1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
Formerly
95
202
7
®
91
9
95
93
2
95 2
93 90
90
7
November 16 2016
95 91
7
495 6 195
395
95 91
3
84 6
84
6
E
q
u
I
P
m
E
N
t
g
u
I
d
E
95
95
Vol. XlIX • No. 23
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Amanda Hogeboom-merritt 1-800-988-1203 Specializing in:
2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers
www.jrvinagrocorp.com
Call for Pricing
Ante Up: MGM Bets $950M Springfield Casino Will Win Big for Massachusetts By Brenda ruggiero CEG CORRESPONDENT
LEED Accredited in Waste Management WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks Available.
A NJ, TX, WSES U WAREHO • HIGH QUALITY
www.foleyengines.com
In historic downtown Springfield, Mass., along the Connecticut River, a resort known as MGM Springfield is rapidly taking shape. It is contained within three city blocks, bordered by Union and State streets and Main Street and Columbus Avenue. The resort is being constructed on
about 10 acres of land heavily damaged by a tornado in downtown Springfield in June 2011. MGM Springfield’s plan will reportedly generate approximately 3,000 direct jobs, 2,000 construction related jobs, and thousands of indirect jobs. MGM Resorts made a commitment early on that 90 percent of the jobs will be staffed by a combination of
• FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS
2017 EZ-Screen 1200XLS
• FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
w
$80M Vermont Wind Project Under Way By Jennifer rupp
New Option Separate 3 Products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
CEG CORRESPONDENT
GIVE US YOUR HAMMER! • Repairs • Rebuilds • Replacement Parts in Stock
30% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
$41,900 plus freight. Other Screeners Available
ArguS INduStrIAl CO. www.ez-screen.com
866-745-5828 Cat D7F
VERY NICE SHAPE Phil (413) 427-7171
YOUR ONE-STOP HYDRAULIC HAMMER SHOP™ New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!
CALL 888-81-GORILLA(46745) *Some restrictions apply
“Big Wind” has had a presence in Vermont since the 6 mW Searsburg Wind Farm was erected in 1997. Three additional wind farms have been constructed since, with a handful more in proposal stages. In September, groundbreaking for the latest wind energy effort took place in the towns of Searsburg and Readsboro, Bennington County, Vermont. The new $80 million Deerfield Wind Farm project will be built on U.S. Forest Service land, near the existing Searsburg wind project. The project will include 15 wind turbines, eight in Searsburg and seven in Readsboro, which will produce enough energy to power about 14,000 average Vermont
households. It is expected to deliver at least $400,000 per year in local economic benefits and an additional estimated $300,000 per year for the state of Vermont, which add up to more than $6 million over 20 years. Each of the 15 modern wind turbines will reside on 256 ft. (78 m) towers. Manufactured by Gamesa, the turbines are comprised of 8 G97 turbines, with 318 ft. (97 m) rotor diameters; and 7 G87 turbines, with 285 ft. (87 m) rotor diameters. Deerfield Wind has worked for 12 years through the permitting processes at the federal and state level. The project has been reviewed by the Vermont Public Service Board (PSB), and the Vermont Agency of Natural Resources (ANR). As see WINd page 6
Springfield and regional residents. The project, valued at $950 million, was awarded to Tishman/Fontaine Bros. Construction Company. Funded see CASINO page 4 Mark M. Murray/MGM Springfield photo
Funded by MGM Resorts International, everything is currently on schedule for an expected opening in the fall of 2018.
