State Supplement sponsored by:
1
THE NEW ENGLAND EDITION
11
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
95
95
®
March 30 2022
SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
Vol. LX • No. 7
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Specializing in:
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Kubricky Construction Demolishes Bridges, Builds Temp Spans, More
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
By Irwin Rapoport
Call for Pricing
The Middlebury Bridge & Rail project, a Vermont Agency of Transportation (VTrans) initiative in collaboration with the town of Middlebury, is nearing completion this summer. The more than $92 million project replaced two nearly 100year-old bridges that crossed the Vermont Rail Corridor in the center of Middlebury with a tunnel in the summer of 2020. A 360-ft. long tunnel replaced the Main Street (60 ft. long) and Merchants Row (80 ft. long) bridges, which addresses several structural deficiencies. The final construction contract was the main project, which consisted of temKubricky Construction porary support of excavation, removal of the temporary bridges; excavation of Corporation (KCC) served as the the rail corridor; installation of the precast tunnels and U-walls; and recon-
CEG CORRESPONDENT
LEED Accredited in Waste Management
2022 EZ-Screen 1200XLS
Visit Equipment East for a demo. Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $59,900 plus freight.
508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Tibbits Equipment Services, Inc.
www.tibbitseq.com
802-479-9696 ®
KWIK KLEET ts Traction Clea
Other Screeners Available
EZ-SCREEN www.ez-screen.com
248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
see MIDDLEBURY page 10
Arborio Construction Rehabs Bridge Damaged By Hurricane Ida in Conn. By Ken Liebeskind CEG CORRESPONDENT
• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com ‘05 Caterpillar 928G $36,800
• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
Phil (413) 427-7171
CALL 888-81-GORILLA(46745)
struction of roadways, embankments and landscaping features.
Hurricane Ida, which dropped more than 6 in. of rain in many parts of Connecticut in early September 2021, caused massive flooding, highway closures and water rescues. It also damaged roadways and a bridge on Route 9 Southbound in Cromwell, which is currently being rehabilitated. see BRIDGE page 4
Work began on the project in September and is on track for completion by May 1, according to CTDOT.
Page 2 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100
2013 HAMM HD12VV
2005 WIRTGEN W2000
Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000
stk# 26021, single & dual vibratory, PSI water system, recent service to engine, new seat assy, 4104 Hrs ....................................$22,500
stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work ..................................................$115,000
2015 KUBOTA KX080-4
2019 BOBCAT S740
2018 DEERE 550KXLT
stk# 27162, c/air, 2 speed, aux hyds, angle blade, 80% rubber tracks ....................$54,500
stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500
stk# 26504, 240 hours, ROPS, 18” pads, 105” 6 way blade, like new condition ........$119,500
2020 CASE TV450
2019 DEERE 333G
2016 LEEBOY 8515D
stk# 26945, c/air, pilots, 2 speed, RC, Hi Flow, hyd coupler, 84” bucket 80% tracks ..$68,500
stk# 27123, c/air, hi flow hyds, 2 speed, forestry package, new tracks, 84” bucket ........ ............................................................$69,500
stk# 26028, 1790 hours, Kubota, 8-15’ propane screed, dual spraydowns, rubber tracks ..................................................$79,500
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 3
New 738 8M purpose p p e-built t h tree han ndler is BIG new ws for tree care speecialists SENNEBOGEN’s “game-changing” tree care handlerrs have raised the bar even higher! Thee new 738 M weighs in at twice the size of 718 M and R-HD models with mo models, ore power and more reach to take on bigger jobs! d with a power grapple The 738 M, fitted saw, is attached to a 75 ft. telescoping boom and stick to t quickly fell or prune trees as high as 1125 ft. to 150 ft. tall. Then it easily cutts, swings and stacks the wood with a single operator to hole job. complete the wh
CUSTOM MENGINE EERED TREE CARE HANDLLERS
PU URPOSE-BUILT
FR ROM THE GR ROUND UP
• Ideal for all tree seervice operators • Used for woodlot thinning, harvesting wood fuel f to clearing storm debris up to o 48" and up to 125' high • All wheel drive or tracked models • Jobsite safety incrreased with trimming, cuttingg, loading and stacking operation ns as all are done from the con nfines of the SENNEBOGEN eleevating and tilting Maxcab
As big and poweerful as it is, the 738 keeps pace with w the 718 M and 718 R-HD machines with precise handling and fasst cycle times to process up to 150 trees per day. From the roadsid de, on embankments or in heavy wood ds, the 738 M is the new game-changger for all land clearing, right-of-way right of way maintenance and heavy tree care operations.
