State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
May 26 2021
Vol. LIX • No. 11
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Maine Begins Work On Interchange
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2021 EZ-Screen 1200XLS
*Limited time offer. Some restrictions apply. See dealer for details.
LEASE THE EQUIPMENT. OWN THE JOB. 3 MONTH LEASE 36 AS LOW AS
$1,500*/MONTH Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $49,900 plus freight. Other Screeners Available
Tibbits 508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Equipment Services, Inc. www.tibbitseq.com
802-479-9696 ®
KWIK KLEET ts Traction Clea
EZ-SCREEN
www.ez-screen.com
248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
2003 Cat 938G Series II, 4190 Hrs, 3.65 CY Bkt, 180 HP, US Made, Nice Machine, Excellent Cond. $69,500 or BO Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models
• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com
• Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
CALL 888-81-GORILLA(46745)
By Ken Liebeskind
CEG CORRESPONDENT
The reconstruction of the Exit 45 Interchange on the Maine Turnpike I-95 in South Portland began on March 19 after the initial pre-load of the site was completed at the end of December 2020.
“When completed, Exit 45 will have a more efficient diamond interchange, a brand new bridge with increased clearance and ramp toll plazas giving drivers a safer, more fluid connection to the Turnpike,” said MTA Executive Director Peter Mills.
CPM Contractors, Freeport, Maine, is the lead contractor on the $28 million reconstruction and Sargent Corporation, Old Town, Maine, was the contractor on the pre-load project, which had a budget of $14,792,753. HNTB Inc., South Portland, Maine was the designer of the nearly $43 million construction project. see MAINE page 10
Warm, Spring Weather Brings Full Plate of Highway, Bridge Jobs in Rhode Island With construction season back, the Rhode Island Department of Transportation (RIDOT) has made plans to work on 50 road, bridge and highway projects this year. Gov. Dan McKee came together with other state leaders in mid-April to celebrate RIDOT’s spring return to action at the site of one of Rhode Island’s key projects,
the $265 million effort to replace Providence’s I-95 Northbound Viaduct. “It’s the busiest stretch of highway in Rhode Island see PROJECTS page 10
RIDOT graphic
According to RIDOT, the I95 Northbound Viaduct project’s key element is the replacement of the 1,300-ft.-long structure in downtown Providence.
Page 2 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Call Mark Doty @ 203-823-2316 2014 BOBCAT S770
2005 VOGELE 1110RTB
2019 BOBCAT S740
stk# 26537, c/air, hi flow hyds, pilots, 2 speed, switchable controls ..............................$37,500
Cummins, 10-19’ electric screed, 70% tracks, all wear items 70%, stk# 25947 ..........$15,000
stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$54,000
2013 METSO MINERALS LT200HP
1996 KOBELCO SK270LC
2010 WIRTGEN 2100
4300 hrs, stk# 25979, Cat Power, Well Maintained Unit ..................................$325,000
9306 hrs, c/heat, pin on 42” bucket, stk# 26039 ..........................................$42,500
Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000
2001 JOHN DEERE TC54H
2017 DEERE 650K
2008 HAMM HDO120V
15,058 hrs, C/air, 3rd valve hyds, hyd coupler, 2.75 yard bucket, radials, Municipal Owned, stk# 26375 ..........................................$32,500
stk# 25014, 1060 hours, c/air, 6 way 105” blade, Topcon ready ..........................$125,000
3110 hrs, stk# 22866, 78” drums, oscillation dealer maintained ................................$35,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 3
Tyler Equipment Massachusetts 251 Shaker Road P.O. Box 544 P. East Longmeadow, MA 01028 413.525.6351 800.292.6351 Connecticut C ti t 1980 Berlin Turnpike Berlin, CT 06037 Dealer Name 860.356.0840 City, ST 800.352.4473
Contact your local dealer:
IMMPROVE YOUR EFFFICIENCY CY.
