Skip to main content

New England #26,2012

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

FormErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

December 19 2012

95 91

7

495 6 195

395

95 91

3

84 6

84

6

e

q

u

i

P

M

e

N

t

g

u

i

D

e

95

95

Vol. XliX • No. 26

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New england states connection •  kent Hogeboom 1-800-988-1203

2013 EZ Screen 1200XL New option separate 3 Products

Kraft Power Corporation

Engines, Parts & Service Authorized Deutz Distributor

800-969-6121 Woburn, MA & Syracuse, NY

MULTI MACHINE INC.

By Jay adams

Best We stock Prices ruBBer tracks for over 2,500 Models! some used tracks available.

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$39,500 plus freight. other screeners available

argus iNDustrial co. www.ez-screen.com

866-745-5828

WaNteD

• GUARANTEED TO FIT • HIGH QUALITY • FAST SHIPPING

888-888-1248

kraft Power corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

800-969-6121 www.kraftpower.com

CATERPILLAR EQUIPMENT

Auctioneering & Liquidation

Call Lou Giza

www.itlauctions.us

603-595-2090

ITL Auctioneering Justin Lyerla (508) 824-3262

WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA

www.foleyengines.com

w

Second of Five ‘Mega’ Projects Under Way With Start of Fore River Bridge

(46745)

CEG CORRESPONDENT

For commuters getting in and out of Boston, this “Mega” Project will be like hitting “Mega” Bucks. The second of five Massachusetts “Mega” Projects is under way as officials have broken ground on the new Fore River Bridge, a critical artery span connecting Weymouth and Quincy, two of the busiest suburbs south of Boston. Ground was broken in front of the Ground was broken in front of the original 1936 bridge by Gov. Deval original 1936 bridge by Gov. Deval Patrick and a coterie of local and state officials on Nov. 12. Patrick and a coterie of local and state officials on Nov. 12. Work will begin in earnest in January by road and by sea, making use of what is there and what 2013. The project is expected to be completed in the fall of must be brought up river. “The project plans to make use of both conventional hor2016. A major part of Patrick’s Accelerated Bridge Program, the izontal construction equipment that would be expected with planned $244 million bridge will replace a 10-year “tempo- a large bridge project, as well as specialized heavy lift equipment to move large steel segments, such as the bridge’s liftrary” trestle that will parallel it as it is erected. In the old days, government was deemed wasteful. In the ing span, into place,” added Verseckes. “As the job site is new spirit of making every buck count, a new temporary easily accessible by rail and water, the project team plans to trestle will serve two purposes — rerouting traffic and hold- make the best possible use of the river itself and the nearby ing the heavy iron equipment to build the new bridge. In railroad to bring in the large, permanent steel components addition, many workers and craftsmen from the South Shore associated with the new span. This will help minimize the area will be hired to build the very bridge that will serve their number of large trucks traveling on Route 3A and reduce traffic impacts to the abutting communities of Quincy and hometowns. Weymouth.” Verseckes and local officials noted the long, noteworthy Joint Venture Under the direction of the Massachusetts Department of and recommended histories of the companies involved in Transportation (MassDOT), J.F. White Co., Framingham, this critical joint venture. Mass., and Skanska-Koch of Carteret, N.J., have been selectJ.F. White ed to design and build the span as a joint venture. According to company literature, J.F. White was founded “The White-Skanska Joint Venture is responsible for constructing the project and managing an array of subcontrac- in 1914 by Joseph F. White Sr. During the 1920s and 1930s, tors who are assisting them in the work,” said Michael J.F. White focused on roadwork and excavating foundations. Verseckes, spokesman of MassDOT. “Subcontractors In 1945, brothers Tom, Joe Jr., and John returned from World include lead designer Parsons, Modjeski and Masters, the War II and reinvigorated the company. In 1950, J.F. White designers for the bridge’s operating machinery and controls; was awarded the contract to construct what is now known Gill Engineering, which will design the new bridge’s famously as Storrow Drive around Boston and Cambridge approach roadways; Haley and Aldritch for geotechnical — one of the city’s most important roads paralleling the engineering and design; Dan Brown and Associates, charged Charles River. In the early 1970s, the company entered the arena as one with the new bridge’s foundations, and Howard/Steinof the region’s premier contractors with the award of the Hudson, which supports the public involvement effort.” Construction methods will be both horizontal and vertical, see BriDge page 4


Page 2 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316

2008 Deere 524K

2004 Case 321D

c/air, hi lift, hi- vis hyd coupler w/2.75 yd bucket, radials

c/air, hyd coupler, aux hyds, fully serviced, 80% rubber

2011 Deere 244J

2006 Deere 544J

c/air, r/c, 1.4 yd bucket, hyd cplr, 3rd valve hyds, R20’s, like new condition

A/C, RC, 3rd valve hyds, JRB hyd cplr and 3 yd bucket

stk# 20889 ........................$110,500

stk# 20830 ..........................$35,000

stk# 21173 ..........................$69,500

stk# 21348 ........................$127,500

2007 Deere 50D

1998 Deere 410E

New Holland L190

2005 Hitachi ZX225USLC

ROPS, 890 hours, hydraulic thumb

stk# 20936 ..........................$42,500

c/heat, 4x4, std hoe, 2000 original hours

stk# 21372 ..........................$47,500

2003 New Holland LS180 2008 Komatsu PC45MR-3 c/heat, gp bucket, 80% rubber, great snow machine

stk# 21417 ............................$22,000

c/air, hydraulic coupler, 2090 original hours, fully serviced and ready for work

OROPS, hi-flow, 2 spd travel, new rubber and bucket, serviced and ready to go

stk#21404 ............................$26,000

stk# 21153 ........................$108,500

2006 Deere 450JLGP

2009 Carlson CP-90

c/air, 24" bucket, hyd thumb, 880 hrs

c/air, 2400 hrs, 115” blade, very good condition

Cat engine, 8-15’ electric screed, 416 demo hours, excellent condition

stk# 21314 ............................$42,500

stk# 20503 ..........................$51,500

stk# 20713 ........................$124,500

WHEEL LOADERS 1990 CAT IT28B, C/HEAT, 3RD VALVE HYDS, HYD COUPLER, 2.5 YD BKT, 10,600 HRS ONE OWNER MACHINE, STK# 21338 ......................................................................................$35,000 2004 CASE 321D, C/AIR, HYDRAULIC COUPLER, 80% RUBBER, STK# 20830 ........................................................$35,000 2011 DEERE 244J, C/AIR, R/C 3 VALVE HYDS, 1 YD BUCKET WITH HYD CPLR, EXCELLENT CONDITION, STK# 22179 .......... ......................................................................................$72,500 2008 DEERE 344J, A/C, RC, 3RD VALVE HYDS, HYD COUPLER, 920 HRS, STK#20274 ........................................$98,500 SKID STEERS 2010 TAKEUCHI TL250, C/AIR, PILOT CONTROLS, HI-FLO HYDS AND 80" BUCKET, STK# 21233 ..........................$43,500