Page 2 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316
2003 Bobcat S130
2002 Deere 270
2013 Doosan C185WKUB
ROPS, Foot Controls, 60” Bkt, stk#23226........ ............................................................$12,500
600 Hrs, C/Heat, Foot Controls, 78” Bkt, 14” Rubber, Like New Cond, stk#23479 ....$25,000
375 hours, Like New Condition............$15,000
2004 Komatsu D41E-6
2012 Deere 524K Hi-Lift
2010 John Deere 410J
C/Air, 22” Pads, 11’ Blade, stk#23379 $44,500
3360 Hrs, 3 Spool, RC, JRB Hyd Coupler, GP Bkt, Nice Loader, stk#28851 ..............$110,500
C/air, 2000 Hrs, 4x4, Ext. Hoe, Front & Rear Hyds, 4-1 Bkt, stk#22846 ....................$66,500
2007 Cat CB224E
2012 Leeboy 8515B
2002 Hamm HD 12VV
1488 Hrs, Kubota, 8-15’ Electric Legend Screed, Poly Pads, stk#23142 ............$85,000
Deutz, 47” Drums, PSI Water System, Runs Great, stk#23406 ................................$10,500
ROPS, 47” Drums, PSI Water System, stk#23510 ............................................$15,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 3
251 Shaker Road East Longmeadow, MA 01028 800.292.6351
www.tylerequipment.com
1980 Berlin Turnpike Berlin, CT 06037 800.352.4473
Page 4 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
MGM Casino Reaches New Heights in Springfield, Mass. CASINO from page 1
by MGM Resorts International, everything is currently on schedule for an expected opening in the fall of 2018. Work is occurring six days a week, sometimes 10 to 12 hours a day. The groundbreaking was held on March 24, 2015. Guests at the event could participate by writing down their wishes for the future of the city of Springfield and western Massachusetts. The notes were then dropped into an MGM Springfield wishing well and ultimately included in a capsule that was placed in the resort foundation as construction Mark M. Murray/MGM Springfield photo Mark M. Murray/MGM Springfield photo began. The resort is being constructed on about 10 acres of land heavily damaged by a torThe crane is used to set steel and heating, ventilation, “The city of Springfield’s nado in downtown Springfield in June 2011. air conditioning equipment and some concrete work. people welcomed us into their hearts and homes and trusted us with their hopes for the future, Michael Mathis, the most robust construction site Springfield has ever seen.” ury bowling facility featuring 10 lanes; a 37,000-sq.-ft. The resort will include 850,000 sq. ft. (78,967.5 sq m) of (3,437 sq m) state-of-the-art cinema; 55,000 sq. ft. (5,110 sq president and chief operating officer of MGM Springfield said. “This property was designed with the input of residents residential, dining, retail and entertainment — including m) of retail and restaurant space including a buffet; a 7,000who wanted more for their families and their community. hotel and gaming facilities; a six-story hotel with 250 guest sq.-ft. (650 sq m) spa; an ice-skating rink; a 3,400-space Today is the day we start to realize that future as we activate rooms and 20 VIP suites; a 12,300-sq.-ft. (1,142.7 sq m) luxsee CASINO page 8
NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Main office
Toll Free Fax Web site Editorial e-mail Advertising e-mail
Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Judith Nixon Cathy Printz
470 Maryland Drive Fort Washington, PA 19034 215/885-2900 800/523-2200 215/885-2910 www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com
For advertising rates: Contact
Edwin M. McKeon Jr.
215/885-2900 800/523-2200 215/885-2910 e-mail tmckeon@cegltd.com
Toll Free Fax
Amanda Hogeboom-Merritt • New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail amerritt@cegltd.com Contact
Kent Hogeboom • New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact
Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2016, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.
Mark M. Murray/MGM Springfield photo
The 387,000-lb. (175,540 kg) crane was delivered in 18 separate trucks, and it took a team of 10 to 12 workers a total of four days to assemble it — rising 205 ft. (62 m) in the air.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 5
HYUNDAI HX SERIES EXCAVATORS
More Standard Features s s s s s s
Faster cycle times, greater productivity Standard rear camera; All-Around View Monitoring option Spacious, quiet cab with Bluetooth and wireless Standard air-suspension seat 3-year Hi-Mate remote management system 3-year, full-machine warranty, plus 5-year / 10,000-hour structural guarantee
To learn more about the HX series excavators, call your Hyundai dealer today. 160 Elm Street Walpole, MA 02081 (508) 660-7600 ©2016 Hyundai Construction Equipment Americas, Inc. All Rights Reserved.
