State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
September 29 2021 Vol. LIX • No. 20
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Through Economic Highs, Lows, Crestview Adapts, Continues to Grow
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2021 EZ-Screen 1200XLS
*Limited time offer. Some restrictions apply. See dealer for details.
LEASE THE EQUIPMENT. OWN THE JOB. 3 MONTH LEASE 36 AS LOW AS
$1,500*/MONTH Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $49,900 plus freight. Other Screeners Available
508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Tibbits Equipment Services, Inc. www.tibbitseq.com
802-479-9696 ®
KWIK KLEET ts Traction Clea
EZ-SCREEN
www.ez-screen.com
248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com 84” Dynapac Roller, 3447 Hrs.....$36,500
• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business
w Phil (413) 427-7171
Crestview has purchased an assortment of John Deere equipment from Schmidt Equipment, which is now called United Construction & Forestry LLC.
CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
CALL 888-81-GORILLA(46745)
In 1983, neighbors John Dziengelewski, a dairy farmer with a gravel bank on the farm, and Bernie DeLuc, a union truck driver, got together and started a business selling and hauling gravel. The two combined their resources, procured a loan for a dump truck and a loader, and started what would eventually develop into Crestview Inc. Today, Crestview has three principals, Bernie DeLuc’s son, Brian; John Dziengelewski; and Dziengelewski’s son, Aaron. The company is known as an excavating contractor that does residential and commercial work, sells sand, gravel and loam, does site development, drainage, utility work, snow removal and about any other job that makes sense for them to tackle. see CRESTVIEW page 8
Conn. Tackles Slope Failure Caused By Tropical Storm Ida The Connecticut Department of Transportation (CTDOT) has assumed remediation of the “slope failure” caused by Tropical Storm Ida’s heavy rains near the TPC River Highlands in Cromwell, which left a refined products pipeline exposed and dozens of feet of see IDA page 12
IAFF Local 4662 photo
A massive sinkhole opened up following storm Ida, leaving the railroad tracks in the air near the 13th hole at the TPC at River Highlands in Cromwell.
Page 2 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Call Mark Doty @ 203-823-2316 2014 BOBCAT S770
2005 VOGELE 1110RTB
2019 BOBCAT S740
stk# 26537, c/air, hi flow hyds, pilots, 2 speed, switchable controls ..............................$34,500
Cummins, 10-19’ electric screed, 70% tracks, all wear items 70%, stk# 25947 ..........$15,000
stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500
2013 HAMM HD12VV
1996 KOBELCO SK270LC
2010 WIRTGEN 2100
stk# 26021, single & dual vibratory, PSI water system, recent service to engine, new seat assy, 4104 Hrs ....................................$22,500
9306 hrs, c/heat, pin on 42” bucket, stk# 26039 ..........................................$35,000
Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000
2018 TAKEUCHI TL6R
2005 WIRTGEN W2000
2008 HAMM HDO120V
stk# 26849, C/air, 2 speed, hyd coupler, 4-1 bucket, 80% tracks, pilots. overall a nice one!, 734 Hrs ................................................$46,500
stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work....................................................$115,000
3110 hrs, stk# 22866, 78” drums, oscillation dealer maintained ................................$25,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 3
New 738 8M purpose p p e-built t h tree han ndler is BIG new ws for tree care speecialists SENNEBOGEN’s “game-changing” tree care handlerrs have raised the bar even higher! Thee new 738 M weighs in at twice the size of 718 M and R-HD models with mo models, ore power and more reach to take on bigger jobs! The 738 M, fitted d with a power grapple saw, is attached to a 75 ft. telescoping boom and stick to t quickly fell or prune trees as high as 125 1 ft. to 150 ft. tall. Then it easily cutts, swings and stacks the wood with a single operator to complete the wh hole job.
CUSTOM MENGINE EERED TREE CARE HANDLLERS
PU URPOSE-BUILT
FR ROM THE GR ROUND UP
• Ideal for all tree ser ervice operators • Used for woodlot thinning, harvesting wood fuel to clearing storm debris up to o 48" and up to 125' high • All wheel drive or tracked models • Jobsite safety increased reased with trimming, cutting, g, loading and stacking operation ns as all are done from the con nfines of the SENNEBOGEN elev evating and tilting Maxcab
As big and poweerful as it is, the 738 keeps pace with w the 718 M and 718 R-HD machines with precise handling and fasst cycle times to process up to 150 trees per day. From the roadsid de, on embankments or in heavy wood ds, the 738 M is the new game-changger for all land clearing, right-of-way right of way maintenance and heavy tree care operations.