Get th he details on the high effficiency solutio l ion for custom tree rem movall
The New 738 M
www.seennebogen-na.com | +1-7040 347-4910
251 Shakker Road East Longmeadow, MA 01028 (800) 292-63 6351
1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473
www.tylerequipmentt.com
Page 4 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Emergency Work to Repair Damaged Hub Prepares to Bridge in Cromwell to Finish in May Build Long Island Stabilization Package The mayor has said she envisions the island as a mid- to long-term solution to help rid the scourge of addiction that continues to plague the city and its surrounding area. The work being done on Route 9 Southbound is an emergency job that is progressing well.
Arborio Construction of Cromwell, Conn., is the contractor on the project. BRIDGE from page 1
Arborio Construction of Cromwell, Conn., is the contractor. An Emergency Declaration project was signed by Connecticut Department of Transportation Commissioner Joseph Giulietti on Sept. 7 in order to stabilize and repair an existing 84-in. asphalt-coated corrugated metal (ACCM) pipe that was found to be structurally compromised following the storm event. The excessive rainfall from Ida caused a large sinkhole to develop above the 84-in. ACCM pipe that conveys an unnamed brook under the ramp and across Route 372 in Cromwell, according to a CTDOT report. Further investigation found the culvert to be compromised structurally due to the erosion around the pipe. “The work being done on Route 9 Southbound is an emergency job that is progressing well,” according to a CTDOT. “We began the work because the road was settling due to an underground pipe failure following Hurricane Ida. Rather than shutting down the entire road, we are pipe jacking, which is pushing the pipe through the ground. So far, we’ve been prepping the pipe jacking and working on the access roads to get to the pipes. Next, we will excavate for the earth retaining systems on the inlet and outlet sides, pour concrete
A plan to prepare a stabilization package for the buildings on Boston’s Long Island, where the city continues to one day envision an addiction-recovery campus, is again in the works, with the added hopes of rebuilding a bridge to it this fall. Sources in Boston Mayor Michelle Wu’s administration told the Herald the second week of March that the amount of cash the city is looking to put toward stopping the deterioration of the already dilapidated buildings on the island is still to be decided. Located in Boston Harbor, Long Island is 1.75 mi. long and covers a total of 225 acres. Documents outlining a “master plan,” created during former Mayor Marty Walsh’s term, called for a complete overhaul of the island to the tune of $80 million to stabilize all the buildings there, according to the results of a Herald record request. Wu administration officials, made available to speak about the plan to the newspaper, said they are not looking at a package that big. The mayor has said she envisions the island as a mid- to long-term solution to help rid the scourge of addiction that continues to plague the city and its surrounding area. “During Mayor Wu’s visit to Long Island [in January], the need to immediately stabilize and secure some of the existing public health facilities to prevent further deterioration was evident,” her office said in a statement to the Boston Herald. “Mayor Wu has authorized [the Public Facilities Department] to develop and pursue a stabilization program for the existing facilities while we engage in our own planning around Long Island and the great potential it has to support Boston’s recovery and supportive housing needs.”
