Skip to main content

New England 25, December 6, 2023

Page 1

State Supplement sponsored by:

1

THE NEW ENGLAND EDITION A Supplement to:

11

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

December 6 2023

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. LXI • No. 25

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

CALL 800-367-4937

Your New England States Connection • Kent Hogeboom 315-866-1423

*On approved credit • Financing Available

Rehabilitation of Quechee Gorge Bridge Under Way in Hartford, Vt.

The existing structure is a three-hinge steel deck arch constructed in 1911 and reconstructed in 1972 and 1989.

By Ken Liebeskind

Tibbits Equipment Services, Inc.

www.tibbitseq.com

802-479-9696

KWIK KLEET ts Traction Clea ®

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

Phil (413) 427-7171

CALL 888-81-GORILLA(46745)

CEG CORRESPONDENT

The rehabilitation of the Quechee Gorge bridge on U.S. Route 4 over the Ottauquechee River in Hartford, Vt., is under way with preliminary work completed and a range of items in the project ahead.

Harrison & Burrowes Bridge Constructors, Glenmont, N.Y., is the lead contractor with Tri-State Painting of Tilton, N.H., the first subcontractor. Tri-State Painting started the project by assembling cables and bracing for a containment system that will allow its crews to work under the bridge and remove paint without material falling

into the river below or surrounding areas in the Hartford area, according to a report in Valley News, a community newspaper in West Lebanon, N.H. “Over the next two years, corroded parts of the structure will be replaced, it will be repainted, the deck will be widened to accommodate six-foot sidesee QUECHEE page 14

Mass. Needs $24.5B to Repair Transit System The Massachusetts Bay Transportation Authority (MBTA) said Nov. 16 that it needs $24.5 billion to fix the state’s public transit system, WBZ-TV in Boston reported. MBTA admitted the staggering cost is needed to repair the multitude of issues it faces system wide. The agency’s announcement came after it publicized the findings of its Capital Needs Assessment and Inventory (CNAI), an audit that MBTA releases every three to four years. It makes clear what assets MBTA has and what investments need to be made to bring the sys-

tem to a State of Good Repair (SGR). The estimated multi-billion-dollar price tag is for repairs to MBTA’s stations, trains, tracks, bus garages, signal systems and more. The transportation agency emphasized that the new assessment lays out an estimated cost of repairs, not improvements. see TRANSIT page 14 MBTA photo

Crews performing in-station work on the stairway areas at JFK/UMass station.


Page 2 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2019 LEEBOY 8500D

stk# 28000, 1901 hours, 8-15' propane screed, dual spraydowns ..................................$99,500

2014 LEEBOY 8515C

2016 BOBCAT S630

stk# 28527, 850 hours, skid steer loaders, stk# 28172, 4000 hrs, 8-15' HD electric screed, C/air, 2 speed, hydraulic coupler, gp bucket, no seats, augur sensors or cables........$59,500 foot controls, one owner. great shape ..$34,500

2006 JOHN DEERE 310G

2012 LEEBOY 8515B

1992 JOHN DEERE 624E

stk# 28617, 2781 hrs, c/heat, 4x4, standard hoe, front & rear hyds, 4-1 bucket, Wain Roy mechanical coupler and 24" bucket......$39,500

stk# 28429, 3888 hrs, electric screed, poly pads, dual spraydowns ........................$59,500

stk# 28445, 14,700 hrs, C/heat JRB coupler, and 3 yard bucket ................................$39,500

2018 JOHN DEERE 50G

2015 JOHN DEERE 75G

2017 JOHN DEERE 85G

stk# 27845, 1400 hrs, hyd thumb, 24" bucket .. ..............................................................$64,500

stk# 27248, 1968 hrs, Cab w/ AC, Long Arm, Rubber Pads, 18" Pads, Aux Hydraulics, Blade, Coupler, 24" Bucket ..................$79,500

stk# 27856, 4216 hours, c/air, mech coupler, gp bucket ..............................................$71,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 3

PR ROVEN UPTIME WITH UPTIIME KITS SENNEBOGEN, in keeeping with their philosophy to maxim mize uptime, has created UPTIME Kits. Whether you are a service technician in-house or on the road, these kits have everything you need for every servicee, maintenance and PM task in one place. p They were created to save you time and money. Managing hundreds of o related service d nuts to O-Rings parts, from belts and and special tools becomes easy with a single part number to o order and stock. stock

