Skip to main content

Texas 25, December 6, 2020

Page 1

State Supplement sponsored by:

TEXAS STATE EDITION

A Supplement to:

SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY

®

December 6 2020

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. VI • No. 25

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

CALL 800-367-4937

Your Texas Connection • Dennis Hogeboom • 1-877-877-4997 • dennishogeboom@cegltd.com

*On approved credit • Financing Available

By Irwin Rapoport CEG CORRESPONDENT

Longview Bridge & Road Ltd. (LBR) is building a new 690-ft.-long overpass bridge (two lanes in each direction) on U.S. 69 spanning FM 346 in the city of Tyler to improve traffic flow in the largest municipality in northeast Texas. LBR crews have been on-site since October 2018 and are expected to complete their work next spring. The other elements include paving adjacent sections of U.S. 69, culvert work, retaining walls and roadway tie-ins on FM 346. The Texas Department of Transportation (TxDOT) project comes at a cost of $16.7 million. CP&Y Inc. designed the new prestressed concrete Tx46 girder-type bridge and associated infrastructure. The six-span bridge is 80-ft. wide with a 20-degree skew structure. see FLOODPLAIN page 12

Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas

We Have Parts For: Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case

(254) 562-7500 • www.HighTech-parts.com


Page 2 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

HEAVY CONSTRUCTION EQUIPMENT EARTHMOVING, UTILITY, MATERIAL HANDLING, DEMOLITION, SCRAP & RECYCLING

CRUSHING, SCREENING, DRILLING & WASHING MOBILE & STATIONARY EQUIPMENT

Sales - Rentals - Parts - Service

Sales - Rentals - Parts - Service

214.819-4100/800.227-6626 www.romco.com

214.819-4100/800.227-6626 www.romco.com

PAVING TEXAS CONCRETE & ASPHALT PAVING EQUIPMENT

YOUR HEAVY DUTY POWER ADVANTAGE COMPRESSORS, GENERATORS, PUMPS & LIGHT TOWERS ENGINE &

HAMMER

Sales - Rentals - Parts - Service

REBUILDS

214.819-4100/800.227-6626 www.romco.com

210.569-7068 / 800.966-4601 www.romco.com


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 3


Page 4 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Samson Solar Energy Center: Largest Solar Project in U.S. Invenergy, a privately-held global developer and operator of sustainable energy solutions, recently announced a 1,310megawatt solar energy generation facility that will be the largest in the United States upon completion. Currently under construction in northeast Texas, the Samson Solar Energy Center will support the sustainability objectives of five major consumer brands and supply power to three Texas municipalities. “Invenergy continues to lead the energy transition, and this record-setting project demonstrates our expertise at a new scale,” said Ted Romaine, senior vice president of origination at Invenergy. “The Samson Solar Energy Center is the latest example of what can be achieved when companies and utilities seek an innovative partner to meet their sustainability goals and invest in a clean energy future.” As a leading partner to commercial and industrial renewable energy customers, Invenergy has contracted more than 3,500 MW of wind and solar capacity to help more than 20 different corporate users across six U.S. markets and in Mexico to reach their sustainability and clean energy goals. Samson Solar is one of many Invenergy developments that is powering daily American life and also will provide more Texans with cleaner, cost-effective power through agreements with: • AT&T: 500 MW • Honda: 200 MW • McDonald's: 160 MW • Google: 100 MW • The Home Depot: 50 MW • city of Bryan, Texas: 150 MW • city of Denton, Texas: 75 MW • city of Garland, Texas 25 MW “At AT&T, we believe renewable energy is good for the planet, for our business and for the communities we serve,” said Scott Mair, president of AT&T Technology &

Currently under construction in northeast Texas, the Samson Solar Energy Center will support the sustainability objectives of five major consumer brands and supply power to three Texas municipalities.

Operations. “With more than 1.5 gigawatts of renewable energy capacity, our portfolio delivers clean electricity to the grid, helps to create jobs and community benefits, and supports the transition to a low-carbon economy. We're excited to participate in Invenergy's Samson project through the largest corporate solar energy deal in the U.S.” Located in Lamar, Red River and Franklin counties, Samson Solar is a $1.6 billion capital investment and will support up to 600 jobs over the course of the 36-month construction period. In addition, the project will drive significant local economic development, bringing more than $250 million in landowner payments and supporting local communities through nearly $200 million in property tax payments over the life of the project. Samson Solar will be constructed in five phases over the next three years, with each phase commencing operation upon completion. The full project is slated to be operational

in 2023. When complete, it will produce enough energy to power nearly 300,000 American homes. About Invenergy Invenergy and its affiliated companies develop, own and operate large-scale sustainable energy generation and storage facilities in the Americas, Europe and Asia. Invenergy's home office is located in Chicago, and it has regional development offices in the United States, Canada, Mexico, Colombia, Japan, Poland and Scotland. Invenergy has successfully developed more than 25,000 MW of projects that are in operation, construction or contracted, including wind, solar, transmission and natural gas power generation facilities as well as advanced energy storage projects. For more information, visit www.invenergy.com. For more information on the Samson Solar Energy Center, visit www.SamsonSolarEnergyCenter.com. 