123.456.7890
Get jobs done faster with efficien nt Volvo compact wheel loade ers. They provide all-around visibility, excellent stability and easy accesss to tight areas — plus the L20H L model just won the Highest Retained Value Award™ in 2019 by EquipmentWatch. Improve cycle times and your profitability with powerful, efficient Volvo compact wheel loade ers. Cont act your today. Contact yournearest nearestXXXX Tyler location Equipment location today.
tylerequipment.com
Page 4 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
RENT! RENT! RENT! RENT!
2015 CAT 329FL, 4200 hours, Rear Camera, Aux. Hydraulics ..................................$139,000
2019 Hitachi ZX210 LC-6, 1400 hours, Aux. Hydraulics, QC, Rear Camera ............$159,000
2017 Terex TA300, 1700 hours, Excellent Condition, Good Rubber, Work Ready$189,000
2001 GROVE RT750E, 13,000 hrs, Cummins C8.3-C, 450 lb 3 Sheave Block, 36’ - 110’ Boom, 33’ - 56’ Swing Away Ext Jib, Anti Two-Block, PAT DS350 LMI, Aux Winch, Hyd Outriggers $89,000
2017 John Deere 350G LC, 4400 hrs, 32” Triple Grouser Pads, 60” Paladin HD Bkt......$129,000
2017 CAT D8R, New Engine, 80% UC, Recent Equalizer Bar, Work Ready ........$169,000 Firm
2016 CAT 262D, 2000 hours, QC, Aux. Hydraulics, AC ......................................$33,500
2008 Komatsu D61EX-15EO, 4000 Hours, EROPS w/AC, Runs Great! ..................$65,000
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 5
Commanding power.. Pro oven ve reli e ability. Boost your performance and save time digging, loading trucks and more thanks to the best-in-class hydraulics of Doosan® excavators. You can rely on consistent power deliver y to the arm and bucket to confidently take on tough digging conditions that slow other machines down. And increased swing torque helps you easily swing uphill and backfill fasterr,, with better results. Experience Doosan Strong today y.. Stop in ffo or a demo.
Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3. 7
Au thor ized Doos an De aler
Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 • w w w.equipmenteast.com
Page 6 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
MaineDOT Plans Big, Small Building University to See Projects From 2021 Through 2023 ‘Ugly’ Law School Building Razed If you’re wondering whether the roads on your commute to work, or if you’re working from home, the road to the grocery store, is due for a fix, the MaineDOT may have your answer. The state agency recently released a searchable database as part of its threeyear work plan, where anyone can view projects slated for 2021-23 organized by the municipality. “Years and years ago, our work plans used to be in print version and only distributed to policymakers and such,” MaineDOT Commissioner Bruce Van Note said in a phone interview. “We realized, to take a spoof on Tip O’Neill’s saying, ‘All politics is local,’ well, all transportation is local, too.” The DOT has released a similar database each year since 2013. There are plenty of central Maine projects included in the report, many of which are big-ticket items — roads, bridges and airport jobs — slated to be built from Augusta to Pittsfield. The finances include all sources of funding, including federal, state and municipal dollars as well as grants. The state’s plans, can be found at https://www.maine.gov/mdot/projects/workplan/index.shtml “We came up with this work plan process so people could see what we are doing the next three years, and through our website, can go back and see what we’ve done,” Van Note explained. “The DOT’s work plan process is often perceived as just a group of projects. And of course, it is, but it’s really an assembly line that just keeps going.” Here’s a look at projects around central Maine:
Waterville Eight projects are estimated to cost more than $1 million. The biggest of these is the $40.5 million replacement of the Ticonic Bridge between Waterville and Winslow in 2022 and 2023. In addition, the Robert LaFleur Airport will see a $6.28 million safety and infrastructure improvement in 2021; the Interstate 95 northbound and southbound bridges spanning Webb Road just north of the Sidney town line, midway between exits 124 and 127, will be replaced for more than $4.5 million each in 2022 and 2023.
Augusta Runway and taxiway reconstruction at the Augusta State Airport will be accomplished in 2021 at a cost of $3.35 million. Multi-million-dollar bridge construction also is slated for 20222023 with the replacement of Rines Hill Bridge over the old Maine Central Railroad coming in at $4.45 million; and the replacement of the Western Avenue bridge over I-95 is expected to cost $8.5 million.
