Skip to main content

New England 2, January 19, 2022

Page 1

State Supplement sponsored by:

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

SHIP WITHIN 48 HOURS

3

84

495 6

84

6

6

195

395

95 91

95

95

®

January 19 2022

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. LX • No. 2

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection •  Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com info@jrvinagrocorp.com

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing

LEED Accredited in Waste Management

2022 EZ-Screen 1200XLS

*Limited time offer. Some restrictions apply. See dealer for details.

LEASE THE EQUIPMENT. OWN THE JOB. 36 MONTH LEASE AS LOW AS

$1,500*/MONTH Authorized Doosan Dealer

Optional 3 Product Conveyor

6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $59,900 plus freight.

508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)

Tibbits

Equipment Services, Inc. www.tibbitseq.com

802-479-9696 ®

KWIK KLEET ts Traction Clea

Other Screeners Available

EZ-SCREEN www.ez-screen.com

248-745-5828

Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989

• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches

www.foleyengines.com ‘05 Caterpillar 928G $36,800

• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

Phil (413) 427-7171

SAME DAY PARTS AVAILABILITY

CALL 888-81-GORILLA(46745)

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

Conn. Port Authority Still Supports $235M Cost of Upgraded State Pier A delay in permitting has pushed some of the construction work at the State Pier in New London into late this year, but the Connecticut Port Authority (CPA) said recently that the project remains on its projected $235 million budget. The CPA’s board of commissioners met Dec. 21, five days after receiving a key federal permit from the U.S. Army Corps of Engineers that authorizes in-water work. Projects like dredging deeper berths, installation of bulkheads and filling in the 7.4 acres of water between the two piers are now allowed to move forward. The bulk of the dredging, which is a crucial part of the planned upgrades to accommodate ships carrying massive offshore wind turbines, will not happen until late this year. Part of the reason for the delay is that the permit that allows work in the Thames River prohibits any in-water construction work between Feb. 1 and May 31 to protect fish habitats. The Day, New London’s news source, report- A pile dynamic analysis (PDA) test was being conducted in this ed that some limited dredging work between the November 2021 photo. two piers is expected to start this month. Marlin Peterson, a project coordinator of AECOM, the CPA’s con- Central Wharf area spanning the existing pier and the older struction administrator and a multi-national engineering Central Vermont Railroad Pier. The construction is funded firm, said the dredging is a precursor to depositing the mate- by the state and offshore wind partners Ørsted and Eversource, and State Pier will be used as a staging area for rial between the two piers. see PIER page 6 Design for the modernized State Pier calls for one large

Barry Equipment Opens New Dealership, Parts Sales Center in South Windsor, Conn. Barry Equipment Co. Inc. has opened a brand new 5,000-sq.-ft dealership in South Windsor, Conn. Located on Route 5 at 1608 John Fitch Blvd., the new building will be a one-stop-shop for equipment and parts sales, and beginning later in 2022, a full-service center for machine maintenance and repairs.

This is the third Barry Equipment location and the second facility that the company has opened in the past 18 months, following a brand new 17,500 sq. ft. service and training location that was introduced on Harrys Way in Webster, Mass., in the fall of 2020. The team at Barry Equipment is see BARRY page 10


Page 2 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100

2013 HAMM HD12VV

2005 WIRTGEN W2000

Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000

stk# 26021, single & dual vibratory, PSI water system, recent service to engine, new seat assy, 4104 Hrs ....................................$22,500

stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work ..................................................$115,000

2004 BOBCAT S750

2019 BOBCAT S740

1997 HITACHI EX300-3C

stk# 26915, c/air, 2 speed, foot controls, 50% rubber, mech coupler ..........................$34,500

stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500

stk# 27130, C/heat, 32” pads, 48” bucket, newer pumps, very nice original machine ........ ............................................................$29,500

2020 CASE TV450

2006 DEERE 325

2014 JOHN DEERE 410K

stk# 26945, c/air, pilots, 2 speed, RC, Hi Flow, hyd coupler, 84” bucket 80% tracks ..$68,500

stk# 27127, C/air, 2 speed, foot controls, new rubber, mech coupler, standard hyds, serviced and ready for snow ..............................$32,500

stk# 26993, 6851 Hrs, c/air, new front rubber, front coupler, ext hoe, pilots ................$59,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 3