Page 6 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Officials Break Ground on $80M Vermont Wind Farm WIND from page 1
Special alloy steel and heat treatment for extra toughness Durable breaker body has fewer moving parts Ideal for excavation, trenching, demolition and quarry work
Learn more about our full line of breakers:
OkadaAmerica.com (800) 270-0600
the project is located on Forest Service land, it has been subject to a multi-year review by the U.S. Forest Service, including an Environmental Impact Statement and Special Use Permits. Additional federal reviews and consultations have occurred with the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service. In July 2015, Iberdrola Renewables filed a potential 25year contract to supply Vermont’s largest utility, Green Mountain Power (GMP), with wind energy from the permitted Deerfield Wind Farm. GMP would purchase 30 megawatts (mW) from the wind farm. Iberdrola Renewables LLC is a subsidiary of Iberdrola USA and the U.S. renewable energy division of parent company IBERDROLA S.A., an energy pioneer with the largest renewable asset base of any company in the world. Iberdrola Renewables LLC is headquartered in Portland, Ore. At the time of filing, Vermont Gov. Peter Shumlin said, “Going forward, we know we need all renewable energy sources on the table, including wind, if we are going to meet our state energy goals and have a livable planet for our kids and grandkids. While most of Vermont’s wind projects have been located in the Northeast Kingdom, I am encouraged that through the Deerfield project southern Vermont will be contributing to our fight against climate change.” “Providing stable, affordable and highly reliable power in our power portfolio is a top priority for Green Mountain Power and this purchase agreement will ensure we can achieve these important goals for years to come,” said Charlotte Ancel, Green Mountain Power’s general counsel and vice president of Power Resources. The Deerfield Wind Farm is set to be fully operational in 2018. “Like many parts of Vermont, we have a small tax base, and not much ability to attract investments of this size, so the local financial windfall would generate benefits for years to come, benefitting all the taxpayers here in Readsboro,” said Readsboro Selectman Teddy Hopkins. Not everyone is on board though. Many local residents turned out for the ground-breaking ceremony on September 19th to show their opposition. Among them was State Rep. Marianna Gamache, who sits on House Committee on Natural Resources and Energy. She, along with other Vermonters against the project, was not allowed at the press conference. Shumlin addressed the protest with this statement: “Whenever you have change you have some protests, but my protest is this — climate change is destroying the planet. We have made a terrible mess for our kids and grandkids. We have got to build out renewables in a thoughtful way.” (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 7
391 Loudon Rd. Concord, NH 03301 603.225.3361 800.358.6007 www.ewsleeper.com
Page 8 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Shops, Restaurants Part of MGM’s Springfield Casino Plans
Mark M. Murray/MGM Springfield photo
Mark M. Murray/MGM Springfield photo
The resort will include 850,000 sq. ft. (78,967.5 sq m) of residential, dining, retail and entertainment.
The start of construction of the parking garage followed months of site preparation and demolition work and the relocation of a church on the site.
CASINO from page 4
parking garage; more than 126,000 sq. ft. and 350 tons (317.5 t) of reinforcing steel in (11,706 sq m) of gaming, featuring 100 table the foundation. games (including poker) and 3,000 slot Tishman is partnering with Fontaine Bros. machines; and more than 45,000 sq. ft. Inc. to manage the parking garage project, (4,180 sq m) of meeting and convention including the solicitation of subcontractors facilities. Sustainable features include LED and other procurement efforts. lighting and water-saving fixtures. The church relocation was necessary to Unlike an inward-focused, self-contained clear the land for the resort casino’s congaming project, the shops and restaurants struction site, and occurred in April 2016. will be open to Main Street, allowing tourists The French Congregational Church, known to have easy access without having to since 1919 as the First Spiritualist Church is maneuver through the gaming area or the a historic high Victorian gothic church, hotel. It will offer visitors a unique experiwhich was located at 33-37 Bliss Street. The ence with all the amenities of a resort, but Mark M. Murray/MGM Springfield photo church was moved approximately 600 ft. without the confinement of moving around The largest piece of equipment used on the job is a Liebherr model LR1400 garage (182.88 m) to its new permanent home. in a ‘big box.’ This design was implemented crane with a maximum capacity of 440 tons (399 t) and 253 ft. (77.11 m) of boom. “Relocating this historic church, which to encourage local business growth and easnow sits on what will become the casino ily link visitors to other Springfield attractions, including the gaming floor, is a major milestone for MGM Springfield,” MassMutual Center, museums and Symphony Hall. said Mathis. “This entire project is transforming the landAccording to a project spokesperson, the main challenge scape of downtown Springfield. We are proud to be able both is that it involves “developing a $950 million resort in the to preserve iconic structures and build a world-class, new heart of Springfield’s downtown district while seamlessly facility for the community to enjoy.” integrating a number of existing historical buildings, through Preparation for the relocation included bracing the interieither total or partial reuse, into the project.” or of the building, installing dolly wheels, and raising the The contract for a seven-level, 3,400-space parking building up on blocks. garage was awarded to Tishman Construction, a wholly“I am pleased that MGM Springfield and the city of owned subsidiary of AECOM, in partnership with Springfield are able to work together to move this mega ecoSpringfield-based construction manager Fontaine Bros. Inc. nomic development project forward, but also to preserve this This portion of the project began in May, 2016, and is historic building by saving and moving the First Spiritualist expected to be completed in about 20 months. Church,” said the Hon. Domenic J. Sarno, mayor of the city The start of construction of the parking garage followed of Springfield. “Pardon the pun — if you look in Merriammonths of site preparation and demolition work and the reloWebster, this gives a new definition to ‘Holy Rollers’.” cation of a church on the site. Upcoming work includes the Wolfe House and Building Movers was contracted to casino podium (super structure) and hotel. move the historically-registered building, with great care The parking garage will have a total area of 1.37 million taken to protect the framework of the 129-year-old structure. Mark M. Murray/MGM Springfield photo To lift the church, they used a specialized unified hydraulic sq. ft. (127,663 sq m), and will include a total of 3,609 precast pieces; 10,295 cu. yds. (7,871 cu m) of CIP concrete; The project, valued at $950 million, was awarded to see CASINO page 14 Tishman/Fontaine Bros. Construction Company.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 9
THE N.I.C.E. COMPANY 9 Rosenfeld Drive, Hopedale, MA Toll Free# 888-717-8096 • www.theniceco.com
We sell NICE machines!
2014/15 Volvo L70Gs: Low hours!! Starting @ $114,000
RENTALS CAT M322 Excavator ....$6900/month CAT 330 w/ Hammer ..$16,500/month CAT 735 Truck ..............$8500/month CAT 312 Excavator ........$4000/month
Many more available!! Visit us at www.theniceco.com Text “NICECO” to 22828 to join our email list!
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
Page 10 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
PLAYIN’ IN THE DIRT
SINCE
1965
PUSHING THE LIMITS OF CONSTR CONSTRUCTION UCTION PERFORMANCE Mustang skid steer loaders come ready to work with the right power needed to tackle the biggest tasks. Building its first skid-steer in 1965, Mustang loaders have pushed the limits of durability, setting
WOULD YOU LIKE A FREE FLEET OF NEW EQUIPMENT? SECTION 179 & BONUS DEPRECIA ATION TION 00,000 IN T TAX AX INCENTIVES* ALLOW UP TO $500,000 *Check with a tax professional for more details.
new industrryy standards.
G E N U I N E
CALL YOUR AREA MUSTANG DEALER TODAY!
ABLE TOOL & EQUIPMENT 410 Burnham Street South Windsor, CT 06074 860-289-2020 149 Rocus Street Springfield, MA 01104 413-363-0780 www.abletool.net
RS EQUIPMENT 2900 County Street Somerset, MA 02726 508-672-1051 866-650-5297 www.rsequipment.com
www.mustangmfg. com
™
P A R T S
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 11
DOOSAN DELIVERS
The Doosan lineup of heavy equipment offers strong performance in the areas that matter most — from powerful bucket forces on excavators to superior payload capacities on articulated dump trucks and exceptional lifting capabilities on wheel loaders. And with our unbeatable warranty, dedicated dealer support and versatile attachment selection, one thing is certain: Doosan delivers. Call or visit your local authorized dealer today and see the Doosan difference. Authorized Doosan Dealers
Equipment East, LLC 61 Silva Lane • Dracut, MA 01826 • 978-454-3320 • www.equipmenteast.com
Barry Equipment Co., Inc. 30 Birch Island Road • Webster, MA 01570 • 508-949-0005 • www.barryequipment.com
F&W Equipment 164 Boston Post Road • Orange, CT 06477 • 203-795-0591 • www.fwequip.com
Central Equipment Company 45 Dempsey-Greaves Lane • Stillwater, ME 04489 • 207-827-6193 • www.centralequipmentco.com
Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 15-D008
Page 12 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
888-485-03 0383 NorthlandJCB.com
DISPLAY ADS/ CLASSIFIEDS Hydraulic Cranes 8 to 600 Ton
Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034
215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200
Daily & Hourly Services
CRANE INSPECTIONS
HYDRAULIC HAMMERS
Fully Insured
ALL TYPES OF CRANES
NEW Promac/Sandvik - All models - All sizes ..........CALL!