Officials Hold Virtual Meetings for Highway Improvements Texas officials recently met — virtually — at public hearings to discuss highway improvements throughout the state. Potential fixes and solutions were brought to the table for some of the area’s most troublesome roads. The proposed project consists of the reconstruction and widening of approximately 13.7 mi. of U.S. 377 from north of BUS 377E in Pilot Point to U.S. 380 in Cross Roads. Improvements would include the expansion of the current two-lane rural roadway to a six-lane urban roadway with a raised median to provide additional capacity and improve safety. Improvements would consist of 12-ft.-wide travel lanes, 14-ft.wide outside shared-use lanes and 5-ft. sidewalks with Americans with Disabilities Act (ADA) curb ramps in both directions through most of the project. Proposed drainage would be conveyed by curb and gutter, a storm sewer system and crossing

Officials from the Texas Department of Transportation recently held vitual meetings with public input on how to handle improvement projects on state highways.

culverts. Other improvements would include realigning the intersections of BUS 377 S at U.S. 377 and FM 424 at U.S. 377. The existing right of way (ROW) width would

increase with the proposed project to 140 ft. The proposed project is anticipated to require 54.7 acres of additional ROW and 1.1 acres of proposed permanent drainage

easements. TxDOT also is proposing to improve 7.7 mi. of FM 741 in Kaufman County from U.S. 175 in Crandall to FM 548 in Forney. Improvements include widening from the existing two lane rural section to a proposed four lane divided urban roadway. The existing right of way width varies from 70 to 100 ft. and the proposed right of way for the project is 140 ft. wide from U.S. 175 to FM 2757 and 120 ft. wide from FM 2757 to the end of project. The proposed U.S. 60 project will construct a new bridge interchange located southwest of Friona, between County Road 14 and County Road 15. The new bridge will span over U.S. 60 and the railroad, with new entrance and exit ramps to U.S. 60. The proposed project would require the acquisition of additional right of way, however, no residential or building displacements are anticipated. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 5

B O B C A T. C O M

FINISH YOUR YEAR STRONG WITH SPECIAL OFFFERS ON BOBCA AT T LO LOADERS OADERS AND EXCA AVATORS. ATORS. E 32 COMPACT EXCAVATOR

U S D*

OR

PLUS

REBATES UP TO $6,000 USD*

I N L I E U O F F I N A N C I N G , GE T

REBATES $ 6,000 UPP TO

UP P TO

REBAT TE S $10,0 0 000

0% FINANCING 60 MONTHS* FOR

IN LIEU OF FINANCING, GE T

U S D*

OR

0% FINANCING 60 MONTHS* FOR

T 7 70 COMPACT TRACK LOADER

PLUS S

REBATES UP TO $4,000 USD* ®

VISIT BOBCAT.COM/FALLSALE20 FOR DETAILS ON HOW TO SAVE ON OTHER BOBCAT EQUIPMENT. *Offer expires 12/31/20. Available at participating and eligible dealers only. Offer may vary by product type, seeries, model and select units in dealer’s current inventory. Must take delivery from dealer stock by 12//31/20. Offers available on new equipment in i US and Canada only. Some restrictions apply. Length of contract may vary. Prior purchases not elligible. See dealer for details. Financing provided on approval of credit by authorized Bobcat finance providers to well-qualified buyers. Administrative fees may apply. Offer not available to government accounts, national accounts and municipal/utility bid customers. Non-commerccial customers may not be eligible for low raate financing. Bobcat Company reserves the right to extend or discontinue any of these proggrams at any time without prior notice.

Bobcat of Abilene 325-673-7361 Bobcat of Amarillo 806-622-9593 Bobcat of Austin 512-251-3415

Bobcat of Corpus Christi 361-884-3959

Bobcat of Midland–Odessa 432-685-9298

Bobcat of the Rio Grande Valley 956-425-4300

Bobcat of Waco Elm Mott 254-666-1669

Bobcat of Lubbock 806-745-1322

Bobcat of San Antonio 210-337-6136

Bobcat of Victoria 361-579-0922

Ranchers ATV and Tractor Kerrville 830-315-2330

BobcatCCE.com ®

Bobcat , the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United Statees and various other countries.


Page 6 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Since 2010, Amazon has created more than 43,000 jobs in Texas and invested more than $16.9 billion across the state, including infrastructure and compensation to its employees.

Amazon’s investments have contributed more than $18.8 billion in GDP to the Texas economy and have helped create more than 49,000 indirect jobs on top of Amazon’s direct hires.

Amazon Announces Its First Fulfillment Center in Waco Amazon.com Inc. recently announced plans to open its first fulfillment center in Waco, Texas, which is anticipated to launch in 2021. “We are proud to be bringing our newest Amazon facility to the city of Waco and we look forward to bringing in new jobs and supporting this great community,” said Alicia Boler Davis, Amazon’s vice president of global customer fulfillment. “We are excited for our future in central Texas, and for what this means for our customers as we continue to grow. We’d also like to thank local and state leaders for their strong support in making this project possible.” In the 700,000 sq.-ft. robotics fulfillment center, Amazon employees will pick, pack and ship small items to customers such as books, electronics and toys. The facility will create more than 1,000 new full-time jobs with comprehensive benefits starting on day one. “The Lone Star State is proud to celebrate another economic achievement for central Texas with Amazon's new investment in Waco,” said Texas Gov. Greg Abbott. "Texas continues to thrive as the nation's premier destination for companies like Amazon thanks to our skilled workforce, diverse economy and business-friendly model that promotes economic growth. This facility is the latest milestone in the strong partnership between Amazon and Texas, and I look forward to seeing the prosperity this facility will bring to the Waco community." “We are delighted to welcome Amazon to Waco. This is an especially exciting eco-

nomic development success for the city of Waco and our entire region,” said Waco Mayor Kyle Deaver. “Within two years after opening, Amazon plans to have more than 1,000 new jobs in Waco. Amazon’s investment and commitment to job growth in Waco will help drive our economic recovery forward. We appreciate the work of the Greater Waco Chamber of Commerce, the Waco/McLennan County Economic

