Skip to main content

New England 24, November 22, 2023

Page 1

State Supplement sponsored by:

1

THE NEW ENGLAND EDITION A Supplement to:

11

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

November 22 2023

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. LXI • No. 24

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

The first support tower of the gantry system was installed on centerline pier.

By Ken Liebeskind CEG CORRESPONDENT

Tibbits Equipment Services, Inc.

www.tibbitseq.com

802-479-9696

KWIK KLEET ts Traction Clea ®

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

Phil (413) 427-7171

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com

• Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

CALL 888-81-GORILLA(46745)

The Ticonic Bridge, which crosses Route 201 over the Kennebec River at the Waterville-Winslow town line is being replaced on alignment, with a new two span, steel girder with concrete bridge deck structure. A single concrete pier will be built in the river to support

the new bridge, according to Maine Department of Transportation. Cianbro of Pittsfield, Maine, is the lead contractor on the project, which has a budget of $52.8 million with $25 million coming from a Federal Highway Administration grant. The current Ticonic Bridge’s concrete arch dates to the early 20th century, when the bridge carried a trolley line. see TICONIC page 14

Creative Specialty Contractor Combines Teamwork, Technology, Tenacity in Mass. As its name suggests, Maverick Construction Management Services, based in Oxford, Mass., has its roots in construction management — from a nonconformist perspective. Since it was established in 1997 by John Fiore, the company has had an interest in and willingness to take on unique and challenging projects. Within a few years of its founding, the firm transitioned from managing projects to self-performing full site As part of its construction utility and environmental of a drawbridge in North work, largely because of Hero, Vt., Maverick installed a steel cofferdam its can-do attitude. that was tied to anchor Still a relatively small rods at the bottom of Lake Champlain.

see MAVERICK page 12


Page 2 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2019 LEEBOY 8500D

stk# 28000, 1901 hours, 8-15' propane screed, dual spraydowns ..................................$99,500

2014 LEEBOY 8515C

2016 BOBCAT S630

stk# 28527, 850 hours, skid steer loaders, stk# 28172, 4000 hrs, 8-15' HD electric screed, C/air, 2 speed, hydraulic coupler, gp bucket, no seats, augur sensors or cables........$59,500 foot controls, one owner. great shape ..$34,500

2020 JOHN DEERE 544L

2012 LEEBOY 8515B

1992 JOHN DEERE 624E

Stk# 27286, 2243 hrs, c/air, ride control, 416 coupler, gp bucket ..............................$169,500

stk# 28429, 3888 hrs, electric screed, poly pads, dual spraydowns ........................$59,500

stk# 28445, 14,700 hrs, C/heat JRB coupler, and 3 yard bucket ................................$39,500

2018 JOHN DEERE 50G

2015 JOHN DEERE 75G

2017 JOHN DEERE 85G

stk# 27845, 1400 hrs, hyd thumb, 24" bucket .. ..............................................................$64,500

stk# 27248, 1968 hrs, Cab w/ AC, Long Arm, Rubber Pads, 18" Pads, Aux Hydraulics, Blade, Coupler, 24" Bucket ..................$79,500

stk# 27856, 4216 hours, c/air, mech coupler, gp bucket ..............................................$74,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 3

PR ROVEN UPTIME WITH UPTIIME KITS SENNEBOGEN, in keeeping with their philosophy to maxim mize uptime, has created UPTIME Kits. Whether you are a service technician in-house or on the road, these kits have everything you need for every servicee, maintenance and PM task in one place. p They were created to save you time and money. Managing hundreds of o related service d nuts to O-Rings parts, from belts and and special tools becomes easy with a single part number to o order and stock. stock

E H T D N O Y BE

E N I H C A M I virtually lose NO downtime

They are: s ock • Easy to order and eaasy to st components l t and d too t ols • Ideal for stocking seervice sshops and trucks owing kits: Choose from the follo • Central lubrication system kits • Preventive maintenance service kits • O-Ring kits • Electrical service kits • Hydraulic service kits k And the best thing iss that these kits, in stock and ready to go, are custommodel built to match your machine m and series. Count on SENNEBOGEN in-house. For more in nformation on he QR code. UPTIME Kits, scan th

over month to go ing rough once a br th st e ju om y] c n he ia [t echnic situation, Theyy have a t ck. Iff I have a downtime… Since they ba o t t on r f , ually lose no every machine ne and I virtu ck quickly. achi g t the unit ba in another m air parts in sttock. I ge ld Hills, MI have the rep t r, Bloomfie ontracto Demolition C rsale afte hee Machine” eyond th out how our “B e for SENNEBOGEN ab e or m ad e R mizes uptim to-ship maxim ories of readycommitment mplete invent om c ith w . s er se custom warehou rth American parts in our No

ns icciiaan t ained tecchn -ttr y r o to t ct ac f N E G SENNEBO

support througho out the life of its equipment. We’re thinking “beyond the machine” to deliver dependable uptime aand lower Total Cost of Ownership (TCO) for every customer.