Belgrade In 2022, a project described as a mitigation effort to offset impacts to wells will cost $2 million. The effort also includes a groundwater investigation. China In 2022 and 2023, MaineDOT plans to address a large culvert on U.S. Highway 202 near the intersection of Pond Road. The work, which is estimated to cost $515,000, includes highway safety and spot improvements, in addition to culvert upgrades. Clinton The Manley Holt Bridge is expected to be replaced to the tune of $2.1 million in 2022 and 2023. Fairfield State Rt. 139 will get $2.93 million worth of work in paving and other improvements. More than 5 mi. of the route will get attention in 2022 and 2023. Sidney Upgrades to Maine Rt. 104 also will take place in 2021, as a $920,000 project will resurface and pave the road for more than 5 mi. beginning just north of the Augusta town line. Skowhegan U.S. 2 West will get $660,000 worth of work in two projects. The first, which is lined up for this year, involves 6.37 mi. of surface and base maintenance. The second and larger effort will be at the intersection of Madison Avenue and Commercial Street. Town residents will see safety and spot improvements, as well as signal improvements in 2022 and 2023. Vassalboro U.S. 201 will get some assistance later this year, with $941,000 worth of
work. New pavement will be laid beginning at the Augusta line and expanding northward for more than 4 mi. Winslow Two $1 million-plus projects are scheduled in the next few years. A $1.1 million contract will provide paving and filling on Benton Avenue beginning at the Clinton Avenue intersection and expanding north for approximately seven-tenths of a mile. In 2022 or 2023, $1.91 million will go toward a replacement of the Fish Bridge over Winslow Stream near the Benton line. Norridgewock The Central Maine Regional Airport has three different projects on the docket totaling $859,000 for a multiphase, three-year effort focused on safety and infrastructure improvements through field investigations, studies and research. Pittsfield Work also is set to occur at the Pittsfield municipal airport in 2021 where nearly $1 million worth of infrastructure improvements will be done, which may include a six-bay hanger. Bridge work on I-95 going through the city also is planned for the area in 2022-23. The Sebasticook River Bridge, spanning southbound over the interstate, will receive $4.38 million in rehabilitation work; a $2.6 million rehab is slated for the southbound North Main Street Bridge over Madawaska Avenue, while the northbound structure’s deck will be replaced for $1.18 million. Another replacement of the bridge deck of the southbound State Rt. 152 and Maine Central Railroad bridge over Rt. 152 has been budgeted to cost $2.93 million. Van Note said the coronavirus pandemic impacted the planning process in a couple ways: fewer people have been driving, so fuel tax revenue is not as high. However, interest rates are so low, bonding and federal funding allows MaineDOT to move forward. With the public database, he encourages everyone who wishes to view the state’s upcoming transportation projects, and at what cost, can do so. “We just like people to be able to see where their money is going so they can ask questions,” Van Note said.
The University of Southern Maine’s School of Law building, at the intersection of Brighton Avenue, Deering Avenue and Falmouth Street in Portland, will be demolished and replaced with a more modern facility at the same site on campus. In the meantime, the University of Maine Board of Trustees received a recommendation from its Finance, Facilities and Technology Committee at a May 5 meeting that the USM School of Law temporarily relocate to a building on Fore Street in the city’s upscale Old Port district until a new law building can be constructed. In addition, the committee endorsed a plan to demolish the current law building, citing the fact that is woefully outdated and in dire need of repair. There is no timetable set for when the structure will be torn down as approval is needed from the full board in a meeting on May 24. But the USM building also is infamous for its design and can regularly be found on lists of the ugliest buildings in the United States. In fact, Architectural Digest has named it one of the top eight ugliest buildings, calling it “rather unfortunate,” and Business Insider declared it the ugliest building in Maine, claiming it looks like a water tower. According to a written proposal that went to the committee, the age, design and condition of the current law building limit the size of classes and make it “functionally obsolete.” It would require at least $20 million to make meaningful updates or renovations, the Press Herald reported. “Perhaps less critically, but still noteworthy, the facility also has been named among the ugliest university buildings in the nation,” the proposal read. “This is obviously a challenge, rather than an advantage, to law student recruitment.” No one seems to disagree that the current law school building at USM is, to be charitable, unsightly, but the proposal to temporarily relocate the department is being criticized by some faculty members at USM, who question spending nearly $1 million a year on rent when the existing building is scheduled for replacement. “One question repeatedly raised by faculty and staff who have contacted me is that the building is not attractive, but is livable and soon to be replaced,” Lydia Savage, president of the USM chapter of the Associated Faculties of the Universities of Maine, a faculty union, said in an email to the Press Herald. “Why spend this money to be in the fashionable high-rent downtown when we should be investing in faculty and students?” According to the newspaper, university and law school leaders counter that argument by saying the planned move is critical to the success of the law school, which recently underwent a reorganization to help improve its programming and financial standing. They said the current building is in such disrepair that it doesn’t make sense for students and staff to remain there. “What is wrong with the building is a four-hour conversation,” Leigh Saufley, dean of the University of Maine School of Law, told the Press Herald. She added that she often works from home because water pours into her office in the law see BUILDING page 14
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 7
Experience the Progress.