Development Corporation and the Waco Industrial Foundation in attracting Amazon, and we look forward to having this innovative fulfillment center as a showpiece in the Central Texas Industrial Park.” Amazon has pledged to invest more than $700 million to provide upskilling training for 100,000 U.S. employees for in-demand jobs. The programs will help employees from all backgrounds access training to

“The Lone Star State is proud to celebrate another economic achievement for central Texas with Amazon's new investment in Waco,” said Texas Gov. Greg Abbott.

move into highly skilled roles across the company’s corporate offices, tech hubs, fulfillment centers, retail stores and transportation network, or pursue career paths outside of Amazon. “I would like to join the McLennan County Commissioners Court in welcoming Amazon and its state-of-the-art robotics fulfillment center to Waco,” said McLennan County Judge Scott Felton. “This project is definitely a breakthrough collaboration of the Waco McLennan County Economic Development Corporation working with the Waco Industrial Foundation. We can draw the interest of Fortune 100 companies, we can do the big deals and we can meet the infrastructure and resource needs of most companies. We continue to promote workforce development and are creating a growing skilled workforce.” Since 2010, Amazon has created more than 43,000 jobs in Texas and invested more than $16.9 billion across the state, including infrastructure and compensation to its employees. Amazon’s investments have contributed more than $18.8 billion in GDP to the Texas economy and have helped create over 49,000 indirect jobs on top of Amazon’s direct hires – from jobs in construction and logistics to professional services. More than 116,000 independent authors and small and medium businesses in Texas are selling to customers in Amazon’s store, creating thousands of additional jobs across the state. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 7

Kirby-Smith Machinery has one of the largest and most diverse rental fleets in the region. UÊ >À}iÊ iiÌÊ vÊVÕÀÀi ÌÊ `i ÊiµÕ « i Ì UÊ,i Ì> ÃÊ>Û> >L iÊLÞÊÌ iÊÜii ]Ê Ì Ê ÀÊ }iÀ UÊ ÜÊÜii ÞÊ> `Ê Ì ÞÊÀ>ÌiÃ

UÊ6>À iÌÞÊ vÊ «Ì Ã\Ê,i Ì]Ê,i ÌÊÌ Ê*ÕÀV >Ãi]Ê ÕÞÊ ÀÊ i>Ãi UÊ ÜÊw > ViÊÀ>ÌiÃÊ>Û> >L iÊÜ Ì Ê >ÌÃÕÊ > V > UÊ iÜÊ> `Ê1Ãi`ÊiµÕ « i ÌÊv ÀÊÃ> i Follow us on

www.kirby-smith.com

888.861.0219

Abilene

Amarillo

Dallas

Ft. Worth

Lubbock

Odessa

325.692.6334

806.373.2826

214.371.7777

817.378.0600

806.745.2112

432.333.7000 Follow us

Waco

Oklahoma City

Tulsa

McAlester

Kansas City

St. Louis

254.261.1370

405.495.7820

918.438.1700

918.310.1550

913.850.6300

314.729.0125

on


Page 8 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Bottom Line Equipment Lends Helping Hand After Derailment

Armed with a fleet of heavy equipment, crews from Bottom Line Equipment helped lift damaged tracks caused by a train derailment on Oct. 29.

A train derailment on Oct. 29 in Texas caused the evacuation of nearly 600 residents in Mauriceville — but the local emergency management office reported no injuries. A Kansas City Southern train derailed around 7:30 a.m. in Mauriceville, near the state’s border with Louisiana. The derailment involved 25 cars, according to the Orange County Office of Emergency Management. Most of the cars were loaded; 10 were empty. Bottom Line Equipment, with locations throughout Texas and Louisiana, was there to lend a helping hand in the cleanup effort. Armed with a fleet of heavy equipment, crews helped lift damaged tracks. “A freight train derailment in southeast Texas caused railcars to pile up on the tracks and spill over onto a nearby roadway. We were ready with equipment onsite to assist in the cleanup right away,” Bottom Line Equipment said in a Facebook post. “Five confirmed tank cars were breached, four were leaking a petroleum product that did not represent a risk to the general population and the fifth involves a corrosive product that is being contained,” the Office of Emergency Management said in a Facebook post. A 1-mi. “exclusion zone,” which initially impacted

600 residents, was set up while cleaning and containment were underway. By the evening of the derailment, the zone included only about 25 to 30 homes, Orange County Emergency Management Coordinator Joel Ardoin told USA TODAY. Total cleanup took about 48 to 72 hours, he said. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 9


Page 10 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Joe Tegtmeyer photos

New footings were installed on the central “road;” new contractor trailers were erected; the 9th & 10th columns were installed; and many trucks delivered steel columns and beams to the Travis County construction site.