Parts • Service • Train ning • Application Speciallists • Flexible Financing • Attachments 251 Shaker Roaad East Longmead dow, MA 01028 (800) 292-6351

1980 0 Berlin Turnpike Berliin, CT 06037 (800 0) 352-4473

www.tyleerequipment.com m Learn more about a our commitment to our customers

sennebogeen-na.com/beyond-the-machine -


Page 4 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

MassDOT to Construct Shared-Use Path Along U.S. 5 Massachusetts transportation officials are moving ahead with plans to construct a shared-use path for bikers and walkers along a dangerous 1.2-mi. stretch of U.S. Highway 5 between Northampton and Easthampton. The $6 million project, scheduled to begin construction in 2026 and take two years to complete, is being greeted with enthusiasm by bikers and others who use that part of the highway to get to and from Northampton, Holyoke and Easthampton. The Daily Hampshire Gazette reported Oct. 12 that plans call for the path to run between Easthampton’s Manhan Rail Trailhead near East Street and connect to proposed bike lanes to be constructed at Interstate 91’s Exit 23 in Northampton, where a bridge replacement project is currently under way. “This is an area where pedestrian and bike access has been just totally unworkable and dangerous,” said Northampton resident Nicholas Horton, speaking at a public hearing hosted by the state Department of Transportation (MassDOT). “This has really important implications for the folks who live on Island Road, for those who are making their way down towards Holyoke, and for those connected to the Manhan Rail Trail.”

State officials said the trail will be constructed along the west side of U.S. 5, closest to the Oxbow and opposite the B&M Railroad tracks. It would run past Island Road, which provides access to the Oxbow Marina as well as a neighborhood and a warehouse for Packaging Corporation of America. “The project is intended to address the need to provide a direct connection for alternative and healthy modes of travel,” MassDOT Project Manager Muazzez Reardon said during the Oct. 11 virtual public hearing, which was being held at the 25 percent design stage. Reardon added that this section of U.S. 5 “lacks adequate shoulder width for bicycles and there are no sidewalks for pedestrians,” creating an accessibility barrier for pedestrians with disabilities and safety issues for those traveling along the corridor. As a result, she said project goals include improving accessibility and safety, and encouraging more use by bicyclists and pedestrians. In addition to construction of the shareduse path, MassDOT is proposing other improvements, including an expanded parking lot at the Manhan Rail Trailhead, a

potential Pioneer Valley Transit Authority bus stop at the trailhead, modifications to the existing U.S. 5 bridge, and signalized pedestrian and bicycle crossings near the I-91 ramp interchange. “At the Manhan River Bridge, there’s an existing sidewalk on the west side,” noted Keith Lincoln, project manager at Chappell Engineering in Marlborough, Mass., the design consultant of the project. “That helps facilitate the widening of that sidewalk and construction of the shared-use path.” He added the project is being designed to have a limited impact to the existing U.S. 5 roadway. “The intent is to maintain as much of the existing roadway as possible, and as such, we’re doing very minimal work on the roadway,” explained Lincoln, who also said there are certain areas where the guardrail will need to be modified, particularly at the bridge. “In general, we’re not proposing to relocate the guardrail.” Additional safety measures include a minimum of 5 ft. of buffer space between the road and the path. The possibility exists that a curb, guardrail or railing will separate the path from the roadway. As for a timeline, Reardon said environ-

mental permits and 75 percent design submission will be completed by winter 2024, with final design submission coming in fall 2025, and an anticipated construction start in 2026. Funding for the U.S. 5 project will come from federal and state contributions, with the feds kicking in 80 percent of the cost, and the state supplying the 20 percent. The estimated price tag does not cover any right-of-way acquisition costs, the Northampton news source noted. The project’s current design plan suggests that temporary and permanent easements may be needed, but no details have been determined. MassDOT said earlier in October it would notify affected property owners 10 months to a year before the project begins to discuss easement specifics and compensation, according to Angela Steinman, a right of way agent for the state agency. Environmental Impacts Discussed at Forum Reardon said that because the project involves work within regulated wetland boundaries, coordination with the see PATH page 6

Belchertown, Mass., Advances Plan for New Middle School Officials in Belchertown, Mass., took a major step in early October to replace its aging Jabish Brook Middle School with a new building that is estimated to cost between $117 million and $121 million if residents approve the project at a town meeting next June. The Daily Hampshire Gazette in Northampton reported Oct. 15 that after examining three design options — two that called for a new building and one that would renovate and expand the current school — the Jabish Brook Middle School Building Committee chose the option that its members felt would best meet education program goals and communal space needs, while also limiting the amount of disruption to students during construction. If the project comes to fruition, it should be completed by 2027, after which the Belchertown school district would close Cold Spring School and redistribute students in the K-8 schools. “There’s so much to get done but I feel like we have really great people on this program and I’m excited to share it with the town,” noted School Committee Chair Heidi Gutekenst. The project now advances to the Massachusetts School Building Authority

(MSBA), which in 2020 accepted Belchertown into its Core Facilities Program and made it eligible to receive state funding for a new school building. The town expects to receive about a 30 percent reimbursement from the state for the construction effort, which, if approved, would bring the town’s cost for the new facility to between $86 million and $90 million. The building committee said in a public presentation Oct. 7 that the exact cost of the new school and the impact on taxpayers will be determined when more details are finalized. Once that happens, the project would advance to next summer’s annual town meeting, where voters will decide whether they want to increase their property taxes to pay for the project. Jabish Brook in Desperate Need of Replacement The proposed three-story Jabish Brook Middle School would accommodate 475 students and be built on the site of the current facility between North Washington Street and Springfield Road. The floor design parallels the grade readjustments, with sixth grade students on the first floor, seventh graders on the second floor and eighth graders on the top floor.

