Skip to main content

Georgia 04 February 15, 2017

Page 1

441

59

75

GEORGIA STATE EDITION

Cornella 19

A Supplement to:

Rome 85 27

Athens 441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

301

185 19

®

16

Swainsboro

Dublin

Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

February 15 2017

Dorchester

341

Cuthbert

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

301

1

82

Vol. XIX • No. 4

Savannah

McRae Cordele

27

27 84

Moultrie

19 319

84

Bainbridge

Valdosta Thomasville

Waycross Brunswick 82

1 441

Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

Crews Work to Save Lives on Mike Padgett Highway By Cindy Riley

In an effort to help save lives, construction crews in Augusta, Ga., are making improvements to a dangerous stretch of roadway commonly referred to as Mike Padgett Highway. Work on the $29 million state Route (SR) 56 project began in late 2013 and should be completed by the first quarter of 2017. “Based on project design studies, the four-year accident data for this segment includes 295 total accidents, with 165 total injuries and 10 fatalities,” said Kyle Collins, a communications specialist of the Georgia Department of Transportation (GDOT). “In 2006, the statewide average accident rate on comparable roads was 2.42 times the accident rate on this segment of SR 56. The majority of accidents were rear-end collisions. The second most frequent type of accident was angle collisions.” The ongoing construction covers Mike Padgett Highway widening and reconstruction beginning at Bennock Mill Road and extending to Old Waynesboro Road. Two bridges and approaches over Spirit Creek and Little Spirit Creek are included. The purpose of the project is to improve operational conditions on SR 56 and control left turn movements to and from connecting streets. Collins said speeding and aggressive driving are factors that lead to increased vehicular incidents. “This south Augusta area route is heavily traveled due to various industries in the corridor. SR 56 also serves as a connection to nearby Burke County, and carries a large load of Plant Vogtle traffic, Collins said. “Higher traffic volumes also lead to increased chances of incidents. This construction project will create additional lanes at side road intersections, which will allow vehicles to decelerate and exit out of the through travel lanes when making turns. This will enhance rear-end crash avoidance at these locations.” The work involves almost 5 mi. (8 km) of widening and reconstruction. It includes construction of two bridges and approaches. The widening will include four 12-ft. (3.7 m) travel lanes (two in each direction), a 22-ft. (6.7 m) raised concrete center median and 10-ft. (3 m) shoulders, with 6.5 ft. (2 m) being paved and the balanced being grassed. The work is following the scheduled flow of all GDOT projects. The concept was developed and approved in April 2008. The project then went into the design phase, which was completed and let to construction in June 2013. According to Dallas Suggs, Augusta area manager, Reeves Construction Company the project is currently in the later phases of Stage II construction.

CEG CORRESPONDENT

“Most of the heavy grading and utility work is complete. As of right now, bridge work over Little Spirit Creek and Spirit Creek on the right side is approaching completion. Concrete raised medians are currently being installed in preparation of the final surface placement. Minor grading activities remain, once bridge construction has been completed.” Stage I is finished, which, in addition to the construction of two bridges, called for the installation of 25,000 linear ft. (7,620 m) of new water main, 21,000 linear ft. (6,400 m) of new storm drainage, 150,000 cu. yds. (125,419 cu m) of earthwork, 150,000 tons (136,077 t) of graded aggregate base and 100,000 tons (90,718 t) of recycled HMA. Utility relocation also is complete. Suggs said existing concrete roadbed removal has

delayed the project, as have environmental restrictions and the elements. “Weather plays a major role in construction projects where grading is critical to completion. Even though 2016 was a dry year, previous years experienced above average rainfall. Weather will be the major contributing factor heading into the winter months,” Suggs said. Another challenge involves a specification requiring the contractor to coordinate all utility relocation on behalf of the owner. “This requires the contractor to schedule and coordinate concurrent utility and construction activities, to maximize contract time,” said Suggs. “This project is also located on a historically dangerous section of Hwy 56. Safety of the travsee PADGETT page 2

Reeves Construction photo

The ongoing construction covers Mike Padgett Highway widening and reconstruction beginning at Bennock Mill Road and extending to Old Waynesboro Road.