Get th he details on the high efficienc fficiency solutio l ion for custom tree remo movall
The New 738 M
www.sennebogen ennebogen-na.com | +1-7040 347-4910
251 Shakker Road East Longmeadow, MA 01028 (800) 292-63 6351
1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473
www.tylerequipment.c t.com
Page 4 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Major $28M Road Improvement Project First Dedicated Road Begins On Nearly 12.5 Mi. of VT Route 9 Choice Parts Retail Store Opens in Mass. The 46.96 mi. of Vermont Route 9 from the Chesterfield, N.H., bridge west to the New York State border has been around in one form or another since the 1760s. VT 9 — officially the Molly Stark Trail through the entirety of its length in southern Vermont — is part of a key eastwest route between Portland, Maine, and Albany, N.Y. While the traffic on VT 9, designated a National Scenic Byway in 1995, has evolved over the centuries from slowmoving horse-drawn freight wagons to speeding trailer trucks, the route of this highway has improved little over the years — and it has been a constant source of aggravation for people who use it and the people who live along it. The Commons, a Windham County, Vt., news source, reported that is the context behind the current $28 million improvement project on approximately 12.5 mi. of VT 9 from Edward Heights in West Brattleboro to Sun and Ski Road in Wilmington.
Fixing 10-Year-Old Flood Damage Work on the VT 9 improvement project began the second week of September by the primary contractor, Pike Industries Inc., of Belmont, N.H., according to Vermont Agency of Transportation (VTrans) Project Manager Matthew Bogaczyk. A fact sheet from VTrans noted that the two-year building effort will reduce damage from potential floods at five specific locations along VT 9 beginning near Mile Marker 8 in Marlboro to Mile Marker 3.5 in Brattleboro. Among the improvements scheduled for this section of the roadway, according to VTrans, are “armoring and constructing flood shelves along the road bank, creating access to a floodplain to reduce stream power and realigning the river channel to improve flow through an existing bridge.” The work will create permanent fixes for the sections of the highway that were destroyed by flash flooding during Tropical Storm Irene in 2011. Considerable damage was caused along VT 9, where the storm washed away several roadway segments between Marlboro and West Brattleboro. Destruction of the highway also occurred through the heart of Wilmington. The result was that the entire 35-mi. stretch of roadway between Woodford and West Brattleboro was closed for nearly three weeks due to Irene. In all, VT 9 was among 450 mi. of state highways that were damaged by the storm. It took a combination of VTrans crews, private contractors, and the Vermont National Guard to reopen the highway and other key east-west roads in southern Vermont, including VT 103, VT 11 and U.S. Highway 4. “New gravel will be placed in some areas along the corridor to improve banking” during the repaving, according to information VTrans shared on the Marlboro community Facebook group. “Additional work will include the replacement and maintenance of existing guardrail runs, some culvert replacements, [and] ditching and center line rumble strip [CLRS] installations where criteria have been met,” noted the VTrans post. The transportation department added that, when completed, VT 9 will be as “smooth as glass.”
Much Work Ahead “The contract was structured such that [Pike Industries] could only perform some of the drainage and prep work for the [pavement] reclamation taking place next year,” VTrans’ Bogaczyk wrote in an email to The Commons. “As such, I am only expecting to see some ditching, shoulder restoration, underdrain installation and culvert replacements this year.” Next spring, VTrans and the contractor will start work on the roadway by giving it the first new paving job on that section of VT 9 in about 20 years. The focus will be on rebuilding the road surface before applying a fresh coat of asphalt. Bogaczyk noted that the contractor also will install a new left-turn lane near Marlboro Elementary School for westbound vehicles to safely turn onto South Road in Marlboro. The Commons reported that as recently as Sept. 2, though, VTrans produced a presentation about the project as part of the VT 9 Corridor Management Plan, noting that rights-ofway issues for property not already covered by such agreements could thwart plans for such a turn lane. The department’s presentation also listed work that will include: • Assessment of the truck climbing lane just before the Marlboro School, and removing sight impediments there, “mainly trees,” in the current state right of way. • Center line rumble strips near Hamilton Road, as well as a potential redesign to improve visibility. • Road slant (banking) issues along most of the paving project. • Shoulders, where possible, which will be widened to at least 4-ft. “except for one small area.” Most will be 5-ft. or wider. “I have heard that the contractor is planning to work on some of the widening needed for this installation in the [current] construction season,” he wrote.