DOZER – CRAWLER 1984 DEERE 450D, 6 WAY BLADE, GOOD CONDITION, STK# 21370............................................................................$17,000 2005 DEERE 750J, S/N TO750JX110563, C/AIR, PAT BLADE, RECENT SERVICE, CLEAN MACHINE, STK# 19345 ....$131,500 2007 DEERE 1050J, A/C, 24" PADS, 159" SEMI-U BLADE, MS RIPPER, NEW PAINT, STK#20688 ..............................$315,000 EXCAVATOR – CRAWLER 2005 HITACHI ZX225LC, C/AIR, HYDRAULIC COUPLER, EXCELLENT CONDITION, 2090 HRS, STK# 21153 ....$108,500 MOTOR GRADER 1988 DEERE 570B, C/HEAT, 12’ BLADE, FRONT SCARIFIER, 80% REAR RUBBER, 833 ORIGINAL HOURS, FULLY SERVICED, STK# 21413 ........................................................$65,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 3

1987 MORBARK HURRICANE 18, Stk# 12089, 448 Hrs, Call Tom Tyler, VP at 203-509-0967 ............................$30,000 2002 Volvo EC35, Stk# 12257, 3,475 Hrs. 12" And 24" Volvo Q/F Excavator Bucket, Dipper Arm 55", Rubber Tracks, 12", Full Cab, Rops, Fops & Tops, Heated..$26,000

1990 OLATHE 986, Stk# 11957; 2,309 Hrs, 12" Brush Chipper w/ Ford BSD444 60 hp Dsl Eng, 42" dia., 1-1/2" thick hot-rolled steel w/ paddle type fan blades welded on, includes Operator's Manual & Parts List. Has all details on service and parts notes. If interested, Call Tom Tyler, VP at 203509-0967..............................Only $5,000!

2010 Volvo Hydraulic Hammer HB1100, 2300 ft/lb hammer, w/S6 Manufacturer Plate, New Hoses Chisel Point. 6 Month Manufacturer Warranty................$33,500

20 TON ROGERS #12292, 20 Ton, 22’Level Deck with 6’ Beavertail and Ramps, 215 Tires, Tool Box, Very Good Condition with Fair Deck $14,000

2005 Volvo EC240BLC, Stk# 12231, 3,900 hrs, A/C, 32" Track Pads, Std Roller Guard, Hammer/Shear Piping w/1 Pump, Q/C Piping, Boom 19'8", Arm, 9'9", Std Counterwieght 11,690 lbs., S2 Quick Coupler, Foot Pedal Control ........$97,500

1985 Akerman 200 Wheeled Excavator, Stk# 8260; 24,370 Hrs; 39" 1.1 Cu.Yd. Q/F Bkt, 8'2" Bulldozer Blade, 15'3" Boom, 9'2" Dipper Arm, One Way Hammer Hydraulics Only, Additional Tilt Hyd. Circuit. Quick-Fit Device w/ Bkt, Counterweight (5,842 Lbs.) 9/4/12 Price Just Reduced From $25k To $21k!

VOLVO CONSTRUCTION EQUIPMENT

u SALES u PARTS u SERVICE u RENTALS u CUSTOMER SUPPORT u

www.tylerequipment.com

MAIN OFFICE-MASS 251 Shaker Road East Longmeadow, MA 01028 1-800-292-6351 Parts Department: 877-255-6351

CONNECTICUT 1980 Berlin Turnpike Berlin, CT 06037 1-800-352-4473 Parts Department: 860-356-0848


Page 4 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Officials Break Ground on New Fore River Bridge Project BRIDGE from page 1

Charles River Dam project. The Charles River Dam transformed J.F. White from a road builder and excavating contractor into a competent and well-recognized heavy/civil contractor. Larger and more challenging projects followed, including the Deer Island Wastewater Treatment Facility, the Ted Williams Tunnel and the North Street to New Chardon Street segment of the Central Artery/Tunnel (Big Dig) project. More recently, J.F. White has delivered the Interstate 93 Fast 14 project in Medford, Cedar Street project in Wellesley and the Chelsea Street Liftspan Bridge. Skanska Koch According to MassDOT, Skanska Koch has been involved with the construction or the rehabilitation of most major bridge structures in New York, and has performed bridge rehabilitation in other parts of the country. The company has more than 100 years of experience in steel erection, bridge construction and bridge rehabilitation. Skanska Koch’s experience in the public-sector construction market has been exemplary and has earned the esteem and tremendous respect, not only of the public agencies that the company has served, but also of its vast array of competitors. Skanska Koch’s successful longstanding history with public-sector clients includes the New York City DOT; New York State; the Triborough Bridge & Tunnel Authority New York, New York; the Port Authority of New York & New Jersey (PANJNY); and Caltrans.

NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Asst. Circulation Mgr. Main office

Toll Free Fax Web site Editorial e-mail Advertising e-mail

Up to 100 Workers Per Shift The number of workers on the Fore River Bridge project will vary throughout the job depending on the current requirements of construction. The size of the force on the job site will vary from 10 to 100 depending on the phase of the project, according to Verseckes. The project will be under construction year round. “Certain aspects of the project, such as silt-producing inwater work, will be restricted due to the requirement to protect migrating anadromous fish that travel through the Fore River, but generally speaking, and with the exception of extreme weather events, some work will be under way on the project year round,” said Verseckes. Workers on the project will generally work a double shift, with shifts currently scheduled for 7 a.m. to 10 p.m. “At certain key moments during the project, such as concrete pours, and with the concurrence of MassDOT and adequate advance notice to the abutting communities, the job will operate on a 24-hour basis for a defined period of time,” added Verseckes of the consensus commitment to finish the massive project on-time and on-budget. “Our Accelerated Bridge Program is a key part of our growth strategy of investing in education, innovation and infrastructure to create jobs and spur economic development,” said Patrick at the groundbreaking. “Investing in transportation infrastructure builds stronger communities for the next generation across the Commonwealth.” Replacing a temporary bridge constructed in 2002, the new Fore River Bridge will be a vertical-lift bridge with several upgrades. The Fore River channel will be widened to accommodate the vessels that serve the active petroleum ter-

For advertising rates: Contact

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Reckner Pete Sigmund John Pinkerton Tom Weinmann Rolf Krog Cathy Printz

470 Maryland Drive Fort Washington, PA 19034 215/885-2900 800/523-2200 215/885-2910 www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com

Edwin M. McKeon Jr.

215/885-2900 800/523-2200 215/885-2910 e-mail tmckeon@cegltd.com

Toll Free Fax

Kent Hogeboom •New York •New England 315/823-7668 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2012, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

minal, and its vertical clearance in the down position will be higher to reduce the number of openings for sailboats. Additionally, design improvements have been incorporated that will improve the aesthetics of the bridge. One of the elected officials on hand at the groundbreaking had an interesting perspective. Mass. Congressman Stephen F. Lynch is a former iron worker in heavy construction before his life in politics. Lynch was glad that his local colleagues would get jobs on this huge project. “I am pleased to see that construction will finally begin on the new Fore River Bridge,” Lynch said. “As an ironworker, I commend Governor Patrick and MassDOT Secretary [Richard] Davey for choosing a world-class construction team whose strong record of utilizing local South Shore building trades people will guarantee that the craftsmanship and pride of Weymouth and Quincy workers will become part of this bridge.” MassDOT Secretary Davey added, “This project is an important link for South Shore drivers, but it also is an important corridor for the industrial shipping uses that need this bridge and this channel just as much. The finished product will not only meet those needs, but also will have major upgrades to accommodate pedestrians and cyclists as well.” The new bridge will consist of two, 12 ft. (3.7 m) wide travel lanes on each side and a 5 ft. (1.5 m) bike lane on both sides; pedestrian sidewalks will be 6.5 ft. (2 m) wide on the bridge and expand to 9 ft. (2.7 )in width on the approaches to the bridge. “The Fore River Bridge has long served as a vital link between the City of Quincy and the entire South Shore, and its viability is crucial to the continued economic success of the entire region,” said Senator John F. Keenan. “After many years of work, today’s ground breaking marks an important milestone in the bridge’s history and I look forward to working with MassDOT, state, city and town officials to make sure this replacement project is completed on-time, on-budget and with little interruption to local residents and commuters.” Trestle Offers Support According to the MassDOT Web site, the initial phase of construction after Christmas includes building a temporary trestle extending from both banks of the Fore River to the future location of the new bridge’s tower legs. When finished, the temporary trestle will be used to support the very machinery that will drill the shafts for the new bridge’s foundations. It is currently expected that installation of these drilled shafts will begin in January 2013. The steel supports and wooden deck for the temporary trestle will arrive at the work site on a fleet of trucks traveling up Route 3A, the artery carried over the Fore River Bridge. As the job progresses, and larger permanent bridge components begin arriving at the site, the project team expects to take advantage of deliveries by water and rail to help minimize traffic impacts. Throughout construction, until the spring of 2016, at least one sidewalk will be available to pedestrians. During periods of reduced capacity on the temporary bridge, the community will be alerted through the MassDOT Web site and social media, the project email list, and other media channels. MassDOT said construction phases will be as follows: • Phase 1: Construction of the lifting span and towers, the north side dolphins and fenders (the system that protects the bridge from collisions with ships), four of the six approach spans and rehabilitation of the retaining walls. This phase runs from March 2013 to June 2015. see BRIDGE page 8


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 5

A A

Company Company A

Serving Servin ng All Of New England As authorized Terex® From Five Locations!

ACompany A A

Company Company Company

Your Y our partner parttner t ffor portable porrtable t bl Finlay Distributors... crushing and screening!

Jaw, IImpact mpact & C Cone one C Crushers rushers hers

2 & 3 Deck I nclined & Horizontal Screens

Heavy Duty Screens

Sales, Rentals, Parts and an nd Service Serrvice

Complete Modular Washing Systems

Chadwick-BaRoss has formed a team of specialists to provide sales and service to its screening and crushing customers throughout the six-state territory. For more information contact:

Bangor, ME 800-698-4838

Caribou, ME 800-270-2547

Chelmsford MA 800-804-0775

Concord, NH 800-477-4063 Or follow follow us:

Visit Our NEW Website

w www.chadwick-baross.com ww.chadwick-baross.com www.cbused.com w ww.cbused.com

Westbrook, ME 800-262-5714


Page 6 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Maximum Output

A tthe At he lowest low we t west ccost ost p per er ton! Clean Chips. Microchips. Biomasss. Land Clearing. For 30 yearss, Petterrson chippers havve led tthe ZD\³ \³ ÀQG RXW PRUH DW www ww ww.p pettersoncorp.ccom y q p 30 Birch Island Road, Webster, MA PH: 508.949.0005 www.barryequipment.com 800-269-6520 • www.petersoncorp.com • PO BOX 40490 • Eugene, OR 97404

Maine... • Aroostook • Cumberland • Franklin • Hancock • Androscoggin Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset

‘Pine Tree State’ Highway Projects Let

The Maine Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Androscoggin Contract ID: 013060.00 Location: Lewiston. Project: Highway reconstruction. Contractors and Bid Amounts: • Gendron & Gendron Inc. — $709,999 • K & K Excavation Inc. — $769,961 • St. Laurent & Son Inc. aka Maine Heavy Equipment Rental Inc. — $776,713 • Pratt & Sons Inc. — $778,600 • Peters Construction Inc. — $823,414 • CPM Constructors — $834,929 • A H Grover Inc. — $854,601 County: Aroostook Contract ID: 018000.00 Location: T9 R5 Wels — Masardis Route 11 and others. Project: Hot mix asphalt overlays. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $2,659,978 • Northern Maine Paving Inc. — $3,689,969 County: Penobscot Contract ID: 019208.00 Location: Old Town, Center Street. Project: Highway rehabilitation. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $132,859 • Pike Industries Inc. — $266,460 Counties: Aroostook and Penobscot Contract ID: 019215.00