Page 2 • February 15, 2017 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Project to Improve Operational Conditions on SR 56 PADGETT from page 1

eling public and employees is taken into consideration in every decision of the project. “With the recent expansion project at Plant Vogtle, traffic and MVA has increased substantially. Removal of the old concrete roadway also proved to be challenging, especially adjacent to active travel lanes and unknown obstructions. The project is also located in an area where large industries are present and involved in the planning/ construction process.” The project called for routine widening, with most of the grading involving the removal of old roadway and grading down for new typical section. Asphalt paving consists of 6 in. (15 cm) of .9 in. (25 mm) base, installed in two lifts each at 3-in. (7.6 cm) thickness, followed by 2 in. (5 cm) of .7 in. (19 mm) binder. The final surface at project completion will be 1.5 in. (3.8 cm) of .4 in. (12.5 mm) topping. The total of 9.5 in. (24 cm) of asphalt is placed on 14 in. (35.5 cm) of GABC base material. Suggs said that the weather is the main factor. “It’s holding up the asphalt paving, due to rain and wet cold winters. “As far as the work on the bridge goes, there’s been grading, driving piles, placing concrete on caps, setting the

GDOT photo

In an effort to help save lives, construction crews in Augusta, Ga., are making improvements to a dangerous stretch of roadway commonly referred to as Mike Padgett Highway.

“It’s very challenging, and extremely critical that everyone is always aware of this condition. Even though channel and barrier devices are used to control the traffic, employees have to always be aware of their surroundings, and never become comfortable with temporary barriers separating the work area from the travel lanes. In the age of the smart phone, and texting while driving, employees always have their guard up for the unexpected,” Suggs said. Reeves Construction photo Main equipment being used The work involves almost 5 mi. (8 km) of widening and reconstruction. involves conventional grading machinery, including dozers, beams, placing concrete on diaphragms, edge beams and end excavators, loaders, graders and dump trucks as the primary walls. Other activities include welding the deck pans, tying fleet. Asphalt operations consist of a paver, a transfer vehisteel and placing concrete on the decks, approach slabs and cle, multiple rollers, brooms and a number of dump trucks. barrier walls.” Workers utilized the latest Topcon GPS technologies, includSuggs said the state of the existing road was expected for ing integrated equipment systems. a typical state route that had been previously widened to the GDOT allowed the contractor to recycle all the existing limits of homes and utilities. roadway concrete into recycled graded aggregate base to be “The existing road consisted of sections containing four used on the project. Crews also incorporated 30 percent recylanes, with and without a center turn lane. The purpose of the cled asphalt in all the asphalt placed on the project. project was to construct a physical barrier to help control the The widening project was designed based on multiple flow of traffic with the addition of median and outside turn studies. A design to provide minimal impacts to environmenlanes that enable the two constant lanes of travel moving tal resources and surrounding properties was the major connorth and south.” cern. There are four total traffic signals on the project at Doug Working in an environment with traffic nearby, crews are ever mindful of motorists, especially considering the road- Barnard Parkway, Goshen Industrial Boulevard, Old Waynesboro Road and Tobacco Road. They are in place and way’s reputation.

active, but there are some small items to make them permanently complete. The 2006 average daily traffic of 12,200 vehicles per day on SR 56 within the project area was projected to increase to 35,240 by 2032. The project was proposed to involve 126 parcels requiring right-of-way acquisition. A total of seven wetland sites and three stream sites were identified within the APE of the project. The U.S. Fish and Wildlife Service and the Georgia Department of Natural Resources listed 16 species of plants and animals as protected or endangered within Richmond County, Georgia. Bridge construction was halted in March 2016 to prevent impact to the endangered fish in the area. The work resumed in late August 2016. Localized temporary water quality impacts were anticipated to be minimized during construction by the use of best management practices. In November 2016, preparations had to be made for a traffic split as workers asphalt paved sections of the roadway mainline to properly level the area. The switch separated vehicles in a single lane to either side of the new construction starting at Old Waynesboro Road. GDOT officials expect the new four-lane highway to fully open to traffic by March 2017. The estimated completion date has been adjusted to next March, due to remaining bridge construction at Little Spirit Creek and other factors. Mike Padgett Highway was dedicated in 1995, and is named for the longtime legislator representing Richmond County in the state house, state senate and Richmond County Commission. It follows Georgia Highway 56 from its intersection at Peach Orchard Road to the Burke County line. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 15, 2017 • Page 3