A Complex Road Project In a public hearing in 2019, the VT 9 project was described as “one of the most complex projects” that VTrans has undertaken in recent years. Part of that is due to the path of the highway, The Commons reported in a recent article. Ideally, VTrans likes to create roadways with 11-ft.-wide travel lanes and 4-ft.wide shoulders, the news source noted. Where it was possible, VTrans did exactly that on sections of VT 9 in the 1990s to eliminate dangerous curves and narrow lanes of travel. But it is impossible to build a roadway that wide on many stretches of VT 9, VTrans noted, because the road travels close to unmovable landforms, such as ledges; and to waterways, such as the Deerfield River and Whetstone Brook. Those complexities effectively doubled the cost of the project, which VTrans first estimated at $14 million in 2018. The federal government will pick up 86 percent of the tab, with state bonding covering the rest. Drivers on VT 9 can expect construction delays when the major construction work begins next spring. VTrans hopes to have everything wrapped up by the end of summer 2023.
Road Choice, a private-label, all-makes aftermarket parts brand, announced that its first dedicated retail store is now open at Ballard Truck Center in Tewksbury, Mass., serving the greater Boston area. The 1,120 sq.-ft. retail store features the product lines in highest demand from transport customers for medium- and heavy-duty trucks, trailers and buses. It also will allow customers to access the complete Road Choice portfolio of more than 50 product categories. “Ballard is committed to servicing our customers to the best of our ability, and our goal is to have a readily available inventory of parts at a competitive price for all of our customers’ needs. This is where Road Choice fits in,” said Steve Grahn, president and owner of Ballard Truck Center. “Road Choice’s product line is compatible with many makes and models of trucks, trailers and buses, allowing Ballard to offer a quality product at a fair price.” With six facilities in Massachusetts and Rhode Island, Ballard Truck Center’s Tewksbury site was chosen for the Road Choice store due to its central location, making it ideal to service a diverse customer base. The Road Choice parts portfolio complements Ballard’s service offerings to include many makes and models for Class 5-8 trucks, trailers and buses. The Road Choice product pricing structure also positions Ballard competitively, opening up new sales opportunities in the area, the company said. “Our goal at Road Choice is to offer trucking and bus customers a one-stop shop for aftermarket parts that they can rely on to keep their vehicles moving on the road. The introduction of our first dedicated retail store at Ballard Truck Center is an extension of achieving that goal,” said Jessica Kopp, marketing manager of Road Choice. “We’re proud to partner with Ballard Truck Center on their investment in the Road Choice brand. It is a strong reflection on Road Choice’s aftermarket solutions that maximize vehicle uptime and budget. We look forward to working with other dealers interested in expanding the Road Choice presence at their locations.” Ballard’s Road Choice retail store is staffed with dedicated personnel trained specifically to sell the Road Choice product line. This ensures both truck and bus customers are provided the guidance and expertise needed to purchase the aftermarket parts they seek. Road Choice’s wide array of parts portfolio ranges from drivetrain, engine cooling and HVAC parts to brakes, steering, suspension, among many others. Each Road Choice part comes with a minimum of a oneyear warranty. In some cases, the warranty is longer and may include extended labor coverage. In addition to the warranty, customers are covered by the support of more than 600 retailers throughout the United States and Canada, ensuring parts and services availability. Road Choice truck parts also are sold exclusively online through the Road Choice dealer network via PartsASIST, 24 hours a day, 365 days a year, and shipped to your doorstep by local Road Choice dealer or at will-call parts pickup. For more information, visit www.roadchoice.com.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 5
PAYMENTS S AS LOW AS $9 99 A MONTH* THE SNOW LEASE IS BACK. Ma ake higher lease payments in the winter while you’re y turning cold wet snow into cold hard cash. Keep your machine working g year round with lowered payments the other 7 months of the year as low as $99 a month. *All applications are subject to credit review and approval. Security deposit may be requuired based on applicant’s credit. Five (5) “ON-SEASON” (November - March) increased payments and seven (7) “OFF-SEASON” F-SEASON” (April - October) reduced payments per year based on 5-year/5,000 hour lease terms. First payment d in due i advance d andd mustt be b an “ON-SEASON” “ON SEASON” payment.t Minimum Mi i “OFF SEASON” payment is $99 + applicable taxes. Offer valid only on specific models. Offer may change without prior notice, and additional “OFF-SEASON” ti l terms t andd conditions ditions may ma apply. l Call for f complete l t details.
800-Go2-ALT TA A | AltaEquipNE.com
Page 6 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
2021 MCCLOSKEY SDX130: Hours: Serial Number: 90666, New Telescoping Stacker 36"x130' Electric Hydraulic Power WEG 20HP. Standard Hopper, Pivot Point, Hydraulic Landing Gear, Hydraulic Wheel Drive, Remote Greaselines, Walking Beam w/Lift Axle >>>Call
2021 MCCLOSKEY 512R-T: Serial Number: 91834, Hydraulic Tipping Grid, Safety Beacons, Remote Start/Stop Feeder, CAT 3.4L Tier 4Final 74HP >>>>>Call
2021 MCCLOSKEY ST80T: Hours: 66, Serial Number: 91768, Hopper Wear Plates, Impact Idlers under Hopper, Upgraded Belt Cleaner/Scraper. CAT 3.4L Tier 4 Final 74HP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2020 MCCLOSKEY C3: Hours: 1101, Horsepower: 510 hp, Serial Number: 91189, METSO designed cone, 300 HP Class. Volvo D13 Medium Cone Liner currently installed.>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY R155: Hours: 224, Serial Number: 91711, Extended Tail Conveyor, Twin Drive on Tail, Remote Variable Speed Feeder. CAT Tier 4F 130HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2020 MCCLOSKEY R155: Hours: 342, Serial Number: 91421, Long hopper feeder. Remote stop/start feeder. CAT Tier 4F 130HP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2020 MCCLOSKEY S190 3D: Hours: 276, Horsepower: 130 hp, Serial Number: 91405, Tracked Triple Deck Heavy Duty Screener. CAT Tier 4F Engine. 15ft Feeding Hopper. Chevron Belt on Main Conveyor. Remote Machine Shut Off >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY J45: Hours: 456, Serial Number: 91695, Crusher with pre-screen. Volvo D11 Tier 4F 360HP Engine>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY 516R-T: Hours: 116, Serial Number: 91830, Radial Conveyor. Hydraulic Tipping Grid over Hopper. Remote Stop/Start Feeder. Fitted Safety Beacons. CAT 3.4L Tier 4 Final 74HP >>>>>>>>>>>>>>>Call
2021 MCCLOSKEY ST80TLA: Hours: 8, Serial Number: 91780, 36" x 80' Tracked Stacker with Radial Lift Axles. Wireless Remote. Hopper Wear Plates, Impact Idlers under Hopper, Belt Cleaner/Scraper. Custom Paint - Black>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2018 MCCLOSKEY C44: Hours: 1144, Serial Number: 89103, Metal detector on feeder, twin oil coolers, wired/wireless track remote. Powered by a Tier 4 Volvo D13 Engine. Ready to Run >>>>>>>>>>>>>>$579,500
2021 MCCLOSKEY 621RE: Hours: 154, Serial Number: 91827, Trommel with Aux Drive Circuit. 8' Extended Overs >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MWS 3625T: Serial Number: 20350, Washing NEW MWS CSP200 COMPACT SAND PLANT, Serial Screw Twin 36" Spiral Shaft. Control Panel for Screw Number: 20349, cost and energy efficient, exceptional and Stacker >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call performance, 14 x 6 dewatering screen, can produce 1 grade of sand, self regulating sump tank>>>>>>>>>Call
2021 MCCLOSKEY ST100T-LA TRACKED STACKER: Hours: 607, Serial Number: 91551 Cat 3.4B T4F 74HP. Hopper Wear Plate, Impact Idlers Under Hopper, Upgraded Belt Cleaner/Scraper, Radial Lift Axle with Wireless Remote >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY ST80TLA: Hours: 35, Serial Number: 91715, Stacker with Hopper Wear Plates, Impact Idlers under Hopper, Radial Lift Axle with wireless remote, Upgraded Belt Cleaner/Scraper. CAT 3.4L Tier4 Final 74 HP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
NEW ENGLAND’S EXCLUSIVE MCCLOSKY DEALER!!!
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 7
ROCK SOLID SERVICEžWE CRUSH YOUR ROCKS
140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307 LARGEST DEALER IN NEW ENGLAND
THE MOST MATERIAL HANDLING MACHINES IN NEW ENGLAND SCREENING CRUSHING CONES IMPACTORS CONVEYORS TROMMELS WASHING RECYCLING
SCREENING
I M PAC T O R S
TROMMELS
USED AND NEW MACHINERY RENTALS AND FINANCING AVAILABLE
CONVEYORS
CRUSHING
1-800-53 CRUSH
Over 100 Machines in Stock
CALL TODAY! 1-800-53-CRUSH
W W W. P O W E R S C R E E N - N E . C O M Family Owned and
Operated for over 20 years
Call for Parts Today
ROCK SOLID SERVICEžWE CRUSH YOUR ROCKS
Page 8 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Deeres Dominate Mass.’s Crestview’s Equipment Fleet
Particularly helpful to new operators, Auto SmartGrade automatically lifts the blade over heavy loads before track slippage occurs, then returns the blade to grade. SmartGrade also limits the number of passes required, reducing the pace of wear on the undercarriage.
(L-R): Aaron Dziengelewski, Brian DeLuc and John Dziengelewski, all with Crestview Inc.
CRESTVIEW from page 1
that has continued on with Schmidt Equipment to this day. the company changed direction and went after the commerThe first expansion/diversification of the company Even to the point that when the 2008-2009 economic col- cial market. Today, it does commercial, utility and residential occurred in 1987, when John and Bernie got involved in a lapse occurred, the same Schmidt Equipment management work. Four years ago, Crestview started a new division that in a subdivision project. This project ultimately led to their first was instrumental in helping us manage our assets at a time purchases of earthmoving equipment and the company grew when there was almost no utilization at all, in a manner that sense took the company back to its aggregate roots: it is back into doing larger residential projects, utility work, commer- allowed us to survive the worst recession/near depression we in the aggregate business producing specialized sand for concrete production. cial projects and solar farms. Today, it can handle just about had ever seen.” Through the highs and the lows and the dramatic economOf course, the loaders that feed the aggregate equipment any project that comes its way, according to John ic swings that has defined the New England economy over at those sites are John Deere. Dziengelewski. When asked why over the years they have stayed so loyal Some of the company’s early machines included a John the past few decades, Crestview has found that the ability to Deere 450 dozer and a John Deere 510 tractor loader back- change directions and diversification is the key to survival. to John Deere equipment, John Dziengelewski replied, “It hoe, as well as a tri-axle trailer to haul the John Deere pieces In the 1980s, when the housing market virtually collapsed, started with my background on the farm. We used John Deere agricultural equipment and it had always and other miscellaneous equipment to various been a good experience. The equipment was job sites. A few months later, as their need for reliable and maintained good value so that carequipment grew, they purchased a John Deere ried over when we started buying construction 650G dozer. It wasn’t long before another largequipment. And we like the way Schmidt er dozer was needed, and a John Deere 850 was Equipment treated us.” purchased as well as a John Deere 892 excavaSchmidt Equipment and its five locations, along with nine “Massachusetts is two different worlds: east tor. of I-495 and west of I-495,” Brian DeLuc Nortrax Inc. locations, recently was acquired by a company According to John Dziengelewski, “In the added. 1980s and early 1990s, John Deere still had a called Fernandez Holdings Inc. Schmidt and Nortrax now oper“Schmidt Equipment has always treated us few utility equipment dealerships that only sold ate under the name, United Construction & Forestry LLC. United like we are their most important customer and the smaller end of the construction equipment Construction & Forestry, together with its sister company, United that goes a long way. But it’s not just how they spectrum and we originally started our John Ag & Turf, is dedicated to serving and supporting customers in treat us; the machines are reliable and Deere experience with Lomac Inc., who at that all market segments with the full line of John Deere equipment Schmidt’s parts and service after the sale is time was the local John Deere utility equipand solutions. exemplary.” ment dealership. I believe sometime in the late Fernandez Holdings Inc. owns a diverse portfolio of businessAs Crestview continues to plan for future 1990s Lomac ceased to exist and our equipexpansion, particularly in areas like site develment needs were getting bigger. es, including 57 John Deere Ag and Turf dealerships in the opment and utility work, partnering with a “The John Deere 850 was our first purchase northeast and south central United States. company that is on the cutting edge of technolfrom Schmidt Equipment,” he added (see Eric Driscoll, CEO of United Construction & Forestry and ogy is critical. Schmidt Equipment Becomes United United Ag & Turf NE said, "at United, we believe in maintaining “Not long ago, Brian started pushing hard Construction & Forestry LLC) “It only had a culture of high morale, where hard work and strong performfor GPS technology,” Aaron Dziengelewski a few hundred hours on it. But what really ance are rewarded, and we know that this creates an empowsaid. “We started to realize that even through impressed us was that the manager of Schmidt ered team that is motivated to deliver for our customers. This is the bidding process companies were looking to Equipment, which at that time was considered see that you had that technology and that you a pretty big John Deere dealership, came out to an exciting organization to be a part of, and the acquisition of were going to get passed over if you could not see us in person, and we were still just a small … Schmidt Equipment creates tremendous opportunities for provide it. We further realized that not only upstart construction company. The fact that he everyone in both organizations as well as everyone who will be did we have to catch up with GPS technology, took the time to visit us, pay attention to our joining the team as we continue to grow." but we had to advance with that and all other needs and personally follow up made a lasting For more information, visit www.unitedcf.com. impression on us, and it started a relationship see CRESTVIEW page 14
Schmidt Equipment Becomes United Construction & Forestry LLC
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 9
Commanding power.. Pro oven ve reli e ability. Boost your performance and save time digging, loading trucks and more thanks to the best-in-class hydraulics of Doosan® excavators. You can rely on consistent power deliver y to the arm and bucket to confidently take on tough digging conditions that slow other machines down. And increased swing torque helps you easily swing uphill and backfill fasterr,, with better results. Experience Doosan Strong today y.. Stop in ffo or a demo.
Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 7
Au thor ized Doos an De aler
Equipment East 61 SiManley lva LaneSt. • D•raBrockton, cut, MA 018MA 26 02301 • 508-484-5567 196 978Silva -454-Lane 3320 • w w w.equMA ipm01826 enteas•t.co m 61 Dracut, 978-454-3320 1474 Rte 3A • Bow, NH • 603-410-5540 www.equipmenteast.com
Page 10 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
2002 CAT D8R, New Engine, 80% UC, Recent Equalizer Bar, Work Ready $169,000 Firm
2011 Volvo L350F, 9700 hours, spade nose, Runs Good, Very Clean Machine Reduced to $219,000!
2001 GROVE RT750E, 13,000 hrs, Cummins C8.3-C, 450 lb 3 Sheave Block, 36’ - 110’ Boom, 33’ - 56’ Swing Away Ext Jib, Anti Two-Block, PAT DS350 LMI, Aux Winch, Hyd Outriggers $89,000
2016 Volvo EC350EL, 4500 hours, Aux. Plumbing, 12’ stick, 65” bucket $129,000
New $71.7M Land Port of Entry to Be Built at Border The U.S. General Services Administration (GSA) has officially broken ground on a $71.7 million Land Port of Entry (LPOE) project at the international border crossing between Madawaska, Maine, and Edmundston, New Brunswick in Canada. J&J Contractors Inc., of North Billerica, Mass., had already begun groundwork at the site of the new building where people enter the United States through a U.S. Customs and Border Protection (CPB) checkpoint. An official kickoff for the work, though, was held in the Multi-Purpose Center in Madawaska on Sept. 9 bringing together regional dignitaries from the GSA and CBP, representatives from Maine’s congressional delegation and local officials to hear updates on the project thus far. The LPOE, as well as the nearby $97 million Madawaska/Edmundston International Bridge project across the St. John River, represents not only a massive infrastructure upgrade in the Maine town, but a renewed connection between the community and Edmundston — divided for more than a year by pandemic restrictions on international travel. The bridge work, too, got under way earlier this summer and is being erected by
Reed & Reed Inc., a Woolwich, Maine, specialist in building bridges. “Days like this, when we can bring everyone together again for that mutual benefit [are] really special,” said Executive Assistant Commissioner of CBP’s Office of Field Operations William Ferrara at the groundbreaking. The two projects will be some of the largest construction undertakings in Madawaska in decades, the Valley Times reported. The old international bridge, for example, was built exactly 100 years ago, and has been posted with only a 5-ton weight limit since 2017. It is in dire need of replacement. The port of entry will be significantly expanded from Madawaska’s current facility, Ferrara said, and along with the new building will come technological updates and an expansion of CBP’s security abilities, according to the Valley Times. In addition, the GSA noted in a press release that the LPOE is designed to accommodate non-intrusive inspection equipment. Not only will the larger facility potentially create more CBP jobs, but Madawaska Town Manager Gary Picard told the news-
paper that the upgraded border crossing will likely create more maintenance work too, with “bigger buildings to heat, bigger driveways to plow.” Already, the Madawaska LPOE processes 430,000 southbound privately owned vehicles a year — more than 115 times the total population of the town. But municipal leaders in both Edmundston and Madawaska have pushed for additions to the project to promote even more international travel and flow of commerce between the United States and Canada. Part of that was convincing the Maine Department of Transportation (MaineDOT) to widen the bridge to accommodate a pedestrian and recreational vehicle lane. The entry point, meanwhile, will include a large piece of art, which will be visible from Madawaska’s Main Street, and which Picard hopes will be an attraction for visitors. While the GSA already requires a half-percentage of its project budgets to be spent on art, Picard worked directly with the feds to be sure the port of entry fits within the vision laid out in Madawaska’s decade-long downtown revitalization plan. “It’s hard to put into words the amount of work it’s taken to get to this point,” he said
to Madawaska’s local newspaper. “It’s taken an enormous amount of collaboration.” As of Sept. 10, GSA spokesperson Paul Hugues was unsure what the immediate next step in the LPOE’s construction will be, reported several Maine news outlets, but the federal agency noted on its website that it estimates the two projects to be finished in late 2023. The timeline for the new LPOE’s construction is tied to the MaineDOT and the New Brunswick Department of Transportation and Infrastructure (NBDTI) international bridge project. GSA said it is committed to ensuring that the port of entry is operational when the bridge is completed. The current land port will remain open throughout the construction, according to the GSA website. The federal and state governments, as well as their counterparts in Canada, have been planning upgrades to the bridge and land port since at least 2009, GSA noted. Besides the CBP and GSA, the other U.S. tenant agencies operating at the LPOE will be the Department of Homeland Security (DHS), the Department of Health and Human Services (HHS), and the Food and Drug Administration (FDA).
