Skip to main content

New England 14, July 12, 20177

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

July 12 2017

F O R M E R LY

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

95 91

7

495

Vol. l • No. 14

2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

LEED Accredited in Waste Management

Other Screeners Available

ArguS INduStrIAl CO.

www.ez-screen.com

GIVE US YOUR HAMMER!

• Repairs • Rebuilds • Replacement Parts in Stock

30% off same class Ramfos hammer with competitor’s trade in

61 Silva Lane • Dracut, MA 01826

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, W USES

WAREHO

• FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248

Cat D7F

YOUR ONE-STOP HYDRAULIC HAMMER SHOP™

Phil (413) 427-7171

New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!

www.foleyengines.com

u

I

P

m

E

N

t

g

u

I

d

By Chuck Harvey

E

A massive $30 million overhaul of the southbound span of the Gold Star Memorial Bridge on I95 between the Connecticut cities of New London and Groton has begun. The project that kicked off on April 1 is slated to conclude at the end of November 2018. Once the work is complete, the span is expected to last about 25 years. A few months into the project, workers are busy patching up concrete and repairing the southbound

ConnDOT photo

The project that kicked off on April 1 is slated to conclude at the end of November 2018.

see BrIdgE page 14

Monroe Tractor Acquires Case of New England to Better Serve Customers

• HIGH QUALITY

866-745-5828

VERY NICE SHAPE

q

6

$30M Overhaul of Gold Star Memorial Bridge in New London, Conn., Begins CEG CORRESPONDENT

www.jrvinagrocorp.com

$41,900 plus freight.

E

Your New England States Connection •  Amanda Hogeboom-guilfoyle 1-800-988-1203

Call for Pricing

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

95

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Specializing in:

New Option Separate 3 Products

195

95

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers

2017 EZ-Screen 1200XLS

6 395

95 91

3

84 6

84

CALL 888-81-GORILLA(46745) *Some restrictions apply

Monroe Tractor, a distributor in construction and agri- Chuck Miller, general manager construction division. culture equipment in New York state, has acquired Case of Case of New England will now operate as Monroe New England, a Case dealership in Massachusetts. This Tractor of New England and continue to provide Case acquisition will enhance Monroe’s ability to serve the New Construction equipment, parts and service out of its England construction Shrewsbury and Woburn industry. locations. With this acquiThe purchase of Case of sition, identified new New England, based in needs to better serve the Shrewsbury, Mass., further New England area and increases Monroe Tractor’s positions will be created, offering in the construction according to the company. equipment market. Monroe Tractor, a famiMonroe Tractor has acquired Case of New England. “The combination of the ly-run dealership in New two companies synergies, Case of New England’s expert- York state with 66 years in construction and agriculture ise in the area and our vast history as a Case dealer, will distribution, has a strong partnership with Case. The comprovide customers with an even greater level of service and pany currently employs 220 employees throughout New support,” said Janet Felosky, CEO and president of York state and now Massachusetts. Monroe Tractor. For more information, visit www.monroetractor.com. “The acquisition is also expected to result in greater effi(This story also can be found on Construction Equipment ciencies and significantly increase market share,” added Guide’s website at www.constructionequipmentguide.com.)


Page 2 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Danbury, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316 2011 John Deere 50D

2011 Hamm HD10CVV

2016 Deere 50G

2675 hrs, c/air, blade hyd thumb, 24” bucket, stk#23535............................................ $46,500

288 hrs, Foldable ROPS, dual vibratory, offset drum, psi water system........................$25,000

c/air, push blade, hyd thumb, 650 hrs, stk#23792............................................ $56,500

1998 Deere 744H

2006 Komatsu PC138USLC

2013 Leeboy 8616B

TIER 3 repower, 5.5 yard bucket, c/air, ride control, stk#23768................................$49,000

2765 original hours, rubber pads, aux hyds, 36” bucket, push blade, stk#23933......$78,500

Kubota Diesel, HD Poly Pads, Slope, Power Crown, stk#21988.............................. $135,000

2005 Deere 850JLT

2005 Yanmar VIO27-3

Deere 323E

c/air, 158” 6 way blade, recent U/C turn and service, stk#22281............................ $115,000

2050 hrs, ROPS, rubber tracks, push blade, hyd coupler, 18” bucket, stk#23909.... $19,500

Yanmar, c/air, EH Controls, 2 Speed, 18” Tracks, 78” Bucket, stk#23928............ $39,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 3

!

%

%

!

!

!

!

!

!

!

% ! ! ! ! ! ! !

!

!

!

! !

!

!

!

!

!

!

!

!

!Q

!

!

!

!

!

!

! 2

! 2

! !

!

! !

!

! !

! !

%2

!

!

%

%

!

%

Q

! !

!

!

! !

!

!

!

! Q

Some companies have you choose power or fuel efficiency. You chose both. %

%

!

! ! 2

!

