Porters Avenue Pedestrian and Cycle Overbridge Urban Design Delivery Work Plan

Page 1

Mt Eden Main Works Porters Avenue Pedestrian and Cycle Overbridge Urban Design Delivery Work Plan

CRL-MTE-RME-LKA-PLN-800038

Revision: 000 Date: 24 July 2020


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP

Porters Avenue Pedestrian and Cycle Overbridge – Urban Design Delivery Work Plan CRL-MTE-RME-LKA-PLN-800038

This document is uncontrolled when printed. This document should be printed in colour

Review Status Revision

Issue Date

Status

Prepared By

Reviewed By

A01

29/06/2020

Draft for Auckland Council and Independent Peer Review

Tim Jones

Peter Roan

000

24/07/2020

Final for Submission

Tim Jones

Peter Roan

Approval Status Name/Title

Signature

Date

Prepared by:

Tim Jones Link Alliance – Senior Landscape Architect

Reviewed by:

Richard Jenkins Link Alliance – Principal Planner

24/07/2020

Approved by:

Peter Roan Link Alliance – Consenting Lead

24/07/2020

Mt Eden Main Works

24/07/2020


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP

Table of contents 1.

Introduction ........................................................................................... 1

1.1

Overview of CRL works in Mt Eden ...................................................................................... 1

1.2

Statutory Provisions ........................................................................................................... 2

1.3

Purpose and Objectives ...................................................................................................... 3

1.4

Summary of Designation Condition Requirements ............................................................... 4

1.5

Review and updates ........................................................................................................... 5

2.

Porters Avenue Public Realm Works Description .................................... 6

2.1

Urban Design Delivery Work Plan Staging............................................................................ 6

2.2

Porters Avenue Pedestrian and Cycle Bridge -Public Realm Reinstatement .......................... 6

3.

Response to Urban Design Principles.................................................... 10

3.1

Introduction ..................................................................................................................... 10

3.2

Mana Whenua Principles .................................................................................................. 10

3.3

Movement and Connections ............................................................................................. 13

3.4

Public Realm and Landscape ............................................................................................. 16

4.

Consultation and Liaison ...................................................................... 20

4.1

Introduction ..................................................................................................................... 20

4.2

Auckland Council .............................................................................................................. 20

4.3

Community Liaison Group................................................................................................. 20

4.4

Mana Whenua.................................................................................................................. 21

4.5

Other Consultation ........................................................................................................... 21

Appendix A - Urban Design Assessment ....................................................... 24 Appendix B - Mana Whenua Artist Update .................................................. 25 Appendix C – Detailed Design Drawings ....................................................... 26 Appendix D – Record of Consultation........................................................... 27 D.1

CLG Comments ................................................................................................................. 27

D.2

Affected Party / Affected in Proximity Party Comments..................................................... 29

D.3

Mana Whenua.................................................................................................................. 32

D.4 Further Consultation with Owner of 5 Porters Avenue .......................................................... 35 D.5

Independent Peer Review ................................................................................................. 37

Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP

1.

Introduction

The City Rail Link (CRL) project comprises the construction, operation and maintenance of a 3.4 km underground passenger railway, running between Britomart Station and the North Auckland Rail Line (NAL) in the vicinity of Mt Eden Station. The CRL also involves the construction of two new underground stations at Aotea and Karangahape and a redeveloped Mt Eden Station (refer to Figure 1-1). The design and construction of the CRL infrastructure between the Aotea and Mt Eden Stations is being delivered by the Link Alliance.

Figure 1-1: CRL Route and Location

This Urban Design Delivery Work Plan (Urban Design DWP) addresses the Porters Avenue overbridge works and reinstatement of the public realm in Porters Avenue, Wynyard Road and Haultain Street, which forms part of the Mt Eden Main Works (“main works�). A subsequent Urban Design DWP will be prepared at a later date addressing the Mt Eden Station and wider public realm reinstatement works that will occur in the local Mt Eden area.

1.1 Overview of CRL works in Mt Eden CRL works in the Mt Eden area involve the construction of the southern section of the tunnel structures and the tie-in of the CRL railway to the existing NAL, including the construction of the redeveloped Mt Eden Station. The Mt Eden Active Construction Zone (ACZ) and Construction Support Areas (CSAs) are generally located between Nikau Street to the north, State Highway 1 (SH1) to the east, Dominion Road to the west and the existing NAL to the south. The works in this area include: Operational activity required to support the tunnel boring machine (TBM) drive, including control room and plant, storage and spoil handling;

Page 1

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP Construction of a new Mt Eden Station building, incorporating passenger linkages between the new CRL platform and the modified existing NAL platform; Road over rail bridges at Mt Eden Road, Normanby Road and Ruru Street with sections of road realignment; Grade separation structures for the existing and new rail lines to pass-over and connect with each other, including the Newton Junction Grade Separation Structure, the Eastern Facing Connection and the Western Facing Connection; Construction of a portal vent house building structure; Installation of retaining walls and utilities; Pedestrian and cyclist bridge structures at Fenton Street and Porters Avenue; and New road linkages within the reinstated area post-construction. Given the nature and scale of construction works in Mt Eden, works will be undertaken in a staged manner, involving: Enabling and early works (demolition, network utility relocation and site establishment work) – early works have commenced and will continue to end of 2020; Main construction works (construction of the underground CRL cut and cover tunnels, grade separation structures and trenches, station building and platforms, and tie-ins to the NAL) to be undertaken from mid-2020 through to mid-2023; and Public realm reinstatement – likely to be undertaken from 2021 to early 2024. As noted above, this Urban Design DWP address only those works relating to the Porters Avenue overbridge and the associated public realm reinstatement.

1.2 Statutory Provisions This Urban Design DWP is required under the CRL designation conditions, specifically Condition 47. The DWP is a ‘sub-plan’, forming part of the Construction Environmental Management Plan (CEMP) and integrated into the document framework of the overarching Mt Eden Main Works Outline Plan as shown by Figure 1-2.

Figure 1-2: Outline Plan Document Framework

Page 2

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP

1.3 Purpose and Objectives CRL designation condition 47 addressees Urban Design matters, including the objective and principles of the Urban Design DWP. Designation condition 47.1 states: “The objective of the Urban Design DWP is to enable the integration of the CRL’s permanent works into the surrounding landscape and urban design context”

Designation condition 47.2 states that: “An Urban Design DWP shall be developed to ensure that the areas within the designation footprint used during the construction of the City Rail Link are to be restored and the permanent works associated with the CRL are developed in accordance with urban design principles.”

An Urban Design Framework (UDF) (Jasmax, 2012) was completed for the CRL project and submitted during the Notice of Requirement process. The UDF determined the urban design principles for the public realm within the designation conditions, and these principles guide the final design of the public realm reinstatement, including: • • •

Mana Whenua Principles Movement and Connections Public Realm and Landscape

CRL designation conditions 47 and 49 specify the matters required to be included within the Urban Design DWP addressing these principles. The design for the Porters Avenue overbridge and associated public realm reinstatement has evolved over a number of years, building from the reference design that supported the Notice of Requirement. Numerous parties have been consulted through this process. The proposed reinstatement design outlined within this Urban Design DWP has been prepared in consultation with: Auckland Council – Auckland Urban Design Panel Community and Business Liaison Group (CLG) and individual stakeholders Mana Whenua The reinstatement and overbridge design was presented to the local community (affected parties and affected in proximity parties), including the Mt Eden CLG, as required by designation condition 47.6 (c), on 27th May 2020. One-on-one consultation has also been undertaken with some affected parties in the local area. Mana whenua have been actively involved in the design of the overbridge as it has developed, through the CRL mana whenua forum and separate focused cultural design hui held between September and December 2019. Individual workshops have also been ongoing in 2020 with the mana whenua appointed artist to guide integration of the cultural narrative. This Urban Design DWP has also been through an independent peer review (IPR) process (as required under designation condition 11) prior to submission to Auckland Council.

Page 3

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP A record of consultation and review outcomes, including the Link Alliance’s response to matters raised, is provided in Appendix D.

1.4 Summary of Designation Condition Requirements Table 1-1 below provides a summary of the relevant CRL designation conditions and indicates where in this document the required information is provided. The specific requirements of the Urban Design principles are addressed in detail in Section 3 of this DWP. Table 1-1 Summary of designation conditions for the Urban Design DWP and where addressed in this document

No.

Summary of Condition

Section where addressed

Community Liaison Groups 7.4 In addition to the requirements in Condition 5, the purpose of the A summary of consultation Groups shall be to: undertaken with the CLG is outlined in section 4 of this Urban (d) Provide feedback on the development of the CEMP and DWPS. Design DWP and provided in full 7.5 The Requiring Authority will consult with the Groups in respect of within Appendix D. the development of the CEMP and DWPs. Mana whenua Consultation 8.3 The role of the mana whenua forum may include the following: (a) Developing practical measures to give effect to the principles in the Urban Design DWP (refer to Condition 49); (c) Input into the preparation of the CEMP and DWPs;

A summary of consultation undertaken with mana whenua is outlined in section 4 of this Urban Design DWP and provided in full within Appendix D.

8.4 The mana whenua forum may provide written advice to the Requiring Authority in relation to any of the above matters. The Requiring Authority must consider this advice and the means by which any suggestions may be incorporated in the City Rail Link project. 47 Urban Design Principles 47.2 (a) (b) (c) 47.3

An Urban Design DWP shall be developed to ensure that the areas within the designation footprint used during the construction of the City Rail Link are to be restored and the permanent works associated with the CRL are developed in accordance with urban design principles including:

Refer to sections 3.2, 3.3 and 3.4.

a) Mana Whenua Principles b) Movement and Connections c) Public Realm and Landscape The Urban Design DWP shall show how these principles have been used to guide and influence the design of permanent works associated with the CRL, and how the design has responded or otherwise to these principles and initiatives. Auckland Council Urban Design Panel 47.5 (a) Refer the Urban Design DWP to the Auckland Urban Design (b) Panel for comment on the degree to which the Urban Design

Page 4

| Mt Eden Main Works

Refer to section 4.2


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP 47.6 (a) DWP has appropriately responded to the principles listed in (b) designation conditions 47.2 and 49.1. Provide a record of feedback received and detail how the Urban Design DWP has responded to any feedback received from the Auckland Urban Design Panel (or equivalent entity at that time) and, where they have not, the reasons why Mitigation Planting Requirements 48.1 48.2 48.3

The Urban Design DWP shall include any replacement planting proposed to mitigate the adverse effects of tree and vegetation removal from within the designation footprint. It is acknowledged that the mitigation of effects of tree and vegetation removal will be considered in response to the urban design principles of Condition 47.

No tree removals have occurred within the Haultain Street, Wynyard Road or Porters Avenue area. Two replacement specimen trees are however proposed to assist in mitigating the nett tree removals across the wider CRL designation. The specimen trees will additionally aid in mitigating the bulk and scale of the overbridge landings, while providing a ‘softening’ with some vegetated greenery to what is currently a very utilitarian commercial area. Refer section 4.14 in Appendix A for type and location of specimen tree planting.

Specific Area Requirements: North Auckland Line area 53.1 (a) The Urban Design DWP shall include Restoration Plans showing how the worksite area will be maintained during the construction period.

Sections 2.8 and 2.9 of the CEMP discuss how the worksite area will be maintained during the construction period.

53.1 (b) The Urban Design DWP shall include Restoration Plans showing how the following are to be restored after construction completion:

Refer section 4.14 in Appendix A for details.

The area used for the grade separation of Porters Avenue; (c) Including how the bulk, scale and massing of structures resulting from the City Rail Link at Mt Eden Station are integrated with the components of the Mt Eden Station located in the adjacent North Auckland Line designation.

Refer section 4.8 in Appendix A for details.

1.5 Review and updates This Urban Design DWP will be reviewed if there is a material change to the design. Refer to the CEMP for further detail on the review and updating process.

Page 5

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP

2.

Porters Avenue Public Realm Works Description 2.1 Urban Design Delivery Work Plan Staging

To reflect the staged construction approach for the CRL in the Mt Eden area, a series of Urban Design DWPs are being prepared. This Urban Design DWP has been prepared in relation to the public realm reinstatement works associated with Porters Avenue, Wynyard Road, Haultain Street and the Porters Avenue pedestrian and cycle overbridge (shown in Figure 2-1 below). The urban design and public realm reinstatement works for the Mt Eden Station and associated wider Mt Eden precinct area will be detailed in a future Urban Design DWP, to be submitted at a later date. Figure 2-1: Porters Avenue pedestrian and cycle bridge location plan

2.2 Porters Avenue Pedestrian and Cycle Bridge -Public Realm Reinstatement The Porters Avenue overbridge is a new purpose-built bridge over the NAL and CRL tracks specifically for pedestrians and cyclists. This connection for pedestrians and cyclists will replace the existing level crossing between Porters Avenue and Wynyard Road as shown in Figure 2-1. The design is summarised below and described in detail in the following design reports appended to this Urban Design DWP: • •

Page 6

Porters Avenue Footbridge Urban Design Assessment – prepared by Jasmax (and Aurecon, Mott MacDonald, ARUP) (Appendix A) Porters Avenue Footbridge Mana whenua artists update – prepared by Jasmax (and Aurecon, Mott MacDonald, ARUP) (Appendix B)

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP •

Porters Avenue Footbridge Detailed Design Drawings – prepared by Jasmax (and Aurecon, Mott MacDonald, ARUP) (Appendix C)

The overbridge will be located to the western edge of Porters Avenue and Wynyard Road. The overbridge will incorporate: • •

Accessible through-lifts at either end of the bridge, suitable for pedestrians, cyclists and mobility scooters, which allow users to exit the lift without having to turn around; and A stairwell designed for pedestrians and cyclists, which includes a cycle wheel ramp – a ‘runnel’ - built into the side, which enables advanced cyclists to push their bike on and off the bridge without waiting for the lift.

The overbridge will also carry the network utility connections that need to be diverted in order to construct the NAL and CRL tracks. The Figures 2-2 to 2-6 illustrate the proposed bridge design.

Figure 2-2: Porters Avenue Pedestrian and Cycle Bridge – Eastern Elevation

Figure 2-3: Porters Avenue Pedestrian and Cycle Bridge – Western Elevation

Page 7

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP Figure 2-4: View from Wynyard Road looking north towards the Porters Avenue Pedestrian and Cycle Bridge

Figure 2-5: View from Porters Avenue looking south towards the Porters Avenue Pedestrian and Cycle Bridge

Page 8

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP Figure 2-6: View from on the Porters Avenue Pedestrian and Cycle Bridge looking north, showing transparency of perforated barrier

Page 9

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP

3.

Response to Urban Design Principles 3.1 Introduction

An Urban Design Framework (UDF) for the CRL project (dated 7 August 2012) was prepared by Jasmax and submitted as part of the Notice of Requirement process to establish the CRL designations. The UDF set the guiding urban design principles for the project and these were in turn incorporated into the CRL designation conditions. This section of the Urban Design DWP describes how the proposed public realm reinstatement and overbridge design responds to these urban design principles and to the requirements set out in the designation conditions under Conditions 47 and 49.

3.2 Mana Whenua Principles Condition 49 of the CRL designation conditions requires the Urban Design DWP to identify and discuss how the proposed streetscape reinstatement design has incorporated mana whenua principles and other mana whenua aspirations. Seven specific mana whenua cultural design principles are identified in condition 49 and are addressed in Table 3-1 below: Table 3-1 Designation Condition 49 – Mana Whenua Principles

Ref

Mana Whenua Cultural Design Principle

49.1 Mana / Rangatiratanga (a) As the original local authorities of Tamaki (i) Makaurau, Iwi require high level Treaty based relationships with all key stakeholders including the Requiring Authority and Auckland Council which recognise their Tangata Whenua status in order to fulfil their roles as kaitiaki. Such partnership relationships can then inform engagement with AT / Council at all levels including direct involvement with design consortia. Relationships are required at governance and senior management levels. Such relationships are a precursor to actualising the other 6 principles.

49.1 Whakapapa (a) Names and genealogical connections– reviving (ii) names revives mana through Iwi connections to specific ancestors and events / narratives associated with them. An Iwi inventory of names

Page 10

| Mt Eden Main Works

Public Realm Reinstatement Design Response •

While there are no specific relationships at governance and management level within the Link Alliance there are processes in place as part of the wider CRL project that enable rangatiratanga to be exercised.

•

Regular (monthly) meetings with mana whenua have been, and continue to be, held by way of the CRL Mana Whenua Forum. Amongst other things, this is an open forum to discuss, develop, critique and approve public realm and architectural designs.

•

The CRL Mana Whenua Forum includes kaitiaki from self-elected iwi to engage with the Link Alliance about all CRL related activities. This enables the kaitiaki to go back to their constituents and rangatira and provides the opportunity to provide feedback and express their mana.

•

Details of the engagement undertaken with mana whenua, including specific cultural integration workshops, are included in Appendix D.3.

•

Through discussions with mana whenua, appropriate naming and genealogical conventions for much of the surrounding Maungawhau Station precinct have been followed, where possible. For the Porters Ave


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP associated with a given site can be developed so that the most appropriate names are identified to develop design, interpretation and artistic responses.

pedestrian and cycle overbridge, this currently includes the clear use of karā (basalt) as the key underlying materiality, relating back to the narrative of Matāoho and the concept that all of the bridges will embody part of the story of the ‘states’ of Matāoho, as in the stages of volcanic activity. •

In relation to place naming and meaning, CRLL is working with mana whenua on the naming of the Porters Avenue pedestrian and cycle overbridge.

•

The spelling of Matāoho was debated amongst the Kaitiaki on the Mana Whenua Forum toward the end of 2019. It has now been minuted and agreed the spelling moving forward would be Matāoho.

• 49.1 Tohu (a) Acknowledging the wider significant Iwi cultural (iii) land marks associated with the CRL route and their ability to inform the design of the station precincts, entrances and exits. In particular exploring opportunities to maximise view shafts to such tohu / landmarks as a way of both enhancing • cultural landscape connections and as way finding / location devices.

The Porters Avenue pedestrian and cycle overbridge, unmistakably, has a strong visual connection to Maungawhau. The maunga is considered to be tohu. Refer sections 2.4, 4.4 and 5.1 in Appendix A.

•

The bridge also affords views back to Te Waonui o Tiriwa (Waitākere ranges) when standing on the bridge deck and facing west.

• 49.1 Taiao (a) Exploring opportunities to bring natural landscape (iv) elements back into urban /modified areas e.g. specific native trees, water / puna wai (springs) – promoting bird, insect and aquatic life to create meaningful urban eco systems which connect with • former habitats, mahinga kai (food gathering areas) and living sites.

The scope within this Urban Design DWP is limited to upgrades of the footpaths, roading and the Porters Avenue pedestrian and cycle overbridge and the ability to enact Taiao principles is therefore limited.

Page 11

| Mt Eden Main Works

The design of the public realm reinstatement acknowledges this tohu through the design and location of the bridge. The bridge height and orientation afford clear and unobstructed views of Maungawhau when walking from Porters Ave south toward Wynyard Road.