E H T D N O Y BE

E N I H C A M I virtually lose NO downtime

They are: s ock • Easy to order and eaasy to st components l t and d too t ols • Ideal for stocking seervice sshops and trucks owing kits: Choose from the follo • Central lubrication system kits • Preventive maintenance service kits • O-Ring kits • Electrical service kits • Hydraulic service kits k And the best thing iss that these kits, in stock and ready to go, are custommodel built to match your machine m and series. Count on SENNEBOGEN in-house. For more in nformation on he QR code. UPTIME Kits, scan th

over month to go ing rough once a br th st e ju om y] c n he ia [t echnic situation, Theyy have a t ck. Iff I have a downtime… Since they ba o t t on r f , ually lose no every machine ne and I virtu ck quickly. achi g t the unit ba in another m air parts in sttock. I ge ld Hills, MI have the rep t r, Bloomfie ontracto Demolition C rsale afte hee Machine” eyond th out how our “B e for SENNEBOGEN ab e or m ad e R mizes uptim to-ship maxim ories of readycommitment mplete invent om c ith w . s er se custom warehou rth American parts in our No

ns icciiaan t ained tecchn -ttr y r o to t ct ac f N E G SENNEBO

support througho out the life of its equipment. We’re thinking “beyond the machine” to deliver dependable uptime aand lower Total Cost of Ownership (TCO) for every customer.

Parts • Service • Train ning • Application Speciallists • Flexible Financing • Attachments 251 Shaker Roaad East Longmead dow, MA 01028 (800) 292-6351

1980 0 Berlin Turnpike Berliin, CT 06037 (800 0) 352-4473

www.tyleerequipment.com m Learn more about a our commitment to our customers

sennebogeen-na.com/beyond-the-machine -


Page 4 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Conn. Outlines Current, Future Projects at State Summit Gov. Ned Lamont, U.S. Sen. Chris Murphy and many local officials from across Connecticut gathered in Hartford Nov. 17 to highlight the array of new infrastructure projects that are currently under way in the state and to discuss what other changes residents are likely to see in the next decade and beyond. But amid the calls to boost Connecticut’s transportation and energy infrastructure, officials focused their discussions on one aspect of infrastructure growth: housing. CT Mirror reported that the gathering was billed as the first inaugural infrastructure summit, meant to lay out a roadmap about what investments the state is likely to make between now and 2035. Scheduled to coincide with the two-year anniversary of the passage of the 2021 federal Bipartisan Infrastructure Law, the event included mayors, first selectmen, state lawmakers, state agency leaders, economic development officials and private developers. It featured several panels that provided an overview of the investments that were being made as a result of the federal law, which authorized more than $1.2 trillion in infrastructure spending in the United States. To date, more than $6 billion in federal infrastructure spending has been announced for Connecticut. Mark Boughton, commissioner of the Connecticut Department of Revenue and Services, and Lamont’s senior advisor on infrastructure, said the state is focusing on winning additional competitive grants from federal agencies. “We here in Connecticut take its implementation very seriously,” Boughton told CT Mirror. Murphy, who is seeking his third term in the U.S. Senate, joked that there were so many infrastructure projects under construction that fellow Democratic U.S. Sen. Richard Blumenthal was not able to keep up.

“There are so many ribbon cuttings in Connecticut these days that Blumenthal can only make half of them,” Murphy quipped. Even with all of the federal funding arriving in Connecticut and other states, Murphy argued that Congress needed to do even more to improve the country’s energy, water and transportation infrastructure. He noted, for instance, that China was able to build a high-speed railway from Beijing to Shanghai, despite the distance between those two cities being double the mileage between Boston and Washington, D.C. “This is not a moment for us to rest on our laurels,” Murphy said.

Even with all of the federal funding arriving in Connecticut and other states, Sen. Murphy argued that Congress needed to do even more to improve the country’s energy, water and transportation infrastructure.

West Hartford Mayor Shari Cantor said she has been able to advance home building in her community by explaining to residents that it was necessary for the town’s growth and economic development.

Many of the other speakers at the event, however, were focused on projects that are already in the works. The panelists and attendees talked broadly about investing in water and sewer systems, rebuilding Connecticut’s bridges, reengineering highway exchanges, constructing new rail stations, installing electrical vehicle charging stations, speeding up the passenger rail between New Haven and New York, and preparing the state for the future effects of climate change.

