University of Auckland July 2016

Page 1

CRL UoA

July 2016


25 years from now we will have….. • • • •

Gained the equivalent of the populations of Wellington and Christchurch Twice as many city centre and fringe residents and employees A third more city centre students Raised the city centre contribution to Auckland’s GDP from 17-25%


Without the CRL and surface improvements we will then have…. gridlock • Bus networks significantly over capacity • Private vehicle times to the city centre from the west and south increased by a third to a half • Private vehicle speeds in a.m. peak down to 5km/h • Britomart 20 years past capacity


• https://www.youtube.com/watch?v=S9wVb _jnrL8


Auckland rail patronage growth - 25% last year


How it works


7

Albert Street growth


Transport leads development

Leading growth with transport infrastructure is vital to shaping the city


Who is working with us

Cost Advisors - RLB


Engineering challenges • Multi-disciplinary integration – civil, architecture, building services, railway systems • Geotech – below sea level and reclaimed land in city with basalt at Mt Eden • CBD environment – stakeholders, businesses, residents, workers


Project features •

Continuous up hill grade from Britomart Station up to the portals at Mt Eden Station.

•

Two intermediate stations, Aotea and Karangahape Road

•

Short tunnel sections of 800m to 1000m

•

24 train per hours service level with one train per tunnel section


Enabling works construction areas

Orakei Sewer strengthening

Stormwater underground works

Shaft


Britomart Temporary Facility


CPO Image


Aotea Location Plan


Wellesley Street Entrance


Victoria Street Entrance


Victoria Street Entrance


Aotea Interior


K'Road Station Location Plan


K'Road Station Axonometric Cutaway


Entrance from Mercury Lane


Mt Eden Location Plan


Mt Eden Station Forecourt


25

CRL Programme


Packaging


Programme


The Build is On