Location: Lincoln, Route 2, Mattawamkeag-Macwahoc, Route 2A. Project: Hot mix asphalt overlays and safety improvements. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $2,398,983 • Pike Industries Inc. — $3,088,458 County: Statewide Contract ID: 019254.10 Location: Statewide. Project: Excavator rentals. Contractors and Bid Amounts: • Hertz Equipment Rental Corp. — $164,287 • Eagle Rental — $207,000 • Nortrax — $232,100 • Beauregard Equipment Inc. — $354,075 • Milton Cat — $448,250 Counties: Kennebec and Waldo Contract ID: 018260.00 Location: Benton Area: Albion, Benton, Burnham, Clinton and Freedom. Project: Light capital paving. Contractors and Bid Amounts: • Pike Industries Inc. — $1,833,548 • Lane Construction Corporation (The) — $1,834,829 County: Kennebec Contract ID: 017052.00 Location: Augusta, U.S. 201. Project: Milling and hot mix asphalt overlay. Contractors and Bid Amounts: • CPM Constructors — $1,110,267 • Lane Construction Corporation (The) — $1,197,949 • Pike Industries Inc. — $1,246,355 see MAINE page 13


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 7

We’ve become attached to your machines. b Sandvik (Rammer) E-Series hydraulic impact hammers

Sandvik (Rammer) G-Series hydraulic impact hammers t

( t

o

Where can you go to get high performance boom-mounted attachments? Allied Construction Products, LLC

For over 65 years, we’ve developed many attachments that are legendary in the construction and demolition industries that demand high performance. Names like Ho-Ram, Hy-Ram®, Rammer, Ho-Pac® and Pedestal Breaker System™ are names that equal: Ê UÊSimple, proven design (Our attachments have high resale or trade-in value) Reliable performance (If you purchased you’re probably AR Series™ an Allied attachment, U Reliable performance (If you purchased an Allied attachment, you’re probably still using it) hydraulic impact hammers still using it) U Superior productivity (Compare AEM– formerly CIMA– ratings, our attachments get the job done faster) attachments get the job done faster) And, now Allied adds to that great family background with the Sandvik (Rammer) and AR Series™ hammers. Allied’s attachments don’t take a back seat to any competitor. In particular, our Sandvik (Rammer) product features a long-stroke design, all oil operation and ProControl. All of our high performance boom-mounted attachments are supported by the most respected parts and service organization in North America. Customer satisfaction is job one at Allied. Great products supported by people who know the industry and its customers. To put a high performance Allied attachment on your machine, call the Tyler Equipment Corporation office nearest you. We’ve become attached to your machines.

®

Ho-Pac vibratory compactor/drivers

Pedestal Breaker System™ stationary boom systems

Tyler Equipment Corporation Main Office MAIN OFFICE: 251251 Shaker Road Shaker Road East Longmeadow, East Longmeadow,MA MA 01028 01028 1-800-292-6351

Tel: 413-525-6351

Prospect, CT CT LOCATION: NEW 1980 Berlin Turnpike Tel: 203-758-3925 Berlin, CT 06037 1-800-352-4473

www.tylerequipment.com

Contractor’s Mechanical Grapple material and waste handling systems

Sandvik (Rammer) S-Series hydraulic impact hammers © 2008 Allied Construction Products, LLC

www.equipmenteast.com HEAVY CONSTRUCTION EQUIPMENT

SALES • RENTALS • PARTS • SERVICE

Crushing and Screening Plants as well as Keestrack/OM parts in stock.

Hydraulic Hammers for All Your Demolition Needs. Besides eco-friendly silenced design, which is to fit international standard to be used in environmentally noise sensitive area, Ramfos TF series hydraulic hammers boast unbeatable performance.

• Pile Drivers • 360˚ free rotation & 90˚ tilting rotation of jaw clamp • Tilting structure can easily be attached and detached

61 Silva Lane Dracut, MA 01826 (978) 454-3320 Fax: (978) 454-3325

Buy Proven High Quality Construction Equipment from one of the World’s Leading Manufacturers and Save $$$$ from Competitor’s Brands.

Perfect where there is limited space. Yanmar introduced the first Swing boom excavator, First Rubber tracked excavator and First Zero Tail Swing excavator.


Page 8 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Your New England

Dealer

WANTED!!!

Rough Terrain Cranes from 40 - 80 US Tons

MACK TRUCKS

SRC840 SRC865 SRC865XL SRC880

CAT, DEERE, BOBCAT EQUIPMENT IN ANY CONDITION IMMEDIATE PAYMENT!

CALL JOHNNY MACK HARTFORD, CT 860-883-1186

Crawler Cranes from 110 - 550 US Tons

Critical Fore River Bridge Job Begins

SCC8100 SCC8150 SCC8200 SCC8300 SCC8500

BRIDGE from page 4

Sales • Installation • Parts • Service • Road Service DAKOTA BODIES, INC.

OK Champion

NEPPA H

Member

11

SKYLIFT

Committed to Serving Contractors Needs for Over 25 Years

10 Airport Rd., P.O. Box 11, Hopedale, MA 01747 E-mail: dave@dcbates.com • www.dcbates.com Phone: 508-473-0041 • Sales Fax: 508-473-5531 Parts Fax: 508-478-3380

• Phase 2: Connection of the new bridge to the approaches, set for June to November 2015. This phase will include a reduction in capacity on the temporary bridge while the approach ramps are connected to the new structure. Also included in this segment of the job is testing of the machinery which lifts the movable span. • Phase 3: All four lanes open and all traffic on the new bridge. Construction of the sidewalks, south side dolphins and fenders and removal of the old temporary bridge. Approximately Sept. 2015 to Sept. 2016. The $3 billion Patrick-Murray Accelerated Bridge Program is greatly reducing the number of structurally deficient bridges in the state system, while creating thousands of construction jobs on bridge projects. Since 2008, the number of former MassHighway and Dept. of Conservation and Recreation structurally deficient bridges has dropped from 543 to 437, a decline of 19.5 percent. As of Sept. 1, 2012, the ABP Program had completed 102 bridge projects, with another 67 bridge projects currently under construction and an additional 19 bridge projects scheduled to start construction within the next year. Over the course of the eight-year program, more than 200 bridges are to be replaced or repaired, but none bigger than Fore River. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 9