The project also calls for a new overlapping baseball and soccer field for town recreation. Christopher Lee, a project manager of Lamoureux Pagano Associates, a Worcester architecture firm, noted the biggest unknown financial factor is the soil on the field, which he said is “great for fill, but not so great for building on.” He added that depending on the severity of the soil, the building’s costs could rise. Skanska, the project’s contractor, hired Lamoureux to conduct a feasibility study and to design several options, including base renovations to the existing school and what a new building would look like. The feasibility study revealed that the school’s roof, heating systems, and materials are not up to code and need complete replacement. “The building is 50 to 60 years old, so it’s typical that a building this age [would have] a lot of systems and materials nearing [the end of their lives],” Lee said. As a result, the building is extremely energy inefficient, allowing heat to easily escape, and it has no fire suppression system. Gutekenst also told the Daily Hampshire Gazette that the structure has reached absolute capacity for electrical usage. As an example, she explained, without enough

power, school staff struggled to get students proper technology during the transition to inperson classes after the pandemic. “To access any of the [heating, ventilation, and air conditioning] systems, you have to pull up the floorboards and crawl into these tiny spaces,” Gutekenst said. The approved design option for the new middle school is partly based on the number and size of rooms MSBA believes are appropriate for middle school learning. However, Gutekenst noted the communal spaces, such as the gymnasium and sports fields, are larger than MSBA suggestions because of the town’s needs. These areas will receive less state reimbursement. Other factors considered during design will be the needs of teachers, students and community members. Parents attending the most recent town meeting voiced their concerns about the lack of music and choir space in the new designs, which opted for a cafeteria auditorium for music classes rather than a dedicated classroom. The committee later added a classroom for music in the approved design. If the project does not pass during next year’s Town Meeting, Jabish Brook Middle see MASS page 12


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 5


Page 6 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Sales • Service • Parts • Rentals

CONNECTICUT

MASSACHUSETTS

410 Burnham St., South Windsor, CT 06074

120 Interstate Dr, West Springfield, MA 01089

860-289-2020

413-363-0780

Proud to be your Full Service Dealer • NEW Inventory In Stock! PDI3A Diaphragm Trash Pump

abletool.net

The Gas Pumps & Generators you’ve used for decades... A new & improved range of mobile generators.

Pump, Power & Light

Widest Range of Light Towers Available!

PT2A Self-Priming Trash Pump LTV4L Light Tower

GP660 Portable Generator

Submersible Pumps

WHY CHOOSE ABLE TOOL and EQUIPMENT...

G25 Mobile Generator • Local Ownership with flexible approach • Trained staff for repairs and maintenance • Dedicated Parts personnel on site

• Focused on the Heavy Construction Industry • Providing the BEST support equipment available • Experienced outside sales staff

Funding for Shared-Use Trail to Come Mostly From Feds PATH from page 4

Massachusetts Department of Environmental Protection and the Easthampton and Northampton conservation commissions will be required. Some attendees at the Oct. 11 hearing voiced environmental concerns about the project, according to the Daily Hampshire Gazette. “I hope that no additional lights will be installed, and I’m thinking especially about the fact that the path runs along sensitive environmental areas,” said Northampton resident James Lowenthal, who favors the project. “All the wildlife in that refuge need it to be dark at night, and we humans do as well. I think safety can be served by good

design without more lights.” Kathryn Bass, a resident of Island Road suggested more lighting to help avoid bike collisions with crossing wildlife. Other members of the public at the hearing — particularly bikers and Island Road residents — were strongly supportive of the proposed shared-use path. “We need to keep promoting separated trails like this so more and more families and young people and less confident bike riders can get out on the trails,” said George Kohout of Northampton. City Councilor Jim Nash added, “I am stupidly excited that this project is moving forward. To be able to go down Route 5 safely, it just opens up a lot of possibilities.” 

Would you like your company featured in Construction Equipment Guide? If so, please contact us at: editorial@cegltd.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 7

Lexington, Kentucky | www.linkbelt.com

, and much more • 20° tilting operator ’s cab with • Upper Cameras – winch operation and swing • Carrier Cameras and right turn

Ver e mont 802--658-1700 Massachusettss 508-499-1950 Pennsylvania 717-795-0700 New Yoork 3155-676-2008 www.woodscrw.com

