Skip to main content

Ohio 5 March 13, 2017

Page 1

90

A Supplement to:

OHIO STATE EDITION

80 6 422

6 80 24

6

4

71

76

199 30 30 75

68

30 77

71 23

®

March 11 2017

Vol. XVIIII • No. 5

22 68

4

70 70

70

22 71

75

77

27 22 74

50

50 25

35

52

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your Ohio Connection: Ed Bryden, Strongsville, OH • 1-800-810-7640

Utility Work Marks Phase I of ODOT’s $84M I-76 Project

By Irwin Rapoport

CEG CORRESPONDENT

Shelly & Sands (S&S) started work on the Ohio Department of Transportation’s (ODOT) $84 million Main/Broadway interchange improvement project, a major urban renewal project for Akron, in June 2016, and the project is set for completion in July 2020. The plan, developed by ODOT and the city of Akron, improves safety and will reduce the number of crashes, replace aging infrastructure and provide roads that meet current design standards. The work entails the reconfiguration of the I-76/77 Main/Broadway interchange ramps; relocation and modifying of sections of several side streets; and the permanent closure of the I-76/77 Grant Street/Wolf Ledges Parkway interchange ramps. The work area covers one mile of I-76, one mile of Main and Broadway and 11 bridges. “The Grant St. and Wolf Ledges exit and entrance ramps will be permanently closed,” said Lorie Feudner, P.E. ODOT District 4 traffic studies engineer. “Upon completion, all traffic will exit at the Main/Broadway interchange creating a single point of access to downtown Akron along I-76.” The majority of highway components are between 40 and 50 years old, facilitating the replacement of nine bridges and complete pavement replacement on I-76 between Princeton St. and Sumner St. pedestrian bridge. The new infrastructure was designed by AECOMM . “The contractor may use any portion of the project right-of-way for staging, equipment storage, or

Shelly & Sands (S&S) started work on the Ohio Department of Transportation’s (ODOT) $84 million Main/Broadway interchange improvement project, a major urban renewal project for Akron, in June 2016, and the project is set for completion in July 2020.

an office site with the approval of the engineer,” said Jason Young, P.E. ODOT District 4 construction engineer. “This project takes place in an urban environment and to minimize any adverse construction noise impacts, the contractor is restricted from operating construc-

tion equipment between the hours of 10:00 p.m. and 6:00 a.m. on city streets.” The work site encompasses four neighborhoods: the downtown area, south Akron, Summit Lake and University Park. Pete Kinzer, Shelly & Sands

project manager, said that the work is divided into four phases — Phase 1, the S. Main/S. Broadway section and three bridges to be completed in late fall 2017; Phases 2 and 3, I-76 EB/WB, including and eight bridges to be completed in 2018 and 2019; and Phase 4,

final surface pavements to be completed by July 2020. While some minor work has been done on I-76, the Phase 1 work has crews focusing on underground infrastructure installation with a new 66-in. (167.6 cm) diameter sanitary sewer pipe with bypass pumping that is 20 ft. (6 m) deep, and new waterlines. “We’re doing this while avoiding existing utilities,” said Kinzer. “We’re also doing some excavation work. We demolished Wolf Ledges Parkway Bridge that spans I-76. It took us a month to do that, removing the deck at night with some temporary rolling road closures at 15 to 20 minute intervals and dealing with the abutments during the day. The bridge crosses the interstate on an angle, but it is similar to the nearby Grant Street bridge, which is also being rebuilt,” said Kinzer, “We hope to set beams on Wolf Ledges and finish it in early April and complete the Grant Street bridge in October.” S. Main and S. Broadway range from three to five lanes in each direction as some lanes link to I-76 ramps. “We’re changing the alignment of south S. Broadway and S. Main, which will be combined and merge at a single point at the south end of the project so that the road is more efficient,” said Kinzer. “We’re also building a roundabout near this area. Motorists, so far, are being very cooperative in the work zone.” There has been a fair amount of night work thus far. “We had to do some temporary widening with concrete to strengthen the shoulders on 1-76 see ODOT page 2