True Power At Liebherr, we custom-engineer every machine to perform as efficiently as possible. The Tier 4F emissions system in our PR 716 is practically maintenance free, designed from the ground up. The electronic drive system automatically adjusts to keep operators in the “sweet spot” – even when saving fuel in ECO mode. And like all our machines it is built to last with exclusive Liebherr components.
www.heavymachinesinc.com PORTLAND, ME 2401 Broadway, Bldg #3 S. Portland, ME 04106 877-202-1275 | 207-550-0014
SKOWHEGAN, ME 159 North Ave. Skowhegan, ME 04976 888-875-3954 | 207-858-0051
Page 8 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Ove 40 Us r Hamm ed in Sto ers ck!
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 9
SOLD NEAR N YOU.
Your Y our local D Doosan® dealer is you ur source ffor or sales, par a ts and service.
Learn more at doosanequipment.c . om
Doosan® and the Doosan a logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. © 2021 Doosan Infracore North America, LLC. All rights reserved.
Page 10 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
CPM Contractors Leads Maine Turnpike Interchange Job MAINE from page 1
Work on the pre-load started in September 2019. “Due to poor soil quality, a pre-load was necessary a year in advance to allow the soils to settle prior to constructing the new interchange,” said Peter Merfeld, chief operations officer of the Maine Turnpike Authority. Sargent placed 45,000 cu. yds. of gravel for embankment preload. In addition to preloading the site with gravel and other materials, Sargent also installed nearly 4 mi. of wick drains over 30,000 locations to help draw the water out as the soil settled. During construction, there will be coordination and work on items including: Wick drains are a mechanism to remove drainage, lighting, utility coordination and relocation, signage, highway design, trafwater from the clay as the preloaded fic signal design and structural and materials press down on the soils, which civil engineering of the toll plazas and increases the rate of soil settlement. toll administration building. “Because the area around Exit 45 has soils that are mostly clay, building in this toll payment to two new ramp plazas. It environment causes an undesirable also includes a new higher and wider amount of settlement,” Merfeld said. “By bridge. The new bridge will be raised to pre-loading and installing wick drains, provide a 16.5-ft. clearance over the we were able to compress the soils by as Maine Turnpike. much as six feet in some locations, and “When completed, Exit 45 will have a this work has allowed us to start the more efficient diamond interchange, a much-needed reconstruction sooner.” brand new bridge with increased clearThe last Geotech review, completed at ance and ramp toll plazas giving drivers a the end of February 2021, reported soils safer, more fluid connection to the had settled up to 71 in. in some areas. Turnpike,” said MTA Executive Director The current interchange, which sees Peter Mills. “It is also the last plaza on the some of the greatest traffic volumes on Pike to receive tolling system upgrades. the 109-mi. turnpike, has an awkward Once all the plazas are on the same platdesign that forces drivers entering the form it gives us greater flexibility to highway to drive down a ramp and circle enhance our electronic tolling capabilities back into traffic before they can pass — all which benefit our customers.” through the toll plaza. There also is a difTim Ouellette, chief financial officer of ficult lane merger, and the existing bridge CPM Contractors, said the company over the turnpike has been struck multibegan the job by driving piles for the new ple times by overheight vehicles, accord- Tim Ouellette, chief financial officer of CPM northbound toll plaza. The company used ing to the MTA. Contractors, said the company began the job a Link-Belt LS-218H crawler crane on The Exit 45 Interchange is being by driving piles for the new northbound toll the job. reconstructed with additional capacity for plaza. The company used a Link-Belt LS-218H He said earth work was completed by future traffic volumes and will relocate crawler crane on the job. Shaw Brothers Construction, Gorham,
