Skip to main content

New England 9, April 28, 2021

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

April 28 2021

Vol. LIX • No. 9

®

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

LEED Accredited in Waste Management

*Limited time offer. Some restrictions apply. See dealer for details.

LEASE THE EQUIPMENT. OWN THE JOB. 3 MONTH LEASE 36 AS LOW AS

$1,500*/MONTH Authorized Doosan Dealer

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $46,900 plus freight. Other Screeners Available

Tibbits 508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Equipment Services, Inc. www.tibbitseq.com

802-479-9696 ®

KWIK KLEET ts Traction Clea

EZ-SCREEN

www.ez-screen.com

248-745-5828

CALL 800-367-4937 *On approved credit • Financing Available

Phased Return to In-Person Classes Begins at New $256M Somerville School

CEG CORRESPONDENT

Call for Pricing

2021 EZ-Screen 1200XLS

Affordable Price. Premium Service.

By Irwin Rapoport

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

2003 Cat 938G Series II, 4190 Hrs, 3.65 CY Bkt, 180 HP, US Made, Nice Machine, Excellent Cond. $69,500 or BO Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

95

95

CALL 888-81-GORILLA(46745)

The delivery of the new Somerville High School (SHS) building and campus, which is expected to be completed in spring 2022 when Suffolk Construction completes Phase 3 — the construction of the new athletic field — is pressing forward. The city of Somerville, Mass., is replacing a school built in 1895 that has served generations of students, at a cost of $256 million. SHS is located on top of Central Hill between city hall and the public library, and on March The city’s share is approximately $136 million, of which approximately $130 mil4, 2021, the school wel- lion is via debt exclusion, and the state’s share is approximately $120 million. comed younger students as part of the district’s phased return to in- who will learn here over the years,” options to get you access to the buildperson learning during the COVID-19 said Mayor Joseph A. Curtatone. “To ing sooner, and of course we look forour high school students and families, I ward to when it will be safe for all of pandemic. “We are so excited for our students want you to know we are working on see SOMERVILLE page 4

U.S.-Canada Border Closure May Affect International Bridge Replacement Start Construction on two large federal infrastructure projects are scheduled to get going in Maine’s most northern community this summer. A long-planned effort to rebuild the Madawaska/Edmundston International Bridge across the Saint John River from Madawaska, Maine, to Edmundston, New Brunswick,

MaineDOT photo

along with the new U.S. Land Port of Entry (LPOE), will each likely transform the face of the tiny Maine community. But the continued closure of the U.S.-Canada border, which began in March 2020 due to COVID-19 restrictions, has created uncertainty as to exactly when construction will begin. In see CROSSING page 8


Page 2 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2016 LEEBOY 8510D

2005 VOGELE 1110RTB

2016 LEEBOY 8515C

272 hrs, excellent condition, propane screed, augur sensors, dual seats and spraydowns, stk# 25980 ........................................$125,000

Cummins, 10-19’ electric screed, 70% tracks, all wear items 70%, stk# 25947 ..........$25,000

2,400 Hrs, stk# 25464, 8-15’ electric screed, poly pads..............................................$76,000

2013 METSO MINERALS LT200HP

1996 KOBELCO SK270LC

2010 WIRTGEN 2100

4300 hrs, stk# 25979, Cat Power, Well Maintained Unit ..................................$325,000

9306 hrs, c/heat, pin on 42: bucket, stk# 26039 ..........................................$42,500

Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000

2001 JOHN DEERE TC54H

2002 JOHN DEERE 544H

2008 HAMM HDO120V

15,000 hrs, C/air, 3rd valve hyds, hyd coupler, 2.75 yard bucket, radials, stk#26375 ..$32,500

stk# 26359, c/heat, 3rd valve hyds, JRB coupler and 3 yard bucket ........................$42,500

3110 hrs, stk# 22866, 78” drums, oscillation dealer maintained ................................$35,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 3

Tyler Equipment Massachusetts 251 Shaker Road P.O. Box 544 P. East Longmeadow, MA 01028 413.525.6351 800.292.6351 Connecticut C ti t 1980 Berlin Turnpike Berlin, CT 06037 Dealer Name 860.356.0840 City, ST 800.352.4473

Contact your local dealer:

IMMPROVE YOUR EFFFICIENCY CY.