Scheduled to coincide with the two-year anniversary of the passage of the 2021 federal Bipartisan Infrastructure Law, the event included mayors, first selectmen, state lawmakers, state agency leaders, economic development officials and private developers.

Increased Housing Stocks Key to State’s Economy But the most prominent topic of discussion was housing — a vital but politically fraught issue at the moment. Lamont, who is in his second term as governor, and many other speakers voiced the need to build new housing stock in Connecticut, a state with one of the lowest vacancy rates for apartments in the country. Along with Daniel O’Keefe, the new nominee to become the commissioner of the state Department of Economic and Community Development, Lamont emphasized that housing is a vital piece of Connecticut’s infrastructure. They added that it was a necessity for the state’s continued economic development, which is why they highlighted the millions of dollars in funding that has gone toward new housing. “We are doing everything we can to build housing,” the governor explained. Lamont, however, continued to show deference toward the Connecticut municipalities where local zoning ordinances have been used to block new developments in recent years. “For the towns, we are following [their] lead,” he said during one of the panel discussions. Housing advocates in the state have said

those zoning laws — and the local opposition to multifamily housing developments — are likely the biggest impediment to Connecticut solving its housing crisis and boosting the number apartments and homes that are available to lower-income households. Lamont recognized the pushback that developers have faced in many suburban municipalities when trying to build multifamily housing. He joked that in his hometown of Greenwich, he has seen yard signs suggesting that state lawmakers want to build the Empire State Building on Greenwich Avenue. Additionally, the governor asked several of the panelists how they were able to plan and build more multifamily housing when faced with that type of resistance. West Hartford Mayor Shari Cantor said she has been able to advance home building in her community by explaining to residents that it was necessary for the town’s growth and economic development. But Cantor said that does not mean that the entire community supported all of the housing developments. As an example, Cantor noted, she was meeting with several town residents later in the day on Nov. 17 who are opposed to one of the newly proposed housing construction projects currently in the planning stages in West Hartford. Jocelyn Ayer, the director of the Litchfield County Center for Housing Opportunity, also spoke to her experiences in trying to counter local resistance toward building new housing in Connecticut’s northwest corner. “When we talk to towns about where they can locate new housing, they shrug,” she said. Ayer told CT Mirror that she responds by pointing to old parking lots or vacant school properties that could be developed into multifamily housing. “We can turn those into community assets,” she explained. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 5


Page 6 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Frank Martin Sons, Inc. 316 Market Street Fort Kent Mills, ME 04744 207-834-3171

Toll Free 844-307-2596

fms-equipment.com

491 Lakewood Road Madison, ME 04950 207-858-4748

NOW YOUR AUTHORIZED HITACHI DEALER FOR MAINE


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 7

WE’RE IN THE BUSINESS OF KEEPING YOU IN BUSINESS.

DISCOVER THE ASV GENUINE PARTS & SERVICE ADVANTAGE. ASV Genuine Parts are specifically engineered and guaranteed to maintain the integrity of your ASV machine. They’re designed, built, tested and re-tested to ensure equipment performance and reliability always stay at an all-time high – because less downtime for your machine means more uptime for you. Contact us now to learn more!

© 2021 ASV Holdings, Inc.


Page 8 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

PORTABLE ROCK CRUSHING Onsite or Quarry • Making aggregates since 1983

Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT

www.FAYWRIGHTINC.com

Rhode Island Ranks 11th in Nation in NRDC Scorecard for ILJA Funding Use The Rhode Island Department of Transportation (RIDOT) announced that Rhode Island has been ranked 11th in the nation for its use of transportation funding under the Infrastructure Investment and Jobs Act by the Natural Resources Defense Council (NRDC), an international non-profit environmental organization. In making the designation, the NRDC said “the NRDC has evaluated all 50 states to gauge the general policy and spending context that will influence and direct this federal funding, aiming to identify the degree to which states have adopted policies and directed dollars to improve equity, public health and climate outcomes. In this scorecard report, NRDC assessed states across a range of metrics related to state planning for climate and equity, vehicle electrification, expansion of transportation choices, system maintenance and procurement.”