B U Y

•

L E A S E

•

R E N T


Page 8 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Vt. Unveils Redevelopment Plan for Flood-Ravaged Barre City Vermont Gov. Phil Scott attended Barre City’s council meeting Oct. 24 alongside several top administration officials to unveil a massive redevelopment proposal for the north end of the city that was walloped during last summer’s catastrophic statewide flooding. Scott and the other state officials offered the plans, they said, to help the Granite City rebuild more resiliently — and be first in line to draw down federal funds if they become available. Drawings presented to the council, prepared by Black River Design, a Montpelier architecture firm, at the direction of Scott’s office, revealed a completely transformed north end neighborhood, according to VTDigger, a statewide news service. Plans call for demolishing most homes and apartment buildings along a five-block stretch from the intersection of North Main and Beckley streets to Fifth Street — which saw heavy flooding in July — to make way for a large park. A mix of new housing construction, including high-rise and mid-rise buildings and single-family homes, would be built on the new park’s outskirts, including an eightstory, 80-unit residential building between Fifth and Sixth streets. If fully realized, the proposal would remove 92 existing housing units and replace them with 225 new homes and apartments. State officials emphasized that their ideas were intended as a rough first draft and would not be imposed from on high. “This is not etched in stone,” Scott told the Barre City council. “This is a concept — a vision for what I see could be helpful to the city and to the region.” Doug Farnham, appointed by the governor to lead the state’s flood recovery efforts, stressed that while officials in the capital city of Montpelier were eager to kickstart planning, they would take their cues from local leaders and the community. “We want to respect your local visions for growth,” he said. “Again, we’re bringing these sketches as a starting point for a discussion.” Farnham also stated repeatedly that to assemble the property necessary to undertake the project, the state would not take homes against anyone’s will. “We’re not going to be forcing this on anyone,” he said. “The buyouts will be voluntary.” Barre City Area Ground-Zero for Vermont’s Floods Scott, who grew up in Barre City, and his administration have begun referring to the Granite City as ground zero for July’s floods. While many Vermont communities saw immense damage, the wreckage in that community stands apart, they said.

The state picked up 4,000 tons of debris from Barre City in the weeks following the floods — more than two-and-half times what it collected in neighboring Montpelier, Farnham told the city council in another meeting earlier in October. About 16 percent of all Federal Emergency Management Agency (FEMA) individual assistance claims in Vermont have been paid out to Barre City residents, he said, representing a “very, very heavy concentration.” “We always look back and compare the event to Irene,” Farnham added, referring to the 2011 tropical storm. “And if you do, you don’t find such a dense concentration of damage in Irene that we did this time around.” Gov. Scott Anxious to Obtain Flood-Recovery Funding Scott administration officials also pointed to congressional timelines to explain the speed and scale of their proposal. The governor described speaking to U.S. Sen. Bernie Sanders, I-Vt., at an event they both attended recently, when the senator “said there’s some opportunity in Washington right now,” Scott noted. “There is extra money that is put into the disaster relief fund that is going to be up for grabs, so to speak,” he continued. “But there’s nothing that is being appropriated, individually or spread throughout the states.

It’s first come first serve. So, we need to act quickly, and I took that to heart.” In response to questions from Barre City councilor Teddy Waszazak, though, Scott clarified some of the funds the administration was eyeing would require additional congressional approval. “I agree that we definitely need to have federal money to do whatever it is we’re going to do with the north end. But … when the legislature reconvenes in January, is the administration going to propose any direct aid from state dollars to the city to help get things started?” Waszazak asked. Scott replied that he and his team were “very hopeful in talking with our congressional delegation” that federal funds could cover the bulk of such a project. “That’s our goal, without having to dip into local resources in any large-scale capacity, or into state funds either,” he added. “But time will tell.” In speaking with VTDigger after the meeting, Farnham said that while the supplemental FEMA budget approved by Congress when it narrowly averted a government shutdown in late September should provide more money for Vermont to undertake buyouts, the project would require far more to actually develop the area. In particular, the Scott administration is contemplating using Community Development Block Grants, he said, if additional funding comes

through in Congress’ next spending bill. The federal dollars Vermont seeks will have to make their way through a divided Congress where Republicans in the U.S. House just recently elected a new speaker in Rep. Mike Johnson, R-La. But Vermont’s congressional delegation has also had trouble getting its own party to give Vermont much special consideration thus far. Despite letters and in-person appeals from Sanders, President Biden omitted a laundry list of the delegation’s statespecific flood recovery requests from his supplemental budget request for FEMA last summer. Sanders’ office did not make anyone available for an interview to discuss the federal funding they believed might be available. Instead, a spokesperson for his office provided a written statement from his state director, Kathryn Van Haste, stating that Sanders had “fought hard to bring every possible federal resource into our state to aid our people, town, and state as a whole.” “As Vermont moves from response to recovery and rebuilding, Senator Sanders is working closely with Governor Scott, the Biden Administration, and others to make sure impacted communities like Barre, Montpelier, Johnson, Weston and many more can determine how they want to rebuild stronger than before, as quickly as possible,” she said. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 9

YOU O R REPUTA TATION IS ON THE LINE EVERY RY DA AY. Jobs keep getting tougher. Timelines keep getting shor ter. Yo Y ou need to get it done faster and more ef ficiently. We get it. That’s why we’ve been making the big moves that keep yo y u moving for ward. Rolling out new machines engineered with a “get it done” mentality. Providing Af After Sales Solutions that keep you up and running. Because yo y u’ve earned it. And your customers deser ve it.

hitachi h cm.us Hitachi Construction Machiner y A mericas Inc.