123.456.7890

Get jobs done faster with efficien nt Volvo compact wheel loade ers. They provide all-around visibility, excellent stability and easy accesss to tight areas — plus the L20H L model just won the Highest Retained Value Award™ in 2019 by EquipmentWatch. Improve cycle times and your profitability with powerful, efficient Volvo compact wheel loade ers. Cont act your today. Contact yournearest nearestXXXX Tyler location Equipment location today.

tylerequipment.com


Page 4 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

MaineDOT Plans Big, Small Building Merrimack’s Third Projects From 2021 Through 2023 Water Treatment Plant to Be Built If you’re wondering whether the roads on your commute to work, or if you’re working from home, the road to the grocery store, is due for a fix, the MaineDOT may have your answer. The state agency recently released a searchable database as part of its threeyear work plan, where anyone can view projects slated for 2021-23 organized by the municipality. “Years and years ago, our work plans used to be in print version and only distributed to policymakers and such,” MaineDOT Commissioner Bruce Van Note said in a phone interview. “We realized, to take a spoof on Tip O’Neill’s saying, ‘All politics is local,’ well, all transportation is local, too.” The DOT has released a similar database each year since 2013. There are plenty of central Maine projects included in the report, many of which are big-ticket items – roads, bridges and airport jobs – slated to be built from Augusta to Pittsfield. The finances include all sources of funding, including federal, state and municipal dollars as well as grants. The state’s plans, can be found at https://www.maine.gov/mdot/projects/workplan/index.shtml “We came up with this work plan process so people could see what we are doing the next three years, and through our website, can go back and see what we’ve done,” Van Note explained. “The DOT’s work plan process is often perceived as just a group of projects. And of course, it is, but it’s really an assembly line that just keeps going.” Here’s a look at projects around central Maine:

Waterville Eight projects are estimated to cost more than $1 million. The biggest of these is the $40.5 million replacement of the Ticonic Bridge between Waterville and Winslow in 2022 and 2023. In addition, the Robert LaFleur Airport will see a $6.28 million safety and infrastructure improvement in 2021; the Interstate 95 northbound and southbound bridges spanning Webb Road just north of the Sidney town line, midway between exits 124 and 127, will be replaced for more than $4.5 million each in 2022 and 2023.

Augusta Runway and taxiway reconstruction at the Augusta State Airport will be accomplished in 2021 at a cost of $3.35 million. Multi-million-dollar bridge construction also is slated for 20222023 with the replacement of Rines Hill Bridge over the old Maine Central Railroad coming in at $4.45 million; and the replacement of the Western Avenue bridge over I-95 is expected to cost $8.5 million.

Belgrade In 2022, a project described as a mitigation effort to offset impacts to wells will cost $2 million. The effort also includes a groundwater investigation. China In 2022 and 2023, MaineDOT plans to address a large culvert on U.S. Highway 202 near the intersection of Pond Road. The work, which is estimated to cost $515,000, includes highway safety and spot improvements, in addition to culvert upgrades. Clinton The Manley Holt Bridge is expected to be replaced to the tune of $2.1 million in 2022 and 2023. Fairfield State Rt. 139 will get $2.93 million worth of work in paving and other improvements. More than 5 mi. of the route will get attention in 2022 and 2023. Sidney Upgrades to Maine Rt. 104 also will take place in 2021, as a $920,000 project will resurface and pave the road for more than 5 mi. beginning just north of the Augusta town line. Skowhegan U.S. 2 West will get $660,000 worth of work in two projects. The first, which is lined up for this year, involves 6.37 mi. of surface and base maintenance. The second and larger effort will be at the intersection of Madison Avenue and Commercial Street. Town residents will see safety and spot improvements, as well as signal improvements in 2022 and 2023. Vassalboro U.S. 201 will get some assistance later this year, with $941,000 worth of

work. New pavement will be laid beginning at the Augusta line and expanding northward for more than 4 mi. Winslow Two $1 million-plus projects are scheduled in the next few years. A $1.1 million contract will provide paving and filling on Benton Avenue beginning at the Clinton Avenue intersection and expanding north for approximately seven-tenths of a mile. In 2022 or 2023, $1.91 million will go toward a replacement of the Fish Bridge over Winslow Stream near the Benton line.

Norridgewock The Central Maine Regional Airport has three different projects on the docket totaling $859,000 for a multiphase, three-year effort focused on safety and infrastructure improvements through field investigations, studies and research. Pittsfield Work also is set to occur at the Pittsfield municipal airport in 2021 where nearly $1 million worth of infrastructure improvements will be done, which may include a six-bay hanger. Bridge work on I-95 going through the city also is planned for the area in 202223. The Sebasticook River Bridge, spanning southbound over the interstate, will receive $4.38 million in rehabilitation work; a $2.6 million rehab is slated for the southbound North Main Street Bridge over Madawaska Avenue, while the northbound structure’s deck will be replaced for $1.18 million. Another replacement of the bridge deck of the southbound State Rt. 152 and Maine Central Railroad bridge over Rt. 152 has been budgeted to cost $2.93 million. Van Note said the coronavirus pandemic impacted the planning process in a couple ways: fewer people have been driving, so fuel tax revenue is not as high. However, interest rates are so low, bonding and federal funding allows MaineDOT to move forward. With the public database, he encourages everyone who wishes to view the state’s upcoming transportation projects, and at what cost, can do so. “We just like people to be able to see where their money is going so they can ask questions,” Van Note said. 