“This report recognizes the careful planning on the part of RIDOT and other state agencies that has moved Rhode Island toward its goals of reducing emissions, encouraging residents to use alternative modes of transportation, and giving drivers access to electric vehicles and charging stations,” said Gov. Dan McKee. “While more work remains, I am pleased for Rhode Island’s recognition by this national organization.” “The NRDC is highly recognized as an environmental advocacy group and are considered the experts in assessing programs that impact climate change and carbon reduction strategies,” RIDOT Director Peter Alviti said. “I’m very proud of the work that our RIDOT staff, along with other departments, have done in executing a plan that efficiently and effectively uses our federal transportation funding to have a positive impact on meeting the goals

of national and State of Rhode Island climate acts. This study recognizes that RIDOT is using its federal and state funding resources effectively to meet the goals of our carbon reduction strategies.” NRDC used data on a variety of metrics that included: state planning for climate and equity, encouragement in the state DOT’s public participation plan, electric vehicle charging ports per 1,000 residents, reducing vehicle miles traveled through expanded transportation choices, spending of federal dollars on maintenance, and encouragement of environmental products for commonly used construction materials in transportation products. Rhode Island scored well in its resiliency work. It also was recognized for its electric vehicle rebate program, its 2023 Qualified Allocation Plan and for the Energy 2035 Rhode Island State Energy Plan. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 9

Call To Tony So ola! 203-577-90 036 anth ony.sola@alltg.com

Scottt Barton w jobs. Now I have a I’ve had a few w.. rewarding careeer with room to grow It’s great leadding a winning team that realllyy carees.

afavre Jim La The Alta Equippment Compannyy mission statementt saayys “Customer First”” and I keep thhat in mind everryy single daayy. I take pride p in m myy work.

Steve Min ner This job is awesome. Grea G t paayy and benefits plus a consistent schedule and I’m part of a winning w team. What more could I askk ffoor?


Page 10 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 11

MERRY CHRISTMAS In warm appreciation of our association during the past year, we extend our very best wishes for a happy holiday season. Happy Holidays!

Happy Holidays

800-Go-2--ALTTA (800-462-2582) AlttaEquipNE.com

from your friends at

East Longmeadow, MA

413-525-6351

BOSTON LOCATION 2 Rivergreen Drive, Everett, MA 02149 888.267.3857 • www.bostonftl.com

Berlin, CT

860-356-0840 www.tylerequipment.com

BROCKTON LOCATION 2000 Main Street, Brockton, MA 02301 508.857.0280 • www.nereinc.com

DAVIS

HAPPY HOLIDAYS from

Clifton Park, NY 518-877-8000

Warenham, MA 508-291-1200

Syracuse, NY 315-476-9981

Cranston, RI 401-946-6350

Binghamton, NY 607-772-6500

or

Richmond, VT 802-434-4228

Batavia, NY 585-815-6200

1-800-201-4368

Scarborough, ME 207-883-9586

Tonawanda, NY 716-799-1320

Brewer, ME 207-989-1890

Londonderry, NH 603-665-4500

www.davisauctionsinc.com

HAPPY HOLIDAYS from

Happy Holiliday’s from

Chappell Tractor Sales Outfitters by Chappell B-B Chain Chappell Tractor East

Poughkeepsie, NY Y 845-452-1200 Bronx, NY 7118-863-3800 H Holtsville, l ill NY 6631-758-7500 Bloomingburg, NY Y 845-733-6400 Newington, CT 860-666-8401

100 Quarry Drive, Milford, MA 01757 508-634-3400 North Reading, MA 978-276-2400

203-758-4087

11/21/2022 8:43:51 AM

from your friends at

Auctions, Inc. 210 Cheshire Road P.O. Box 7071 Prospect, CT 06712

Happy Holidays

20221121 - Christmas Spread.indd 1

Dracut, MA 978-454-3320 Brockton, MA 508-484-5567 Bow, NH 603-410-5540 Auburn, MA (EE Rents) 508-635-5058

www.equipmenteast.com

BRENTWOOD, NH 1.800.616.5666 MILFORD, NH 1.800.698.2640 CONCORD, NH 1.603-225-3361 FOR MORE INFO GO TO WWW.HO OPENN.COM OR SCAN HERE


Page 12 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, MA Toll Free# 508-381-3939 • www.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

2014 CAT 730 Truck, 9400 hours, 6x6, Tires 65% or Better, Rear Tailgate, Work Ready............ ..............................................................$179,000

2018 Deere 410L, 2600 Hrs, Ride Control, Backhoe Pilot Controls, Powershift Trans., 2017 US EPA Label, QC, Diesel Exhaust Fluid Req., Hyd. Cplr, 93" Loader Bkt, 24" Backhoe Digging Bkt, Rear Aux. Hyd REDUCED $99,000 $89,000