and do the physical pipe jacking on the site. Then we will move to a ground remediation plan, which is pressure grouting any voids under the existing roadway.” The finalized scope of this project includes the full replacement of the existing 260 linear ft. of the 84-in. ACCM pipe by jacking a new 84-in. reinforced concrete pipe (RCP). New headwalls and compaction grouting also will be installed. Work began on the project in September and is on track for completion by May 1, according to CTDOT. The construction equipment being used by Arborio on the project includes a Cat 330B excavator, a Volvo EW170 excavator, a Cat CS-431B vibratory smooth drum roller, an Ingersoll Rand 180, air compressor, a Vermeer E2983 Navigator S3 drilling rig and a Wacker Neuson compactor plate. Long Island Bridge Faces Fierce Opposition President Biden granted a Major Disaster Declaration for There is, however, still the ongoing debate over rebuilding the State of Connecticut, releasing federal funds to help res- a bridge to the island. idents recover from Hurricane Ida on Oct. 31, 2021. State The Walsh-era documents detailing the overall plan are funds of $4,297,171 will pay for the job, according to about the island itself, while barely mentioning the bridge CTDOT. The money comes from the Fix it First bridge pro- needed to get there. What that plan does present are different gram that was authorized by the State Bond Commission. CEG
see ISLAND page 6
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 5
AUTHORIZED DOOSAN DEALER
DRACUT
BROCKTON
BOW
978-454-3320 61 Silva Lane Dracut, MA 01826
508-484-5567 196 Manley St. Brockton, MA 02301
603-410-5540 1474 Rte 3A Bow, NH 03304
www.equipmenteast.com
DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done. Visit Equipment East for a demo. ©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,
Page 6 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Boston Looks to Build Bridge as Part of Island Master Plan ISLAND from page 4
Ove 40 Us r Hamm ed in Sto ers ck!
dollar amounts for work on the island depending on whether there is a bridge during construction. The cheapest near-term options, for “Phase 1” of getting two buildings ready to begin handling patients, include $200 million with a bridge open and no stabilization spending, $238 million with the bridge and some stabilization, or $250 million with no bridge. That would create up to 124 beds of the 500 visualized in the broader $540-millionplus primary plan, which saw no further action after Walsh was chosen by President Joe Biden in early 2021 to serve as U.S. Secretary of Labor. Walsh always intended to rebuild the bridge, which his administration considered the only viable option for using the small island as a recovery center. The bridge construction effort — which Walsh’s administration put at $80 million, though other estimates have placed it higher — would replace the former span that the
city removed in 2014 due to its deterioration. Although the bridge is in Boston, the only way to drive out to the island is by going through Quincy first. The smaller town has fought the construction plans tooth and nail, dragging Boston into an ongoing court fight. A Wu administration official told the Herald that the city is “hopeful” that bridge litigation will wrap up soon enough for Boston to begin advertising for the project this fall. The mayor’s office also mentioned the idea of ferry service in lieu of the bridge, and one of the administration’s officials recently noted “nothing is off the table” on that front. But the Walsh administration long objected to that idea, saying it was too expensive and would not work for emergency responses to the island. Acting Mayor Kim Janey, who ran the city for much of 2021 between Walsh’s departure and Wu’s swearing in, also floated the idea of ferries at one point and ordered up a review, only to quietly drop the idea a few months later, according to the Boston news source.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 7
Page 8 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
2017 Doosan DX235LCR-5, 2500 hrs., reduced tail swing, 36” bucket, hyd. thumb, aux. hydraulics, heat/AC, good condition, work ready. $139,000
2018 CAT 320FL, 3800 hrs, 50" Strickland Bucket, QC, Aux. Hydraulics, Clean Cab, Front/Side Cameras, Work Ready $169,000
Spring Specials 2018 CAT 336+FL, 2500 hrs, Single Grouser Pads, 54" Bucket, QC, AC/Heat/Radio, Rear Camera, Long Undercarriage $289,000
2017 CAT D6K2 LGP, 4500 hrs., Heat/AC, Accu-Grade Ready, 6 Way Blade, Grade Control, Good condition, Work Ready $169,000
PORTABLE ROCK CRUSHING Onsite or Quarry • Making aggregates since 1983
Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT
www.FAYWRIGHTINC.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 9