Tesla Gigafactory Making Quick Progress in Travis County

B

ulldozers and other heavy construction equipment have been at work for weeks at the location of Tesla’s future $1.1 billion electric vehicle factory in southeast Travis County. The planned 4.5 million sq.-ft. factory will make Tesla’s cybertrucks and Model Y electric crossover utility vehicles. The site sits on 2,100 acres of land, just off Texas 130.

Joe Tegtmeyer photo

The new Tesla Gigafactory will suport cybertrucks and Model Y electric crossover utility vehicles.

Joe Tegtmeyer photo Joe Tegtmeyer photo

Travis County and the Del Valle school district helped lure the factory here by approving tax breaks sought by Tesla that are valued at a minimum of about $60 million combined.

Tesla CEO Elon Musk first referred to the plant as a “Cybertruck Gigafactory” since it’s also going to be the site where Tesla’s electric pickup truck is going to be produced.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 11

WE FOCUS ON THE MACHINE SO Y YOU OU CAN WORK. O

Houston, TX 713-247-0066

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

713-247-0066

CLOSE TO OUR CUSTOMERS

For your su uccess uccess. ROAD AND MINERAL TECHNOLOGIES. S. The WIRTGEN GROUP owes its strength to the excellence ence of its product brands – WIRTGEN, VÖGELE, HAMM and KLEEMANN – with their unique que wealth of experience. Put your trust in the WIRTGEN GROUP P.. Find out more: www.wirtgen-gr group.com/america

Corpus Christi, TX San Benito, TX

El Paso, TX

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

956-361-0066

915-541-0066

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

San Antonio, TX

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

210-310-0066

361-576-0066

956-725-0066

713-247-0066

361-289-0066


Page 12 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Crews Able to Beat Water, Soil Conditions On Overpass Job FLOODPLAIN from page 1

“The spans utilize prestressed concrete Tx46-girders ranging from 105-foot to 120-foot in length,” said Paul Schneider, area engineer of TxDOT’s Tyler district. “The skew of the overpass is set to match the underlaying FM 346 roadway and is constant throughout the structure. Given the width of the bridge, not varying the skew eliminates a significant variance in length between exterior girders and instead allows for the same length girder to be fabricated for a given span. “Slab and girder deflections also remain relatively similar within a span,” he added. “The prestressed girders were selected to optimize span length, structure depth and foundation elements. Additional benefits include their cost effectiveness and familiarity amongst local contractors. The railing and aesthetics of the bridge and retaining walls were designed to match the interchange of U.S. 69 69 at FM 344, 5 miles to the south.” Construction Progress LBR has completed the main bridge structure and major culvert work. The remainder of the work consists of installing barrier rail, adjacent roadway and ramp tie-ins and FM 346 roadway tie-ins under the bridge. “The floodplain and creek also affected construction,” said Alvaro Lopez, Longview’s project manager. “The hydraulics and the drainage impacted the project when heavy rains were experienced at the initial phases of construction, which caused delays. These issues were addressed with appropriate drainage and underdrain installation. Additionally, careful planning and resource loading to expedite subgrade and structure work when weather allowed. After the award of the project, only a couple weeks are allotted before the notice to proceed, but our management team and field staff spent the essential time to plan and review how the bid was composed in order to deduce the proper execution plan. However, the team constantly readjusted the plan to match the changing conditions.

The prestressed girders were selected to optimize span length, structure depth and foundation elements.

The hydraulics and the drainage impacted the project when heavy rains were experienced at the initial phases of construction.

“We mainly conduct work during the day, but due to the restricted lane closure times – 9 a.m. to 4 p.m. — we change shifts to accommodate the nature of work that requires closures, which includes traffic switches, pavement operations, beam sets and critical structure work,” he added. “This is a tight work zone due to the traffic configuration, but with help of lane closures and TCP plans, we are able to work through these circumstances. TxDOT is our main client and we always strive to continue the great relationship we have with them. Construction issues are inevitable in our industry, but

New materials should include: more than 4,400 cu. yds. of structural concrete, 44,400 tons of asphalt and 515,842 lbs. of steel.

The remainder of the work consists of installing barrier rail, adjacent roadway and ramp tie-ins and FM 346 roadway tie-ins under the bridge.

with partnering we always find the most optimal, safest and cost-effective resolution in a timely manner.” The construction sequence and plan of attack proceeded with shifting traffic on the insides of the pavement using temporary pavement to reconstruct NB and SB of U.S. 69, along with the necessary storm sewer and culvert adjustments. “This was followed by continuing, traffic shifts on outside NB and SB U.S. 69 and culvert work on inside and middle portions,” said Alvaro. “We then proceeded to construct the bridge structure along with MSE retaining walls in this second phase, as well as completing the U.S. 69 transitions and main lanes. Traffic was then shifted to its final configuration, and we completed the remaining storm sewer work and constructed the inner portion of U.S. 69 ramps and FM 346 Uturn.” The last aspect had traffic shifted onto FM 346 to complete remaining work — leveling up the U.S. 69 main lanes, finishing the final driveways and access to the cross streets, and placing final pavement markings along with landscape work. Elements of the bridge were prefabricated, including 36,718 sq. ft. of prefabricated concrete deck panels from Austin Prestressed Company, 8,096 linear ft. of TX 46 concrete girders from Texas Concrete Partners, 30,000 sq. ft. of MSE wall panels from The Reinforce Earth Company, and precast drainage items from Forterra. “Our deck pours consisted of two separate pours, which were conducted at night for temperature control and traffic closures,” said Alvaro. “Our Bidwell bridge screed paver played an essential role on this scope of work. Additionally, East Texas Concrete Pumping provided great assistance to the pour of this deck.” Safety was a constant for the bridge work. “We have safety cable systems that are installed for our bridge work and we also use an engineered safety overhang rail system,” said Alvaro. “Our safety record has been good, see FLOODPLAIN page 18