With construction expected to begin in April, Merrimack, N.H.’s third water treatment facility is designed to treat contamination of per- and polyfluoroalkyl substances, or PFAS. Peter Pitsas, a project manager with Underwood Engineering of Concord, has been overseeing the designs of the PFAS treatment plants for Merrimack Village District (MVD) wells since contamination was discovered coming from faucets at the Saint-Gobain Performance Plastics facility and later within the surrounding groundwater. Once the new treatment plant is complete, Merrimack will have three PFAS treatment plants for its public water wells serviced by MVD. That will bring the total of New Hampshire PFAS plants to five, including one in Dover and one now under construction in Portsmouth. “You guys are on the leading edge of what is happening in the state,” Pitsas told MVD planning officials in December while introducing site plans for the newest treatment facility. He predicts that other municipalities will be inquiring about Merrimack’s treatment sites and using them as role models as water companies adjust to recently approved state regulations for perfluorooctanoic acid contamination. The newest treatment plant will be constructed for MVD’s Well No. 2 in the area around Berry Lane and Stevens Avenue off Amherst Road. If all goes to plan, the Merrimack facility will break ground in April. The new plant will include four vessels, each 12 ft. in diameter, 26 ft. high and filled with two-thirds granular activated carbon, which Pitsas explained is the treatment for PFAS. MVD also is exploring the idea of drilling a new well in the same vicinity, which would be known as Well No. 9. “The goal is to have the total for Well No. 2 and Well No. 9 to be 2,000 gallons per minute,” added Pitsas. This newest well could potentially replace Well No. 3, which is experiencing a significant amount of iron and manganese content, as well as elevated sodium and chloride levels. “The water is getting very difficult to treat there,” he said. Previously, MVD constructed a treatment plant for wells No. 4 and No. 5 along Front Street. That facility was under construction in the summer of 2019 and began treating water in October, meaning each well is now back online after being out of commission for several months. In addition, wells No. 7 and No. 8 in Hollis also required one new treatment plant. That construction broke ground last July and should be up and running by August or September of 2021, according to Pitsas. “I think what we are going to create is a new paradigm for a lot of other municipalities and village districts in New Hampshire,” said Bill Boyd, a Merrimack town councilor and planning board member. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 5

Northland JCB B is now A Alta Equip pment Company ompany SIM MPL LY PUT T,, NO ONE CAN OFFER YOU MORE RE SALES AND SUPPOR POR RT T THAN AL LT TA, one e of the largest, fastest growing g equipment companies panies in the country. country With ith a slew of OEM’s, OEM’ including Avant, Avant, JCB, Polaris, ris, T Terramac, erramac, T Tor oro, Vibro oscreen, and more, Alta is the only company tha at can help manage your equipment needs. And with multiple locations across acr New England, mo ore service techs, better parts availability, and an outstanding support network, you’ll see why UP PTIME MA ATTERS TTERS – AL LW WAYS.

Ca all us at 800.Go2.ALT LTA or visit us online at a AltaEquipNE.com W IL ILM M ING IN GTO N, MA M 6 Jonspin J i Road R d Wilmington, MA 01887 833-NE-AL 8 LTTA TA-1

SHR SH R E WSB SBU U RY, Y, MA MA

MAIN MA INE E

M I D D LE BORO, ORO, M MA A

N E W HAM M MP PS HIR E

CON CO N N ECT CTII C UT

V E R M O NT

230 Cherr Cherry Ch y SSt. Shrewsbur Shrewsburyy, MA 01545 833-NE-AL 8 LTTTA A-2

23 FFoss oss R Roadd Lewiston, ME 04240 833-NE-AL 8 LTTTA A-3

3 Chalet Ch l t Road R d (Route (R t 44) Middleboro, MA 02346 8833-NE-ALLTTTA A-4

114 Hall St. Concord, NH 03301 301 833-NE-AL 8 LTTA TA-5

150 N. Plains Industrial Road Wallingford, CT 06492 833-NE-AL 8 LTTTA A-6

33B Commerce C Ave. S. Burlington, VT 05403 833-NE-AL 8 LTTA TA-7


Page 6 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

SOLD NEAR N YOU.

Your Y our local D Doosan® dealer is you ur source ffor or sales, par a ts and service.

Learn more at doosanequipment.c . om

Doosan® and the Doosan a logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. © 2021 Doosan Infracore North America, LLC. All rights reserved.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 7


Page 8 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Ove 40 Us r Hamm ed in Sto ers ck!