Where possible garden beds have been implemented to improve pervious surfaces and aid in softening the public realm. Only native specimen tree and vegetation species are to be utilised within the Mt Eden (Maungawhau) Precinct public realm generally, in line with historical ecologies, and a ‘right tree right place’ mentality. Mana whenua support the use of native trees and final decisions regarding tree species will be agreed with mana whenua. Refer section


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP 4.14 in Appendix A for type and location of specimen tree and vegetation planting. 49.1 Mauri tū (a) Ensuring emphasis on maintaining or enhancing (v) environmental health / life essence of the wider site – in particular focusing on the quality of wai / water (puna / springs), whenua / soil and air. In particular any puna or underground waterways encountered should be carefully treated with Mana whenua assistance to ensure their mauri is respected and enhanced where possible. It is also important to minimise the disturbance to Papatuanuku through carefully planned ground works.

•

The scope of this Urban Design DWP is confined to upgrades of the footpaths, roading and Porters Avenue pedestrian and cycle overbridge, which provides limited opportunity to enact mauri tū principles.

•

The quality of the materials used forms an important aspect of mauri tū. Re-use of materials and the use of locally sourced material (such as timber/stone) aids in maintaining the local essence and the mauri. Existing heritage basalt (karā) kerb stones are to be re-used within the streetscape design. Refer section 4.14 in Appendix A.

•

Basalt (karā) boulders from the CRL project will also be re-purposed as informal seating and sculptural elements with the guidance of the mana whenua appointed Artist. Treatment of these pieces are yet to be determined. Refer page 6 in Appendix B.

• 49.1 Mahi toi (a) Harnessing the Creative dimension through (vi) drawing on names and local tohu to develop strategies to creatively re-inscribe iwi narratives into architecture, interior design, landscape, urban design and public art.

•

Page 12

| Mt Eden Main Works

In earlier consultation with mana whenua, the Porters Ave pedestrian and cycle overbridge was associated to the pūrakau / narrative of the patupaiarehe Hui and Wairere that lived in Te Waonui o Tiriwa (the Waitakere Ranges) and Te Ngahere o Kohukohunui (the Hunua Ranges), respectively. Continued engagement with mana whenua identified a desire to more strongly locate the narrative within the local context of Maungawhau, as it has a rich history to draw from. The four bridges proposed within the wider Mt Eden (Maungawhau) Precinct public realm that radiate out from Maungawhau station over the rail line could be conceived of as thresholds or tomokanga moving towards / away from the station. Thus, marking the journey towards Matāoho. These bridges are conceived of as being a part of the ‘whānau’ of Maungawhau station and will all whakapapa back to the parent narrative of Matāoho and Matāoho‘s specific relationship to Maungawhau volcano and surrounding area. Refer pages 3-4 in Appendix B. Working with the mana whenua appointed artist, Tessa Harris, and a mana whenua design subcommittee comprising appointed kaitiaki from the CRL Mana Whenua Forum,


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP the design considers the narrative gifted by mana whenua and has collaboratively worked through appropriate mahi toi responses with the artist as outlined following: −

−

−

• 49.1 Ahi kaa (a) Need to explore opportunities to facilitate living (vii) presences for iwi / hapu to resume ahi-kaa and kaitiaki roles in and around the CRL route and new station precincts.

The architectural form of the bridge likens itself to a toki, as if to be a new ‘fashioned’ tool of the maunga, to be crafted as if from basalt (karā). Refer Section 4.4 in Appendix A and page 5 in Appendix B. The lift shafts act like pou, markers of the thresholds being passed through toward and away from the new Maungawhau station. Refer page 4 in Appendix B. The narrative is encapsulated within glass fritting around the lift, the bridge balustrade screen element, the materiality of the bridge deck and inclusion of sculptural basalt boulders. Refer page 6 in Appendix B.

Given this DWP only addresses the Porters Ave Pedestrian and Cycle Overbridge the principle of ahi kaa and facilitating living presence for iwi is not relevant here. However, this principle will be considered as part of future development of the wider Mt Eden Precinct UD DWP.

•

Project wide, ongoing opportunities for māna whenua to exercise kaitiakitanga are being identified.

•

The Link Alliance has an ongoing presence attending the CRL Mana Whenua Forum in relation to the Ahi kaa outcomes for the whole of CRL. Particularly with relationship for opportunities to hire māori contractors, and sub-contractors. Designed to keep within the wider family of stories being told to perpetuate the narratives of mana whenua’s kaitiakitanga and ahikāroa.

3.3 Movement and Connections Condition 47.2 (b) of the CRL designation conditions requires the Urban Design DWP to identify and discuss how the proposed reinstatement design has incorporated the Movement and Connections Principles. The UDF submitted as part of the Notice of Requirement process identifies seven principles relevant to Movement and Connections. The designation conditions expand on this with further area specific

Page 13

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP requirements. The principles specifically relevant to the current Urban design DWP are identified in designation condition 47.2 (b) and are addressed in Table 3-2 below: Table 3-2 Designation Condition 47.2 (b) – Movement and Connections Principles

Ref

Movement and Connections Design Principle

Public Realm Reinstatement Design Response

47.2 Existing Networks (b) Structures of the CRL should not interrupt or (i) adversely change the function of existing public open space, street networks and infrastructure

•

The pedestrian and cycle overbridge provides a direct link between Porters Ave and Wynyard Rd as a replacement to the existing level rail crossing. While the existing vehicular access has been removed, the pedestrian and cyclist bridge supports the connectivity while providing for enhanced pedestrian safety.

47.2 Entrance Location (b) Station entrances should be clearly identifiable (ii) and conveniently located in relation to existing and anticipated main pedestrian routes and destinations.

•

This principle is not applicable to this Urban Design DWP. The Mt Eden (Maungawhau) Station entrance will be addressed in a future Urban Design DWP.

47.2 Intuitive Orientation (b) The location and nature of structures resulting (iii) from the CRL (station entrances in particular) should facilitate intuitive orientation and support a legible street network.

•

The pedestrian and cycle overbridge provides a direct and linear connection between Porters Ave and Wynyard Rd. This forms a legible pedestrian continuation of these streets. There is additionally a direct sightline to the Fenton Street pedestrian and cycle bridge which provides for connectivity between Fenton Street and Ngahura Street.

• 47.2 Way Finding (b) Coherent signage should be utilised to aid intuitive (iv) orientation and way finding.

Signage and wayfinding for pedestrians and cyclists using the bridge will be implemented in accordance with the Auckland Transport Wayfinding and Signage Design Guide. Refer Section 5 in Appendix A.

•

This principle is not applicable to this Urban Design DWP. Integration with other modes will be addressed in a future Urban Design DWP.

•

Note that pedestrian access is maintained, allowing continued access to bus routes on New North Road via this connection.

47.2 Bicycle Parking (b) Appropriate numbers of safe bicycle storage or (vi) parking should be provided in each station environment.

•

This principle is not applicable to this Urban Design DWP. Bicycle storage and parking will be addressed in a future Urban Design DWP.

47.2 Street Crossings (b) Safe pedestrian street crossings shall be provided (vii) in the immediate vicinity of station entrances to the extent practicable. The provision of level street crossings is preferable over any grade

•

This principle is not applicable to this Urban Design DWP. Street crossings within the wider Mt Eden (Maungawhau) Precinct public realm will be addressed in a future Urban Design DWP.

47.2 Mode Integration (b) Spatial integration with bus stops as well as kiss (v) and ride should be facilitated where possible without imposing on the quality of public realm.

Page 14

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP separated solutions. 47.2 Footpaths (b) Footpaths surrounding stations need to be (viii) adequate to provide for pedestrians entering and exiting the stations.

•

Existing footpaths within Porters Avenue, Wynyard Street and Haultain Street are to be enhanced in both width and finish. Footpaths provided are to Auckland Transport Code of Practice recommended requirements as a minimum.

47.2 Grade separated rail crossings (b) Structures associated with grade separated rail (ix) crossings need to be carefully and sensitively designed and in accordance with crime prevention through environmental design principles to ensure appropriate amenity and safety are retained or achieved. Measures to achieve this may include: a.

Utilising permeable balustrades on overbridges;

•

The pedestrian and cycle overbridge complies with this condition. Perforated panels are proposed for the balustrades. Refer Page 8 Appendix B and Figure 2.6 for details.

b.

Maximising the width of the footpath at • grade in street reserves;

Existing footpaths are to be enhanced in both width and finish. Footpaths provided are to Auckland Transport Code of Practice recommended requirements as a minimum. Refer Landscape General Arrangement Plan, sheet CRL-NAL-ARC-000-DRG-1406-E in Appendix C for details.

c.

Orientating any steps parallel to overbridges;

The pedestrian and cycle bridge complies with this condition. Refer 3D Overview, sheet CRLNAL-ARC-000-DRG-1051-J in Appendix C for details.

d.

Providing appropriate levels of lighting • (in accordance with the Auckland Transport Street Lighting Policy (Appendix 1) for “Pathways in high risk, high brightness areas”); and

Lighting is provided to meet Auckland Transport Lighting Policy (Appendix 1) for “Pathways in high risk, high brightness areas”). Refer section 4.14 in Appendix A for lighting column locations within the streetscape. Downlighting is to be provided within handrails along the bridge structure.

e.

Treatment of the sides of ramps and footpaths to enhance visual amenity.

•

The Bridge design has been treated in its entirety to improve amenity.

•

The pedestrian and cycle overbridge incorporates perforated panels and glass as the primary materials to maintain transparency for safety and security reasons, striking a balance between privacy for neighbouring properties and visibility requirements for security and surveillance. Refer 3D Stairs drawings, sheets CRL-NALARC-000-DRG-1060, 1063, 1065 and 1067-G

47.2 Grade separated rail crossings (b) Permeable balustrades on overbridges should be (x) required not only for crime prevention purposes but to enable views into the neighbouring sites. For clarity all balustrades comprised within Normanby Road grade separation works (as defined in condition 30.1(l) shall be permeable

Page 15

| Mt Eden Main Works

•


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP in Appendix C and Figure 2-6 for details of the privacy screen. •

The pedestrian and cycle overbridge structure is set back a minimum 3.5m from the property boundary of 5 Porters Avenue. Refer Proposed Site Plan, sheet CRL-NAL-ARC-000DRG-1011-J in Appendix C for dimensioned offset.

•

The pedestrian and cycle overbridge has been positioned within the western half of Porters Avenue, as shown in Proposed Site Plan, sheet CRL-NAL-ARC-000-DRG-1011-J in Appendix C. The bridge incorporates perforated panels and glass as the primary materials to maintain transparency for safety and security reasons, striking a balance between privacy for neighbouring properties and visibility requirements for security and surveillance. Refer 3D Stairs drawings, sheets CRL-NAL-ARC-000-DRG-1060, 1063, 1065 and 1067-G in Appendix C and Figure 2-6 for details of the privacy screen.

b.

Ensure the lifts are through lifts to carry • bicycles; and

The pedestrian and cycle overbridge complies with this condition. Refer Appendix C - 3D Stairs drawings, sheets: − CRL-NAL-ARC-000-DRG-10060-G − CRL-NAL-ARC-000-DRG-10063-G − CRL-NAL-ARC-000-DRG-10065-G − CRL-NAL-ARC-000-DRG-10067-G

c.

Incorporate bicycle push ramps into the • side of the pedestrian stairways.

The pedestrian and cycle overbridge complies with this condition. Refer Appendix C - 3D Stairs drawings, sheets: − CRL-NAL-ARC-000-DRG-10060-G − CRL-NAL-ARC-000-DRG-10067-G

47.2 The Porters Avenue Bridge (lift and bridge (b) structure above finished ground level) shall be (xi) located no closer than 3.5m from the property boundary of 5 Porters Avenue (ALLOT 236 SEC 10 Suburbs AUCKLAND). Foundation support (i.e. below finished ground level) for the bridge may extend closer but shall not cross the property boundary. 47.2 The design of the Porters Avenue and Fenton (b) Street pedestrian/cycle bridges shall: (xii) a. Minimise loss of privacy on adjacent residential sites, including by locating the pedestrian/cycle bridge in the western half of the Avenue;

47.2 The extensions to Ruru Street and Nikau Street (b) shall generally be undertaken in accordance with (xiii) the indicative road layout shown on drawing CRLSYW-RME- 000-DRG-0110 Revision 1 dated 26/7/16.

3.4 Public Realm and Landscape

Page 16

| Mt Eden Main Works

•

This principle is not applicable to this Urban Design DWP. The wider Mt Eden (Maungawhau) Precinct public realm reinstatement design is to be addressed in a future Urban Design DWP.


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP Condition 47.2 (c) of the CRL designation conditions requires the Urban Design DWP to identify and discuss how the proposed reinstatement design has incorporated Public Realm and Landscape Principles. The UDF submitted as part of the Notice of Requirement process identifies nine principles relevant to Public Realm and Landscape. The designation conditions expand on this with further area specific requirements. The principles specifically relevant to the main works reinstatement are identified in designation condition 47.2 (c) and are addressed in Table 3-3 below: Table 3-3 Designation Condition 47.2 (c) – Public Realm and Landscape Principles

Ref Public Realm and Landscape Design Principle

Public Realm Reinstatement Design Response

47.2 Existing Streetscape (c) Structures of the CRL should be designed to (i) respect and contribute positively to the form and function of existing public open space.

•

Public open space is created and enhanced. The bridge landings necessitate a reconfiguration of the existing vehicular focused streetscape and provide an urban space opportunity. Existing footpaths are to be enhanced in both width and finish. Footpaths provided are to Auckland Transport Code of Practice recommended requirements as a minimum. Refer Landscape General Arrangement Plan section 4.14 in Appendix A.

47.2 Universal Access (c) Station environments should promote universal (ii) access (e.g. footpath ramps and smooth ground surfaces).

•

Accessible stairs and large capacity lifts are to be provided with tactile ground surface indicators and handrails designed to AS/NZS 1428 and NZS 4121. Refer Appendix C - 3D Stairs drawings, sheets: − CRL-NAL-ARC-000-DRG-10060-G − CRL-NAL-ARC-000-DRG-10063-G − CRL-NAL-ARC-000-DRG-10065-G − CRL-NAL-ARC-000-DRG-10067-G

•

Clearly identified crossing tables are provided using tactile ground surface indicators and accessible gradients directing pedestrians across to Fenton Street – The Western approach to Mt Eden Station allowing universal access gradients. All designed to designed to AS/NZS 1428 and NZS 4121. Refer Landscape General Arrangement Plan section 4.14 in Appendix A.

•

The new overbridge is overlooked by apartments but, in response to Environment Court imposed designation conditions, lift landing areas on the bridge are screened to avoid direct lines of sight into the apartments at a high level. Activation and passive surveillance will be provided by users of the bridge, passing vehicles and nearby residents. Refer Appendix C - 3D Stairs drawings, sheets: − CRL-NAL-ARC-000-DRG-10060-G

47.2 Safe Environments (c) Structures resulting from the CRL should promote (iii) safe environments. The station entrances should release patrons into safe public spaces that are well lit at night, overlooked by other users (e.g. residents or workers) and have sufficiently wide and unobstructed footpaths.

Page 17

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP − − −

CRL-NAL-ARC-000-DRG-10063-G CRL-NAL-ARC-000-DRG-10065-G CRL-NAL-ARC-000-DRG-10067-G

47.2 Reinstated Surfaces (c) The design and construction of reinstated (iv) streetscapes should be coherent with the wider area and/or recent public realm upgrades in the area.

•

The streetscape upgrades are in line with Auckland Transport Code of Practice standards and align with Auckland Council’s footpath renewal works occurring across the Mt Eden Precinct area. Kerbstones are to be basalt and, where feasible, will re-use existing aligning with the materiality already used across the Mt Eden Precinct area. Refer Landscape General Arrangement Plan section 4.14 in Appendix A for details.

47.2 Station Plazas (c) The design and construction of station plazas (v) should be coherent with the wider area and/or recent public realm upgrades in the area.

•

This principle is not applicable to this Urban Design DWP. The plazas associated with the redeveloped Mt Eden (Maungawhau) Station will be addressed in a future Urban Design DWP.

• 47.2 Public Art (c) Integration of art and design should foster local (vi) identity and character and reflect and/or interpret local characteristics including natural heritage and • Mana whenua cultural narratives, history, art and particular traits of the local community.

Public art is not applicable and is not proposed within this Urban Design DWP. A cultural narrative has been gifted by mana whenua and has been integral to the bridge design. A Mana Whenua nominated artist has worked directly with other designers on the bridge to create a fully integrated art/design response to the bridge. Refer Appendices B and C.

• 47.2 Landscape Planting (c) Plant species used in station environments and/or (vii) as part of landscape plantings should consider the opportunity to acknowledge the area’s pre-human ecology as and where appropriate. This may include species which connect strongly with Mana whenua cultural narratives.

Where possible garden beds have been incorporated to provide pervious surfaces and aid in softening the public realm. Only native specimen tree and vegetation species are to be utilised within the Mt Eden (Maungawhau) Precinct public realm generally, in line with historical ecologies, and a ‘right tree right place’ mentality. Mana whenua support the use of native trees and final decisions regarding tree species will be agreed with mana whenua. Refer Landscape General Arrangement Plan in Section 4.14 in Appendix A for details.

• 47.2 Entrances within the Road Reserve (c) Designs for station entrances within the road (viii) reserve should be designed to consider the impacts upon other modes of traffic, including the expected pedestrian patronage.

This principle is not applicable to the current Urban Design DWP. The Mt Eden (Maungawhau) Station entrances will be addressed in a future Urban Design DWP.

Page 18

| Mt Eden Main Works


Porters Avenue Pedestrian and Cycle Overbridge - Urban Design DWP 47.2 Utility Structures (c) Above ground utility structures (e.g. vents, access (ix) services) should be designed to minimise any negative effect on public realm. Where possible these structures should be integrated with other buildings.

47.2 Where landscape planting is affected by (c) construction works on private properties, (x) replanting and/or mitigation of any such landscaping shall be undertaken in consultation with those landowners, and in recognition of wider mitigation works required for those properties (e.g. vehicle parking and access requirements).

Page 19

| Mt Eden Main Works

•

It is envisaged that this condition relates to the vent and access structures associated with the station architecture. This principle is not applicable to this Urban Design DWP. Utility structures associated with the Mt Eden (Maungawhau) Station will be addressed in a future Urban Design DWP.

•

Mechanical plant space has been incorporated into the overbridge structure, including by locating it under the stairs, to ensure that it does not impact on the public realm.

•

This principle is not applicable to the current Urban Design DWP. There is no landscape planting affected by construction works on private properties.


4.

Consultation and Liaison 4.1 Introduction

The design of the Porters Ave pedestrian and cycle overbridge and the reinstatement of Porters Avenue, Wynyard Road and Haultain Street has been developed in consultation with the following parties: Auckland Council Mt Eden Community and Business Liaison Group (CLG) Mana whenua (CRL project partners) Independent Peer Reviewer Affected parties and affected in proximity parties A summary of engagement is provided for each party as follows. A full record of consultation is provided in Appendix D.

4.2 Auckland Council The Porters Ave pedestrian and cycle overbridge and public realm reinstatement were presented to the Auckland Urban Design Panel on 6th Oct 2016 as part of the concepts for each Station and precinct surrounds. At this time the panel commented that the residual spaces associated with the pedestrian bridge landings have not been fully resolved. In particular, the panel recommended improvement of the Ngahura Street end of Fenton Bridge including how it might relate to future development. No specific comments were raised in relation to the bridge itself. A further Urban Design Panel presentation was held on 21st July 2020 to provide an update on the Porters Avenue pedestrian and cycle overbridge. The panel was in general agreement with the bridge design and proposed public realm reinstatement commenting “In general the Panel understands and is supportive of the design approach taken and the mana whenua narratives for the bridge. The Panel is in particular comfortable with the landscaping, wayfinding / signage, and treeplanting solutions proposed. The bridge structure and aesthetic of itself is also supported “. The panel only provided minor recomendation that the perforated panels forming the balustrade to the stair structures appeared much more visually obstructive than the reference design and this was queried from both a bulk / scale and CPTED perspective. The design will investigate incorporating changes to address this recommendation and seek resolution of the above items to the satisfaction of the Reporting Urban Designer. A full record of feedback is provided in Appendix D.