Page 2 • March 11, 2017 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

ODOT Project Improves Safety, Meets Design Standards ODOT from page 1

— eastbound and westbound,” said Kinzer, “and we had to tear down the existing pier and put in a new pier in the median. We pulled traffic to the outside to get it done as rapidly as possible.” The major subcontractors on the project are: A&A Safety Inc. for traffic control; Aeromark Inc. for pavement striping; B&G Trucking & Construction for walls and bridge decks; Boca for asphalt milling; Cleveland Environmental Services for building demolition; DOT Diamond Core Drilling for sawcutting; Dresden Landscaping; Follow the River Designs LLC for environmental monitoring and controls; Foundation Steel for structural reinforcing steel; Lake Erie Construction Company for guardrail and signs; Lionel Construction Company for concrete pavements; Miller Cable Company for electrical items; Vermillion Tree Service for clearing and grubbing; and W. L. Markers, Inc. for RPM’s. When completed, crews will have removed 200,000 tons (181,436 t) of asphalt, 27,000 tons (24,493 t) of concrete, 1,400 tons (1,270 t) of steel, and 200,000 cu. yds. (152,910 cu m) of excavation. New materials should include 112,000 tons (101,604 t) of asphalt, 44,000 cu. yds. (33,640 c m) of concrete, 5.2 million lbs. (2.3 million kg) of structural steel, 3.4 million lbs. (1.5 million kg) of reinforcing steel, 62,000 ft. (18,897 m) of pipe, 78,000 ft. (23,774 m) of underdrain, 28,000 ft. (8,534 m) of piling, and 3,500 ft. (1,066) of drilled shafts. “ODOT typically lets you use recycled asphalt products,” said Kinzer, “so some of the asphalt will be recycled.” Currently, S&S has sanitary sewer, waterline, bridge and reenforcing steel crews on site, which account for 30 to 40 people on site. Kinzer pointed out that planning is ongoing for the Phase 2 work and this is aided by a general bridge superintendent, a bridge project manager, a project engineer, a roadway superintendent and an onsite cost accountant. Numerous foremen, safety personnel, equipment managers and estimators also offer valuable input.

When the interstate work is completed, it will be three to four lanes in each direction and have 10 to 12 ft. (3 to 3.7 m) shoulders on either side. The median/concrete wall will be replaced. The work will begin on the south side on the westbound lanes and then proceed to the eastbound lanes. There are two sets of twinbridges along I-76 , with one that crosses CSX Railway tracks. “They are doing away with a lot of the spans on these two structures,” said Greg Sykes, bridge superintendent, and they will become embankment and MSE wall. We have two MSE walls that are adjacent to the railroad, one of which will have six bridges sitting on the same shared abutment. CSX attends our bi-weekly meetings and we have a full-time railroad flagger that is paid for by ODOT. There are between 36 and 39 trains a day.” Robert Hunt, Tom O’Brien,

The work area covers one mile of I-76, one mile of Main and Broadway and 11 bridges.

Pete Kinzer, Shelly & Sands project manager, said that the work is divided into four phases.

bridge engineers, and Kinzer are working with CSX to determine the most efficient ways to demolish the bridges that span the tracks to schedule the beam erection for the new bridges. “You can’t control the weather or the utilities,” said Kinzer. “You just deal with them as they come and do as best as you can, come up with your best plan, and know that there will be some curve balls thrown at you. Everyone is working together to make this a successful project.” On this project S&S is using

Link-Belt 138HS 80-ton crawler and Grove RT60 cranes; John Deere 400D articulated dumps; Cat D6N and John Deere 750K dozers; Case CX80, Cat 345 CL, Cat 330 C, John Deere 245G, Kobelco SK135, Kobelco SK260, Komatsu PC 400 and Komatsu PC228 excavators; Cat 420D backhoes; Ingersoll Rand SD-100, Cat 815 and Hamm HD110/120 rollers; a Vogele Vision 5200-2 paver, a Hamm GRW 280i roller, Terex CR662 and Vogele MT3000 material transfer machines; Cat 938, Cat 943, John Deere 624K

and Kawasaki 70ZV loaders; Cat 16G graders; Soilmec SR-30 ADV and LoDril DH30 drill rigs; and a SkyTrak 8042 telehandler. The company has an Akron office/shop that is 10 mi. (16 km) from the work site — mechanics can be there in 20 minutes. Mike Reischman, S&S’s area equipment manager, runs the shop and has three mechanics to aid him. Reischman attends the S&S project meetings. “Our mechanics communicate with our field managers and equipment operators daily,” he said. “Attending the bi-weekly meetings really helps us focus on the current schedule and allows us to focus on what hurdles to tackle first.” Mike Roth, S&S mechanic, agrees. “Most of our hurdles right now are replacing buckets and repairing teeth/shanks on excavators,” he said. “Our operators have been great about communicating what parts are wearing out and need replaced — they have been very proactive and conscientious about keeping us informed. We are also working on drill rigs and augers