PORTABLE ROCK CRUSHING Onsite or Quarry • Making aggregates since 1983

Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT

www.FAYWRIGHTINC.com

Contractors Wait for Border Opening to Begin Work On Much-Needed Crossing CROSSING from page 1

addition, the final details on both projects remain uncertain. Contractors for both the LPOE and the International Bridge have prepared to start work in the coming months, with Woolwich, Maine’s Reed & Reed, specialists in bridge builders, planning to move trailers into town by the end of April, according to the St. John Valley Times. Meanwhile, there is no official start date for the LPOE project either, with the federal General Services Administration (GSA) saying only that the current timeline marks this summer for the site preparation. GSA and its Tennessee-based contractor J & J Contractors are still designing their project, which should continue for another six to nine months, the GSA told the local new outlet. The reasons for replacing the steeltruss International Bridge are straightforward: After almost a century of service, the span over the Saint John River was determined by DOTs in two coun-

tries to be in poor condition. Both Canada’s New Brunswick transportation agency and MaineDOT agreed that, despite efforts to maintain its upkeep, the old bridge’s rate of deterioration was quickly bringing it closer to being obsolete. In recent years, its load capacity was determined to be a paltry five tons (the equivalent of a passenger vehicle). MaineDOT said on its website that the nearly 100-year-old structure, “no longer meets the needs of the communities and local businesses because of its width and load capacity. It would cost more to upgrade the current bridge than to build a new one.” When construction on the new Madawaska/Edmundston International Bridge finally gets under way, it will be located approximately 1,300 ft. upriver of the old structure on the Saint John. A more modern border station near the U.S. end of the bridge will be an upgrade over the “substandard” size and conditions of the existing building, too. MaineDOT has said the station

prevented “customs and inspection agencies from adequately fulfilling their respective missions.” The reopening of the border between the United States and Canada cannot come fast enough for Reed & Reed as it worries about delays in its construction project. “We sure hope they’ll lift the COVID restrictions soon, because we need to have access over there,” CEO Jackson Parker said while speaking to the St. John Valley Times. “I hope and think by the time we get up there and start working in May we’ll be able to have open borders, [but] your guess is as good as mine.” If workers are unable to cross, Parker said the company would focus on building up the U.S.-side abutment until the restrictions lift. Construction also will likely affect downtown driving in Madawaska, with Main Street running immediately adjacent to the LPOE site. Away from the see CROSSING page 10


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 9

Proven worldd-class Tele-craw e wlers LER TELE CRAW TH ORT N NO

1LIINNE UP

#

CA!! R CA MEER AAM

ft | 68m main boom 223 348 ft | 105m max tip height full attachment with Superior capacities winch design Ultra-wide Vision package - 4 cameras!

Ver e mont 802-658-1700 Massachusetts etts 508-499-1950 Pennsylvania ia 717-795-0700 New Yoork 315-676-2008 www.woodsscrw.com

250 t | 230 mt TELESCOPIC CRAWLER

Lexington, Kentucky, USA SA | www.linkbelt.com

HIGHEST CAPACITY A AVAIL A ABLE IN THE MARKET!

B U Y

•

L E A S E

•

R E N T


Page 10 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

JDC Demolition, Dow Contribute to Massive School Project SOMERVILLE from page 4

abatement activities, was completed in late August, with debris removal taking place in October. “Following the removal of any hazardous materials, the demolition contractors commenced bulk building take-down activities,” said Antonellis, “followed by sorting and stockpiling aligned with material reuse and recycling. These activities all happened directly on site. The Dow Company Inc. managed site soils as part of its overall site work scope. Soils were generally stockpiled unless prevented by site constraints that required live-loading.” Mike Rygiel, Dow’s project manager, is eager to return to the site to help complete Phase 3. Dow arrived on the site in October 2018, where for two years its crews engaged in mass excavation, site prep and soil nailing operations. “Phases 1 and 2 required a lot of soil excavation,” he said. “During Phase 1, the building was terraced with 20-foot cuts and there were retaining walls that were 20 feet tall at some levels. Overall, we were looking at close to a 50-foot change in elevation from the upper elevation to the lower level. It wasn’t easy as there were existing buildings that had to remain in place. With the 20-foot cuts right up against them, we had to install 20foot deep holes on the back side that we had to backfill to bring it up to grade.” This required an immense amount of planning to create the support. “We poured holes through the footings of the foundations and then installed mini-piles in the holes, injecting grout on top of them to build a mushroom-like cap underneath the footings,” said Rygiel. “This allowed us to excavate vertically right up against the footing.” This work was performed by Hub Foundation Co. Inc., a subcontractor brought in by Dow, based on its experience of dealing with similar situations. Dow crews worked through the winter months, which saw soil nailing and earth support operations performed in the cold