2

! ! !

! %

! !

%

!

!

%

!Q

Q

%

%

% % Turnpike % 1980 Berlin Company Name Berlin, CT 06037 1234 Any Road 800.352.4473 City, ST 12345

!

2

DEALER LOGO

251 Shaker Road 123.456.7890 East Longmeadow, MA 01028 800.292.6351

%

%

!

!

%

! ! ! !

!

%%! !

!

Q !

!

!

Volvo developed the industry’s first fuel efficiency guarantee so you never have % 2 on performance or productivity. And with CareTrack machine to% compromise % 2 monitoring, you can focus your attention on more important things — like growing your business. Get the details at volvoce.com/smartfuel. 2


Page 4 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Skanska Builds New Recreation Center for Boston College Skanska has signed a contract to build a new recreation center for Boston College in Massachusetts. The contract is worth $113 million, which will be included in the United States order bookings for the second quarter of 2017. Skanska will replace Boston College’s existing Flynn Recreation Complex with a new four-story, 242,188-sq.-ft. recreation center. The center’s exterior will match the campus’ distinctive Gothic aesthetic. Its interior will consist of numerous flexible spaces to ensure versatility

Skanska has signed a contract to build a new recreation center for Boston College in Massachusetts.

and functionality. Construction is under way and the project is scheduled for completion in summer 2019.

(This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Gilbane Receives Project Team Award for Hartford Hospital Gilbane Building Company recently was honored by the Connecticut Building Congress (CBC) with a first place Project Team Award in the New Construction category for the Hartford Hospital Bone and Joint Institute project in Hartford, Conn. Gilbane also was recognized with an award of merit in the K-12 Schools category for the Francis T. Maloney High School in Meriden, Conn. Hartford Hospital’s Bone and Joint Institute is the first

NEW ENGLAND EDITION

Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Director of Web Services

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Judith Nixon Cathy Printz Teddy McKeon

Main office 470 Maryland Drive

Fort Washington, PA 19034

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910

Web site www.constructionequipmentguide.com

Editorial e-mail editorial@cegltd.com

Advertising e-mail production@cegltd.com

dedicated orthopedic specialty hospital in New England, and one of only a few like facilities nationwide. The new, 150,000 sq. ft. facility provides coordinated care that integrates all elements of orthopedics and musculoskeletal treatment, including primary and specialty care, diagnostics, rehabilitation, rheumatology, neurology and pain management. The building consists of five floors and features: eight

For advertising rates: Contact Edwin M. McKeon Jr.

215/885-2900

Toll Free 800/523-2200 Fax 215/885-2910

e-mail tmckeon@cegltd.com

Contact Amanda Hogeboom-Guilfoyle

• New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail ahogeboom-guilfoyle@cegltd.com Contact Kent Hogeboom

• New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2017, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

operating rooms with room to expand to 10; 48 inpatient beds with the capability of expanding to 60 beds; a postanesthesia care unit (PACU) featuring 27 beds; complete imaging center including radiology, MRI and CT scans; rehabilitation facilities; a motion laboratory study center; a center for sports and fitness; and after-hours orthopedic urgent care services. The Francis T. Maloney High School project encompassed the renovation, addition and selective demolition of an existing high school into a like new 283,000 sq. ft. high school. The school was constructed in four major phases over three years to allow the school to remain open and occupied during construction. Fully renovated areas include two full gymnasiums with locker rooms, natatorium, 950 seat auditorium, cafeteria, and kitchen. Additions included a classroom wing, media center and musical wing. The finished school embodies Meriden Public Schools’ vision of providing a “modern, first class student-centered learning environment.” “We are proud to have been recognized by the Connecticut Building Congress for the accomplishments of the two project teams including our client Hartford HealthCare, the pwner’s representative Concord Healthcare, Perkins+Will and HDR for the Hartford Hospital project, and the town of Meriden, the owner’s representative Arcadis, and Fletcher Thompson for the Francis T. Maloney High School project,” said John Hawley, Gilbane vice president and Connecticut business unit leader. “We appreciate our clients, our design partners, and the numerous trade contractors who exemplify what can be accomplished when all stakeholders are dedicated to a truly collaborative process.” Each year the Connecticut Building Congress recognizes projects whose team members have met or surpassed goals and achieved higher project quality through collaboration among project owners, architects, engineers, constructors and trades. This year’s awards banquet was held at The Bond Ballroom in Hartford, Conn. on June 13. For more information, visit http://www.gilbaneco.com. (This story also can be found on Construction Equipment Guide’s website at www.construction equipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 5