www.astrocrane.com
200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666
INSPECTED AND CERTIFIED
Promac Group 610-497-3555
Accredited by the US Dept.
Place Your Business Card for... 3 months 6 months 12 months
$300* $585* $1040*
only $50 an issue only $45 an issue only $40 an issue
Call now to reserve your space! 800-225-8448 * pre-payment required
of Labor Under 29CFR Part
DAILY AND WEEKLY
1919 and Accredited by
EQUIPMENT RENTALS
CALOSHA
CLOSE TO YOUR JOB SITE
RENTMACHINES.COM Call 215-639-2579 Atlantic Crane Inspection Services Visit us at www.atlanticcrane.com
CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 13
A VERSATILE AND AFFORDABLE SNOW REMOVAL PACKAGE Chappell Tractor has been putting together snow removal packages for New England Winters for almost as long as we’ve been around. This Hyundai equipped with the one of a kind Kage snow removal system combines the best features of a snow pusher and a traditional plow.
TOMORROW’S EDGE TODAY
Milford, NH 800.698.2640
Brentwood, NH 800.616.5666
www.chappelltractor.com
Page 14 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Holy Rollers: Crews Move Church to Make Room for Casino CASINO from page 8
jacking system that allowed the structure to be raised steadily and simultaneously, without disruption to the drywall. The building was then placed on Buckingham power and coaster dollies, an instrument Wolfe designed and built inhouse. These remote-controlled hydraulic coasters speak to each other in real time through an advanced technology, allowing each movement to be carefully aligned. The largest piece of equipment used on the job is a Liebherr model LR1400 garage crane with a maximum capacity of 440 tons (399 t) and 253 ft. (77.11 m) of boom. The heaviest planned pick is 39.25 tons (22.7 t). The last time a crane of this size was in downtown Springfield was 30 years ago when with the construction of Monarch Place in 1986, according to Mathis. The 387,000-lb. (175,540 kg) crane was delivered in 18 separate trucks, and it took a team of 10 to 12 workers a total of four days to assemble it — rising 205 ft. (62 m) in the air. The crane is used to set steel and heating, ventilation, air conditioning equipment and some concrete work. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG
Mark M. Murray/MGM Springfield photo
Mark M. Murray/MGM Springfield photo
The church relocation was necessary to clear the land for the resort casino’s construction site.
The First Spiritualist Church was moved approximately 600 ft. (182.88 m) to its new permanent home.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 15
RUN STRONG.
Want to run strong equipment? Run Doosan. Stop in and visit us today to learn more.
Authorized Doosan Dealer
Barry Equipment Co., Inc. 30 Birch Island Road | Webster, MA 508.949.0005 www.barryequipment.com Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world.
