1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
Formerly
95
202
7
®
91
9
95
93
2
95 2
93 90
90
7
July 27 2016
95 91
7
495 6 195
395
95 91
3
84 6
84
6
E
q
u
I
P
m
E
N
t
g
u
I
d
E
95
95
Vol. XlIX • No. 15
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Amanda Hogeboom-merritt 1-800-988-1203 Specializing in:
2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers Call for Pricing
MassDOT Project Replaces Casey Overpass With Grade-Level Road By Irwin rapoport CEG CORRESPONDENT
LEED Accredited in Waste Management
2016 EZ-Screen 1200XLS
GIVE US YOUR HAMMER! •Repairs •Rebuilds •Replacement Parts in Stock
30% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
YOUR ONE-STOP HYDRAULIC HAMMER SHOP™
New Option Separate 3 Products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!
$41,900 plus freight.
CALL 888-81-GORILLA(46745)
866-745-5828
Other Screeners Available
ArguS INduStrIAl CO. www.ez-screen.com
*Some restrictions apply
WE STOCK RUBBER TRACKS for Over 6,000 Models! A NJ, TX, WSES U WAREHO
Cat D7F
Some Used Tracks Available.
VERY NICE SHAPE
• HIGH QUALITY
Phil (413) 427-7171
• FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248 www.foleyengines.com
The $67 million Casey Overpass project replaces the Monsignor William J. Casey overpass in Boston, and is scheduled to be complete in the summer of 2018. The project also includes upgrades and new infrastructure for commuter rail service. Barletta Heavy Division Inc. (BHD) is working with the Barletta Heavy Division photo Massachusetts Department of The $67 million Casey Overpass project replaces the Monsignor William J. Casey Transportation (MassDOT), overpass in Boston, and is scheduled to be complete in the summer of 2018. the Massachusetts Bay Transportation Authority (MBTA), the city of Boston and the Department of the elevated section of Route 203 carried the Arborway over Washington and South street in the Jamaica Plain neighborConservation and Recreation (DCR). The work began in December 2014 and is being funded hood of Boston. It was located directly north of the Forest by ABP NFA. The Casey overpass was built in the 1950s — see OVErPASS page 10
Equipment East’s New Facility Remains on Schedule for Fall 2016 Grand Opening Equipment East is excited about the progress on its new facility, still on target for fall 2016 opening. Meanwhile customers are still being served from its current location, which is just next door to Equipment East’s soon-to-be new home. Nothing is changing about the company except for location and space: • 40,000 sq. ft. (3,716 sq m) facility • 5,750 sq. ft. (534 sq m) service shop with eight double bays, welding bay and wash bay • Two 10-ton (9 t) cranes spanning entire service area • more than 1,550 sq. ft. (144 sq m) of office space • 11,500 sq. ft. (1,068 sq m) parts area inside and additional outdoor storage area. see FACIlItY page 4
Equipment East is excited about the progress on its new facility, still on target for a fall 2016 opening.
Page 2 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316
2008 Ingersoll Rand HP1600WCU
2008 Kubota L5740HST Tractor
2013 Doosan C185WKUB
Cummins Power, Dealer Maintained Since New, Great Condition, stk#20097 ......$109,000
C/air, Front Loader & Hydraulics, Rear Hitch, 400 Hrs, Great Condition, stk#22459 ..$35,000
375 hours, Like New Condition............$16,500
2013 Bobcat S70
2003 Bobcat S130
2010 John Deere 410J
160 hours, c/heat, 90% rubber, 36” bucket and snowblower, stk#23078........................$21,500
OROPS, 30% rubber, 60” bucket, 2900 hours, Stk#23226............................................$12,500
C/air, 1890 Hrs, 4x4, Ext. Hoe, Front & Rear Hyds, 4-1 Bkt, stk#22846 ....................$79,500
2014 Deere 344K
2010 Hamm HD+120VO
2005 John Deere 672D
C/air, JRB Coupler, 3 Spool Hyds, Ride Control, 1.4 Yd Bkt, Great Condition, stk#23139 ..........................................$125,000
3783 Hrs, Deutz Diesel, Dual Vibratory, Water System, stk#21181 ..............................$65,000
1721 Hrs, 12’ Blade, Front Scarifier, 60% Rubber, Well Maintained, stk#22195 $159,500
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 3
Featuring Leading Brands
Since 1922
Hydraulic Breakers The concept of the high performance boom-mounted hydraulic hammer was pioneered by Allied Construction Products, LLC. Allied, which continues to lead the industry, has combined performance, efficiency and reliability in their boom-mounted Rammer hydraulic hammersand the Allied AR Series™ to offer several design advantages over other hammer manufacturers.
Rammer Series® Rammer offers four series of hydraulic breakers, each series designed to fit a variety of carriers.
Compactor - Drivers Allied pioneered the concept of hydraulically operated Ho-Pac® vibratory compactor/drivers. Using an eccentric, rotating weight that creates vibrations and impulse energy, a carrier mounted Ho-Pac provides the needed forces for effective soil compaction.