New 738 8M purpose p p e-built t h tree han ndler is BIG new ws for tree care speecialists SENNEBOGEN’s “game-changing” tree care handlerrs have raised the bar even higher! Thee new 738 M weighs in at twice the size of 718 M and R-HD models with mo models, ore power and more reach to take on bigger jobs! d with a power grapple The 738 M, fitted saw, is attached to a 75 ft. telescoping boom and stick to t quickly fell or prune trees as high as 1125 ft. to 150 ft. tall. Then it easily cutts, swings and stacks the wood with a single operator to hole job. complete the wh

CUSTOM MENGINE EERED TREE CARE HANDLLERS

PU URPOSE-BUILT

FR ROM THE GR ROUND UP

• Ideal for all tree seervice operators • Used for woodlot thinning, harvesting wood fuel f to clearing storm debris up to o 48" and up to 125' high • All wheel drive or tracked models • Jobsite safety incrreased with trimming, cuttingg, loading and stacking operation ns as all are done from the con nfines of the SENNEBOGEN eleevating and tilting Maxcab

As big and poweerful as it is, the 738 keeps pace with w the 718 M and 718 R-HD machines with precise handling and fasst cycle times to process up to 150 trees per day. From the roadsid de, on embankments or in heavy wood ds, the 738 M is the new game-changger for all land clearing, right-of-way right of way maintenance and heavy tree care operations.

Get th he details on the high effficiency solutio l ion for custom tree rem movall

The New 738 M

www.seennebogen-na.com | +1-7040 347-4910

251 Shakker Road East Longmeadow, MA 01028 (800) 292-63 6351

1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473

www.tylerequipmentt.com


Page 4 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Pawtucket Wants to Build New School Maine to Address On Site of Old Paw Sox Baseball Park Substandard Roads, McCoy Stadium in Pawtucket, R.I., may soon be torn down to make way for a high school campus. The Pawtucket district hopes to use a recently vacated minor league baseball stadium site as the location for a 482,500-sq. ft., 2,500-student high school. The campus would consolidate two of the city’s existing high schools, Shea and Tolman, and possibly a third, the Jacqueline Walsh School for the Arts, the Boston Globe reported. The school also would house Career Technical Education spaces. In December, a subcommittee of school and city officials recommended moving forward with construction plans. The project would require A rendering of the proposed new Pawtucket High School, which would be demolishing the vacant McCoy built on the site of McCoy Stadium in Pawtucket, R.I. Stadium, the 79-year-old city-owned ballpark that the Pawtucket Red Sox called home for 50 will soon present the recommendation to the full school years. The PawSox left McCoy for a new stadium that committee, calling it “a bold vision for the type of 21st century learning environment that our students deserve.” opened in May in Worcester, Mass. “The Pawtucket High School campus concept would be The new high school construction would cost approxithe most modern high school learning environment in the mately $302.5 million. To pay for it, Pawtucket would need to tap a previous state, with room for exciting new CTE career pathways, school bond and ask the Rhode Island General Assembly to state-of-the-art classrooms, arts and performances spaces, approve a new bond, which would then require approval by athletics fields and shared community spaces,” he continued. City Councilman Terrence E. Mercer, a subcommittee Pawtucket voters, spokesperson Christopher Hunter said. The Rhode Island Department of Education would provide member who represents the area around McCoy Stadium, said the proposal “would breathe new life into the area while reimbursement for about 80 percent of the costs. Construction could be completed by 2026 and open to stu- providing our students with the 21st century learning environment they deserve.” dents by the fall semester. The subcommittee, Mercer noted, delved into the conMcCoy Stadium was the site of baseball’s longest game, a 33-inning marathon in 1981. After the PawSox left McCoy cept’s educational and financial feasibility, “and we collecfor Worcester, the old baseball park has remained vacant and tively agree that this is a project the school committee should moribund, with fading murals hanging on the walls and seriously consider. A new Pawtucket High School and CTE campus [can] be a shining example of our commitment to Canada geese fertilizing the outfield. future generations of Pawtucket students.” He told the Globe that officials considered other options City Weighs Options for Site’s Use Pawtucket’s Ad Hoc Subcommittee to Study High School for McCoy, including making it the home of another minor Academic Complex has been meeting over the last four league baseball team or a professional softball team, and months, holding eight public meetings and working with constructing a new public safety complex there. But, he said, “Nothing seemed to take hold, and all those school facilities consultant Colliers International and SLAM ideas required a considerable level of retrofitting and getting architects. The subcommittee — with representatives from the it up to snuff.” In the end, the subcommittee agreed that the best option school committee, city council, the mayor’s office, teachers, administrators — voted to recommend a 482,500-sq.-ft. was the Pawtucket High School campus concept. “It’s bittersweet for me,” Mercer admitted to the venerable Pawtucket High School campus. “This project would take advantage of a city-owned asset, Boston news source. “I grew up a block from McCoy turning the now sadly vacant McCoy Stadium site into a Stadium and have watched the PawSox since I was six years vibrant campus for learning, career exploration, athletics and old. That was my personal playground. So, I’d hate to see the community activities,” Pawtucket Mayor Donald R. Grebien old stadium demolished. I’m a dyed-in-the-wool Tolman said in a statement. “This project is a priority for my admin- guy. I played baseball and basketball there.” But, he said, “I think this will be good for the city and istration, and I thank the members of the ad hoc subcommittee for their work vetting and developing the concept to this future generations of students.” After taking part in a recent tour of the new $190 million point.” If the plan proceeds, the city would look at potentially sell- East Providence High School, Mercer told the Globe that he ing William E. Tolman Senior High and analyzing options realized the potential benefits of a new, modern school buildfor repurposing Charles E. Shea Senior High, Hunter added. ing. “I was astounded to see what could be.”  Subcommittee chair Gerard “Jay” Charbonneau said he