SPRING IS RIGHT RIIGHT AROUND THE CORNER TIME TO DIG. Introducing the new JCB 35Z-1, the zero tailswing, 7,840 lb. mini excav vator. The new 35Z-1 is one of the New Generation Stage V machines with no need for electronic control, aftertreatment or E EGR. It has zero tailswing for easy and safe maneuverability, especially in confined spaces and 100% steel bodywork. 800-Go2-ALT TA A | AltaEquipNE.com
Page 10 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Crews Substantially Complete $92M Job in Middlebury MIDDLEBURY from page 1
construction manager and general contractor. The contractor was awarded three separate construction contracts over the duration of the project in order to advance critical items and maintain the overall project schedule. The first contract was Early Work Package One, which was the removal of the existing bridges and replacement with two temporary structures. The second project was Early Work Package Two, which consisted of undergrounding utilities, construction of temporary infrastructure, drilling and blasting a 40-ft. diameter by 40-ft. deep launch shaft to be used for three micro tunneling drives for future drainage infrastructure. The final construction contract was the main project, which consisted of temporary support of excavation, removal of the temporary bridges, excavation of the rail corridor, installation of the precast tunnels and Uwalls, and then reconstruction of roadways, embankments and landscaping features. The project is substantially complete and is awaiting completion and acceptance, which is anticipated to occur this spring. The remaining work is focusing on punch list items, such as final seeding, plantings and minimal general clean up. “The tunnel provides vertical clearance for double-stack rail cars,” according to VTrans. “By lowering the rail bed approximately 4 feet, clearance has increased to 21 feet without impacting the grade of the road and sidewalks above. The tunnel provides improved rail alignment, softening the rail curve to allow better horizontal clearance for trains. The project includes drainage improvements, mitigating the risk of icing problems as well as ponding that occurred historically.” The two bridges were about 300 ft. apart, with one located on Main Street/VT 30 and the other on Merchants Row. The structures were aging. “For over 25 years, AOT bridge inspection reports documented ongoing deterioration of both bridges,” said VTrans. “Concrete cracking, delamination and spalling had degraded all bridge components. Embedded steel reinforcement was rusted and exposed. There was leakage through the deck and full-depth holes on the Merchants Row sidewalk, requiring patching. In the spring of 2017, AOT became increasingly concerned about the deteriorated condition of the sidewalks and concrete that fell onto the railroad tracks. A sudden, unplanned emergency resulted in downtown Middlebury road closures for several months. “The agency decided to replace both
The third year focused on the mobilization and stockpiling of material, bridge demolition, excavation, tunnel installation and roadways approach reconstructions.
The second project was Early Work Package Two, which consisted of undergrounding utilities, construction of temporary infrastructure, drilling and blasting a 40-ft. diameter by 40-ft. deep launch shaft to be used for three micro tunneling drives for future drainage infrastructure.
bridges with temporary bridges in the summer of 2017, until permanent structures were built,” it added. “Both the Main Street and Merchants Row bridges were demolished and travel was restored within four weeks. [The] tunnel is a notable engineering and design feat within Vermont. After three years of construction, Middlebury stakeholders celebrated the process.” VHB is the Lead Engineering Designer for the project, which along with the AOT, balanced community needs and development character, local and regional mobility, construction feasibility “all while keeping the rail line active, except during the closure period,” said VTrans. “Communities along the line depend on rail for deliveries of various commodities.” The project team, which consisted of the owner, designer, contractor and community liaison, worked out a plan that placed utilities in the Printer’s Alley underground so that they did not interfere with crane opera-
