Skip to main content

New England 9 April 23, 2025

Page 1

State Supplement sponsored by:

1

THE NEW ENGLAND EDITION A Supplement to:

11

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

April 23 2025

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. LXIII • No. 9

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

CPM Contractors Leads $27M Bridge Replacement Project in Yarmouth By Ken Liebeskind CEG CORRESPONDENT

Compact Equip pment Built For More e. AUTHORIZED YANMAR COMP PACT EQUIPMENT DEALER

DRACUT BROCKTON (978) 454-3320 (508) 484-5567 61 Silva Lane 196 Manley St. St Dracut, MA 01826 Brockton, MA 02301

B BOW (6 603) 410-5540 1474 Route 3A B Bow, NH 03304

www.equipmentteast.com

AUBURN (508) 635-5058 250 Washington St. St Auburn, MA 01501

Tibbits Equipment Services, Inc.

www.tibbitseq.com

802-479-9696

KWIK KLEET ts Traction Clea ®

The Maine Department of Transportation is in the process of replacing two interstate bridges that carry the northbound and southbound lanes of I-295 over Route 1 near Exit 17 in Yarmouth. The project also includes the extension of the Beth Condon Memorial Pathway to the Yarmouth Visitor Center. CPM Constructors, based in Freeport, Maine, is the general contractor of the project, while Shaw Brothers Construction of Gorham, Maine, serves as the subcontractor. Work began in the fall of 2021 on this multi-year project, which is expected to be completed by the end of 2025. The contract is valued at $27,566,210, and the project has received federal funding through the U.S. Department of Transportation’s Competitive Highway Bridge Program. Significant progress has been made. According to Anthony Salafia, CPM Constructors project manager, both new bridges are now open to traffic, and the old bridges have been demolished. A shared-use path sidewalk is currently under construction and is expected to be completed later this year. see BRIDGES page 12

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

Phil (413) 427-7171

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com

The Maine Department of Transportation is in the process of replacing two interstate bridges.

Historic Mill Site in Springfield, Vt., Will Be Renovated to Include Retail, Living Space Eastern Union, one of the U.S.’s largest commercial mortgage brokerages, has arranged $9.4 million in constructionto-permanent refinancing for the first stage of a multi-phase renovation project at 100 River St. in Springfield, Vt., according to PR Newswire on April 7, 2025. The first portion of the initiative will create a 43,000-sq.ft. self-storage facility and 55,000 sq. ft. of retail space in the town, located along the Black River about 95 mi. northeast of Albany, N.Y., and 130 mi. northwest of Boston, Mass.

The renovation — undertaken by Integrity Community Partners LLC (ICP), of San Diego, Calif., with offices in New Jersey, Pennsylvania and Washington, D.C. — represents the first of a three-phase project that will ultimately deliver a six-floor, 100-unit, age-targeted multifamily property and an adjacent, six-story, 162-unit senior living facility at 5 Pearl St. in downtown Springfield. see SPRINGFIELD page 14


Turn static files into dynamic content formats.

Create a flipbook