Bridges With $245M

Maine’s two U.S. senators announced Dec. 20 that the state will receive close to $245 million in federal funding to maintain and construct roads, highways and bridges across the state. The monies were authorized through the Infrastructure Investment and Jobs Act and provided through the Federal Highway Administration (FHA). With the funds, the Maine Department of Transportation (MaineDOT) intends to tackle a backlog of repairs on more than 1,438 mi. of state highways rated as being in “poor condition” and 315 bridges considered to be “structurally deficient.” “Deteriorating roads cost Mainers hundreds of dollars each year on average in vehicle repairs and wasted gasoline due to congestion,” said U.S. Sen. Susan Collins, the ranking member of the Transportation Appropriations Subcommittee and one of 10 senators who negotiated the text of the bipartisan infrastructure law. Noting that poor road designs also create hazardous conditions for pedestrians and cyclists, Collins explained that the planned improvements “would help all users of Maine roadways reach their homes and jobs safely and more quickly.” Joining her in announcing the federal funds for the New England state was U.S. Sen. Angus King, who added, “Go for a drive basically anywhere in ... Maine, and you’ll see why our state so desperately needs investments in roads and bridges. Whether it is potholes, erosion damage or rusty bridges, our infrastructure is aging [and that] contributes to traffic, unsafe conditions and an average of more than $500 in annual repair costs for Maine drivers. Fortunately, thanks to funding from the Bipartisan Infrastructure Bill, historic investments are on the way,” The FHA said Dec. 20 that it will provide $52.5 billion in funding to all 50 states and the District of Columbia in fiscal year 2022, representing a spending increase of more than 20 percent over the previous fiscal year. The investment aims to help reduce overdue repairs for highways and bridges and support communities’ efforts to reduce traffic deaths and serious injuries. 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 5