Milford, NH 603.673.2640

Brentwood, NH 603.642.5666

chappelltractor.com

Concord, NH 603.225.3361

Now Your Hitachi Dealer for Vermont, New Hampshire and Massachusetts


Page 10 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, MA Toll Free# 508-381-3939 • www.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

2014 CAT 730 Truck, 9400 hours, 6x6, Tires 65% or Better, Rear Tailgate, Work Ready............ ..............................................................$179,000

2018 Deere 410L, 2600 Hrs, Ride Control, Backhoe Pilot Controls, Powershift Trans., 2017 US EPA Label, QC, Diesel Exhaust Fluid Req., Hyd. Cplr, 93" Loader Bkt, 24" Backhoe Digging Bkt, Rear Aux. Hyd REDUCED $99,000 $89,000

2018 CAT 336FL, 2300 hours, Heat/AC/Rear Camera, Aux. Hydraulics, QC, 48" Bucket, 28" SG Pads, Work Ready! Comes w/ Ramfos TF40 10K hammer ................................$264,000

2020 Hitachi ZX210 LC-6, 2400 hours, Aux. Hydraulics, QC, 36" Digging Bucket, Rear & Side Cameras, Ready to Work ............$129,000

2018 Bell B30E, 5200 hours, 6x6, AC/Heat, Diesel Engine, 30T Lift Capacity, Tailgate, Two Available ................................................$199,000

2018 CAT 320FL, 4000 hours, 50" Stickland bucket, QC, Aux. Hydraulics, Front and Side Cameras, Work Ready. Comes w/ 5Klb. Atlas Copco EC140 hammer ........................$154,000

2013 Deere 470G LC, 3800 hours, 12'7" Stick, Newly Rebuilt Bucket, AC, Counterweight Removal System, Rady to Work! ........$159,000

2017 Doosan DX235 LCR-5, 2500 hours, Reduced tail swing, 36” bucket, Hydraulic thumb, Aux. hydraulics, Heat/AC, Work ready $114,500

CALL US S TODAY TO

RESERVE S YOUR WIN NTER RENT NTA ALS!


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 11


Page 12 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Maverick Construction Management MassDOT Plans to Services Finds Tech Partner in Milton CAT Replace Aging Span in Northhampton MASS from page 4

will undergo base renovations to bring the building up to code. A new roof and building envelope, as well as an additional fire suppression system and other upgrades, will cost the town an estimated $87 million to $89 million. The base renovations are not eligible for the MSBA grant, according to the Hampshire Daily Gazette.

The Everett Wetlands project entails a stormwater restoration of a highly contaminated mixed waste site, which included low, radioactive wastes and some compound waste, such as gasoline, as well as metals like lead, arsenic and chromium. MAVERICK from page 1

company — just 20 people — Fiore and his team perform in excess of $10 million of work a year, with a customer list that includes names like Monsanto, DuPont, Aquafina and multiple Departments of Defense (DoD), state and local agencies. Fiore believes it’s his firm’s unique combination of tenacity, skills and technology, along with a focused emphasis on partnerships, that turns his small firm into an industry problem solver. GNSS Legacy Maverick’s heavy civil and environmental focus naturally makes equipment central to the company’s operations. The company started with about a dozen machines, primarily dozers and excavators, and is now up to 29. To maintain these machines, the firm has an especially close relationship with Milton CAT, a Cat dealer servicing the Northeastern United States and upstate

New York. For Fiore, adding technology to the equipment, namely GNSS, was an obvious step. “Pretty much as soon as we started buying equipment, we looked to GNSS,” he said, “and that was over 18 years ago.” However, as technology needs continued to grow and projects have become more complex in both scope and scale, Fiore realized he needed a technology partner — not just a technology provider. “Technology today is amazing and we’re all in,” Fiore said. “But we also recognize that it’s not something that we can just plug and play. Support is essential. We wanted and needed the same relationship we had with Milton CAT with our technology provider.” About 18 months ago, Maverick partnered with Trimble and SITECH Northeast to better shape those connections. Today, all dozers and 80 percent of the company’s excavators are

equipped with Trimble Earthworks. Field crews also rely on a Trimble SPS986 GNSS Smart Antenna, and a Trimble R750 Modular GNSS Receiver. Fiore said, “Besides the tight Cat/Trimble relationship, there is a reliability aspect to the Trimble solutions. We haven’t had a single problem — even on projects that pose some out of the ordinary requirements.” Anchor rods beneath a dual drawbridge spotlighted the importance of that relationship. Shear Precision As part of its construction of a drawbridge in North Hero, Vt., Maverick installed a steel cofferdam that was tied to anchor rods at the bottom of Lake Champlain. The rods are located some 15 ft. or more below the surface. During final inspections, the client called Maverick to help resolve a discrepancy between the state of Vermont see MAVERICK page 16

MassDOT to Replace Aging Bridge in Northampton Citing safety concerns, Massachusetts Department of Transportation (MassDOT) officials are advancing plans to replace an aging 84-year-old bridge on Old Springfield Road in Northampton, the Hampshire Daily Gazette reported Oct. 25. Located near the town’s border with Easthampton where Hulberts Pond meets the Oxbow of the Connecticut River, the bridge was initially constructed in 1939 by the U.S. Army Corps of Engineers. By 1991, temporary steel needed to be placed over the existing bridge due to its poor condition. Seventeen years later, MassDOT’s initial plans for a replacement structure ultimately fell through due to permitting issues, with the current project plan initiated in 2018. At a recent public hearing, transportation agency officials said the $4.6 million project is now expected to begin in 2025. Once construction starts, the bridge will be closed to vehicle, pedestrian and bicycle traffic. Shuttering the bridge makes sense in that it normally sees very little traffic, said Doug Peterson, vice president of Michael Baker International, the Pittsburgh-based design consulting firm for the project. “The second reason is this area floods a lot so it’s frequently closed, and the logistics of putting a temporary pedestrian/bike lane [in an area] with flooding concerns would be very challenging,” he explained. Peterson also acknowledged that the nearby area is used for recreational purposes, such as fishing, and the project may disrupt some of that outdoor activity. “It won’t necessarily be the same as it was before,” he told the Northampton newspaper. “On one side of the bridge, that area has been kind of destroyed almost by some of the cars parking there, and that wasn’t the original intent.” According to MassDOT, the finished bridge will consist of one 12-ft. travel lane with 2-ft. shoulders for a total roadway width of 16 ft. There will be no sidewalks on the bridge or approaches, in keeping with the rest of the road. During the bridge’s construction, a detour will be set up along Clapp Street and Easthampton Road. In 2022, the bridge replacement project received $3.13 million in funding from the administration of former Gov. Charlie Baker, part of a $1.74 billion investment of federal funds in 146 projects across the commonwealth. MassDOT is expected to submit the structure’s final design by January 2025, with bids being advertised the following month. Property owners who may be affected by the construction will be contacted by city officials regarding further project details, according to the state agency. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 13