tions for the tunnel construction; acquired right-of-way — temporary and permanent; negotiated with Vermont Rail Systems to secure work windows that enabled construction without interrupting rail service; monitored walls, foundations and windows of nearby historic buildings during activities that produced vibrations, as well as noise levels; found ways to mitigate a 100-year flood level of Otter Creek; ensured a design that considered community character and aesthetics concerns; created a safe working environment for workers, motorists and the community; scheduling a construction sequence to minimize community disruption; and developed a communication and outreach program to identify and respond to community concerns. Replacing the bridges was considered, but VTrans noted that “the tunnel offers better safety, drainage and aesthetics. For example, it adds green space and connects Middlebury Village Green and Middlebury village his-
toric district. Trains can now pass through town with less noise. The tunnel option was supported by the Middlebury select Board as it responds to the 2012 town plan to ‘close up the chasm that exists in the downtown area.’” Prior to construction, the AOT conducted an environmental assessment in accordance with the National Environmental Policy Act. The project received broad support at public meetings and was endorsed by the Middlebury town select board. The tunnel changes the town landscape by overlaying the depressed, walled rail bed with green space that links Triangle Park with the Village Green in the heart of downtown. Aside from the 2017 Early Work Package One, which was the emergency replacement of the existing bridges and the 2019 summer road closures, the traffic plan is based on temporary road and lane closures where work is occurring. The first permanent infrastructure work began in summer of 2018 with the first year focusing on micro tunneling, access roads and overhead utilities relocations. The second year focused on water, storm and sanitary utility locations and temporary support of excavation and preparatory excavation. The third year focused on the mobilization and stockpiling of material, bridge demolition, excavation, tunnel installation and roadways approach reconstructions. In 2021, activities focused on landscaping in Triangle Park, Village Green, and Lazarus Park and the reconstruction of Printer’s Alley and final paving. Last year’s construction activities had crews installing new north and south cap walls, constructing berms and drainage swales along the southwest limits of the train tracks, reconstruction of Lazarus Park and Printer’s Alley, landscaping and hardscaping in Triangle and Lazarus Parks. Work was suspended during the winter months for between 2018 and 2019 (winter work did occur during the 2019-2020 winter season). During the summer of 2020, Main Street and Merchants Row were closed to traffic. “Alignment of SOE was critical as we experienced some tight areas in terms of setting precast between lagging/sheet pile walls,” said Bob Hyatt, Kubricky Construction’s senior construction manager. “No conflicts were experienced, but it was close. Working through the COVID-19 pandemic with zero cases of infection throughout the tunnel construction was a challenge in addition to speaking very highly of the diligence of our personnel to remain safe and infection-free during shutdown. see MIDDLEBURY page 12
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 11
0% FOR S H T N O M 60
T ACT EQUIPMENT OMPA NEW CAT CO S ON SELECT PLUS A 2-YEAR//1,000 HOUR ARTS KIT E PA MAINTENANCE N E W I N G TO N
H OLTS V I L L E
225 Richard St, Newington, CT 06111 860-666-8401
660 Union Ave, 783 Bloomingburg Rd, Holtsville, NY 11742 Bloomingburg, NY 12721 631-758-7500 845-733-6400
B L O OM I N G B URG G
POUGHKEEPSIE
BRO N X
122 Noxon Rd, 699 Brush Ave, Poughkeepsie, NY 12603 Bronx, NY 10465 845-452-1200 718-863-3800
FOR MORE INFO SCAN QR CODE OR GO TO HOPENN.COM/SAVE
Page 12 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Coordination With Railway Proves Key During Vt. Project The road work had crews use a Caterpillar D4K2 dozer, a Cat 938M loader and a Coordination among numerous parties, Dynapac CA150D roller. agencies, subcontractors and citizens of The management team includes Middlebury was challenging but also a Construction Manager Nathan Speanburg; ‘team’ success story. All parties worked Project Manager John Whittaker; Project together to the point we created lasting relaEngineer Ian Robison; and Field Engineers tionships to all directly and indirectly Grant Gilbert, Cassandra Mondello, Dustin involved.” Franke, Makayla D’Amore and Ben Pelchar. Kubricky worked 24/7 during nine out of The superintendents included Roger Slater, 10 weeks in the shutdown. Bill Hanchett, Cale Gleason, Pete “No major utility issues were discovered Olney. Forepersons included Al Matteson, throughout the project,” said Hyatt. “KCC Nick Popp, Nolan Diamond, Mike Shissler, was able to acquire seven acres just outside Luke Herald, Addam Butler and Edward of downtown Middlebury that became our Allen. storage yards for the