobcat engine paired with a robust fuel system, the PA375V delivers long-term reliability. “The PA375V portable air compressor is built to deliver reliable performance while helping operators reduce downtime and maintenance demands,” said Cody Blythe, product manager of Bobcat Company. “With flexible air output, extended service intervals and simplified serviceability, it offers rental providers and fleet owners a dependable solution that keeps equipment running
Bobcat photo
longer while working more efficiently across a wide range of applications.” Maximized Uptime The PA375V includes multiple serviceability enhancements to keep operators productive while reducing operating costs, including: • Extended compressor oil change intervals for reduced maintenance downtime. • Dual spin-on separator elements for fast, simplified service. • Large access doors for easy to reach access points. • On-screen diagnostics for real-time system insights.
Bobcat photo
• 9-hour runtime, enabling a full shift of productivity. Together, these features help keep units in the field longer, maximizing uptime for rental operators and fleets.
Rental-Ready Built for rental environments, the PA375V delivers towing stability, straightforward operation and easy serviceability, according to Bobcat. Rental providers can count on a durable, dependable machine that offers flexible pressure control, extended runtime and simplified maintenance, ensuring customers get reliable performance day after day. For more information, visit bobcat.com.
Construction Equipment Guide • Utility Equipment Section • www.constructionequipmentguide.com • September 6, 2026 • Page 57
baconuniversal.com HAWAII
smsequipment.com ALASKA
transourceusa.com MONTANA
WYOMING
Page 58 • September 6, 2026 • www.constructionequipmentguide.com • Utility Equipment Section • Construction Equipment Guide
MODEL ENGINE
BOOM FT. (M)
LIGHTS METAL HALIDE
LIGHTS GENERATOR SETUP ELECTRICAL OVERALL OVERALL OVERALL LED HZ (KW) SYSTEM LENGTH FT. (M) WIDTH FT. (M) HGT. FT. (M) DB*= Drawbar
BOBCAT
TD*= Tower Deployed
PL65 Kubota Tier 4F 23 (7) 4 × 1050W 4 × 300W 60 (6) 120/240 PL80 Kubota Tier 4F 23 (7) 4 × 1050W 4 × 300W 60 (8) 120/240
WEIGHT LBS. (KG)
TP*= Transport
9.1 (2.8) DB down 4.6 (1.4) 6.8 (2.1) DB up 9.1 (2.8) DB down 4.6 (1.4) 6.8 (2.1) DB up
23 (7) TD 8.5 (2.6) TP 23 (7) TD 8.5 (2.6) TP
1,669 (758) 1,793 (813)
ALLMAND Maxi-Lite (LED - Std, MH - Optional) Kubota D1105 27.7 (8.4) 4 4 or 6 60 (8) 120/240 10.5 (3.2) 6.4 (1.9) 8.7 (2.9) 3,430 (1,555) CAT C1.1 27.7 (8.4) 4 4 or 6 60 (8) 120/240 10.5 (3.2) 6.4 (1.9) 8.7 (2.9) 3,430 (1,555) Perkins 1.1L 27.7 (8.4) 4 4 or 6 60 (8) 120/240 10.5 (3.2) 6.4 (1.9) 8.7 (2.9) 3,430 (1,555) CAT C1.5 Turbo 27.7 (8.4) 4 or 6 4 or 6 60 (15) 120/240 10.5 (3.2) 6.4 (1.9) 8.7 (2.9) 3,430 (1,555) Perkins 1.5T 27.7 (8.4) 4 or 6 4 or 6 60 (15) 120/240 10.5 (3.2) 6.4 (1.9) 8.7 (2.9) 3,430 (1,555) Isuzu 4LE2T 27.7 (8.4) 4 or 6 4 or 6 60 (20) 120/240 10.5 (3.2) 6.4 (1.9) 8.7 (2.9) 3,430 (1,555) Night-Lite Pro II Vertical (V) or Laydown (LD) (LED - Std, MH - Optional) Kubota D1005 26.6 (8.1) V 4 4 60 (7) 120/240 10.0 (3.0) 4.2 (1.3) 8.3 (2.5) 1,950 (884) 29.1 (8.9) LD Kubota D1105 26.6 (8.1) V 4 4 60 (8) 120/240 10.0 (3.0) 4.2 (1.3) 8.3 (2.5) 1,950 (884) 29.1 (8.9) LD Cat C1.1 26.6 (8.1) V 4 4 60 (8) 120/240 10.0 (3.0) 4.2 (1.3) 8.3 (2.5) 1,950 (884) 29.1 (8.9) LD Perkins 1.1L 26.6 (8.1) V 4 4 60 (8) 120/240 10.0 (3.0) 4.2 (1.3) 8.3 (2.5) 1,950 (884) 29.1 (8.9) LD Night-Lite V-Series (LED - Std, MH - Optional) Kubota D1005 24.5 (8.2) 4 4 60 (7) 120/240 9.2 (2.8) 4.4 (1.3) 8.5 (2.6) 1,885 (855) Kubota D1105 24.5 (8.2) 4 4 60 (8) 120/240 9.2 (2.8) 4.4 (1.3) 8.5 (2.6) 1,885 (855) Cat C1.1 24.5 (8.2) 4 4 60 (8) 120/240 9.2 (2.8) 4.4 (1.3) 8.5 (2.6) 1,885 (855) Perkins 1.1L 24.5 (8.2) 4 4 60 (8) 120/240 9.2 (2.8) 4.4 (1.3) 8.5 (2.6) 1,885 (855) Night-Lite Chain GR-Series (LED only)
N/A
23 (7)
N/A
4
N/A
120
8.5 (2.6)
4 (1.2)
8.2 (2.5)
750 (340)
Night-Lite GR-Series Air Cooled Yanmar L70W (LED only)
23 (7)
N/A
4
60 (3)
120
8.5 (2.6)
4 (1.2)
8.2 (2.5)
1,000 (454)
Night-Lite GR-Series Liquid Cooled Core Model (LED only)
Kubota Z482
23 (7)
N/A
4
60 (1.4)
120
8.5 (2.6)
4.2 (1.3)
8.2 (2.5)
1,155 (524)
Night-Lite GR-Series Liquid Cooled 3kW (LED only)
Kubota Z482
23 (7)
N/A
4
60 (3)
120
8.5 (2.6)
4.2 (1.3)
8.2 (2.5)
1,155 (524)
Night-Lite GR-Series Liquid Cooled 6kW (LED only)
Kubota D1005 Cat C1.1 Perkins 1.1L
23 (7) 23 (7) 23 (7)
NA NA NA
4 4 4
60 (6) 60 (6) 60 (6)
120/240 120/240 120/240
8.9 (2.7) 8.9 (2.7) 8.9 (2.7)
4.2 (1.3) 4.2 (1.3) 4.2 (1.3)
8.2 (2.5) 8.2 (2.5) 8.2 (2.5)
1,355 (615) 1,355 (615) 1,355 (615)
8.4 (2.56) Folded Tongue: 5.3 (1.6) 8.4 (2.56) Folded Tongue: 5.3 (1.6) 11.8 (3.6) Folded Tongue: 8.5 (2.6)
4 (1.2)
8.4 (2.55)
1,499 (680)
4 (1.2)
8.4 (2.55)
1,554 (705)
6.3 (1.9)
8.8 (2.7)
2,767 (1,255)
WACKER NEUSON LTT4 LTV6 LTG14
Kohler KDW702, 2-cylinder, 23 (7.0) N/A 4 x 320W 60 120/240 Tier 4F Diesel Kohler KDW1003, 3-cylinder, 23 (7.0) N/A 4 x 320W 60 120/240 Tier 4F Diesel Kohler KSD1403, 3-cylinder, 23.6 (7.2) N/A 4 x 320W 60 120/240 Tier 4F Diesel
Terex Places Order for Specially-Equipped HUDDIG Machine The new HUDDIG machine is tailored for demanding utility and live-line applications and will be delivered to Terex Utilities at the end of summer before later being upgraded with additional equipment toward the end of the year. The configuration includes a 2200C LWI system with remote-control functionality for insulated live-wire work, creating a highly versatile platform for utility operations where safety, flexibility and efficiency are critical. The machine also will be equipped with an OilQuick quick-coupler system and connectors, enabling fast attachment changes and increased operational efficiency
in the field.
Built for Utility Applications The HUDDIG 1370 CABLE is specifically designed for utility and infrastructure work, combining excavation, lifting and tool carrier capabilities in a single machine. Its ability to travel efficiently on public roads while maintaining strong off-road performance makes it particularly wellsuited for utility maintenance, construction and service operations spread across large geographic areas, according to the company. With the addition of the insulated live-wire equipment and remote-control capability, the
machine becomes an even more specialized solution for complex utility work where uptime and operator safety are essential. The machine’s multifunctional concept allows operators to perform several tasks using one platform, helping reduce transportation needs, improve efficiency and create a more streamlined workflow in the field. With delivery planned for the end of summer and further upgrades scheduled later in the year, the machine will play a key role in demonstrating the capabilities of the HUDDIG concept within the U.S. utility sector, according to the company.