Page 16 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
North Country Auctions Holds Inventory Reduction Sale
N
orth Country-Auctions, held a major inventory reduction sale in Concord, N.H., on Oct. 15. at E.W. Sleeper’s location on 391 Loudon Road. The sale included a total of 700 lots, 200 of which was heavy equipment including a surplus of inventory from E.W. Sleeper, a local heavy equipment dealer that carries lines such as Kawasaki, Yanmar, Vibroscreen and more. The sale also featured equipment from Azores Construction located in Windham, N.H., and the estate of Keith Bryar. The morning started off dreary and cold, which is expected with a fall sale in the More than 250 ground bidders poured in to see what kind of good deals they could New England region, but the score on heavy equipment at the North Country/E.W. Sleeper liquidation sale. E. Douglas Ryan, New England regional manager of warm weather surprisingly North Country Auctions, was one of many of North broke through and allowed for a beautiful day for people Country’s crew. to come out and enjoy the event. There were more than 250 ground bidders and an additional 150 online bidders via Equipmentfacts.com. The highest bid items included a 2013 Kawasaki 85Z-7 wheel loader, a Cat 950-H wheel loader and Cat D6R XL dozer.
(This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG see SALE page 18
Joseph Cardillo (L), owner of Joseph P. Cardillo & Son Inc., a general contractor in Wakefield, Mass., and Paul Blais, Construction Support Equipment in Whitaker, N.H., were at the sale looking to score some great deals.
Steve Tedstone (L), salesman, and Mike Sherman, used equipment manager, both of Milton CAT, were in attendance at the North Country sale.
Paul LeBlanc, mechanic of Ronald J. Loiselle Inc. located in Chelmsford, Mass., was sent out to check out particular pieces of equipment.
There was a very nice selection of mini-excavators up for grabs.
The sale kicked off by selling generators, small tools and parts. North Country’s auction truck allows the auctioneers to easily navigate throughout the auction while monitoring the online and ground bidders simultaneously.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 17
CONSTRUCTION AUCTION DAVIS AUCTIONS, INC.
SATURDAY, DECEMBER 3, 2016 • 9:00 A.M. LOCATION: 210 CHESHIRE ROAD, RT. 68 PROSPECT, CT
S a le f o t u O
THINK SUNSHINE!!!
Davis Auctions, Inc. will be conducting our next auction of utility and construction equipment and related supplies on December 3, 2016. This auction will consist of excess equipment from the power companies, municipalities and others to be sold in absolute.
Early Consignments:
EQUIPMENT Excavators: JOHN DEERE 490, s/n S01059; KOMATSU PC35, w/blade & thumb Loaders: (2) FIAT ALLIS FR20 Wheel; Loader Backhoe: JOHN DEERE 410D, extendahoe, 4x4; CASE 580M Series 3, EROPS, extendahoe, 4x4; Skid Steer Loader: 2012 VOLVO MC95C Track; BOBCAT 742; NEW HOLLAND; Skid Steer Attachments: Mower; Grapple Forks; (4) 94” Hyd. Dozer Blade; Snow Blower; 72” Sweeper Attachment; 3PtH Attachments: Rototiller; Logging Winch; Pavers: LEE BOY 700B, gas Forklift: MITSUBISHI FG30K Forklift, 5,290# cap., 185” lifting height, side shift, adjustable forks; Mowers: (4) EXMARK 48” Walk Behind; EXMARK Zero Turn; JOHN DEERE 757 Zero Turn; JOHN DEERE F620 Zero- Turn; ; 2001 HUSTLER 4600 Range Wing; PERMAGREEN Ride On Ultra; (2) 48” Walk Behind; Misc.: AMERICAN Wood Splitter; (2) Heavy Duty PTO Wood Chipper; 82” Heavy Duty Rotary Tiller; WILDCAT LS250A Compost Turner; LAZER 3000 Line Striper, part 231-560, Honda motor; TORO 70’s 48” Snow Blower (Cab), w/v-plow attachment; 12” Auger Attachment; (4) TARCO 6-8 yard SS Hyd. Sanders; MILLER Big 400 Portable Gas Welder/Generator, w/leads; Gas Powered Curber; Plate Compactor; Jumping Jack Compactor; 70 KW Backup Generator, propane; Wood Chipper; VEHICLES Dump Trucks: 1987 MACK RD688S Tri-Axle, w/power cover; 2008 FORD F550 Flatbed Dump, dsl, 4x4; Squirt Boom: 2005 Ford F750XL SD, w/Versalift VST-240101 squirt boom & Versalift utility body; Box Truck: 2006 INT’L CF600 COE S/A, w/SERVAC vacuum excavation system, 14’ body, 7,000# front, 13,500 # rears, VT275 engine; 2002 INT’L 4300 24’; Step Vans: 2002 FREIGHTLINER MT55, w/lift gate & compressor; 2002 FREIGHTLINER MT55, w/lift gate; (3) 2002 FREIGHTLINER MT55; 2009 FORD E350 16’ Cube Van, V8, gas; 2005 CHEV. G3500 Cube Van; Slider: 1997 GMC C-Series C7H042; Welder Truck: 2003 FORD F550SD, w/Miller welder& Reading utility body, V8, Powerstroke turbo dsl; Tow Truck: 1989 FORD, w/Vanguard 865 wheel lift wrecker body;
Utility Trucks: 2009 GMC K1500 Ext. Cab, w/utility cap; 2003 FORD F250 XL, w/utility body Flatbed Trucks: 2000 FORD F350 Crew Cab, w/9’ flatbed, dsl, 4x4; 1995 FORD F250 Flatbed; Pickups: 2011 CHEV. Silverado Ext. Cab, 4x4, flex fuel; (3) 2011 - 2007 FORD F150, 4x4; (3) 2009 GMC Sierra Ext. Cab; 2009 FORD F150 Ext. Cab, w/winch, tool box & tonneau cover; 2008 FORD F250XL SD Ext. Cab, 4x4; 2008 DODGE Ram Crew Cab, w/tonneau cover, 4x4; (3) 2009 2008 DODGE Dakota SLT Crew Cab, 4x4; 2008 CHEV. Colorado LT Crew Cab, 4x4; (4) 20082007 DODGE Dakota Ext. Cab, 4x4; (2) 2008-2006 DODGE Dakota; (2) 2007-2006 DODGE Dakota Ext. Cab; 2006 CHEV. Colorado, 4x4; 2006 FORD F350XL SD, 4x4; 2006 DODGE Dakota, 4x4; 2005 CHEV. Colorado Z71 Crew Cab, w/cap & ladder rack. 4x4; 2004 FORD F150STX Ext. Cab, w/hard cover, 4x4; 2004 FORD F250XL SD Ext. Cab, w/plow, dsl, 4x4; (3) 2004 FORD Ranger Ext. Cab; 2003 FORD Ranger Ext. Cab, 4x4; 2000 FORD F150; 2000 FORD Ranger; 1999 FORD F150XLT, Triton V8, 4x4; 1997 FORD F350 Cab & Chassis, 4x4; SUVs/Vans: 2011 JEEP Wrangler Rubicon Unlimited, w/winch, 4x4; 2008 CHEV. G2500 Cargo, Duramax dsl; 2011 FORD Escape Hybrid; 2009 FORD Escape, 4x4; 2007 FORD Escape; 2007 JEEP Liberty, 4x4; (2) 2006 FORD Escape; 2006 PONTIAC Torrent; 2004 FORD E250 Econoline; 2004 CHEV. Trailblazer; 2003 FORD Explorer; 2003 SATURN Vue, AWD; 2001 LEXUS RX300; (5) 2008-2003 DODGE Caravan; 2002 CHRYSLER Town & Country; Car: 2009 CHEV. Aveo; 2009 CHEV. Cobalt; 2007 HYUNDAI Sonata; 2006 CHRYSLER Sebring Convertible; 2005 NISSAN Altima; 2003 JAGUAR S-Type; 2002 CHEV. Cavalier 4 dr.; 1998 HYUNDAI Sonata; 1994 CADILLAC Seville; Trailers: 2016 CAM Superliner 14’ Dump Trailer, w/cover; 2008 CAM Superliner 14’ Sump Trailer, w/cover; 2002 AMERICAN Enc. Cargo Trailer, w/barn & side doors; 1996 CM TRAILERS 8’ Enclosed Cargo; 1986 Storage; 20 Ton Construction Trailer; (2) Landscape Trailers; Misc: 2003 HONDA Fourtrax Rancher 4 Wheeler; 2016 SEADOO Spark Jet Ski; MISCELLANEOUS Storage Buildings: 20’ x 30’ x 12’ Peak Ceiling; 30’ x 40’ x 15’ Peak Ceiling Double Door; Tents: 20’ x 20’ Pagoda Party; (2) 10’ x 20’ Instant Pop Up Tent; Misc.: Heavy Duty Multi Drawer Tool Cabinet; (2) Heavy Duty 20 drawer Metal Work Bench, w/hanging peg board; 20’ Heavy Duty Bi-Parting Wrought Iron Driveway Gate; 9000# Heavy Duty Two Post Auto Lift; 10 Ton Digital Floor Scale; 75 Ton Hydraulic Shop Press; (2) Heavy Duty Tire Changer; Staging Planks; Auto Lift; Heating System; Parts Washer; Engine Hoist; Plastic Strap Wrapping & Tensioning Machine; Brake Lathe; Engine Stand; (2) 125K BTU Propane Air Forced Heater; (2) 3 Ton Floor Jack; (2) 20 Ton Hydraulic Air Jack; (2) 1” Dr. Air Impact Wrench Kit; (2) 50’ Air Hose Reel; (8) 3” x 30” Tow Strap; Heater; Sandblaster; Air Compressors; Welders; Thatcher; Aerator; Power Tools; Fencing; Leaf Blowers; Hand Tools; Landscape Tools
