Skip to main content

Georgia 24, December 1, 2021

Page 1

State Supplement sponsored by:

441

59

75

Cornella 19

Rome 85 27

Athens

GEORGIA STATE EDITION

A Supplement to:

441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

16

Dublin

Swainsboro Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

Dorchester

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson Moultrie

19

27 84

319

84

Bainbridge

Valdosta Thomasville

®

Waycross Brunswick 82

SHIP WITHIN 48 HOURS

1 441

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS

December 1 2021

Thousands in Service!

Vol. XXIII • No. 24

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

Superior Construction Co. Inc. expects to complete the $82.5 million I-20 @ Savannah River Bridge Replacements project for the Georgia Department of Georgia Transportation (GDOT) and the South Carolina Department of Transportation (SCDOT) in the winter of 2022. This initiative is replacing and widening the existing I-20 bridges over the Augusta Canal and Savannah River within the city of Augusta, Ga. (Richmond County) and the city of North Augusta, S.C. (Aiken County) to improve safety and operations along I-20 that links the two states. Construction began in January 2019 and the progress has been solid. The project also will widen 1.8 mi. of I-20, replacing four bridges over the Augusta Canal and Savannah River, and is CEG CORRESPONDENT

301

1 341

Cuthbert

By Irwin Rapoport

Savannah

McRae Cordele

27 82

making intersection improvements at the West Martintown Road Interchange in South Carolina, including signalizing the intersection at Exit 1, placing a new signal at the I-20 EB offramp and West Martintown Road and turn lane improvements. Construction Progress Thus far, Superior Construction has completed the following: poured 1,779.9 cu. yds. of bridge deck concrete, set 1,268 linear ft. of 74-in. PSC beams, set 1,263.2 linear ft. of 78-in. PSC beams, set 244 linear ft. of 3-in. PSC beams, installed 975,563.62 lbs. of reinforced steel, placed 25,455.5 tons of GAB and paved 17,550 linear ft. (3.3 mi.) of 12-in. PCCP. The remaining work will focus on the demolition and reconstruction of the existing WB and EB travel lanes during Phase 3 and Phase 4 construction, which followed the first

Affordable Price. Premium Service.

CALL 800-367-4937 *On approved credit • Financing Available

major traffic shift on the weekend of Nov. 20. During each of the upcoming phases, Superior will install the same or more of the above-mentioned quantities. “Some of the challenges we’ve faced were the failure of the Aquadam system prior to switching to a rock cofferdam, subcontractor availability and readiness due to transportation constraints and a reduction in workforce, COVID-19, water level increases due to weather, and dam releases, and adverse weather events,” said Tim Marsh Sr., Superior’s project manager. “Superior negated the effects on these challenges by bringing on additional resources and assisting subcontractors with labor and transportation. The progress of work has returned to an exemplary standard of execution and should continue to improve as the project progresses. see BRIDGE page 6


Page 2 • December 1, 2021 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Atlanta, GA 404-696-7210

800-239-2694 | COWIN.COM

Mobile, AL 251-633-4020

Tuscaloosa, AL 205-848-4147

Birmingham, AL Montgomery, AL Pensacola, FL 205-841-6666 334-262-6642 850-479-3004 Madison, AL Oxford, AL 256-350-0006 256-832-5053


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 1, 2021 • Page 3


Page 4 • December 1, 2021 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

GUCA Announces Hiring of Industry Vet Brumbelow As Its New Executive Director The Georgia Utility Contractors Association (GUCA) board of directors announced the election of Scott Brumbelow as GUCA executive director. Brumbelow has been with GUCA more than 19 years, and he will be responsible for the day-to-day operations of the GUCA including all staff positions, committees and board of directors. As the former assistant executive cirector, Brumbelow was responsible for the safety and workforce development department as well as liaison for all community service projects undertaken by the association. “The commitment that he has shown to the utility construction industry is unparalleled as he has taken part in providing safety and educational training for tens of thousands of contractors across the state,” said GUCA President David Westrick. Brumbelow has provided exceptional business development principles to GUCA to increase market share and presence statewide as the leading utility construction

non-profit trade association in the country. Additionally, Brumbelow has received numerous training and development certifications in his tenure at GUCA including Certified Safety Professional (CSP), Department of Labor Occupational Safety and Health Administration Construction Outreach Trainer, and Georgia Soil and Water Conservation Commission Level One Trainer. Previously, Brumbelow has served as Clayton County Soil and Water Conservation district supervisor assisting the development and revitalizing efforts of Clayton County. As a champion for workforce development to bring new talent to the construction industry, he has served on various initiatives with the Construction Education Foundation of Georgia (CEFGA) and the Construction Industry Education and Research (CIER). For more information about GUCA, visit Scott Brumbelow www.guca.com. 

