Skip to main content

New England 15, July 21, 2021

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

July 21 2021

Vol. LIX • No. 15

95

SAME DAY PARTS AVAILABILITY

95

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Empire Paving Rules Over I-95 Interchange Project in Stratford

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking

The Bridge 7011 (seen here), along with the new southbound I-95 off-ramp over Barnum Avenue Cutoff, utilized a Geosynthetic Reinforced Soil — Integrated Bridge System (GRS-IBS).

Call for Pricing

LEED Accredited in Waste Management

2021 EZ-Screen 1200XLS • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $49,900 plus freight. Other Screeners Available

• Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

CALL 888-81-GORILLA(46745)

*Limited time offer. Some restrictions apply. See dealer for details.

LEASE THE EQUIPMENT. OWN THE JOB. 3 MONTH LEASE 36 AS LOW AS

$1,500*/MONTH Authorized Doosan Dealer

EZ-SCREEN

www.ez-screen.com

248-745-5828

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

Tibbits 508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Equipment Services, Inc. www.tibbitseq.com

802-479-9696

www.foleyengines.com ®

KWIK KLEET ts Traction Clea

2003 Cat 938G Series II, 4190 Hrs, 3.65 CY Bkt, w Nice Machine, Excellent Cond. 180 HP, US Made, $69,500 or BO Phil (413) 427-7171

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

By Irwin Rapoport

CEG CORRESPONDENT

In the next 14 months, Empire Paving Corp. will be delivering the Connecticut Department of Transportation’s (CTDOT) $28,857,927 Reconstruction of Interchange 33 on Interstate 95 in Stratford project, an initiative that is helping the state address the infrastructure deficit and improve traffic flow by providing motorists with more options. The work, taking place on the southern side of the town of Stratford (Fairfield County), began in June 2020 and is scheduled to be completed on July 5, 2022. The project is financed by the federal (80 percent) and state (20 percent) funds and Empire Paving was awarded the contract on Sept. 3, 2019, which gave the contractor sufficient time to plan the project and assemble equipment and

personnel to execute it. The interstate and interchange were constructed in the 1950s and on a daily basis both carry approximately 142,000 cars and trucks. In addition to reconstruction, the project is adding an Exit 33 off-ramp in the southbound lane direction and an on-ramp in the northbound lane direction to make it a full interchange. There also will be roadwork on Ferry Boulevard and Barnum Avenue Cutoff with minor road configurations and traffic signal work, as well as drainage improvements. “The interchange currently handles on average, 910 vehicles daily on the northbound off-ramp and 680 vehicles daily, on average, on the southbound off-ramp,” said Steven Herbert, CTDOT’s project engineer. “The projected volume for the new northbound on-ramp is 270 [average daily] and see INTERCHANGE page 6


Page 2 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2014 BOBCAT S770

2005 VOGELE 1110RTB

2019 BOBCAT S740

stk# 26537, c/air, hi flow hyds, pilots, 2 speed, switchable controls ..............................$37,500

Cummins, 10-19’ electric screed, 70% tracks, all wear items 70%, stk# 25947 ..........$15,000

stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$54,000

2000 WIRTGEN W500 TRIMMER

1996 KOBELCO SK270LC

2010 WIRTGEN 2100

stk# 26553, Fiat diesel 3 wheeled, 20”  standard drum......................................$27,500

9306 hrs, c/heat, pin on 42” bucket, stk# 26039 ..........................................$42,500

Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000

1998 IR DD90HF

2017 DEERE 650K

2008 HAMM HDO120V

Cummins, Hi Frequency, 66” drums, serviced and ready to go, stk# 26392 ................$17,500

stk# 25014, 1060 hours, c/air, 6 way 105” blade, Topcon ready ..........................$125,000

3110 hrs, stk# 22866, 78” drums, oscillation dealer maintained ................................$25,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 3

Tyler Equipment Massachusetts 251 Shaker Road P.O. Box 544 P. East Longmeadow, MA 01028 413.525.6351 800.292.6351 Connecticut C ti t 1980 Berlin Turnpike Berlin, CT 06037 Dealer Name 860.356.0840 City, ST 800.352.4473

Contact your local dealer:

IMMPROVE YOUR EFFFICIENCY CY.