The N.i.c.e. Company Northeast International Construction Equipment Co., Inc. “Your Newest Source for Quality Equipment”

I Buy Machines

1999 Cat 950G, runs good, command control, 16K hours..............................................................$57,500

Cat 420DIT, very nice machine! ................$38,500 Also in stock 420E, 420EIT

GET YOUR LOADERS NOW 2002 2000 2003 2008

WA180, bucket/forks..................................$59,000 Bobcat 863, cab, heat ............................$15,500 F750 Dump Truck, low miles ................$28,500 C3500, plow, sander, diesel ......................$35,000

Now Off 495 in Franklin!!! 76 Grove St., Franklin, MA

508-966-4888 508-966-4887

Call Bryn Smith at:

Fax:

Email: brynsmith@thenicecompany.com

See all of my machines at www.thenicecompany.com


Page 10 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 11

Happy Holidays! These advertisers wish you all new and greater opportunities for growth, health, happiness and prosperity in 2013. A

Woburn, MA

CONSTRUCTION EQUIPMENT & TRUCKS

Excavators, Backhoes, Loaders, Skid Steers, Forklifts, Trucks & More!

888-763-4656 Fax: 978-249-4257 60 State Road • Phillipston, MA 01331

Email: tim@brooksideequiment.com

www.brooksideequipment.com

DAVIS

Auctions, Inc.

391 Loudon Road Concord, NH 03301

(800) 358-6007 Fax: (603) 225-4918

or

1-800-201-4368 www.davisauctionsinc.com

HAPPY HOLIDAYS!

www.ewsleeper.com Serving Construction Contractors & Municipalities Since 1964

Bangor, ME 207.942.4838

Caribou, ME 207.498.2547

Concord, NH 603.224.4063

Chelmsford, MA Westbrook, ME 978.256.9571 207.854.8411

EQUIPMENT

901 South Main Street, Route 125 Haverhill, MA 01835 978-373-3440

Avon, MA

508-584-8484

860-356-0840 www.tylerequipment.com

from

860-665-7470 www.eastpbe.com 97 Route 302 Pine Bush, NY

24 Sybil Court Holmes, NY

845-744-2006

845-878-4004

www.pbeinc.com

www.pbeinc.com

Johnston, RI

413-665-7009 401-942-9191

413-525-6351

283 Pane Road • Newington, CT

Volvo Rents of Haverhill

Whately, MA

East Longmeadow, MA

Happy Holidays

300 Turnpike Road, Route 9 East Southborough, MA 01772 508-481-1350

New Haven, CT

781-935-1919 203-848-6735

Berlin, CT

Volvo Rents of Southborough

210 Cheshire Road P.O. Box 7071 Prospect, CT 06712

203-758-4087

Company

Manchester, CT South Easton, MA Saint John, NB (800) 829-4161 www.shawmutequipment.com

www.cn-wood.com

MULTI MACHINE INC. WE STOCK BEST PRICES RUBBER TRACKS for Over 2,500 Models!

Poughkeepsie, NY 845-452-1200

Some Used Tracks Available.

Bronx, NY

• GUARANTEED TO FIT

718-863-3800

• HIGH QUALITY

Holtsville, NY

• FAST SHIPPING

631-758-7500

Mention this ad and receive FREE SHIPPING!

888-888-1248

Bloomingburg, NY 845-733-6400

Newington, CT 860-666-8401


Page 10 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 11

Happy Holidays! These advertisers wish you all new and greater opportunities for growth, health, happiness and prosperity in 2013. A

Woburn, MA

CONSTRUCTION EQUIPMENT & TRUCKS

Excavators, Backhoes, Loaders, Skid Steers, Forklifts, Trucks & More!

888-763-4656 Fax: 978-249-4257 60 State Road • Phillipston, MA 01331

Email: tim@brooksideequiment.com

www.brooksideequipment.com

DAVIS

Auctions, Inc.

391 Loudon Road Concord, NH 03301

(800) 358-6007 Fax: (603) 225-4918

or

1-800-201-4368 www.davisauctionsinc.com

HAPPY HOLIDAYS!

www.ewsleeper.com Serving Construction Contractors & Municipalities Since 1964

Bangor, ME 207.942.4838

Caribou, ME 207.498.2547

Concord, NH 603.224.4063

Chelmsford, MA Westbrook, ME 978.256.9571 207.854.8411

EQUIPMENT

901 South Main Street, Route 125 Haverhill, MA 01835 978-373-3440

Avon, MA

508-584-8484

860-356-0840 www.tylerequipment.com

from

860-665-7470 www.eastpbe.com 97 Route 302 Pine Bush, NY

24 Sybil Court Holmes, NY

845-744-2006

845-878-4004

www.pbeinc.com

www.pbeinc.com

Johnston, RI

413-665-7009 401-942-9191

413-525-6351

283 Pane Road • Newington, CT

Volvo Rents of Haverhill

Whately, MA

East Longmeadow, MA

Happy Holidays

300 Turnpike Road, Route 9 East Southborough, MA 01772 508-481-1350

New Haven, CT

781-935-1919 203-848-6735

Berlin, CT

Volvo Rents of Southborough

210 Cheshire Road P.O. Box 7071 Prospect, CT 06712

203-758-4087

Company

Manchester, CT South Easton, MA Saint John, NB (800) 829-4161 www.shawmutequipment.com

www.cn-wood.com

MULTI MACHINE INC. WE STOCK BEST PRICES RUBBER TRACKS for Over 2,500 Models!

Poughkeepsie, NY 845-452-1200

Some Used Tracks Available.

Bronx, NY

• GUARANTEED TO FIT

718-863-3800

• HIGH QUALITY

Holtsville, NY

• FAST SHIPPING

631-758-7500

Mention this ad and receive FREE SHIPPING!

888-888-1248

Bloomingburg, NY 845-733-6400

Newington, CT 860-666-8401


Page 12 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Tyler Equipment

C.N. Wood Co., Inc.