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 13


Page 14 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Officials Approve New 63,000-Sq.-Ft. A&M Rec Center

The 63,000-sq.-ft. facility will have areas for basketball, volleyball, indoor soccer, strength and conditioning, a climbing wall and locker rooms, among other amenities.

Texas A&M University’s Board of Regents has approved the construction of a $35 million recreation center on the south side of A&M’s main campus. The recreation center will be off Bizzell Street adjacent to the A&M golf course and across from Krueger, Mosher and Rudder halls. Construction could begin as early as December and is expected to be completed by June 2022. “In recent years, Texas A&M has invested heavily in several facilities designed to enhance the educational experience,” Texas A&M University President Michael K. Young in a statement. “With this new recreation center, we’re supporting our students’ health and well-being, which are essential to helping them succeed not only in the classroom, but also in life.” The 63,000-sq.-ft. facility will have areas for basketball, volleyball and indoor soccer, strength and conditioning, a climbing wall and locker rooms, among other amenities. A&M administrators said the facility is needed because of the university’s increasing enrollment. A study by the National Intramural Recreational Sports Association shows a university of A&M’s size should have at least 587,000 square feet of indoor recreational facilities. A&M has about 415,000 square feet. Since the Student Recreation Center was opened in 1995, the university’s student body has grown more than 60 percent, the university said in a release announcing the project. During the same time, recreational

facilities on campus have expanded by only 25 percent. A&M administrators noted how all recreational facilities are on the west side of A&M’s campus, which is more than a 10minute walk from many academic and housing buildings. “The South Campus Recreation Center is

Texas A&M University’s Board of Regents recently approved the construction of a $35 million recreation center on the south side of A&M’s main campus.

a critical project to the university’s commitment to provide students, faculty and staff with the best opportunities to support and nurture their health and well-being,” said Rick Hall, A&M’s director of recreational sports. “The Department of Recreational Sports provides high-quality, inclusive experiences and facilities. Multiple assessments

have shown that participants in recreational activities have higher persistence rates and graduation rates than those who do not engage in recreation. A student’s overall health and well-being, coupled with academic success, will prepare graduates for successful careers within the global economy.” 

The recreation center will be located off Bizzell Street adjacent to the A&M golf course and across from Krueger, Mosher and Rudder halls. Construction could begin as early as December and is expected to be completed by June 2022.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 15

WE HAVE YOUR NEXT WATER OR FUEL AND LUBE TRUCK Niece NFL200 Niece Fuel/Lube trucks are built to keep your fleet of construction vehicles in high production condition. The NFL2000 features: • 2000 gallon fuel tank • (4) 100 gallon oil product tanks • 150 gallon waste oil tank • 50 gallon water / antifreeze tank • 120 lb. grease station with Graco 50:1 piston pump

NWT4000

The NWT4000 on-highway water distribution system is very popular in Highway and Sub Division applications. With more water the return to the fill site saves money. It can reload in three to four minutes and spend more time moisturizing soil. 4,000 gallon tank.

NWT2000

The NWT2000 is our most popular water truck. It is registered at 25,900 pounds and does not require driver to have a CDL. 2,000 gallon tank.

NFL1000

The NFL1000 Our popular 1000 gallon fuel truck, perfect for mid-sized fleets. Also (4) 75 gallon oil product tanks, 100 gallon waste oil tank, and 50 gallon water/antifreeze tank


South Texas’ one stop truck and trailer source!

Page 16 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Used Truck & New/Used Trailer Sales/Parts/Service

Trailer Service (Light up to Heavy duty) Truck Maintenance (Medium & Heavy Duty)

Laser alignments on truck and trailers (unlimited axles) Texas DOT inspection station

Our New Location in...

Robstown, TX

Robstown 3205 Highway 44 Robstown,TX 78380

361-387-5010 Houston 11113 Wallisville RD Houston,TX 77013

713-670-0733 www.jbpavelkainc.com

Full rigging shop Full fabrication shop

Reflooring Truck frame modifications

Tarp system repair/installation Field Service

Conversions Custom builds

Ground Breaks on $53 Million KSM Hires Sales Manager New High School Expansion A groundbreaking ceremony was recently held to celebrate the renovation and construction of an addition to Midlothian Independent School District’s Heritage High School in Midlothian. Adolfson & Peterson Construction is the general contractor, and VLK Architects is the architect on this project. Located in northwest Ellis County, 25 mi. southwest of Dallas, the $53 million project includes a 185,000-sq.-ft. addition to Heritage High School, adding a second-level classroom wing, two gymnasiums, a fine arts complex, cafeteria expansion and four new athletic facilities. With a completion date slated for summer 2022, the project also will include renovations to the existing high school and gymnasium spaces, a new football field, a new entrance pavilion and parking lot expansions.