4.3 Community Liaison Group The reinstatement and overbridge design was presented to the CLG on 27th May 2020 via a virtual meeting using Microsoft Teams. The key comments received from the CLG are related to:

Page 20

•

The need for both the Porters Avenue and Fenton Street overbridges to be constructed;

•

Connection of the Mt Eden Station with other modes of transport;

•

Clarification on the design of the overbridge;

•

The materials chosen to reduce visual impact of wear and tear; and | Mt Eden Main Works


•

CCTV coverage.

Following the meeting, a copy of the presentation and a feedback form was published on the CRL project website. Participants of the meeting were sent this information along with an article explaining the bridge design. Details on how to provide feedback were published in the June CRL Mt Eden newsletter and on CRL social media pages. CLG comments, and subsequent responses from the Link Alliance, are attached in Appendix D.1.

4.4 Mana Whenua A CRL Mana Whenua Forum has been established for the purpose of undertaking kaitiakitanga responsibilities associated with the CRL project. The forum comprises those mana whenua groups who expressed an interest in being involved in the project and its related activities. Eight mana whenua self-identified their interest in CRL and are currently part of the forum. Kaitiaki attending the forum represent iwi groups as follows: • • • • • • • •

Te Ākitai Waiohua Te Kawerau a Maki Ngāti Maru Ngāti Paoa Ngāi Tai ki Tāmaki Ngāti Tamaoho Ngāti Te Ata Waioha Ngāti Whātua o Ōrakei

The Link Alliance continues to work collaboratively with the Kaitiaki through the forum. It is anticipated that fostering the relationships CRL has already established with mana whenua will build better understanding and assist to better cooperate and resolve any potential issues. This partnership will deliver benefits from closer involvement and a greater focus on long-term outcomes. Presentations at the CRL Mana Whenua Forum on the Porters Avenue pedestrian and cycle overbridge and associated urban realm reinstatement started in August 2019 and have been ongoing. Workshops at a separate design hui with selected Kaitiaki from the forum also occurred between August 2019-December 2019. At these hui the Link Alliance sought to ascertain a deeper understanding of the cultural narratives gifted by mana whenua for use across the CRL project. A summary of this consultation is presented in Appendix D.3 For the Porters Ave overbridge and immediate environs mana whenua nominated artist Tessa Harris to work directly with the Link Alliance to explore how these narratives are expressed within the design of the overbridge. Refer Section 4.4 and 4.16 within Appendix A and Appendix B for an overview of the artist inputs.

4.5 Other Consultation Further consultative processes have been undertaken as follows: •

Page 21

The reference design for the Porters Avenue and Fenton Street pedestrian and cycle overbridges was publicly canvassed as part of a Notice of Requirement (NoR) to alter the CRL Mt Eden designation in 2016-17. The NoR was publicly notified and 79 submissions were

| Mt Eden Main Works


•

•

•

Page 22

received on a range of topics, including the overbridges. In 2017 the NoR was directly referred to the Environment Court. The decision of the Environment Court confirmed the NoR with conditions relating specifically to the overbridges in response to submissions. Compliance with these conditions is addressed in Table 3-2 of this Urban Design DWP. Representatives from CRLL and the Link Alliance met with one of the owners of 5 Porters Avenue (Mr Martin van Zonneveld) on 28 February 2020 to discuss the proposed Porters Avenue overbridge design. At this meeting, the following was discussed: o How the proposed design of the overbridge addresses the specific requirements of the designation conditions, including the required offset from the boundary of 5 Porters Avenue, privacy screening, and incorporation of ramps and lifts to provide for cyclists; o The need for both the Porters Avenue and the Fenton Street overbridges to be constructed, and the need for lift access to be provided at both bridges; o How the current Porters Avenue overbridge design differs to the earlier reference design, and the reason for these changes, including:  The closing-in of the underside of the stairs to enclose plant and for safety reasons;  The sizing of the structure to incorporate utility services across the span of the overbridge; and  The incorporation of mana whenua design narratives. o The manner in which the proposed streetscape reinstatement accounts for vehicle safety, including a barrier to be constructed along the boundary of the railway corridor to prevent vehicles from entering the tracks. o Mr van Zonneveld expressed concerns regarding the extent to which the proposed design will block sunlight access to the building at 5 Porters Avenue. In this regard, it was discussed how the design seeks to balance transparency while incorporating screening to provide for privacy and temperature control for the plant within the glazed lift shafts; o A subsequent meeting was held with Mr van Zonneveld on 12 June 2020 to further discuss his concerns. A summary of the consultation undertaken with Mr van Zonneveld is provided in Appendices D.2 and D.4. Attendance to the CLG meeting held on the 27 May was opened up to affected parties and affected in proximity parties, to provide them with the same opportunity to understand the proposed design and provide their feedback. Flyers with information about the virtual meeting were distributed to all properties within 1.7km of the Porters Avenue rail crossing. Following the letter drop, the Mt Eden Communications and Engagement team sent out an email to the stakeholder database, inviting them to join the virtual meeting. The comments from these parties received at this CLG meeting are contained in Appendix D.1. Meetings and email communication with affected parties and affected in proximity parties (including Nos. 2, 3, 4 and 6 Porters Avenue) following the CLG meeting to discuss operational issues relating to their properties. o Nos. 2 and 4 Porters Avenue: the owners expressed concerns regarding property access and road safety when the overbridge is constructed. They were also concerned that the proposed changes to the road layout of Porters Avenue would restrict the development potential of their properties. In response, vehicle tracking and traffic movement drawings were provided to the owners. The design of the road

| Mt Eden Main Works


o

o

Page 23

layout, regarding location of the loading zone, footpath width and car parking has been reviewed with no changes resulting. No. 3 Porters Avenue: Kennards Self Storage (“Kennards”) raised several concerns regarding the overbridge:  Obscuring of the property’s external signage. The Link Alliance considered that the extent of visual obstruction will be limited and have offered to produce a drawing to demonstrate this.  Maintaining access to the property’s emergency power plug (for backup generator connection in the event of an electricity outage). This issue has been resolved with an agreement to move the power plug closer to the property boundary to accommodate access for an emergency generator.  Lack of sunlight, including inadequate sunlight for vegetation. In response, a solar study was provided which confirms adequate sunlight for the proposed vegetation.  Security and lighting for the space between the overbridge and the eastern façade of the Kennards building (approximately 2m wide). Health and safety concerns as the area may encourage unsavoury characters. In response, information and lighting renders were provided to Kennards demonstrating that additional lights are placed on the bridge staircase to light the area between the stair and the Kennards building. A ground level camera will be placed on the bridge pier to view the area between Kennards’ building and the bridge staircase. Cameras are also placed on the staircases to ensure pedestrian safety and deter graffiti. 6 Porters Avenue: the land owner raised questions regarding the location of the loading zone in Porters Avenue, privacy viewpoints from the lift on the new overbridge to the western side of property and the need for a rundle ramp on the bridge stairwell. Information was provided to the land owner showing the proposed location of the loading zone, and an assessment of views from the overbridge/lift into 6 Porters Avenue. It was explained that the perforated screens are designed to maintain sufficient privacy for neighbouring properties, while keeping bridge users visible for safety and security concerns. It was also explained that the rundle ramp was a result of the ruling from the Environment Court in 2017 to improve cycle accessibility.

| Mt Eden Main Works


Appendix A - Urban Design Assessment

Page 24

| Mt Eden Main Works


Auckland City Rail Link In association with:

Porters Avenue Footbridge Urban Design Assessment

CRL-NAL-ARC-000-RPT-1002

17th July, 2020

INTERNAL WORKING DOCUMENT COMMERCIAL IN CONFIDENCE


Document Control Record Document prepared by: Aurecon New Zealand Limited Level 4, 139 Carlton Gore Road Newmarket Auckland 1023 PO Box 9762 Newmarket Auckland 1149 New Zealand

Document control

T +64 9 520 6019 F +64 9 524 7815 E auckland@aurecongroup.com W aurecongroup.com

Report Title

URBAN DESIGN ASSESSMENT - Porters Avenue Footbridge - DRAFT

Document ID

CRL_NAL_ARC_000_RPT_1002

Project number

219064.00

Client

City Rail Link Limited

Client contact

Simon Lough

Rev

Date

Revision details / status

Prepared by

Author

Verifier

A

17.12.2019

Draft - For Information

Jasmax

Elisapeta Heta

Martin Walton

B

19.06.2020

Review Copy

Jasmax

Elisapeta Heta

Martin Walton

1

17.07.2020

Final

Jasmax

Kaushik Madhoo

Martin Walton

Approver

Current revision

A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon.

Approval Author signature

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Approver signature

Name

Kaushik Madhoo

Name

Martin Walton

Title

Architectural Graduate

Title

Architect

Page 3


Contents Document control record

3

Contents 4

1. Introduction 1.1. Project Description

2.

Design Response

5.

Neighbourhood Context 6

2.2. Wider Context

7

2.3. Existing Context

8

2.4. Context - Views to/from Maungawhau

9

Existing Conditions

3.1. The Unitary Plan

10

3.2. The Auckland Plan 2012

10

4.1. Project Requirements

12

5.1. Introduction

30

4.2. Requirements of Site

12

5.2. Wayfinding Approach

30

4.3. Bridge Requirements

13

5.3 Staging

30

4.4. Design Concept

16

5.4. Surrounding Zone - Flow Chart

31

4.5. Temporary Stage

17

5.4.1 Surrounding Zone - Sign Diagram

32

4.6. Final Stage

18

5.4.2 Surrounding Zone

33

4.7. Scope and Movement across Site - 2024 CRL

19

5.5. Approach Zone - Flow Chart

34

4.8 Bulk and Location of Bridge

20

5.5.1 Surrounding Zone - Sign Diagram

35

4.9. Street Elevations - Bulk and Height

21

5.5.2 Approach Zone

36

4.10. Bridge Deck Level

22

4.11. Street Level Plan

23

4.12. Elevation - Looking East

24

4.13. Elevation - Looking West

25

4.14. Urban Realm

26

4.15. Visualisations

27

4.16. Mana Whenua Artist Opportunities

29

6.

CPTED Review

6.1

CPTED Review Commentary

7. 7.1

Page 4

Signage and Wayfinding Concept

5

2.1. Overview

3.

4.

REVIEW

39

Community Liaison Feedback Actions following Consultation

41

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


1. Introduction 1.1

Project Description

The CRL works in the Mt Eden area involve the construction of the southern section of the tunnel structures and the tie-in to the existing NAL, including the construction of the redeveloped Mt Eden Station. The Mt Eden Active Construction Zone (ACZ) and Construction Support Area (CSA) is generally located between Nikau Street to the north, State Highway 1 (SH1) to the east, Dominion Road to the west and the existing NAL to the south. (see fig 1.1.1)

Fig 1.1 .1 Fig 1.1.2 Fig 1.1.3

Construction Zones The end state of CRL with all bridges Diagram illustrating the bridge works surrounding the Maungawhau station

1

The works in this area include: – Construction of an underground grade separation structure near Mt Eden Station; – A new Mt Eden Station building incorporating passenger linkages; – Modifications to the existing Mt Eden Station platforms;

H

RT

T.

No

W

NE

NO

RD

ED EN RD MT

normanby road bridge

Ede Mt

ruru street bridge

The focus of this report is the works for the pedestrian / cyclist bridge structure and associated public realm works for Porters Ave Footbridge, only.

Maungawhau station

Porters ave footbridge

Given the nature and scale of CRL works in Mt Eden, construction will be undertaken in a staged manner.

Fenton St bridge

nR

oad

– New road linkages within the reinstated area post-construction.

DOM INIO

N RO

w Ne

Ro

AD E X

d

ad

rth

Mt Eden road bridge

– Pedestrian and cyclist bridge structures at Fenton Street and Porters Avenue; and

Tunnel Entry

2 Roa

– Grade separation structures for the existing and new rail lines to pass-over and connect with each other;

3

Dom inion

– Road over rail bridges at Mt Eden Road, Normanby Road and Ruru Street with sections of road realignment;

CRL platform

Porters Ave Footbridge

Fenton St Bridge

Maungawhau NAL platform Station

Note: The Porters Ave project will be completed prior to the completion of the CRL works. In the interim, until the CRL words are complete, Mt Eden Station will be closed.

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 5


2. Neighbourhood Context 2.1

Overview

The site for the proposed bridge is the Porters Ave - Wynyard Road level crossing. Currently the vehicular traffic runs through Porters Ave - Wynyard Rd, over the rail line. This allows traffic to connect from New North Road, through Porters and Wynyard to View Road, and the surrounding suburban neighbourhood. N

N

h

Rd

Po

The main arterial routes around the site of Porters Ave, are that of New North Road and Dominion Road, with feeder roads mostly coming from Porters, Wynyard and Brentwood Ave. Porters Ave is not a highly used pedestrian route. Based on survey work done by Flow Transportation specialists on behalf of Auckland Transport (on December, 2015); traffic and pedestrian counts indicated that at the morning peak there are 285 cars, 9 cyclists and 83 pedestrians using the Porters Ave level crossing (movements / hour). At evening peak there are 270 cars, 8 cyclists and 65 pedestrians using the Porters Ave level crossing.

ew

t or

r te rs e Av

in

St

Dom

Rd

inion

a rd

Rd

lta

St

ny

Further information on the current and proposed traffic impact report can be found in the traffic management plan by Aurecon.

u Ha

to n

Wy

It is anticipated since this report has been undertaken that these pedestrian/cyclist counts will increase and will continue to increase after the stations have been completed and the surrounding neighbourhood has undergone further development

n Fe

Legend

Br

e

o ntw

od

e Av

On-grade rail crossing zones

Mt Eden Station Platform

Feeder Roads, important to assessment

Main Arterial Roads Porters Ave - Wynyard road rail crossing

Page 6

REVIEW

Fenton Street - Ngahura Street on grade rail crossing

Mt Eden Station platform N

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


2.2

Wider Context

1

The site of the Porters Ave Footbridge spans from Porters Ave to Wynyard Road, with all of Haultain street being repaved. The scope of the site terminates at the entry to Fenton Street meeting with the beginning of the C3 contracted works.

N ew

Nor

th R

d

3 Po r te

2

e Av

s ard nn Ke

e rag Sto f l Se

rs

The neighbourhood character is light industrial and medium density residential, bordering low-density residential neighbourhoods of Eden Terrace and Mt Eden.

ts en rtm a Ap

n Fe

to n

1

St

Wy ny

in

St

Rd

lta

a rd

u Ha

l tria g us d sin ou t In h H Lig ity ns De w Lo

N

2

3

4

Images Fig 2.2.1 Fig 2.2.2 Fig 2.2.3 Fig 2.2.4

Existing Site Aerial View down Fenton Street towards existing station platform View down Fenton Street towards Porters Ave View from Porters Ave towards New North Road

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 7


2.3

Existing Context

1

4

2

5

3

6

The immediate surroundings are mostly light commercial buildings. A large percentage of the industrial buildings are predominantly of late 20th century building stock character, bound to the south by villas and cottages from the early 1900s. Along the rail corridor from 6 Porters Ave - 6 Ngahura Street are 3 storey medium density apartments called Eden North. Porters Ave has a large commercial premises of Kennards Self Storage (3 Porters Ave), and some light commercial properties on the opposite side of the road (2 and 4 Porters Ave), next to Eden North Apartments (6 Porters Ave - 6 Ngahura St).

3 Po

4

n Fe

St

ny a rd

1

to n

ton en 1 F St

5

Wy

Rd

ers ort 5 P Ave

2

e Av

ul

St

rs

Ha

n tai

6

r te

e ag tor S f el sS ard n n Ke

e Av ers t r Po

N

Images Fig 2.3.1 Fig 2.3.2 Fig 2.3.3 Fig 2.3.4 Fig 2.3.5 Fig 2.3.6

Page 8

Photograph of Maungawhau from base of proposed Porters Avenue Bridge, Wynyard Road end. View down Haultain St View from Porters Ave towards Wynyard Road Existing level crossing connecting Porters Ave and Wynyard Road View from Wynyard Road towards Porters Ave and New North Road Aerial 3D from google earth that shows the current road crossing over the rail at the Porters Ave - Wynyard Road intersection.

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


2.4

Context - Views from Maungawhau

1

The Porters Ave Footbridge site is visible from the summit of Maungawhau, when looking back towards Auckland City and the harbour bridge. Refer to Fig 2.4.2 and Fig 2.4.3. The obvious point of reference is the Kennards Self Storage building. Fig 2.4.1 shows that from street level (this photo is taken on Wynyard road), Maungawhau is also clearly visible. The significance of these visual connections and how it informs the bridge narrative is described in the Mana Whenua narrative in Section 4.4. Of note in Fig 2.4.1 is also the height restriction signage structure warning of an over-height hazard for approaching vehicles using the Porters Ave level crossing. This will be removed as part of the proposal.

2

3

Images Fig 2.4.1

View from Wynyard Road toward Maungawhau mountain - note the removal of overhead rail clearance signal included in scope.

Fig 2.4.2

View of Wynyard Road, Porters Ave, Kennards Self Storage and the future location of the footbridge.

Fig 2.4.3

Zoomed in view of site from Maungawhau

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 9


3. Existing Conditions 3.1

The Unitary Plan

This site falls within the Eden Terrace neighbourhood and is bound by surrounding properties that are zoned Business - Mixed Use. On the following page, the Unitary Map plan shows the wider context surrounding the Porters Ave Footbridge site. All properties coloured blue are zoned ‘Business – Mixed Use Zone’. These zones are typically located around centres and along corridors served by public transport. It acts as a transitional and/or buffer zone between shifts in scale and activities. In particular, it applies to areas where there is a need for a compatible mix of residential and employment activities. Of the controls in place, the rules that may be of relevance to the proposal are: •

Buildings in the Business - Mixed Use Zone have height restrictions of 18m total (16m occupiable height + 2m for roof); this includes 3 Porters Ave, 5 Porters Ave and 1 Fenton Street.

•

The properties at 2,4 and 6 Porters Ave are subject to Height Variation Control measures under the unitary plan. Buildings in this zone are afforded variable height restrictions of 21m (19m occupiable height + 2m roof). These properties are the hatched blue areas shown in Fig 3.2.2 overleaf.

3.2

The Auckland Plan 2012

With reference to the 2012 Auckland Plan, and the ‘Four Good Design Principles’ identified in Chapter 10, we have considered the application of these principles in the context of the proposed site, at the various urban scales identified: •

Sections

•

Street

•

Neighbourhood

•

City

The Auckland Plan the character of this area would be described as a combination of low - medium density, light commercial, along a significant public transport spine. In the future this spine, and the Maungawhau Station Precinct, will make for an important local neighbourhood public / civic amenity, encouraging pedestrian and cyclist use.