Page 6 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Drawbridge Replacement to Allow Rail to Resume in May The Massachusetts Bay MBTA photo Transportation Authority Roof panel being (MBTA) announced just before installed on the Christmas that its commuterobservation level of rail service over the Gloucester the control tower. Drawbridge on the Rockport Line is expected to be restored by May. In the meantime, construction is progressing on the $100 million drawbridge replacement project. The bridge carries the rail line over the Annisquam River. Work left to be completed includes removing loose rock from the ledges alongside the MA Rt. 128 bridge tracks and cyclical maintenance operations. MBTA noted in a press release that the disruption in service has provided an opportunity to accelerate other projects planned for the Rockport Line that would have required service interruptions later in 2022. Several complex projects were launched that could only be accomplished with rail service suspended, and this extended interruption allowed MBTA to complete its work more efficiently. Those projects include: “We remain diligent and confident in our • The 100 percent replaceability to deliver the project in a timely and ment of more than 11,000 treated wood ties tions were deep cleaned and repainted to cost-effective way,” Kooris said. with plastic ties containing no preservative refresh their appearance and improve the Critics continue to question the State Pier chemicals. The distance between Cleveland customer experience. • Between Gloucester Station and the improvements’ projected costs, which have Street in Gloucester and Poole’s Lane in Rockport was completely rebuilt using a drawbridge, a new interlocking was installed risen from initial estimates of $93 million. The port authority has a memorandum of new type of tie that does not require preser- to replace a spring-powered switch that utiunderstanding in place with both the state vative chemical. In addition to replacing ties lized outdated technology. The interlocking Department of Administrative Services in the area, the rail also was treated to bring allows the train dispatcher in the central dis(DAS) and CT’s Office of Policy and it within current neutral temperature stan- patching office to control the track used by Management for administration and support dards to prevent track alignment issues in hot each train and allows that dispatcher to disservices related to construction and procure- weather. The track also was realigned both play signals to control the movement of trains through the area. vertically and horizontally. ment activities on the pier upgrades. • The grade crossing at Maple Street in • Eleven 150-year-old “stacked stone” Noel Petra, deputy commissioner of DAS, box culverts were removed and replaced Gloucester also was replaced. is taking the lead on state oversight of the with concrete pipe restoring water flows, Other work to be completed includes the State Pier project. ensuring they are ready for the predicted critically important effort to remove loose In a statement, Petra explained that efforts changes in weather patterns brought about rock from the ledges alongside the tracks by are under way to finalize the completion by global warming. A twelfth culvert will be the MA 128 bridge. Regular cyclical mainteschedule. replaced in the early spring prior to the rail nance operations also will be scheduled to “We look forward to embarking on the service’s restoration to complete the culvert maximize the remaining time to the greatest benefit. final phases of construction on one of the that was deemed at risk. Shuttle buses will continue to serve the • At Rockport, switches and special track most significant infrastructure projects under work beyond Poole’s Lane were renewed MBTA’s Gloucester and Rockport Stations way in New England,” he said. The CT Port Authority provides updates and brought up to current standards for reli- during the bridge closure, and the agency has the capacity to offer additional buses if rideron the State Pier project on its website, able service. • Both the Gloucester and Rockport sta- ship demand warrants it.  www.statepiernewlondon.com. 

Upgraded State Pier Remains On Budget Despite Permit Delays PIER from page 1

offshore wind projects. Marlin told the Day that the total estimated costs for the construction is $171.7 million, with an additional $32.1 million for the final dredging. The total remains under the $204 million “Targeted Guaranteed Maximum Price” for the project set by construction manager Kiewit last April. That figure includes $193 million for construction and $11 million for contingency. There is an additional $31 million for project soft costs that include construction administrator fees, design, permitting, environmental mitigation and a railroad property lease. CPA Board Chairman David Kooris indicated that work is being done to finalize the timeline for the project. The “substantial completion date” is currently listed as Jan. 31, 2023. While construction costs remain on track, he told the New London newspaper that there may be cost implications of having workers on the project for longer than anticipated.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 7