160 Elm Street Walpole, MA 02081 (508) 660-7600


Page 6 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Baker-Polito Admin Awards More Than RITBA Completes $14M in Green Communities Grants Phase I of Pell Bridge The Baker-Polito Administration awarded $14,043,257 in Green Communities competitive grants to 72 municipalities across Massachusetts to fund clean energy projects. With this announcement, the largest in the program’s sevenyear history, the Department of Energy Resources (DOER) has awarded more than $80 million to Green Communities grants since the program’s inception. One hundred and eighty-five Massachusetts cities and towns have currently earned the Green Communities designation. “Today’s grant announcement is the largest award in the Green Communities program history and represents our administration’s commitment to supporting clean Lt. Gov. Karyn Polito, joined by state energy officials, awarded $14,043,257 in energy efforts for our partners in Green Communities competitive grants to 72 municipalities across cities and towns across Massachusetts to fund clean energy projects. Massachusetts,” said Gov. Charlie Baker. “The projects funded by these grants will allow cities and towns across the Commonwealth as we continue to work collaboratively to Commonwealth to reinvest their energy savings in vital pub- build a clean, resilient, and affordable energy future.” The grants announced fund a range of projects from venlic services like schools, public safety and local infrastructilation system upgrades and high efficiency lighting to ture.” “As we work to meet our ambitious energy and emission installation of insulation and energy management systems at reduction goals, the Green Communities program gives our municipal buildings and facilities. Also included are projects municipal partners the resources they need to continue build- to install LED streetlights, oil-to-gas heating system convering upon the substantial energy progress each city and town sions, electric vehicles and electric vehicles charging stahas already made,” said Lt. Gov. Karyn Polito. “We look for- tions. Grants have been awarded to the following communities: ward to the continued success in energy innovation these Acton, Acushnet, Amesbury, Andover, Arlington, grants will ensure across the Commonwealth.” Under the Green Communities Act, cities and towns must Ashburnham, Ashby, Auburn, Barre, Belchertown, Belmont, meet five criteria to be designated a Green Community and Beverly, Bridgewater, Brookline, Buckland, Cambridge, receive funding. The grants provide financial support for Chelmsford, Cohasset, Easton, Essex, Gloucester, energy efficiency and renewable energy projects that further Greenfield, Hanover, Hardwick, Harvard, Hatfield, Holland, the designated communities’ clean energy goals. This sixth Holliston, Hopkinton, Kingston, Lakeville, Lenox, Leverett, annual round of DOER Green Communities competitive Lexington, Littleton, Manchester, Mashpee, Maynard, grants is awarded to existing Green Communities that have Medford, Melrose, Mendon, Milton, Monson, Montague, successfully invested their initial designation grants and pre- Natick, Newton, Northampton, Palmer, Pepperell, vious competitive grant awards. Grants are capped at Rockland, Salem, Saugus, Scituate, Sherborn, Somerville, Sudbury, Sunderland, Sutton, Swampscott, Tewksbury, $250,000 per municipality. “DOER’s Green Communities program works with cities Truro, Tyngsborough, Wayland, Wellfleet, Westford, West and towns from North Adams to Provincetown in an effort Newbury, Westwood, Weymouth, Whately, Whitman, to fund programs that put Massachusetts on the forefront of Winchester and Woburn. All Green Communities commit to reducing municipal clean energy innovation,” said Energy and Environmental Affairs Secretary Matthew Beaton. “The Baker-Polito energy consumption by 20 percent over five years. These Administration is committed to giving our municipal part- commitments amount to collective savings of 2,534,787 ners the tools they need to find clean energy solutions that MMBtu, energy use equivalent to heating and powering reduce long-term energy costs and strengthen local nearly 20,000 homes, and reducing greenhouse gas (GHG) emissions by 233,640 tons, equivalent to taking over 45,000 economies.” “The efforts of the 72 communities receiving [more than] cars off the road. For more information, visit www.mass.gov/eea/ $14 million today are important as we work to meet the greenhouse gas emission reduction goals set forth under the energy-utilities-clean-tech/green-communities. (This story also can be found on Construction Global Warming Solutions Act,” said Department of Energy Resources Commissioner Judith Judson. “These grants rep- Equipment Guide’s website at www.constructionequipresent another milestone for both the communities and the mentguide.com.)

Deck Repair Project The Rhode Island Turnpike and Bridge Authority (RITBA) announced that the first sequence of the deck repair project on the Newport Pell Bridge was completed two days before its scheduled completion date of June 29. This work, which began on May 16, consisted of a partial depth hydrodemolition and replacement of the concrete roadway deck from curb to curb for 200 ft. of the westbound and eastbound lanes to the east approach of the Bridge (Newport side). The contractor removed the concrete deck down to the rebar and fresh concrete has been poured. This work required permanent lane closures and single travel lanes in each direction. During July and August work will be performed from underneath the bridge using barges to focus on the removal of the existing steel bearings from the bridge’s original construction in 1969 and replace them with new and modern elastomeric bearings. As a result there will not be any permanent lane closures during these months on the bridge. However, there will be ongoing maintenance work associated with other projects, which will require periodic lane closures during non-rush hours as well as some nights. Overweight vehicles with gross vehicle weight (GVW) over 80,000 lbs. will be prohibited from crossing the bridge. Starting Sept. 19, the above deck work will recommence and will continue through December 2017. This stage will again require permanent single travel lanes in each direction. For more information, visit RITBA.org. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 7

No one delivers quite like Doosan Doosan crawler excavators are packed with comfort features. A wide-open view of the work area. Low noise levels. Adjustable joystick control stands. Reduced dust and dirt levels. Of course, performance and productivity is key, and your Doosan crawler excavator delivers fast, class-leading cycle times, increased flotation in soft soil and precision controls for outstanding efficiency. It’s a difference operators can see, hear and feel. Get a closer look. Stop in and visit us today.

Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 16-D014

Authorized Doosan Dealer

Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 • www.equipmenteast.com


Page 8 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Cianbro’s Sarah Long Bridge Team Reaches Safety Milestone The effort to replace the old Sarah Long Bridge began with mobilization to the job site in October of 2014. Throughout the months since then, the Cianbro team has remained injury free, despite the tremendous hazards that are inherent in a project of this scope, and the large workforce that is necessary to have a hand on the work.

According to Senior Project Manager Kaven Philbrook, Cianbro’s crew performed thousands of crane picks that were maximum capacity picks on the Sarah Mildred Long Bridge Replacement project.

The original plan was to celebrate the Sarah Mildred Long Bridge Replacement team’s remarkable safety performance when the Cianbro safety hours tally reached 900 work days and 400,000 hours without an OSHA recordable injury. By the time the hard working Cianbro team was able to take a brief time-out for a celebration, they had racked up an additional two months’ worth of safe work days. So, on June 2, the team settled down to a celebratory lobster bake commemorating 960 work days and 440,000 work hours without an OSHA recordable injury. The safety feat encompasses the full duration of the massive Sarah Long project. The effort to replace the old Sarah Long Bridge began with mobilization to the job site in October of 2014. Throughout the months since then, the Cianbro team has remained injury free, despite the tremendous hazards that are inherent in a project of this scope, and the large workforce that is necessary to have a hand on the work. Cianbro Safety Manager Mike Franck said the biggest part of the team’s success springs from the expectation that was agreed upon by every team member from the start: Everybody would have each other’s back. “And I think what is happening now is people are really identifying the hazards out in the field,” said Franck. “They’re letting their team members know if their face shield is not down or if they don’t have their safety glasses on. People are taking ownership of their safety. “It’s not just about policies and procedures, it’s about how they’re going to take ownership of the next move they make: ‘Will it be just following the policies, or am I going to say from point A to point B, I’m going to watch out for every hazard or anything that happens on the job, whether it’s moving equipment, overhead loads, whatever.’ We’re making sure to have that situational awareness all the time while we’re on The Sarah Mildred Long Bridge Replacement is nearing its fall completion date. the project.”

Senior Project Manager Kaven Philbrook added that Cianbro’s safety performance is especially significant because of the hazardous nature of the work. “We have thousands of crane picks that are maximum capacity picks,” said Philbrook, who mentioned a task that Infrastructure Vice President Keith Anderson has held up as an example of Cianbro safety in action, in the midst of heavy and complicated operations. “We installed over a million pounds of steel in two different counterweight boxes at the bridge. Over two hundred picks from the ground to 200 feet in the air — each pick, although not heavy compared to the other lifts we do every day, presented a risk in itself. By focusing on every detail and not getting complacent the team completed the task safely. We have another two hundred plates to go and will no doubt accomplish the balance of the operation safely by continuing to do what the team has done from the beginning and that is communicate and look out for each other.” The team currently is sprinting down the home stretch toward a fall completion date. The stunning visual impact of the new bridge has inspired positive comments from increasing numbers of local citizens, according to Cianbro team members. Still, the safety accomplishment ranks high upon the team’s priority list. “The safety performance by the Sarah Long Team sets a great example,” said Senior Project Engineer Pete Malikowski. “Not only are we building a great looking job, but the safety performance has been our proudest achievement down here.” (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


THE N.I.C.E. COMPANY 9 Rosenfeld Drive, Hopedale, MA Toll Free# 888-717-8096 • www.theniceco.com

We sell NICE machines!