weather between January and March of 2019. “Soil nailing requires spraying concrete grout against mesh walls, which we did in freezing conditions,” said Rygiel. Cat excavators, a 349 and a 336, were critical for the excavation operations. “Most of the work required the use of excavators,” Rygiel said. “As we excavated soil, we would cast them behind us and down to the lower level where another excavator would be loading a tractor trailer to haul the soil off site.” For the mini-piles, the subcontractor utilized airtracks. Having reliable equipment was critical to meet benchmark. “We maintain our equipment pretty well,” said Rygiel. “We don’t experience much down time on our equipment and for the Somerville project, I can’t think of any instances where we had any issues with equipment.” Dow purchases and rents equipment from dealerships, such as Milton CAT. The Central Hill monument, honoring Union Civil War soldiers, was moved between January and February 2019. “All existing monuments within the site were meticulously removed and crated for storage off site until they can be re-installed within the city at a later date and location,” said Antonellis. “Larger monuments required documentation and disassembly in advance of crating for offsite storage.” Soil nailing activities ran from January through March 2019, with foundations completed in June 2019. The foundations were cast-in-place concrete. Operations to remove the existing Field House roof began in June 2019. “This work entailed not only the entire removal of the 26,400-square-foot roofing assembly, but also the roof decking, and existing 121-foot-long span truss structure,” said Antonellis. “As existing trusses were removed, new replacement trusses were hoisted into place followed by an entirely new roof decking membrane assembly. This tightly coordinated sequence of activities

was completed ahead of schedule. “The biggest challenge was managing water that inevitably would enter the building while portions of the roof were open,” he added. “The Suffolk Construction team devised a ‘bathtub’ approach whereas a membrane was installed over the entire Field House floor area and temporary drains installed to manage any rain water that came into the structure.” The east building demolition was completed in August 2019 and via solid progress, the Phase 1 steel topping off ceremony occurred in October. “Both the west and east structures were turned over to the client in February 2021,” said Antonellis. “The building envelope is multi-faceted with a large number of different surface planes. Additionally, the myriad of building elevations all had differing grade elevations, making logistics especially challenging. Envelope material conditions also ranged from a terra-cotta rainscreen system, including varying brise soleil systems to reduce thermal gains, to new masonry, historic preservation of existing masonry, curtainwall, metal panel, and DAFS [directapplied finish system]. “Suffolk worked with the various envelope subcontractors to coordinate the extremely tight dimensional tolerances between the multiple systems and their respective air vapor barrier and waterproofing components,” said Antonelis. “To better manage and understand these critical system interfaces, the project included the design and construction of a complete mockup structure, essentially a mini-building that included all envelope systems for both the façade and roofing. As the mockup structure was fully enclosed, it was also subjected to envelope pressure and waterproofing testing.” Installation of the MEP/FP systems for the building started virtually, with all components fully modelled and spatially coordinated in three dimensions. Following this “virtual construction,” the building was broken down into smaller discrete zones that the MEP/FP trade contractors would “cycle

through” in a sequenced fashion to reduce the overlap of multiple trades trying to access a single work zone. “Following the installation of all components,” said Antonellis, “the systems were tested and commissioned to ensure interfaces and overall system performance achieve or exceeded project requirements.” With a year to go, site work crews have started the third phase of the project — a new synthetic athletic field. “Due to the natural slope of the site, this phase will require the installation of over 1,440 linear feet of cast-in-place concrete retaining wall as tall as 20 feet,” said Antonellis. “A major challenge throughout construction has been that the site is actually shared with a major railway and bridge infrastructure project being completed by the state. The two projects share an entire perimeter boundary, as well as overlapping scopes of work traversing respective property lines controlled by easement agreements between the two abutters, each a separate city or state entity. “As with any large scale, multi-phased, urban construction project, communication is key,” he said. “This was only furthered by the onset of the COVID-19 pandemic that required new working and communication protocols to be developed and deployed in real time as regulatory and public health conditions evolved over time.” The project had more than 320 tradespersons daily just before the onset of the pandemic. Following a restart of construction after a brief regulatory moratorium, the project census dropped slightly to averaging between 250 to 300 tradespersons daily. Local and regional subcontractors have been hired. The excavation and demolition generated a large amount of concrete, steel, wood, asbestos, earth and rock. “All construction waste was removed from the site conventionally to a processing facility that would manage all material sorting and recycling off site,” said Antonellis. Suffolk is still tabulating the amount of new materials being brought in.  CEG

Town’s Business Should Pick Up Once Bridge Work Begins CROSSING from page 8

downtown area entirely, the community’s public works department will undertake the first stage of a major hot topping project. Town manager Gary Picard was unsure what effect the ongoing work would have on traffic, saying that representatives from each project would be responsible for managing the flow individually.

“GSA, MaineDOT and their respective contractors will collaborate, coordinate and communicate any significant, planned traffic and travel impacts during construction as necessary,” said Paul Hughes, a spokesperson of the GSA. One thing is sure — with dozens of workers coming into Madawaska for the multiyear projects, the streets will be more full

than usual, something that could spell promise for local businesses. “That would definitely increase everything from apartment rentals to dining to purchases in the retail stores,” Sharon Boucher, director of the St. John Valley Chamber of Commerce, told the newspaper. “It would mean a lot for the town.” Boucher has been assembling a directory

of apartment rentals since a Reed & Reed representative called her earlier in April about bringing local subcontractors in on the bridge work. While the streets are quiet when Boucher leaves work at night now, she sees a bustling Main Street in Madawaska’s future. “I really think we’re going to have a lively downtown,” she predicted. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 11

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

RENT! RENT! RENT! RENT!