PAYMENTS S AS LOW AS $99 99 A MONTH* THE SNOW LEASE IS BACK. Ma ake higher lease payments in the winter while you’re you’r turning cold wet snow into cold hard cash. Keep your machine working g year round with lowered payments the other 7 months of the year as low as $99 a month. *All applications are subject to credit review and approval. Security deposit may be requuired based on applicant’s credit. Five (5) “ON-SEASON” (November - March) increased payments and seven (7) “OFF-SEASON” F-SEASON” (April - October) reduced payments per year based on 5-year/5,000 hour lease terms. First payment d iin advance due d andd mustt bbe an “ON “ON-SEASON” SEASON” payment.t Mi Minimum i “OFF “OFF-SEASON” SEASON” payyment is $99 + applicable taxes. Offer valid only on specific models. Offer may change without prior notice, and additional ti l terms t andd conditions diti may apply. l Call C ll for f complete l t details. d t il

800-Go2-ALT TA A | AltaEquipNE.com


Page 8 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

AUTHORIZED DOOSAN DEALER

DRACUT

BROCKTON

BOW

978-454-3320 61 Silva Lane Dracut, MA 01826

508-484-5567 196 Manley St. Brockton, MA 02301

603-410-5540 1474 Rte 3A Bow, NH 03304

www.equipmenteast.com

DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done. Visit Equipment East for a demo. ©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 9

2021 MCCLOSKEY SDX130: Serial Number: 90666, New Telescoping Stacker 36"x130' Electric Hydraulic Power WEG 20HP. Standard Hopper, Pivot Point, Hydraulic Landing Gear, Hydraulic Wheel Drive, Remote Greaselines, Walking Beam w/Lift Axle >>>Call

2021 MCCLOSKEY 512AG: Hours: 6, Serial Number: 91959, Trommel. Aux Stockpiler Circuit, Hydraulic Tipping Grid, CAT 3.4L Tier 4F 74HP >>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY ST80T: Hours: 104, Serial Number: 91768, Hopper Wear Plates, Impact Idlers under Hopper, Upgraded Belt Cleaner/Scraper. CAT 3.4L Tier 4 Final 74HP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2020 MCCLOSKEY C3: Hours: 1265, Horsepower: 510 hp, Serial Number: 91189, METSO designed cone, 300 HP Class. Volvo D13 Medium Cone Liner currently installed.>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY R155: Hours: 261, Serial Number: 91711, Extended Tail Conveyor, Twin Drive on Tail, Remote Variable Speed Feeder. CAT Tier 4F 130HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2020 MCCLOSKEY R155: Hours: 489, Serial Number: 91421, Long hopper feeder. Remote stop/start feeder. CAT Tier 4F 130HP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2020 MCCLOSKEY S190 3D: Hours: 441, Horsepower: 130 hp, Serial Number: 91405, Tracked Triple Deck Heavy Duty Screener. CAT Tier 4F Engine. 15ft Feeding Hopper. Chevron Belt on Main Conveyor. Remote Machine Shut Off >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY J45: Hours: 629, Serial Number: 91695, Crusher with pre-screen. Volvo D11 Tier 4F 360HP Engine>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY 516R-T: Hours: 200, Serial Number: 91830, Radial Conveyor. Hydraulic Tipping Grid over Hopper. Remote Stop/Start Feeder. Fitted Safety Beacons. CAT 3.4L Tier 4 Final 74HP >>>>>>>>>>>>>>>Call

New 2021 McCloskey J50 Jaw Crusher: Hours: 18, Shorter Panfeeder with Prescreen, Side Discharge Conveyor, Overband Magnet on Main, Telematics, Volvo D11 Tier 4F 360HP Engine >>>>>>>>>>>>>>>>>>>>>Call

2003 Fintec 1107: Hours: 7900 >>>>>>>>>>>>>>>>>>>>$Call

2021 MCCLOSKEY 621RE: Hours: 287, Serial Number: 91827, Trommel with Aux Drive Circuit. 8' Extended Overs >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MWS 3625T: Serial Number: 20350, Washing 2021 MWS S190: Hours: NEW, Serial Number: 91989, Screw Twin 36" Spiral Shaft. Control Panel for Screw Screening Plant with Fitted Rinser Kit with Spray and Stacker >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call Bars on Screenbox, Aux Drive Circuit, Plain Belt on Main Conveyor >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