2011 Cat 966K: 4300 Hrs, Joy Stick, Third Valve, Ride Control $179,000

2014 Volvo EC250EL $129,000

2014 Cat 312EL Excavator: 1000 Hrs, Medium Stick, Plumbed, North American Machine

$114,000

2017 Hyundai Robex 220LC-9 $129,000

2014 Cat 308E2 CR $79,000

2015 Volvo L70G Wheel Loader: 2500 Hrs, Hyd QC w//Bkt, AC Cab, Rear View Camera, 20.5x25 $114,000

2015 Cat 313FLGC Excavator: 215 Hrs, New Machine!! Aux Hydraulics $109,000

2017 Bobcat E85: QC, Aux. Hydraulics

$79,000

WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT

WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT

Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 9

284 North Street Windsor Locks, CT 06096

51 Veterans Drive Loudon, NH 03307

1-800-53-CRUSH or 860-627-6596 www.powerscreen-ne.com

Call for In Stock Parts

1-800-53-CRUSH


Page 10 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

208 Holland Road Brimfield, MA 01010

Sales Contact: R.J. Poirier rjpoirier@rjpoirier.com 413-245-3882 Fax: 413-245-3522

www.rjpoirier.com

Repair Services: Complete Machine Rebuilding, Engine, Transmission, Undercarriage, Bucket Rebuilding, Computer Diagnostics, Software Enhancements, Hydraulic Cylinder Repair, Custom Products.

2014 CAT 988K, Low Hour, 9yd Spade Bucket.............. CALL 2004 CAT D8R, New U/C................................................ CALL 2016 CAT D6TXW, New U/C............................................CALL 2006 CAT 988H, 9yd Spade.......................................... SOLD 2010 CAT D9T WHA, 8200 Hrs, Full Waste Spec.......... SOLD

Bandit Expands Dealer Network, Adds Vermont’s Champlain Valley Equipment Vermont-based Champlain Valley Equipment is now part of Bandit Industries’ growing network of authorized dealers, expanding our dealership network to cover even more customers with Bandit’s industry-best customer support. Headquartered in Middlebury, Vt., Champlain Valley has long served Vermonter’s farm, lawn and garden equipment needs. The company will offer Bandit’s lineup of small equipment, including hand-fed chippers, stump grinders and attachments. “When Bandit looks for dealer partners, we’re searching for people who are passionate about providing the absolute best customer support and service,” said Jason Morey, Bandit sales manager. “Champlain Valley

Equipment has made that an integral part of their mission since their start in 1970. Whether it’s through sales, parts,

five to choose from: Middlebury, St. Albans, Derby, Berlin and East Randolph.

service or rentals, the staff at Champlain Valley are committed to giving their customers the best experience possible.” No matter where Bandit’s customers are in Vermont, they’re not far from a Champlain Valley location. There are

For more information, call 802/3884967 or visit champlainvalleyequipment.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

South Coast Improvement Company Promotes Whalen to Sr. Vice President South Coast Improvement Company (SCI), a design-build general contractor serving New England and the Mid-Atlantic states, recently promoted Sean J. Whalen to senior vice president. In his new role at South Coast Improvement, Whalen will take on additional responsibilities in building relationships and strategic alliances, channel development, expanding the company’s sales markets and overseeing the sales team. “The client experience defines our business and has been the leading factor to the growth and repeat business we’ve enjoyed over the last several years. Sean has been an integral part of that,” said Tom Quinlan, president of South Coast Improvement Inc. “In fact, we could list the many things Sean does for our firm but when you get right down to it, his primary responsibility is ensuring the client experience on a senior level. He’s very good at it and worthy of

Sean J. Whalen

this promotion.” Whalen began with South Coast Improvement in 2012. Prior to that, he worked for more than two decades in business development for

large public and private corporations as well as start-ups. “After the crash of 2008, there were a lot of GC firms in tough shape. South Coast, through its commitment to doing great work and the client experience, was one of the few companies that held its ground during that tough period. I’m just delighted that I’ve been part of this incredible growth the company has enjoyed these last few years,” said Whalen. Based in Marion, Mass., and with an office in Reading, Pa., South Coast Improvement Co. provides building and renovation services to a client base of senior living, healthcare, institutional and retail clients. For more information, call 508/748-6545 or visit southcoastimprovement.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 11

CRUSHING EQUIPMENT, PARTS & SERVICE Ace Equipment Sales, Inc. and Milroy and Company LLC 171 Tolland Turnpike (Route 74) • PO Box 535 • Willington, CT 06279

(860) 429-2793 • Fax: (860) 429-0542 John Patton • (860) 614-3426

Go to www.acecrushers.com for a complete listing and description of our new and used equipment.

TS-522 TD • Largest Screen Deck in its Class • Longer Conveyors at 16’8” Stockpile Height • Standard 14’ Wide 12 CY Hopper ENGINE 129-horsepower CAT® C4.4 (Tier 3) HOPPER CAPACITY 12-cubic yards STOCKPILE HEIGHT 16-feet 8-inches

TOP DECK 22-feet by 5-feet MIDDLE DECK 22-feet by 5-feet BOTTOM DECK 20-feet by 5-feet

WE HAVE ALL THE PARTS YOU NEED: Manganese, Conveyor Belts, Idlers, Head Pulleys, Tail Pulleys and Much More!

Quality Service Guaranteed!


Page 12 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

6DOH UHQW RU 532 DYDLODEOH

Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

ZZZ (PSLUH&UDQH FRP 1HZ (QJODQG 6DOHV -XVWLQ 0HOYLQ

POWERSCREEN FOR SALE!