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 11
Get an “A” with Hyundai Hyundai Construction Equipment is excited to announce the launching of our new A-series machines. Along with a new look, these machines are packed full of standard new features and benefits to get the job done efficiently. • Cummins Performance Series Engines Stage V emissions compliant engines • EPFC (Electric Positive Flow Control) Reduces daily fuel consumption by 8-11% • EPIC (Electric Pump Independent Control) Improved controllability with reduced RPM drop • Serviceability/Safety Enhanced cab visibility Easy access engine panels
More standard features. More value.
www.hceamericas.com To learn more about the what the new Hyundai A-Series machines can offer your business, contact your Hyundai dealer today. Chappell Tractor 251 NH-125 Brentwood, NH 03833 603/642-5666
454 RTE 13 Milford, NH 03055 603/673-2640
www.chappelltractor.com
391 Loudon Rd. Concord, NH 03301 603/225-3361
Kahn Tractor & Equipment, Inc.
Lorusso Heavy Equipment, LLC
Quality Fleet Service, Inc.
520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com
160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com
548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com
Whited Equipment Co. 2160 Hotel Road Auburn, ME 04210 207/346-0279
837 Portland Road Saco, ME 04072 844/430-6810
www.whitedtruck.com
©2020 Hyundai Construction Equipment Americas. All Rights Reserved.
Page 12 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
FEMA May Offer Assistance as Crews Address Slope Failure IDA from page 1
train rails unsupported. The massive sinkhole opened near the PGA golf course’s 13th hole on Sept. 2, where large amounts of earth washed down a steep incline toward the Connecticut River. Left hanging were a railroad line owned by the Providence and Worcester Railroad Co., and a jet fuel line operated by Buckeye Partners, a Texas-based petroleum distributor. Cromwell Fire Chief Jason Balletto told the Middletown Press that the fuel line was not compromised because of the washout, noting that his department responded after a crew member saw a post about it on Facebook. He added that Providence and Worcester Railroad crews also would be working on addressing the problem. In addition, the storm-generated landslide uprooted trees in the area, which contributed to the sinkhole. Part of a golf cart path also tumbled down the hill as a result. Kevin Nursick, a CTDOT spokesperson, said construction is now under way at the site and should be completed soon.
“Work is currently taking place to relocate the pipeline away from the slope failure,” he noted in an agency statement. At the same time, Nursick said, crews have “begun and are performing design activities” to address the slope failure as well as some drainage improvements. Construction will progress in stages and include clearing for an access road. Neighbors said they had concerns about the spot after heavy rains in June washed away some of the rocks and gravel used to support the railroad, adding that one side of the tracks was left suspended. They told CT Insider that railroad crews were dispatched at the time to fill the gaps. Nursick said the state will work to stabilize the slope and prevent future washouts by creating drainage and other preventive measures. It also is possible the Federal Emergency Management Agency (FEMA) could reimburse some the state’s costs. “We do not yet have cost estimates, but FEMA is involved and there may be some federal relief associated with this,” he said.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 13
U UNITE ED
Consttruction & Forestry We chose the name, “United” to o reflect that the new company is about more than o on ne individual. At United Con nstruction & Forestry we believe ellieve that people come first!! We W have a united team am m of employees that are de edicated to serve and suppor uppor pport customers in all market ket segments. We W believe e in being united with our cu ustomers to listen and then en deliver the best solutions We solutions. W are united with John Deer D e to provide the best quality products, partss, and solutions available in the industry. Expect the t same great people at your y service with a united goal go oal of excellence.
UNITED D We are Strong.