2015 CAT 329FL, 4200 hours, Rear Camera, Aux. Hydraulics ..................................$139,000

2019 Hitachi ZX210 LC-6, 1400 hours, Aux. Hydraulics, QC, Rear Camera ............$159,000

2017 Terex TA300, 1700 hours, Excellent Condition, Good Rubber, Work Ready$189,000

2018 LINK-BELT 210 X4, 1650 hours, Graptor Bucket & Thumb, Very Nice Machine $122,000

2012 CAT 324EL, 5500 hours, QC, thumb, aux. hydraulics ......................................$99,000

2017 CAT D8R, New Engine, 80% UC, Recent Equalizer Bar, Work Ready ........$169,000 Firm

2016 CAT 262D, 2000 hours, QC, Aux. Hydraulics, AC ......................................$33,500

2008 Komatsu D61EX-15EO, 4000 Hours, EROPS w/AC, Runs Great! ..................$65,000


Page 12 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

CONSTRUCTION AUCTION DAVIS AUCTIONS, INC. • SATURDAY, May 8, 2021 9:00 A.M. LOCATION: 210 CHESHIRE ROAD, RT. 68, PROSPECT, CT Davis Auctions, Inc. will be conducting our next auction of utility and construction equipment and related supplies on May 8, 2021. This auction will consist of excess equipment from the power companies, municipalities, and others to be sold in absolute. We will be accepting consignments through May 1. Please call to confirm space.

Early Consignments: EQUIPMENT

Excavator: DEERE 26G, w/Blade, Rubber Tracks, Aux. Hyd. Swing Boom; BOBCAT E20, w/Blade, Rubber Tracks, Aux. Hyd., Swing Boom, Expanding Undercarriage; KOMATSU PC15-2, w/Blade, Swing Boom, Padded Steel Tracks; Skid Steer Loader: DEERE 316GR, Rubber Tired; NEW HOLLAND L218, aux hyd., pilot controls; CASE SR250, aux. hyd., EROPS, pilot controls; CAT 289D, aux. hyd., rubber tracks; 2001 BOBCAT 773, aux. hyd.; Loader: KOMATSU WA180PT-MC; DRESSER 520C, JRB 416 Quick Connect, No Bucket; NELSON, Cummins 220 HP; Screener: TEREX Evoquip Colt 600 3 Way Split, Deutz TD2.9 4 Cyl. Dsl, 74 HP, Hydrostatic Drive, Remote Control, 12” Steel Tracks, 40” Hopper w/3.9 yd Material Shaker, low hours; Lifts: JLG 800AJ, 80’ Boom, Deutz 4 Cyl. Dsl, 4x4; 2008 GENIE Z60/34, 60’ Boom, Deutz Dsl, 4x4; SKYJACK MD3220 20’; Elec.; Roller: CATERPILLAR CS74 Single Drum; LEEBOY 400T Double Drum, Hatz Dsl; Landscape Equipment: FIRST PRODUCT AERA-VATOR AE60 w/Power Seed Box, Roller, Grooming Brush, 3PtH; 2019 KUBOTA T2290 Lawn Tractor, w/48” Mower Deck, gas 22 +/- hrs.; FORD 4610 Wheel Tractor, w/TMC Side Sickle Bar, 3 PtH, Dsl; TORO Groundmaster 455D 10’ Wing Mower; TORO Groundmaster 345 72” Mower; DEERE Zero Turn Mower; DEERE Lawn Tractor, w/Mower & Blower; INT’L Cub Cadet Lowboy 154 Tractor, 3 PtH; Wheel Loader Backhoe: CATERPILLAR 416C Turbo, 4x4; (3) DEERE 310SG, EROPS, Extend-A-Hoe, w/Buckets & Hyd. Hammers; Unused 48”- 84” Skid Steer Attachments: (2) Hammers; (2) Trenchers; (2) Tree/Post Pullers; (2) Augers, w/3 bits; (3) Root Rake Grapples; (4) Power Angle Snowplows; (3) Brush Mowers; (2) Rollers; Grapple; Snowblower; Broom; (3) Rototillers; (8) Skeleton Buckets; (4) Sets- 10’ Forklift Extensions; 2016 MCCONNEL 4’ Boom Mower; BOBCAT Sweeper; Pallet Forks; Light Towers: TEREX AL5HT, Kubota Dsl; MULTIQUIP Nighthawk LT12; GODWIN GLT416; Misc.: 2003 IR 185WJD Port. Air Compressor; PETTIBONE MERCURY Forklift; CROWN HEAT KING Mobil Glycol Heat System, Trailer Mtd; (2) MAC 550F Heaters, 5500 BTUs; Trailer Mtd, Isuzu Dsl; AGGREKO Mobile Heat Trailer, 700,000 BTUs, Kubota Dsl; MARKLIFT Elec. Lift; 4’ Asphalt Roller; Kubota Sweeper Attach.; Port. Solar Arrow Board; JRB 10' Plow, JRB 416 Quick Connect; (2) Unused Forklift Dumps; LAYMOR Sweeper, w/6’ Hyd. Angle Broom, Dsl; Call for more information: DAVIS AUCTIONS, INC. (203) 758-4087 or 1-800-201-4368 www.davisauctionsinc.com