2018 CAT 336FL, 2300 hours, Heat/AC/Rear Camera, Aux. Hydraulics, QC, 48" Bucket, 28" SG Pads, Work Ready! Comes w/ Ramfos TF40 10K hammer ................................$264,000

2020 Hitachi ZX210 LC-6, 2400 hours, Aux. Hydraulics, QC, 36" Digging Bucket, Rear & Side Cameras, Ready to Work ............$129,000

2018 Bell B30E, 5200 hours, 6x6, AC/Heat, Diesel Engine, 30T Lift Capacity, Tailgate, Two Available ................................................$199,000

2018 CAT 320FL, 4000 hours, 50" Stickland bucket, QC, Aux. Hydraulics, Front and Side Cameras, Work Ready. Comes w/ 5Klb. Atlas Copco EC140 hammer ........................$154,000

2013 Deere 470G LC, 3800 hours, 12'7" Stick, Newly Rebuilt Bucket, AC, Counterweight Removal System, Rady to Work! ........$159,000

2017 Doosan DX235 LCR-5, 2500 hours, Reduced tail swing, 36” bucket, Hydraulic thumb, Aux. hydraulics, Heat/AC, Work ready $114,500

Sales • Service • Parts • Rentals

CONNECTICUT

MASSACHUSETTS

410 Burnham St., South Windsor, CT 06074

120 Interstate Dr, W. Springfield, MA 01089

860-289-2020

413-363-0780

Proud to be your Full Service Dealer NEW Inventory In Stock!

abletool.net

SA12 Truss Screed

Screeds and Trowel Pouring, Placing, Finishing Concrete?

Allen Engineering products are USA engineered & manufactured.

We Can Help! PRO446 Walk-Behind Trowel

HD7070 Magic Screed

Made in the USA

Allen Razorback screeds have been used through four decades in all corners of the world! WHY CHOOSE ABLE TOOL and EQUIPMENT... • Local Ownership with flexible approach • Trained staff for repairs and maintenance • Dedicated Parts personnel on site

• Focused on the Heavy Construction Industry • Providing the BEST support equipment available • Experienced outside sales staff


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 13


Page 14 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Harrison & Burrowes Leads Vermont Bridge Project QUECHEE from page 1

backwall, expansion joints, railings and new sidewalks connecting all corners of the bridge to parkwalks that will extend west on Route 4 to parking ing areas will be constructed.” areas, and new safety fencing will be installed,” VTrans said the project also will include: said Tom Chase of Greenman-Pederson Inc., a • cleaning and painting the steel arch members; consultant to the Vermont Agency of • replacement of deteriorated steel members; Transportation, the Valley News reported. • bridge joint repair or replacement; The report on Tri-State Painting’s work was • bearing rehabilitation/replacement; filed on Sept. 23, 2023, a short time after the offi• deck membrane and pave application; cial starting date of Aug. 29, according to VTrans. • widening of the existing sidewalks — new The existing structure is a three-hinge steel concrete sidewalks and fascias; deck arch constructed in 1911 and reconstructed • partial deck replacement to the approximate in 1972 and 1989. It is approximately 285 ft. in limits of the 1972 deck and sidewalk reconstruclength and 41 ft. wide. The bridge deck is in tion; “good” condition while the superstructure and • silane application to the substructures and new substructure are in “fair” and “satisfactory” condiconcrete sidewalks and fascias; and tion, respectively. • slope stabilization. The upgrades will entail cleaning and painting When asked what is ahead for the project Amy the structural arches and frame of the three-span Tatko, VTrans spokesperson, said, “Installation of steel deck truss structure, replace deteriorated the containment system and access panels is going beams or joints and widen the existing sidewalks The upgrades will entail cleaning and painting the structural arches and on this fall. Cleaning and prime coat of the strucfrom 3.5-ft. to 6-ft. The state has designated the structure a “forever frame of the three-span steel deck truss structure, replacing deteriorated tural steel will begin next spring. This is a threeyear project and the completion date is June 26, bridge.” Both its history and its location make it beams or joints and widening the existing sidewalks from 3.5-ft. to 6-ft. 2026.” hard to replace. It originally served as a railroad Construction equipment being used on the project bridge, then was converted to a highway bridge in the 1930s. fence. Police say 14 suicides took place at the gorge between includes a Cat 420E IT backhoe by Harrison & Burrowes The 285-ft.-long span was partially reconstructed in 1972 2007 and July 2018. In a release, VTrans said, “A major part of the project is to and a Cat TH460B telescopic fork lift to unload staging hardand 1989. The preventive maintenance project also will include sui- rehabilitate, clean and paint the structural steel arch and ware by Tri-State Painting.  CEG (Photos courtesy of VTrans.) cide mitigation considerations including a suicide prevention framing that support the deck. In addition, bridge abutment