This project responds to the Good Design Principles in the following ways: 1. Identity - Develop the Maungawhau Station precinct through the design of an reinvigorated urban realm and architectural responses that uplifts the quality and character of the environment to encourage a sense of place. Create an elegant and rich architectural form, expressive of a city vision, and showcasing Mana Whenua narratives and mahi toi. 2. Diversity - Enable quality and accessible landscape and architecture that allows users of all abilities to use safely and with ease. 3. Integration - Creating street activation in the Maungawhau Station precinct, particularly in along Fenton Street*. 4. Efficiency - Create quality public realm environments, alongside the Maungawhau Station Precinct, to give more efficient and well utilised spaces to the local commercial, medium and low density neighbourhoods. Links the site back to outlook of Maungawhau and gives clear views along the NAL toward Fenton Street Bridge and Maungawhau Station. The proposal supports these activities as well as providing necessary infrastructure to support pedestrian and cycling activities, as required by the local adjacent residential neighbourhood.

The proposal does not exceed these height limits, nor does it preclude developments occurring on adjacent sites in accordance with these rules, as demonstrated in Fig 4.9.1 and 4.9.2.

* With reference to works along Fenton Street, this will be the subject of a separate Urban Design package. This proposal interfaces with that development at the entrance to Fenton Street.

Note: There are no volcanic view shaft constraints over the proposed Porters Ave Footbridge site. Refer to Fig 3.2.2 overleaf.

Page 10

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


3.2.1 Planning Map

140 - 148 New North Road

2 Porters Ave

3

e Av ers t r Po

ve sA r e ort ve 4P rs A e t or 6P

5 Porters Ave

1 Fenton Street

Fig 3.2.1 Diagram showing the addresses of key adjacent properties

Legend – 3

Scope of Site

– 3

Adjacent Sites to Porters Ave Footbridge Site;

– 3 3

Business - Mixed Use Zone; total building height controls 18m (16m occupiable height + 2m roof)

– 3 3

Business - Mixed Use Zone; variable building height controls 21m (19m occupiable height + 2m roof)

– 3

Residential - Single House Zone

– 3

Residential - Mixed Housing Urban Zone

– 3

Business - Town centre zone

– 3

Open Space - Informal Recreation Zone

– 3 3

Regionally Significant Volcanic View-shafts and Height sensitive areas overlay

Aurecon | Mott MacDonald | Jasmax | ARUP

Fig 3.2.2 Planning Map - Auckland Council GeoMaps - Auckland Unitary Plan Operative in part (16 Nov 2016) - Printed 07 October 2019 N

REVIEW

Page 11


4. Design Response 4.1

Project Requirements

4.2

Requirements of the Site

– The footbridge is located on the western side of Porters Ave and Wynyard Road. This is to maximise separation from existing apartment buildings (Eden North Apartments on 6 Ngahura Street) and also provide a clear path of travel for pedestrians transitioning to Fenton Street to access the bridge towards the Station.

Currently the NAL has two tracks that service the current train stations and platforms. With the addition of CRL existing tracks will be slewed and two new tracks will be laid in a new trench. This is one of the key reasons the on grade vehicle and pedestrian crossing cannot be maintained.

– The Porters Ave pedestrian bridge incorporates the same provision of access as the Fenton Street bridge with an accessible lift and accessible stairway incorporating provision for stair cycle wheel ramp.

The fig 4.2.1 shows the existing condition of the vehicle intersection that connects vehicular, pedestrian and cycle traffic across the NAL. However, as sections show (fig 4.2.2) the trench will be significant.

– The footbridge is required to carry a significant amount of utilities across the NAL. This is due to the fact that the widened, and deepened NAL track cannot have utilities travelling under it, and the more manageable long term solution is to have the utilities accessible through the bridge.

All affected roading and footpaths will be improved, this includes Porters Avenue, entry into Fenton Street, all of Haultain Street, and the beginning of Wynyard Road. While the road at the ends of Porters Ave and Wynyard Road will be narrowed, parking is still available on Porters Avenue, and Wynyard Rd.

– This project will provide the opportunity to enhance the area’s current urban realm / streetscape. – With reference to the City Rail Link Notice of Requirement, Urban Design Principles. Particular designation conditions as follows : – Designation Condition 47.2(a) is identified as the need to engage with Mana Whenua to locate and provide opportunities through the Te Aranga Māori Design Principles. – Designation Condition 47.2(b) specifies key outcomes required to enable movement and connections within and around the proposal – Designation Condition 47.2(c) Public Realm and Landscape Our design response to these requirements are identified in this section. A comprehensive assessment of compliance with the urban design principles in designation Condition 47.2 has been provided in Sections 3.3 and 3.4 of the Urban Design DWP.

Page 12

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


View Toward

Maungawhau

5 Porters Ave

Haultain Street

3 Porters Ave

Toward New North Road

Kennards

Self Storage

Wynyard Road

Porters Ave

Rail Corridor / Level Crossing Current NAL line

Fig 4.2.1

View Toward Maungawhau

Section from Wynyard Rd - Porters Ave, looking West. Through current state of site with vehicle on-grade crossing over NAL

5 Porters Ave

Haultain Street

NAL line, slewed

3 Porters Ave

Toward New North Road

Kennards

Self Storage

Wynyard Road

Porters Ave Final Stage Rail Corridor Approx. 5m minimum clearance from the road underside of hull

Approx. location of Pantograph zone, see Section for exact location, see Fig 4.3.1

Fig 4.2.2 Section from Wynyard Rd - Porters Ave, looking West. Through the future stage including the NAL and CRL lines, where the NAL line has been slewed to make way for trench and two new CRL tracks

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 13


4.3

Bridge Requirements Pantograph Zone

The bridge must protect the public from the risk of electrification from the OLE (Overhead Line Equipment) above the tracks be creating a suitable barrier. The balustrade design is driven by the Rail Overhead Line Equipment (OLE) requirements (see fig 4.3.1). A solid surface is required on the sides of the bridge up to a minimum of 1000 mm above bridge deck level. The proposal shows a 1200mm high solid steel clad balustrade (see Fig 4.3.2). A mesh screen is attached onto this solid balustrade up to a minimum height of 1800 mm above bridge deck level. This material change allows for visibility; from street level looking up to the bridge and from the bridge looking down to the street, without the use of glass. While glass is robust, it is prone to vandalism. The mesh screen is higher at the western side facing 5 Porters Avenue to provide a degree of privacy screening, but with some natural light penetration and visibility through. A similar approach is taken to the balustrade facing the apartments at No.6 Porters Ave. Refer to designation Condition 47.2(b) (xii). As mentioned in Section 4.1 the bridge will carry all the services utilities that were in the road and paved under the level crossing. The design of the balustrade allows for a 200mm diameter Watercare pipe, and gas main to be carried over the bridge and be visually concealed. Preliminary discussions have indicated a 200mm clearance around the Watercare pipe is required. These pipes (water and gas) are to be contained in the designed balustrade. There will be removable panels at required intervals to allow for easy access for emergency and maintenance purposes. To provide adequate lighting to the bridge deck, it is proposed that lights be integrated into the steel balustrade and steel handrails. The bridge height is dictated by the minimum depth of structure required for the span which is 1.5 meters and providing for vehicle and rail clearances underneath. Road clearances required to permit the passage of rubbish trucks. Refer Traffic Impact Report. Rail clearances required to clear OLE - a minimum of 6m from top of track has been provided.

Page 14

Fig 4.3.1 Pantagraph Zone - demonstrates the area over which there are specific requirements for balustrade heights to prevent electrification of pedestrians on the bridge. Indicative zone (mirrored on both sides of balustrade) where lighting will go. Screen of variable size above the minimum required. Screened Balustrade - over the OHLE zone (see Fig 4.3.3) has minimum requirements must allow for screened element 0.8m above the 1m (min) solid balustrade (up to 1.8 m high total). As per below. This proposal also has privacy requirements at the lift side of each of the balustrades, as such, each balustrade slopes down from the lift end, to the opposite stair (and is mirrored and flipped on the opposing balustrade. Solid Balustrade Zone for 1.2m high continuous along the bridge - minimum requirements 1m high solid CITYare RAIL LINK balustrade. 12/02/19

PREPARED FOR:

The gas pipe is in the non-structural balustrade on the eastern side of the footbridge The rest of the utilities will be carried through the structural hull of the bridge.

Varies 1800 from bridge deck

Approx. 1200 from bridge deck

PROJECT No. 219064.00 DRAWING BRIDGE LEVEL - PLAN - UDA

SCALE @ A1 1 : 125

DRAWING No. UDA-011

REV.

The water pipe is in the non-structural balustrade on the western side of the footbridge

Fig 4.3.2 Axonometric through a section of the Bridge Hull.

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1

Copyright Š


Haultain Street

3 Porters Av

Screen much higher on the side of the balustrade attached to the lift shafts to give privacy balanced with visibility through. Also occurs on the opposite side of the balustrade nearest 5 Porters Ave.

Min req. of screen 1.8m above FFL Solid Balustrade 1.2m above FFL

Kennards Self Storage

FFL 76350

N

Approx. Location of pantograph zone, see Section for exact location

Porters Ave

Final Stage Rail Corridor

Fig 4.3.3 Diagram that zooms in on the Porters Ave side of the elevation looking West, (from Wynyard Rd - Porters Ave). This diagrammatically illustrates the compliance with height requirements.

Distance from Eden North Apartments, only able to view into the short elevation of the apartment block, and high screen at lift end of the bridge all aid in restricting view into building

Restricted view into 5 Porters Ave due to high screening at lift end of bridge

FFL 81070

FFL 81070

TOP OF LIFT PARAPET

Eden North Apartments. 6 Porters Ave - 6 Ngahura Rd

LIFT DOORS

5 Porters Ave. LIFT DOORS

FFL 76350

BRIDGE LEVEL

FFL 70000

FFL 70000

FFL 67975

FFL 67975

WYNYARD ROAD LEVEL

WYNYARD ROAD LEVEL

PORTERS AVENUE LEVEL

PORTERS AVENUE LEVEL

PORTERS AVE

WYNYARD RD

Fig 4.3.4 Screen on Balustrade are lifted beyond the designated requirement at the lift ends to restrict views into Eden North Apartments, 6 Porters Ave. 1

1 : 100

Plan Detail

CROSS SECTION - LIFT - PORTERS AVENUE

ilename:

Aurecon | Mott MacDonald | Jasmax | ARUP

Fig 4.3.5 Screen on Balustrade are lifted beyond the designated requirement at the lift ends to restrict views into commercial property at 5 Porters Ave. 2

1 : 100

Plan Detail

CROSS SECTION - LIFT - WYNYARD ROAD

REVIEW

AUCKLAND COUNCIL STAMP

Page 15

ND IL

BRIDGE LEVEL

Kennards Self Storage. No ability to see into this building

LA

FFL 76350

TOP OF LIFT PARAPET


4.4

Design Concept

1

2

3

As this is a part of the wider CRL family, the Porters Ave Footbridge design conceptually links to the design narratives that had been discussed through mana whenua engagement from 2013 - ongoing, and an incorporation of the pragmatics of the brief. The earlier ‘big idea’ concept of the footbridge is to be ‘of Maungawhau’ insomuch as linking back to the whakapapa of Maungawhau, and the narrative of Matāoho, the deity of volcanic activity and earthquakes specifically in the Auckland region.

Auckland Council

Creative Studio Presentation

4

5

The bridge is a sculpted, and honed ‘tool’ likened to a basalt ‘toki’, or a new ‘tool’ of the maunga, similar to that of basalt toki that would have been used to carve out the extensive earth works on Maungawhau, and dig, plant and harvest kumara pits. The shape of the ‘hull’ of the bridge, the significant form in the site, pinches in the centre to trim some of the bulk of the bridge, and this pinch shapes a faceted steel object that meets faceted piers and grounds on both sides of the bridge. This ‘toki’ arawhata (bridge) is held up as a precious object by lift shaft and stair solutions that contrast in colour, weight, and feel. The lift shafts will provide significant opportunities to become ‘Aro Ngatahi’ or focal points/ thresholds that mark coming toward / travelling away from the Maungawhau Station precinct. Page: 193

Copyright © 2017

The surrounding landscape will use the cues of materiality and colour palette from this narrative to inform the way the urban realm leads pedestrians and cyclists, locals and visitors alike toward the new ‘front door’ to the CRL network at Maungawhau Station.

6

The images to the right show narrative materiality and object precedents that we have explored for inspiration and design ideas. A comprehensive assessment against the Mana Whenua principles in designation Condition 49 has been provided in Section 3.2 of the Urban Design DWP. Further detail about the design process in conjunction with the Mana Whenua artist is included in the appendices of this design assessment

Fig 4.4.1 Karā Whao / Basalt Chisel. Source: Te Papa. https://collections.tepapa.govt.nz/object/164669 Fig 4.4.2 Basalt toki. Source: https://www.dunbarsloane.co.nz/Artefacts-0 Fig 4.4.3 Brett Graham Artwork. Source: Two Rooms. https://tworooms.co.nz/artists/brett-graham/# Fig 4.4.4 Auckland Council Creative Studio Presentation Source: Public Arts Concept Report, December 2017 Fig 4.4.5 Brett Graham Artwork. Source: Two Rooms. https://tworooms.co.nz/artists/brett-graham/# Fig 4.4.6 Te Papa Toki

Page 16

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


4.5

Temporary Stage Future Mt Eden Platform + Station

The new rail alignment at Mt Eden interrupts the existing pedestrian level crossing at Fenton Street and both the vehicle and pedestrian level crossing between Porters Avenue and Wynyard Road. Two bridges will replace these crossings in order for pedestrian connections to be maintained. As the first stage in a series of stages that forms the CRL project, the proposed Porters Avenue bridge will interface with an interim construction phase for the Mt Eden Station platform. The anticipated significant dates are:

Road

Ext.

– Porters Ave Footbridge construction commences late 2020, with completion in late 2022.

w

Ne

Rd

N

Dom

inion

– Fenton St Bridge Construction commences in Mar-21 and completed by Feb-23.

th or

– For NAL Platform, C5 will complete and handover to C3 for completion of remaining works by Jan-23. However, the station and the NAL Platform will be complete by late Jul-23. – The Mt Eden NAL Station is closed and will be open after CRL Mt Eden Station/CRL is commissioned. (Late 2024) – For construction purpose, C5 will access through the CRL Mt Eden Platform side for NAL Platform Construction

Legend

Approximate extent of Porters Ave Footbridge Scope of Work

Porters Ave Footbridge

Current path along Fenton St to Mt Eden Station Platform; across level crossing

Future Maungawhau Station Building

Current Mt Eden Station Platform

Future NAL Platform

Main Arterial Roads

Porters Ave Footbridge

Fenton St level crossing, location of future Bridge

Current Mt Eden Platform

Fig 4.5.1 Site plan showing the position of Porters Avenue Footbridge and Fenton Street Footbridge in relation to the station building, platforms and main arterial roads

Aurecon | Mott MacDonald | Jasmax | ARUP

N

REVIEW

Page 17


4.6

Final Stage

Porters Avenue Footbridge supports the connection with New North Road and provides access between Wynyard Road and Porters Avenue while Fenton Footbridge directs pedestrian traffic to and from the station building providing access from Fenton Street to Ngahura Street. The Fenton St Bridge project phase includes urban realm upgrades to Fenton Street and Ngahura Street.

Road

Ext.

Refer to separate UDA for Further information.

w

Rd

N

Dom

inion

Ne

th or

Ede

nR

d

Legend

Porters Ave Footbridge

Fenton Street Bridge (approx. size and location, only)

Mt.

Approximate extent of Porters Ave Footbridge Scope of Work

Street upgrades on Fenton Street and Ngahura, outside of the scope of this project.

New Maungawhau Station Building

New CRL Platform

New NAL Platform

Main Arterial Roads

Page 18

Porters Ave Footbridge

Fig 4.6.1 Site plan showing the position of Porters Avenue Footbridge and Fenton Street Footbridge in relation to the station building, platforms and main arterial roads

REVIEW

Fenton St bridge

Tunnel Entry

N

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


4.7

Scope and Movement Across the Site at 2024 CRL Completion

TO

NT TE EX

N TIO TA S RE TU FU

E OP SC OF

EXISTING MT EDEN STATION

ION

E NU VE SA ER RT PO

TO

IN DOM

T EN TM R A AP

RD

3

OR DO

4

TM AR AP

6

N TIO CA LO

F EL SS 3 RD A E NN KE RAG AGE O ST TOR

LF SE DS R A NN KE

S

TO

1 MC

0

TO

2 MC

Pedestrian connection from Porters Avenue Footbridge to Proposed Mt Eden Station Entry

E OP SC

LIN

E L NA

M UP

ION AT ST ND A L GS KIN

0

MC

AIN

30

-M

T UL HA

0 C4

MT

RY DA

GE

Pedestrian connection from Porters Avenue Footbridge to New North Road

UN BO

ID BR

Key

ET RE ST N AI

Porters Avenue Bridge landing zones

F

EN ED

S

INE EL OP SC

in -3 -0 0 2 co re u \A g P ie n co re u A 5 tl U d o p D A sC

ST

S DE RA ESIGN PG T U CE D E N RE ST LLIA ON INK A NT FE FER L E R

ION AT

T EE TR S N TO EN

5

3

5 N TIO CA LO

5 NT TE EX

E OP SC OF

D AR NY WY

4

Scope of Works

7

5

3

2

Fenton Street Bridge landing zones (not in scope)

T EN TM R A AP 11

11

OR DO

AD RO

1 SA ND KE T OR REE F W ST IN SO NT ULTA TE EX F HA O 12

Volcanic View Shaft

T EN

\ ja sm \ a jc \A ro t\P e x.n 9 1 0 2 d n ckla u s 0 m Ico sfe n ra \T 4 6

N TIO NA SIG DE

FENTON BRIDGE BY OTHERS

OT TL

Fig 4.7.1 Site plan showing the position of Porters Avenue Footbridge and Fenton Street Footbridge in relation to the station building, platforms and main arterial roads N 1

1 : 500

Plan Detail

TRUE NORTH SITE PLAN

Aurecon | Mott MacDonald | Jasmax | ARUP

CITY RAIL LINK

REVIEW

Page 19 PROJECT No. 219064.00


1

5 PORTERS AVE

3.5m min.

WYNYARD ROAD

the western side of the Porters Ave and Wynyard Road. The combined width of these elements is 6m. The Road is narrowed but there is room for vehicle access to get into Haultain Street, and Fenton Street.

KENNARDS SELF STORAGE 3 PORTERS AVE

PORTERS AVENUE

WYNYARD ROAD

6

1 FENTON STREET

PORTERS AVE

RAIL CORRIDOR

Fig 4.8.1 - Accessible lift and stair are located on two landing zones on

PORTERS AVENUE

FENTON STREET

1 FENTON STREET

5 PORTERS AVE

FENTON STREET

The following describes the way the bulk, location and form of the bridge has been created.

3

3 PORTERS AVE

RAIL CORRIDOR

The positioning of the lift and stair and main body of the bridge structure is to the west side of Porters Ave and Wynyard Ave. This is to maximise separation from the existing property at 5 Porters Ave as required by the NOR Designation conditions and also provide a clear path of travel for pedestrians transitioning to Fenton Street to access the bridge towards the station.

KENNARDS SELF STORAGE -

HAULTAIN STREET

Bulk and Location of Bridge

HAULTAIN STREET

4.8

6 PORTERS AVE

On the Wynyard Street landing zone, the bridge must be set back from the building at number 5 Porters ave, by a min. of 3.5m - as per designation Condition 47.2(b)(xi).

Fig 4.8.3 - The key sight lines and desire lines will link the mirrored

amenities - lift to lift, and stair to stair.