6$/(6 3$576 6(59,&(

DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion.

Under 2000 hours w/ Grizzly EXCELLENT condition. Can be transported on road! 12’ high, 3 products.

PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200

Call Chuck Mabardy C - 617.438.9200 T - 617.354.7580

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 only $45 only $40

an issue an issue an issue

Call now to reserve your space!

800-225-8448 * pre-payment required

AIR COMPRESSORS

EXCAVATORS

TELEHANDLERS

2017 DryAIR Gll, Portable aftercooler, NEW.......... $2,650.

2010 Gradall XL4200III, Crawler Excavator, Dealer owned & maintained, work ready, choice of 60’’ ditching bucket or 42’’ excavating bkt. Very good condition, 1,744 hours.......................... $69,000.

2001 Genie S125, AWD, 5260 hours............................ 37,500.

DryAIR by TDM 207-799-1538

BORING EQUIPMENT TERRA MISSILE (MOLE) TU090+SK Underground Piercing Tool 3.5 inch, fast, powerful, balanced for accuracy, 14 turn locking reverse, replaceable head, fully rebuildable, ISO 9001 Certified. Retiring Dealer. $4750. florencefagan@yahoo.com 609-476-3481

Elliott & Frantz, Inc. 610-279-5200 ‘16 Takeuchi TB230, Open ROPS, Rubber tracks, Hyd. thumb & Bucket, New condition, 257 hours.......... $34,000. ‘08 Komatsu PC50MR-2 Cab w/ AC, Rubber tracks, 18’’ bucket, Used condition 7,825 hrs.................... $24,700. Komatsu Northeast 908-561-9000

832-991-8381 rmaccallum@usdg.com

DAILY AND WEEKLY EQUIPMENT RENTALS CLOSE TO YOUR JOB SITE

RENTMACHINES.COM CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 13

RENTS

TO DO THE JOB RIGHT, YOU NEED THE RIGHT EQUIPMENT. Backhoes, excavators, compact track loaders, skid steers, telehandlers, wheel loaders, screeners, and more. Whatever the job requires, we’ve got you covered with top-of-theline equipment, extensive inventory, exceptional service, and extreme product knowledge. With six convenient New England locations, call New England’s trusted JCB, Vibroscreen, and Avant dealer. Rent the equipment; own the success.

6 Jonspin Rd. Wilmington, MA 01887

230 Cherry St. Shrewsbury, MA 01545

3 Chalet Rd. (Route 44) Middleboro, MA 02346

114 Hall St. Concord, NH 03301

NorthlandJCB.com (888) 485-0383 23 Foss Rd. Lewiston, ME 04240

150 N. Plains Industrial Rd. Wallingford, CT 06492

230 Cherry S


Page 14 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Deterioration Leads ConnDOT to Begin Bridge Repairs

ConnDOT photo

A few months into the project, workers are busy patching up concrete and repairing the southbound span.

ConnDOT photo

The Gold Star Memorial Bridge is a pair of steel truss bridges that carry both Interstate 95 and U.S. Route 1 across the Thames River.

Current construction on the southbound span includes patching. BRIDGE from page 1

span. The huge size of the bridge — the southbound span includes five lanes of traffic, three through lanes and two exit lanes — requires the crew to stay on a steady project plan. Connecticut Department of Transportation officials report that improvements are needed to repair deterioration from road salt, debris and wear on the bridge. The Gold Star Memorial Bridge is a pair of steel truss bridges that carry both Interstate 95 and U.S. Route 1 across the Thames River. It is actually a set of twin bridges, but they are generally spoken of as a single bridge. Each bridge features 11 spans, which is the distance between two intermediate supports for a structure. Construction of the bridge took place from 1941 to 1943, opening to traffic on Feb. 27, 1943. In 1951, the bridge was designated as the Gold Star Memorial Bridge in honor of armed forces from Groton, New London and Waterford who

were killed during World War I, World War II and the Korean War. “Virtually all businesses and industries in the area depend on the bridge for access,” said Kevin Nursick, a spokesman of the Connecticut Department of Transportation (ConnDOT). ConnDOT photo In addition to carrying motor vehicles, concrete deck the bridge has a pedestrian and bicycle path on the south span. The bridge is the largest structure in the state with more than one million sq. ft. of deck area, and the longest bridge in the state at 6,000 ft. Its 11 highway lanes are needed accommodate heavy daytime traffic crossing the bridge. “Traffic has steadily increased along I-95, one of the major corridors in Connecticut,” Nursick said. “Peak summertime traffic reaches 55,000 vehicles per day.” Northbound Bridge Work Starts in 2018 A more extensive $200 million improvement project for the northbound bridge is scheduled for a spring, 2018 start. It will include major steel strengthening of girders and trusses, complete deck replacement, bearing replacement, maintenance painting and substructure repairs to piers and abutments. Like the southbound span, the northbound bridge span includes five lanes of traffic including three through lanes

and two exit lanes. Current construction on the southbound span includes concrete deck patching, membrane application, paving, joint replacements including deck ends where needed, steel repairs and coatings and bearing repairs and replacements. Work also includes overhead sign replacement and associated parapet reconstruction, electrical upgrades and illumination. Heavy equipment on site includes aerial lifts including man-lifts, snooper vehicles that work under the bridge, loaders, excavators, mobile concrete mixers, paving equipment and dump trucks. About 4,500 cu. yds. of asphalt will be laid over the course of the project. Small amounts of steel will be removed for recycling. “Generally speaking, steel is recycled or salvaged for ConnDOT projects,” Nursick said. Contractor is Experienced in Marine Construction Prime contractor for the bridge improvements is Mohawk Northeast Inc. of Plantsville, Conn. The company’s specialties include heavy construction, marine construction, facilities maintenance and engineering services. Mohawk Northeast Inc. was the low bidder of the project. ConnDOT is administering the project contract. Figg see BRIDGE page 16


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 15

Generator Rentals • Rental Generators • Load Banking Services • Generator preventive maintenance agreements • We Service All Brands of Generators/Transfer switches

11 Rebel Road Hudson, NH 03051 (603) 598-9812

42 Dave’s Way Hermon, ME 04401 (207) 848-7702

www.cmdpowerrentals.com bill@cmdpowersystems.com


Page 16 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Crews Patch Concrete, Replace Joints on Bridge Project ConnDOT photo

Once the work is complete, the span is expected to last about 25 years.

ConnDOT photo

About 4,500 cu. yds. of asphalt will be laid over the course of the project.

ConnDOT photo

ConnDOT photo

A massive $30 million overhaul of the southbound span of the Gold Star Memorial Bridge has begun.

Connecticut Department of Transportation officials report that improvements are needed to repair deterioration from road salt, debris and wear on the bridge.

BRIDGE from page 14

Bridge of Tallahassee, Fla., has been hired for construction inspection services. The project has about 10 subcontractors on duty. They include Quaker Construction Services of Millville, Pa.; Santoro Construction of Syracuse, N.Y.; Garrity Asphalt Reclaiming Inc. of Bloomfield, Conn.; and KTM Electrical Contractors of Orange, Conn. About 40 construction workers are on duty daily at the project site. One of the biggest challenges of the project is maintaining traffic and access to the bridge during construction.

Crews also must deal with logistical and safety challenges. “Many of the bridge spans are over water and very high up,” Nursick said. “The main truss sections are very deep as well, making them difficult to access and install shield.” Necessary Lane Closures Four lanes of traffic will be shifted to the right side of the bridge during the initial project. A work zone will set up on the left side of the bridge with barriers running down the middle of the bridge. Additional off-peak hour lane closures may be neces-

sary to expedite the needed repairs, which are numerous. Crews will use concrete patches to fix places on the bridge where concrete is falling apart and will replace reinforcing steel where needed. Workers will lay new asphalt and replace the old membrane underneath the asphalt. Expansion joints will be replaced as well. Lighting improvements also are planned to better illuminate the bridge at night. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 17

Chappell Tractor Sales, Inc. 454 Route 13 South Milford, NH 03055 800/698-2640 www.chappelltractor.com

Chappell Tractor East, LLC 251 Route 125 Brentwood, NH 03833 800/616-5666 www.chappelltractor.com

Kahn Tractor & Equipment, Inc. 520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

Lorusso Heavy Equipment, LLC 160 Elm Street P.O. Box 857 Walpole, MA 02801 508/660-7600 www.lhequip.com


Page 18 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ACE EQUIPMENT SALES INC...................................... 11 ARGUS INDUSTRIAL COMPANY.................................... 1 ASTRO CRANE.............................................................. 12 BULLETIN BOARD..........................................................12 C J MABARDY INC........................................................ 12 CLASSIFIED....................................................................12 CMD POWERSYSTEMS INC........................................ 15 EMPIRE CRANE LLC......................................................12 EQUIPMENT 4 RENT.................................................... 15 EQUIPMENT EAST........................................................ 1,7 FOLEY MARINE & INDUSTRIAL ENGINE...................... 1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 LOCKE CRANE SERVICES LLC....................................10 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT............................................................ 1 MILTON CAT....................................................................12 NORTHLAND JCB.......................................................... 13 POWERSCREEN NEW ENGLAND..................................9 R J POIRIER HEAVY EQUIPMENT REP...................... 10 ROGERS BROTHERS CORPORATION........................ 19 SUMMIT SUPPLY LLC...................................................... 1 T-QUIP SALES & RENTAL INC...................................... 15 THE N.I.C.E. COMPANY.................................................. 9 THE W. I. CLARK COMPANY.......................................... 2 TYLER EQUIPMENT CORPORATION............................ 3 WOODCO MACHINERY................................................ 20 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Boutique Hotel Opens in Middletown, Rhode Island The Sea Breeze Inn announced the grand- egress stairs with expansion along the street opening of its newly built boutique hotel edge to improve curb appeal. It is truly an located at 147 Aquidneck Ave. in asset to the budding Aquidneck Avenue Middletown, R.I. The hotel is steps to streetscape,” Herchenroether said. Easton’s Beach and close to downtown “We wanted to take this opportunity to Newport, R.I., Cliff Walk, the Newport celebrate the roots of the Amarant family, Mansions and area beaches. The hotel fea- who emigrated from Greece in 1971, and tures 16 professionally designed guestrooms bring Newport a taste of the Mediterranean and suites with ocean views, along with a 30 with a modern, subtle approach. With each seat full-service café. design decision, we collaborated with Leeza “After years of planning, design and con- and Telly to ensure we created a space that struction, we are excited to open our new boutique hotel and once again welcome guests to the “After years of planning, Newport area,” said Leeza Amarant, owner and operator of design and construction, we the hotel. “We truly look forward are excited to open our new to offering top-quality accommodations along with our signature boutique hotel and once personal touch to travelers from again welcome guests to the around the world.” The Sea Breeze Inn started as a small ice cream parlor in 1991 by Newport area.” husband and wife team Telly and Leeza Amarant Leeza Amarant. In 1995, the Sea Breeze Inn Amarants expanded the site into an 8-room bed and breakfast with a café. In late 2015 the building was com- was authentic and uniquely theirs,” Gray pletely razed to begin construction of the said. new hotel. The hotel is located in the Atlantic Beach “Since we opened the original inn, we’ve neighborhood overlooking both Newport’s had the opportunity to host and meet amaz- Easton’s Beach (First beach) and Easton’s ing people from across the globe and we’ve pond and is just minutes to downtown been very fortunate to have many of our Newport, R.I. Rooms boast private balconies guests return to stay with us year after year,” with views of the beach and pond, each indisaid Telly Amarant, who oversaw construc- vidually designed with unique features and tion on the hotel. “The facility was growing accents. An onsite café provides compleold and dated it was time for an update. Our mentary made-to-order breakfast to all focus with this project was to start from guests every morning, which is included in scratch and create a space that complements the price of the stay. The café also is open to the unique style of Newport, Rhode Island. the public daily for breakfast and lunch. We’re confident that our guests will enjoy Amenities at the hotel include: complethe improvements we’ve made.” mentary made-to-order breakfast; a full servTelly and Leeza Amarant worked with an ice café where breakfast and lunch are area architect and interior designer on the served daily; private balconies; LED TV’s development of the new hotel. The building with 50+ channels; desks in each room; an was designed by local architect Dan elevator; free WiFi; and free plug-in Ethernet Herchenroether of HerkWorks and the inte- in each room. riors throughout the hotel were crafted by “We are thrilled to re-open and we hope Boston based designer Misty Gray of our guests will be happy with what we’ve Grayscale Designs. created,” said Leeza Amarant. “We will conHerchenroether worked to create a unique tinue to operate the hotel as we always have, feel for each custom designed room, con- treating all of our guests just as we would structing individual spaces with an open aes- family, and we look forward to beginning the thetic that celebrates expansive water views. next chapter of the Sea Breeze Inn.” “The redesigned Sea Breeze Inn celeFor more information, call 401/849-1211 brates the best of New England vernacular or 877/227-8400 or visit architecture with large roof overhangs, clean www.theSeaBreezeInn.com. (This story also can be found on lines, intimate private balconies and a welcoming entrance sequence. The building Construction Equipment Guide’s website at was reconfigured to account for proper www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • July 12, 2017 • Page 19

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

Avon, MA (508) 584-8484

www.cn-wood.com

Johnston, RI (401) 942-9191


Page 20 • July 12, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Contact your local dealer:

Headquarters rs Woburn 22 North Maple Street Woburn, MA 01801 781.935.3377

Massachusetts 140 Wales Avenue Avon, MA 02322 508.584.8484

Rhode Island

When the other contractors saw the power of that excavator, their jaws dropped to the floor. Powerful productivity.

That’s t our Ex Factor. – Glenn Korner, owner, Midstate Site Development

60 Shun Pike Johnston, RI 02919 401.942.9191

Midstate Site Development owner Glenn Korner says having Volvo on the j won them a school job b job by allowing them to propose a slide rail system. It required a machine powerful enough to drive the slide s rail system into the ground. It saved the customer $250,00 00 — and got Midstate in, out, an nd on to the next job in just two months. Find tips to get the e most from your excavator at volvvoce.com/ExFactor.

Smarrt Works.

®


Turn static files into dynamic content formats.

Create a flipbook