“We are both proud and excited to partner with Midlothian ISD and Adolfson & Peterson in the realization of Phase 2 of the master plan of Heritage High School,” said Ross Rivers, principal of VLK Architects, in a statement. “We believe in fostering an environment where every student can discover their passions and reach their unlimited potential,” added Dr. Lane Ledbetter, superintendent of schools. “Thanks to the support of our community, we can create new opportunities at Heritage High School that will benefit our students for many years to come.” Established in 1906, the Midlothian Independent School District is a fast-growing K-12 public school district with more than 9,800 students and 1,100 employees. Comprised of 12 campuses, MISD focuses on innovative learning environments of academic and vocational student interests. 

Kirby-Smith Machinery Inc. (KSM) has hired Gavin Cole as sales manager of its Fort Worth, Abilene and Waco, Texas, locations. Cole brings more than 24 years of relevant experience in managing sales and dealer operations to the position, most recently serving as general manager of Briggs Equipment in Houston. With more than two decades of heavy equipment sales experience in Texas, Cole is extremely familiar with KSM’s market and customer base. He will manage all sales activity and be responsible for a team of nearly a dozen sales personnel covering territory around the three branch locations. “I am excited to be back in the Dallas-Fort Worth metroplex with the opportunity to join such a talented team,” said Cole. “I am looking forward to building new relationships and working with our sales team to support our customers.” Del Keffer, vice president of sales of KSM, believes Cole is an excellent addition to the sales management team. “Gavin is tenacious in his responsibilities, thoughtful in the way he treats customers and employees, and possesses both great integrity and a strong moral compass. His can-do attitude and customer focused manner will only add to the team he is leading in

Gavin Cole

our Fort Worth, Abilene and Waco facilities. As you add to any team, you look for players who possess the skillset to make everyone around them better. Those skills are abundant in Gavin and will be well-matched to his new role.” For more information, call 888/861-0219 or visit kirby-smith.com. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 17

800.255.8628 www.powerscreentx.com

Hybrid Solutions from Powerscreen Premiertrak 600E Jaw Crusher The 600E comes complete with an onboard diesel generator. This machine can be powered from the generator or from an external power supply HIGHLY PRODUCTIVE IN: • Recycling

• Demolition,

• Quarrying

• Mining

• Construction

Warrior 1400 XE Is electricity your preferred power method? Achieve economy in your screening operation. POWER OPTIONS: • Self-powered with its own 72kVA generator • Electricity generated by other Powerscreen models • Connected to a main electricity supply

Crushing • Screening • Conveying • Washing • Recycling • Grinding Systems

SERVING TEXAS, OKLAHOMA, ARKANSAS & LOUISIANA 5680 West State Hwy 71 • La Grange, TX 78945 • Phone: 800.255.8628


Page 18 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Hydraulics, Drainage Issues Pace Crews On U.S. 69 Project FLOODPLAIN from page 12

and we plan to close out the job with the same record.” The management team also includes Superintendent George Davidson; General Superintendents David Talancon and John Clemens; Longview Vice Presidents Robert Adamson and Reece Sterling, President Casey Johnson and CEO Larry Johnson. “The team dynamic plays an important role in our success,” Alvaro said. “We are fortunate to have crew leaders with many years of experience that constantly push our employees to provide quality work. Our field crews sacrifice countless hours from night and day to build and improve our infrastructure.” Peak days had 75 workers on site. The main subcontractors are: Striping Technology L.P. for electrical, striping and large signs; Issacs Construction Services for small signs and erosion control; M&D Foundation Drilling Industries for drilled shafts; Morris County Contractors for MBGF, CCA and object markers; and Wolfe Construction for seeding. Earth work and excavation accounted for 60,983 cu. yds. of embankment and topsoil, 20,121 cu. yds. of excavation, and 45,508 sq. yds. of cement treated subgrade. “Longview Bridge and Road has a sister company, Wood County Asphalt, that produces multiple asphalt products which allows us to recycle RAP [reclaimed asphalt pavement] for our projects,” said Alvaro. “Additionally, we have a concrete crusher which we use to recycle concrete paving and base removal. LBR has a commitment to recycle materials to make improvements for the community by avoiding waste and keeping material as well as the work in east Texas.” New materials should include: more than 4,400 cu. yds. of structural concrete, 44,400 tons of asphalt, 515,842 lbs. of steel, more than 8,000 linear ft. of concrete girders and 30,000 sq. ft. of MSE retaining wall.

Flooding issues have plagued U.S. 69 for years. Crews from Longview Bridge and Road helped alleviate those problems by building a new overpass.