precast and all aggre“We had good comradery between the gates and construction materials. Every crews, especially during the setting of preinvolved party whether it was KCC, VAOT, The Middlebury Bridge & Rail project, a Vermont Agency of Transportation cast,” said Hyatt. “Toward the middle of the (VTrans) initiative in collaboration with the town of Middlebury, is nearing completown of Middlebury, all made it a point to precast operation, it became a friendly comwork as a collective group to achieve the tion this summer. petition to see which crew could correctly set bridge opening date.” the most pieces in a 12-hour shift. It was a The temporary bridges were constructed in 2017 and shutdown itself beyond the Main Street bridge abutments. huge team effort. We had two 12-hour shifts rain or shine. This work happened early in the shutdown and was a critical taken down in 2020 over one week. “The plan of attack was to take it out the same way it went hurdle to clear to allow work to progress. A very tight work There was lots of coordination and moving pieces. KCC in using a crane and excavator/dozer,” said Hyatt. “The site in downtown Middlebury required a lot of coordination crews, alongside our subcontractors, worked relentlessly and were able to complete the shutdown on time. bridge was picked from its place and flown back to sit on the with local community and project stakeholders.” “Every morning at 6 a.m. we would have a handover The erection of the tunnel began on July 24, 2020, and approach in order to later be dismantled. The challenge was meeting with the night crew,” he added. “The day crew startcreating the space to lay down the bridge for dismantling as was concluded on August 18. Prior to the shutdown, the work included: SOE — ed at 7 a.m., so it gave everyone time to understand what was well as coordination with the town/railroad.” The bridges were manufactured by Mabey and were made Installation of micropiles (~350 EA) and tie backs for completed the shift prior and adjust the game plan if necesof steel members that were pinned and bolted together. They upcoming excavation. Hundreds of linear ft. of temporary sary for the day.” On peak construction days, there were anywhere from 50 sat on precast concrete abutment slabs with a precast back- steel sheeting were installed in the northern section. There to 70 people on site. Some of the main subcontractors are were several pre-shutdown weekend closures for blasting wall to hold back the approaches. Engineers Construction INC (ECI); Maine Drilling & The bridge was erected using a Caterpillar 307 excavator and utility pipe crossings. Blasting for drilling mini-piles and blasting into the rock “Utility work — storm, sewer and water improvements and telehandler, a Cat D4 dozer and a 100-ton Link-Belt ledge; Waters Excavation for sidewalk and curb; and crane. The approach work was installed using Cat D4 doz- were made,” said Hyatt. The plan of attack, with the start of the shutdown, was to: Landshapes for landscapes and hardscapes. ers. Excavation operations within the rail corridor generated • remove the rail and temporary bridges; Taking down the bridges was performed utilizing more than 26,000 cu. yds. of material, with some to be • excavate down to grade while installing timber lagging mechanical methods,” said Hyatt, regarding the 2017 removal of the old bridges. “The challenge was protecting on previously installed micropiles and grade and stone for reused on the project, and 2,500 cu. yds. of solid rock removal, with the aid of Maine Drilling & Blasting. the tracks below while demolishing the bridges, as well as precast; “Soils in the project area have been thoroughly tested for • set precast tunnel, seal joints, grout bolt holes and backwhile hauling out all materials.” the presence of contaminants,” said Hyatt. fill precast, and install retaining walls; For the demolition of the Rail Tie bridge, the work was “A Corrective Action Plan was developed before con• pour new bridge decks, sidewalks and parapets, pave done via weekend shutdowns. “The existing bridges were demolished and temporary sidewalks and install tree cells and additional downtown struction began,” said VTrans. “We were able to reuse almost 7,600 cubic yards of matebridges were set in place,” said Hyatt. “This required us to granite curb and sidewalk; and rial excavated from the rail bed in the non-contaminated • eventually open to traffic with much other landscaping close the road temporarily during construction, as well as areas,” said Hyatt. “All the millings have been stored on site perform all work over the railroad under temporary shut- and hardscaping work to follow the shutdown period. “This was a cut and cover tunnel and no tunneling to be reused