frequently since our drilled shaft crew started work about one month ago. So far, we are keeping up, but we will get into some night maintenance next year and utilize an oil/lube truck from our Zanesville shop to help keep up with the aggressive project schedule.” The company owns most of the equipment used on the project, although some manlifts and all-terrain forklifts may be rented at some point. S&S’s main equipment dealers are Columbus Equipment in Columbus, Ohio; The McLean Company in Columbus, Ohio; Murphy Tractor in Cambridge, Ohio; Ohio Cat in Zanesville, Ohio; Rudd Equipment in Columbus, Ohio; and Southeastern Equipment in Cambridge, Ohio. S&S has several 500- and 1,000-gallon on site fuel storage tanks that are fitted with sensors to alert the fuel supplier that the tanks need to be refilled. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • March 11, 2017 • Page 3

PARTNEERED WITH

TOO BRIN NG OHIO ITS BBEST FLEET F YET

No matter if your job is big or small, Company C Wrench Wrench has always prided ourselves es on providing cutting edge customer service and equipment. Join us in welcoming JCB as our newest linne of quality equipment. JCB is now available for Sale or R Rent e in Franklin, Fairfield, Union, Delaware, ent e, Licking, Madison, Clark, Greene, Mo ontgomeryy,, Fayette and Pickawayy Counties.. Countie es.. 4805 Scooby Lane Carroll, OH 43112 740-654-5304

3120 0 S Verity Pkwy. Middleetown, OH 45044 513-649-8105

Toll Free 866-262-4181

www ww w.companywrenchjcb.com .companywrenchjccb.com


T

Page 4 • March 11, 2017 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

OAIMA Holds 19th Annual Legislative Reception in Columbus he Ohio Aggregates and Industrial Minerals Association (OAIMA), held its 19th Annual Legislative Reception on Feb. 15 at the Ohio Statehouse in Columbus, Ohio. The reception was attended by nearly 150 legislators and legislative aides who were on hand to discuss industry related issues with OAIMA members and their guests. Two key issues discussed at the reception were zoning laws and their impact on access to aggregates, and transportation issues created by Ohio Bill SB30, a patchwork of county-wide traffic regulations likely to create confusion which will add to transportation costs. Other topics discussed at the reception were support for ODOT’s two-year budget proposal and the need to protect access to local aggregates sources. Sponsors for the 2017 Legislative Reception include Barrett Paving Materials; CEC; CF Poeppelman Inc.; East Fairfield Coal Co.; Eastman and Smith LTD; The Gerken Companies; Lehigh Hanson; Martin Marietta; Mar-Zane Materials Division; Melvin Stone Co.; National Lime and Stone Co.; Ohio CAT; Olen Corp.; Shelly Materials; Terracon; and Watson Gravel. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG

Dorothy Pelanda (L), majority house leader, House District 86, spoke with (L-R) Brett Bartholomew, Patrick Gray and Ken Rambo of East Fairfield Coal Company; and Tyson Lamielle of ODNR DMRM at the reception.

(L-R): Chris Scala of American Sand & Gravel, caught up with Sen. Scott Oelslager, District 29 and Brian Barger of Eastman and Smith. Lifetime OAIMA Member Steve Williamson (L) and Glen Holmes (R), state representative, 63rd District, are greeted by Ohio CAT’s Linda Meier.

Kyle Tucker (L) of Eastman Smith, spoke with Todd Pester of Vibra-Tech Inc.

(L-R): Tim Rhodes of Olen Corporation; Andy Thompson, state representative District 94; Frank Reed of Frost Brown Todd LLC; Shelly Company’s Ed Beach and Jay Garrison discussed aggregate issues.

(L-R): Steve Huffman, Ohio state representative, District 80; Dennis Garrison of Melvin Stone Company; Pat Jacomet, OAIMA executive director; and Wes Retherford, Ohio state representative, District 51, caught up at the reception.


Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • March 11, 2017 • Page 5

Aggregate Industry Vet William Hole Jr. Passes Away at 89 address to a graduating class of Greenville High School. After retirement Mr. Hole and Gloria enjoyed world travel, bridge, golf, friends, family and vacations at their summer home in Canada. He is survived by his wife of 65 years Gloria (Shiverdecker) Hole, son William Jeffrey, daughter Julie Ann Kirk and husband Wilson, and grandsons Griffin and McGregor, of whom he was very proud. He also leaves two sisters, Susan Brewer and Barbara Brewer and in-laws Walter I. Thieme and Marcia Glenn. Also many loving nieces and nephews.