Maine, before CPM began its work. Additional subcontractors on the job include Enterprise Electric, Newtown, Conn.; H.B. Fleming, South Portland, Maine; Great Falls Construction, Gorham, Maine; and Lakeside Concrete Cutting, Newport, Maine. CPM should complete its work on the Interchange by September 2022. New roadways and the toll plaza should be operable in late 2022 with demolition of the existing plaza and old bridge completed by the end of 2022. Median barrier installation on Route 95 and Route 703 will be completed in 2023. During construction, there will be coordination and work on items including: drainage, lighting, utility coordination and relocation, signage, highway design, traffic signal design and structural and civil engineering of the toll plazas and toll administration building. The reconstruction of the interchange will alter the way drivers enter the turnpike. “Currently, the way traffic is flowing through the existing Exit 45 there is a barrier toll plaza across the road and drivers make a decision once they’ve traveled through the toll plaza and decide whether they’re going north or south,” said Turnpike Spokesperson Erin Courtney. “When the new interchange is complete, drivers will first turn into north or south entrance ramps, then encounter the toll plaza before reaching the highway. The new design will enable the highway to handle higher traffic volumes in the years ahead.” The MTA is separate from the state and doesn’t use state or federal money for construction projects. It is paying the $43 million for the Maine Turnpike reconstruction. It generates revenue from tolls and concessions from service plazas, according to Merfeld. He also said, “We have our own borrowing authority separate from the state.” CEG
Rhode Island Readies to Tackle 50 Infrastructure Projects in 2021 PROJECTS from page 1
with 220,000 vehicles a day traveling over the [structure],” RIDOT Director Peter Alviti told WJAR-TV NBC 10 News. It’s one of 34 projects currently under construction across the state. The new season also will see RIDOT work to improve 146 deficient bridges, a number that put Rhode Island dead last on the list of states in the nation with the worst bridges. But Alviti said things are looking up. “We’ve only moved up a couple of points but we’re out of the basement,”
he noted. McKee noted that the new construction season will result in $1.4 billion of investment in Rhode Island’s infrastructure. The costliest project in Rhode Island is the Route 6/10 Interchange connector in Providence at more than $400 million and in its third full year of construction. It is set to be finished by fall 2023. “We’re seeing those dollars be put to work in this season. A major challenge for all is to make sure we manage it well and I’m confident we will,” said U.S. Sen. Jack Reed, one of the lawmakers who helped
secure federal funds for Rhode Island, in speaking with NBC 10 News. And it’s not just roads and bridges that will be built or upgraded in 2021. Crews have started work on the Pawtucket-Central Falls train station. In addition, new bike and pedestrian pathways and improved bus hubs also are on tap. “These projects will not only create good paying construction jobs, but also safe, updated, resilient infrastructure for our residents,” McKee told the Providence TV station. According to RIDOT, the I-95
Northbound Viaduct project’s key element is the replacement of the 1,300-ft.-long structure in downtown Providence. In addition, a collector-distributor road will be built to eliminate the bottleneck where northbound traffic from the nearby Route 6/10 Connector crosses traffic trying to exit at Route 146 and the State Offices. The Route 6/10 reconstruction project, the most expensive in Rhode Island’s history, is a massive effort to improve the entire interchange while replacing or removing the seven structurally deficient bridges within its footprint.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 11
Lexington, Kentucky | www.linkbelt.com
, and much more • 20° tilting operator ’s cab with • Upper Cameras – winch operation and swing • Carrier Cameras and right turn
Ver e mont 802--658-1700 Massachusettss 508-499-1950 Pennsylvania 717-795-0700 New Yoork 315-676-2008 5-676-2008 www.woodscrw.com
B U Y
•
L E A S E
•
R E N T
Page 12 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
T-Quip Hires Zach Kahr as Its New Rental Coordinator “[Zach Kahr] shares a common vision for the company’s goals and expectations and has big plans to better the rental process …”
Zach Kahr
T-Quip Sales & Rentals
T-Quip Sales & Rentals recently appointed Zach Kahr as the new rental coordinator. Kahr joined the team a couple weeks ago as the “go-to person responsible for all your rental needs,” according to the company. Kahr has more than six years of managerial experience in a B2B customer-service based industry. His skills include product management as well as logistical and analytical planning. “He [Kahr] shares a common vision for the company’s goals and expectations and has big plans to better the rental process for our team and our customers,” said T-Quip. “We’re excited to see Zach apply his knowledge to the rentals position here at TQuip. “T-Quip Sales & Rentals has been a