5 PORTERS AVE

Fig 4.8.4 - Pinching together gives a chiseled look that thins down the bulk of the bridge. As demonstrated in further images of the bridge, it is sculpted around the hull and pier to shave away as much bulk from the overall mass.

5 PORTERS AVE

PORTERS AVENUE

AVE

3 PORTERS AVE

PORTERS AVENUE

1 FENTON STREET

RAIL CORRIDOR

6 PORTERS

KENNARDS SELF STORAGE -

WYNYARD ROAD FENTON STREET

RAIL CORRIDOR

1 FENTON STREET

4

3 PORTERS AVE

WYNYARD ROAD FENTON STREET

The diagrams overleaf (fig 4.9.1 and fig 4.9.2) show the proposed lift and bridge in the context of the existing streetscape.

KENNARDS SELF STORAGE -

HAULTAIN STREET

2

HAULTAIN STREET

Fig 4.8.2 - Bridge to link lift and stair, at a 6m width the bridge is a thick, large bulk in the context of the street, and neighbourhood grain.

6 PORTERS AVE

N

Page 20

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


4.9

Street Elevations - Bulk and Height

Maximum building height as permitted by the Unitary plan - 21m

Fig 4.9.1 Elevation toward Fenton St

Commercial Property

Haultain Street

Kennards Storage

New North Road

Maximum building Height level as permitted by the Unitary plan - 18m

Fig 4.9.2 Elevation toward Haultain St

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 21


PRIVATE DRIVEWAY

RAIL CORRIDO

RAIL CORRIDO

HAULTAIN

4.10 Drawings - Bridge Deck Level

EXISTING TRANSFORMER ENCLOSURE

EXISTING PLANTER BED

EXISTING PLANTER BED

1 1151

1 : 125

FENTON STREET UPGRADES REFER TO LINK ALLIANCE DESIGN

ENTON STREET

WYNYARD ROAD

PORTERS AVENUE

Plan Detail

BRIDGE DECK LEVEL - PLAN

Filename:

1:250 6.25

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND12.5 INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING 25m TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

N

Plot Date: 19/06/2020 11:07:33 AM

Office:

AU

0

CO CK L ST UN AN AM CIL D P

AUCKLAND COUNCIL STAMP

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

Page 22 THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND

REV DATE

REVIEW

REVISION DETAILS

APPROVAL

SCALE

1 : 125

DRAWN

Author

DESIGNED

SIZE

A1

BUILDING CONSENT

KIWIRAIL DOCUMENT No. PROJECT

CRL-NAL-ARC-000-RPT-1002 CITY RAIL LINK Project 219064 | 17 July 2020 | Revision 1

APPROVED DATE

TITLE

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) BRIDGE LEVEL - PLAN - UDA


4.11

Drawings - Street Level Plan

PRECAST CONCRETE - PLAZA STAIR

4000 3500 MIN CLEAR

SERVICE RISER

SIGNAL ROOM

EXTERNAL CONDENSER UNITS

26 PERSON LIFT - SCHINDLER 26 PERSON LIFT - SCHINDLER

1 : 125

Plan Detail

GROUND LEVEL - PLAN

AUCKLAND COUNCIL STAMP

Filename:

1:250 6.25

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND12.5 INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING 25m TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

N

Plot Date: 19/06/2020 11:06:12 AM

Office:

AU

0

CO CK L ST UN AN AM CIL D P

1 1151

2000

SERVICES ENCLOSURE

FINAL STAGE C - FOR BUILDING CONSENT Aurecon | Mott MacDonald | Jasmax | ARUP THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND

CLIENT

REV DATE

REVIEW

REVISION DETAILS

APPROVAL

SCALE

1 : 125

DRAWN

Author

DESIGNED

SIZE

A1

BUILDING CONSENT

KIWIRAIL DOCUMENT No. PROJECT

APPROVED DATE

TITLE

CITY RAIL LINK

Page 23

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) GROUND LEVEL - PLAN - UDA


BOUNDARY

5 PORTERS AVE

FFL 81070

TOP OF LIFT PARAPET

4.12 Drawings - Elevation - Looking East

WYNYARD ROAD

RL 76.575 m TOP OF DECK AT BR CENT

FFL 76350

6350

BRIDGE LEVEL

FFL 70000

2025

WYNYARD ROAD LEVEL

VIEW TO NEW NORTH RD

FENTON ST

FFL 67975 (TBC)

VIEW TO MAUNGAWHAU

PORTERS AVENUE LEVEL

2

1 : 125

Plan Detail

SOUTH ELEVATION (WYNYARD ROAD)

FFL 81070

TOP OF LIFT PARAPET

FFL 76350

WYNYARD ROAD

BRIDGE LEVEL

OHLE ZONE

6350

PORTERS AVENUE

FFL 70000

2025

WYNYARD ROAD LEVEL

FFL 67975 (TBC)

PORTERS AVENUE LEVEL

1

1 : 125

AUCKLAND COUNCIL STAMP

Plan Detail

Office:

Filename:

AU CO CK L ST UN AN AM CIL D P

WEST ELEVATION

Plot Date: 19/06/2020 11:12:02 AM

1:250 0

6.25

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

ORIGINAL SIZE

Page 24

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

REV DATE

REVISION DETAILS

APPROVAL

SCALE

1 : 125

DRAWN

Author

SIZE

A1

BUILDING CONSENT

12.5

25m

DATE

N

KIWIRAIL DOCUMENT No.

CITY RAIL LINK

PROJECT

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) SOUTH/WEST ELEVATION - UDA

APPROVED

DESIGNED

REVIEW

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

TITLE

Jasmax

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

CRL

ZONE

NAL

DISCIPLINE

ARC

ELEMENT

TYPE

CRL-NAL-ARC-000-RPT-1002

000

DRG

SHEET

UDA-004

Project 219064 | 17 July 2020 | Revision 1

REVISION


BOUNDARY

3 PORTERS AVE

FFL 81070

TOP OF LIFT PARAPET

4.13

Drawings - Elevation - Looking West FFL 76350

BRIDGE LEVEL

6350

PORTERS AVE

FFL 70000

2025

WYNYARD ROAD LEVEL (TBC) PORTERS AVENUE LEVEL

FFL 67975

VIEW TO MAUNGAWHAU

HAULTAIN ST 2

1 : 125

VIEW TO NEW NORTH RD

Plan Detail

3480

NORTH ELEVATION (PORTERS AVE)

4125

FFL 81070

TOP OF LIFT PARAPET

FFL 76350

6350

6350

12475

BRIDGE LEVEL

FFL 70000

2025

2025

WYNYARD ROAD LEVEL

FFL 67975

PORTERS AVENUE LEVEL

C L

C L

1

1 : 125

AUCKLAND COUNCIL STAMP

Plan Detail

Office:

Filename:

AU CO CK L ST UN AN AM CIL D P

EAST ELEVATION

Plot Date: 19/06/2020 11:39:32 AM

1:250 0

6.25

FINAL STAGE C - FOR BUILDING CONSENT CLIENT THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

Aurecon | Mott MacDonald | Jasmax | ARUP ORIGINAL SIZE

REV DATE

REVISION DETAILS

APPROVAL

SCALE

1 : 125

DRAWN

Author

REVIEW

SIZE

A1

BUILDING CONSENT

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE 12.5 25m HELD LIABLE. KIWIRAIL DOCUMENT No.

CITY RAIL LINK

PROJECT

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) NORTH/EAST ELEVATION - UDA

APPROVED DATE

DESIGNED

TITLE

Jasmax

CHECKED

Jasmax

B. RYDER

N

DOCUMENT

PROJECT

CRL

ZONE

NAL

DISCIPLINE

ARC

ELEMENT

000

Page 25 TYPE

DRG

SHEET

UDA-003

REVISION


4.14 Urban Realm Within this public realm there are design elements that have the opportunity to embody expressions of an appropriate narrative and tie Maungawhau Station, Fenton Street public realm, Fenton Street Bridge and Porters Avenue Footbridges together. – Reuse of heritage kerb stones – Integrating of footpaths and roading, with precinct – Table crossing points – Clear and legible pedestrian routes – Robust materials selected suitable for the context of the location. – Native trees – Integration of cpted principles – Lighting All of this will be done in alignment with the Auckland Transport public realm material requirements.

N

Page 26

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


4.15 Visualisations

Wynyard Rd Approach

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 27


Porters Ave Approach

Page 28

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


BOUNDARY

3 PORTERS AVE

FFL 81070

TOP OF LIFT PARAPET

4.16 Mana Whenua Artist Opportunities

FFL 76350

BRIDGE LEVEL PORTERS AVE

6350

Within this project there are several architectural components that offer potential opportunities to include embodied expressions of an appropriate narrative. A key component are the glass fritting on both lift shafts. These will ground the identity of the bridge and connect it back to the wider narrative associated to Maungawhau Station.

1

Non-structural Balustrade elements - perforated steel with pattern through

FFL 70000

2025

WYNYARD ROAD LEVEL (TBC) PORTERS AVENUE LEVEL

FFL 67975

2

Other opportunities are the plant room walls, on the Porters Avenue side, piers that support the bridge and the non structural balustrade elements of the bridge.

1 : 125

Plan Detail

NORTH ELEVATION (PORTERS AVE)

3480

This will continue to be developed in conjunction with the Mana Whenua Kaitiaki Forum, and the Mana Whenua Artist selected to work with the design team on the bridge.

4125

FFL 81070

TOP OF LIFT PARAPET

There has been ongoing engagement with Mana Whenua, resulting in: FFL 76350

12475

BRIDGE LEVEL

– Engagement begun with Mana Whenua appointed artist, Tessa Harris.

6350

6350

– Mana Whenua Artist Brief Written FFL 70000

2025

2025

WYNYARD ROAD LEVEL

FFL 67975

PORTERS AVENUE LEVEL

PORTERS AVENUE C L

C L

1

1 : 125

AUCKLAND COUNCIL STAMP

Plan Detail

EAST ELEVATION

Filename:

– Opportunity to work with artist to develop the materiality and look/ feel of bridge, artistic designs to be added to bridge to embellish the narrative.

WYNYARD ROAD

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING

Images: ORIGINAL SIZE

CLIENT THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION There is an opportunity for the AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED 4 INCORPORATED IN THE CONSTRUCTION AND ANY CONDITIONS OF THE CONSENT narrative to be embodied in the DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE bridge architecture through the HELD LIABLE. frit CONSENT pattern on KIWIRAIL the DOCUMENT No. FINAL STAGE Cwhite - FORceramic BUILDING glazed façades of theCONSENT lift. SCALE SIZE APPROVAL BUILDING PROJECT

AU

3

2

Plot Date: 19/06/2020 11:39:32 AM

Office:

A completed Design Package has been submitted to Mana Whenua. The completed Mana Whenua Artist Update has been included in the appendices of this document. Section 4.5 and Appendix D.3 of the Urban Design DWP otherwise address the outcome of consultation with the forum.

CO CK L ST UN AN AM CIL D P

– Design of bridge to incorporate narrative into architectural design.

REV DATE

REVISION DETAILS

1 : 125

DRAWN

Author

CITY RAIL LINK

A1

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) NORTH/EAST ELEVATION - UDA

APPROVED

The design team would workTITLE with a DESIGNED Jasmax local artist to develop this. CHECKED DOCUMENT B. RYDER DATE

PROJECT

Jasmax

CRL

ZONE

NAL

DISCIPLINE

ARC

ELEMENT

000

TYPE

DRG

SHEET

UDA-003

Fig 4.16.1 Diagram showing the Wynyard Rd - Porters Ave elevation of the bridge and indicative zones for possible mahi toi / art work to be incorporated into the design. Fig 4.16.2 Indicative render of the lift at the Wynyard Rd end of the footbridge Fig 4.16.3 Image is of a frit design pattern by artist Tessa Harris (Ngāi Tai Ki Tāmaki), at Ōtāhuhu Station. Fig 4.16.4 Indicative Render of Lift at the Porters Ave end of the footbridge

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 29

REVISION


5. Signage and Wayfinding Concept 5.1

Introduction

The Signage and Wayfinding concept for Porters Avenue Footbridge Bridge has been developed with AT in accordance with Designation condition 47.2(b)(iv). This includes modifications to existing signage where required. This document is used to determine and locate service requirements such as power and comms to support the wayfinding infrastructure. AT will be responsible for the completed graphics and signage in accordance with the current signage and wayfinding design manual and specification requirement. This will be a client supply and install item in the contract. It is recommended that the CRL Porters Avenue Footbridge requirements for Signage and Wayfinding are issued to the AT Contractor to ensure compliance.

5.2

Wayfinding Approach

For details regarding wayfinding principals, suggestions and requirements refer to the following manuals and documents: – AT Transport Design Manual: Signage December 2018 The wider urban realm around the proposed bridge development is coded to fall within the ‘surrounding’ zone, whilst the bridge itself and its immediate surrounds are referred to as the ‘approach’ zone. The objective for this Signage and Wayfinding concept is to integrate the AT signage system with the bridge design, and to provide the minimum signage required to convey maximum information and orientation.

5.3

Staging

This signage strategy addresses the interim stage of the CRL works when Mt Eden Station is closed. It is anticipated that the interim wayfinding and signage strategies for interim construction phasing will be required, this will be supplied by the CRL Alliance contractor. Upon completion a final signage and wayfinding overlay will be supplied by the CRL Alliance demonstrating the connections between this proposal and Fenton St and Maungawhau Station.

The following is divided into 2 parts Part 1 - Surrounding zone - an audit of the existing directional signage in the area Part 2 - Approach Zone : this represents new signage provided as part of these works. The intent of this is to show that there’s an adequate overlay of directional and wayfinding signage for the proposed bridge in its location.

Page 30

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


inio n Ro ad

on D r i ve

nR oad ad n Ro inio

Shad do c

Seht tre S k

t

kS

oc

et

Ncbt POI

Bear Park Early Childhood Centre

Akiraho St Ak

d Ro a Mo

Brothers Brewery

iraho Street

Sylvan Avenu e East Quakers

ue

st enue We AvW n ve Syl ylvnaA Sva t Edwin Stree Kelly S

ad

Ro rd ya

Ro ad

yn

ent

n de tE

W

Cres c

un

Edenva le

treet Mo

Edenvale Park

REVIEW

Station

un

treet ton S n e F

tE de n

I2

n Train

e re BrB

Brentwood Avenue

Mt Eden Railway Station

Ro ad

tre in S

i ni o Dom

et

d ad

Mt Ede

even dvA doA o o o ntw ntw

AAkkee ppiirroo Sttrree S eett

Dom

Sttre auu S a k i k i N

Ed en

n RoI a adn M ck in n inio Dom Ace A ce P Pllaacce e

Seventh-Day Adventist

treet

t

H

lta aSut

in aH

lt au

ito S

ee

No New

d Roa

Horo p

´

t

t

St

d

oa rth R

eet

Aurecon | Mott MacDonald | Jasmax | ARUP

e re

ad Do m in io n Ro

ad Ro Rd a r d ard y ny W y n Wy

s Str

rth

ad

ve n u e rs A v e rte A Por t e r s Po

treet George S

Cha rle

ru Reut e S tr

N

No ew

Ro

St

N

et Sttre uraa S ahur Nggah N

et re St

th

e

Nor

No

ni

New

d Roa

w Ne

in

t

New

th No r

d

oa

R rth

Sri Radha Krishna Mandir POI

M

et

e tre

t

ace

ru Ru

re eSt t ret Sigt h hBt r

t

e tre

rS

de

S atn arene cSht Bun na ha

te ree tSret nS

rr n Te Aitke

st Ea

ig

an ex

Al

c Bu

n tsyty oso MM

ce

erra en T Aitk

et re

e nu

Br Ian Mckinnon Drive Reserve

u ka Ni

Str

St

e Av

et

Auckland Indian Association

iS raert Ktore iS rar Ko

te

a ini

t

tre

tr e et

t rlo

rg Vi

S er

tS

ad Ne w No rth Ro

r we Flo

ay W sle Ha

nd xa

a ilim

a Ch

e Al

Va

Flow Chart

Mo unt

Surrounding Zone

Dom

5.4

Page 31


ad Ne w No rth Ro

t ee

e

M ck

et

tre Shad do c k S

t ee

et

I2

rt e

Mt Ede

rs

n Train

Av

un

Akiraho Street

et Wy

Ace Plac e

ue

ny a rd

nR oad

lta

Station

Mo

en

treet ton S Fen

d

Po

u Ha

tre in S

Mt Eden Railway Station

Ro a

Ian

ad

S tr

rth

tre

ra hu

et re St

et re

a Ng

ni

nD r i ve

in

St

inn o

M

et

an

et

2

Ro

i ni o

ad

Sylvan Avenu e East

4

Dom

treet George S

5

Bre

Brentwood Avenue

ntw

A ood

u ven

8

e

ve Sylvan A

7

nue Wes

Kelly S

ad

Ro rd ya yn

CRL-NAL-ARC-000-RPT-1002

ad

W

REVIEW

Ro

treet

ent

n de tE

ito S

Cres c

un

Edenva le

treet Mo

Edenvale Park

Horo p

t t Edwin Stree

6

Ake pi

ro S tre e t

et

S tr

tre

n ha

re St

N

No ew

Ro

eet

Page 32

S au Nik

ad Do m in io n Ro

d Roa o rt h N New

s Str

´

et

tre

ru Ru

st Ea

S ht

c Bu

n

1

ace Terr n e k Ait

Cha rle

u ka Ni

re St

t

et re

e nu

ig Br

Ian Mckinnon Drive Reserve

ee

St

iS rar Ko

te

e Av

et

tr e et

Str

t rlo

t

tre

tS

a ini

sle Ha

S er

rg Vi

nd xa

Directional

r we Flo

ay W

a Ch

e Al

Va

Legend

a ilim

Sign Diagram

tE de n

5.4.1 Surrounding Zone

Project 219064 | 17 July 2020 | Revision 1


5.4.2 Surrounding Zone

Zone

Sign Ref

Location

Sign Type

Sign Subtype

Panels / Sides

Content

Mounting

Int/Ext

Services

Comment

Surrounding

SZI

Great North Road

Directional

Driver Direction Large Pedestrian Blade

1

– Pedestrian & Cycle Bridge xxmins

Lamp Post

Ext

No

Complete During Audit

Surrounding

SZ2

Corner Porters Avenue & Great North Road

Directional

Small Pedestrian Blade

2

– Pedestrian & Cycle Bridge xxmins – To Ncbt

New Shared Cycle & Pedestrian Route Post

Ext

No

Complete During Audit

Surrounding

SZ4

Brentwood Ave & Wynyard Road

Directional

Driver Direction and Small Pedestrian blade

1

– Pedestrian & Cycle Bridge xxmins – To New North Road

Lamp Post

Ext

No

Complete During Audit

Surrounding

SZ5

Dominion Road & Brentwood Avenue

Direction

Driver Direction and Small Pedestrian blade

2

– Pedestrian & Cycle Bridge xxmins - To Mt Eden Train Station via Sylvan Ave West

Lamp Post

Ext

No

Complete During Audit

Surrounding

SZ6

Brentwood Avenue

Directional

Driver Direction and Small Pedestrian blade

2

– Pedestrian & Cycle Bridge xxmins - To Mt Eden Train Station via Sylvan Ave West