BERCO Sweeper, Honda Eng.; BOMFORD 3 PtH 6’ Side Flail Mower, PTO; WOODS PRD8400 Finish Mower, 3PtH; (Unused) TITAN 6’ Landscape Rakes, 3 PtH; Excavator Thumb;

VEHICLES

Bucket Trucks: (2) 2012 DODGE 5500 Ram w/Altec AT37G Squirt Boom; (2) 2007 INT’L 4400, w/Terex HR50M Material Handler; 2001 FORD F550XL SD Crew Cab, w/ETC 37’ Bucket & Knapheide Ut. Body; (2) 2012 DODGE 5500 Ram w/Altec AT37G Squirt Boom, Bad Engine, Rusted; (2) 2010 FORD F750, w/Altec AT40 Squirt Boom, Bad Engine; 2006 INT’L 4400 w/Terex Telelect HR50M Material Handler, Dakota Ut. Body, 4 Outriggers, DT466, Boom Not Complete; 2003 FREIGHTLINER Boom Truck; 2001 STERLING Boom Truck; Utility Trucks: 2015 CHEV. 2500HD, w/Reading Ut. Body, Tommygate Lift Gate, Fisher Plow, 4x4; 2007 INT’L 4400; 2003 FORD F550, w/Mini Crane, 4x4; 2000 GMC 3500HD, w/Reading Ut. Body, Venturo ET6KR Crane; Box Trucks: 2000 INT’L 4900, DT466E, Dsl; 2000 FORD F650 SD; Dump Trucks: 2005 STERLING F/B S/A, Dsl; 1988 INT’L 2554 S/A, w/plow; Flatbed: 2005 STERLING Acterra; Mercedes Benz Powered; 2002 FORD F450XL SD, w/Reese Hitch, Triton V10; Pickups: 2015 CHEV. 2500HD Crew Cab, w/Side Boxes, Fisher Plow, Tommygate Lift Gate, Job Box, 4x4; 2013 CHEV. 1500 Ext. Cab, 4x4, Bad Engine; 2011 DODGE Dakota Crew Cab, 4x4, Bad Trans.; 2011 FORD Ranger, 4x4, Bad Engine; Rust; 2010 FORD F350 Crew Cab, 4x4; 2009 DODGE Crew Cab, 4x4, Needs Repairs; 2007 GMC Canyon Ext. Cab, w/Reading Ut. Cap, 4x4; 2003 CHEV. Silverado 2500HD, w/Plow, Thieman Lift Gate, 4x4; 2003 CHEV. Silverado Ext. Cab, 4x4; 2003 FORD F150 Crew Cab; Vans: (13) 2013 CHEV. Express, (1) AWD, (11) CNG; 2013 DODGE Grand Caravan; 2012 FORD Transit, Bad Trans.; (2) 2010 DODGE Grand Caravan, Bad Trans.; 2009 CHEV. Express, Flex Fuel, AWD; 1995 GMC Vandura 3500; Cars/SUV: 2016 CHEV. Equinox LTZ, AWD; (2) 2013 FORD Escape, 4x4, Bad Engine; 2010 JEEP Rubicon, 4x4; 2009 HONDA Civic GX, CNG; 2009 TOYOTA Corolla S; (2) 2009 FORD Escape, Frame Rot; 2008 CHEV. Aveo LS; 2007 CHEV. HHR LS; 2007 TOYOTA Prius Hatchback Hybrid; 2006 VOLVO XC90, 4x4; 2005 JEEP Grand Cherokee, 4x4; 1998 CHEV. Camaro, V6, Auto, T-Tops; 1998 MERCEDES BENZ CLK320; Misc. Vehicles: 2004 INT’L CE300 School Bus; 2002 STERLING L9500 Tractor; 1998 WINNEBAGO Adventurer 32’ Motorhome; 1991 INT”L Pressure Drill Truck; Trailers: 2006 TRANSCRAFT Flatbed; (2) 2005 ROGERS 50 Ton

For Online Bidding, Visit https://www.proxibid.com

Sale Terms: 10% Buyer’s Fee Payment: Cash, Good Checks, Credit Card & Certified Checks