“Hydraulic leaks, hoses, radiator and routine mechanical eral funding, is expected to carry 16,600 vehicles daily when maintenance is where we find our on-site mechanic very open to traffic and 21,800 vehicles by 2036. The structure is beneficial,” said Alvaro. “Keys to successful maintenance being built in the southern part of the city, in an area consistare performing required daily inspections and properly ing mainly of commercial properties with adjacent FM (farm reporting any issues/malfunction to our mechanical depart- to market) roads feeding residential areas. It serves as the ment.” main corridor for those that commute from the south to and Longview purchases and rents equipment from Tyler. from Holt CAT, Howard-McAnear “The new bridge will decrease the comEquipment, Louisiana Machinery and Bane mute time and increases safety by eliminatEquipment Used Machinery, as well as United Rentals and ing a signalized intersection and allowing a Sunbelt for small equipment needs. continuous traffic flow over the current atCranes: grade intersection,” said Schneider. Link-Belt 218HSL Bridge Information “Henshaw Creek crosses the U.S. 69 corLink-Belt 118 The new bridge, financed by state and fedridor immediately south of FM 346, and it Grove RT 750 and the associated floodplain influenced the design in several ways,” said Schneider. “The Excavators: hydraulic analysis of the creek indicated that Cat 325E roadway embankment approaching the Cat 329E bridge could not be present within 500 feet of Komatsu PC210 the south side of FM 346. To accommodate the hydraulic needs, the bridge includes addiDozers: tional spans on the southern approach of the Cat D5 bridge, as well as the installation of a new Cat D6 box culvert structure under the frontage John Deere 750 roads. “In addition, water-bearing sandy soils Motor graders: were discovered in the geotechnical investiCat 140M gation,” he added. “The use of casing or slurCat 140H ry displacement was noted in the plans to address any potential hole integrity issues Loaders: during drilled shaft construction. Cat 950G Underdrains were also used under the southCat 924G ern spans of the bridge to convey groundwaKomatsu WA380-8 ter from the site.” The construction phasing design allows Rollers: the bridge to be constructed in a single phase, Ingersoll Rand 125R reducing overall construction duration and Cat C5S eliminating multiple mobilizations of conVolvo SD100 struction crews. The traffic management is based on occaPavers: sional lane closures of U.S. 69, mainly Roadtec 4223 along U.S. 69 near the intersection of FM Cat AP 100E 346, with the speed limit reduced to 60 mph LBR Project Manager Alvaro Lopez Jr. (L) poses with a little helper, Julian. in the work zone.  CEG


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 19

December 23, 2020


Page 20 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Maplewood 2 Solar Project...

Pipeline Company Building Solar Project in West Texas Canadian Solar Inc. recently announced its wholly-owned subsidiary, Recurrent Energy LLC, is currently constructing the 28 MWac Maplewood 2 Solar Project for Energy Transfer, a Dallas-based Fortune 100 midstream energy company. Maplewood 2 is located in Pecos County in the Permian Basin of west Texas, and will deliver low-cost, clean power to Energy Transfer under a 15-year Power Purchase Agreement (PPA). This PPA marks Energy Transfer’s first-ever dedicated solar contract. “The Maplewood 2 Solar Project is our third project to be constructed in Texas, bringing our total to more than 385 MWac of low-cost clean solar projects built in the Lone Star State,” said Shawn Qu, chairman and chief executive officer of Canadian Solar. “We are pleased that this project is now under construction, as it brings us that much closer to delivering low-cost, clean power to Energy Transfer.” Energy Transfer President and Chief Commercial Officer Mackie McCrea added, “The Maplewood 2 Solar Project demonstrates our commitment to reducing our environmental footprint by integrating alternative energy sources when economically beneficial. While we currently use a diversified mix of energy sources along with emission-reducing technologies to operate our assets, this project marks a new milestone for us as our first dedicated solarpowered facility.” Texas has led the production of energy since the discovery of the Spindletop oilfield in 1901. The state’s geography and natural resources, skilled labor force and internal competitive power market, the Electric Reliability Council of Texas (ERCOT), give it an energy advantage. According to a report by Wood Mackenzie and the Solar Energy Industries Association, Texas

“This project marks a new milestone for us as our first dedicated solar-powered facility.” Shawn Qu Energy Transfer

Houston, TX 713-247-0066

San Antonio, TX 210-310-0066

www.nuecespower.com

ranks 4th in the United States for solar installed, with enough solar capacity to power more than 640,000 homes, and is poised to become a nationwide leader with more than 4 GW of capacity expected to be installed over the next five years. Qu added, “Our partnership with Energy Transfer on the Maplewood 2 Solar Project is emblematic of the diverse Texas energy landscape and represents the market-oriented business climate the state is so well known for. It’s tremendous to be working with Energy Transfer to provide an economical, clean energy solution that will support their U.S. operations.” The Maplewood 2 Solar Project is estimated to be in operation in Q1 2021. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 21

The W Wor orldwide e Leader in Concrete Paving T Technolo echnology

ww ww.gomaco.com m ❘ inffo@gomac o@gomacco.com GOMACO offers the full range of concrete slipform p pavers, curb and d gutt tter machiness, placer/sp er/spreaders, texture/cure machines and bridge/ idge/canal finishing equipment. GOMACO equipment features our exclusive and proprietary G+ G ® control system, created in-house by our soffttware engineers from the wants and needs of contractors paving in the field. At the heart of GOMACO equip fie pment is our passion for concrete and our commitment to our customers. We look ffo orward to visiting with you about your upcoming paving projects and your concrete paving equipment needs.

ROMCO Equipment Co.