800-Go-2-ALT 2 TA ( 8 0 0 - 4 6 2 -2 5 8 2 ) AltaEquipNE.com Lease the la atest and greates st JCB equipmentt to turn WHITE into i GREEN all winter w long. When the snow melts, keep the machin ne for a lower, affordable e payment for year-roun nd productivity. No need d to search for a rental every ye ear; lock in the low rates s now for a machine tha at works as hard as you do! JCB 270 skid steer (wheeled): $19 99 a month for six mon nths a year / $1,731 a month m for six months a year.* y JCB 215T skid d steer (tracked): $199 a month for six mon nths a year / $2,133 a m month for six months a year.* y JCB 270T skid d steer (tracked): $199 a month for six mon nths a year / $2,139 a m month for six months a year.* y JCB Te Teleskid 3TS-8W 3 (wheeled): $199 $ a month for six m months a year / $2,159 a month for six months a year.* 199 a month for six months a year / $2,729 a m month for six months a year.* JCB Te Teleskid 3TS-8T 3 (tracked): $1 JCB 407 comp pact wheel loader: $299 $ a month for six months a year / $2,109 a month for six months a year.* JCB 409 comp pact wheel loader: $299 $ a month for six months a year / $2,797 a month for six months a year.* *For qualified lessees.. Lease terms and conditions appply. Six year lease/500 hours per p year. Contact an Alta Equipm ment Company representative for f complete details.


Page 14 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

New Ticonic Bridge to Introduce Streetscape Features TICONIC from page 1

Other sections of the 113year-old bridge were replaced in 1936 after a flood washed away the original steel truss. The bridge was further widened in 1970. The current bridge has deteriorated to the point that the end of its useful life is near. Further attempts to Cianbro of Pittsfield, repair or rehabilitate it will Maine, is the lead connot restore the full integrity tractor on the project, of the bridge to meet modern which has a budget of $52.8 million with $25 milsafety standards, Maine lion coming from a DOT reported. Federal Highway The new bridge will be Administration grant. made of steel girders with a concrete bridge deck. Like the existing bridge, the new bridge will carry five lanes of traffic. So far, Cianbro has removed the bridge beams and completed demolition of the south abutment and piers. Cianbro is currently working on demolishing the northern abutment while also reconstructing the south abutment and piers, according to Maine DOT. In a month-by-month review of the construction work being done, Maine DOT wrote that in April, “The contractor installed construction signs and performed the general project survey layout. Jersey barriers began to be delivered to the project.” In May, “Bridge curbs in the median continued being removed with a mini hoe-ram and concrete demo began being removed. Utility test pits were dug to determine the exact location and condition of existing utilities. Bridge deck began being saw cut for 3-ft.-6-in. wide utility access with concrete slabs attempting to be removed. CCI Waterville concrete vault was excavated on the south side for installation of new duct bank.” Beyond the traditional demands of a multi-million-dollar endeavor of this kind, additional factors are inherent in this project making it particularly challenging and difficult, Maine DOT said. The design and construction must be

In June, bridge deck demolition continued with 3-ft.-6in. wide utility section removal with APE mounted hoe-ram and demolition platform to catch debris.

The new structure will be a two-span bridge with a single concrete pier in the river.

undertaken in ways that are responsive to these challenges while continuing to minimize project impacts. For instance, the riverbanks are steep and water levels vary widely throughout the year creating a complex set of factors to be dealt with during construction. Although the Kennebec River is not a commercial waterway, it is a critical habitat for Atlantic salmon and Shortnose sturgeon populations during spawning season, therefore contractor work will be restricted so that no work will be done in the waterway during the late spring and summer months. Finally, because there are numerous electricity, cable, telephone and water utilities located along the bridge, special measures will be taken to relocate these facilities in a manner that maintains operability at all times during construction.

Maine DOT noted that when completed, the new bridge will introduce streetscape features to promote walking and bicycling and improve the quality of life downtown. The new bridge will feature 5-ft. shoulders to accommodate bicycles, as well as 6-ft. sidewalks for pedestrians. It will have safe modern bridge rails that meet crashworthy standards, will include architectural lighting and feature corrosion resistant construction materials that will stand the test of time. The new Ticonic Bridge represents a move forward for the continued vitality of Waterville and Winslow, and the surrounding communities. Construction began in April 2023 and is scheduled for completion in May 2027.  CEG (All photos courtesy of MaineDOT.)

In July, Carter Memorial Drive/Augusta Road intersection fine grade was completed, base pavement installed and catch basin covers installed.