Lamp Post

Ext

No

Complete During Audit

Surrounding

SZ7

Sylvan Ave W & Wynyard Road

Directional

Small Pedestrian blade

1

– Pedestrian & Cycle Bridge xxmins

Lamp Post

Ext

No

Complete During Audit

Surrounding

SZ8

Corner Mt Eden Road & Sylvan Ave E

Directional

Small Pedestrian blade

2

– Pedestrian & Cycle Bridge xxmins

Lamp Post

Ext

No

Complete During Audit

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 33


Approach Zone

Flow Chart

Haultain Street

5.5

Wynyard Road

Fenton Street NO ACCES S TO TRAIN

Porters Avenue

Page 34

REVIEW

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


5.5.1 Approach Zone Sign Diagram

Legend

Directional ID Orientation Behavioural Information

8

6

5

(Driveway)

Haultain Street

Regulatory

4

3

1

Wynyard Road Porters Avenue

Fenton Street Fenton Street NO ACCES S TO TRAIN

9

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 35


5.5.2 Approach Zone

Zone

Sign Ref

Location

Sign Type

Sign Subtype

Panels / sides

Content

Mounting

Int/Ext

Services

Approach

AZI

Ground Level Porters Avenue

Orientation / ID

PTo020 Gateway Plinth

2

Porters Ave Footbridge Eden Terrace

Free Standing

Ext

No

Approach

AZ3

Lift - Porters Avenue, Ground Level

ID

PTid162-1PTid163 Wayfinding

1

To Bridge Level To Wynyard Road

To Lift Structure

Ext

No

Approach

AZ4

Lift - Porters Avenue, On Bridge

ID

PTid162-1PTid163 Wayfinding

1

To Ground Level To Porters Avenue

To Lift Structure

Ext

No

Approach

AZ5

Lift - Wynyard Road, On Bridge

ID

PTid162-1PTid163 Wayfinding

1

To Ground Level To Wynyard Road

To Lift Structure

Ext

No

Approach

AZ6

Lift - Wynyard Road, Ground Level

ID

PTid162-1PTid163 Wayfinding

1

To Bridge Level To Porters Avenue

To Lift Structure

Ext

No

Approach

AZ8

Ground Level Wynyard Road

Orientation / ID

PTo020 Gateway Plinth

2

Porters Ave Footbridge Eden Terrace

Free Standing

Ext

No

Approach

AZ9

Corner Fenton Street and Wynyard Road

Orientation

PTo020 Gateway Plinth

2

Porters Ave Footbridge Eden Terrace

Free Standing

Ext

No

Page 36

REVIEW

Comment

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


5.5.3 Approach Zone Indicative Visual

Wynyard Road Street Level

6 8

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 37


5.5.4 Approach Zone Indicative Visual

Porters Avenue Street Level

1

Page 38

REVIEW

3

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


6. CPTED Review 6.1

CPTED Review Commentary Recommendation 1

Recommendation 3

Provide design features identified for Option 2, including: generous pedestrian spaces for Fenton Street, good approaches from Porters Avenue/ Wynyard Road and Ngahura Street with direct access to the over-bridges and potentially replace 1 & 3 Fenton Street with a new apartment building.

Locate the over-bridges and elevator buildings to maximise surveillance and enhance use as part of a through route; use them to form prominent cues (including at night), and provide generous spaces around them as landings for orientation (and visibility into/out of Fenton Street)

Design Response

Design Response

– The proposed apartment development at 1-3 Fenton Street will be beneficial from a CPTED perspective. It would enhance the residential street character, increase passive surveillance, increased public ownership of spaces and improved visibility of Fenton Street from Wynyard Rd.

Foot way approaches are direct from Porters Avenue and Wynyard Road. CRL has earmarked 1-3 Fenton St as a development site post CRL. Refer to the C5 Contract Fenton St Bridge Designer for shared space concept on Fenton Street.

The lift facade are proposed to be laminated glazing with a fritted interlayer, including the facade facing the building at 5 Porters Avenue. Note the lift car is not fully glazed for to The scale of the lifts and stairs is such that suitable recognisable cues are provided. Refer to the landscape plans for the proposed areas surrounding.

– Further attention is required to avoid entrapment issues at the end of Porters Ave and Ngahura Streets. (Refer to Design Response for Porters Avenue Footbridge in Recommendation 2 in this commentary)

Recommendation 2

Recommendation 4

Design the space as a thoroughfare rather than a place to linger; alternatively provide activity generators that support places to sit and rest and/or promote future activities that provide use and direct interaction between the adjacent properties and station/street.

Pay attention to design at eastern end to optimise the location of the overbridge and exit, with consideration of the location of the emergency space/access, and access to/through the service yard at 13 Akiraho Street

– Both options improve the quality of the public realm from the current state

Design Response

Design Response

Further to the above findings the following summary of recommendations were to be considered in subsequent stages with regards to the Porters Ave footbridge.

The approach has been to define the space as a thoroughfare, but some seating in the form of basalt boulders is proposed for informal waiting to mitigate the extents of bollards required to protect the bridge from vehicle impact. The design allows for good sight-lines to the bridge deck as well as at street level, through passive surveillance from nearby apartments. The lighting has been designed to ensure adequate lighting to the area around the bridge, as well as incorporation of CCTV cameras to all areas of the bridge.

Not applicable to this scope. Refer to the C5 Contract Fenton St Bridge Designer

A Crime Prevention Through Environmental Design assessment was conducted in May 2014 as part of the Definition Design phase for Mt Eden Station. Ref report Architecture and Planning Definition Design Report: Mt Eden – Fenton St Public Realm CPTED Assessment (CRLMTE-URB-RPT-004) Several options were reviewed, and a final recommendation made in the form of the layout of Fenton and Porters Avenue Footbridges as proposed in the current Reference Design. This report identified key findings as follows:

– The location of transport related elements (pedestrian bridges) are negligible between options from a CPTED perspective.

A final CPTED Summary was provided by the CPTED Reviewer and is included in the appendices for information.

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 39


Recommendation 5

Design Response

Recommendation 10

Seek to provide line of sight from the station to Fenton Street and avoid placing elements where they may screen the station or route (including trees)

Wayfinding provided in accordance with the AT Signage and Wayfinding Manual, refer to Signage and Wayfinding section of this report. CCTV coverage will be provided in accordance with CRLL requirements for Stations and Station Precincts. We recommend a follow up review for Porters Ave. Refer to C3 Contractor for Ngahura St.

Consider business requirements, including vehicle manoeuvring and visitor parking, while providing a safe pedestrian route.

Recommendation 8

All adjacent crossing points have been retained - refer to roading engineers for traffic safety assessments.

8. Promote surveillance from adjacent buildings (including active use of the ground level and street frontage); limit removal of balconies from 6 Porters Avenue as far as possible.

Recommendation 11

Design Response Not applicable to this scope. Refer to the C5 Contract Fenton St Bridge Designer. Trees proposed near Porters Avenue Footbridge have high canopies to ensure clear sight-lines are maintained. Recommendation 6 Minimise the dominance of the railway infrastructure as far as possible e.g. by making the pedestrian access the route visually interesting and providing a partial screen/buffer to tracks; ensure fencing detail is coordinated while maintaining through views and passive surveillance from adjacent buildings Design Response Haultain and Fenton Streets enjoy an elevated position relative to the adjacent parallel rail lines. Fencing designs to be considered in the next stage and coordinated by the C5 Fenton St Bridge designers Recommendation 7 Ensure the approach routes incorporate appropriate information on way-finding, facilities, and contact details for reporting incidents/ maintenance; consider providing CCTV and/or a telephone or panic button for emergency situation; include upgraded street lighting; carry out further CPTED assessment of Porters Avenue and Ngahura Street.

Page 40

Design Response Passive surveillance will be possible from adjacent occupied buildings but will require some screening for apartment users privacy from the bridge deck. 1-3 Fenton St will have opportunity to promote street activation as future development site. As we understand it, 6 Porters Ave Balconies will be retained - TBA by CRLL.

Design Response

Ensure spaces between building frontages and the street are integrated into the design, and spaces between buildings are fenced off at night; review the design at the eastern end of Fenton Street and liaise with 13 Akiraho Street to avoid potential use of the yard for entrapment; alternatively seek to create a safe through-site link. Design Response

Recommendation 9

Not applicable to this scope. Refer to the C5 Contract Fenton St Bridge Designer.

Remove visual clutter as far as practicable and ensure street signs are legible; avoid having places where rubbish bins and other objects are stored/left on the street.

Recommendation 12

Design Response There is no street furniture proposed. Basalt boulders, designed by a mana whenua artist are proposed outside the lifts on Porters Avenue and Wynyard Road to be used as a form of “passive blocking�.

REVIEW

Consider whether the area will need to accommodate large crowds and whether the elements are appropriately sized. Design Response Large event crowds are not anticipated in this area. It is anticipated that there is a small pedestrian catchment using the Porters Ave Footbridge.

CRL-NAL-ARC-000-RPT-1002 Project 219064 | 17 July 2020 | Revision 1


7. Community Liaison Feedback 7.1

Actions following Consultation

A Community Liaison Group presentation was undertaken under the direction of the Link Alliance on 27 May 2020. A copy of this presentation is included in the 'Porters Avenue Footbridge Urban Design Delivery Work Plan' of which this report forms a part. Subsequent consultation with interested parties has occurred after this presentation, the owner of No 5 Porters Ave. Areas identified in consultation with the owner of No 5 Porters Ave are: – Balustrade perforation design and the potential for transparency in the opening sizes forming the perforation pattern – Glazed lift graphic design and the potential for transparency in the design of this graphic as applied to the lift – Solar shading impact on No 5 Porters Ave in particular, execution of solar shading diagrams for information. Further review of the design was undertaken, the findings of which are included in the appendices of this report ref. CRL-NAL-ARC-000MEM-1001 Porters Ave Foot Bridge - Matters Relating to No 5 Porters Ave. In summary we came to the following conclusions: – The technical constraints and client requirements for the design of openings in the balustrade offered limited scope for significant changes. – The transparency of the graphic design for the lift shaft also has technical constraints and had been maximised – Adjustments to the permeability of the balustrading and lift graphic would have limited influence of the amount of shade from the bridge cast on to No 5 Porters Ave.

Aurecon | Mott MacDonald | Jasmax | ARUP

REVIEW

Page 41


Appendix B - Mana Whenua Artist Update

Page 25

| Mt Eden Main Works


Auckland City Rail Link In association with:

Western Line - Single Line Enable Works Porters Avenue Footbridge Mana Whenua Artist Update DRAFT 19 June 2020

INTERNAL WORKING DOCUMENT COMMERCIAL IN CONFIDENCE


BOUNDARY

REVIEW

3 PORTERS AVE

FFL 81070

TOP OF LIFT

FFL 76350

BRIDGE LEVEL

6350

PORTERS AVE

Mana Whenua Artist Opportunities

FFL 70000

WYNYARD ROAD LEVEL (TBC) PORTERS AVENUE LEVEL

2025

1.1

FFL 67975

2

1 : 125

Plan Detail

3570

NORTH ELEVATION (PORTERS AVE)

Non-structural Balustrade elements, made of a mesh. Could be a perforated steel with patternation through it.

Within this project there were several architectural components that were initially identified where we wanted to work with a Mana Whenua Artist, to integrate an embodied expression of the narrative. 1

FFL 81070

TOP OF LIFT

The key component, and most visible features were the bridge span, and the glass fritting design on both lift shafts. These aimed to ground the identity of the bridge and connect it back to the wider narrative associated to Maungawhau Station - particularly the relationship to the Volcano, Matāoho, and Karā (Basalt) found on the site. As you will see on the following page.

FFL 76350

6350

6350

BRIDGE LEVEL

FFL 70000

2025

2025

WYNYARD ROAD LEVEL

WYNYARD ROAD Filename:

1

1 : 125

Plan Detail

EAST ELEVATION

PRELIMINARY KIWIRAIL DOCUMENT No. CLIENT

At the time of writing this Urban Design Assessment report, there has been ongoing engagement with Mana Whenua, resulting in: – Mana Whenua Artist Brief Written

PORTERS AVENUE

C L

C L

Office:

This will continue to be developed in conjunction with the Mana Whenua Kaitiaki Forum, and the Mana Whenua Artist selected to work with the design team on the bridge.

PORTERS AVENUE LEVEL

Plot Date: 17/01/2020 3:30:24 PM

Other opportunities are the plant room walls & non-structural balustrade elements all made of mesh, on the Porters Avenue side.

FFL 67975

REV DATE REVISION DETAILS

APPROVAL

SCALE

1 : 125

DRAWN

Author

CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK. NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING. FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR VERIFICATION OF MEMBER SIZES

ORIGINAL SIZE

SIZE

A1

PRELIMINARY

NOT FOR CONSTRUCTION

CITY RAIL LINK

PROJECT

PORTERS AVENUE FOOTBRIDGE NORTH/EAST ELEVATION - UDA

APPROVED DATE

DESIGNED

TITLE

Designer

CHECKED

Checker

Approver

DOCUMENT

PROJECT

CRL

ZONE

NAL

DISCIPLINE

ARC

ELEMENT

000

TYPE

DRG

SHEET

UDA-003

– Engagement begun with Mana Whenua appointed artist, Tessa Harris. – Design of bridge to incorporate narrative into architectural design – Opportunity to work with artist to develop the materiality and look/ feel of bridge, artistic designs to be added to bridge to embellish the narrative

Figure 1.

Diagram showing the Wynyard Rd - Porters Ave elevation of the bridge and indicative zones for possible mahi toi / art work to be incorporated into the design.

Figure 2. Indicative render of the lift at the Wynyard Rd end of the footbridge

2

3

4

Figure 3. Image is of a frit design pattern by artist Tessa Harris (Ngāi Tai Ki Tāmaki), at Ōtāhuhu Station.

Figure 4. Indicative Render of Lift at the Porters Ave end of the footbridge

There is an opportunity for the narrative to be embodied in the bridge architecture through the white ceramic frit pattern on the glazed façades of the lift. The design team would work with a local artist to develop this.

Page 2

Project 219064 | 19 June 2020 | Revision A

REVISION


REVIEW

1.2

Whakapapa of the Site

From west along the North Auckland Line towards Maungawhau station, two new bridges are to be built: Porters Ave and Fenton Ave; heading away from Maungawhau North (along the current rail line toward Britomart) Mount Eden Bridge is to be updated, and Normanby Road Bridge is new; there is also a new bridge at Ruru St, collocated to Maungawhau station, will also be built and is not over a rail line.

5

6

TE

O WA

N

TIR UI O

IWA

TE

In earlier consultation with Mana Whenua, the Fenton Rd and Porters Ave bridges were associated to the pūrakau / narrative of the patupaiarehe Hui and Wairere that lived in Te Waonui o Tiriwa (the Waitakere Ranges) and Te Ngahere o Kohukohunui (the Hunua Ranges), respectively. Recent engagement with Mana Whenua has led to a desire to more strongly locate the narrative within the local context of Maungawhau, as it has a rich history to draw from.

VIEW SHAFT TOWARD

NG

AH

ER

E

O

KO

HU

KO

HU

NU

I

MAUNGAWHAU

7

FL OW ER

RE

ET

ST

RE

RU

ST

RU

These bridges are conceived of as being a part of the ‘whānau’ of Maungawhau station and will all whakapapa back to the parent narrative of Matāoho, and Matāoho’s specific relationship to Maungawhau volcano and surrounding area.

ET

AH UR AS T

(Mana Whenua need to add any further kōrero here, in relation to Matāoho, and/or the states of Matāoho, and particularly in relationship to the ahuatanga being expressed within the bridges as thresholds towards the station).

N

U IKA

RO

A

X DE

TE

NS

ION

AU

RO

AD T REE I ST RAR KO

NG

NIK

K OC DD SHA

EET STR

PO ER VE SA NU

ET E

XTE

NSIO

E

N

F

Figure 5. View Shaft along Porters Ave toward Maungawhau

ET

ST

RE

ET

R YA D RO

HA

IN TA UL

AD

TE NGAHERE O VIEW SHAFT TOWARDS MAUNGAWHAU

Aurecon | Mott MacDonald | Jasmax | ARUP

MT

RE

YN

Diagram demonstrating proposed bridges and their relationship to Maunagawhau

ST

W

Figure 7.

ON

TE WAONUI O TIRIWA

Figure 6. Aerial highlighting view shafts / narrative threads which fall along site.

T EN

ED

EN

U ST RE

AD

RT

RUR

RO

As the following diagram will demonstrate, the four bridges that radiate out from Maungawhau station over the rail line could be conceived of as thresholds or tomokanga moving towards / away from the station. Thus, marking your journey towards Matāoho.

KOHUKOHUNUI

Page 3


REVIEW

1.3

Whakapapa of the Arawhata (bridges) to Maungawhau Station Porters Avenue Footbridge Fenton St Bridge Maungawhau Threshold 2. Liquid Station Threshold 1. Solid State State - Volcanic / Karā, heavily crafted tool Matāoho Lava Flow, organic

Ruru Street Bridge (not over rail)

Mount Eden Bridge Threshold 3. Liquid State - TBC

Normanby Bridge Threshold 4. Solid State - TBC

At a high-level, each of the bridges relate to the following characteristics: Porters Ave: Karā (basalt), as a material it’s relationship back to the state of Matāoho post-volcanic activity and use as tools particularly as toki. (needs expansion as a narrative) – Fenton St: Lava flows and the liquid state of Matāoho, organic movement etc. – Mount Eden Rd: TBC Road

w

Ne

Ro

N

ad Ro en Ed Mt

While Mount Eden Rd, Normanby Rd and Ruru St Bridges have unconfirmed narratives associated, there is presently a recommendation that the Mount Eden Rd bridge might have a similar narrative to the Fenton St Bridge. Following the same mirroring logic the Normanby Rd Bridge might be similar to Porters. This is to conceptually radiate out from Maungawhau, and therefore the bridges on the flip side (east of Maungawhau Station) of the NAL could mirror the narratives of the bridges to the west of Maungawhau Station.

inion

– Ruru St: TBC

ad

th or

Dom

– Normanby Rd: TBC

View to Maungawhau

Page 4

Project 219064 | 19 June 2020 | Revision A


REVIEW

1.4

Precedent Imagery and Form

9

8

Karā (basalt), is a fine-grained, dark charcoal-black stone. Karā occurs when hot lava flow meets the earth’s surface or a mid-ocean ridge and is cooled. The cooling can occur over a number of days, or weeks depending on the thickness of the lava flow. Thickness and cooling time also effects density of the karā. Karā is a plentiful stone in Tāmaki Makaurau, and columnar karā is found around Aotearoa, and was used in the fashioning of many tools for Māori. Tools such as toki (adze), or whao (chisels) had many uses. Within the context of Maungawhau large toki made of karā would have been used for the significant earth works done to shape Maungawhau, as well as dig, and maintain the rua (kumara) pits that fed the surrounding peoples.

11

10

Toki are tools that were used for everything from earth works and kai preparation, for waka and whare building, as adornments to be worn around the neck, and in metaphorically in whaikōrero to indicate the skill and knowledge of the speaker. The toki is a versatile tool Conceptually, the Porters Avenue Footbridge conceives of the bridge element as a toki. A new tool of the maunga. Solid, carved with careful honing and chamfering that angles on its underside and up around the balustrade. The piers hold the precious object in the air, above the train tracks and people who will pass under it. And the translucent lift shafts act as pou / whakawae that illuminate the arawhata, as a threshold.