Ho-Pac® Hydraulically operated Ho-Pac® vibratory compactor/drivers
Skid-Pac® Hydraulically operated Skid-Pac® vibratory compactor/drivers
TWO FULL SERVICE LOCATIONS! E. LONGMEADOW, MA
BERLIN, CT
251 Shaker Road • East Longmeadow, MA 01028
1980 Berlin Turnpike • Berlin, CT 06037
(800) 292-6351
(800) 352-4473
www.tylerequipment.com
Page 4 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
MGM Steps Up Opposition to Proposed Tribal Casino Project By Susan Haigh ASSOCIATED PRESS
HARTFORD, Conn. (AP) A border war between titans in the casino world has escalated, with MGM Resorts International stepping up its opposition to a proposed tribal casino project in Connecticut that’s supposed to help the tribes fend off competition from MGM’s planned $950 million project in neighboring Massachusetts. Besides challenging the law, which laid the groundwork for the possible satellite casino, MGM was credited lin June with proposing the surprise amendment to a federal defense bill. It would have prevented tribes with casinos on tribal land, like Connecticut’s Mashantucket Pequot and Mohegan tribal nations, from opening a venture off-reservation in the same state. “It’s pretty exceptional to try to solve a local issue in the defense authorization bill. So, we weren’t going to let that amendment go anywhere,” said Connecticut Sen. Chris Murphy, who worked with fellow Democratic Connecticut Sen. Richard Blumenthal to scuttle the provision. “But it’s clear that MGM is using every angle they can find to try to stop this project from going forward.” Clyde Barrow, an economist and general manager of Pyramid Associates, a Massachusetts consulting firm that conducted a market analysis for the two Connecticut tribes, said “the magnitude of what MGM is engaged in is probably above and beyond anything I’ve seen elsewhere in the country at this point.” Alan Silver, a casino industry expert at Ohio University, contends MGM’s tactics are not surprising, given what’s at stake.
NEW ENGLAND EDitioN Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Main office
Toll Free Fax Web site Editorial e-mail Advertising e-mail
Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Judith Nixon Cathy Printz
470 Maryland Drive Fort Washington, PA 19034 215/885-2900 800/523-2200 215/885-2910 www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com
“I think any business person would be doing the same thing,” said Silver, who agrees MGM should question the fairness of Connecticut’s law. Proponents maintain the jointly run satellite casino could protect thousands of jobs at the tribes’ two existing casinos in southeastern Connecticut — Mohegan Sun and Foxwoods Resort Casino. The state legislature still needs to approve any new casino. The tribes have yet to pick a potential site. Alan Feldman, executive vice president of MGM Resorts International, said MGM isn’t fighting the proposed satellite casino per se, but rather the process created by Connecticut to possibly allow a casino on non-tribal land. While MGM has not said it was responsible for the amendment to the defense bill offered by the two senators from Nevada, MGM’s home state, Feldman said other developers besides the tribes should be allowed to compete. MGM has limits on how close to Springfield, Mass., it can build another facility, but Feldman said it might make financial sense for the state and MGM to open a casino in populous southwestern Connecticut. But Feldman said there’s no opportunity for MGM to prove it can offer a better option that could lead to more revenue and jobs. “We’d like the ability to show that we think there is a better alternative,” he said. Besides filing the federal lawsuit — and now appealing a judge’s recent dismissal — MGM has teamed up with a state-recognized tribe that filed a similar suit. MGM also is challenging the closed-door meetings by the state’s airport authority about possibly hosting the casino at Bradley International Airport, about a dozen miles from MGM’s Massachusetts project. MGM has enlisted former U.S. Attorney General Eric Holder and a contingent of state lob-
For advertising rates: Contact
Edwin M. McKeon Jr.
215/885-2900 800/523-2200 215/885-2910 e-mail tmckeon@cegltd.com
Toll Free Fax
Amanda Hogeboom-Merritt • New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail amerritt@cegltd.com Contact
Kent Hogeboom • New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact
Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2016, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.
byists and public relations experts as well. “MGM’s shameless tactics are well-documented,” said Andrew Doba, a spokesman of the two tribes. “They will say anything, do anything, spend anything to protect their bottom line. And if they’re successful in Connecticut, more residents will find themselves in the unemployment line.” In 2012, MGM and competitor Penn National Gaming Inc. each spent tens of millions of dollars in an advertising battle over a gambling expansion ballot question in Maryland. MGM ultimately won and construction of the $1.3 billion MGM National Harbor casino is under way. Two years later, MGM teamed up with a California antigambling expansion group to oppose the federal recognition of the Pamunkey Indian Tribe in nearby Virginia. The tiny tribe, which ultimately won recognition, had considered gambling. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
New Facility for Equipment East Nears Completion FACILITY from page 1
Equipment East is looking forward to having plenty of outdoor space for equipment display and storage, customer parking, as well as radiant heating throughout the entire facility’s interior. For more information, visit https://www.equipmenteast.com/. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
Equipment East is looking forward to having plenty of outdoor space for equipment display and storage, customer parking, as well as radiant heating throughout the entire facility’s interior.
The new service shop is 5,750 sq. ft. (534 sq m) and includes eight double bays, a welding bay and a wash bay.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 5
160 Elm St. Unit 1 • Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614
www.lhequip.com
Page 6 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Volvo Excavator ‘One-Armed Money-Maker’ for Baltazar If Paulo Baltazar was a betting man, you might say he went “all-in” when his construction company, Baltazar Contractors, wagered its ability to turn a profit on a $22 million, 6 mi. (9.6 km) water transmission pipeline replacement job with just one excavator — a 77-ton (70 t) Volvo EC700C crawler excavator that could do the work of
two machines. The South transmission main serves more than 28,000 people in the leafy suburb of Springfield, Mass. The 48 and 54 in. (121.9 and 137.2 cm) diameter steel pipe was originally installed in 1928 to funnel water from the 16 million gal. (60 million L) underground Provin Mountain Reservoir.