Joseph Equipment Company

251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351

200 Merrimac St. Woburn, MA 01801 (781) 935-1919

300 Gay Street Manchester, NH 03103 603-641-8608

Avon, MA (508) 584-8484

www.josephequipment.com

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

Johnston, RI (401) 942-9191

www.cn-wood.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 13

DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $30.00. Each Additional Word is 95¢. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion.

Hydraulic Cranes 6-365 Ton

Bijur Automatic Lubrication Systems VEI Wheel Loader Scales West Springfield, MA 01089-3850 (413) 788-LUBE

Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Lubrication Engineers High Performance Lubricants Professional Lubrication Management

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 FORKLIFTS

LOADERS

Industrial Forklifts

Backhoe Loaders

GRADALL / LULL Sales - Service - Training

1995 Kubota B1700, 4WD, loader, Sims cab, good condition, 1082 hours ..$7,000.

Modern Equipment Sales & Rental 800-445-4381 GENERATORS & GEN SETS Generators & Gen Sets For Sale or Rent

Call now to reserve your space! 800-225-8448 * pre-payment required

Maine... • Aroostook • Cumberland • Franklin • Hancock • Androscoggin

Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln

‘Pine Tree State’ Highway Projects Let MAINE from page 6

County: Androscoggin Contract ID: 011599.00 Location: Auburn. Project: Safety improvements. Contractors and Bid Amounts: • St. Laurent & Son Inc. aka Maine Heavy Equipment Rental Inc. — $427,724 • Pratt & Sons Inc. — $463,169 • Gendron & Gendron Inc. — $517,777 • K & K Excavation Inc. — $519,463 • CPM Constructors — $588,699 Counties: Cumberland and York Contract ID: 016704.00 Location: Bonny Eagle covered bridge. Project: Bridge replacement. Contractors and Bid Amounts: • Wyman & Simpson Inc. — $2,124,609 • T. Buck Construction Inc. – $2,133,180 • Reed & Reed Inc. — $2,196,566 • CPM Constructors — $2,250,665 • Lane Construction Corporation (The) — $2,253,465 • New England Infrastructure Inc. — $3,138,411

All Makes and Models Modern Equipment Sales & Rental 800/445-4381 HYDRAULIC HAMMERS Hydraulic Breakers ALLIED SALES/RENTALS

County: York Contract ID: 018294.00 Location: Shapleigh-Acton, Route 109. Project: Hot mix asphalt overlay. HMA overlay. Contractors and Bid Amounts: • Pike Industries Inc. — $542,943 • F R Carroll Inc. — $627,225 • Shaw Brothers Construction Inc. — $647,873 • Lane Construction Corporation (The) — $728,995 County: Aroostook Contract ID: 016819.20 Location: Sherman, Crystal, and Island Falls. Project: Highway resurfacing. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $4,645,395 • Northern Maine Paving Inc. — $5,696,788 Counties: Kennebec and Waldo Contract ID: 019151.00 Location: Clinton-Burnham Route 100. Project: Hot mix asphalt overlay. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $828,225 • Pike Industries Inc. — $891,700

Jason Niro 732-446-7600 Wheel Loaders NH Construction Equipment New & Used Parts & Service Modern Equipment Sales & Rental 800-445-4381 MISCELLANEOUS Miscellaneous

Eagle Power & Equipment

CE, new solid flex tire 12x16.25, fits most skid steers, excellent ......$2100.

Montgomeryville PA 215/699-587

Jason Niro 732-446-7600

New Castle DE 302/652-3028

EVERYTHING DRILLING ‘’VERTICAL’’

Eagle PA 610/458-7054 CHAIN-LINK & WOOD FENCE PRODUCTS Galvanized & Vinyl Chainlink Fence Galvanized & Vinyl Fence Pipe Cedar Picket & Board Wood Fence Galvanized & Vinyl Fence Hardware Huge Inventory Available at Wholesale Prices Call Today Delivery For Pricing... Available

Mid-City Steel Fence 190 State Rd. (Rte 6) Westport, MA Ask for Paul J. Aguiar

Office: (508) 646-9800 Cell: (508) 951-6092 Fax: (508) 676-5400

jonrents.com

=========== DAILY AND WEEKLY EQUIPMENT RENTALS CLOSE TO YOUR JOB SITE

RENTMACHINES.COM CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®


Page 14 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham Hampshire... •New Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham • Cheshire • Merrimack • Coos • Grafton • Sullivan • Carroll • Belknap •Strafford • Hillsborough • Rockingham

‘Granite State’ Highway Projects Let

The New Hampshire State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Grafton Project: FRANCONIA-LITTLETON X-A002(318), 22312. Scope of Work: Pavement and bridge rehabilitation. Location: I-93 spanning from MM 111.6 to MM 125.0. Contractors and Bid Amounts: • Pike Industries Inc. — $7,670,840 • Continental Paving Inc. — $8,042,901 Scheduled Completion Date: June 20, 2014 County: Hillsborough Project: PELHAM X-A000(415), 14491. Scope of Work: Roadway rehabilitation. Location: N.H. 111A in the Pelham town center. Contractors and Bid Amounts: • Continental Paving Inc. — $2,793,117 • FL Merrill Construction Inc. — $3,096,216 • Weaver Bros. Construction Company Inc. — $3,256,935 • R.S. Audley Inc. — $3,789,606 • Northeast Earth Mechanics Inc. — $3,984,828 Scheduled Completion Date: Oct. 17, 2014 County: Merrimack Project: BOW-HOPKINTON X-A001(242), 16321. Scope of Work: Median barrier placement. Location: I-89 in Bow-Hopkinton. Contractors and Bid Amounts: • Weaver Bros. Construction Company Inc. — $1,915,786 • Continental Paving Inc. — $2,064,148 • J.P. Sicard Inc. — $2,174.336 • F.L.Merrill Construction Inc. — $2,224,539 • Northeast Earth Mechanics Inc. — $2,279,481 • R.S. Audley Inc. — $2,344,836 • CPM Constructors — $2,394,547 • Northern Construction Service LLC — $2,623,000 Scheduled Completion Date: Aug. 23, 2013 County: Cheshire Project: KEENE-SWANZEY X-A001(201), 10309S and TROY X-A002(446), 10434E. Scope of Work: Building demolition. Location: Two state owned parcels in the city of Keene and town of Troy. Contractors and Bid Amounts: • Jay-Mor Enterprises Inc. — $57,800 • Francesco Demolition Inc. — $60,885 Scheduled Completion Date: May 31, 2013 County: Hillsborough Project: MILFORD-MERRIMACK X-A002(367), 22633. Scope of Work: Roadway resurfacing. Location: N.H. 101A in Milford and N.H. 101-Nashua city line.