In August, the contractor continued work on the gantry system foundations at both abutments and began work at the existing piers.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 15

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS

140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307 LARGEST DEALER IN NEW ENGLAND

THE MOST MATERIAL HANDLING MACHINES IN NEW ENGLAND SCREENING CRUSHING CONES IMPACTORS CONVEYORS TROMMELS WASHING RECYCLING

SCREENING

I M PAC T O R S

TROMMELS

USED AND NEW MACHINERY RENTALS AND FINANCING AVAILABLE

CONVEYORS

CRUSHING

1-800-53 CRUSH

Over 100 Machines in Stock

CALL TODAY! 1-800-53-CRUSH

W W W. P O W E R S C R E E N - N E . C O M Family Owned and

Operated for over 20 years

Call for Parts Today

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS


Page 16 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Wetland Project Presents Opportunity to Show GNSS Benefits MAVERICK from page 12

and the U.S. Coast Guard specifications, which was holding up the bridge permit. The U.S. Coast Guard required that the eight anchor rods be cut 12 ft. below the mud line or the bottom of the lake. The conventional method would have been to tie string lines to the rods, but at that depth, accuracy was limited. “We could be off by multiple feet, which would limit our efficiency,” Fiore said. “I told the owner we could build a model and get this done with precision. He was skeptical.” Fiore called his Milton CAT and SITECH Northeast experts. Together, they used GPS to first topo the underwater rods that needed to be cut using the Trimble T7 data collector. Then, the SITECH Northeast team created a model of the anchor rod positions and the tip of the shear. Fiore installed a steel sheer (essentially a big pair of scissors) on his 60ft.-long stick excavator equipped with Trimble Earthworks. With the 3D model in the Trimble Earthworks system, the operator knew exactly where the tip of the shear was on his screen. He moved it to the rod locations and set the shears and snips. “The customer thought it would take two weeks to cut these rods. We did it in two days,” Fiore said. “That success is entirely enabled by our close working relationship with the team at Trimble, SITECH Northeast and Milton CAT.” A sensitive dry dock construction project would create another opportunity for creativity, innovation and teamwork.

Maverick also serves as an onsite problem solver. For instance, during a sonar check of the marina, the JV contractor found a 16-in. diameter pier sticking up 3 ft. from the bottom of the marina that could potentially hit the bottom of a barge. They called in Maverick to remove it, thinking it would take several days to locate and remove the pier. Fiore took the sonar coordinate data from the surveyor and loaded it into the Trimble Earthworks software on the Cat 340 longstick equipped with a hydraulic thumb.

while we were there. Every day, we would compare our contours to theirs. It was unbelievable how well they lined up. And we had no shoals [piles of material]. The customer was blown away by the accuracy and efficiency of our work.”

Environmental Expertise The Everett Wetlands in Boston presented Fiore and his team with an entirely different challenge — and another great opportunity to demonstrate the ROI of GNSS. The project entails a stormwater restoration of a highly contaminated mixed waste site, which included low, radioactive wastes and some compound waste, such as gasoline, as well as metals like lead, arsenic and chromium. Per EPA specifications, all of this waste must be shipped off site for disposal. The cost for disposing of the soil ranges from $40 a ton to $3,500 a ton depending on the level of contamination. Maverick petitioned the EPA to set grids to better manage contamination types. “To give them assurance about the John Fiore process, we did a pilot test using the Maverick Construction Management Services GNSS to demonstrate horizontal and vertical accuracy,” Fiore said. “We used the client’s 3D model to develop a sampling plan and to generate grids. Then, they put that model right “We got as close as possible to the area, into our Trimble Earthworks on the turned on the machine control system, low- machine.” In this case, sampling is based on a tonered the boom and picked up the pier — all nage or yardage. Every 500 cubic yards, for in the first try,” Fiore said. In another case, some underwater con- instance, has to be sampled. To accelerate crete needed to be removed near a dry dock. the project while carefully controlling soil “We needed to prove to him that we can management, Maverick used its 3D cut and put a cutting wheel or grinding wheel on the fill model to develop a site sampling grid of end of an excavator long stick and use the the site. For waste removal, the team used the GNSS to guarantee our position to ensure we’re nowhere near the dry dock door,” said same grid plan to mark distribution locations Fiore. “Building our models requires a little for waste materials. For instance, Sub Area more upfront data collection, but we use the X is designated for a local landfill while Sub avoidance capabilities built into the machine Area Y might be a state landfill. “Once again, we had the data to show our control system to set boundaries. The Navy approved the process, and we were able to clients that contaminated waste was removed and sent to specified disposal locacut six months off our client’s schedule.” As part of the same drydock project, one tions. On the ground, those same grid plans of the JV contractors is casting precast mod- allowed us to take that soil directly to trucks ules at its yard in Brewer, Maine, which is for removal. No double handling and no about three hours from the Navy yard. The piles,” Fiore said. The same 3D site maps helped the modules will be lowered into the water to Maverick team support landscaping of the form a precast barrier. “These modules are so large and heavy site, which called for 150 new trees. that we had to dredge the dock area to ensure Maverick used the landscaper’s CAD file to sufficient clearance in the Penobscot River,” create a work order documenting every tree’s proposed location and uploaded to the Fiore said. “We again worked with Milton CAT and machine control system. While working the the SITECH Northeast team to develop a site, the operators could see where to cut out beautiful system that mapped the area in real deeper holes for the trees and then add qualtime,” he continued. “The customer had a ity topsoil. “Even though this is not the most company do a sonar survey once a week

“The customer thought it would take two weeks to cut these rods. We did it in two days.”