This is our early tentative list. We accept consignments up thru Monday, November 28, 2016. We never know what will be consigned at the last minute – so come to our inspection and find out!
INSPECTION: FRIDAY, DECEMBER 2, 2016 Call for more information: DAVIS AUCTIONS, INC. (203) 758-4087 or 1-800-201-4368 www.davisauctionsinc.com
This is when/where you find out what is really here!!! For Online Bidding, Visit Realtimebid.com
TERMS: CASH OR GOOD CHECKS WITH IDENTIFICATION.
ABSENTEE BIDS ACCEPTED.
Website list frequently updated. If you don't see what you want here, visit www.davisauctionsinc.com for updates.
9:00 A.M. – 5:00 P.M. Auctioneer: Reginald Lussier Lyndonville, VT 05851 NH License# 2413
Page 18 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX
Bidders Hunt for Bargains at Inventory Reduction Sale
ARGUS INDUSTRIAL COMPANY ....................................1
SALE from page 16
ASTRO CRANE ..............................................................12 BARRY EQUIPMENT CO................................................15 BULLETIN BOARD ........................................................12 C N WOOD CO INC ........................................................20 CHAPPELL TRACTOR SALES ......................................13 CLASSIFIED ..................................................................12 DAVIS AUCTIONS INC ..................................................17 DOOSAN NORTHERN NEW ENGLAND........................11 E W SLEEPER CO............................................................7 EQUIPMENT EAST ........................................................1,9
There was an extensive fleet of wheel loaders up for sale, one of which was a 2013 Kawasaki-KCM loader that sold for more than $120,000.
FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS........................................................1 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................12 MUSTANG DEALER GROUP ........................................10
Angelino’s Sausage House, located on 11 Westside Drive in Exeter, N.H., was at the sale all day with its food truck serving its well-known burgers and steak sandwiches.
NEW ENGLAND GROWS ................................................6 NORTHLAND JCB ..........................................................12 OKADA AMERICA ............................................................6 ROGERS BROTHERS ....................................................19 SUMMIT SUPPLY LLC/MULTI MACHINE ........................1 T-QUIP SALES & RENTAL INC ......................................14 THE N.I.C.E. COMPANY ................................................10 THE W I CLARK COMPANY ............................................2 TYLER EQUIPMENT CO ..................................................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
This purple Chevrolet El Camino was one of a few vintage cars up for bid at the auction.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 16, 2016 • Page 19
Tyler Equipment
C.N. Wood Co., Inc.
251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351 Parts: (877) 255-6351
200 Merrimac St. Woburn, MA 01801 (781) 935-1919
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848
www.tylerequipment.com
Avon, MA (508) 584-8484 Johnston, RI (401) 942-9191
www.cn-wood.com
Page 20 • November 16, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
200 Merrimac Street Woburn, MA 781-935-1919
60 Shun Pike Johnston, RI 401-942-9191
102 State Road Whately, MA 413-665-7009
140 Wales Avenue Avon, MA 508-584-8484