Mass. Faces Multitude of Issues in State’s Transit System TRANSIT from page 1

According to the CNAI report, MBTA facilities require the most attention with $6.4 billion needed. Another $5.3 billion is required to fix structures and another $2.4 billion would be used on trains. Stacy Thompson, with the transportation advocacy group LivableStreets Alliance, told WBZ-TV that she views this assessment as a step toward transparency. “Really for the first time in a decade, we have a sense of where we are at with the State of Good Repair, what needs to be fixed, and how much it will cost,” said Thompson. “It’s a lot of work but we finally have a starting point.” MBTA last did this assessment in 2019 and found that $10 billion worth of repairs needed to be made; this time around, the number jumped by $14.5 billion. Part of the reason came down to having a clearer understanding of the agency’s assets, inflation and construction costs, and an aging system that gets more complicated to fix by the day. MBTA said much of

its equipment is at least 50 years old. “Restoring reliability and ensuring safety are priorities as we rebuild MBTA infrastructure,” explained Philip Eng, the transit agency’s new general manager and CEO, in a statement. “Understanding and acknowledging the significant resources needed to bring our system to a State of Good Repair is just one step towards fixing our infrastructure to deliver more robust and frequent service. The MBTA is one of the oldest transit agencies in the country, and while there are a number of contributing factors, it’s clear that years of underinvestment have added to the cost of bringing our system back to a State of Good Repair. “Timely and appropriate actions are key to mitigating and avoiding more costly and potentially impactful efforts,” he continued. “Know that we are committed to aggressively addressing our immediate needs — like the recent 16day outage on the Ashmont Branch to perform track work — as we

strive to deliver a modernized system to serve future generations.” He added that there are no plans currently to raise fares for riders. In her own news release, Massachusetts Gov. Maura Healy said, “The Capital Needs Assessment and Inventory shows what we have known for a long time: there is an urgent need for significant resources and work across the MBTA system because of decades of underinvestment. The Healey-Driscoll Administration is committed to ensuring that the MBTA has the resources it needs to deliver the safe, reliable service that the people of Massachusetts deserve.” Latest Assessments Clearly Lay Out MBTA’s Needs The CNAI is an exercise that helps the state agency understand the magnitude of assets needs across the system at a single point in time. According to MBTA, its SGR designation does not indicate the level of safety, but rather is representative of an asset operating at its

optimal and expected level of performance. An asset “out of SGR” is more likely to require rehabilitation or replacement. While they do not reflect total project costs or the totality of capital investment that may be needed, both the CNAI and SGR Index help Massachusetts’ transit department develop strategies about where to allocate funding resources and make investments toward a modernized transportation network as part of MBTA’s rolling five-year Capital Investment Plan (CIP). In the MBTA’s Fiscal Year 2024-2028 CIP process, SGR and safety were the most important prioritization factors, making up half of a project’s total weighted score. The MBTA estimates the current overall SGR Index for assets in need of rehabilitation or replacement include facilities, rolling stock, equipment, structures, signals, track and power. This estimated increase of $14.5 billion from the last CNAI performed in 2019 is driven by a number of factors, including:

• Significant infrastructure and construction cost increases driven by inflation and supply chain challenges. • The continued aging of MBTA’s assets faster than they can be replaced due to years of underinvestment. • The length of time for capital investments to show improvements and be reflected in the CNAI. Many capital projects under way now are in varying planning, design, and construction phases. The rehabilitation or replacement of those assets will be reflected in future iterations of the CNAI and SGR Index. The MBTA is already addressing many of the needs identified in the CNAI. For example, critical track work on the Red Line’s Ashmont Branch and Mattapan Line was successfully completed in late October when crews replaced nearly 5,000 ft. of rail and 1,174 ties on the Ashmont Branch and nearly 4,700 ft. of rail and 1,380 ties on the Mattapan Line, allowing for the removal of all speed restrictions in that area. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 15

Solutions that arre more than meets the e eye.