However, due to corrosion and poor weld quality, two major ruptures occurred in recent years, prompting the Springfield Water and Sewer Commission to initiate the planning process for a full replacement of the entire 6 mi. (9.7 km) stretch of pipe. The project was issued for bids in early 2014 and ultimately awarded to Baltazar Contractors
With more than 30 lbf (356 kN) of breakout force and up to 55,980 lbf (249 kN) of tear out force, the Volvo EC700C offers a combination of power and stability to lower the 12 ton (11 t) pipe segment into the trench, according to the manufacturer.
Suited for mass-construction applications, the EC700C offers the flexibility to handle a wide range of materials, making it the ideal money-making partner for Baltazar Contractors, according to the manufacturer.
Inc., of nearby Ludlow, Mass. The family-owned company specializes in the installation of sanitary sewer, storm and water mains, site development, roadway construction and streetscapes throughout Connecticut and Massachusetts. Francisco Baltazar, the family patriarch, and his son, Paulo, founded the business in 1992. More than two decades later, Baltazar continues to thrive under Francisco, Paulo and his brother, Dinis. The Agawam project, completed in the spring of 2016, calls for the replacement of the entire pipeline, including the installation of 11 valves, 13 air valve chambers, 12 drainage blow-offs, six box culvert crossings, 13 wetland crossings and 13 road crossings. Added to this, neighborhood sprawl has encroached on the pipeline’s path in many areas, leaving a slim 80 ft. (24.4 m) right-of-way to position equipment. Because the South transmission line is the region’s primary water source, Baltazar Contractors is performing construction in three phases to limit service disruptions. Each phase involves the installation of a section of 48 to 66 in. diameter pipe, and related valves and infrastructure. Once delivered on-site, the replacement pipes are individually numbered and thermal-welded together like pieces of a snaking jigsaw puzzle. The Right Machine for the Job The sheer scale of the project, plus unforeseen hurdles, prompted Baltazar to rethink how they would complete the job. “The original plan was to cut the existing pipeline into segments, grab hold of the old steel pipe, and pull it out by wedging it in the see VOLVO page 8
Even on the 25 degree slant of the Provin Mountain, the Volvo EC700C yields superior digging performance, optimizing productivity and profitability, according to the manufacturer.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 7
391 Loudon Rd. Concord, NH 03301 603.225.3361 800.358.6007 www.ewsleeper.com
Page 8 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Maine Water Details Plans to Build New Volvo’s EC700C Water Treatment Plant in Biddeford Designed for Fuel Efficiency, Power VOLVO from page 6
Concept of the new treatment plant.
Maine Water will build a new water treatment plant in Biddeford on the Saco River, replacing the existing plant that was first constructed over 130 years ago. The existing water treatment plant was built in 1884, with the last major upgrade done in 1936. The plant has served the four communities of Saco, Biddeford, Old Orchard Beach and Scarborough for over a century. The current plant continues to produce water that meets all water quality standards, but a significant upgrade is long overdue. Of particular concern is that the plant is in the flood plain of the Saco River, and has been out of service due to sig- Current treatment plant. nificant flooding at least three times in its history. These facts, along with an engineering assessment of the served. “All of us in the state of Maine cherish the Saco River for plant commissioned by Maine Water in 2014, are driving the its beauty, recreational opportunities, and as a clean source of decision that it is time to build a new plant. “The engineering assessment concluded that it is expect- drinking water,” Wallingford said. “We applaud the work of ed to be about the same cost to build a new plant versus ren- the Saco River Corridor Commission in its effort to maintain ovating the existing plant,” stated Judy Wallingford, Maine the high water quality. Our first priority in building a new Water president. “With a new plant, we can bring new tech- plant is to serve our current customers, using the Saco River nology, more efficient processes and operations and have a wisely and honoring its value in all respects to the area.” The new plant will be designed to allow expansion of its state-of-the-art water treatment plant with an environmentally friendly footprint to reliably serve our customers for the capacity in the future should other water systems in Southern next century. This is yet another example of the continuous Maine wish to partner with Maine Water. Wallingford said that a regional approach could alleviate environmental presneed to assess and replace our aging infrastructure.” The new plant is expected to be on line in 2020 with a sure on other sources of water in Southern Maine and procapacity of 20 million gallons a day (MGD), versus the cur- vide redundancy to existing supplies to enhance reliability rent plant with a 12 MGD capacity. It will be built well out and emergency response capabilities for the entire region. Maine Water serves 32,000 customers, or a population of of the flood plain, on a parcel of land recently purchased by Maine Water across South Street from the existing plant. 100,000, in over 20 communities throughout the state of With more than 2.2 billion gallons a day flowing by the plant Maine. For more information, visit www.MaineWater.com. each day, the Saco River will continue to be the source, since (This story also can be found on Construction it has been identified as one of two significant sources of water that could serve the growing population of Southern Equipment Guide’s website at www.constructionequipMaine, even beyond the existing service area currently mentguide.com.)