Detach. 3 Axle Lowbed; 2005 WABASH NATIONAL Box; 2003 TRANSCRAFT 45’ Drop Deck; 2002 HOGG DAVIS Reel; Antique Trailer; Other: 2016 POLARIS Razor 900ES Side by Side; 1995 BOMBARDIER SW48, w/Angle Plow, Auto, Dsl; Sailboat w/Trailer; SKIDOO Snowmobile; (2) Jet Skis; Unused Containers/Storage Shelters: (3) 40' 4 dr. Container, 4 side doors; (2) GOLDEN MOUNT 40’x80’ Dome Container Shelter; GOLDEN MOUNT 40’x40’ Dome Container Shelter; GOLDEN MOUNT 30’x85’x15’ Dome Storage Shelter; (3) GOLDEN MOUNT 30’x65’x15’ Dome Storage Shelter; (6) GOLDEN MOUNT 20’x30’x12’ Dome Storage Shelter; GOLDEN MOUNT 20’x40’ Dome Container Shelter; GOLDEN MOUNT 20’x20’ Dome Container Shelter; 9’ Container, w/door & window; GOLDEN MOUNT 20’x12’ Car Port; Portable Buildings: 19'x20' Port. Office, w/bathroom (Visit Website for More Information); BASTONE 110V Port. Bathroom, w/shower & toilet; (2) BASTONE 110V Port. Toilet, w/two stalls; BASTONE 110V Port. Toilet, w/one stall; Misc.: Unused 4000 PSI Hot Water Pressure Washer; (3) 7’ 18 drawer Work Benches; (2) Unused 7’ 10 drawer Work Benches; 10 Wheel Dump Body, w/strobes & taillights, no piston; Flatbed Body, w/liftgate; (4) Pallets- 2” Bluestone Patio Kits; (2) Pallets- 1.5” Irregular Tumbled Pavers; (2) Pallets- 2” Irregular Tumbled Pavers; (19) Pallets- Gauged Colonial Wallstones; Concrete Blocks; 6’x6’& 2’x8’ Blue Stone Slab; Pallet- Oak Firewood; Pallet- 3/4” Red Decorative Stone; Pallet- 3/4” Blue Decorative Stone; (2) 14’ Driveway Gates w/(20) 8’ Fence Sections; (12) 20’ Wrought Iron Gates; (3) 14’ Wrought Iron Gates; (2) 200# Cast Iron Anvils; 20,000# Elec. Winch; (2) GREENLEE Boxes; Stainless Steel Milk Tank; Pallet- Safety Cones; Straps; Double Hook Chains; Safety Cabinets; Pallets- PVC Pipe; Sub Pumps; Plastic Collars; Pallet- Firehose; Traffic Boxes; (2) Pallets- Light Fixtures; (Unused) Large Assortment of HD motorcycle parts, peg board organized; Complete Shovelhead motor; Shovelhead Motor, parts; HD Frame; HD Fenders; Grease Guns; Lasers; Heater; Saws; (5) 275-330 Gallon Oil Tanks w/Legs; 1000 Gallon Double Wall Diesel Tank, w/Transfer Pump; 500 Gallon Single Wall Diesel Tank w/Transfer Pump;

Inspection: Friday, May 7- 8:00 am to 5:00 pm

Masks are required by all attendees. Temperatures will be taken to enter and bid. We will be following all CDC guidelines for social distancing and hand sanitizing. Online bidding will be available. Please register for online bidding a minimum of 24 hours before sale. AUCTIONEER: REGINALD LUSSIER LYNDONVILLE, VT 05851 NH LICENSE #2413


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 13

®


Page 14 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT/NORTHLAND JCB ............................5 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT ........................................................6 DAVIS AUCTIONS ..........................................................12 DOOSAN NORTHERN NEW ENGLAND ......................13 EQUIPMENT EAST ......................................................1,16 FAY & WRIGHT EXCAVATING INC ..................................8 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HEAVY MACHINES INC ..................................................7 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................14 PETERSON ATTACHMENTS ..........................................8 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ....................................8 T-QUIP SALES & RENTAL INC ......................................11 THE N.I.C.E. COMPANY ................................................11 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP........................................................9 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • April 28, 2021 • Page 15

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 16 • April 28, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Cut your big g jobs down to size. Go beyond scooping, carr ying and loading. The impressive digging and high tractive power of Doo D san® wheel loaders help you take on the most challenging material-handling tasks. Powered by a Tier 4 diesel engine, you’ll penetrate tough materials, tilt and lift with ease, and carr y more in ever y cycle. It’s your ticket to making harder work easier, longer days more enjoyable and ever y minute more productive and profitable. Stop in fo for details on Doosan wheel loaders s to oday y..

Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 2

Au thor ized Doos an De aler

Equipment East 61 SiManley lva LaneSt. • D•raBrockton, cut, MA 018MA 26 02301 • 508-484-5567 196 978 -454-Lane 3320 •• w w w.equMA ipm01826 enteas•t.978-454-3320 com 61 Silva Dracut, 1474 Rte 3A • Bow, NH • 603-410-5540 www.equipmenteast.com


Turn static files into dynamic content formats.

Create a flipbook