123.456.7890

Get jobs done faster with efficien nt Volvo compact wheel loade ers. They provide all-around visibility, excellent stability and easy accesss to tight areas — plus the L20H L model just won the Highest Retained Value Award™ in 2019 by EquipmentWatch. Improve cycle times and your profitability with powerful, efficient Volvo compact wheel loade ers. Cont act your today. Contact yournearest nearestXXXX Tyler location Equipment location today.

tylerequipment.com


Page 4 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

New $100M Project to Bring Transformationto USM Portland There are major changes coming to the University of Southern Maine’s Portland campus, where extensive construction is under way on a $100 million dormitory and student center project. The benefits of this effort are many, such as affordable housing for students at the new 580-bed residence hall, a career and student center with sustainable features such as solar panels and cross-laminated timber, a grassy quad providing a natural gathering place, and new arts and graduate facilities. Construction on the Portland Commons Residence Hall — the first university residence hall on USM’s Portland campus — started in the spring and is expected to be nearly finished by June 2023. Soon, work will commence on the three-story, 42,000sq.-ft. Career & Student Success Center and a one-acre campus quad. “When completed, the three projects will transform USM’s Portland campus and the city’s skyline,” said USM President Glenn Cummings at a virtual groundbreaking in May. By the end of August, the city of Portland expects to near completion on the new Deering’s Corner Roundabout at the intersection of Deering and Brighton avenues and Falmouth Street — a project that planners hope will improve traffic operations and safety, according to CentralMaine.com, a local online network of area newspapers. A portion of the roundabout work may continue through November. Designers for the new Portland Commons dormitory have engineered it to use 50 percent less energy than a normal building built to code. According to the USM, when finished the dorm will be on track to become the second-largest university “passive house” structure in the United States, meaning that the dorm will possess a strict green building standard that prioritizes energy reductions and high indoor air quality. Funding for the $72.8 million residence hall will come from UMaine System revenue bonds, and revenue generated by the residence hall will fund annual debt service payments. The building is expected to alleviate overcrowding in the dorms at the university’s Gorham campus as well as provide affordable housing for students in Portland’s tight housing market, CentralMaine.com reported. The $26.6 million Career & Student Success Center will be funded in part with a $19 million state bond and will be constructed in the space formerly occupied by the Woodbury Campus Center at 25 Bedford St. The new facility will provide space for diversity, equity and inclusion offices. Both the dorm and student center are part

Elkus Manfredi Architects rendering

This aerial view shows the proposed new student center, just left of center, and the proposed new residence hall, right of center, at the University of Southern Maine in Portland.

of a master plan approved in 2019 that seeks to create a new “campus heart” around the quad and calls for other building investments, including a new Graduate Center for Professional Studies and Center for the Arts. USM is currently in the planning stages for the new arts center and the graduate center, the latter of which will draw on funding from a $240 million gift made to the UMaine System last fall, according to the CentralMaine.com news source. “I think the work we’re doing will be transformative to the campus,” said Alec Porteous, chief operating officer and chief business officer of USM. “Having residential housing on the campus for the first time in its history will really change it considerably and make it welcoming to our students, who really struggle to find affordable housing. Putting 580 beds on campus is really a game changer for us.” A house at 118 Bedford St. is slated for demolition beginning in July because it needs significant structural repairs and lacks energy efficiency, said Dan Hartill, a USM spokesperson, in an email to CentralMaine.com. Once the building has been removed, the property will be open green space for the time being, he said. It is one of several houses the university occupies on Bedford Street that also includes administrative offices, the student newspa-

