Skip to main content

New England 6 March 25, 2026

Page 1

State Supplement sponsored by:

1

THE NEW ENGLAND EDITION A Supplement to:

11

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

SHIP WITHIN 48 HOURS

95 2

93 90

90

7

95 91

7

3

84

495 6

84

6

6

195

395

95 91

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY AN 85 YEAR BUSINESS

March 25 2026

Thousands in Service!

Vol. LXIV • No. 6

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

CALL 800-367-4937

Your New England States Connection • Kent Hogeboom 518-221-5159

*On approved credit • Financing Available

jrvinagrocorp.com (401) 943-7100 LAND CLEARING FULLY LICENSED AND INSURED Tree/ Stump Removal Brush/ Debris Removal Commercial & Residential Tree Removal On-Site Grinding/ Chipping

Cianbro Corporation has advanced into Phase 2 of the initiative, which will link the communities of Winslow and Waterville, divided by the Kennebec River, with a targeted completion date of May 2027.

By Irwin Rapoport CEG CORRESPONDENT

Since Construction Equipment Guide (CEG) last reported Tibbits on Maine Department of Transportation’s (MaineDOT) Equipment Services, Inc. $52.85 million Ticonic Bridge Replacement Project in www.tibbitseq.com ® KWIK KLEET ts Traction Clea

800-Go2-ALLTA www.altaequipNE.com

Concord, NH | Middeboro, MA | Berlin, CT Scarborough, ME | Hooksett, NH

Phil (413) 427-7171

abletool.net

802-479-9696

Brushheads AJCE Hammers Screening Buckets Specialty Attachments

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

October 2024, Cianbro Corporation has advanced into Phase 2 of the initiative, which will link the communities of Winslow and Waterville, divided by the Kennebec River, with a targeted completion date of May 2027.

The new 566-ft.-long, five-lane bridge on Route 202 is being rebuilt on a new alignment as a two-span steel girder structure with a concrete bridge deck. A single concrete pier in the river and two abutments will support the new bridge. Streetscape improvements are designed to encourage walking and bicycling while enhancing the attractiveness and quality of life in the downtown area. These improvements include 5-ft. shoulders to accommodate bicycles, 6-ft. sidewalks for pedestrians and architectural lighting. see TICONIC page 8

Robert S. Benard of C.N. Wood Passes Away, 91 Robert S. Benard, 91, died on March 1, 2026. He was born in Melrose, the son of the late Frank F. and Rose E. (White) Benard. Raised and educated in the Melrose School System, Mr. Benard graduated from Melrose High School, where he developed both his work ethic and his lifelong love of football. Mechanically gifted from a young

age, Mr. Benard began working alongside his older brothers on cars and stockcars, eventually working at a nearby filling station throughout high school. That early hands-on experience sparked a passion that would shape the rest of his life. It led him to a position at a heavy equipment dealer, then joining see BENARD page 18

C.N. Wood photo

Robert S. Benard’s legacy of service, humility and generosity continues to inspire all who knew him, said his family.


Turn static files into dynamic content formats.

Create a flipbook
New England 6 March 25, 2026 by Construction Equipment Guide - Issuu