bucket and place it to the side. Then we’d attach the new concrete pipe to the bucket via a chain sling and swing it back into the trench. However, the previous excavator could not lift the pipe with the bucket attached. We were losing three and a half minutes per pipe by taking off the bucket and reattaching,” said Luis Santos of Baltazar Contractors, project manager for the Agawam project. Paulo Baltazar consulted with his dealer, Peter Gaj of Tyler Equipment in East Longmeadow, who recommended using a larger excavator capable of delivering greater power while using less fuel. In terms of performance, Gaj weighed the options. “The competitor machine was constantly maxed out, revving and burning more fuel. When we went for the Volvo EC700C, with the way Volvo designs its excavators, you do not need to run them at max horsepower.” That’s because the crawler excavator is powered by a 451 hp (336 kW) Volvo D16E engine, which works in harmony with the electro-hydraulic system to deliver increased horsepower and fuel efficiency, according to the company. “For this application, the excavator can run at about threequarters throttle, around 1,400 rpm, and that is where you also start to see the fuel savings,” he added. “It’s not taxed at all and that also makes it more stable on the uneven terrain. Even though it is a next step larger in size than what they were using, because of the lower working engine speed Baltazar is actually saving fuel, which we know because we are tracking consumption through the Volvo CareTrack telematics system.” The partnership was a success. “We have been very impressed with the excavator’s picking power at maximum reach as well as the smoothness and response time,” said Paulo Baltazar. Productive From the Inside Out Once on-site, the Volvo EC700C placed the pipes faster than pipe manufacturer, Vianini Pipe could produce and ship it from Somerville, N.J. Dana Kroll is the main operator of the Volvo machine. With 27 years of running equipment, he knows what sets a machine apart from the competition. In terms of the operator environment provided by the class-leading Volvo Care Cab, Kroll is satisfied. “The comfort factors — are you kidding me? I’m seeing the chiropractor a lot less. I also find the controls to be very smooth, especially when you are lifting a 9.97-ton [11 t] pipe and placing into a hole. It’s been a tremendous machine for us,” said Kroll. With Volvo machinery, Santos’ initial estimation that Baltazar would complete the entire project three months ahead of schedule proved accurate. For more information, visit https://www.volvoce.com/press. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 9
D Doosan oosan w wheel heel lloaders oaders a are re packed packe ed with with comfort comfort features features yyou ou ccan an ssee, ee, h hear, ear, a and nd ffeel. eel. A w wide-open ide-open vview iew o off tthe he w work ork a area. rea. T Tinted inted g glass. lass. L Low ow n noise oise llevels. ev vels. A Air ir ssuspension uspension sseat eat a and nd e ergonomic rgonomic ccontrols ontrols iin n lline ine w with ith yyour our n natural atural m movements. ovements. S Still, till, p erformance a nd p roductivity is is key, key, and and your your Doosan Doosan lloader oader d elivers p ower a nd ttorque orque tto op enetrate h ard m aterials. S uperior performance and productivity delivers power and penetrate hard materials. Superior llift ift h eight a nd llift ift ccapacity apacity iincrease ncrease efficiency. efficiency. Operators Operators ccan an ssee ee a nd ffeel eel tthe he d iffe erence. height and and difference. G et a ccloser loser llook. ook. S top b ya nd vvisit isit u s ttoday. oday. Get Stop by and us
30 Birch Birch Island Island R 30 Road oad | W Webster, ebster, M MA A 508.949.0005 | www.barryequipment.com www.barryequipment.com 508.949.0005
Page 10 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Crews Demolish Overpass to Make Way for New Intersection Barletta Heavy Division photo
On a typical weekday in 2010, the overpass carried approximately 24,000 cars and trucks while the new Washington Street surface road carried approximately 12,000 vehicles per day.
Barletta Heavy Division photo
The project also includes upgrades and new infrastructure for commuter rail service.
Barletta Heavy Division photo
Barletta Heavy Division photo
Subcontractors continue the drainage installation work throughout the area formerly occupied by the overpass and at Shea Circle. OVERPASS from page 1
Hills Station. On a typical weekday in 2010, the overpass carried approximately 24,000 cars and trucks while the new Washington Street surface road carried approximately 12,000 vehicles per day. These roadway volumes are projected to grow by 5 to 12 percent over the next 25 years and the new roadways are designed with sufficient capacity to accommodate these future volumes. “The area around the overpass serves many neighborhoods and traveling consistencies including pedestrians, cyclists,
MBTA riders and motorists,” stated the web page for the project. “[It] also acts as an important gateway to such Boston institutions as Franklin Park, Forest Hills Cemetery, Shattuck Hospital and the Arnold Arboretum. In 2010, the overpass was determined to be structurally deficient, suffering from numerous superstructure and substructure problems due to a combination of deterioration and original design flaws and beyond the point of effective repair.” This project, being constructed as an accelerated bridge program, has already
This project, being constructed as an accelerated bridge program, has already involved the removal of the structurally deficient 1,650 ft. (503 m) Casey overpass, replacing it with a simplified, at-grade roadway network that will be fully opened to traffic in 2018.
