Skip to main content

Royal chartered institute of surveyors presentation

Page 1

City Rail Link

September 2012

www.aucklandtransport.govt.nz


Presentation Overview Overview of: •

CRL and its role for Auckland

•

Transport and economics

•

Planning process

•

Property


Insert video


A Vision for Auckland A globally competitive city • A thriving economic centre • A lifestyle that attracts and retains top talent • Transport solutions that allow for and shape growth • New Zealand is fifth in OECD for growth and most is in Auckland • New migrants are a key growth factor


Contributing to Plans for Auckland The CRL is the foremost public transportation project in the first decade of Auckland Council’s 30 year Auckland Plan

The CRL is one of Auckland’s key initiatives to reach its transport and economic goals.


Drivers

Auckland’s Population Growth 3.5

• Auckland’s population 2.3m by 2050

Growth to 2051 2006

3.0 Population (millions)

• Two thirds of NZ’s growth in next three decades is forecast to be in Auckland

2.5 2.0 1.5 1.0 0.5 0.0

Rest of New Zealand

Auckland


Network Benefits •

Links the existing network

•

Unlocks Auckland wide network capacity-not a CBD loop

•

Allows more direct city centre access

•

Enables cross city travel without changing trains

•

Provides for future North Shore line to connect at Aotea


Travel Time Savings TRAVEL TIMES TO CITY RAIL LINK STATIONS Travel by Train / Bus (minutes) From

To Before CRL

% Improvement Reduced Travel in Travel Time After CRL Time

New Lynn

Aotea Station

51

23

28

55%

Morningside

Aotea Station

39

14

25

64%

Onehunga

K' Road Station

47

27

20

43%

Manukau Centre

K' Road Station

61

42

19

31%

Newmarket

Aotea Station

27

10

17

63%

Panmure

Newton Station

40

27

13

33%


Route Selection • There have been a number of routes considered since the CRL was first suggested • Identified route based on extensive consideration and evaluation of alternative sites, routes and construction methods • Factors included technical assessments regarding:

₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋ ₋

feasibility geology gradients network function construction methods environmental impacts engineering risk heritage constraints property

• Land identified is considered necessary based on alignment, station locations and effects assessment

• In recent months the route has been refined to include an inner west interchange to optimise train operations and passenger services


Innovation: Integrated Station Planning

Alignment

• Britomart to Eden Terrace

• 3.5km- mainly underground • Provides for three city centre stations and an interchange


Innovation: Integrated Station Planning

City Centre Stations


Timeline May 2011

•

Government and Auckland Council agree that it makes strategic sense to protect a route

2011/12

•

Auckland Transport undertakes the engineering, technical, planning and legal work required to progress protection of the route

2012

• • •

Auckland Council adopts LTP including CRL funding Land footprint identified Route protection initiated

2013 and beyond

• • •

Planning and property 3 years Construction 5 years Target opening 2020/21


Transport and Auckland’s economy


Transport shapes city development •

• •

Enables access and mobility which supports economic activity and growth

Many cities developed around strategic transport assets – harbours and river crossings, like Auckland and London As transport networks develop urban form follows


Changing Cities •

Manufacturing supported the growth of cities in the 19th and 20th centuries

•

Today they thrive through the concentration and provision of high value added services

•

Over 50% of world’s population live in cities

•

Within countries large cities continue to grow faster than smaller ones despite rising congestion, pollution and other negatives


Cities and Agglomeration •

A concentration of people and economic activity generates higher productivity and higher returns to business and workers

•

The growth of modern cities is an economic response to the self maximising behaviour of firms and workers

•

Modern economies demand knowledge, scale and proximity to assist in the sharing and dissemination of knowledge


Auckland’s Economy •

Auckland employment composition Advanced business services, finance and insurance

12% 24%

Wholesaling and retailing

23%

23% 18%

• •

Government, health and education

Other

Manufacturing

Auckland accounts for 34% of jobs in NZ and most are in the urban areas Wellington, Hamilton and Tauranga combined, account for 13% of jobs


Contribution to employment growth by sector 2000-2010 Per cent of total employment change 2000-2010

80%

60%

40%

20%

0% North

West

Central

South

Region

New Zealand

-20%

-40%

Primary & Manufacturing Advanced services Other services

Basic services Government, Health and Education


Average earnings by sector 2006 Average income by sector 2006

Average income per worker 2006 ($pa)

70000

60000

50000

40000

30000

20000

10000

0 Ag and Mining

Manu

Utils and Const

Whole- Retail- Accom, Tspt & saling ing Cafes & Stge Rest

Fin & Ins

Other Govt, Other Adv Bus Health S’vices Svices & Educ

Total


North ov

G

West Central en

m

B

an d

South Region

es

ta l

To

vi c

se r

n

io

ic es uc at

Ed

er

d

th

O

an

e

g ra nc

su

us in

Se rv

In

de

e

n

ic es

ra

Se rv

eh o

ss

in e

us ea lth

tH

ce d

an

od

W ar

Fo

nd

nc e

la

d

tio

Tr ad

lT

ai

al e

et

R

le s

uc

tr

g

g

tu rin

in

M in

uf ac

d

on s

C

W ho

d

an

an

M an

re

tu

ul

an

na

Fi

ta

os

n

at io

,P

dv

er n

A

rt

sp o

an

Tr

od

cc om m

A

es

ic

gr

iti

til

U

A

Per cent of Regional Average

Average earnings by sector and area 2006 (% of average) 160%

140%

120%

100%

80%

60%

40%

20%

0%


Auckland Agglomeration •

Studies in Auckland show a positive relationship between density, productivity and income

•

The value added per worker is 30-50% higher than other regions and in the city centre is 120-150%