MAINE Hermon H lt Houlton Ft. Kent Westbrook
866-416-3764 866-416-3765 6 416 3765 20 07-834-6701 866-416-3763
MASSACH HUSETTS North Oxford d 800-922-8295 Bill i Billerica 800 531 2266 800-531-2266 Plymouth 800-916-0997 6SULQJıHOG 800-734-5594 Swansea 800-456-6885
NEW HAMPSHIRE H Pembro oke 800-852-3338 NEW YO ORK Clifton Park P 800-333-0620 Gouverrneur 315-287-0703
VER RMONT 6SULQJıHOG 800-639-3071 Williston i t 800 422 4955 800-422-4955
Page 14 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT COMPANY/NITCO LL ......................5 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................16 EQUIPMENT EAST ........................................................1,9 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................11 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 POWERSCREEN NEW ENGLAND ..................................7 ROCK & RECYCLING EQUIPMENT LLC ........................6 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ..................................12 T-QUIP SALES & RENTAL INC ......................................12 THE N.I.C.E. COMPANY ................................................10 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 UNITED CONSTRUCTION & FORESTRY ....................13 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Crestview Takes Technological Plunge, Further Expands CRESTVIEW from page 8
technologies or we are going to get left behind. “As jobs continue to get more competitive in pricing, materials and the handling of materials is a huge cost factor. Anytime that you can use GPS technology to home in on those costs it's going to make you more competitive. Furthermore, you’re getting a better finished project through the use of the technology and a happier customer.” When Crestview decided SmartGrade is integrated into the machines, it it was time to invest in a Since removes the need to install blade-mounted sensors and John Deere 850 size dozer, components daily, reducing setup time and allowing its history with Schmidt operators to get to work. Eliminating external cables to Equipment made the dealer the masts reduces breakage, and the removal of the the clear choice. masts from the blade eliminates vulnerability to dam“Our past experience age and theft. with Schmidt Equipment told us that they were willing to grow and sensors and components daily, reducing learn the technology with us,” Brian setup time and allowing operators to get to DeLuc said. “John Deere uses Topcon and work. Eliminating external cables to the we were very comfortable with Topcon’s masts reduces breakage, and the removal of reputation and we know that Schmidt has the masts from the blade eliminates vulneraquality people to support Topcon. We had bility to damage and theft. “A key feature of the integrated machine 38 years with John Deere and Schmidt, which gave us more confidence in their control is Auto SmartGrade. This allows the organization that we would have with any- operator to easily adjust the system when moving the machine from one soil type to one else. “Our sales rep with Schmidt Equipment, another, unlike an after-market system, Chris Kokosa, is a part of the equation. He is which often requires the GPS manager to very hard-working. If he doesn’t have the make a trip to the machine to recalibrate the answers for you, he will research it until system. Particularly helpful to new operayou’re completely satisfied with the answers tors, Auto SmartGrade automatically lifts the and your purchase. He has a background blade over heavy loads before track slippage with a trucking company, so he understands occurs, then returns the blade to grade. the need for being responsive and he’s SmartGrade also limits the number of passes always willing to work off hours and meet required, reducing the pace of wear on the whenever it is convenient for the customer. undercarriage.” And how has Crestview been satisfied He’s been a real standup guy and I think he brings a lot to the table for Schmidt with the John Deere 850L purchase? Brian DeLuc replied, “By far the best asset our Equipment. “I think a lot of salespeople try to sell you company owns for a machine. It’s in the a substitute if they don’t have what you’re highest demand at all times and I think very looking for. Chris went out of his way when soon we will be adding to the SmartGrade we were adamant that the only machine that fleet so that we continue to be competitive was going to meet our needs was going to be and to make sure we are giving our employa John Deere 850L. Chris went to work ees the best possible technology they can through John Deere, and we were fortunate run. This was a big purchase for us and it enough to get them to sell us the machine was a tough decision to make, but it has cerdirectly from John Deere’s Arizona proving tainly paid off faster and more efficiently grounds which we feel speaks volumes to than any other machine purchase we have ever made.” CEG his hard work for his customers. (All photographs in this article are “Why did we want the 850L? Since SmartGrade is integrated into the machines, Copyright 2021 Construction Equipment it removes the need to install blade-mounted Guide. All Rights Reserved.)
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • September 29, 2021 • Page 15
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
60 Shun Pike Johnston, RI 02919 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
Page 16 • September 29, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
SOLD NEAR N YOU.
Your Y our local D Doosan® dealer is you ur source ffor or sales, par a ts and service.
Learn more at doosanequipment.c . om
Doosan® and the Doosan a logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. © 2021 Doosan Infracore North America, LLC. All rights reserved.