per, and a student and community radio station, WMPG. In addition, the university also owns five homes on Chamberlain Avenue, and a sixth nearby on Deering Avenue, all of which are being leased through the nonprofit affordable housing provider Avesta Housing. “The university is highly sensitive to living arrangements and regularly meets with [local] residents,” Hartill noted. He said the university is currently reviewing its options with the Bedford Street corridor and currently has no plans to expand parking into the space where 118 Bedford now exists. Mark LaPointe, president of the Woodfords-Oakdale Neighborhood Association, said residents previously had concerns about a proposal to put additional parking near Falmouth Street, though the university has changed those plans and now expects to enter the permitting process for expanding the existing parking garage into the Wishcamper Center parking lot instead. LaPointe also expressed concerns about traffic in the broader area following construction of the dorm and student center. “It’s going to increase the number of students and with more students there will be more cars,” LaPointe told CentralMaine.com. “That’s always a problem. You like to have a residential neighborhood with people walking and kids playing but all these things are going to increase the

number of cars in the neighborhood.” USM is expecting most of the traffic impact from the student center and dorm to stay focused on Bedford Street and has been working with a traffic consultant through the planning, permitting and construction process. As part of its traffic mitigation efforts, USM has set goals to reduce the number of university-generated trips during the local peak traffic hour by 3 to 6 percent by 2025, and to reduce demand for parking by 10 to 14 percent during the peak hour of demand on campus. The goals are part of a transportation demand management plan, the goals of which include reducing overall trips, demand for parking and greenhouse gas emissions. On Chamberlain Avenue, residents said that despite their concerns about the demolition and future of the university-owned houses, they do see benefits to the dorm and student center project. John Stevens, whose backyard borders 118 Bedford St., told CentralMaine.com, “(I do have) the usual concerns that would go along with that: traffic, late night noise. [But] we were in college in dorms, and I remember how that went. I think there’s that but at the same time they are making the school nicer and what they’re doing is they’re improving it, so that side of it is great.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 5

Lexington, Kentucky | www.linkbelt.com

, and much more • 20° tilting operator ’s cab with • Upper Cameras – winch operation and swing • Carrier Cameras and right turn

Ver e mont 802--658-1700 Massachusettss 508-499-1950 Pennsylvania 717-795-0700 New Yoork 315-676-2008 5-676-2008 www.woodscrw.com

B U Y

•

L E A S E

•

R E N T


Page 6 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

RENT! RENT! RENT! RENT!

2015 CAT 329FL, 4200 hours, Rear Camera, Aux. Hydraulics ..................................$139,000

2019 Hitachi ZX210 LC-6, 1400 hours, Aux. Hydraulics, QC, Rear Camera ............$159,000

2017 Terex TA300, 1700 hours, Excellent Condition, Good Rubber, Work Ready$189,000

2001 GROVE RT750E, 13,000 hrs, Cummins C8.3-C, 450 lb 3 Sheave Block, 36’ - 110’ Boom, 33’ - 56’ Swing Away Ext Jib, Anti Two-Block, PAT DS350 LMI, Aux Winch, Hyd Outriggers $99,000

2017 John Deere 350G LC, 4400 hrs, 32” Triple Grouser Pads, 60” Paladin HD Bkt ....$129,000

2017 CAT D8R, New Engine, 80% UC, Recent Equalizer Bar, Work Ready ........$169,000 Firm

2016 CAT 262D, 2000 hours, QC, Aux. Hydraulics, AC ......................................$33,500

2008 Komatsu D61EX-15EO, 4000 Hours, EROPS w/AC, Runs Great! ..................$65,000

Project Challenge Includes Removing Raymark Waste INTERCHANGE from page 1

Crews perform work at the drainage Ramp B.