Docks, Rocks, Underwater Dilemmas As part of its Shipyard Infrastructure Optimization Program to revitalize the nation’s four public shipyards, the U.S. Navy is constructing a multi-mission dry dock. The project includes an addition to the shipyard’s Dry Dock #1, which will consist of two bays. The construction includes pumps, caissons, crane rails and utility access. Maverick is handling the dredging and specialty work. One of its first tasks was to remove 17,000 cu. ft. of rock. Using the surveyor control points, plus a few more points and contours gathered with the Trimble SPS986 rover, Fiore had his third-party modeling partner develop a 3D plan. That model was sent to the Cat 349 hydraulic excavator equipped with a 15k hammer. “We beat the schedule by weeks,” Fiore said. “It was unbelievable how well our digital map lined up with reality.”

advanced project, between the sampling, the soil characterization, disposal, general excavation and landscaping — all to a specified horizontal and vertical accuracy — it’s a project with a lot of pieces. Our technology enabled systems added a great deal to the project in terms of organization.” Also, the GNSS-enabled workflows saved Maverick time and money in potential rework. “We can show them the models and the tolerances that we’re working to, but they’re still going to check the final as built with a licensed surveyor. We had to prove to them what was being done and achieve the grades — and we did on the first try. I estimate we saved the client $15 million on this project, Fiore said. Continuous Improvement The success that Maverick has realized from its full adoption of GNSS and grade control solutions from Trimble is impressive — and they’re not done. Fiore believes it’s important that he stays on the leading edge of technology advancements and trusts his industry partners to inform and guide him. For instance, one area that he is working to improve in his current workflow is takeoff and modeling, specifically with Trimble Business Center. Fiore explained, “We’re already using it for cut-and-fill reports and generating our estimates, but I think we can do more in the way of managing ongoing projects from within this system. For instance, I would like to know truck counts on jobs and monitor other work on the site. That kind of data will facilitate our continued improvement.” Maverick’s use of technology also is getting noticed from clients and partners. “Interestingly, in many cases, project partners are learning from me. In one case, a very large prime contractor wasn’t using machine control or GNSS technology because they thought it was too costly. Once they saw how fast and efficient I was, they quickly pivoted.” One aspect of Maverick that surprises many is the company’s low overhead, a fact that Fiore believes makes them more agile. “It’s basically me and my operators. We don’t have an engineer and no support staff. We’ve shown that technology can really lift a small company like ours to a different plateau of capabilities,” he said. His advice to others in the industry is clear: “The technology gets a small company to grow into different building projects. Don’t be intimidated by the technology or the cost. Small contractors can take full advantage of GPS. You can reduce overhead, increase productivity, and show your clients a better final product in a shorter amount of time. We do it every day.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 17

THE DOER’S DREAM Loved for the features. Trusted for the performance. Do more without feeling like it in Hyundai’s new HX mini excavator series. • Distinctive, award winning ‘Tiger Eye’ design • Load-sensing hydraulic system (HX40A, HX48A Z) • 5” color LCD monitor • Auto safety lock for unintended operation • Large, quiet, tilting cab delivers excellent service access • Free Hi MATE telematics access for 5 years • Bluetooth radio, now a standard option

See the Hyundai difference yourself at your local dealer or hceamericas.com.

Chappell Tractor

Butler Equipment

Lorusso Heavy Equipment, LLC

Whited Equipment Co.

www.chappelltractor.com

www.butlerequip.com

www.lhequip.com

www.whitedhyundai.com

251 NH-125 Brentwood, NH 03833 603/642-5666

631 New Park Ave West Hartford, CT 06110 860-233-5439

160 Elm Street Walpole, MA 02801 508/660-7600

2160 Hotel Road Auburn, ME 04210 207/346-0279

454 RTE 13 Milford, NH 03055 603/673-2640

Kahn Tractor & Equipment, Inc. www.kahntractor.com

17 Houlton Road Presque Isle, ME 04769 207/346-0279

391 Loudon Rd. Concord, NH 03301 603/225-3361

520 Pond Road North Franklin, CT 06254 860/642-7596

837 Portland Road Saco, ME 04072 844/430-6810


Page 18 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ABLE TOOL & EQUIPMENT ............................................6 ALTA EQUIPMENT COMPANY/NITCO LLC ..............1,13 BARRY EQUIPMENT CO. INC.......................................20 CHAPPELL TRACTOR ....................................................9 EQUIPMENT EAST........................................................1,5 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT ..................................................................18 NEW ENGLAND ROAD EQUIPMENT............................11 POWERSCREEN NEW ENGLAND................................15 ROGERS BROTHERS CORPORATION........................19 SHAWMUT EQUIPMENT CO INC....................................6 T-QUIP SALES & RENTAL INC......................................10 THE N.I.C.E. COMPANY ................................................10 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC............................1 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP........................................................7 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 22, 2023 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

ROGERS BROTHERS CORPORATION ALBION, PA

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

3 Rocky Hill Road Smithfield, RI 02917 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

Over a CENTURY of building the very best heavy-duty trailers for your hauling needs! Contact your local dealer for a quote today.


Page 20 • November 22, 2023 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook