State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
May 27 2020
Vol. LI • No. 11
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Maine Uses Design-Build Approach for Nine Spans Over Four-Mi. Stretch
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
The $44.8 million project to replace the 60year-old bridges got under way in March.
Call for Pricing
LEED Accredited in Waste Management
2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS
$1,500* / Month Authorized Doosan Dealer
978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH) Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $46,900 plus freight. Other Screeners Available
EZ-SCREEN
*Limited time offer. Some restrictions apply. See dealer for details.
WE STOCK RUBBER TRACKS for Over 6,000 Models! A & GA NJ, TX, WOUSES WAREH
Some Used Tracks Available.
• HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
CEG CORRESPONDENT
Dump truck drivers will be busy in the coming months on a bridge project in Hampden, Maine. Their task: hauling 160,000 cu. yds. of fill material for the replacement of eight bridges and
repair of one on I-95 just south of Bangor. That’s more even than was required for the construction of the state’s signature Penobscot Narrows Bridge. Maine Department of Transportation (MaineDOT) resident engineer Robbin Lanpher is leading the I-95 bridge proj-
ect and also worked on the Penobscot bridge in 2004-2005. “We blasted a new highway for the Penobscot project over 100 feet of ledge,” Lanpher said. “I was telling the bridge manager, we are putting in more fill on this project than we took out of see BRIDGES page 12
888-888-1248
www.ez-screen.com
Boston Mayor Walsh Announces Plan to Begin Construction Reopening
248-745-5828
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
By Lori Tobias
CALL 888-81-GORILLA(46745)
Boston Mayor Martin Walsh announced May 5 plans to gradually reopen construction projects throughout the city. The city of Boston will be taking an incremental approach to broaden the allowable categories, he said during a video call with Associated Subcontractors of Massachusetts. Walsh also said he planned to speak with Gov. Charlie Baker and suggested the governor may
expand the definition of essential. Key dates of the gradual restart included and will include: • May 5, 2020 — Essential construction projects with approved safety plans and signed affidavits filed with the appropriate regulatory agencies will be authorized to prepare the site with project-specific COVID-19 safety see PLAN page 10