450 [average daily] for the southbound off-ramp. The project was needed due to a public desire that a more functional and efficient full diamond interchange be constructed. Prior to construction, there was only a partial interchange, which consisted only of a northbound off-ramp and southbound on-ramp, thereby limiting the basic usefulness and functionality of the interchange. The project was planned over the course of approximately eight years. “The existing condition of I-95 was/is in good shape due to the construction activities from the Moses Wheeler Bridge Projects that CTDOT recently performed,” he added, “however, the condition of the local roads was, and is, in poor shape.” STV and CTDOT designed the project. “The intersections on the local roadways are getting updated, including the installation of modern traffic signal equipment with improved video detection versus less reliable loop detector systems, which will enhance traffic flow and efficiency,” said Herbert. “It is

also addressing the removal of Raymark Waste within the project limits, as well as capping all areas containing asbestos contaminated soils. As part of the project, $4 million is being invested in the construction of new noise barrier walls to help mitigate noise from the interstate. “Projects often present unique circumstances that require special handling,” he added, “This one required the removal of Raymark Waste that contains asbestos and other contaminants and must be removed from the site and disposed of properly. This necessitated coordination with the EPA, CTDEEP, CTDOT Office of Environmental Compliance and the town of Stratford’s Environmental Office. This issue was resolved by removing all Raymark Waste within the project limits and coordinating with the EPA and DEEP to dispose of it in the newly constructed EPA landfill. As for particular challenges, the limits for Raymark Waste removal fell within the southbound I-95 off-ramp construction. The EPA landfill was still under construction at the time, so the

removed material had to be temporarily stored and monitored in the designated Waste Stockpile Area [WSA] until it was disposed of.” The construction of the new offramp utilized all native material from within the project limits. “Since all the soil within the project limits was deemed asbestos contaminated soil [ACS], the goal was to use as much, if not all of the soil to construct the ramp and cap it with clean material to limit the need for off-site disposal,” said Herbert. “Some of the challenges in dealing with the ACS was the need for constant air monitoring to ensure the safety of the workers and the public. Working with ACS meant the soil had to always be moistened to limit any fugitive dust, and on a daily basis any exposed soil at the end of the workday had to be protected. In the case of the latter, Empire Paving chose to cap the native soil with a clean process where possible. Any vertical faces where soil would not stay put were covered with poly, so it was necessary to plan to make sure all work could be protected see INTERCHANGE page 10


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 7

4 , 0 8) & ( " / .& / P S U I " W F 4 L P XI F H B O .& X X X I F B W Z N B D I J O F T J O D D P N


Page 8 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

PORTABLE ROCK CRUSHING

Monroe Tractor Hires Paul Giangrave as Equipment Sales Rep in Connecticut

Onsite or Quarry • Making aggregates since 1983

Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT

www.FAYWRIGHTINC.com Paul Giangrave

Monroe Tractor has hired Paul Giangrave as equipment sales representative of its location in South Windsor, Conn. Giangrave joins Monroe Tractor with 30 years of experience in the construction industry. His most recent venture was selling and renting forklifts and aerial equipment. Prior to that, he worked in underground infrastructure selling electrical and telecom vaults to the utility and excavator sector. Plus, his history as a shoring specialist with a construction dealership only adds to his knowledge of earthwork, making him a good match for Monroe Tractor, the company said. “With Paul’s many years of industry experience in construction equipment sales and rentals, we are excited that he has joined our sales team,” said Chris Reseska, branch manager, Hartford, Conn. “And as Connecticut’s only Case dealer, we know Paul will be there to help keep our customers working.” For more information, visit www.monroetractor.com. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 9

Unbeatable perform o ance an nd producti o vity. Performance is what it’s all about. Doo D san® equipment delivers what you need and more. Our crawler excavators provide superior stability for heavy digging and lifting operations. Plus powerful hydraulic, arm and bucket forces help you get the job done quickly and efficiently. So you can confidently take on tough digging conditions that slow other machines down. Stop in to oday and see ffo or y yo ourself the strength of Doosan.

Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 5

Au thor ized Doos an De aler

Equipment East 61 SManley ilva LaneSt. • D•raBrockton, cut, MA 018MA 26 02301 • 508-484-5567 196 978 -454-Lane 3320 •• w w w.equMA ipm01826 enteas•t.978-454-3320 com 61 Silva Dracut, 1474 Rte 3A • Bow, NH • 603-410-5540 www.equipmenteast.com


Page 10 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Interchange 33 Reconstruction Set to Wrap Up in 2022 INTERCHANGE from page 6

using some of the real estate of the project to the bridge for the off-ramp bypassing the store materials for next stage. As we go from area where the retaining wall so that we at the end of each shift.” The new bridges, constructed in 2020 and one area, we use the complete section for could keep working, and built the rest of the 2021, are designed with a lifespan of 75 storage. Deliveries have to be carefully con- ramp.” A John Deere 700K dozer equipped with years and the newly constructed roadways sidered. ‘We have a very good relationship with GPS systems has aided this work. have an anticipated lifespan of 20 years. “We are heavily invested in GPS technol‘The Bridge 7011, the new southbound I- the DOT and issues are resolved as quickly 95 off-ramp over Barnum Avenue Cutoff, as possible,” he added. “They put great effort ogy,” said Goddard. “Topcon GPS systems utilized a Geosynthetic Reinforced Soil — into any issues we bring up. Some things helped to make accurate fills buried beneath the roadways.” Integrated Bridge System [GRS-IBS],” said take time, but they get resolved.” The on-ramp in the northbound Herbert, “which kept the cost of lane direction was completed last the bridge the same as a traditionyear. al cast-in-place concrete construc“It was done the same way as tion, but was able to reduce the the off-ramp, with the same time needed to construct the equipment,” said Goddard. “The bridge.” exception was that we had to The maintenance and protecwiden bridge 134 at I-95. After tion of traffic plans protecting the abutments were completed, motorists and construction workthere was a delay in the steel fabers are based on lane closures that rication due to COVID. We waitoccur on I-95 southbound from 9 ed for the steel to be delivered to p.m. to 6 a.m. and on the norththe site until this spring and we’re bound side from 7 p.m. to 4 a.m. just about to complete the bridge Two travels lanes in each direcdeck. We demolished the existing tion are being maintained, with people being urged to “be alert, The interstate and interchange were constructed in the bridge 134 Parapet to allow for cautious, and to maintain a safe 1950s. On a daily basis, both carry approximately 142,000 the widening. The rest of the ramp speed when driving in this vicini- cars and trucks. In addition to reconstruction, the project was built on a fill. The work went is adding an Exit 33 off-ramp in the southbound ty.” direction and an on-ramp in the northbound “They have been working lane lane direction to make it a full interchange. effectively, and most motorists are reducing speeds in the work The reconstruction began with the zones,” said Herbert. “The CTDOT appreciates their cooperation to help keep our work- drainage infrastructure installation in May ers safe while we deliver this project for the 2020. “We did a lot of pre-emptive drainage public.” The construction of the Exit 33 off-ramp work and then we started the cut and fills for in the southbound direction began in March the ramps,” said Goddard. “The remainder work, taking place on the southern 2020 and is still under construction. Empire of drainage work will have to be done after The side of the town of Stratford (Fairfield Paving, thus far, has completed New Bridge the retaining walls are completed. We’re 80 County), began in June 2020 and is 7011, retaining walls 101 and 102, the percent complete at this point. This wasn’t scheduled to be completed on July 5, removal of Raymark Waste, the local road- easy for sure — there was a lot of deep 2022. way drainage and a major portion of the traf- drainage with fairly unstable material, but it all went off without a hitch. The challenges quite well.” fic control signal work. For the demolition work, Volvo and Cat “The remainder of the work is focusing on for the cut and fills were due to presence of the completion of retaining wall 103, noise asbestos in the soil. We have a comprehen- mini-excavators with hydraulically activated barrier walls 1, 2 and 3 and the completion sive dust control program, but one of the hammers were used. The fill work at the of the reconstruction of local roadways and main methods we’re utilizing is spraying ramp employed a John Deere 700K GPS ramp tie-ins,” said Herbert. “The on-ramp in atomized water on all the excavation opera- controlled dozer. The roadwork on Ferry Boulevard and the northbound lane direction will be com- tions and it seems to be working very well.” The fill operations also were supported by Barnum Avenue Cutoff, which covers severpleted in the late fall of 2021. The roadwork on Ferry Boulevard and Barnum Avenue the use of a water mist cannon to dampen the al miles of lanes, includes minor road conCutoff [approximately 0.5 mi.], which dust, which was supplied by Rain for Rent. figurations and traffic signal work, also is The construction of the Exit 33 off-ramp proceeding to schedule. includes minor road configurations and traf“The road work is going along fairly fic signal work, is also going according to in the southbound lane direction is nearly complete. well,” said Goddard. “We’re starting with schedule.” “With the exception of retaining wall 103, the reconstruction of the sidewalks and the “The work has been slow and steady,” said Chris Goddard, Empire Paving’s project it has been completed,” said Goddard. “The curb and that will continue throughout the manager. “We have had a lot of engineering wall is just west of Route 1 and it starts current constructions season.” This element of the project includes minor challenges to overcome before we can start widening out the deceleration lane that has on doing a lot of the work. We’ve done a lot not been completed. There were some engi- road and intersection reconfigurations and planning and things have reached a point neering problems early on with that and lane shifting, adding lane and installing new where we’re getting a lot done, primarily we’re just starting construction on this wall. signal equipment. The new lanes are based through day shifts. We worked all winter It will take the rest of the construction season on a 12 in. of subbase material and 10 in. long. It’s a very tight work zone. We are to complete. We did all the cut and fills, built topping of asphalt.