At Chadwicck-BaRoss, we know that a machine is never just a mach hine. It’s a tool. An asset. A profit driverr.. And when your business and livelihood are on the line, your decisions a are bigger than just the machine you choose. That’s why we’re here to help you unlock the potential of your flee et to drive the big decisions that lead to the big bucks. For a location near you, visit us at chadwick-baross.com.


Page 16 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

N.H. Seacoast Greenway Set to Finish By Next Summer A section of the long-planned all members of the community to New Hampshire Seacoast Greenway exercise, learn to ride a bike, enjoy from North Hampton to Barberry nature or simply get where they need Lane in Portsmouth is expected to be to go without a car,” according to completed by the summer of 2024, commission officials. the Portsmouth Herald reported Nov. City engineer Eric Eby said its 10. construction is ongoing. “That is just based on what we’ve “They’ve got the base down, but heard directly,” said Portsmouth the finished course will not be Public Works Director Peter Rice installed until next year,” he said durabout conversations city officials ing a recent meeting of Portsmouth’s have had with the New Hampshire Parking, Traffic and Safety Department of Transportation Committee. “It’s kind of tough to (NHDOT), which is in charge of the City of Portsmouth, N.H. rendering bike on right now, [but] it’s [currentrail trail project. “But given the A conceptual design of future trail under Route 33. ly] a good walking path.” progress they’ve made, it’s in good He added, though, that the path is former rail lines that NHDOT bought from still “officially closed.” shape. “It’s going to be a great asset for the city Pan Am Railways, according to information and the entire seacoast,” he told the Herald. previously provided to the Herald by David Pathways Create Access to When finished, the greenway will encom- Allen, a Seacoast Greenway Alliance board Largely Unknown Parts of Town pass a 17-mi. network of rail trails and bike- member and former Portsmouth deputy city As NHDOT’s work on the greenway is ways connecting the communities of manager. continuing, construction on Portsmouth’s The Rockingham Planning Commission Borthwick Avenue multi-use path also is Seabrook, Hampton Falls, Hampton, North Hampton, Rye, Greenland and Portsmouth. has been helping to coordinate the regional moving closer to being finished, Rice said. It is a small part of the larger, 3,000-mi. East effort to bring the rail trail project to fruition, That trail, along with the city’s other pathCoast Greenway project, intended to con- according to the Portsmouth daily news ways — all of which are either completed, nect off-road trails from Maine to the Florida source. being finished or proposed — will connect The 3.6.-mi. section of the greenway in to one another and to the New Hampshire Keys. The local portion of the New Hampshire Portsmouth “will be a community asset Seacoast Greenway, allowing people to walk Seacoast Greenway project is being built on offering a safe place for children, seniors and or bike off-road all over Portsmouth, and, in

time, the entire region, he explained. “You’ll eventually be able to get from Massachusetts to Market Street in Portsmouth, all off-road except for minor crossings,” Rice told the Herald. “From an infrastructure standpoint, it’s very exciting. The long-term vision is to also have spur paths that will connect to neighborhoods throughout the city.” Once the greenway is officially open, it will allow people “to see some parts of the city that are really beautiful that they might not know exist,” Rice said. He added that he is excited for people to get to experience those locations, including the Great Bog, a 700-acre conserved area in Portsmouth featuring trails through its woods, wetlands, fields and hills. Eby pointed out the Borthwick Avenue multi-use path will connect “to the existing multi-use path along Eileen Dondero Foley Avenue, which will connect to the rail trail.” During the Rockingham Planning Commission meeting, he explained, “When all the projects are done by next fall, you’ll have a complete multi-use path going along the rail trail, Eileen Dondero Foley Avenue, [and] Borthwick Avenue up to the bypass, where there’s an existing crossing, and [a] multi-use path along Hodgdon Way.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 17

Equipment East, LLC

Barry Equipment Co., Inc.