in future projects. Ashlar blocks were removed downs. Railroad protection had to be installed during demo to protect the tracks, which required prior planning based on machine was required,” said Hyatt. “The rail corridor was as the existing backwalls for the temporary bridges. These the time it took to set up and tear down. The other challenge excavated between micropile and timber lagging walls. The blocks were reused on site as park benches, as well as a comwas changing the existing approaches as the temporary precast tunnel was assembled and then backfilled. Water ponent in the ‘rock core’ berm that was constructed along bridge decks sat much higher due to the height of the beams trucks were on site to manage dust as needed as well as get- Otter Creek on the southwest end of the project.” New construction materials included 210 cu, yds. of conting compaction when backfilling.” compared to the existing bridges. crete for new bridge decks, 650 cu. yds. of concrete for new This work was equipment driven, with multiple excava“Coordination with the railway was paramount to our success,” he added. “Weekend shutdowns were provided, as tors and loaders working as well as a Liebherr LR1300 300- concrete cap wall and 3,500 tons of asphalt. “Throughout the shutdown period we had a dedicated well as windows of work during the week to perform every- ton crawler crane, two 200-ton crawlers and a 275-ton Linkmechanic on call, as well as an onsite 8-foot x 20-foot conBelt ATC-3275 hydraulic crane, and two Liebherr LR1200 thing.” tainer filled with any supplies or tools the mechanics needed 200-ton cranes. The bridge decks were demolished with Caterpillar 335 The road work required partial depth reconstruction of the that they did not already have in their vehicles,” said Hyatt. and 307 excavators. KCC purchases and rents equipment from Milton CAT in The tunnel construction required 10 week-long, 24/7 shut- bridge approaches, milling and repaving of the entire downClifton Park, N.Y., Contractor Sales in Albany, N.Y., and town area. downs. Chenango Contracting Inc. in Johnson City, N.Y. and in “We did not have a ton of challenges when it came to road “Previous weekend track closures were used to blast high bedrock in the north end of the tunnel,” said Hyatt. reconstruction as the road was completely shut off from traf- Middlebury, Vermont Champlain Valley Equipment, Champlain Construction and G Stone Commercial. CEG “Additional blasting needed to happen during the 10-week fic,” said Hyatt. MIDDLEBURY from page 10
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 13
Equipment East, LLC
Barry Equipment Co., Inc.
F&W Equipment
Central Equipment Company
61 Silva Lane 196 Manley Street Dracut, MA 01826 Brockton, MA 02301 978-454-3320 508-484-5567 1474 Route 3A Bow, NH 03304 603-410-5540
30 Birch Island Road 7 Harry’s Way Webster, MA 01570 Webster, MA 01570 508-949-0005 508-949-0005 1608 John Fitch Blvd South Windsor, CT 06074 860-288-4600
164 Boston Post Road Orange, CT 06477 203-795-0591
45 Dempsey-Greaves Lane Stillwater, ME 04489 207-827-6193
www.fwequip.com
www.centralequipmentco.com
www.equipmenteast.com
www.barryequipment.com
Page 14 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT COMPANY/NITCO LLC ....................9 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................16 DOOSAN NORTHERN NEW ENGLAND ......................13 EQUIPMENT EAST ........................................................1,5 FAY & WRIGHT EXCAVATING INC ..................................8 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 H O PENN MACHINERY CO INC ..................................11 HEAVY MACHINES INC....................................................7 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................14 PETERSON ATTACHMENTS ..........................................6 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ....................................8 T-QUIP SALES & RENTAL INC ........................................6 THE N.I.C.E. COMPANY ..................................................8 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • March 30, 2022 • Page 15
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
3 Rocky Hill Road Smithfield, RI 02917 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
Page 16 • March 30, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
AUTHORIZED DOOSAN DEALER
W E B STER
W E B STER
SOUTH WINDSOR
508-949-0005 30 Birch Island Road Webster, MA
508-949-0005 7 Harry’s Way Webster, MA
860-288-4600 1608 John Fitch Blvd. South Windsor, CT
barryequipment.com
Schedule a demo todayy. © 2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. The Doosan trademark, , is used under license from Doosan Corporation. a