Crews are working on one lane at a time to allow for traffic to keep flowing throughout the reconstruction. The drainage improvements are adding more than 60 structures and increasing the size of some discharge pipes from 18 to 24 in., as well as installing a new 30-in. outlet drainage pipe. “We’re ensuring that the drainage system works a lot better,” said Goddard. “Prior to this, it was choked off and had high-value limitations — it could not handle the amount of flow required at some points.” The CTDOT District 3 construction team is assisted by AI Engineers, TRC and Garg Engineering. “We have an excellent working relationship among the various teams and crews,” said Herbert, “and all parties share a common goal of completing the project on time, safely, and within budget.” The Empire team consists of several experienced people. “It’s well integrated, and the crews are very hard working and pulling toward getting the job done,” said Goddard. Peak days have 30-plus Empire Paving and subcontractor workers on site, with the main subcontractors being: Bay Crane Service of Connecticut for bridge work; Davis Tree and Logging for clearing and grubbing; Mystic Air Quality for air monitoring and testing; Star construction for curb and sidewalk; Quaker Corporation for guardrail and noise barrier wall installation; Rizzo Electric for illumination and traffic signal construction; All Seasons Landscaping for plantings; and Garrity Asphalt for milling and safety markings for line striping Demolition and excavation operations are expected to generate 15,000 tons of concrete, 10,300 tons of asphalt, 15 tons of steel, and 680,000 tons of earth and rock. New materials being brought in will include 7,100 tons of concrete, 15,100 tons of asphalt, 450 tons of steel, and 4,600 linear ft. of various sizes of pipe. “We’re not recycling anything on site due real estate restrictions — the site is just too small,” said Goddard. “We’re sending everything off to a recycling yard in Milford and then bringing it back from there. The materials that we excavate are removed from the site the same day. “Hydraulic lines are a constant battle for us, but they are usually quickly resolved,” said Goddard. “We have an in-house service department that does most of our repairs, but they are supported by the dealers that supply parts on a timely basis.” Empire Paving purchases and rents equipment from H.O. Penn in Newington, W.I. Clark in Wallingford and C.N. Wood in North Haven.  CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 11

Ove 40 Us r Hamm ed in Sto ers ck!