2021 MCCLOSKEY C2: Hours: 20, Serial Number: 92045, New 2021 C2 Tracked Cone Crusher. Metal Detector on Feeder, Medium Liner, Volvo D11 Tier 4F 360HP >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call

NEW MWS CSP200 COMPACT SAND PLANT, Serial Number: 20349, cost and energy efficient, exceptional performance, 14 x 6 dewatering screen, can produce 1 grade of sand, self regulating sump tank

NEW ENGLAND’S EXCLUSIVE MCCLOSKY DEALER!!!


Page 10 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Barry Equipment Opens Second New Abbott Labs Expands Facility in Past 18 Months, Third Overall Again With South Portland Facility BARRY from page 1

excited to now offer this third location to help make it easier for customers in Connecticut, western Massachusetts and New York state to access the parts and equipment they need while keeping travel time to a minimum. Boasting a tough lineup of powerful brands like Doosan, Peterson, Yanmar, ASV and Dynapac, Barry Equipment is ready to serve all its customers’ needs across New England and New York, the company said. The South Windsor location also will have the latest excavators, wheel loaders, grinders, full line of compact equipment, track loaders and more on the ground. Another 5,000 sq. ft addition to the building will be opening Barry Equipment Co. Inc. has opened a brand new 5,000 sq. ft dealership on Route 5 at 1608 John Fitch Blvd., in South Windsor, Conn. later in the year, allowing for full-service maintenance and repair for downed machines. According to Vice President and Operations Manager Joe Barry, it was natural for the company to add a new branch in Connecticut and grow the company’s presence in the Northeast. “We had two goals in mind when we opened the South Windsor store: make it easier for our customers to get the parts and equipment they need, and to let more business owners in the area learn the Barry name,” said Barry. “Getting this third Barry Equipment location opened up is going to make a significant impact to our customers in Connecticut, New York and western Massachusetts. Whether they need to Boasting a tough lineup of powerful brands like Doosan, Peterson, get parts for a downed machine or to Yanmar, ASV and Dynapac, Barry Equipment is ready to serve all its cushave one of our certified technicians tomers’ needs across New England and New York, the company said. diagnose and repair a piece of equipment, or even take a look at a brand-new machine, we’ll be ready and waiting to make that happen,” Barry said. “We really enjoy working with our clients in Connecticut, and we just felt that adding another brickand-mortar location would give us a stronger foothold to provide easier access for our current customer base and help build our relationships with new customers in the area.” For more information, call The new building will be a one-stop-shop for equipment and parts sales, and begin860/288-4600.  ning later in 2022, a full-service center for machine maintenance and repairs.

Abbott Laboratories, the multinational company that makes COVID-19 diagnostic tests at two sites in Maine — in Scarborough and Westbrook — is making plans for a different kind of testing at a vacant office building in South Portland. The Chicago-based medical device manufacturer has signed a long-term lease for an 11.4-acre site at 65 Gannett Dr., the property’s owner, Portland real estate firm J.B. Brown & Sons, confirmed to Mainebiz on Nov. 22. The site is in the Gannett Drive Business Park and includes a 34,800-sq.-ft. office building, where Abbott plans to build an additional 18,000 sq. ft. of lab space. Terms of the lease were not disclosed, and a spokesperson for Abbott did not immediately respond to inquiries from Mainebiz. According to a site plan application filed with the South Portland Planning Board, the build-out is estimated to cost Abbott $3 million, Mainebiz reported. The city’s tax rolls show the property currently has an assessed value of $5.7 million. It was initially developed in 1997 as a banking operations center, and most recently was a branch office of Bottomline Technologies Inc., a New Hampshire payment processing company that moved its South Portland location to John Roberts Road in 2019. At Gannett Drive Business Park, Scarborough-based Landry/French Construction will lead the expansion as general contractor. Construction could begin in the next month or so and be completed by the end of 2022, Ken Mitsui of J.B. Brown & Sons told Mainebiz. In 2020, Landry/French constructed a 126,100-sq.-ft. plant for Abbott in Westbrook, where the company ramped up production of its rapid diagnostic test for COVID. In July, Abbott announced it was laying off almost 400 workers as demand for the tests began to wane. The new facility in South Portland will not be manufacturing tests, according to the application submitted to the local planning board. Instead, Abbott plans to use it as a research and development site, employing about 90 people. Nearly half of the 53,000 sq. ft. of space will be devoted to laboratory analysis of raw materials used in pre-market studies of new medical products. The company also noted in the filing that no animal or human test trials will be conducted at the site. Additionally, the expanded facility will generate a small amount — under 100 kilograms per month — of biohazardous waste. Abbott employs 109,000 people in 160 countries to produce diagnostics, medical devices, nutritional products and branded generic medicines. The company reported sales of $34.6 billion in 2020, up from $31.9 billion the previous year. 