involved the removal of the structurally deficient 1,650 ft. (503 m) Casey overpass, replacing it with a simplified, at-grade roadway network that will be fully opened to traffic in 2018. Construction also includes a new headhouse, which will be ADA compliant for the MBTA Orange Line and will replace the existing substandard exit-only headhouse. Bicycle and pedestrian accommodations will be enhanced throughout the project limits. The Route 39 bus will be relocated to the reconstructed upper busway at Forest Hills Station. The project will result in the recon-
nection of the Arborway and Emerald Necklace Park from the Arnold Arboretum to Franklin Park. “We are pleased with how the project is progressing,” said MassDOT spokeswoman Jacquelyn Goddard. “After a public process regarding the design of the streetscape and the configuration of the new roads and intersections which are impacted, a traffic management plan was developed. The plan is a mix of permanent and temporary routes that are safe for people in vehicles, on bikes and see OVERPASS page 14
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 11
Take a good look at Doosan Doosan crawler excavators are packed with operator-friendly features, including a comfortable cab with reduced dust and dirt levels, precision controls and classleading cycle times. It’s a difference operators can see, hear and feel. Try the best. Just give us a call.
Take a closer look. Stop by and visit us today.
Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 16-D002
Authorized Doosan Dealer
Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 • www.equipmenteast.com
Page 12 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Maine Port Project Receives $7.7M USDOT Grant The Maine Department of Transportation (MaineDOT) was notified that the U.S. Department of Transportation (USDOT) will award $7,719,173 in grant funding to the Maine Intermodal Port Productivity Project (MIPPP) for infrastructure improvements at the International Marine Terminal (IMT) in Portland. The Fostering Advancement in Shipping and Transportation for the Long-term Achievement of National Efficiencies (FASTLANE) grant is a new USDOT program created by the FAST Act. The program is focused on investments in regional and nationally significant transportation assets. “The IMT is undoubtedly one of Maine’s greatest transportation success stories of this century,” said Gov. Paul R. LePage. “The award of this FASTLANE grant will allow the MaineDOT and Maine Port Authority to continue our mission of advancing marine and rail facilities in support of economic development and enhance the global competiveness of Maine businesses in New England and across the world.” The total cost of the MIPPP is $15,438,347. Federal grant funds will be matched equally by funds from state and private sources. The project will include acquisition of a new crane, moving the current
maintenance facility from the pier and development of additional pier area, improvements to gate operations, and the creation of additional rail capacity. “We are very excited to learn that we secured Fast Act funding for the Maine Intermodal Port Productivity Project,” said David Bernhardt, MaineDOT commissioner. “These funds will allow us to make strategic investments to build capacity, realize efficiencies and increase productivity at the IMT in Portland and enable the terminal to fully realize its potential through the improved utilization of all of its transportation assets.” The growth of container traffic at the IMT terminal has exceeded 20 percent year over year. Further growth will be driven by increased rail and vessel activity, which will minimize the use of the U.S. Highway System and other roadways in Maine, as well as key border crossings. As a result, vehicle emissions will be lowered and roadway maintenance costs will be reduced, while freight is moved more efficiently and economically. “This investment is another example of
through the port for trucks moving freight to and from the terminal. Investments in rail capacity will make possible increases in freight moving by that mode as well. “The IMT is an effective multimodal freight asset for the Maine economy,” said Nate Moulton, director of the Rail Program at MaineDOT. “The MIPPP will ensure that the truck, rail and maritime shipping capacities stay balanced so that bottlenecks do not hinder growth.” “Maine has always been home to Bristol Seafood and this setting David Bernhardt inspires our commitment to providing MaineDOT a quality product,” said Peter Handy, president and CEO of Bristol Seafood. “Infrastructure such as the IMT ensures that we are able to efficiently the successful collaboration of the Maine and cost effectively pursue the world’s best Port Authority, MaineDOT, EIMSKIP, fish, expand our customer base and put the PanAm Railways, Soli DG Inc. and most freshest seafood on tables across the counimportantly our private sector customers try.” who move their freight through the terminal Further details are anticipated to be daily,” said John Henshaw, executive direc- announced by the USDOT in September. tor of the Maine Port Authority. (This story also can be found on Movement of the existing port mainte- Construction Equipment Guide’s webnance facility and technology investments site at www.constructionequipmentwill also enable improved speed and safety guide.com.)
“These funds will allow us to make strategic investments to build capacity, realize efficiencies and increase productivity at the IMT in Portland…”
DISPLAY ADS/ CLASSIFIEDS Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services
Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034
215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 LOADERS
TRAINING
1994 John Deere 455G, 7300 hours ..........................$20,000.
NCCCO Crane Operator Training
200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666
CT Excavating 717-294-3507
Place Your Business Card for...
EQUIPMENT RENTALS
Mobile Tower Self Erecting Tower Overhead Articulated Knuckleboom Service Truck Rigger 1 & 2 Signal Person
www.astrocrane.com
Fully Insured
DAILY AND WEEKLY
3 months 6 months 12 months
$300* $585* $1040*
only $50 an issue only $45 an issue only $40 an issue
Call now to reserve your space! 800-225-8448 * pre-payment required
CLOSE TO YOUR JOB SITE
RENTMACHINES.COM CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®
Trained at our location in PA or NJ or your location. All trainers NCCCO Certified Call 215-639-2579 Atlantic Crane Inspection Services Visit us atwww.atlanticcrane.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 13
DOOSAN DELIVERS
The Doosan lineup of heavy equipment offers strong performance in the areas that matter most — from powerful bucket forces on excavators to superior payload capacities on articulated dump trucks and exceptional lifting capabilities on wheel loaders. And with our unbeatable warranty, dedicated dealer support and versatile attachment selection, one thing is certain: Doosan delivers. Call or visit your local authorized dealer today and see the Doosan difference. Authorized Doosan Dealers
Equipment East, LLC 61 Silva Lane • Dracut, MA 01826 • 978-454-3320 • www.equipmenteast.com
Barry Equipment Co., Inc. 30 Birch Island Road • Webster, MA 01570 • 508-949-0005 • www.barryequipment.com
F&W Equipment 164 Boston Post Road • Orange, CT 06477 • 203-795-0591 • www.fwequip.com
Central Equipment Company 45 Dempsey-Greaves Lane • Stillwater, ME 04489 • 207-827-6193 • www.centralequipmentco.com
Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 15-D008
Page 14 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Rail Infrastructure Part of MassDOT’s $67M Project OVERPASS from page 10
on foot and which allow construction crews to do necessary work as part of the project.” Kevin Huie, BHD’s project manager, noted that extensive planning is keeping the project on schedule. BHD has completed the following elements: demolition of the bridge; temporary roadway construction; temporary traffic signal work; and deep foundations for the busway extension. BHD crews have been busy. February saw them and subcontractors continue the drainage installation work throughout the area formerly occupied by the overpass and at Shea Circle and utility work is taking place on the Verizon cables adjacent to Orchard Hill Road, as well as relocation of natural gas lines in the vicinity of the South Street/Arborway Road intersection and relocation of MWRA water lines west of South Street in the area formerly occupied by the Casey overpass. Feeney Brothers performed gas line relocation and tie-in at the intersection of Washington Street/South Street and work in the eastern portion of the Arborway focused on installing traffic signal conduits, as well as installing lighting conduits and bases. The center portion of the Arborway had work on the MWRA water lines undertaken. “As in any large city,” said Huie, “there are multiple underground utility lines of various ages running through the work area. Barletta has worked closely with utility companies to coordinate the scope of work, and the relocation of utilities is ongoing.” Along the future alignment of the Arborway between Shea Circle and Washington Street, the project will install drainage structures, traffic signal conduit, and conduit and bases for street lighting. Drainage structures are being installed in the area formerly occupied by the overpass in the area west of South Street. “The overpass was removed utilizing three Cat 345’s and a Komatsu 1250,” said Huie. “The machines were equipped with hammers, grapples and shears to dismantle and remove the individual bridge segments. There were 20 spans in the overpass, and each span took an average of three days to dismantle and remove. The entire demolition procedure took just under three months. Because the overpass crossed extremely active roadways, busways, railroad tracks and bicycle and pedestrian corridors, work in those sections were completed at night when traffic was minimal. “A major necessary project element was the design and implementation of a comprehensive traffic management plan,” he added. “Traffic controls and detours were designed so that the flow of traffic was not unnecessarily impeded during this operation.”
Barletta Heavy Division photo
The work began in December 2014 and is being funded by ABP NFA.
Ben Niles, BHD’s corporate safety director, said that planning and training are always the keys. “Especially on a project where there are multiple large pieces of equipment working in close proximity to crews on the ground,” he said, “everyone must be fully aware of the schedules, objectives and procedures of the other. This is why the development of our job and task hazard analyses and shift briefings are so vital. There are many ways to measure the success of a project’s progress; on any given day how many yards of concrete were poured, how many feet of trench were dug, how much steel or precast was erected, but the primary measurement that
we use is, ‘did everyone go home to their families tonight?’” The overpass demolition and other prep work for the project will see BHD remove a fair amount of concrete, steel and rebar, asphalt and earth — the numbers are still being tabulated, as are amounts of construction materials to be brought in as the amount of materials to be recycled is still being determined. Equipment-wise, BHD is using Komatsu and Volvo excavators; Cat dozers; Volvo and Komatsu loaders; Tadano cranes; and Ingersoll Rand rollers. The closest BHD yard/shop is one mile away and for this project, there is one onsite
mechanic. “This winter has been a lot easier on us, so productivity has been better,” said Dallas Babineau, BHD’s equipment superintendent. “The equipment has continued to work on a daily basis and that’s been a key in making sure performance stays where it should be. It’s when the equipment tends to sit for stretches of time that we see problems arise. We also have our own fuel truck and selfperform all onsite fueling of equipment to ensure we maintain an efficient, clean, and reliable refueling operation. ”By doing a lot of routine maintenance before the start of the day, equipment problems can be avoided,” he said “Our mechanics start very early in the day to do oil changes, cutting edge flips/replacements, small repairs before the operator starts his day,” said Babineau. “That way we ensure that there is no interruption for productivity with any of the machines. We also sometimes work on Saturdays to do more time consuming jobs if the job site is not working. “The mechanics and myself work together in communicating on all schedules, parts to be ordered, length in time of repairs, and other areas of maintenance to ensure a smooth flow of keeping up with maintaining the equipment while not interrupting the flow of work at each job,” he adds. “To do this as a group we are in constant communication to keep up. This includes constant phone calls and email chains that include mechanics, superintendents, equipment vendors, and anyone related to repair/maintenance of equipment.” (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG
Barletta Heavy Division photo
Barletta Heavy Division photo
Utility work is taking place on the Verizon cables adjacent to Orchard Hill Road, as well as relocation of natural gas lines in the vicinity of the South Street/Arborway Road intersection.
The Casey overpass was built in the 1950s — the elevated section of Route 203 carried the Arborway over Washington and South street in the Jamaica Plain neighborhood of Boston.
149 Rocus St. Springfield, MA 01104 413-363-0780 www.abletool.net
RS EQUIPMENT 2900 County Street Somerset, MA 02726 508-672-1051 866-650-5297 DEALER IMPRINT www.rsequipment.com
Mustang Mfg
to learn more about Mustang skid steers visit
m u s t a n g m f g . c o m
THE N.I.C.E. COMPANY 9 Rosenfeld Drive, Hopedale, MA Toll Free# 888-717-8096 • www.theniceco.com
We sell NICE machines! RENT ME!!
RENT ME!!
2012 VOLVO EC380DL:
2012 VOLVO EC340:
Coupler, 3500 Hrs, 9000 Ft/Lb Hammer
4000 Hrs, Plumbed
$189,000
$149,000
RENT ME!!
2012 KOBELCO SK260: A/C, Pattern Control, Reach Boom, 2-Way Aux. Hydraulics, 31.5” Pads, 48” Bkt, Long U/C, Hyd. Thumb $129,000
RENT ME!!
2014 CAT 303.5E: $49,000 RENT ME!!
350 Hrs, Hydraulic Thumb
RENT ME!!
NEW DOOSAN 225LC: with Factory Plumbing.
Only $149,000 $129,000 RENT ME!!
2008 CAT 324D: $99,000 $79,000 RENT ME!!
5200 hours
NEW 2014 Hyundai Robex R140LC9A EXCAVATOR: Brand New, Equipped 2007 KOMATSU PC158: Plumbed, QC, Fairly Low Hours $69,000 RENT ME!!
w/Factory Plumbing, AC, Bucket w/Teeth, Quick Coupler $115,000 $99,000
RENT ME!!
2010 JOHN DEERE 220W: 3700 Hrs, Angle/Tilt Coupler, Outriggers, Aux. Hydraulics $119,000
2014 HYUNDAI 145:
has Blade, 1600 Hrs, QC $109,000
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
ABLE TOOL & EQUIPMENT 410 Burnham St. South Windsor, CT 06074 860-289-2020
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 15
Page 16 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Massachusetts... Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • Monterey • Nantucket • Hampden • North Adams • Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • West • Monterey • Nantucket • Hampden • North Adams • Essex •
‘Bay State’ Highway Projects Let
Everything in Stock for Sale or Rent Call Us Today!!!
MassHighway received bids for transportation-related improvement projects. Following is a list of some of the projects let. District: District 6 Proposal Number: 004 - 606284-90723 Project: Roadway reconstruction. Location: On a section of Commonwealth Avenue (Route 20) (Phase 2A). (Boston and Brookline). Contractors and Bid Amounts: • Newport Construction Corporation — $17,617,777 • McCourt Construction Company Inc. — $17,669,855 District: District 2 Proposal Number: 007 - 607689-92538 Project: Bridge preservation. Location: On eight bridges along a section of Interstate 90. (Westfield). Contractors and Bid Amounts: • Mig Corporation — $4,227,460 • Northern Construction Services LLC — $4,702,738 • N E L Corporation — $4,949,673 • The Lane Construction Corporation — $5,459,686. • SPS New England Inc. — $5,972,377 District: District 5 Proposal Number: 005 - 606176-93728 Project: Resurfacing, pavement preservation and related work . Location: Along a section of Interstate 495. (Foxborough, Franklin, Mansfield, Plainville and Wrentham). Contractors and Bid Amounts: • PJ Keating Company — $6,974,179 • J H Lynch & Sons Inc. — $7,489,555 District: District 3 Proposal Number: 002 - 606290-93653 Project: Resurfacing and related work. Location: Along a section of Interstate 90 (Grafton and Millbury). Contractors and Bid Amounts: • J H Lynch & Sons Inc. — $13,631,159 • PJ Keating Company — $14,879,181 • Aggregate Industries Ne Region Inc. — $17,190,788 • Palmer Paving Corporation — $17,454,548 District: District 2 Proposal Number: 003 - 607580-93781 Project: Demolition and removal of existing toll plaza structures and ramp reconstruction. Location: At Interchange Nos. 3 through 8 on Interstate 90. Contractors and Bid Amounts: • The Middlesex Corporation — $12,886,638 • Northern Construction Services LLC — $12,917,066 • E T & L Corporation — $14,293,905 • SPS New England Inc. — $14,304,621 • Manafort Brothers Inc. — $15,369,195 • S&R Corporation — $15,843,744 • J H Lynch & Sons Inc. — $17,139,706
391 Loudon Rd. • Concord, NH 03301 603.225.3361 • Toll Free: 800.358.6007 www.ewsleeper.com
District: District 6 Proposal Number: 006 - 605960-93652 Project: Cleaning, painting and structural steel repairs. Location: On the Maurice J. Tobin Memorial Bridge, Bridge Numbers (B-16-017 and see PROJECTS page 18
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 17
- - NorthlandJCB.com
^hDD Z >KtKhdÍŠ JS190 Excavator Including bucket & thumb $143,900
SALES * SERVICE* RENTALS '((5( */&
&$7 &/
$ & 67,&. 3$'6 7,(5 (1*,1( +<' 4 & %.76 =(52 7$,/6:,1*
$ & 67' 67,&. 3$'6 %8&.(7 &$7 +<' 7+80%
5('8&(' 72
.20$768 :$
&$7 &/ &$% $ & +($7 675$,*+7 /,1( 75$9(/ 3('$/ &21752/ 3$77(51 &+$1*(5 67,&. 7227+ %.7 &$7 &283/(5
&$7 .
(5236 $& 5$',$/6 &< %8&.(7 5,'( &21752/ $// 237,216 5$',$/6
(5236 $ & 5,'( &2175/ +<' 4 & $8; +<' 5($5 9,(: &$0(5$ /2& )/
&$7 ; &$7 & ',(6(/ $ & +($7 &2/' :($7+(5 67$57,1* 3$&.$*( 5 58%%(5 21/< . +56
Page 18 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................12 BARRY EQUIPMENT CO..................................................9 BULLETIN BOARD ........................................................12 C N WOOD CO INC ........................................................20 CLASSIFIEDS ................................................................12 DOOSAN NORTHERN NEW ENGLAND ......................13 E W SLEEPER CO ......................................................7,16 EQUIPMENT EAST ......................................................1,11 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS........................................................1 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................12 MUSTANG DEALER GROUP ........................................15 NORTHLAND JCB ..........................................................17 ROGERS BROTHERS ....................................................19 SUMMIT SUPPLY LLC/MULTI MACHINE ........................1 T-QUIP SALES & RENTAL INC ......................................17 THE N.I.C.E. COMPANY ................................................15 THE W I CLARK CO ........................................................2 TYLER EQUIPMENT CO ..................................................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Massachusetts... Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • Monterey • Nantucket • Hampden • North Adams • Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • West • Monterey • Nantucket • Hampden • North Adams • Essex •
‘Bay State’ Highway Projects Let PROJECTS from page 16
C-09-006) Route 1 over the Mystic River. (Boston and Chelsea). Contractors and Bid Amounts: • Liberty Maintenance Inc. — $15,610,322 • Alpha Painting & Construction Company Inc. — $16,481,735 • Blastech Enterprises Inc. — $19,403,581 • L&L Painting Company Inc. — $20,537,000 • Allied Painting Inc. — $21,103,550 • Abhe & Svoboda Inc. — $25,547,795 District: District 2 Proposal Number: 002 - 604446-93934 Project: Roadway reconstruction and related work. Location: At the intersection of Little River (Route 187) and Shaker Roads. (Westfield). Contractors and Bid Amounts: • Ludlow Construction Company Inc. — $4,713,691 • C & A Construction Company — $4,831,215 • Baltazar Contractors Inc. — $4,883,323 • Caracas Construction Corporation — $4,929,293 • E T & L Corporation — $5,102,202 • A Pereira Construction Company Inc. — $5,117,855 District: District 1 Proposal Number: 003 - 605299-94156 Project: Bridge superstructure replacement. Location: Bridge Number G-11-005 (NEBT beams) Route 183 (Park Street) over the Housatonic River. (Great Barrington). Contractors and Bid Amounts: • J H Maxymillian Inc. — $3,227,304 • Northern Construction Services LLC — $3,599,979 • Mig Corporation — $3,765,720 • E T & L Corporation — $3,831,015 • New England Infrastructure — $3,997,000 • S&R Corporation — $4,703,786 District: District 6 Proposal Number: 002 - 607879-94155 Project: Sidewalk, wheelchair ramp and crosswalk repairs and improvements. Location: Along sections of Kneeland and Purchase Streets, Atlantic Avenue and Surface Road (CRC 25). (Boston). Contractors and Bid Amounts: • Newport Construction Corporation — $4,457,457 • McCourt Construction Company Inc. — $4,531,411 • MDR Construction Company Inc. — $4,815,059 • Mario Susi & Son Inc. — $5,343,881 • A R Belli Inc. — $5,887,178 District: District 3 Proposal Number: 003 - 606091-93654 Project: Bridge rehabilitation (including painting). Location: Bridge Number F-07-045 (steel) Interstate 90 over the Foss Reservoir. (Framingham). Contractors and Bid Amounts: • Aetna Bridge Company — $5,737,772 • Mig Corporation — $6,037,268 • SPS New England Inc. — $6,623,744 • Northern Construction Services LLC — $6,739,395 • Mas Building & Bridge Inc. — $7,037,816 • Kodiak Corporation — $7,897,300 • E T & L Corporation — $7,951,682 • N E L Corporation — $8,460,914
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 27, 2016 • Page 19
Tyler Equipment
C.N. Wood Co., Inc.
251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351 Parts: (877) 255-6351
200 Merrimac St. Woburn, MA 01801 (781) 935-1919
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848
www.tylerequipment.com
Avon, MA (508) 584-8484 Johnston, RI (401) 942-9191
www.cn-wood.com
Page 20 • July 27, 2016 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
200 Merrimac Street Woburn, MA 781-935-1919
60 Shun Pike Johnston, RI 401-942-9191
102 State Road Whately, MA 413-665-7009
140 Wales Avenue Avon, MA 508-584-8484