State Supplement sponsored by:
TEXAS STATE EDITION
A Supplement to:
SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY
®
24 HOUR TECHNICAL SUPPORT BACKED BY AN 85 YEAR BUSINESS
May 31 2026
Thousands in Service!
Vol. XI • No. 11
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Affordable Price. Premium Service.
Your Texas Connection • Jacob Estrello • 1-210-878-5650 • jestrello@cegltd.com
CALL 800-367-4937 *On approved credit • Financing Available
J. Lee Milligan Upgrades U.S. 60 Section Near Hereford By Irwin Rapoport
CEG CORRESPONDENT
The Texas Department of Transportation’s (TxDOT) $44 million U.S. 60 in Hereford project — being constructed by J. Lee Milligan Inc. — is upgrading the safety, mobility and connectivity along an important approximately 2.5-mi. section of the highway in the Texas Panhandle area. Operations began in early March 2026, and the initiative is scheduled for late 2029 completion. The construction zone stretches from Progressive Road to the Tierra Blanca Creek bridge. The major safety upgrades include removing and replacing the existing asphalt roadway surface, making Americans with Disabilities Act (ADA) improvements to sidewalks and traffic signals and upgrading the storm sewer and drainage systems. see HIGHWAY page 19
Major safety upgrades include removing and replacing the existing asphalt roadway surface, making Americans with Disabilities Act (ADA) improvements to sidewalks and traffic signals and upgrading the storm sewer and drainage systems.
The Texas Department of Transportation’s $44 million U.S. 60 in Hereford project is upgrading the safety, mobility and connectivity along an important approximately 2.5-mi. section of the highway.
Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas
We Have Parts For:
Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case
(254) 562-7500 • www.HighTech-parts.com