196 Manley Street 61 Silva Lane Dracut, MA 01826 Brockton, MA 02301 508-484-5567 978-454-3320 1474 Route 3A Bow, NH 03304 603-410-5540

7 Harry’s Way 30 Birch Island Road Webster, MA 01570 Webster, MA 01570 508-949-0005 508-949-0005 1608 John Fitch Blvd South Windsor, CT 06074 860-288-4600

www.equipmenteast.com

www.barryequipment.com

F&W Equipment

Central Equipment Company

164 Boston Post Road Orange, CT 06477 203-795-0591

45 Dempsey-Greaves Lane Stillwater, ME 04489 207-827-6193

www.fwequip.com

www.centralequipmentco.com


Page 18 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

Monroe Tractor Hires New Parts Manager of Its Conn. Location

ABLE TOOL & EQUIPMENT ..........................................12 ALTA EQUIPMENT COMPANY/NITCO LLC ................1,9 BARRY EQUIPMENT CO. INC.......................................20 CHADWICK-BAROSS INC..............................................15 DEVELON NORTHERN NEW ENGLAND......................17 EQUIPMENT EAST........................................................1,5 FAY & WRIGHT EXCAVATING INC ................................8 FOLEY INC - WORCESTER ............................................1 FRANK MARTIN & SONS INC ........................................6 GORILLA HAMMERS........................................................1

Noah Peebles

Monroe Tractor has hired Noah Peebles as parts manager for the Connecticut location. Peebles will be responsible for managing the parts operations with oversight of the parts counter technicians to obtain a strong sense of urgency for the Connecticut location. Peebles brings a wealth of knowledge managing an automotive business, years of mechanical experience and a passion for everything with an engine. “I look forward to forming a relationship with our customers so they know who I am and trust that their parts needs will be taken care of in a professional and timely manner,” said Peebles. “Customer service is the number one priority to our parts department, and Noah has already shown to be a great addition to our team. He is organized, detail-oriented, and possesses an indepth knowledge of inventory management and good judgment that will illustrate Monroe’s commitment to our customers,” said Rick Bisesto, Connecticut’s branch manager. 

Monroe Tractor Brings Case IH to Mass., Conn. Locations

H O PENN MACHINERY CO INC ..................................13 HEAVY MACHINES LLC ..................................................7 HOLIDAY CENTER SPREAD ....................................10,11 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 ROGERS BROTHERS CORPORATION........................19 SHAWMUT EQUIPMENT CO INC....................................8 T-QUIP SALES & RENTAL INC......................................16 THE N.I.C.E. COMPANY ................................................12 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Monroe Tractor has 18 locations across New York State, Pennsylvania, Massachusetts, Connecticut and Vermont.

Monroe Tractor is adding Case IH’s red equipment to Westborough and Woburn, Mass., and South Windsor, Conn., locations. With 72 years as a Case and Case IH dealer in New York and Pennsylvania, Monroe Tractor has provided customers with red equipment to handle their equipment needs. Now, it is offering its New England customers more equipment choices with the addition of the Case IH Farmall series, Maxxums, Vestrums, Puma 150, and round and square balers. With horsepower ranging from 25 to 150, chores can be tackled on everyone’s to-do list, from hauling and mowing to loading and towing and then some. “We are proud to bring back the iconic Case IH brand to Massachusetts and Rhode Island. Our knowledgeable staff looks forward to helping customers get into the right size machine to fit their needs,” said Dan Duhn Westborough/Woburn branch man-

ager. “We take pride in this exciting opportunity to introduce Case IH equipment to the entire state of Connecticut and western Massachusetts,” said Rick Bisesto, Connecticut branch manager. “We look forward to providing another line of equipment, top-notch parts and service to our valued customers for years to come.” Monroe Tractor has 18 locations across New York State, Pennsylvania, Massachusetts, Connecticut and Vermont. It carries everything from tractors, balers, skid steers, wheel loaders, backhoes, excavators, portable screen machines, demolition attachments, precision products, and many other fine brand names for any large or small construction site or farm. Its latemodel, low-hour construction equipment is available to purchase or rent by the day, week or month. “We’re here to keep you working.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 6, 2023 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

ROGERS BROTHERS CORPORATION ALBION, PA

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

3 Rocky Hill Road Smithfield, RI 02917 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

Over a CENTURY of building the very best heavy-duty trailers for your hauling needs! Contact your local dealer for a quote today.


Page 20 • December 6, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Developing e elo g onw wards r with DEV EVEL LON. Count on your locall team at Barry Equipment E for the durable macchines and unmatched ma serviice you demand for you ur most challenging ng work.

Authorized Dealer

©2023 HD Hyundai Infracore. All riigh ights reserved. DEVELON is a brand of

Webster e

Webste er

South Winds sor

508 8-949-0005 30 B Birch Island Road Web bster, MA 01570

508-949--0005 7 Harry’s Way Webster, MA 01570

860-288-4600 1608 John Fitch Blvd. South Windsor, CT 06 06074


Turn static files into dynamic content formats.

Create a flipbook