About Huddig Huddig develops, manufactures and sells the HUDDIG excavator loader to the utility, railway and construction industry. “The HUDDIG excavator loader has long been the market leader as the ultimate solution for efficient work in the various segments,” said the company. “With its unique combination of oscillating pivot, powerful transmission and impressive strength, the machine can tackle almost any terrain.” Since its inception in 1959, Huddig has manufactured more than 12,500 excavator loaders.
Construction Equipment Guide • Utility Equipment Section • www.constructionequipmentguide.com • September 6, 2026 • Page 59
One machine. Endless possibilities.
The HUDDIG 1370 is an all-in-one machine built to handle every task – from utility and construction to rail work and maintenance. Engineered to go anywhere. Built to do anything.
Explore more at huddig.com
Avaliable through TEREX Services
Page 60 • September 6, 2026 • www.constructionequipmentguide.com • Utility Equipment Section • Construction Equipment Guide
Atlas Copco Unveils X-Air+ 800-20 Portable Air Compressor Atlas Copco introduced the latest addition to its DrillAir family of portable air compressors: the X-Air+ 800-20. Building on the concept introduced with the X-Air+ 750-25 — delivering full air power in a significantly more compact canopy — the X-Air+ 800-20 combines higher flow at a practical pressure with a compact canopy. This makes transport and logistics easier without compromising performance, giving customers more choice for demanding applications like drilling and blasting. With a focus on efficiency, the X-Air+ 80020 delivers 11 percent greater fuel efficiency than its predecessor, ensuring a low total cost of ownership and optimized operations across the DrillAir range.
Higher Flow for Faster Operations The X-Air+ 800-20 is optimized for jobs that operate comfortably at 20 bar, such as foundation drilling, abrasive blasting and pipeline services. By avoiding unnecessary ultra-high pressure, this model reduces energy consumption and wear, making it a cost-effective choice for customers who value speed and efficiency without over-specifying their equipment. Delivering an impressive flow of up to
efficiency and control in every application, according to Atlas Copco.
Atlas Copco photo Atlas Copco has introduced the latest addition to its DrillAir family of portable air compressors: the X-Air+ 800-20.
800 CFM, the X-Air+ 800-20 accelerates operations where air volume matters most, enabling faster project completion and improved productivity. Compact Power, Intelligent Control Like other DrillAir models, the X-Air+ 800-20 features a compact canopy design, cutting its footprint and weight significantly compared to its previous generation. This makes transportation and logistics easier while reducing warehousing costs for fleet owners. At its core, the compressor is powered by a 6.7-liter Cummins engine, ensuring durability and performance in demanding environments, according to Atlas Copco. Combined with
AirXpert technology, the unit automatically regulates operating parameters based on real-time flow requirements, delivering 11 percent greater efficiency and reducing fuel consumption during drilling operations. The dynamic flow boost feature further enhances performance by increasing flow during the most demanding phases of drilling, such as flushing and drill stem refilling. This innovation ensures quicker borewell completion and streamlined operations. To maximize operational control, the X-Air+ 800-20 comes equipped with the Xc2004 controller, an interface designed for intuitive operation and future-ready connectivity. With advanced computing power and enhanced monitoring capabilities, the Xc2004 helps customers unlock maximum
Designed for Demanding Environments Engineered for reliability, the X-Air+ 800-20 is built to withstand tough job site conditions while maintaining consistent performance. Its compact design simplifies transport and setup, allowing customers to deploy high-performance air systems quickly and efficiently, according to Atlas Copco.
Customer-Centric Innovation The X-Air+ 800-20 is designed to meet real-world needs by delivering higher flow at a practical pressure. This approach helps customers avoid unnecessary costs and complexity while improving efficiency and sustainability. “The X-Air+ 800-20 is all about giving customers more of what they need — and less of what they don’t,” said Srijayan Iyer, product marketing manager of large air. “By combining higher flow with practical pressure, we’ve created a solution that maximizes efficiency and accelerates productivity across diverse applications.” For more information, visit atlascopcogroup.com.
Construction Equipment Guide • Utility Equipment Section • www.constructionequipmentguide.com • September 6, 2026 • Page 61
Underground Utility Damage Costs U.S. $83.2B Annually Yellow outline is cut line. DO NOT PRINT. Half Page Ad W- 10.125 H - 5.25
Damage to the utility lines beneath America’s feet costs the United States’ economy an estimated $83.2 billion every year — more than $227 million every day — according to a report released by Common Ground Alliance (CGA). The new estimate is nearly three times the widely cited $30 billion benchmark established in 2019. It reflects the rising number of damage incidents alongside the most comprehensive accounting of what happens after an underground power, gas, oil, communications, water or other critical utility is struck. The new report’s most striking finding: Repairing damaged utility lines represents just 5.9 percent of the total economic impact. For every dollar spent on direct repairs, nearly $16 is lost to consequences such as business interruptions, construction delays, emergency response, road closures, injuries, property damage and community disruption, according to the CGA. Damage to buried utilities costs more than $227 million every day according to CGA’s landmark new report. “This is a wake-up call for everyone who builds, operates, protects or depends on America’s critical infrastructure,” said CGA President and CEO Sarah K. Magruder
Lyle. “This first of its kind analysis puts a comprehensive number on the problem. An $83.2 billion annual impact makes clear that underground utility damage is not just an industry problem. It’s an economic problem, a public safety problem, a human impact problem and an infrastructure problem that threatens businesses, workers and taxpayers.” CGA’s new report, Between the Lines: The True Cost of Damages to America’s Buried Utilities, statistically models 668,999 damage incidents in 2025 and measures their consequences across five dimensions: direct repair, operational response, business and economic impact, human impact and community and environmental impact. The report arrives as excavation is accelerating nationwide to support broadband deployment, data center construction, energy and water upgrades, housing development and other major infrastructure projects, according to CGA. “America is investing historic sums in new infrastructure, yet damage to underground infrastructure is creating economic harm on a staggering scale,” Lyle said. Repair Bill Only the Beginning Of the estimated $83.2 billion annual impact:
• $32.6 billion, or 39.2 percent, falls on communities and the environment, including property and road restoration, disruption to public facilities, relocation support and environmental remediation. • $31.6 billion, or 38 percent, comes from business and economic disruption, including outages, lost revenue, delayed projects and reduced productivity. • $7.8 billion, or 9.4 percent, results from operational response, including emergency services, traffic control, investigations, insurance and regulatory compliance. • $6.2 billion, or 7.5 percent, reflects human impacts, including injuries, fatalities, medical costs, lost wages and long-term disability. • $4.9 billion, or 5.9 percent, is attributable to direct repair of buried utilities. Community, environmental and business consequences alone total $64.2 billion — more than three-quarters of the overall impact, according to the report. The report also reveals that incidents that don’t draw national attention result in enormous costs to communities. Moderate incidents represent approximately one-fifth of modeled damages but generate $64.5 billion — more than three-quarters — of the total economic impact. Damage in urban
areas accounts for $77.9 billion. $83.2 billion in preventable damages could fund numerous national, state and local budget priorities, according to CGA.
Putting Billions In Perspective According to CGA, the scale of the economic loss, the $83.2 billion annual economic impact is equivalent in scale to: • Paying the average electric bill for 48 million American households for an entire year; • Paying the average natural gas bill for 97 million American households for a year; • 17 months of full federal highway funding for all 50 states; and • The entire combined annual state budgets of Wyoming, North Dakota, South Dakota, New Hampshire, Vermont, Montana, Maine and Rhode Island.
Five Years of Damage Could Erase Investment If annual damage costs remain at their current level, the cumulative economic impact would reach approximately $416 billion over five years. That’s nearly onethird of the entire $1.4 trillion electric grid modernization investment anticipated from 2026-2030, according to CGA.