Auckland Council

Creative Studio Presentation

12

11

The bridge remains pure in form, and a dark charcoal-black colour. Where the whakawae - that is the lift – are adorned, telling the story of karā, Matāoho and Maungawhau.

Figure 8. Te Papa Toki Figure 9. Karā Whao / Basalt Chisel. Source: Te Papa. https://collections.tepapa.govt.nz/object/164669 Figure 10. Basalt toki. Source: https://www.dunbarsloane.co.nz/artefacts-0 Figure 11. Auckland Council Creative Studio Presentation Source: Public Arts Concept Report, December 2017 Figure 12. Brett Graham Artwork. Source: Two Rooms. https://tworooms.co.nz/artists/brett-graham/#

Aurecon | Mott MacDonald | Jasmax | ARUP

Copyright © 2017

Page: 193

Page 5


REVIEW

1.5

Development of Mahi Toi Across Porters Ave Footbridge

The development of the narrative the Porters Ave Footbridge has centralised the importance of the relationship of karā (basalt), the toki (sometimes made of basalt), the notion of the bridge span being sculpted like a new tool ‘of the maunga’ - as if to be a toki fashioned of karā from maungawhau.

1.

Non-structural perforated balustrade - this balustrade has a punched hole pattern in it that related to the glass fritting design

2. Glass Frit design - wrapped around all sides of the glass on both lift shafts on Porters Ave and Wynyard Rds.

13

The next important features are that of the lift shafts that act like pou, and are the ‘binding’ elements that ‘hono’ or join the bridge to the earth/its site. The design features a cross binding design, and relates to Ranginui and Papatūānuku, and Maungawhau, through the specific motif patterns expressed in the triangle formations. All other punch patterns, and forms are integrated designed to accentuate this narrative. The four key mahi toi expressions can be found in this image, being: 1. Non-structural perforated balustrade 2. Glass fritting design on the lift shafts 3. Earthing and bonding shield 4. Karā boulders. PORTERS AVENUE

The following pages will explain the design of these features further.

WYNYARD ROAD Figure 13. Diagram showing the Wynyard Rd - Porters Ave elevation of the bridge and indicative zones for possible mahi toi / art work to be incorporated into the design.

4. Karā Boulders - Karā (Basalt) Boulders from the CRL project will be re-purposed with the guidance of the Artist. Treatment of these pieces are yet to be determined.

Page 6

3. Earthing and Bonding Shield - this is a Stainless Steel shield, permanently wrapped around the underside of the bridge, with a punched pattern through it.

Project 219064 | 19 June 2020 | Revision A


REVIEW

1.6

Mahi Toi - Glass Frit

The main element of the bridges, that was designed first, was the Glass fritting that will be featured on all sides of both glass lift shafts, on Porters Ave and Wynyard Road. The concept of these sketches are that in using the narrative of the bridge representing a karā toki / whao, that it would be bound in parts. So she has conceptualised the lifts and stairs as being bound to the lift shaft using ‘cross binding’. These are two of Tessa’s original sketches to test some of the following ideas out. They have since developed into the final design (on the following pages), and have influenced the punched pattern designs on both the earthing and bonding shield, and the balustrade.

Aurecon | Mott MacDonald | Jasmax | ARUP

Page 7


REVIEW 1

2

1181

WA

2

1181

FFL 81070

TOP OF LIFT

APPROXIMATE LOCATION OF EXISTING BUILDING

PC

RL 81050

9275

FFL 76350

9175

6350

4720

BRIDGE LEVEL

BRIDGE LEVEL

4933-4.1 - ALUMINIUM BALUSTRADE PC PERFORATED - PRECAST REINFORCED SAFETY SCREEN CONCRETE STAIR. SURFACE ETCHED FOR NON-SLIP PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN -POTENTIAL MANA WHENUA ARTIST DESIGN PERFORATED ALUMINIUM 3130-4.2 BALUSTRADE SCREEN 4mm PRECAST CONCRETE STAIR - REFER TO THICKNESS @ 1140mm CTRS TBC. STRUCTURAL ENGINEERS FIXING AT 200CONCRETE CRS, PERFORATED PRECAST STAIR. SURFACE COATED PATTERN TO BE DESIGNED WITH WITH FLOWCRETE FOR NON-SLIP ARTIST, WITH ANTI-GRAFFITI 4933-4.1 COATING PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN HR1 - STAINLESS STEEL HANDRAILS PERFORATED ALUMINIUM BALUSTRADE SCREEN 5mm THICKNESS @ 1140mm CTRS TBC. FIXING AT 200 CRS, PERFORATED PATTERN TO BIKE RAMP ONE SIDE BE DESIGNED WITH ARTIST, WITH ANTI-GRAFFITI COATING

RL 81050

1500 CLEAR. 1000 MIN

PORTERS AVE

FFL 70000

(TBC) PORTERS AVENUE LEVEL

FOLDED WELDED STEEL CANOPY -SUPPORTED OFF CW- ZINC SPRAY - SHOP SPRAYED PAINTED LIGHT GREY

2025 6350

WYNYARD ROAD LEVEL

FFL 67975

NOTE: • REFER TO 1400 SERIES FOR LANDSCAPE DRAWINGS CIVIL ENGINEERS AND LANDSCAPE FOR • REFER TO DISCLAIMER ALIGNMENT: ALL SURFACE LEVELS, TREATMENTS AND DETAILS, EXCEPT FORISAROUND LIFT. / RELATIVE TO TRACK SOFFIT LEVEL GOVERNED • BRIDGE

4924-4.4 STAINLESS STEEL - HANDRAILS AND BALUSTRADES

FFL 70000

WYNYARD ROAD LEVEL

GRAFFITI GUARD ON GLASS EXTENT

2025

(TBC) PORTERS AVENUE LEVEL

LEVEL AND ALIGNMENT DISCLAIMER ALIGNMENT: LEVEL IS SET BY THE ALIGNMENT FILE • CURRENT "CRL-SYW-ALI-MD3-PUB-PTA-ALIGNMENT DR9.Dwg" AND SOFFIT LEVEL @ IS GOVERNED / RELATIVE • BRIDGE FROM AURECON 9THDEC 2019 CONFIRM BRIDGE • EMAIL TO TRACK LEVEL ANDRL74.85m ALIGNMENT SOFFIT LEVEL SET AT • CURRENT LEVEL IS SET BY THE ALIGNMENT FILE: 'CRL_SYW_ARC_000_MD3_ALLIANCE ALIGNMENT_v1_R18.rvt; "CRL-SYW-ALI-CKAMOD-100001.Dwg" FOR CLEARANCE TO RHL'S AND OHLE

BIKE RAMP ONE SIDE

FFL 67975

Elevation

NORTH ELEVATION (PORTERS AVE) 4211TS THERMOSASH CURTAIN WALLING

- TOUGHENED LAMINATED CWCW - TOUGHENED LAMINATED GLAZED CURTAIN WALL GLAZED CURTAIN WALL TO TO LIFTSHAFT, WHITE CERAMIC FRIT LIFTSHAFT, WHITE FRIT TO SURFACE -POTENTIAL MANA INTERLAYER -POTENTIAL MANA WHENUA ARTIST WHENUA ARTIST

1925

1925

1 1182

2

1182 EARTHING AND BONDING ISOLATION SCREEN. INCLUDES PERFORATION PATTERN TO BE PROVIDED BY MANA WHENUA ARTIST

TOP OF LIFT

1

2000

400

2025 2025

TOP OF TRACK (TBA)

FFL 67975

(TBC) PORTERS AVENUE LEVEL

EQEQ NAL UP MAIN MC40

PANTOGRAPH ZONE

OHLE FALL ZONE

1550

SOFFIT RL 74795

PANTOGRAPH ZONE

NOTE: TOP OF RAIL RL. OHLE FALL TOP OF MAIN RAIL RL. AND CHAINAGE ZONE MAIN AND LOCATION TO BE ADVISED CHAINAGE OHLE FALL LOCATION TO BE ZONE RLADVISED 68598 TOP-REFER OF RAIL TOP OF TRACK (TBA) DISCLAIMER RL 68598 TOP OF RAIL

TOP OF TRACK (TBA)

EQEQ MC10

TEMP UP MAIN MC40

EQEQ

C L

Filename:

C L

REFER TO SERVICES ENGINEER

C L

AUCKLAND COUNCIL STAMP

Elevation

EAST ELEVATION 1 : 125 Elevation EAST ELEVATION

PRELIMINARY

Office:

KIWIRAIL DOCUMENT No.

Page 8

CLIENT

CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK.

REV A B C D

DATE 07-08-19 01-11-19 19-11-19 03-12-19

REVISION DETAILS PRELIMINARY DESIGN (STAGE A) 25% DETAILED DESIGN 50% DETAILED DESIGN 60% DETAILED DESIGN

APPROVAL

SCALE

1 : 125

DRAWN

Jasmax

SIZE

A1

PRELIMINARY

NOT FOR CONSTRUCTION

PROJECT

APPROVED DATE

TITLE

THESE DRAWINGS ARE ONLY "FOR CONSTRUCTION" STATUS UPON RECEIPT BUILDING| CONSENT APPROVED ProjectOF 219064 19 JuneAND 2020 | Revision A AND STAMPED DRAWINGS FROM AUCKLAND COUNCIL AND UPON INSTRUCTION FROM THE CLIENT AND ENGINEER TO PROCEED.

AU

Office:

CRL TOP OF TRACK (TBA)

RECESSED FIRE ALARM PANEL - REFER TO SERVICES ENGINEER RECESSED MIMIC PANEL -

GRAFFITI GUARD ON GLASS EXTENT

Filename:

1101

4/2020 11:10:44 PM

Plot Date: 10/02/2020 4:56:50 PM

1 : 125

3415-4.1 STEELWORK- REFER TO STRUCTURAL ENGINEER FABRICATED PAINTED STEEL PIER SHROUD - REMOVABLE FOR MAINTENANCE ACCESS

PORTERS AVENUE FOLDED WELDED STEEL CANOPY -SUPPORTED OF CW- ZINC SPRAY - SHOP SPRAYED PAINTED LIGHT FOLDED WELDED STEEL CANOPY GREY -SUPPORTED OFF CW- ZINC SPRAY - SHOP SPRAYED PAINTED PERFORATED ARCHITECTURAL LIGHT GREY ALUMINIUM SCREEN 4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED ARCHITECTURAL ALUMINIUM SCREEN

TOP OF TRACK (TBA)

EQEQ

C L

ST2 - FABRICATED STEEL PIER SHROUD

PORTERS AVENUE

2025

OHLE FALL ZONE OHLE FALL TOP ZONEOF TRACK (TBA)

2

2

1550

WYNYARD ROAD LEVEL

PANTOGRAPH ZONE

OHLE ZONE OHLE ZONE

FFL 70000

2

2

1302

400

PANTOGRAPH ZONE

RL 74798

E & B CONNECTION TAGS OHLE ZONE

6350

6350

ST2 - FABRICATED STEEL PIER SOFFIT RL 74890 SHROUD 3415-4.1 STEELWORK- REFER TO STRUCTURAL ENGINEER FABRICATED PAINTED STEEL PIER SHROUD - REMOVABLE FOR MAINTENANCE ACCESS

1101

1925

500

2000

RL 74850 BRIDGE SOFFIT

PANTOGRAPH ZONE

52 TOLERANCE

BRIDGE LEVEL

WYNYARD ROAD LEVEL (TBC) PORTERS AVENUE LEVEL

2000

1925

4211TS THERMOSASH CURTAIN WALLING

CW - TOUGHENED LAMINATED CW -CURTAIN TOUGHENED GLAZED WALLLAMINATED TO GLAZEDWHITE CURTAIN LIFTSHAFT, FRITWALL TO LIFTSHAFT, WHITE CERAMIC INTERLAYER -POTENTIAL MANA FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST WHENUA ARTIST

1302

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED ARCHITECTURAL ALUMINIUM SCREEN

FFL 76350

FFL 70000

2000

6197 6200

BRIDGE LEVEL

FFL 67975

400 400

OHLE ZONE

4720

FFL 76350

2000

WYNYARD ROAD PERFORATED ARCHITECTURAL ALUMINIUM SCREEN

OHLE ZONE

4720

1

2000

WYNYARD ROAD

1301

1301

400 2000

GRAFFITI GUARD ON GLASS EXTENT

OHLE ZONE

TOP OF LIFT PARAPET

P1 PY P1 PY

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED - ALUMINIUM BALUSTRADE SCREEN PERFORATED - ALUMINIUM -POTENTIAL MANA WHENUA BALUSTRADE SAFETY SCREEN ARTIST -POTENTIAL MANADESIGN WHENUA ARTIST DESIGN

SURFACE MOUNTED GUARD CONDUCTOR. EARTH AND BONDING SCREEN INCLUDED PERFORATED PATTERN TBC WITH MANA WHENUA ARTIST TEMPORARY PORTION OF E & B SCREEN WITHIN CROSS HATCHED

500

FFL 81070

1

1182

4924-4.1 STAINLESS STEEL - SURFACE MOUNTED GUARD CONDUCTOR. EARTH AND BONDING SCREEN

OHLE ZONE

FFL 81070

WY W1 WY W1

2 1182

6350

1 : 125

Elevation

NORTH ELEVATION (PORTERS AVE)

OHLE ZONE E & B CONNECTION TAGS

1 1101

1 : 125

2025

1 1101

CO CK L ST UN AN AM CIL D P

TOP OF LIFT PARAPET

FFL 76350

PERFORATED - ALUMINIUM BALUSTRADE SCREEN 3 PORTERS -POTENTIAL MANAAVE WHENUA ARTIST DESIGN

BOUNDARY

4720

CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE FRIT INTERLAYER -POTENTIAL MANA 4211TSARTIST WHENUA THERMOSASH CURTAIN WALLING CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO PORTERS AVE LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA FOLDED WELDED STEEL CANOPY WHENUA ARTIST -SUPPORTED OF CW- ZINC SPRAY - SHOP SPRAYED PAINTED LIGHT GREY

RL 79.714 m TOP OF THROWSCREEN AT END RL 78.723 m TOP OF THROWSCREEN AT BR CTR

RL 84559

1500 CLEAR. 1000 MIN

FFL 81070

APPROXIMATE LOCATION OF EXISTING BUILDING

3 PORTERS AVE

12470

PA PX PB

RL 84559

4720

PA PX PB PC WB WA

4720

WC

1181

12525

1

6350

WB

BOUNDARY

WC

1181

CITY RAIL LINK

PORTERS AVENUE FOOTBRIDGE OVERALL ELEVATIONS - NORTH / EAST


REVIEW

15

14

1

1 : 25

2

Plan Detail

MAHI TOI - GLASS FRITTING - PORTERS AVE

SK-010

Images: CITY RAIL LINK 05/04/20

PREPARED FOR:

Figure 14. Shows full Mahi Toi design. This is the facade of the main Porters Ave lift shaft. Not to scale, however full height insitu is 12m.

1 : 10

Plan Detail

MAHI TOI - GLASS FRITTING - PORTERS AVE1 - Callout 1

PROJECT No. 219064.00

DRAWING

The glass fritting design combines the narratives that relate to Rangi and Papatūānuku, Te Ipu o Matāoho, and the relationship to the use of karā (basalt) SCALE @ A1 As DRAWING No. SK-010 REV. MAHI TOI - GLASS FRITTING PATTERN - PORTERS AVE representative in the hull shape.indicated Conceptually the glass fritting is a cross binding pattern that lashes the bridge to the lifts and stair, and grounds it to the site. Copyright ©

Figure 15. Shows an indication of what the design will look like on the lift shaft facade, in the context of Wynyard Street.

Aurecon | Mott MacDonald | Jasmax | ARUP

Page 9


REVIEW

Detail of what the fritting pattern looks like, with a further zoom in to the left.

Page 10

Project 219064 | 19 June 2020 | Revision A


REVIEW

Aurecon | Mott MacDonald | Jasmax | ARUP

Page 11


1197

REVIEW

1.7

Mahi Toi - Earthing and Bonding Shield

The metal earthing and bonding shield is a pragmatic requirement of the bridge as a result of it’s location above an OHLE (electrified train) line. We are able to perforate the screen with a pattern, and have chosen to extend the ‘cross binding’ concept into the metal shroud. The central ‘shield’ is only temporary, and will come down after the trench is dug for the new train-lines. As such, only the two outer shields are permanent.

E & Band CONNECTION TAGS NNECTION TAGS The design - form and the punch pattern - of the earthing bonding shield have been designed with our Artist to integrate its relationship to the overall narrative of the bridge.

SIKA SEALANT TO E&B GAP 500MM EACH SIDE OF OHLE TO PREVENT DRIPS

MAIN BRIDGE STEEL STRUCTURE

Conceptually these act like to more ‘bound’ elements to the bridge hull, with a punch pattern that continues to accentuate the cross bind pattern on the glass fritting. The form continues to accentuate the sculpted hull shape. The following page includes the design of the punch pattern, if it were to be flattened out.

Central shield is temporary.

Page 12

3D View

Project 219064 | 19 June 2020 | Revision A


MIRROR ALONG THE CENTRE OF THE BRIDGE E&B SHIELD

REVIEW

MIRROR ALONG THE BOTTOM OF HULL

Aurecon | Mott MacDonald | Jasmax | ARUP

Page 13


SLOT SIZES TO MANUFACTURER'S RECOMMENDATIONS AND CONFIRMED BY ENGINEER PRIOR TO MANUFACTURE

45

RHS BALUSTRADE POST

PLAN

4911-4.1 STEEL METALWORK TO BALUSTRADE SUPPORT FRAME

10

REVIEW

CONTINUOUS STEEL ANGLE TOP RAIL WITH COUNTERSUNK BOLTS TO POST CLEATS

100

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN ALUMINIUM PERFORATED PANEL FIXED TO TOP RAIL WITH ALUMINIUM RIVET NUTS M10 DOUBLE SIDED DOME NUT FIXING WITH STAR WASHERS AT 300crs

4911-4.1 STEEL METALWORK TO BALUSTRADE SUPPORT FRAME RHS POST .

FIN CONNECTION PLATE

. .

FOLDED EDGE TO ALUMINIUM PERFORATED PANEL 35 45

SECTION AT TOP RAIL

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN ALUMINIUM PERFORATED PANEL 100

RHS POST

.

FOLDED EDGE TO ALUMINIUM PERFORATED PANEL

UPSTAND

5mm STEEL HANDRAIL FIXED TO RHS PUDDLE FLANGES

.

PERFORATED ALUMINIUM PANEL BEYOND

SHS FOR LIGHTING

BALUSTRADE SUPPORT STRUCTURE. REFER STRUCTURAL ENGINEER'S DRAWINGS

50x2.5 SHS WELDED TO 5mm PLATE TO FORM LIGHTING PANEL

BALUSTRADE SUPPORT STRUCTURE. REFER STRUCTURAL ENGINEER'S DRAWINGS

<10mm

ACCESS PANELS SECURED WITH TAMPERPROOF COUNTERSUNK GALV BOLTS. FINISH TO MATCH BALUSTRADE

HEIGHT VARIES

3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER BALUSTRADE FACADE PANEL

INSET SPOT LIGHTING INTO CIRCULAR HOLE IN SHS AT MIDPOINT OF PANEL. REFER ELECTRICAL DRAWINGS FOR LUMINAIRE TYPE

5mm STEEL PLATE REMOVABLE ACCESS PANEL

<1 7m m

SECTION AT BALUSTRADE

TRADE SCREEN TO RHS POST DETAIL

<

1140 PANEL CENTRES

40

Mahi Toi - Balustrade EQ

EQ

The perforated aluminium balustrades and plant room cladding with follow the frit design use of triangular patterns.