GUCA Presents Golden Pipe Engineering Award at Show The Georgia Utility Contractors Association Inc. presented the GUCA Golden Pipe Engineering Award during the GUCA 2021 Fall Quarterly Meeting & Trade Show Nov. 4, 2021, at the Atlanta Motor Speedway, Hamton, Ga. The GUCA Golden Pipe Engineering Award is designed to

recognize engineers who demonstrate the highest degree of merit and integrity for the utility construction industry. RINDT company works as a team and has succeeded, for decades, by adhering to a stable set of values where clients, and their interests, are its top priority.

(L-R) are James Ethan Woodard, Josh Becker and Keith Rowe, all of RINDT Inc.

“RINDT designs follow our client’s instructions, with a view to economics, long, useful life and ease of construction and maintenance. We take pride in the level of service we give and view ourselves as integral to our client’s team. Most importantly, our view is long-term, and we always work with that in mind,” the company said. “Our final goal is to make our client’s life easier by giving them the tools to communicate, build and maintain their vision.” RINDT’s work with GUCA members on the Rottenwood Sewer Interceptor project helped it receive this prestigious award. The Rottenwood Sewer Interceptor project consisted of approximately 5,100 linear ft. of 16 in. DIP gravity sewer and 2,020 linear ft. of 8 to 12 in. PVC and DIP gravity sewers. Installation methods included open trench and trenchless methods of installation. Challenging job site conditions included four creek crossings and the installation of 360 linear ft. of 48 in. steel casing pipe crossing Interstate 75. Additionally, the abandonment and/or removal of existing aerial and buried gravity sewers and existing manholes was required to complete the job. The company was nominated by GUCA member RDJE Inc., who stated because of its excellent knowledge and communications with the constructability of the project, it was a prime candidate. RDJE representatives went on to say RINDT was quick with response and decision making to help meet and solve changing conditions throughout the project. For more information about GUCA, visit www.guca.com. 


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 1, 2021 • Page 5

THE EA ASY WA A Y T O ORDER GENUIN NE CAT PART TS ®

Parts.Cat.Co om is your place to sshop online for all the genuine Cat® parts you need d, all in one place.

FLEXIBLEE WA WAYS TO SEARCH FOR PARTS ART

w

WHY BUY ONLINE? Your life and business keep p yyou

⁄⁄

Search by part or serial number Enter your part o or serial number on the home pag ge or use Quick Order to enter and a purchase multiple parts att once.

on the go — why shouldn’’tt your maintenance routin ne match your lifestyle? Ordering parts online allows you to shop from any device,

⁄⁄

⁄⁄

Search by equiipment category If you don’t know your part or serial number, yyou can start browsing part categories c to narrow down your search.

stay connected to Yancey Brothers from anywhere and d manage parts orders on your schedule.

Search by machine model Use the “Add Equipment” feature to shop by machine model and guarrantee the right fit every time you see a checkmark beside search rresults.

PART A ARTS.CA AT.COM AT Yancey Bros. Co., © 2020 Yanceey Bros. Co. All Rights Reserved. Cat and Caterpillar are registered trademarks of Caterpillar, Inc., 330 3 Lee Industrial Blvd, Austell, GA 30168, Unnited States, 770-941-2300


Page 6 • December 1, 2021 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Superior Construction Tackles Water Level Challenges BRIDGE from page 1