Page 62 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Route 66: ACPA Awards Pavement Award in Oklahoma
supplanted by the Interstate Highway System. In the West, Interstate 40 replaced Route 66. But the old road didn’t disappear. In 1999, the American Concrete Pavement Association presented a Lifetime Pavement Award to Route 66 Core History in Oklahoma, according to In New Mexico, the asphalt Roads&Bridges.com. Citing the industry is drilling into Route 66 award, Neal McCaleb, then U.S. and extracting the road’s history, secretary of transportation, said the Mike O’Leary said. The goal is to section was “clearly built to last.” recycle the materials. “This slab has borne the wheels of “Extract a core, and along with commerce for over 65 years, and is Route 66 is 2,448 mi. long and in its the road mix and asphalt, you’ll still functional, as are the 400 miles most commonly used alignment can be see chip seals and new recycled of Route 66 that remain a part of the broken down into the following sections: mixes that go on top of them,” he fabric of our state highway system • Illinois (301 mi./484km) said. “You might also see macadam, today,” he added, according to Road and an asphaltic mix of a couple of & Bridges.com. • Missouri (317 mi./510km) inches.” In 2025, the New Mexico • Kansas (13 mi./21km) Asphalt and aggregates have Department of Transportation • Oklahoma (432 mi./695km) become valuable. On Highway received the Perpetual Pavement • Texas (186 mi./299km) 6, part of the original Route 66 Award from the Asphalt Pavement • New Mexico (400 mi./640km) alignment, workers use milling Alliance and the Asphalt Pavement • Arizona (401 mi./645km) machines to recycle the pavement Association of New Mexico, • California (314 mi./505km) in place. recognizing a 9 mi. section of New “It’s cost-effective,” O’Leary Mexico Route 6 — part of the said. “They lay it down on the same original Route 66 alignment opened spot. It’s a full-circle use of our assets. In the past we threw in 1928. that away.” Dan Lewis, executive director of the Asphalt Pavement A Route 66 aficionado himself, O’Leary said he’ll be Association of New Mexico, said, “With this award, we’re making a trip on the highway later this year, taking to the celebrating the folks who designed and built this incredible road in his 1937 Chevrolet. Back when his car came off road.” the assembly line, laying asphalt was a more rudimentary In a statement, the association said, “Through innovative operation. asphalt technologies and careful preservation, the roadway “In the West, making a hot mix plant on site was unusual. remains both historically authentic and structurally sound — So, they’d lay aggregate on a stretch of pavement and poured never once experiencing a structural failure.” on liquid asphalt. It got the traveling public out of the mud.” The interstate system was in development as far back as the 1930s, Chalmers said. The U.S. routes made it clear that Awards access control was important. They ran through the center of Improvements, Innovations Route 66 was decommissioned in 1985, having been every town they connected, clogging traffic. “Highway designers intended to make Route 66 ‘modern’ “It was very inefficient for interstate travel,” he said. in every sense of the term,” according to the National Parks “We had engineering principles from the railroads, but Service. “State engineers worked to reduce the number of we didn’t necessarily have those engineering principles for curves, widen lanes and ensure all-weather capability.” vehicles,” he continued. “There’s a lot of things that we had “All of a sudden we needed all these roads, and they’re to develop.” just mud paths,” Chalmers said. Martin said, “Route 66 was a victim of its own success.” “From a civil engineering standpoint, there’s a lot of States promoted it. The public loved it. And then there was things that we had to develop. We had engineering principles too much traffic for the road to carry. from the railroads, but we didn’t necessarily have those It turns out that the Interstate Highway System didn’t engineering principles for vehicles. The automobile was put Route 66 entirely out of business. Icons don’t go out of totally different,” he added. business easily. Driving the road became a destination in “For guardrails, the technology has changed a lot. Before itself. For the construction industry, Route 66 is a 2,448-mile it was, ‘hey, make it real sturdy.’ Now we have guardrails that model of the changes in the ways American highways are basically absorb energy, and they put you back on the road. built. It’s actually safer for you to hit the guardrail than it is to go One hundred years after it was given its number, Route off the road.” 66 carried Rhys Martin and his caravan of devotees into Engineers introduced grade separations where roads Chicago. The 1964 wood-paneled Chevrolet station wagon crossed railroad tracks. “held up wonderfully and continued to turn heads across the And super elevation was developed to keep cars on the corridor,” he said in mid-July. road when they’re driving on a curve. This was his first time driving the entire route in a single As cars improved and their speeds increased, “a lot of trip, he said, “and the thing I learned about it is just how people died on curves,” Chalmers said. “You go around a intense the trip can be, even for a long-time roadie like horizontal curve — super elevations are where you warp the myself. Even though we were on the road for three weeks, curve, so you don’t fly off of it. Jim Grey photo “People come in too hot on a curve. There’s not enough Plenty of Americana could be found along Route 66, it wasn’t nearly enough time. I came home with a greater friction, and there’s not enough super elevation.” including the Paul Bunyon hot dog statue (purposely appreciation for the corridor as a whole.” Route 66, Martin said, “still has value. For the last 30 “Or you have a long straight section of the roadway. And spelled with an “o”), which was originally located in years it’s been growing every year.” CEG all of a sudden have a curve at it. You know you’re going to Cicero, Ill., but is now in Atlanta, Ill. ROUTE from page 24
The New Deal’s Civilian Conservation Corps (CCC) and the Works Progress Administration (WPA) provided workers to build the road, according to the National Park Service. “Road improvements and maintenance work were central features of the New Deal’s Civilian Conservation Corps (CCC) and Works Project Administration (WPA) programs,” it wrote. “From 1933 to 1938, thousands of unemployed men and youths from virtually every state were put to work as laborers on road gangs.” “At that time, the New Mexico Department of Transportation did a lot of their own construction, Chalmers said. “They had their own equipment: hydraulic bulldozers, concrete mixers, batch plants. So, a lot of that technology already existed. I think a lot of that was based on the railroads.” Meanwhile, the Oklahoma Department of Transportation website shows the construction in 1919 of the first section of what would become Route 66 in Oklahoma, with a “waterbound macadam surface, macadam base and ‘Topeka asphalt’ surface placed near the state capitol.” “The first concrete pavement (with exposed concrete surface) was a 7.825 lane-mile section placed in 1922 from Tulsa to Catoosa,” according to roadsandbridges.com. Missouri declared its stretch of Route 66 fully paved in 1931. That March, the Laclede County Republican, of Lebanon, Mo., reported on a celebration of the completed road. At the gathering, Charles U. Becker, Missouri’s then secretary of state, recalled the situation a dozen years earlier, “when Missouri still was ‘in the mud’ … and the road system then was a helter-skelter maze of country roads, ‘nothing more than a disconnected chain of cow paths.’” And Gov. Henry S. Caufield spoke of the expenditure of $12 million to bring Highway 66 to its “present state of perfection.”
get crashes at that curve, especially with impaired drivers. “So vertical geometry had to be developed and the idea of stopping sight distance, where the driver has enough time to react and stop or maneuver.”