Visit CEG’s Web Site at www.ConstructionEquipmentGuide.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 11

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS

140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307 LARGEST DEALER IN NEW ENGLAND

THE MOST MATERIAL HANDLING MACHINES IN NEW ENGLAND SCREENING CRUSHING CONES IMPACTORS CONVEYORS TROMMELS WASHING RECYCLING

SCREENING

I M PAC T O R S

TROMMELS

USED AND NEW MACHINERY RENTALS AND FINANCING AVAILABLE

CONVEYORS

CRUSHING

1-800-53 CRUSH

Over 100 Machines in Stock

CALL TODAY! 1-800-53-CRUSH

W W W. P O W E R S C R E E N - N E . C O M Family Owned and

Operated for over 20 years

Call for Parts Today

ROCK SOLID SERVICE WE CRUSH YOUR ROCKS


Page 12 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The Nice Company, Inc

9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com

Equipment Sales and Rentals

We sell NICE machines!

2018 Anaconda DF410, 550 hours, 38" x 11" Feeder Belt, Rear & Side Discharge Conveyors, 4' x 10' Double Deck Screen Reduced to $129,000!

2014 Vermeer FT300, 2500 hrs., Mulcher, Cab w AC, Industrial 30XL Winch, Rear View Camera Reduced to $169,000!

Happy New Year! 2011 Volvo L350F, 9700 hours, spade nose, Runs Good, Very Clean Machine Reduced to $199,000!

2016 Volvo EC350EL, 4500 hours, Aux. Plumbing, 12’ stick, 65” bucket $129,000


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 13

Get an “A” with Hyundai Hyundai Construction Equipment is excited to announce the launching of our new A-series machines. Along with a new look, these machines are packed full of standard new features and benefits to get the job done efficiently. • Cummins Performance Series Engines Stage V emissions compliant engines • EPFC (Electric Positive Flow Control) Reduces daily fuel consumption by 8-11% • EPIC (Electric Pump Independent Control) Improved controllability with reduced RPM drop • Serviceability/Safety Enhanced cab visibility Easy access engine panels

More standard features. More value.

www.hceamericas.com To learn more about the what the new Hyundai A-Series machines can offer your business, contact your Hyundai dealer today. Chappell Tractor 251 NH-125 Brentwood, NH 03833 603/642-5666

454 RTE 13 Milford, NH 03055 603/673-2640

www.chappelltractor.com

391 Loudon Rd. Concord, NH 03301 603/225-3361

Kahn Tractor & Equipment, Inc.

Lorusso Heavy Equipment, LLC

Quality Fleet Service, Inc.

520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com

548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com

Whited Equipment Co. 2160 Hotel Road Auburn, ME 04210 207/346-0279

837 Portland Road Saco, ME 04072 844/430-6810

www.whitedtruck.com

©2020 Hyundai Construction Equipment Americas. All Rights Reserved.