•

About a third of the wage premium relates to the type of job and two thirds to productivity

•

This is similar to London which has GDP per capita 50% above the rest of the UK with inner London having a premium of 140%

•

The city centre is the hub of Auckland’s economy with up to 20,000 employees per square km

• •

City Centre= 425 ha City Fringe= 822ha


Employment density vs earnings Auckland and London

Auckland Region 2001 Employment density and average Employment Density and Average Wages wages: Auckland 60,000

Average Wages ($ pa)

50,000 40,000 30,000 20,000 10,000 0 -2.50

-2.00

-1.50

-1.00

-0.50

0.00

0.50

1.00

Log Employment Density (Jobs/Ha)

1.50

2.00

2.50

3.00


Accessibility and Auckland Employment Density Cities 2001 Accessibility and Employment Density

Density of Employment (Jobs/ha)

35

30

25

20

15

10

5

0 0.1

0.15

0.2

0.25

0.3

0.35

0.4

Accessibility Index

0.45

0.5

0.55

0.6


Transport, Access and Productivity • •

Transport shapes urban form and leads economic development in cities

•

Improved accessibility increases the number of workers available to employers and provides greater employment opportunities – supports specialisation.

•

Higher accessibility into areas of dense employment will support productivity growth

Cities are becoming more specialised around knowledge based activities which become more productive as employment densitiy rises


Notice of Requirement and designation processes


Notice of Requirement We are here

•

Resource Management Act Requirements

•

Auckland Transport is requiring authority and serves NoR

•

Seeking designation in district plan over land needed for CRL

Auckland Council process •

Public notification

•

Submission process

•

Independent commissioners

•

Hearing

Auckland Transport decision

Auckland Council notifies decision to submitters landowners and occupiers

Environment Court appeal rights

MfE graphic


Property


City Rail Link

Property Surface

Subsurface

Total

Commercial

100

55

155

Residential

110

15

125

Total

210

70

280

Owners

•

Surface land required for station access, where tunnels come to surface to join western line and work sites

•

Sub surface land required where tunnels and stations pass below properties

•

Subsurface numbers include 12 body corporates with multiple owners


Basis of Purchase • Starts once the designation is confirmed (from 2013/14) • Acquisition will be based on the compensation provisions of the Public Works Act • Fair market value (ignoring the effect of the public work) • Assessed by independent valuers • Owners reasonable valuation/legal costs reimbursed • Commercial tenants may have compensation entitlement • Subterannean compensation based on before and after assessment

• Compensation generally relates to degree to which the subterranean purchase impacts on surface use


Construction Cut and cover along Albert Street and at Eden Terrace Impacts to be addressed include: • • •

Noise and dust Altered access and traffic patterns Vibration

Tunnelling from Aotea Station to Newton will be with a Tunnel Boring Machine (TBM) - tunnel depths under private property range from 20 to 33 metres

TBM technology reduces impacts such as vibration and ground movement


Subterranean Requirements

The tunnels may pass wholly or partly below individual properties


Development Impacts There are three layers of designation: 1. Green where the CRL has no impact

2. Orange where you will need to discuss your plans with Auckland Transport and obtain approval 3. Red which Auckland Transport will purchase and own where no development is allowed


Summary


Summary •

The City Rail Link (CRL) is central to future city planning and will release the capacity constraint at Britomart

•

It will improve accessibility, enable and shape growth and lift economic performance

•

Auckland Transport is seeking route protection through a designation for the CRL

•

The process allows for public submissions, hearings by independent commissioners and appeals

•

Once a designation is confirmed property negotiations will start on the basis of fair market value determined by registered valuers, ignoring the public work


Questions


Vibration • • • •

Temporary and varying effects related to construction Reduces with distance and the type of material being worked in Conservative effects assessment has been made for the NoR related to the indicative construction methodology and construction durations Preliminary indications from expert reports are that there is no risk of vibration induced building damage and any effects would likely be aesthetic


Settlement • In Auckland, land rises and falls seasonally as groundwater levels vary- often seen as deep cracks in the lawn or doors that stick • The types of buildings encountered along the CRL route are many and varied • Preliminary assessments show vast majority will have negligible damage, cosmetic in nature and non-structural

• Monitoring will be used to confirm assessments of the likelihood of any damage • Settlement and monitoring will be key elements of the resource consent and construction process

• Auckland Transport will repair any settlement damage caused by the CRL


Settlement Monitoring •

• • •

An array of laser measured monitoring points is established before construction commences -some condition surveys undertaken

Monitoring points selected on existing buildings around sites of all work areas Regular readings taken prior, during and after construction completed ‘Traffic light’ system of continuous monitoring to avoid exceeding pre-defined limits


Typical monitoring regime BRITOMART – EXISTING CPO BUILDING

Monitoring equipment recording movement as the works proceed under the building.

Monitoring points fixed to existing walls


Titles


Title changes Natural Ground Level (NGL)

5m below NGL


Innovation: Integrated Station Planning

Cost

Table 1: Cost comparison APB&B vs LTP CRL Cost Comparison showing changes over time ($millions)

Expected Construction Cost Land Gross land purchase Estimated land sales Net Land Total Construction and Land Cost

Additional EMUs Other network optimisation Expected Cost inc additional EMUs and other network improvements

APB&B 2010 APB&B 2012 AC LTP 2012 Expected Cost Expected Cost inflated to (2010 $s) (2012 $s) year of spend 1,861 1,938 2,324 230 100 130

231 136 95

245 183 62

1,991

2,033

2,386

240 100

259 108

336 140

2,331

2,400

2,862


Turn static files into dynamic content formats.

Create a flipbook
Royal chartered institute of surveyors presentation by City Rail Link Ltd - Issuu