How Many Miles in Each State
Skillit Revolutionizes Way to Recruit Skilled Workers
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 63
Attention Contractors!
Post Your Wanted To Buy Listings FREE!
Here’s How!
List Your Wanted Items. If you would like to place your Wanted To Buy listings on our website for inclusion in our newsletters, simply visit: www.constructionequipmentguide.com/wanted-to-buy and enter your listings. Inappropriate or Sale Ads will be Deleted
Adobe Stock photo
Data centers are a single hyper-skill project requiring thousands of workers over a very short time. The project scales are enormous, which heightens the need for equipment operators, electricians, welders and other skilled construction workers in a very short period of time. JOBS from page 54
“Having strategic partners … is a strong signal that the industry is ready for, and consolidating around, a new category of AIpowered craft hiring infrastructure.” Patterson said the construction industry is entering an era where workforce infrastructure is as critical as project management, procurement, and scheduling. “As a self-performing contractor, we understand firsthand how complex and dynamic the skilled craft labor needs are,” said Eric Lamb, DPR Construction board member. Lamb said Skillit’s platform reflects that direction as its AI-powered infrastructure helps DPR teams connect with talent in the skilled trades. DPR supports an approach “that expands access to meaningful work and drives more predictable outcomes for our project teams and their customers,” he added. Jit Kee Chin, chief technology officer of Suffolk Construction, said Skillit is addressing a critical gap in the industry with purpose-built technology. “Construction’s workforce challenges require new infrastructure and smarter systems,” said Chin, managing partner of Suffolk Technologies. Skillit’s technology is designed “for the realities of construction hiring and labor deployment,” Chin added. “As labor becomes the industry’s most constrained resource, the ability to attract and deploy skilled talent will increasingly define the winners and losers in construction,” he said. Skillit is creating the talent network for 80 percent of workers who don’t sit behind a
desk, said Diana Kay, Suffolk Technologies partner. In an era defined by renewed investment in physical industries, this fundamentally changes how labor is found, mobilized and managed.” Skillit also is being tapped by dozens in the construction sector, including Swinerton, Mortenson and Brasfield & Gorrie Industries. These relationships further support the company’s continued growth across the built world, said Patterson. He believes the challenge for skilled craft workers going through traditional recruiting channels is a lack of “first-principle thinking” on the part of the recruiters. Until now, “they didn’t have the insight into the fact that there’s not a shortage but an access problem,” he said. Recruiters, union hall conversations and word-of-mouth referrals don’t target the enterprise contractors who do 70 percent of the infrastructure work. He said until they find Skillit, customers are using online sites like Indeed or job boards and recruiters. “It’s not a great solution for all the points mentioned,” he said. “Many are using staffing agencies,” he added. “But that gets expensive if you’re scaling a data center project. Multiply that by 15 to 30 workers’ first year wages.” Furthermore, said Patterson, word-ofmouth and employee referrals can actually be a double-edged sword. “You hire a supervisor who comes with five workers. That works out great until the supervisor leaves and leaves with those five workers. It’s not a great strategy for now or for the future as America scales its AI and data center infrastructure.” CEG
WANTED (NJ): VOLVO L110H ABLE FOR CRUSHING BRICK, WANTED: JOHN DEERE 850K WHEEL LOADERS, LOW HOUR. BLOCK, ASPHALT, AND UNRELGP CRAWLER DOZER, SIX WAY EMAIL: FRANK.HORAN@ INFORCED CONCRETE PLEASE ENC CAB WITH WINCH UNDER HOFFMANEQUIP.COM; PROVIDE YOUR QUOTE. REAL HOURS METER AND PHONE: 732-674-2095 EMAIL: EMMA.B@ANETWORKINFRAME 3000 HOURS OR 850JLGP ––––––––––––––––––––––––––– TEGRATORS.COM; PHONE: 917SAME WAY WITH WINCH UNDER WANTED (US): CATERPILLAR 397-1928 $95000 CDN YEAR 2009 – 2018. 966F II WHEEL LOADERS; ––––––––––––––––––––––––––––– EMAIL: JEANMAURICCEBOUTIN@ HITACHI EXCAVATOR: EX200, WANTED: HITACHI EX200 OR VIDEOTRON.CA; EX/ZX270,EX330, ZX330, EX300, EX400 EXCAVATOR EX400, EX450-5; CAT LOADERS: EMAIL: PAKMACHINERY@GMAIL. PHONE: 450-3468975 ––––––––––––––––––––––––––– 950B/E, 966D, E, F; CAT GRADERS COM PHONE: 333-228-3898 WANTED (AR): MECALAC 10 MCR 140G; JOHN DEERE WHEELED –––––––––––––––––––––––––––– EXCAVATOR: 495D, 595D. WANTED: CAT D7G CRAWLERS, EXCAVATOR. EMAIL: FAWCETT.HOTSHOT@ EMAIL: EKTRADINGLLCOMPANY@ WESTERN USA GMAIL.COM: GMAIL.COM; EMAIL: BUYDOZERS@GMAIL. PHONE: 870-321-9572 PHONE: 346-469-2517 COM; PHONE: 559-439-3270 ––––––––––––––––––––––––––– ––––––––––––––––––––––––––– ––––––––––––––––––––––––––– WANTED (US): CATERPILLAR WANTED: HYUNDAI 210 W EXCA- WANTED: ALL MODELS JCB 966F II WHEEL LOADERS; VATOR. EMAIL: SALIMIBREAKER@ SKID STEER LOADERS. HITACHI EXCAVATOR: EX200, GMAIL.COM EMAIL: JKBAKER.KOTZ@GMAIL. EX/ZX270,EX330, ZX330, EX300, ––––––––––––––––––––––––––– COM; PHONE: 907-412-0910 EX400, EX450-5; CAT LOADERS: WANTED (KY): CATERPILLAR ––––––––––––––––––––––––––– 950B/E, 966D, E, F; CAT GRADERS; D10N CRAWLER DOZER N & R WANTED: LARGE PORTABLE OR 140G JOHN DEERE WHEELED EMAIL: ELNASRM@GMAIL.COM; STATIONARY GENERATORS IN EXCAVATOR: 495D, 595D. PHONE: 502-407-8678 ANY CONDITION. ALL MODELS: EMAIL: EKTRADINGLLCOMPANY@ ––––––––––––––––––––––––––– CAT, CUMMINS, DETROIT, MTU, GMAIL.COM; WANTED: CATERPILLAR TH63 PHONE: 346-469-2517 TELEHANDLER WITH ENCLOSED PERKINS, VOLVO (DIESEL OR ––––––––––––––––––––––––––– CAB. IT CAN HAVE A BAD MOTOR. NATURAL GAS). CAN REMOVE IF NEEDED. WANTED (NY): JOHN DEERE I DO HAVE A TH62 WITH A BAD EMAIL: MICHSURPLUS@GMAIL. 550K LGPLGP CRAWLER DOZER. TRANSMISSION BUT GOOD COM; PHONE: 201-587-6300 WANT TO BUY FROM USER MOTOR. ––––––––––––––––––––––––––– BULLDOZER 550KLGP 2022 AND EMAIL:CRAIGBERENS944@ WANTED: JOHN DEERE 850J LGP UP, ENC CAB, SIX WAY WINCH, GMAIL.COM; CALL OR TEXT 6I6CRAWLER DOZERS. WANT TO UNDER 900 HOURS, REAL HOURS 8I3-3642 BUY BULLDOZER 850JLGP SIX METER AND FRAME. ––––––––––––––––––––––––––– EMAIL: JEANMAURICEBOUTIN@ WANTED: CASE 580SE BACKHOE WAY ENC CAB WITH WINCH 2005 VIDEOTRON.CA LOADER. AT 2012 REAL HOURS UNDER PHONE: 450-346-8975 EMAIL: WILMANSDIMI@HOTMAIL. 900. THANKS, YOU HAVE MY ––––––––––––––––––––––––––– COM EMAIL FOR PICTURE. WANTED: LOOKING TO BUY YOUR –––––––––––––––––––––––––– EMAIL: JEANMAURICEBOUTIN@ NEW UN-NEEDED SPARE PARTS WANTED: CATERPILLAR TH63 VIDEOTRON.CA - DEERE, CAT, CASE, IH, ETC. TELEHANDLER WITH ENCLOSED ––––––––––––––––––––––––––– ALSO, INDUSTRIAL ELECTRICAL CAB. IT CAN HAVE A BAD MOTOR WANTED: VOLVO L70G WHEEL EQUIPMENT, FUSES, CIRCUIT I DO HAVE A TH62 WITH A BAD LOADERS. GOOD VOLVO L70G BREAKERS, AUTOMATION ITEMS, TRANSMISSION BUT GOOD WHEEL LOADER, L70F, L70E. SWITCHES, ETC. MOTOR. EMAIL: FRANK.HORAN@ CALL HAROLD @ 717-859-4234 OR EMAIL: CRAIGBERENS944@ HOFFMANEQUIP.COM; EMAIL CLEANPOWER@EMYPEO- GMAIL.COM PLE.NET. PHONE: 616-813-3642 – CALL OR PHONE: 732-674-2095 ––––––––––––––––––––––––––– –––––––––––––––––––––––––– TEXT. WANTED: CATERPILLAR 988K WANTED: BOBCAT 225D WELDER, ––––––––––––––––––––––––––– STRAIGHT EDGE GP FINISH USED. WANTED: JOHN DEERE 550K PRODUCT BUCKET. EMAIL: NUNIJONS@GMAIL.COM LGPLGP CRAWLER DOZER. ––––––––––––––––––––––––––– WANT TO BUY BULLDOZER EMAIL: DUBOISLIVESTOCK@ WANTED: FAE STCH-SD250 550KLGP JOHN DEERE ENC CAB GMAIL.COM; PHONE: (207)-282CRUSHER. LOOKING FOR A SKID SIX WAY UNDER 600 HOURS, 4445 STEER-MOUNTED CONCRETE REAL HOURS METER AND ––––––––––––––––––––––––––––– CRUSHER THAT MEETS THE FRAME NEAR VERMONT OR NEW WANTED: PART FOR CATERPILFOLLOWING SPECIFICATIONS: YORK. LAR CRAWLER DOZER - 943 CAT CRUSHES MATERIAL TO 2” OR EMAIL: JEANMAURICEBOUTIN@ SPRING FOR TRACK ADJUSTSMALLER, DISCHARGE RATE: UP VIDEOTRON.CA ER PART# 7P1675, SERIAL # PHONE: 1-450-346-8975. TO 10 TONS PER HOUR HEAVY 19Z00380. PETE 631-774-1905 ––––––––––––––––––––––––––– PLATE REINFORCED CONEMAIL: LIEARTH3@AOL.COM; STRUCTION 24” WIDE CRUSHING WANTED (TX): JOHN DEERE PHONE: PETE @ 631-774-1905. 3038E TRACTOR LOADER. ROTOR WITH 0.5-YARD HOPPER ––––––––––––––––––––––––––– EMAIL: FLYCAL01@GMAIL.COM CAPACITY ABRASION-RESISWANTED (WORLDWIDE): LIEBTANT WEAR COMPONENTS WITH ––––––––––––––––––––––––––– HERR WHEEL LOADER. WANTED (TX): JOHN DEERE REPLACEABLE CARBIDE BITS, EMAIL: MABAT_560@YAHOO. HARDENED BREAKER, CLEANER, 3038E TRACTOR LOADER. CO.UK EMAIL: FLYCAL01@GMAIL.COM AND CHEEK PLATES FOR EASY ON-SITE MAINTENANCE SUIT––––––––––––––––––––––––––– –––––––––––––––––––––––––––