County: Rockingham Project: SALEM-MANCHESTER BI-A000(129), 13933I. Scope of Work: Roadway construction. Location: I-93, EXIT 3. Contractors and Bid Amounts: • R.S. Audley Inc. — $32,997,604 • George R. Cairns and Sons Inc. — $36,303,749 • The Middlesex Corporation — $36,342,750 • Weaver Bros. Construction Company Inc. — $36,424,026 • Severino Trucking Company Inc. — $39,272,872 Scheduled Completion Date: June 3, 2016

County: Belknap Project: BARNSTEAD X-A001(180), 16200. Scope of Work: Roadway improvements. Location: N.H. 28, N.H. 126 and West Locke Road in Barnstead. Contractors and Bid Amounts: • Connies Septic Service Inc. d/b/a CSSI — $817,424 • F.L. Merrill Construction Inc. — $820,139 • Weaver Bros. Construction Company Inc. — $825,501 • American Excavating Corporation — $827,777 • G.W. Brooks and Son Inc. — $838,184 • Pike Industries Inc. — $839,725 • J. Parker & Daughters Inc. — $845,562 • Northeast Earth Mechanics Inc. — $848,469 • CPM Constructors – $1,085,054 Scheduled Completion Date: June 28, 2013

County: Merrimack Project: ANDOVER X-A001(023), 15901. Scope of Work: Bridge rehabilitation. Location: N.H. Route 11 over the Blackwater River. Contractors and Bid Amounts: • Beck & Bellucci Inc. — $1,572,548 • E.D. Swett Inc. — $1,637,975 • VR Concrete Inc. — $1,644,689 • R.M. Piper Inc. — $1,671,063 • Wyman and Simpson Inc. — $1,744,469 • CPM Constructors — $1,783,288 • Evroks Corporation — $1,800,017 • SPS New England Inc. — $1,895,242 • Northern Construction Service LLC — $1,974,879 • Tbuck Construction Inc. — $2,133,323 • New England Infrastructure Inc. — $2,324,001 Scheduled Completion Date: Oct. 25, 2013

Counties: Rockingham and Strafford Project: BARRINGTON X-A001(181), 16201 and CANDIA X-A001(281), 16413. Scope of Work: Roadway improvements. Location: N.H. 125 in Barrington and N.H. 125/Greenhill Road/Tolend Road in Candia. Contractors and Bid Amounts: • American Excavating Corp. — $594,897 • Weaver Brothers Construction Company Inc. — $599,451 • G W Brooks and Son Inc. — $601,216 • Northeast Earth Mechanics Inc. — $618,385 • Pike Industries Inc. — $634,713 • N. Pandelena Construction Company Inc. — $639,530 Scheduled Completion Date: Aug. 23, 2013

Contractors and Bid Amounts: • Brox Industries Inc. — $2,345,972 • Continental Paving Inc. — $2,462,035 Scheduled Completion Date: July 19, 2013


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 15

CRUSHING EQUIPMENT, PARTS & SERVICE Ace Equipment Sales, Inc. and Milroy and Company LLC 171 Tolland Turnpike (Route 74) • PO Box 535 • Willington, CT 06279

(860) 429-2793 • Fax: (860) 429-0542 Don Bayer • (518) 527-1910

John Patton • (860) 614-3426

Bill Dahill • (203) 314-2113

Go to www.acecrushers.com for a complete listing and description of our new and used equipment. Telsmith Vibro-King TL 8x24 Inclined Screen

MCR Technologies: Integrated Belt Scales

The Telsmith Vibro-King TL Inclined 8x24 screen yields high production and is built around the revolutionary TL shaft assembly. Utilizing the “never-wear” sealing system, the TL shaft assembly delivers long service life with less maintenance. The TL live body is available with flat or crowned deck designs, accepting all screen media to deliver optimum performance in tough applications. This inclined screen is available for either wet or dry screening applications.

Performance Management – Take Control of Your Operation! This integrated belt scale systems allows you to view plant operations from any computer…monitor one scale or up to 24 scales on the network! This system gives you the ability to establish and maintain the full capabilities of your plant through remote management.

A. Remote Display in Control Tower with wireless Ethernet Access Point.

B. Standard Weight Shark C. Remote Display and belt scales with wireless Ethernet additional wireless bridge in loader. Ethernet bridges.

D. Wireless Ethernet Bridge in Office allows either a Remote Display or PC’s to view scale data.

USED EQUIPMENT FOR SALE Crushers Cedarapids 30 x 42 Portable Jaw Plant w/Jaw Crusher

s/n 50309/50382, 42” x 20’ Vibrating Grizzly Feeder, 150 HP Electric Crushing Motor, End Discharge Conveyor, Ready for Transport, FOB: Willington, CT..........................$195,000

Eagle 1536 Portable Jaw Crushing Plant

s/n 10945, Eagle Model 33D4155, 15x36 Jaw Crusher, Vibratory Pan Feeder with Hydraulic Grizzly Dump - Remote Control, 3’x6’ 2-Deck Scalping Screen, Cummins Diesel Engine Drives, 50KW Generator and Hydraulic Pump, Dual-Axle, 30” FoldUp Discharge Conveyor, Rear Discharge Conveyor for Screen Throughs, Jaw Dies Over 50%...VERY GOOD CONDITION!!! ................................$145,000

Pioneer 540CSE Cone Portable Plant

Telsmith 52H Portable Cone Plant

s/n 450CSE101, 45 Allis-Chalmers Cone, DD Screen, Electric Starters and Switch Gear on Board, 200HP, Dual-Axle, Double Deck Screen, Front and Rear Discharge Conveyors ........................$125,000

s/n 505M2588, Refurbished 52S Model H Cone Crusher, Crusher s/n: 202M9842, New Head and Shaft Assembly, New Eccentric, (2) New Thrust Bearings, New Inner Sleeve, New Outer Sleeve, New Inner & Outer Piston Rings, New Countershaft Bearings, New Belleville Springs, 90% Manganese, Hydraulic Relief, Dynamic Adjustment Controls for Close Side Settings & Extraction, Air - Oil Cooler Option, Telsmith Dual-Axle Chassis with Side Discharge Conveyor, 250 HP Motor w/Switch-Geat, Will be Painted, Ready for Transport and Crushing, FOB: Willington, CT ....................................$255,000

WE HAVE ALL THE PARTS YOU NEED: Manganese, Conveyor Belts, Idlers, Head Pulleys, Tail Pulleys and Much More!