Page 12 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Sales Auction Company Holds Sale for John Olender Corp.

The centerpiece of the sale was a pair of Metso crushers, one jaw and one cone, each of which brought more than a quarter of a million dollars. (L-R): Tim Halliday of 202 Truck Equipment, Tim Crean of Crean Equipment and Dan McHugh of Brookside Equipment.

O

n July 10 in Tolland, Conn., Sales Auction Company hosted the complete dispersal of John Olender Corp., a general contractor who had been in business for more than 65 years. A highly desirable pack- The core of John Olender Corp.’s earthmoving fleet consisted of a great lineup of well-maintained Cat iron. age of trucks, excavating and aggregate equipment drew a huge crowd and, as expected, each piece brought top dollars. Many of the pieces in this sale hit the “sweet spot” of being low hours or low miles and just the right age to be pre-emission restrictive standards. With the current shortage of equipment in the marketplace, this sale proved to be a “home run,” according to Sales Auction Company. Sales Auction ringmen A group of industry veterans take advantage of the

This Cat 335F with only 1,000 hours brough in $250,000.

(All photographs in this article are Copyright 2021 Construction Equipment Guide. All Rights Reserved.) CEG see SALES page 14

Besides executing a great sale, the folks at Sales Auction Company spent weeks prepping machines and laying out a well-organized auction.

With a Metso LT105 jaw crusher, Kevin Knaust with his son, Matthew, of A. Montano Company in Saugerties, N.Y.

work the crowd hard to ensure each item, including the hundreds of small tools, etc., brought John Olender Corp. the best possible prices.

Check out this big old beast … a 1988 Cat D8N was looking for a new home.

opportunity to catch up. (L-R): Seamus Sheelan of Powerscreen New England in Windsor Locks, Conn.; Ed Wright of Fay & Wright Excavating in Goshen, Conn.; and Ron Beebe of Milton Beebe in Storrs, Conn.

All of the John Olender Corp. tools and miscellaneous items were well organized and placed under roof to make the buying experience as easy and pleasant as possible.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 13

®


Page 14 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX

Big Crowd Attends July Auction in Tolland, Conn.

ALTA EQUIPMENT COMPANY/NITCO LL ....................16

SALES from page 12

ARGUS INDUSTRIAL COMPANY ....................................1 DOOSAN NORTHERN NEW ENGLAND ......................13 EQUIPMENT EAST ........................................................1,9 FAY & WRIGHT EXCAVATING INC ..................................8 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1

Taking in the sale and checking out a few Cat loaders are Phil Raudat (L) from Madison, Conn., and Ernie Rogan of A & S Construction in Middletown, Conn.

Nate Mix of Mix Brothers in Freeville, N.Y., was really hoping to bring home one of these prime Kenworth T800 dumps.

HEAVY MACHINES INC ..................................................7 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................11 PETERSON ATTACHMENTS..........................................11 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ..................................11

This Rogers 35-ton lowboy needed to be purchased and you might as well load it up and bring home some equipment.

T-QUIP SALES & RENTAL INC ........................................8 THE N.I.C.E. COMPANY ..................................................6 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP........................................................5 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

A fantastic lineup of Kenworth trucks, mostly model T800s from the early 2000s, was up for bid during the auction — the best of which brought in $90,000.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 21, 2021 • Page 15

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 16 • July 21, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Come work foor one of the largest equipmennt dealers in the United Statess! Are you a Technician/Mechanic anic with diesel, agricultural, agricultural or o heavy equipment repair experience? Iff so, then we want you on ourr team! Competitive pay and excellent e benefits are only thee b

C Careers @AltaEquipNE.com m | 800-Go2-ALT LTA | AltaEq qu


Turn static files into dynamic content formats.

Create a flipbook