Page 64 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Auctions are subject to change, please check Auctioneers websites for details ALEX LYON & SON AUCTIONEERS www.lyonauction.com 315-633-2944 • Timed Online (OH) Aug.31 – Sept.10, 2026 For: Construction, Utility Equipment Auction
Coming Auctions To view our complete list of upcoming auctions visit our Auction Calendar at www.constructionequipmentguide.com
• Shreve, OH Thurs., September 10, 2026 BIG IRON AUCTIONS For: Retirement Auction – Construction, www.bigiron.com Mulching, Ag Equipment & Transportation 800-937-3558 • Greenville, TX • Online Tues., September 15, 2026 Wed., September 9, 2026 For: Late Model Rental Fleet Construction For: Farm, Construction and Truck & Equipment Auction Trailer Auction • Timed Online (TX) • Woodward, OK September 2 - 16, 2026 Wed., September 16, 2026 For: Rental Returns, Norman Smith For: Northwest Oklahoma Solid Waste Equipment Rental Disposal Authority Equipment Auction • Timed Online (NV) September 3 - 17, 2026 For: Late Model Mining & Construction Equipment Auction • Timed Online (NV) September 3 - 17, 2026 For: Fleet Construction & Utility Equipment & Canceled Orders
PURPLE WAVE AUCTION www.purplewave.com 866-608-9283
BRIGHT STAR AUCTIONS www.brightstarauctions.com 574-825-0704 • Wingo, KY Fri., September 25, 2026 For: Wright’s Sawmill Inc. Liquidation Auction
GEYER AUCTION COMPANIES www.geyerauctions.com 484-239-3273 • Online (PA) Closes September 9, 2026 For: Major Excavation & Concrete Construction Company Liquidation Auction #1 • Online (PA) Closes September 15, 2026 For: Major Excavation & Concrete Construction Company Liquidation Auction #2 HANSEN AUCTION GROUP www.hansenauctiongroup.com 920-383-1012
J.M. WOOD AUCTION COMPANY www.jmwood.com 800-447-7085 • Montgomery, AL September 22 – 24, 2026 For: 53rd Annual Fall Auction JEFF MARTIN AUCTIONEERS, INC. www.jeffmartinauctioneers.com 601-450-6200 • Stanton, TX Thurs., September 10, 2026 For: Permian Basin Public Auction
• Tyler, TX Tues., September 15, 2026 • Online Only (MN) September 15 - 21, 2026 For: J Michael Design & Construction • Somerset, KY For: Pike Consignment Auction, Retirement Auction Fri., September 25, 2026 RITCHIE BROS. For: Complete Rental Equipment Business Construction Equipment, Trucks & Trailers AUCTIONEERS • Pelzer, SC for Sale • Online Only (MI) www.rbauction.com Thurs., September 17, 2026 Sept. 18 – Oct. 5, 2026 402-421-3631 For: East Coast Construction & For: Logging, Construction & Truck DAVIS AUCTIONS, INC. Transportation Auction • Northeast Regional Auction Consignment Auction www.davisauctionsinc.com September 15, 2026 • Brooklyn, MS 203-758-4087 • Texas Regional Auction Fri., September 18, 2026 • Prospect, CT September 16, 2026 HENDERSON AUCTIONS For: Late Summer Construction & Sat., September 26, 2026 www.hendersonauctions.com Transportation Public Auction • Midwest Regional Auction For: Utility, Construction Equipment & 225-686-2252 September 24, 2026 Related Items Auction • Hudson, NH • Birmingham, AL Sat., September 19, 2026 Sat., September 26, 2026 For: Hudson Paving Absolute Retirement For: Collector Motor Series Live Auction DON SMOCK ABSOLUTE AUCTION & REALTY, INC. Auction AUCTION CO., INC. www.AARauctions.com www.dsa-auctions.com 800-243-0061 HUNYADY AUCTION COMPANY 765-778-9277 • Online KRAFT AUCTION SERVICES LLC www.hunyady.com • Pendleton, IN Ends September 8, 2026 bid.kraftauctions.com 800-233-6898 Fri., September 18, 2026 For: Carmel CSD Surplus Vehicle Auction 574-586-1030 For: 34th Annual Fall Vehicle & Equipment • Virtual, Live Broadcast • Online Auction Wed., September 30, 2026 • Online Only Ends September 8, 2026 For: Merlo, Inc. Absolute Auction Surplus September 28 - 29, 2026 • Online (AZ) For: Oneida County Surplus Auction Liquidation Wed., September 30, 2026 For: 4-Day Farm & Equipment • Online For: Sierra Mining & Crushing Annual Consignment Auction Equipment Reduction Ends September 10, 2026 I.R.A.Y. AUCTION • Walkerton, IN For: Tools & Equipment, Milton, NY www.iraymn.com Sept. 30 – Oct. 1, 2026 • Online 320-968-7230 DPA AUCTIONS For: 4-Day Farm & Equipment Ends September 13, 2026 dpaauctions.com • Online Consignment Auction For: Summer Equipment #5 Auction 800-492-9090 Wed., September 16, 2026 For: Heavy Equipment, Truck & Trailer • Online Wed., September 9, 2026 Auction McGREW AUCTION CO. AUCTIONS INTERNATIONAL For: Online Equipment Auction www.mcgrewauction.com www.auctionsinternational.com 800-536-1401 717-428-0922 • Online J.J. KANE AUCTIONEERS Wed., September 22, 2026 • Online • Seven Valley’s, PA www.jjkane.com For: Online Equipment Auction Aug. 27 – Sept. 11, 2026 Tues., September 8, 2026 855-GO2-KANE For: Online Auctions Closing Daily! For: Tractor & Construction Equipment • Timed Online FREIJE & FREIJE AUCTIONEERS Auction September 10 - 11, 2026 www.freijeauctioneers.com For: Northeast Region Auctions • Online BIDADOO AUCTIONS 317-539-2895 www.bidadoo.com September 11 - 15, 2026 • Timed Online • Stilesville, IN 1-877-BIDADOO For: Timed Online Auction September 15 16, 2026 Tues., September 8, 2026 For: Western Region Auctions • Online For: Onsite Real Estate Auction • Seven Valley’s, PA September 8, 2026 Tues., September 22, 2026 • Timed Online • Online Only For: Tractor & Construction Equipment September 22 - 23, 2026 • Online Ends, September 9, 2026 September 15, 2026 Auction For: Personal Property Auction For: Southeast Region Auctions
• Online Wed., September 9, 2026 For: Vehicle & Equipment Auction • Online Thurs., September 10, 2026 For: Construction Equipment Auction • Online Tues., September 15, 2026 For: Government Auction • Online Tues., September 15, 2026 For: City of Wichita Auction • Online Wed., September 16, 2026 For: Ag Equipment Auction • Online Thurs., September 17, 2026 For: Truck & Trailer Auction RITCHASON AUCTIONEERS INC. www.ritchason.com 615-444-5464 • Lebanon, TN Sat., September 12, 2026 For: 3-Ring Live Onsite Auction RTi AUCTIONS www.rtiauctions.com 585-243-1563 • Online September 10 - 15, 2026 For: Tom Simons Contracting Retirement Auction • Stamford, NY Sat., September 12, 2026 For: Eklund’s Fall Equipment Auction SALES AUCTION COMPANY, LLC www.salesauctioncompany.com 860-627-7506 • Simsbury, CT Thurs., September 17, 2026 For: Compass Enterprises, Inc. Complete Dispersal Auction SITE AUCTION SERVICES www.siteauctionservices.com 936-203-8333 • Timed Online September 3 - 17, 2026 For: Equipment & Transportation Sale VANTAGE AUCTIONS www.vantageauctions.com 951-228-9040 • Lake Elsinore, CA Sat., September 19, 2026 For: Timed Auction YODER & FREY HEAVY EQUIPMENT AUCTIONS www.yoderandfrey.com 419-865-3990 • Atlanta, GA Thurs., September 17, 2026 For: Heavy Equipment Auction
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 65
2 LOCATION AUCTION TIMED AUCTION • PART 1 LATE MODEL MINING & CONSTRUCTION EQUIPMENT
2 LOCATION AUCTION TIMED AUCTION • PART 2 FLEET CONSTRUCTION & UTILITY EQUIPMENT & CANCELED ORDER
~ Bill Miller Rentals ~ Late Model Cat, Komatsu Mining & Construction Equipment, Trucks, Trailers, Support & Attachments
Late Model Cat & John Deere Construction & Utility Equipment, Trucks, Trailers, New Support & Attachments
Opens: THURSDAY, SEPTEMBER 3rd @ 9:30 AM Closes: THURSDAY, SEPTEMBER 17th @ 9:30 AM Location 1: CARLIN (Elko), NEVADA ADDRESS: 102 Rolling Thunder Way, Carlin, Nevada 89822
Note: Selling will be Late Model Mining & Construction Equipment coming off Rent.