Page 4 • February 15, 2017 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Georgia... Calhoun • Quitman • Glascock • Walker • Tattnall • Ben Hill • Colquitt • Lumpkin • Randolph • Oglethorpe • Columbia • Gilmer • Bryan • Effingham • Putnam • Murray •Peach • Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Calhoun • Quitman • Glascock • Walker • Tattnall • Ben Hill • Colquitt • Lumpkin • Randolph Jefferson • Morgan • Pike • Warren • Burke • Lamar • Fannin • Walton • Fayette • McIntosh • Jenkins • Laurens • Lowndes • Coweta • Calhoun •

‘Peach State’ Highway Project Bids

The Georgia State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Appling Proposal Number: 003 - B1CBA1601665-0 Location: On SR 144 beginning at SR 27 and extending to oneway connector. Project: 14.762 mi. of milling and plant mix resurfacing. Contractors and Bid Amounts: • Everett Dykes Grassing Company Inc. — $2,129,660 • East Coast Asphalt LLC — $2,315,813 Counties: Bartow, Carroll, Fannin and Paulding Proposal Number: 004 - B1CBA1601675-0 Location: Various locations. Project: 52.780 mi. of plant mix resurfacing and surface treatment paving. Contractors and Bid Amounts: • Northwest Georgia Paving Inc. — $4,485,478 • C. W. Matthews Contracting Company Inc. — $4,717,822 • Bartow Paving Company Inc. — $4,978,862 • Everett Dykes Grassing Company Inc. — $5,349,296

County: Bibb Proposal Number: 005 - B1CBA1601681-0 Location: On I-16/SR 404 and I-75/SR 401 in the Pleasant Hill neighborhood. Project: Interchange improvments Phase 1B mitgation. Contractors and Bid Amounts: • E. R. Snell Contractor Inc. — $12,330,994 • C. W. Matthews Contracting Company Inc. — $14,935,393 • G.P.’s Enterprises Inc. — $16,997,840 County: Chatham Proposal Number: 006 - B1CBA1601644-0 Location: On SR 25 over the Savannah River. Project: Bridge rehabilitation. Contractors and Bid Amounts: • Tic-The Industrial Company — $664,806 • The L. C. Whitford Company Inc. — $698,887 • Massana Construction Inc. — $1,325,922 • JHC Corporation Inc. — $1,451,690 County: Chatham Proposal Number: 007 - B1CBA1601657-0 Location: On SR 26 beginning west of Lazaretto Creek Bridge and ending east of Tybrisa Street. Project: 4.295 mi. of milling and plant mix resurfacing.

Contractors and Bid Amounts: • Carroll & Carroll Inc. — $1,686,472 • Preferred Materials Inc. — $1,719,051 • Reeves Construction Company — $1,732,913 Counties: Coweta, Harris, Meriwether and Troup Proposal Number: 010 - B1CBA1601661-0 Location: Various locations. Project: Bridge rehabilitation. Contractors and Bid Amounts: • Ram Construction Services of Michigan Inc. — $3,713,610 • Baldwin Paving Company Inc. — $4,160,465 • Triangle Grading & Paving Inc. — $4,438,350 • The L. C. Whitford Company Inc. — $4,798,887 County: Forsyth Proposal Number: 013 - B1CBA1601655-0 Location: At various locations on SR 9 and SR 400. Project: Intersection improvements. Contractors and Bid Amounts: • North Cherokee Electrical Inc. — $1,226,925 • R. J. Haynie & Associates Inc. — $1,313,484 • G.P.’s Enterprises Inc. — $2,386,768


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 15, 2017 • Page 5

PURCH P HASE A NEW MINI EXCA AV VATOR AND GET UP U TO

†

$

1 100 1,1 1 CAS SH BACK K

INCLUDES 1.9% FINANCING FOR INCLUD F 60 MONTHS AND A A POWERTR RAIN EQUIPMENT T PROTECTION PLA AN.* PLUS ADDITIONAL CASH CA ASH BACK REW WARDS ARDS FOR OTHER R MODELS AND MACHINE FAMILIES. FAM MILIES. Albany 800.768.2892