William Edward Hole Jr., age 89 of Greenville, Ohio, and son of William Edward and Dorothy (Coppock) Hole passed away on Feb. 18 at the Village Green. He was born July 2, 1927 in Greenville, Ohio. Mr. Hole was a graduate of Greenville High School, Culver Military Academy and the University of Michigan. After serving in the U.S. Army Air Corps during WWII, he taught sailing at Culver before entering the University of Michigan. He was a member of the Tau Beta Pi honorary engineering society. Mr. Hole also was an integral part of American Aggregates from 1951, becoming a director in 1956, vice president in 1964 and president of the Corporation in 1969. He also served as president of Ohio Aggregates and as national president of National Sand Stone and Gravel where he also was a lifetime member of the board. He also served on the Board of Consolidated Gold Fields in England. He served on the Board of Greenville National Bank for 35 years with 21 years as Chairman of the Board. Mr. Hole was chairman of the Ohio Chamber of Commerce in 1983 and a lifetime member of that board. He had previously served as president of the Greenville chamber of commerce. He was chairman of the building committee of the Darke County Y.M.C.A. and was the first president of that board. He had served a number of terms on the Y. board. He served two terms as president of the Greenville Country Club and on that board several different times. He was a past member and on the board of Edison College, Hope Foundation, Garst Museum, Citizens Education Committee and was vice-president of the Ohio Manufacturer’s Association. He was a lifetime member of the Greenville Elks Lodge. He managed the Coppock-Hole Trust for many years. In addition, Mr. Hole was a faithful member of the First Congregational Church of Greenville, where he taught Sunday school for 23 years sang in the senior choir and served on numerous committees including two pastoral search committees. He was honored to deliver the commencement

In addition to his parents, he is preceded in death by his sister Jean Louise Thieme and in-laws Phyllis and Jim Blocher, Pauline Shiverdecker DeWitte and husband John, Dale Shiverdecker, Leon and Helen Shiverdecker, Lt. Commander Kent Shiverdecker, William D. Brewer and Richard Brewer. Condolences for the family may be expressed through www.zecharbailey.com (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

William Edward Hole Jr.

HUDSON 6681 Chittenden Road Hudson, OH 44236 P-330-655-5900 F-330-655-5969

COLUMBUS 3155 E 17th Avenue Columbus, OH 43219 P-614-475-2880 F-614-475-0069

CINCINNATI 8131 Regal Lane West Chester, OH 45069 P-513-777-5556 F-513-777-4494


Page 6 • March 11, 2017 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

Wood • Hamilton • Stark • Henry • Greene • Knox • Franklin • Clermont • Crawford • Union • Cuyahoga • Brown • Licking • Medina •Ohio.. Williams • Harrison • Adams • Mercer • Butler • Clark • Ashtabula • Sandusky • Portage • Athens • Logan • Lake • Erie • Wyandot • Warren • Fairfield • Miami • Paulding • Darke • Muskingum • Ottawa • Holmes • Jefferson • Trumbull • Summit • Washington • Van Vert • Licking • Wood • Hamilton • Stark • Henry • Greene • Knox • Franklin • Clermont • Crawford • Union • Cuyahoga • Brown • Licking • Medina • Williams • Harrison • Adams • Mercer • Butler • Clark • Ashtabula • Sandusky • Portage • Athens • Logan • Lake

‘Buckeye State’ Highway Lettings

The Ohio State Department of Transportation received bids for transportation-related improvement projects. The following is a list of some of the projects let.

Project No: 160575 Type: Major reconstruction. Location: BEL-CR 29/Commons Mall Crossing. State Estimate: $11,260,000 Contractors and Bid Amounts: • Shelly & Sands Inc., Columbus, Ohio — $10,328,829 • Beaver Excavating Company, Canton, Ohio — $10,882,100 • Marucci & Gaffney Excavating Company, Youngstown, Ohio — $11,458,844 • Karvo Companies Inc., Stow, Ohio — $11,608,401 • Mountaineer Contractors Inc., Kingwood, W.Va. — $13,227,840 • Kokosing Construction Company Inc., Columbus, Ohio — $13,540,704 Completion Date: Oct. 31, 2018