Opens: THURSDAY, SEPTEMBER 3rd @ 3:00 PM Closes: THURSDAY, SEPTEMBER 17th @ 3:00 PM Location 2: LAS VEGAS, NEVADA (Ahern’s Main Yard) ADDRESS: 1720 West Bonanza Road, Las Vegas, Nevada 89106
Note: As in the past, this sale will have very high quality rental fleet equipment that has been maintained the very best. And equipment from 1 canceled order
HIGHLIGHTS INCLUDE: A Full Line of Mining & Construction Equipment to Include: 3 ARTICULATED HAUL TRUCKS: (3) Cat 745C, 8 STRAIGHT FRAME HAUL TRUCKS: 2015-2013 Cat 775D, Cat 773D, (2)Cat 745C, (2)Komatsu 785, Hitachi EH1700, LATTICE BOOM CRAWLER CRANE: LinkBelt HC218, ROUGH TERRAIN CRANE: Grove RT700B, 7 HYDRAULIC EXCAVATORS: 2023(2)2017 Komatsu PC490LC-11, 2022 Komatsu PC360LC-11, (3)Cat 345CL, MOTOR GRADER: Cat 140M2(ripper), MOTOR SCRAPER: Cat 631E, 4 RUBBER TIRED LOADERS: Cat 993K, Cat 988H, Cat 966M, Cat 966H, WATER TRUCK: Volvo A40(8,000gal.), 2 SERVICE TRUCKS: Ford LNT9000, Freightliner FL70. Plus Attachments, New & Used Support Equipment.
HIGHLIGHTS INCLUDE: WATER TRUCK: 2024 Kenworth T480(4,000gal., 8,000mi., t/a), 11 HYDRAULIC EXCAVATORS: (4)Unused Develon DX35Z-7, (4)Unused Develon DX27Z-7, 2020 Hitachi ZX135US-6, New ATS-ME18, New ATS-RT15R, 3 RUBBER TIRED LOADERS: Cat 928G, (2)Cat 926M, 2 TRACTOR LOADER BACKHOES: 2023 Cat 420XE(4x4), JD 310C(4x4), 5 RUBBER TRACKED SKID STEERS: Cat 299D, (2)2025 Cat 255, (2)Takeuchi TL150, 2 MINI TRACK LOADERS: (2)New ATS-T460, BOOM LIFT: JLG 660SJ, 14 TRUCK TRACTORS: 2024-(2)2023 Volvo(t/a), (3)2021 Volvo VNL760(t/a), 2025-2021-2019-2018 Freightliner(t/a), 2020 Kenworth T800(t/a), 2 REFRIGERATED TRAILERS: 2024 Utility 53ft., Utility Reefer(Thermo King), VAN TRAILER: 2024 Utility 40ft.(t/a), DETACHABLE GOOSENECK TRAILER: Trailking 50-ton(t/a), 5 MULTI-USE CONTAINERS: New ZHW 40ft. High Cube, (4)New 20ft., 4 PRESSURE WASHERS: (4) New Easy Kleen 4,000psi, 95 ATTACHMENTS: (92)Skid Steer, (2)Excavator, Mini Track Loader, 25 NEW SUPPORT EQUIPMENT: (3)Landhero LDH-TWP80 Water Pump, (2) ATS-EW13000 Electric Winch, PLUS: Crawler Tractors, Forklifts, Rollers, Scissor Lifts, Utility Vehicles, Golf Carts, Brush Hogs, Portable Bathroom Stations.
Please feel free to preview any of our Live or Timed Auction sale sites 5 days before auction day!
Please feel free to preview any of our Live or Timed Auction sale sites 5 days before auction day!
PERMIT #: NV20111219101 SALE SITE PHONE: (315) 633-2944
PERMIT #: NV20111219101 SALE SITE PHONE: (315) 250-1400 Tony
ALEX LYON & SON
ALEX LYON & SON
SALES MANAGERS & AUCTIONEERS, INC., BRIDGEPORT, NY 13030 Phone: (315) 633-2944 • Fax: (315) 633-8010
SALES MANAGERS & AUCTIONEERS, INC., BRIDGEPORT, NY 13030 Phone: (315) 633-2944 • Fax: (315) 633-8010
Go to WWW.LYONAUCTION.COM for more details
Go to WWW.LYONAUCTION.COM for more details
Page 66 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 67
AUCTIONS
CONSTRUCTION
EQUIPMENT
THURSDAY, SEP 24
275+ ITEMS SELL NO RESERVE!
DU1504
DU1508
DU1500
DU1506
DU1502
2012 Caterpillar D9T dozer
2017 Metso Lokotrack LT120 jaw crusher
2014 Caterpillar 972M wheel loader
2015 Astec FT4250 impact crusher
2007 Caterpillar D6T XL dozer
EL2606
DU1505
EG9231
EL2605
2007 Kenworth T300 fuel / lube truck
2017 Volvo L150H wheel loader
2024 Ditch Witch HX50 vacuum excavator
2012 Dodge Ram 5500 utility / service truck
INVENTORY INCLUDES: dozers, wheel loaders, haul truck, saw, backhoes, excavator, dump trucks, skid steers,crane telehandler, INVENTORY INCLUDES: dozers, wheel loaders, articulated haulrock trucks, horizontal grinder, vacuum trucks, impact crusher, trucks, backhoes, service trucks, sewer jetter plants, trucks, excavators, skid steers, water trucks, ready mixdrilling trucks, rig minitruck, excavators, vertical lifts, more. scraper, mini excavator, screening crane truck, single drum vibratory roller, bucket trucks, andand more. Start Date: Monday, September 21, 2026 (8:00 AM) End Date: Thursday, September 24, 2026 (5:00 PM) Arlington, Virginia Safety and Health • Webinar: Strategic Thinking: From Reactive Growth to Intentional Strategy A Four-Part Strategic Planning Series Date: Tuesday, September 22, 2026 To view our Business Calendar online, Time: 2:00 PM to 3:00 PM go to www.constructionequipmentguide.com. Training/Professional Development • Webinar: Strategic Thinking: From Reactive Growth to ASSOCIATED GENERAL CONTRACTORS (AGC) Intentional Strategy AGC Events Calendar: A Four-Part Strategic Planning Series All AGC Web-Eds are scheduled in Eastern Standard Time Date: Thursday, September 24, 2026 (EST). Conferences are scheduled using the local time zone Time: 2:00 PM to 3:00 PM where the event takes place. Training/Professional Development • AGC EDGE MS PROJECT 1 & 2 Start Date: Wednesday, September 9, 2026 (10:00 AM) • National Chapter Leadership Conference Start Date: Sunday, September 27, 2026 (8:00 AM) End Date: Wednesday, October 7, 2026 (2:00 PM) End Date: Tuesday, September 29, 2026 (7:00 PM) Online, Virtual Washington, District of Columbia Training/Professional Development • A GC EDGE Leadership and Motivation (STP Unit 1) • AGC EDGE Communication (STP Unit 2)-Thursdays Start Date: Monday, September 28, 2026 (1:00 PM) Start Date: Thursday, September 10, 2026 (10:00 AM) End Date: Tuesday, October 6, 2026 (5:00 PM) End Date: Thursday, September 24, 2026 (3:30 PM) Online, Virtual Online, Virtual Training/Professional Development Training/Professional Development • A GC EDGE Blueprint Reading Basics • AGC EDGE Construction Supervision Fundamentals Start Date: Monday, September 28, 2026 (2:00 PM) Start Date: Friday, September 11, 2026 (12:30 PM) End Date: Tuesday, October 6, 2026 (5:30 PM) End Date: Friday, September 25, 2026 (5:30 PM) Online, Virtual Online, Virtual Training/Professional Development Training/Professional Development • Webinar: Strategic Thinking: From Reactive Growth to • AGC EDGE Al for Construction Management Intentional Strategy Start Date: Wednesday, September 16, 2026 (1:00 A Four-Part Strategic Planning Series PM) End Date: Wednesday, September 23, 2026 (5:00 PM) Date: Tuesday, September 29, 2026 Time: 2:00 PM to 3:00 PM Online, Virtual Training/Professional Development Training/Professional Development • Construction Project Manager Course Start Date: Sunday, September 20, 2026 (4:00 PM) FABICK CAT End Date: Friday, September 25, 2026 (2:00 PM) • 2026 Troy Open House Dates: THURSDAY, SEPTEMBER 24, 2026 Atlanta, Georgia TIME: 11:00 AM – 2:00 PM Training/Professional Development • Health Hazards in Construction (HHC) PLACE: FABICK CAT
Business Calendar
All items sell where they sit. 10% buyers premium applies. 866.608.9283
purplewave.com
Transportation construction market development and 2450 Formosa Road, Troy, IL 62294 Phone: 866/345-5681 protection is your business and our mission. • 2026 Cape Girardeau Open House Our programs and services help your business, provide Dates: FRIDAY, SEPTEMBER 25, 2026 policy development opportunities and build a better TIME: 10:00 AM – 2:00 PM industry future. PLACE: FABICK CAT 3033 Nash Rd, Cape Girardeau, MO 63780 UNITING THE INDUSTRY ARTBA represents all public and private sector compoPhone: 573/332-1122 When you want CAT Equipment, come to FABICK CAT! nents of the U.S. Transportation Construction Industry. We utilize the unparalleled diversity of our membership ENJOY LUNCH ON US! Then explore new equipment displays, take advantage to develop consensus-oriented policy solutions that chalof machine specials, and get hands-on with our digital lenge the status quo in pursuit of improving transportatoolbox training. tion system performance and conditions. Whether you are a customer exploring the latest equip- ADVOCACY ment and innovations, looking to chat with our team Our advocacy agenda is driven by one central tenet: of experts or interested in learning more about FABICK securing a dynamic transportation network that enriches CAT’S offerings over lunch, this event has something for American life. everyone. SAFETY, SAFETY, SAFETY We look forward to seeing you! Whether it be policy recommendations for the Federal Register Today: Transportation Programs, sharing “best practices” among https://info.fabickcat.com/2026-TroyOpenHouse or https://info.fabickcat.com/2026-CapeGirardeauOpen- our member firms, training thousands of construction House industry workers annually, or the dissemination of work zone data to project owners, the safety of the traveling AMERICAN ROAD & TRANSPORTATION BUILDERS public and our industry’s workers is foundational to every ASSOCIATION (ARTBA) aspect of ARTBA’s program of work. 2026 ARTBA National Convention COLLABORATION for SUCCESS DATES: SUNDAY, SEPTEMBER 27 – WEDNESDAY, ARTBA has long recognized the value of leveraging inSEPTEMBER 30, 2026 ternal resources and assets through coalition leadership Venue: The American Club and partnerships with non-traditional stakeholders to de419 Highland Drive, Kohler, WI 53044 Phone: 844/247-9140 velop broad-based support that is essential for any meanRegistration is available via the ARTBA event page; ingful federal legislative or regulatory policy outcome. room blocks are reserved. STRATEGIC PLAN ABOUT ARTBA Our 2024 – 2028 Strategic Plan is an outcome-oriented ARTBA represents the transportation construction indus- and advocacy-centric program of work consistent with our try, advocating for infrastructure investment, policy, and association’s mission. safety. The National Convention is a key gathering for members, For more information: industry leaders, and policymakers to discuss transporta- ARTBA Phone: 202/289-4434 tion projects, legislation, and market trends. Fax: 202/289-4435 BECOME A MEMBER
Events are subject to change, check websites for updates
Page 68 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Buying or Selling?