Calhoun 800.752.9804

McDonough 855.901.0100

Washington 888.678.3211

Augusta 800.446.5131

Columbus 800.633.5240

Savannah 800.755.8382

Waycross 888.948.2443

Austell 800.282.1562

Dacula 800.545.2945

Statesboro 888.764.6506

Brunswick 800.299.5010

Macon 800.633.5180

Valdosta 800.755.6841

www.Y YanceyBros.com anceyB Bros.com

* For complete details, check with your local Cat® dealer. Offer valid from February 1, 2017 to June 30, 2017 on select new models of machines manufactured by Caterpillar Inc. Building Construction Products Division. To be eligible, a sales contract must be signed during the offer period. Offer available only at participating Cat dealers. Offer is available ble to customers in the USA and Canada only and cannot be combined with any other offers. Prior purchases do not qualify. Offer is subject to machine availability. All new Building Construction Product models are eligible for the promotion.† The cash back offer is based on a predetermined amount for each machine that is applied to the sale price. Cash back amount varies by model. Customers must apply cash back offer to the sale price of the machine. Offer can only be used at the Cat dealer and must be redeemed on the date of purchase. Machines sold in Canada by authorized dealers are priced in Canadian dollars and the sale price and cash back offer may take into account the exchange rate of Canadian dollars to U.S. dollars. The offer has as no cash value and is not transferable. TToo receive the interest rate offerr,, all remaining balances must be financed through Cat Financial and are subject to credit approval through Cat Financial. Finan Financing rate is subject to approval and some customers will not qualify. The interest rate offer is only for customers who qualify. Not all buyers may qualify. Higher rates apply for buyers yers with lower credit ratings. The Powertrain Equipment Protection Plan (EPP) is provided through Cat Financial for use at participating Cat dealers. EPP coverage varies by model. Final machine prices are subject to change. Prices do not include taxes, freight, set-up, delivery, document fees, inspections, additional options, or attachments. Program period and conditions subject to change without prior notice and additional terms and conditions may apply. 3 year/1500 hour Powertrain EPP included. Cash back varies by model from $1,000-$1,100 USD on 300.9-302.7 Mini Excavators. © 2017 Caterpillar. All Rights Reserved. CAT, T, CATERPILLAR, BUILLTT FOR ITT,, their respective logos, “Caterpillar YYellow,” the “Power Edge” trade dress, as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission.


Page 6 • February 15, 2017 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide

Komatsu America Hosts ‘Day-in-the-Life’ Career Fair Komatsu America Corp., a leading global heavy equipment manufacturer, recently hosted more than 30 students from three Atlanta-area colleges and technical schools at the Komatsu America, Cartersville, Ga., customer center training site. Students came to learn about construction-related jobs, as well as how to operate select Komatsu machines, including bulldozers, excavators, wheel loaders and dump trucks. As guests of Komatsu America and local distributors Tractor & Equipment Co., Linder Industrial Machinery Company, Brandeis Machinery and Power Equipment Co., students from Chattahoochee Technical College, Reinhardt University and Kennesaw State University learned about a day in the work life of construction and mining employees, as well as current and future job opportunities. Students also strapped on hardhats, climbed inside 20 ft. (6 m), 200,000 lb. (90,718 kg) machines, and for an afternoon, received hands-on training and operated state-of-the-art construction equipment. “It’s so important to do all we can to attract top talent to the industry,” said Tom Suess, director, training and publications of Komatsu America. “Komatsu and our local distributors jumped at the chance to host these students and their school administrators. I think we opened the eyes of some students today about how technologically and

Students learn to operate a Komatsu PC490LCi-11.

globally focused the industry is, and how bright a future they can have if they pursue a career in this field,” Suess said. “I had never operated equipment before coming out here,” said Chandler Firestine,

Komatsu America Corp., a leading global heavy equipment manufacturer, recently hosted more than 30 students from three Atlanta-area colleges and technical schools at the Komatsu America, Cartersville, Ga., customer center training site.

Chattahoochee Tech student. “It’s been an awesome experience being able to really get inside one of the machines and see how they work mechanically, especially being a diesel tech. I would love to come out here again.”

For more information, visit www.komatsuamerica.com. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Students from three Atlanta-area colleges explore a Komatsu HD605-8.


Construction Equipment Guide • Georgia State Supplement • www.constructionequipmentguide.com • February 15, 2017 • Page 7


Page 8 • February 15, 2017 • www.constructionequipmentguide.com • Georgia State Supplement • Construction Equipment Guide


Turn static files into dynamic content formats.

Create a flipbook