Quality Service Guaranteed!


Page 16 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

160 Elm St. Unit 1 Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614

www.lhequip.com

A

STRONGCO Company

Chadwick-BaRoss, Inc. 15 Katrina Road • Chelmsford, Massachusetts (800) 804-0775 • (978) 256-9571 Fax: (978) 256-8802 www.chadwick-baross.com • www.cbused.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 17

C Challenging hallenging jjobsites obsites d don't on't iintimidate ntimidate a D Doosan oosan ccrawler rawler e excavator. xcavator. H Hydraulic ydraulic p pump ump p performance erformance d delivers elivers fa fast, ast, cclass-leading lass-leading ccycle ycle ttimes, imes, w with ith a ssynchronized ynchronized e engine ngine a and nd h hydraulic ydraulic ssystem ystem tthat hat b boosts oosts e efficiency. fficiency. IIt's t's d designed esigned tto oo offer ffer iincreased ncreased fflotation lotation iin n ssoft oft ssoil, oil, w while hile p precision recision ccontrols ontrols p provide rovide a accuracy ccuracy a and nd p power. ower. W Whether hether yyou're ou're d digging igging a ttrench, rench, h handling andling b boulders oulders o orr d dumping umping d debris, ebris, tthe he D Doosan oosan ccrawler rawler e excavator xcav vator kkeeps eeps yyou ou p productive roductive n no om matter atter w what. hat. V Visit isit u us s tto os see ee w what hat D Doosan oosan e equipment quipment ccan an d do o ffor or y you. ou.

www.barryequipment.com

www.bobcatboston.com

www.fwequip.com

Barry Equipment

Bobcat of Boston Inc.

Bobcat of Boston South

F&W Equipment

30 Birch Island Road Webster, MA 01570 508-949-0005

20 Concord Street North Reading, MA 01864 978-664-3727

170 MacArthur Blvd. Bourne, MA 02532 508-759-5020

164 Boston Post Road Orange, CT 06477 203-795-0591


Page 18 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

Kenworth of Buffalo Buys Dealership in Boston Area

ACE EQUIPMENT SALES INC ......................................15 ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................13 BARRY EQUIPMENT CO..................................................6 C N WOOD CO INC ........................................................20 CHADWICK BAROSS MA ..........................................5,16 CLASSIFIED ..................................................................13 CONTRACTOR’S CORNER ..........................................13 D C BATES EQUIPMENT CO INC ..................................8 DOOSAN NORTHERN NEW ENGLAND ......................17 EQUIPMENT EAST ..........................................................7 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS ......................................................1 HOLIDAY GREETINGS ..................................................10 HYUNDAI CONSTRUCTION EQUIPMENT....................19 ITL AUCTIONEERING ......................................................1 J R VINAGRO CORPORATION ......................................1 KRAFT POWER CORP ....................................................1 LORUSSO HEAVY EQUIPMENT LLC ..........................16 LOU GIZA EQUIPMENT....................................................1 LUBRICATION TECHNOLOGIES INC ..........................13 MID CITY STEEL CO ......................................................13 MILTON CAT....................................................................13 MULTI MACHINE INC ......................................................1 POWERSCREEN NEW ENGLAND ................................9 ROGERS BROTHERS ....................................................12 THE N.I.C.E. COMPANY ..................................................9 TYLER EQUIPMENT CO ..............................................3,7 W I CLARK CO..................................................................2 WANTED MACK TRUCKS ..............................................8 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Kenworth of Buffalo recently purchased the Kenworth dealership in Stoughton, Mass., along with territorial rights for eastern Massachusetts and Rhode Island from Tri-State Kenworth in Enfield, Conn.

Kenworth of Buffalo has acquired a Kenworth dealership in the Boston area and changed the name of its expanded, five-dealer organization to the Kenworth Northeast Group. The dealer group recently purchased the Kenworth dealership in Stoughton, Mass., along with territorial rights for eastern Massachusetts and Rhode Island from TriState Kenworth in Enfield, Conn. As part of the expansion, Kenworth Northeast Group dealerships are now known by names better indicative of the market region each location serves. Kenworth Northeast Group maintains its headquarters in Buffalo, N.Y., and operates the following full-service facilities: Kenworth of Albany, Kenworth of Buffalo, Kenworth of Rochester, and Kenworth of Syracuse in New York state, and Kenworth of Boston in Massachusetts. A member of the Kenworth dealer network of more than 330 locations in the

United States and Canada, the Kenworth Northeast Group supplies the northeast region with The World’s Best heavy and medium duty trucks, parts and service, and financing. The dealer’s mission statement is: “Providing The Services Our Customers Deserve; Delivering The Satisfaction They Expect.” “The Kenworth Northeast Group is dedicated to providing customers with Kenworth’s excellent heavy and medium duty trucks along with outstanding support,” said Dennis Dintino, president of Kenworth Northeast Group. “We’re pleased to increase customer support with the addition of Kenworth of Boston to join our four excellent dealerships in the state of New York. We plan to deepen our market penetration and expand market share through the growth of existing operations and the pursuit of new opportunities in eastern Massachusetts and Rhode Island.” For more information, visit www.kenworthne.com.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 19, 2012 • Page 19

Chappell Tractor Sales, Inc. Milford, NH 800/698-2640

Chappell Tractor East, LLC Brentwood, NH 800/616-5666

Kahn Tractor & Equipment, Inc. North Franklin, CT 860/642-7596

Lorusso Heavy Equipment, LLC 160 Elm Street P.O. Box 857 Walpole, MA 02801 508/660-7600 www.lhequip.com


Page 20 • December 19, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

140 Wales Avenue Avon, MA 02322 508-584-8484

www.woodcomachinery.com

22 North Maple Street Woburn, MA 01801 781-935-3377

60 Shun Pike Johnston, RI 02919 401-942-9191


Turn static files into dynamic content formats.

Create a flipbook