Call any of these professional auction companies
THE TIME IS NOW
A Strategic Asset Management Full Service Auction House vantageauctions.com
Buy Heavy Equipment, Trucks & More with Vantage Auctions! Need to sell heavy equipment or trucks? Contact us to sell your equipment.
951.228.9040
UPCOMING CONSTRUCTION EQUIPMENT AUCTION Saturday, September 19, 2026 @ 9am
Manufacturing Careers Touted... The Easy Way To Advertise Your Equipment
Run In Two Consecutive Issues – Black & White $140 • Color $205
SAMPLE NEW AND SURPLUS STRUCT. STEEL JUMBO BEAMS, PIPE, ROAD PLATE Joseph Fazzio Inc.com • 856-881-3185 N.J.
SEE YOUR BARGAIN AD IN COLOR.
ONLY $65 EXTRA FOR 2 INSERTIONS
Here's how the BARGAIN ADS Work: • Supply us with a photo of a machine (one machine per Bargain Ad) and a maximum 17 word description, plus contact and phone number. • Either email your copy & photo to: production@cegltd.com, or mail to: Construction Equipment Guide, 470 Maryland Drive, Ft Washington, PA 19034. • Cost is $140 per ad, $65 additional for color. • Your ad will run for two consecutive issues in 1 region.
Your Ad Will Be Seen By Over 21,163 Construction Equipment Buyers in the Western States.
For more information, call Construction Equipment Guide today at
800/523-2200
I Make America Partners With mikeroweWORKS On Campaign
I Make America, the national grassroots program of the Association of Equipment Manufacturers (AEM), announced the launch of a new campaign featuring Mike Rowe. Rowe is a longtime advocate for skilled trades and founder of the mikeroweWORKS Foundation, which spotlights the men and women of the equipment manufacturing industry and promotes rewarding careers in modern manufacturing. The campaign is anchored by a workforce-focused commercial that celebrates the people who build, power and feed America while highlighting the opportunities available across the skilled trades and manufacturing, according to I Make America. The commercial will run for three months across social media, digital video and connected television. “Manufacturing workers are helping build the future of this country, but too many people still do not understand the scale of our industry or the career opportunities
it provides,” said Kip Eideberg, AEM senior vice president of government and industry relations. “By joining forces with the mikeroweWORKS Foundation, we are challenging outdated perceptions and inspiring more people to build their futures with these family-sustaining careers.” Mike Rowe filmed the campaign during an appearance with the AEM Manufacturing Express at ConExpo-Con/ AGG, where he joined AEM leaders and equipment manufacturing workers to discuss the importance of skilled work, career and technical education and the role manufacturers play in strengthening local communities. “Campaigns like these are essential to closing America’s skills gap, by showing the next generation of skilled workers just how much opportunity is out there,” said Rowe. The campaign will run through the 2026 leg of the AEM Manufacturing Express tour, which kicked off on Sept. 1, 2026.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 69
ONSITE-LIVE AUCTION
Please feel free to preview any of our Live or Timed Auction sale sites 5 days before auction day!
!! AN EVENT !! AUTHORIZED CAT RENTAL FLEET EQUIPMENT AUCTION ~ Mustang Cat ~ Definitely The Sale of Sales. Only the Best from the Rental Fleet
TUESDAY, OCTOBER 20th @ 9:30 AM
HOUSTON, TEXAS
ADDRESS: Route 290, Houston,Texas 77040
Note: Mustang Cat is selling current Cat Rental Fleet Equipment to make room for new equipment for the Fleet. Everybody and anybody will be satisfied with this Rental Fleet Equipment - Low Hours! Warranties are available on most equipment.
Absolutely No Consignments HIGHLIGHTS INCLUDE: 49 HYDRAULIC EXCAVATORS: 20222021 Cat 349, 2022 Cat 340, 2019 Cat 336QCEW, 2022-2019 Cat 336QC, 2019 Cat 336EW, 2022-2019 Cat 336, 2020-(2)2019 Cat 330TCQC, 2018 Cat 330TC, (2)2019 Cat 330HYDTH, 2019 Cat 330, 2015 Cat 326HYDTH, 2017 Cat 323QC, (2)2017 Cat 323HYDTH, (2)2017 Cat 323, 2023-2019 Cat 320(thumb), 2017 Cat 320TC, 2023 Cat 320RPQC, 2023-(4)2022 Cat 320QC, 2017 Cat 320HYDTH, 2019 Cat 320, 2023 Cat 317QC, (2)2023-2022 Cat 317GC, 2018 Cat 316FL, 2022 Cat 313GC, (2)2022 Cat 313GC QC, 2019 Cat 313, 2022 Cat 308CR, 2024 Cat 303.5, (2)2023 Cat 302.7HYDTH, 17 RUBBER TIRED LOADERS: 2021 Cat 950M, 2023-2022-2018 Cat 950GC, (4)2022 Cat 938M, 2024-(2)2023-(2)2022-2021-2017 Cat 930M, (2)2023 Cat 926, 16 CRAWLER TRACTORS: 2019 Cat D6KLGP, (5)2022-2021 Cat D5LGP, (2)2021 Cat D4, 2020 Cat D5KLGP, (2)2022 Cat D4LGP, 2021 Cat D4, (3)2023 Cat D1, 6 ARTICULATED HAUL TRUCKS: 2020 Cat 740GC, (5)2022 Hydrema 912HM, 4 WATER TRUCKS: 2022-20172016 Freightliner LW2000WT, 2015 IH 4300, 28 RUBBER TRACKED SKID STEERS: (5)2023-(2)2022 Cat 299D3XE, 2024 Cat 299D3CA, 2022 Cat 299D3, 2018-2017 Cat 299D2CA, 2023-(2)2022-(4)2021(2)2020 Cat 259D3, (8)2023 Cat 249D3, 8 MINI TRACK LOADERS: 2024-(3)2023 Ditch Witch SK800, (2)2023-(2)2022 Ditch Witch SK600, 21 TRACTOR LOADER BACKHOES: (2)2022 Cat 420XETC, (2)2023-(3)2022 Cat 420XE, 2014 Cat 420 IT 4WD, (13)2023 Cat 416-4WD, LOADER LANDSCAPE TRACTOR: 2023 Cat 415-ILWD, 11 MOTOR GRADERS: 2017-(2)2016 Cat 140M3-GPS, 2012 Cat 140M2, 2011 Cat 140M, 2013 Cat 140M2 AWD, 2017 Cat 140M3 AWD, 2016 Cat 140EW, 2014 Cat 120M2AWD, 2016-2015 Noram 65ECA, 6 TELESCOPIC FORKLIFTS: (2)2019 Cat TL1255, (4)Cat TL1255D, 3 ROUGH
TERRAIN FORKLIFTS: 2022 Lift King LK8M42, (2)2022 Lift King LK6M42, 18 WAREHOUSE FORKLIFTS: 2023 Cat GP30N, (3)2023-2019 Cat DP30N5, (6)2023 Cat GP25N5, (3)2024 Cat GP25N, (4)2023 Cat GP18N, 6 SOIL RECLAIMERS: (2)2022-(2)2020-(2)2018 Weiler S200, 12 TRENCH ROLLERS: (6)2018-(5)2017-2016 Bomag BMP8500, 4 VIBRATORY ROLLERS: (2)2012 Cat CS54(Smooth Drum), 2015 Cat CP56B(Padfoot), Cat CP56(Padfoot), 9 TRENCHERS: (2)2023 Ditch Witch RT80, (2)2017 Ditch Witch RT80, 2021-(2)2017-2016 Ditch Witch RT45, 2018 Ditch Witch C24X, 35 BOOM LIFTS: 2011 JLG 1200SJP, (3) JLG 800S, (5)JLG 660SJ, (2)JLG 600AJ, (11)JLG 600S, (3)JLG 460S, (2)JLG 400S, 2019 JLG E450AJ, (3)2023-2022 JLG T350, (2)2018 Genie GR-20, 2020 Genie S65 Trax, 33 SCISSOR LIFTS: 2019 Genie GS4390RT, 2019 Genie GS3369RT, (3)2019 Genie GS3232, 2019-2018 JLG 4045R, (4)2018 JLG 2646ES, 2019-2018 JLG 2632ES, (2)20192018 JLG 1932R, (10)2024-2023 Mec NANO10XD, 2020-(3)2019 Smartlift SL608RT, 2021-2019 Smartlift SL1008OD, 3 SWEEPERS: 2020-(2)2017 Broce BW260, WELDER: 2019 Lincoln V322, 17 LIGHT PLANTS: (2)2023-2022-2021-(8)2020-2019 Allmand NLPROIILED, (4)2019 Allmand NLPROII, 18 GENERATORS: 2018-(3)2011 Cat CATXQ60, 2022-2017 Cat CATXQ35B, Cat CATXQ30, (2)2019 Cat CATXQ125, 2016 Cat CATXQ100N, 2016 MQ MQ100, (3)2019 SWP QP45, (4)2017 SWP QP35, 3 AIR COMPRESSORS: 2020-2019-2018 Sullair 375DH, 12 CONCRETE BUGGIES: (2)2024-(7)2023-(2)2022 Whiteman WTB-16, 2022 Whiteman SC75, 48 UTILITY VEHICLES: 2020 Cat CUV105D, (9)2020-2019-(2)2018 Kubota RTV-X1140, 2018 Polaris RGRCREWD, (3)2024-(4)2019 Polaris ProXD Crew, (5)2024-(21)2023-2022 Polaris ProXD, 4 SUPPORT EQUIPMENT: 2023 Vibratory Plate Compactor, (3) Jumping Jack Tampers. A VERY LARGE ASSORTMENT FROM THE Cat RENTAL FLEET
Page 70 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