“The water level of the Savannah River continues to be an off and on challenge due to the necessity of the dams upstream to release water to maintain their operational abilities,” he added. “This project consists of both day and night work depending on the scope of work required. Superior strives to create open communications between all team members. Communication between all firms have been good and is one of the reasons we’ve been able to proactive with challenge and risk mitigation.” Superior began the Phase 3 demolition of the WB travel lanes and bridges on Dec. 1 and the Phase 4 demolition of the EB travel lanes will begin on Oct. 1, 2022. “We will construct the new bridges will new footers, columns and caps followed by new girders and concrete bridge deck,” said Marsh. “The major challenges are the Savannah River water levels, adverse weather events, labor force availability and global supply chain and transportation efficiency. The work is progressing as planned and will improve as we navigate through the end of the pandemic.” Key equipment for the bridge construction includes 275 ton track cranes, 55-ton service cranes, forklifts and excavators. Superior will reconstruct the roadway between the Canal Bridge and the Savannah River Bridge first, then the South Carolina roadway portion of the project, followed by the Georgia welcome center end of the project. “The challenges include rain events and transportation availability,” said Marsh. “The work is progressing on schedule and continues to improve as the project progresses. There will be new drainage structures installed under both Phase 3 and Phase 4.” For the roadwork, crews are using excavators, forklifts, steel drum rollers, motor graders and dozers. When the project is completed, 20,493 tons of concrete, 1170 tons of steel and 75,650 tons of earth and rock will be excavated, demolished and replaced. Peak days have approximately 80 Superior Construction and subcontractor employees on-site. The subcontractors include firms from both Georgia and South Carolina. Project’s Need “The existing bridges are functionally and structurally obsolete with substandard shoulder widths,” said Kyle Collins, a spokesperson of GDOT. “By widening from four

lanes to six lanes the reconstructed bridges will be better suited to conduct current and future traffic volumes The project represents the first bi-state agreement between Georgia and South Carolina for a Design-Build project. These bridges carry over 67,000 daily vehicles with higher future projections. Increased capacity with the added lanes and shoulders will make commutes better and emergency response safer and easier. One collision can gridlock traffic for miles with the limited existing footprint.” The Augusta Canal Bridges — 410-ft. long and two lanes in each direction — were built in 1964 and will be replaced with bridges that have three lanes in each direction (12-ft. wide) with a 2-ft. inner shoulder and 12-ft. outer shoulder. The Savannah River Bridges were built in 1965 and the new structures will have the same features, with the lengths going from 1,216 ft. to 1,278 ft. The work is taking place close to the Augusta Canal and Industrial District National Historic Landmark, the Augusta Canal National Heritage Area and the Tow Path, both of which have experienced limited closures due to the work. The bi-state agreement to replace the bridges was signed in 2016. The project did not require any right-of-way (ROW) acquisitions. GDOT has taken the lead on the project. The existing bridges carry 67,150 (2017 counts) cars and trucks (15 percent) daily and the new ones, based on a 2042 design year, are built to handle 93,300 vehicles daily. WSP designed the new bridges. The construction plan has the DOTs maintaining traffic on the existing bridges as the new structures are being built, with some off-peak lane closures. “Both nighttime and daytime temporary single lane closures and shoulder closures can be expected along I-20 for the duration of the project,” said Collins. “Traffic shifts can be expected later in the project. Work on the West Martintown Road and the bridge replacements and Georgia roadway widening began in the winter of 2019, with the South Carolina roadway widening starting in early 2020. The West Martintown Road intersection work was completed in late 2020. To prepare for the major construction, crews placed temporary barriers along the roadway, conducted clearing and grubbing operations along the R.O.W., and installed erosion control measures.  CEG

This initiative is replacing and widening the existing I-20 bridges over the Augusta Canal and Savannah River within the city of Augusta, Ga. (Richmond County) and the city of North Augusta, S.C. (Aiken County) to improve safety and operations along I-20 that links the two states.

The project also will widen 1.8 mi. of I-20, replacing four bridges over the Augusta Canal and Savannah River and is making intersection improvements at the West Martintown Road Interchange in South Carolina, including signalizing the intersection at Exit 1, placing a new signal at the I-20 EB off-ramp and West Martintown Road, and turn lane improvements.

The existing bridges are functionally and structurally obsolete with substandard shoulder widths.

The remaining work will focus on the demolition and reconstruction of the existing WB and EB travel lanes during Phase 3 and Phase 4 construction.


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • December 1, 2021 • Page 7

4240 MLK JR Drive SW Atlanta, GA 30336 770-819-6600


Page 8 • December 1, 2021 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook
Georgia 24, December 1, 2021 by Construction Equipment Guide - Issuu