Sierra Machinery, Inc.

www.romco.com

www.sierraelpaso.com

Buffalo, TX 903-322-5602

Ft. Worth, TX 817-626-2288

Longview, TX 903-758-5576

Carrollton, TX 214-819-4100

Houston, TX 713-937-3005

Midland, TX 432-234-9409

939 Hawkins Boulevard El Paso, TX 79915 915-772-0613

Closner Equipment Company Inc. www.closner.com San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131

Austin Branch 13800 FM 973 N Manor, TX 78653 512-272-8200


Page 22 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

TEXAS STATE SUPPLEMENT ADVERTISER INDEX

Construction Crews Deliver $200M Upgrades at Hospital

BANE MACHINERY ........................................................24 BEE EQUIPMENT SALES LTD ......................................20 COMPACT CONSTRUCTION EQUIPMENT ..................5 CONSTRUCTION EQUIPMENT GUIDE ........................19 GOMACO CORP ............................................................21 GORILLA HAMMERS........................................................1 HIGH TECH INDUSTRIES ................................................1 J & B PAVELKA INC ........................................................16 KIRBY-SMITH MACHINERY INC......................................7

Crews recently placed the last beam atop the administration building and are on track to complete 50 percent of the building by February 2021.

MCCOURT EQUIPMENT INC ..........................................9 NIECE EQUIPMENT ......................................................15 NUECES POWER EQUIPMENT - HYUNDAI ................11 NUECES POWER EQUIPMENT - LIEBHERR ..............11 NUECES POWER EQUIPMENT - LINK-BELT ..............11 NUECES POWER EQUIPMENT - TAKEUCHI ..............20 NUECES POWER EQUIPMENT - WIRTGEN ................11 POWERSCREEN TEXAS ..............................................17 ROMCO EQUIPMENT ......................................................2 ROMCO MATERIAL PROCESSING SYSTEMS ..............2 ROMCO PAVING EQUIPMENT ........................................2 ROMCO POWER SYSTEMS............................................2 SMITHCO ........................................................................23 TROPHY TRACTOR ........................................................3 VERMEER OF TEXAS-LOUISIANA ..............................13 WAUKESHA-PEARCE INDUSTRIES INC........................8 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Construction crews are busy at work on a nearly $200 million project to build a modern 227,000 sq.-ft. patient complex and replace the administration building at Rusk State Hospital, the Texas Health and Human Services Commission announced. Crews recently placed the last beam atop the administration building and are on track to complete 50 percent of the building by February 2021. The construction team also has completed demolition work at the site of the new patient complex and have begun laying plumbing and installing electrical infrastructure. “The new hospital isn’t just about having a state-of-the-art building,” said Tim Bray, HHSC associate commissioner of state hospitals. “It’s about creating a therapeutic setting that will foster healing and recovery for the patients entrusted in our care. Rebuilding these units is part of our continued mission to be a leader in modern day mental health care for Texans.” The patient complex will include a 100bed maximum-security unit and a 100-bed non-maximum-security unit. This project also will include the construction of a new administration building. “I’m proud to support Rusk State Hospital and thank them for all the important work that they do,” said State Sen. Robert Nichols. “Their enduring commitment to caring for those in need is vital to the health and wellbeing of East Texas residents. The state’s investment in state hospitals shows our dedication to ensuring Texas is a leader in mental health care.” This project is part of a $745 million investment from the Texas Legislature and Gov. Greg Abbott for the construction and

renovation of state psychiatric hospitals in Austin, Kerrville, Rusk and San Antonio, as well as a new hospital in Houston. Combined, the construction projects at the hospitals will add at least 350 new inpatient psychiatric beds in Texas within the next four years. “The construction project reaffirms our state’s commitment to provide quality care for those who need it most,” said State Rep. Travis Clardy. “While the Rusk State Hospital has served our community for over a century, this much-needed investment will not only serve to enhance the facilities with state-of-the-art-innovation, but more importantly provides the Rusk State Hospital with the resources necessary to increase access to high-quality health care for generations to come.” The three-story, 227,368 sq.-ft. patient complex features single-person rooms, the use of natural light throughout patient rooms and common areas, and outdoor spaces to promote recovery and healing. The first floor will have social interaction spaces such as a movie theater, salon, café, library, gym and a music therapy room. The second and third floors will hold the patient units, an exercise room, group therapy rooms and classrooms. Outside, there will be secure courtyards and walking trails, as well as basketball and volleyball courts. The new two-story administration building is 18,900 sq. ft. and will accommodate the administration department and IT staff. The patient building is expected to open in February 2023, and the administration building is scheduled to open in November 2021. For more information, visit www.hhs.texas.gov. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 6, 2020 • Page 23

What can you haul in a side dump trailer? Nearly anything.

Superior Stability

Faster Cycle Times

Easier Unloading

With construction grade tires and an ability to haul dirt, rock, millings, riprap and other materials, our trailers help solve the everyday challenges of the construction industry. When we build trailers, we build solutions. 800-779-8099 • sidedump.com


Page 24 • December 6, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

True Power. At Bane Machinery, we offer Liebherr machines that are custom-engineered to perform efficiently. And we stand behind them with full service. Count on us for original parts, factorytrained technicians, and an extensive inventory of machines for your toughest jobs. We can also service your equipment to OEM standards in the shop or the field. We haven’t compromised on anything; why should you?

DALLAS 2449 Manana Dr. Dallas, TX 75220 Ph: (214) 352-2468

FORT WORTH 10505 North Freeway Fort Worth, TX 76177 Ph: P (817) 847-5894

TYLER 3402 N. NE Loop 323 Tyler, TX 75708 Ph: (903) 597-6641

www.banemachinery.com


Turn static files into dynamic content formats.

Create a flipbook