New England 5, March 3, 2021

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

March 3 2021

Vol. LIX • No. 5

SAME DAY PARTS AVAILABILITY

®

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

LEED Accredited in Waste Management

*Limited time offer. Some restrictions apply. See dealer for details.

3 Month lease 36 AS LOW AS

$1,500* / Month Authorized Doosan Dealer

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $46,900 plus freight. Other Screeners Available

508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Tibbits Equipment Services, Inc. www.tibbitseq.com

802-479-9696

248-745-5828

*On approved credit • Financing Available

O&G Industries Leads $54.6M I-84 Safety, Operational Improvement Job Workers remove the existing parapets using a backhoemounted shear and a hauler for Bridge 1743B.

The Connecticut Department of Transportation’s (CTDOT) $54.6 million I84 Safety and Operational Improvements project in West Hartford, awarded to O&G Industries Inc., is based upon the mitigation of traffic congestion and safety concerns that can arise in heavy traffic situations. This two-stage project, financed by the state and designed by BL Companies, started in March 2020 and should be completed in summer 2023. Additional parties involved in the project include Urban Engineers Inc., hired as the construction engineering and inspection consultant. The project runs west and east along I84. From the west, it begins at the Farmington/West Hartford town line and ends at the Park Road on-ramp and from the east and 500 ft. east of the Ridgewood Road overpass and extends 200 ft. east of the Mayflower overpass. see SAFETY page 14

®

KWIK KLEET ts Traction Clea

EZ-SCREEN

www.ez-screen.com

CALL 800-367-4937

CEG CORRESPONDENT

Call for Pricing

2021 EZ-Screen 1200XLS

Affordable Price. Premium Service.

By Irwin Rapoport

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

Charter Oak Bridge Project Set to Bring Congestion Relief for Conn.’s Capitol Region New tub girders are being installed.

Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo

Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

95

95

CALL 888-81-GORILLA(46745)

By Irwin Rapoport

CEG CORRESPONDENT

The delivery of the Connecticut Department of Transportation’s (CTDOT) I-91 Charter Oak Bridge (COB) Project, a large-scale initiative that combines two projects to reduce congestion and improve safety in the city of Hartford, and towns of East Hartford, and Wethersfield, is less than two years away. The contract, administered by CTDOT, District 1 and the Federal Highway Administration, was awarded to see CHARTER page 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.