leader in the heavy equipment sales and rental industry since its inception in 1996,” said the company. T-Quip is headquartered in Londonderry, N.H., with a sales and rentals location in Rutland, Vt., and a sales location in Orlando, Fla. “With a 24/7 support team, TQuip strives to provide its customers with the service they need, exactly when they need it,” said the company. “We pride ourselves on having a knowledgeable and reliable team of employees, who are trained to assist the customers with choosing the right machine for the application and have a
PORTABLE ROCK CRUSHING Onsite or Quarry • Making aggregates since 1983
Call us today ROCK CRUSHING • (860) 491-2283 GOSHEN, CT
www.FAYWRIGHTINC.com
phenomenal fleet of work trucks and maintenance team, to provide around-the-clocksupport to minimize a customer’s downtime and maximize their uptime.”
T-Quip Sales & Rentals Inc. is among the largest used heavy construction equipment dealers in the country, according to the company. Its fleet consists of excavators, rock trucks, dozers, loaders, rollers, skid steers, telehandlers, crushers, screeners and more. Its inventory includes Caterpillar, Komatsu, Hitachi, Doosan, Volvo, Dynapac, John Deere, JCB, Link-Belt, Takeuchi, Bobcat and many more. T-Quip has more than 1,000 machines and attachments in stock year-round. T-Quip’s primary customer base consists of builders, general contractors, excavation companies, landscapers, site development companies, local town and municipalities, road and highway construction and forestry and land clearing companies. For more information, call 603/623-3669 or visit www.tquip.com. To contact Zach Kahr, call 603/854-8207 or e-mail at zkahr@tquip.com.
Treasurer Hails School Construction Bond In 2007, the Rhode Island Department of Education’s Jacobs Recommendations for Consideration report concluded that the state’s schools faced a tidal wave of need. Science labs were woefully outdated, roofs leaked, pipes burst, and, at one Newport high school, mice dropped from the ceiling. Just a year later, voters approved a $250 million general obligation bond, the largest in state history, to address decades of neglect. According to the Providence Journal, Rhode Island Treasurer Seth Magaziner recently toured the new $189.5 million East Providence High School to tout the progress that has been made in retooling the state’s school buildings. It is the first new high school built in the state in 20 years. But, since the 2018 bond referendum, more than 160 school buildings have been repaired or replaced. Also, in two years’ time, more than $600 million in school construction projects have been funded. Magaziner told the newspaper he hopes Rhode Island voters will
approve a second $250-million bond in 2022. “East Providence High School is a great example of what can be done,” he said in front of the 304,000-sq. ft., four-story building, which is set to open in September. The difference between the new school and the existing, 70-year-old building adjacent to it, is stark. The latter looks every bit its age. During a tour four years ago, East Providence Schools Superintendent Kathryn Crowley quoted an electrical engineer when she told the Providence newspaper “we’re operating on a wing and a prayer.” One science lab at the old high school serves 1,550 students. The pool has been emptied for six years and beneath the gym, some of the concrete support beams are crumbling. She also noted that steam pipes carrying heat to the classrooms were corroded and to reach them, repair crews must squeeze through a crawlspace littered with asbestos. Following is a sampling of what else the 2018 bond money bought Rhode Island’s school infrastructure, according to the Journal:
• Newport’s Rogers High School was recently judged among the worst school buildings in the state. Last winter, local voters approved a $106.3 million bond to build a new high school and an addition to Pell Elementary School. Now, the state has the funds to cover more than half of the construction costs, • Pawtucket is currently rebuilding two elementary schools and renovating its two high schools. When it’s open, the Winters Elementary School will feature sinks in every classroom for science experiments, an open ceiling so students can see how the building works, wi-fi and wireless speakers in the classrooms and a water filtration garden, • Smithfield’s $45 million plan calls for building a new combined school to serve students from both the Winsor and McCabe elementary schools, renovating the Old County Road School, and expanding the McCabe building. Because the state now offers bonuses to school districts for consolidating their schools and increasing energy efficiency, Smithfield will receive an additional $16.7 million in state funding.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 13