Project No: 160586 Type: Minor widening. Location: HAM-CR 4-3.96. State Estimate: $1,227,000 Contractors and Bid Amounts: • Barrett Paving Materials Inc., Middletown, Ohio — $1,320,029 • Ford Development Corporation, Sharonville, Ohio — $1,348,632 • Eagle Bridge Company, Sidney, Ohio — $1,369,847 • Sunesis Construction Company, West Chester, Ohio — $1,379,037 • John R Jurgensen Company, Cincinnati, Ohio — $1,406,445 • Prus Construction Company, Cincinnati, Ohio — $1,445,825 • Karvo Companies Inc., Stow, Ohio — $1,494,863.18 Completion Date: Aug. 1, 2017

Project No: 160592 Type: Noise walls. Location: CUY-IR 80-01.45/VAR. State Estimate: $6,772,000 Contractors and Bid Amounts: • Great Lakes Construction Company, Hinckley, Ohio — $6,391,526 • Kokosing Construction Company Inc., Columbus, Ohio — $6,628,333 • Shelly & Sands Inc., Columbus, Ohio — $6,739,150 • Perk Company Inc., Cleveland, Ohio — $7,686,906 Completion Date: Oct. 31, 2017

Project No: 160602 Type: Two lane resurfacing. Location: LOR-SR 113-00.00. State Estimate: $3,200,000 Contractors and Bid Amounts: • Erie Blacktop Inc., Sandusky, Ohio — $2,977,023 • Kokosing Construction Company Inc., Columbus,

Ohio — $3,052,942 • Karvo Companies Inc., Stow, Ohio — $3,099,870 • Chagrin Valley Paving Inc., Chagrin Falls, Ohio — $3,206,391 • Gerken Paving Inc., Napoleon, Ohio — $3,256,883 • Shelly Company, Thornville, Ohio — $3,334,314 • Burton Scot Contractors LLC, Newbury, Ohio — $3,652,517 Completion Date: Sept. 30, 2017

Project No: 160604 Type: Two lane resurfacing. Location: MED-SR 162-02.97. State Estimate: $1,788,000 Contractors and Bid Amounts: • Kokosing Construction Company Inc., Columbus, Ohio — $1,638,354 • Karvo Companies Inc., Stow, Ohio — $1,639,828 • Chagrin Valley Paving Inc., Chagrin Falls, Ohio — $1,746,196 • Shelly Company, Thornville, Ohio — $1,788,625 • Cross-Roads Asphalt Recycling Inc., Columbia Station, Ohio — $1,906,257 • Barbicas Construction Company Inc., Akron, Ohio — $1,928,528 • Burton Scot Contractors LLC, Newbury, Ohio — $1,980,360 Completion Date: Oct. 31, 2017

Project No: 160606 Type: Bridge replacement (1 bridge). Location: MIA-IR 75-13.73.

State Estimate: $3,710,000 Contractors and Bid Amounts: • Eagle Bridge Company, Sidney, Ohio — $3,108,887 • Brumbaugh Construction Inc., Arcanum, Ohio — $3,212,131 • Shelly & Sands Inc., Columbus, Ohio — $3,416,500 • Miller Bros Construction Inc., Archbold, Ohio — $$3,434,155 • Double Z Construction Company, Columbus, Ohio — $3,717,597.62 • Kokosing Construction Company Inc., Columbus, Ohio — $3,729,735 • Complete General Construction Company, Columbus, Ohio — $3,816,388 Completion Date: Oct. 31, 2017

Project No: 160596 Type: Bridge repair. Location: BUT-SR 128/129-08.56/14.78. State Estimate: $1,707,000. Contractors and Bid Amounts: • Eagle Bridge Company, Sidney, Ohio — $1,792,570 • Prus Const. Co., Cincinnati, Ohio — $1,797,866 • Sunesis Construction Company, West Chester, Ohio — $1,948,176 • Complete General Construction Company, Columbus, Ohio — $2,054,207 • Great Lakes Construction Company, Hinckley, Ohio — $2,081,375 • Bridge Specialists Inc., Canfield, Ohio — $2,073,233 • Shelly & Sands Inc., Columbus, Ohio — $2,244,773 Completion Date: Oct. 31, 2017


To See More Machines, Please visit us online at www.bobcat-ent.com

Construction Equipment Guide • Ohio State Supplement • www.constructionequipmentguide.com • March 11, 2017 • Page 7

Call Brad Kent at 513-266-7761 or on our USED EQUIPMENT HOTLINE: 888.BOBCATS

2013 T590 Bobcat Track Loader, 1845 Hrs, Cab Heat & Air, 2012 S185 Bobcat Loader, 1536 Hrs, Cab Heat & Air, Power 2013 S750 Bobcat Loader, 2315 Hrs, Cab Heat & Air, High Quick Tatch, CN 100199..................................................$28,000 Flow, 2 Spd, CN 100605..................................................$37,500 Power Quick Tach, Wide Track, CN 99273.................... $36,500