Page 14 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ALTA EQUIPMENT COMPANY/NITCO LLC ....................7 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................16 BOSTON FREIGHTLINER/NEW ENGLAND....................5 EQUIPMENT EAST ........................................................1,8 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................13 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 POWERSCREEN NEW ENGLAND ................................11 ROCK & RECYCLING EQUIPMENT LLC ........................9 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ....................................6 T-QUIP SALES & RENTAL INC ......................................12 THE N.I.C.E. COMPANY ................................................12 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Conn. Borrows More Than $1.3B to Fund Infrastructure Projects Connecticut Gov. Ned Lamont and the other members of the State Bond Commission agreed to borrow more than $1.3 billion to fund state and local projects on Dec. 21. The money will pay for various infrastructure projects statewide, as well as grant programs, improvements at a mental health center in Bridgeport, and a new train station in Enfield. But the Lamont administration also plans to put a large chunk of those funds, roughly $839 million, toward transportation spending for use on state highway interchanges, traffic safety studies, local paving projects and rail improvements. In total, the State Bond Commission, which the governor leads, voted to fund more than 50 different projects, programs, and initiatives — some of which were championed by state lawmakers who are heading into a campaign season next year and are eager to bring home financial wins to their districts. For example, Lamont, Senate Majority Leader Bob Duff, and other lawmakers representing the Norwalk area gathered on Dec. 20 to celebrate the state’s plans to contribute more than $1.2 million to the local YMCA and to spend another $5 million on renovations at the Gallaher Mansion, which is part of a city park. Not long after the borrowing plan was announced, bipartisan groups of lawmakers sent out press releases lauding the state money that would soon pour into their districts, the Hartford-based CT Mirror reported. The legislative delegation in Milford, for instance, noted the $600,000 that would go to a local community health center in their area. In addition, several state lawmakers from Stamford thanked the bond commission for the $2 million their city will receive for a science center. Borrowed Amount Financed Through Bonds The more than $1 billion in spending that was approved will be financed through state revenue and general obligation bonds, which Connecticut officials’ market to Wall Street investors and will eventually need to repay with interest. The state frequently relies on that type of borrowing capacity to finance school construction efforts, capital projects at state universities, transportation upgrades, building maintenance projects, land preservation deals and the smaller community projects that often benefit state legislators.

The most recent meeting marked the third bond commission gathering this year, according to CT Mirror. State legislators control the first step in the borrowing process by adopting a twoyear bond package, but after that, the governor and the executive branch get to decide what gets funded and when. That gives governors in Connecticut a lot of power, and some, including Lamont, have used that influence as leverage when negotiating with legislative leaders in the past. Town Revitalization Efforts Also Funded Lamont, who also is preparing for his own reelection campaign in 2022, kicked off the meeting on Dec. 21 by recognizing the extensive list of projects that the 10member commission considered and approved. “We have a very full agenda today,” he announced. “One of the reasons is because the state is in a pretty good financial position.” There was a wide array of spending priorities approved by the bond commission at the meeting, the Hartford news source reported, including state matching funds for upgrades at Connecticut’s armories, cash grants to financially strapped municipalities, a lengthy list of repairs at state offices and buildings, and several line items meant to combat affordable housing and environmental issues. The governor’s office, however, placed an emphasis on more than $124 million that is intended to help small businesses, workforce training initiatives and community revitalization projects. That spending includes millions for local redevelopment efforts in Middletown, New Haven, Bridgeport and Hartford. One of the more high-profile projects included on that list was $11 million to help renovate a Hilton hotel in downtown Hartford and to transform part of that property into 147 apartment units. “Investing in our communities through revitalization projects, workforce development training and small business support is a key part of our plan to accelerate long-lasting and equitable economic development in Connecticut,” he said. Lamont added, “These investments are aimed at creating thousands of new jobs, improving the vibrancy and quality of life in our communities and making all corners of the state even more attractive for investment and opportunity.” 


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • January 19, 2022 • Page 15

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

140 Wales Ave. Avon, MA 02322 (508) 584-8484

60 Shun Pike Johnston, RI 02919 (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 16 • January 19, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done.

Schedule a demo today. AUTHORIZED DOOSAN DEALER

D E ALE R N AM E Dealer Phone Dealer Addr Dealer Addr Dealer Web Address

©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,


Turn static files into dynamic content formats.

Create a flipbook