®
Page 14 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX
‘Rather Unfortunate’ Building Set to Be Demolished at USM
ALTA EQUIPMENT/NORTHLAND JCB ..........................16 ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ........................................9 DOOSAN NORTHERN NEW ENGLAND ......................13 EQUIPMENT EAST ........................................................1,5 FAY & WRIGHT EXCAVATING INC ................................12 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 HEAVY MACHINES INC ..................................................7 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 MILTON CAT......................................................................8 PETERSON ATTACHMENTS ..........................................8 ROGERS BROTHERS CORPORATION ........................15 SHAWMUT EQUIPMENT CO INC ....................................8 T-QUIP SALES & RENTAL INC ........................................4 THE N.I.C.E. COMPANY ..................................................4 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP......................................................11 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
The USM building is infamous for its design and can regularly be found on lists of the ugliest buildings in the United States. In fact, Architectural Digest has named it one of the top eight ugliest buildings, calling it “rather unfortunate,” and Business Insider declared it the ugliest building in Maine, claiming it looks like a water tower. BUILDING from page 6
school when it is raining. “It is literally falling apart,” Saufley said. She noted that USM has not been able to make technology upgrades that were needed during the pandemic to allow for simultaneous instruction of in-person and remote students, and it would cost millions to seal windows, fix the roof and make the technology upgrades, the Press Herald reported. “The law school can’t grow,” she said in an interview with the Portland newspaper. “We can’t bring in more students because the building restricts that. We can’t use the technology to make the classes more accessible. We can’t bring in other programs because the building doesn’t work, and we would have to spend millions just to have people in the building.” If the UM Board of Trustees approves its own committee recommendation to move the law school and demolish the old building, the law school could move into the new space as soon as this fall.
“I think it’s important to note for the public record that this isn’t just, ‘We have to get a better building,’” James Erwin, chair of the Board of Trustees, said during the May 5 meeting. “This is part of a pathway towards a sustainable, vibrant, distinctive offering in a new legal education marketplace. I strongly support this, but I want to be clear what the implications are. It’s a much bigger deal than just moving to another building.” The proposal comes as the system is planning for the construction of a new Maine Center building on the USM campus that would also house the law school, according to the Press Herald. Last fall, the system announced a historic $240 million investment from the Harold Alfond Foundation that would direct up to $40 million for the Maine Center building in addition to at least $30 million in matching capital funds. The UM system is in the process of raising the matching funds and there is no timeline for when it might break ground or when the building will open, the newspaper reported.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • May 26, 2021 • Page 15
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
60 Shun Pike Johnston, RI 02919 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
Page 16 • May 26, 2021 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Come work foor one of the largest equipmennt dealers in the United Statess! Are you a Technician/Mechanic anic with diesel, agricultural, agricultural or o heavy equipment repair experience? Iff so, then we want you on ourr team! Competitive pay and excellent e benefits are only thee b
C Careers @AltaEquipNE.com m | 800-Go2-ALT LTA | AltaEq qu