2015 T770 Bobcat Track Loader, 355 Hrs, Cab Heat & Air, High Flow, 2 Spd, CN 100277........................................ $65,000

2011 5600 Bobcat Toolcat, 785 Hrs, Cab Heat & Air, 2009 E32 Bobcat Excavator, 1175 Hrs, Cab Heat & Air, Long 2012 DL220 Doosan Wheel Loader, 600 Hrs, CN 84785.......... CN 101280........................................................................$32,500 Arm, Keyless Start, CN 100845.................................... $31,500 ........................................................................................ $123,500

2014 DX420LC-3 Doosan Excavator, 850 Hrs, CN 90363........ ........................................................................................ $258,880

PRE-OWNED, JOB READY EQUIPMENT NOW AVAILABLE! Parts • Sales • Service • Rental • Training Cincinnati • Mt. Orab • Hilliard • Reynoldsburg • Lexington • Louisville

3 ! , % 3 s 2 % . 4 ! , 3 s 0 ! 2 4 3 s 3 % 2 6 ) # %

DRILL ILL RIGS FOR RENT 1.800.PILE.USA -or- www.ecanet.com PITTSBURGH PO Box 306 Coraopolis, PA 15108 P 412.264.4480 F 412.264.1158

PHILADELPHIA PO Box 387 Aldan, PA 19018 P 610.626.2200 F 610.626.2245

WASHINGTON, D.C. 6300 Foxley Road Upper Marlboro, MD 20772 P 301.599.1300 F 301.599.1597

TORONTO 166 Bentworth Ave Toronto, Ontario M6A 1P7 P 416.787.4259 F 416.787.4362

EQUIPMENT CORPORATION OF AMERICA B U I L D I N G F O U N DATI O N S S I N C E 1 91 8

AUTHORIZED DEALER:

PITTSBURGH

PHILADELPHIA

WASHINGTON

D.C.

TORONTO


Page 8 • March 11, 2017 • www.constructionequipmentguide.com • Ohio State Supplement • Construction Equipment Guide

iNTELLIGE ENT MACHINE CON NTROL

The Revolu o ution Contin nues Offtentimes, ads will mak ke lofty claims. Three years y ago, Komatsu claimed aimed its groundbreaking king iMC tec chnology would transfo orm the way contractors rs move earth. A lofty claim, no doubt … was as it true? Here is w what Ohio contractors h have found regarding the t claim that iMC increases creases production efficiency ciency by 25%: ““As As far as the iMC exca exc cavator vator goes, it increasess production by b 30 to 40 percent for utility u work.” Scott Thompson / Thompsson Excavation; Carroll, Ohio o

“T The iMC dozer is at least l 30 to 40 percent per more m productive than a conventional dozer d r,, possibly over o 50 percent.” p Charles Sayre / Sayre Construction struction Company; Mantua, Ohio

¸>L >L ÄUPZ Ä PZOLK [OL WYVQ VQLJ[ PU [^ ^V KH KH`Z `Z VY MH MHZ[LY Y (ZZ H YLZ\S[ [ ^L ZH]LK [O [OYLL L days o of fuel and three days of maintenance and wear and tear on the machine. mac ” Eric De edden / MDX Inc.; Milford, Oh hio

Should d we always believe w what we read in ads? No, N but when in-the-field performance truly does d meet or excee ed revolutionary expec ctations, the impact on n your business can be transformative. Conta act Machine Control M Manager Mike Fenster a at (614) 802-7099 802 7099 for more m information on Komatsu’s K D37i D39i D37i, D39i, D51i, D51i D61i and D65i crawlerr dozers and PC210LCi--10, PC360LCi-11 and PC490LCi-11 P excavatorrs, and to schedule an iMC MC demonstration.

Columbus Toledo Cincinnati 9PJOÄLSK Cadiz (614) 443-6541 1 (419) 872-7101 (513) 771-3922 (330) 659-6681 (740) 942-8871 Dayton Massillon Zane eville Painesville Piketon (937) 879-3154 4 (330) 833-2420 (740) 455-4036 (440) 352-0452 (740) 289-3757

Ohio’s D Dependable Dealer

w .columbuseequipment.com www.


Turn static files into dynamic content formats.

Create a flipbook
Ohio 5 March 13, 2017 by Construction Equipment Guide - Issuu