ADVERTISER INDEX To read articles about these CEG advertisers, visit www.constructionequipmentguide.com ABRA EQUIPMENT SUPPLY...........................................................7 ALEX LYON & SON INC ELKO NV 9/3-17 LAS VEGAS NV 9/3-17/2026...................65 HOUSTON TX 10/20/2026....................................................69 ASTEC CARLSON PAVING PRODUCTS.....................................40 ASTEC ROADTEC.........................................................................33 ASV ................................................................................................52 AUCTION BLOCK..........................................................................68 BARGAINS......................................................................................68 BERLON INDUSTRIES..................................................................27 BOBCAT COMPANY......................................................................17 CEG SCALE MODELS...................................................................22 CONSTRUCTION EQUIPMENT GUIDE............................ 48,63,66 DEVELON.......................................................................................26 DYNAPAC..................................................................................36,37 FAE USA INC..................................................................................39 FIORI/BELL TRUCKS.....................................................................11 FLANGE LOCK...............................................................................10 HENDRIX RENTALS LLC................................................................3 HIPOWER SYSTEMS INC.............................................................61 HITACHI CONSTRUCTION MACHINERY ..............................46,47 HUDDIG INC...................................................................................59 HYUNDAI CONSTRUCTION EQUIPMENT.............................28,29 IEDA ................................................................................................19 JCB INC..........................................................................................27 JFW EQUIPMENT INC...................................................................34 JJ SCHECKEL CORP......................................................................5 JOHN DEERE.................................................................................25 JOHN DEERE SKID STEER..........................................................71 KIRBY-SMITH MACHINERY INC...................................................72 KOMATSU AMERICA CORP....................................................50,51 LANDMARK EQUIPMENT AN EQUIPMENT.............................7,27 LEEBOY..........................................................................................35 LIEBHERR USA CO.......................................................................13 MAULDIN PAVING PRODUCTS....................................................32 NATIONAL ATTACHMENTS INCORPORATED............................16 NIECE EQUIPMENT......................................................................21 NPK CONSTRUCTION EQUIPMENT INC....................................57 OKADA AMERICA INC...................................................................60
PREMIER DOOR COMPANY..........................................................7 PURPLE WAVE INC ONLINE/NO RESERVE AUCTIONS 9/24.............................67 ROAD BUILDERS MACHINERY.....................................................9 ROMCO EQUIPMENT CO...............................................................6 ROSCO MANUFACTURING..........................................................42 SAKAI AMERICA INC.....................................................................39 SANY AMERICA INC......................................................................15 SMART TALK TRANSPORT CORP...............................................16 SONSRAY MACHINERY..................................................................2 TAKEUCHI.................................................................................44,45 TORO..............................................................................................30 TROPHY TRACTOR LLC...............................................................20 VANTAGE AUCTIONS....................................................................68 VOLVO COMPACTION..................................................................43 VOLVO CONSTRUCTION EQUIPMENT......................................53 WACKER NEUSON AMERICA CORPORATION..........................23 WEILER PRODUCTS.....................................................................38 WIRTGEN AMERICA......................................................................41 YANMAR AMERICA CORP............................................................49 CALIFORNIA SUPPLEMENT CALIFORNIA CAT GROUP..............................................................3 CONSTRUCTION EQUIPMENT GUIDE.........................................7 GORILLA HAMMERS.......................................................................1 JCB CALIFORNIA.............................................................................8 N & S TRACTOR..............................................................................5 SONSRAY MACHINERY..................................................................2 FOUR CORNERS SUPPLEMENT 4 RIVERS EQUIPMENT................................................................3,7 CONSTRUCTION EQUIPMENT GUIDE.........................................8 FISHER TOOLS................................................................................1 GORILLA HAMMERS.......................................................................1 HOWE RENTAL & SALES...............................................................7 RASMUSSEN EQUIPMENT CO...................................................4,5
The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
CONSTRUCTION EQUIPMENT GUIDE • www.constructionequipmentguide.com • September 6, 2026 • Page 71
DOMINATE
THE DAILY GRIND When the to-do list is long, an average machine won’t cut it. Our G-Series Compact Track Loaders were built to break the mold, with the pushing power and leverage to carve out piles and handle large loads. They’re your go-to machines when you have to get after it. JohnDeere.com/CTLs
DOGGETT HEAVY MACHINERY SERVICES www.doggettequipment.com 9111 North Freeway Houston, TX 77037 713-679-6700 Beaumont, TX 409-842-1754
Bryan, TX 979-823-1905
San Juan, TX 956-787-0001
Alexandria, LA 318-442-0455
Broussard, LA 337-837-9481
Longview, TX 903-758-3326
Monroe, LA 318-343-8787
St. Rose, LA 504-466-5577
Corpus Christi, TX 361-289-0727
Victoria, TX 361-570-6666
Baton Rouge, LA 225-291-3750
Covington, LA 985-893-3005
Lufkin, TX 936-634-8801
Shreveport, LA 318-631-3090
Tyler, TX 903-592-8900
5-2-2025-K-S CEG Equipment Rentals Done Right Ad 10.125x10.625.qxp_Texas Contractor 100 Year Ad 5/2/25 4:06 PM Page 1
Page 72 • September 6, 2026 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
Kirby-Smith Machinery has one of the largest and most diverse rental fleets in the region. • Large Fleet of current model equipment • Rentals available by the week, month or longer • Low weekly and monthly rates • Specialized Equipment & Support – Paving, Crushing, Material Handling, Demolition and more! • Smart Construction and Intelligent Machine Control equipment Follow us on
kirby-smith.com Abilene 325.692.6334
Amarillo 806.373.2826
Chico 940.678.5046
Dallas 214.371.7777
Ft. Worth 817.371.777
Lubbock 806.745.2112
Odessa 432.333.7000
Hewitt 254.261.1370
Oklahoma City 405.495.7820
Tulsa 918.438.1700
McAlester 918.310.1550
Kansas City 913.850.6300
St. Louis 314.729.0125
Van Alstyne Coming Soon!