40

10

40 1140

EQ

EQ

4

4

1110

Detail of what the perforation pattern looks like.

35

10

3 Page 14

TRADE SCREEN FOLD SETOUT DIMENSIONS

1 : 10

Section Detail

ALUMINIUM BALUSTRADE SCREEN PERFORATION LAYOUT Project 219064 | 19 June 2020 | Revision A


REVIEW

LEGEND

Mahi Toi - Karā Boulders

TRACK CENTRELINE DESIGNATION BOUNDARY EXTENTS OF WORK

This landscape plan indicates the location of the boulders. Design whether polished, or carved, to be decided by Artist. Boulders will be reused from site and/or the CRL project.

P02-1

CONCRETE GRASS BERM PLANTING AREA RAIL CORRIDOR FENCE

5

HAULTAIN STREET

PROPSED

NOTE: MAINTAIN 3M CLEARANCE BETWEEN GARDEN BED AND HANDRAIL

ASPHALT

LIGHTING TREE STONE ARTWORK

EXISTING PLANTER BED H01

D01

W01

P08

P02-1

H01

P08 WT1

WT1

F01 PA1 GB1

H01

W01 H01

P02-1

P02-2

WT1

D01

TE1-A

K01

LIFT BRIDGE

300

0

WT1

P03 K01 WT1

K01

K02

K01

K01

P05 P01

GB1

P02-2

P05

WYNYARD ROAD

P03

K01

K02 L01 P05

K01

WT1 P02-1 W01

L01

1 NEW FOOTPATH & GRASS BERM TO TIE INTO EXISTING

FENTON STREET UPGRADES REFER TO LINK ALLIANCE DESIGN

P02-1

FENTON STREET

Aurecon | Mott MacDonald | Jasmax | ARUP

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE

CO CK L ST UN AN AM CIL D P

AUCKLAND COUNCIL STAMP

AU

N

1.8

Page 15


REVIEW

Visualisation :

Page 16

Wynyard Rd - Approach

Project 219064 | 19 June 2020 | Revision A


REVIEW

Visualisation :

Porters Ave - Approach

Aurecon | Mott MacDonald | Jasmax | ARUP

Page 17


REVIEW

Page 18

Project 219064 | 19 June 2020 | Revision A


REVIEW

Aurecon | Mott MacDonald | Jasmax | ARUP

Page 19


Appendix C â&#x20AC;&#x201C; Detailed Design Drawings

Page 26

| Mt Eden Main Works


WC WB WA

N WYNYARD ROAD

STAIR

DOOR LOCATION

5

3

1

5

WX 2800 MIN

4

2

DOOR LOCATION

4000 3500 MIN

LIFT

WY DOOR LOCATION

W1

HAULTAIN STREET

FENTON STREET FOR FENTON STREET UPGRADES REFER LINK ALLIANCE DESIGN

NAL UP MAIN - MC40 BRIDGE

DESIGNATION BOUNDARY MC30

cL

TO MT EDEN STATION

TO KINGSLAND STATION

NOTE: • REFER TO 1400 SERIES FOR LANDSCAPE DRAWINGS

MC20

• REFER TO CIVIL ENGINEERS AND LANDSCAPE FOR ALL SURFACE LEVELS, TREATMENTS AND DETAILS, EXCEPT FOR AROUND LIFT.

MC10

ALIGNMENT DISCLAIMER:

DESIGNATION BOUNDARY

• BRIDGE SOFFIT LEVEL IS GOVERNED / RELATIVE TO TRACK LEVEL AND ALIGNMENT • CURRENT LEVEL IS SET BY THE ALIGNMENT FILE: 'CRL-SYW-ALI-LKA-MOD-100001 VERSION E' FOR CLEARANCE TO RHL'S AND OHLE

6

P1 LIFT 1500 1000 MIN

2000

LEGEND

PY

TRACK CENTRELINE DESIGNATION BOUNDARY BOUNDARY

3

PX

EXISTING BUILDINGS

KENNARDS SELF STORAGE AUCKLAND COUNCIL STAMP DOOR LOCATION

Office:

Filename:

STAIR

Plot Date: 2/07/2020 3:38:17 p.m.

PA PB PC 1 1151

1 : 250

1

1101

Plan

FINAL STAGE C - FOR BUILDING CONSENT

SITE PLAN ORIGINAL DRAWING IN COLOUR

ORIGINAL SIZE

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

CLIENT

REV C D E F G H J K

DATE 19-11-19 03-12-19 20-12-19 28-02-20 20-03-20 09-04-20 17-04-20 03-07-20

REVISION DETAILS 50% DETAILED DESIGN 60% DETAILED DESIGN PRELIMINARY - ISSUED FOR INFORMATION FOR PROCUREMENT ONLY DRAFT STAGE C FOR REVIEW WIP FOR LINK ALLIANCE ISSUED DETAILED DESIGN (STAGE C ) UPDATED - ISSUED DETAILED DESIGN (STAGE C )

Internal Only Internal Only Internal Only Internal Only External External External

APPROVAL

SCALE

SIZE

As indicated

A1

DRAWN

Jasmax

BUILDING CONSENT

KIWIRAIL DOCUMENT No. PROJECT

CITY RAIL LINK

APPROVED DATE

DESIGNED

AU CO CK L ST UN AN AM CIL D P

4

PORTERS AVENUE

APARTMENTS

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) PROPOSED SITE PLAN

TITLE

Jasmax B. RYDER B. RYDER

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

ZONE

DISCIPLINE

ELEMENT

TYPE

SHEET

CRL

NAL

ARC

000

DRG

1011

REVISION

K


WYNYARD ROAD No. 5

PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN PLATE STEEL BALUSTRADE AND CLADDING

CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST PERFORATED ALUMINIUM BALUSTRADE SCREEN @ 1140mm CTRS U.N.O. FIXING AT 200 MAX CRS. ANTI-GRAFFITI COATING

No. 3

No. 3 PORTERS AVE

PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN

1

3D View

PORTERS AVE

VIEW FROM PORTERS AVENUE

CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST

No. 5

PERFORATED ALUMINIUM BALUSTRADE SCREEN @ 1140mm CTRS U.N.O. FIXING AT 200 MAX CRS. ANTI-GRAFFITI COATING

2

3D View

Office:

Filename:

VIEW FROM WYNYARD ROAD THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

Plot Date: 2/07/2020 3:39:28 p.m.

WYNYARD ROAD

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

ORIGINAL SIZE

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

REV C D E F G H J K

DATE 03-12-19 20-12-19 28-02-20 13-03-20 20-03-20 09-04-20 17-04-20 03-07-20

REVISION DETAILS 60% DETAILED DESIGN PRELIMINARY - ISSUED FOR INFORMATION FOR PROCUREMENT ONLY DRAFT STAGE C DRAFT STAGE C FOR REVIEW WIP FOR LINK ALLIANCE ISSUED DETAILED DESIGN (STAGE C ) UPDATED - ISSUED DETAILED DESIGN (STAGE C )

Internal Only Internal Only Internal Only Internal Only External External External

APPROVAL

SCALE

SIZE

BUILDING CONSENT

A1 DRAWN

Jasmax

KIWIRAIL DOCUMENT No. PROJECT

CITY RAIL LINK

APPROVED DATE

DESIGNED

AU CO CK L ST UN AN AM CIL D P

AUCKLAND COUNCIL STAMP

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) 3D OVERVIEW

TITLE

Jasmax B. RYDER B. RYDER

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

ZONE

DISCIPLINE

ELEMENT

TYPE

SHEET

CRL

NAL

ARC

000

DRG

1051

REVISION

K


4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN 3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER PLATE STEEL BALUSTRADE AND CLADDING

POWERCOATED ALUMINIUM PARAPET CAP FLASHING

4211TS-4.15 POWDERCOATED METAL ROOF FULLY WELDED WITH UPSTANDS POWDERCOATED ALUMINIUM ROOF FULLY WELDED WITH UPSTANDS ON INSULATED METAL PANEL SUBSTRATE TO FALLS

4211TS THERMOSASH CURTAIN WALLING CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST

4924-4.4 STAINLESS STEEL - HANDRAILS AND BALUSTRADES Ø50mm STAINLESS STEEL HANDRAIL AND FABRICATED STANCHIONS TO ENGINEERS LOADINGS

EDGE OF CUTTING

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED ARCHITECTURAL ALUMINIUM SCREEN 4211TS THERMOSASH CURTAIN WALLING CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST

3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER FOLDED WELDED STEEL CANOPY - SHOP SPRAYED PAINTED LIGHT GREY

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN 4924-4.4 STAINLESS STEEL - HANDRAILS AND BALUSTRADES Ø50mm STAINLESS STEEL HANDRAIL AND FABRICATED STANCHIONS TO ENGINEERS LOADINGS 3130-4.2 PRECAST CONCRETE STAIR - REFER TO STRUCTURAL ENGINEERS PRECAST CONCRETE STAIR. SURFACE COATED WITH FLOWCRETE FOR NON-SLIP 6614FS-4.1 FREEDOM STEPMASTER® SMN 211 NOSING SURFACE MOUNTED FREEDOM TREADMASTER SMN211 STAIR NOSING PROFILE 3130 PRECAST CONCRETE PRECAST CONCRETE BICYCLE STAIR RAMP. 20mm ABOVE SLOPE LINE. SURFACE ETCHED FOR NON-SLIP, CONTRASTING COLOUR TO STAIR

8281FG-4.1 GUIDEMASTER® 60 MM PRECAST CONC HAZARD / WARNING TACTILE PAVER

8281FG-4.1 GUIDEMASTER® 60 MM PRECAST CONC HAZARD / WARNING TACTILE PAVER

7451A ACO HEELGUARD IRON THRESHOLD DRAIN RECESSED MIMIC PANEL - REFER TO SERVICES ENGINEER

AUCKLAND COUNCIL STAMP

PAVEMENT SURFACE - REFER TO LANDSCAPE DRAWINGS

Filename:

PORTERS AVE

Plot Date: 2/07/2020 3:40:10 p.m.

Office:

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

ORIGINAL SIZE

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

REV A B C D E F G H

DATE 03-12-19 20-12-19 28-02-20 13-03-20 20-03-20 09-04-20 17-04-20 03-07-20

REVISION DETAILS 60% DETAILED DESIGN PRELIMINARY - ISSUED FOR INFORMATION FOR PROCUREMENT ONLY DRAFT STAGE C DRAFT STAGE C FOR REVIEW WIP FOR LINK ALLIANCE ISSUED DETAILED DESIGN (STAGE C ) UPDATED - ISSUED DETAILED DESIGN (STAGE C )

Internal Only Internal Only Internal Only Internal Only External External External

APPROVAL

SCALE

SIZE

BUILDING CONSENT

A1 DRAWN

Jasmax

KIWIRAIL DOCUMENT No. PROJECT

CITY RAIL LINK

APPROVED DATE

DESIGNED

AU CO CK L ST UN AN AM CIL D P

8461 STREET FURNITURE

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) 3D STAIRS - PORTERS

TITLE

Jasmax B. RYDER B. RYDER

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

ZONE

DISCIPLINE

ELEMENT

TYPE

SHEET

CRL

NAL

ARC

000

DRG

1060

REVISION

H


4211TS-4.15 POWDERCOATED METAL ROOF FULLY WELDED WITH UPSTANDS POWDERCOATED ALUMINIUM ROOF FULLY WELDED WITH UPSTANDS ON INSULATED METAL PANEL SUBSTRATE TO FALLS

4211TS-4.14 POWDERCOATED ALUMINIUM PARAPET CAP FLASHING 2mm POWDERCOATED ALUMINIUM PARAPET CAP FLASHING 4211TS-4.25 INCORPORATED ELEMENTS MECHANICAL LOUVRES POWDERCOATED ALUMINIUM VENTILATION LOUVRES-3UL SHALLOW

4924-4.4 STAINLESS STEEL - HANDRAILS AND BALUSTRADES Ø50mm STAINLESS STEEL 316 HANDRAIL AND FABRICATED Ø73mm STANCHIONS TO ENGINEER'S LOADINGS

4911-4.4 STEEL METALWORK DOWNPIPE ACCESS CONDUIT FOLDED WELDED STEEL CANOPY - SUPPORTED OFF CW - ZINC SPRAY - SHOP SPRAYED PAINTED LIGHT GREY REFER SPEC

PERFORATED ARCHITECTURAL ALUMINIUM SCREEN PERFORATED ALUMINIUM BALUSTRADE SCREEN @ 1140mm CTRS U.N.O. FIXING AT 200 MAX CRS. ANTI-GRAFFITI COATING

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN

1: 57

FA LL

BALUSTRADE INTERNAL FACADE AND ACCESS PANELS WITH TAMPER PROOF COUNTERSUNK BOLTS. PAINTED TO MATCH HULL. 6745A ALTEX PROTECTIVE COATINGS STEELWORK- REFER TO ENGINEER

1:60 FALL

BRIDGE HULL FLOOR - NON-SLIP HIGHBUILD COATING WITH COLOURED QUARTZ - REFER SPECIFICATION

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED ARCHITECTURAL ALUMINIUM SCREEN

1: 62

PERFORATED ALUMINIUM BALUSTRADE SCREEN @ 1140mm CTRS U.N.O. FIXING AT 200 MAX CRS. ANTI-GRAFFITI COATING

FA LL

3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER PLATE STEEL BALUSTRADE AND CLADDING

5mm ALUMINIUM SOLID CLOSURE PANEL TO MATCH SCREEN FINISH

1:77 FALL

Filename:

SURFACE MOUNTED GUARD CONDUCTOR. EARTH AND BONDING SCREEN INCLUDED PERFORATED PATTERN TBC WITH MANA WHENUA ARTIST

AUCKLAND COUNCIL STAMP

Plot Date: 2/07/2020 3:40:58 p.m.

Office:

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

ORIGINAL SIZE

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

REV A B C D E F G H

DATE 03-12-19 20-12-19 28-02-20 13-03-20 20-03-20 09-04-20 17-04-20 03-07-20

REVISION DETAILS 60% DETAILED DESIGN PRELIMINARY - ISSUED FOR INFORMATION FOR PROCUREMENT ONLY DRAFT STAGE C DRAFT STAGE C FOR REVIEW WIP FOR LINK ALLIANCE ISSUED DETAILED DESIGN (STAGE C ) UPDATED - ISSUED DETAILED DESIGN (STAGE C )

Internal Only Internal Only Internal Only Internal Only External External External

APPROVAL

SCALE

SIZE

BUILDING CONSENT

A1 DRAWN

Jasmax

KIWIRAIL DOCUMENT No. PROJECT

CITY RAIL LINK

APPROVED DATE

DESIGNED

AU CO CK L ST UN AN AM CIL D P

3415-4.1 STEELWORK- REFER TO STRUCTURAL ENGINEER FABRICATED PAINTED STEEL PIER SHROUD - REMOVABLE FOR MAINTENANCE ACCESS

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) 3D STAIRS -WYNYARD ROAD

TITLE

Jasmax B. RYDER B. RYDER

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

ZONE

DISCIPLINE

ELEMENT

TYPE

SHEET

CRL

NAL

ARC

000

DRG

1063

REVISION

H


4211TS-4.14 POWDERCOATED ALUMINIUM PARAPET CAP FLASHING 2mm POWDERCOATED ALUMINIUM PARAPET CAP FLASHING 4211TS-4.15 POWDERCOATED METAL ROOF FULLY WELDED WITH UPSTANDS POWDERCOATED ALUMINIUM ROOF FULLY WELDED WITH UPSTANDS ON INSULATED METAL PANEL SUBSTRATE TO FALLS

4911-4.4 STEEL METALWORK DOWNPIPE ACCESS CONDUIT FOLDED WELDED STEEL CANOPY - SUPPORTED OFF CW - ZINC SPRAY - SHOP SPRAYED PAINTED LIGHT GREY REFER SPEC

4211TS THERMOSASH CURTAIN WALLING CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST

26 PERSON LIFT - SCHINDLER

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN FABRICATED SS 316 CHANNEL DRAIN. 80mm DP TO CONNECT TO CIVIL

7451A ACO HEELGUARD IRON THRESHOLD DRAIN

3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER PLATE STEEL BALUSTRADE AND CLADDING

PROPRIETARY STAINLESS STEEL CHANNEL DRAIN

3415-4.1 STEELWORK- REFER TO STRUCTURAL ENGINEER FABRICATED PAINTED STEEL PIER SHROUD - REMOVABLE FOR MAINTENANCE ACCESS

INSITU CONCRETE WALL - REFER TO STRUCTURAL FOR CONSTRUCTION AND FOOTINGS

3130-4.2 PRECAST CONCRETE STAIR - REFER TO STRUCTURAL ENGINEERS PRECAST CONCRETE - PLAZA STAIR

SOLID ALUMINIUM PANEL CLOSURE WITHIN CURTAINWALL SYSTEM

Plot Date: 2/07/2020 3:41:51 p.m.

Office:

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

ORIGINAL SIZE

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

REV A B C D E F G H

DATE 03-12-19 20-12-19 28-02-20 13-03-20 20-03-20 09-04-20 17-04-20 03-07-20

REVISION DETAILS 60% DETAILED DESIGN PRELIMINARY - ISSUED FOR INFORMATION FOR PROCUREMENT ONLY DRAFT STAGE C DRAFT STAGE C FOR REVIEW WIP FOR LINK ALLIANCE ISSUED DETAILED DESIGN (STAGE C ) UPDATED - ISSUED DETAILED DESIGN (STAGE C )

Internal Only Internal Only Internal Only Internal Only External External External

APPROVAL

SCALE

SIZE

BUILDING CONSENT

A1 DRAWN

Jasmax

KIWIRAIL DOCUMENT No. PROJECT

CITY RAIL LINK

APPROVED DATE

DESIGNED

AU CO CK L ST UN AN AM CIL D P

Filename:

AUCKLAND COUNCIL STAMP

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) 3D STAIRS - WYNYARD ROAD

TITLE

Jasmax B. RYDER B. RYDER

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

ZONE

DISCIPLINE

ELEMENT

TYPE

SHEET

CRL

NAL

ARC

000

DRG

1065

REVISION

H


4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN POTENTIAL MANA WHENUA ARTIST DESIGN 3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER PLATE STEEL BALUSTRADE AND CLADDING 4911-4.2 STEEL METALWORK ACCESS PANELS TO BRIDGE HULL SOLID BALUSTRADE BALUSTRADE INTERNAL FACADE AND ACCESS PANELS WITH TAMPER PROOF COUNTERSUNK BOLTS. PAINTED TO MATCH HULL.

4924-4.4 STAINLESS STEEL - HANDRAILS AND BALUSTRADES Ø50mm STAINLESS STEEL 316 HANDRAIL AND FABRICATED Ø73mm STANCHIONS TO ENGINEER'S LOADINGS

3130 PRECAST CONCRETE PRECAST CONCRETE BICYCLE STAIR RAMP. 20mm ABOVE SLOPE LINE. SURFACE ETCHED FOR NON-SLIP, CONTRASTING COLOUR TO STAIR

4211TS THERMOSASH CURTAIN WALLING CW - TOUGHENED LAMINATED GLAZED CURTAIN WALL TO LIFTSHAFT, WHITE CERAMIC FRIT TO SURFACE -POTENTIAL MANA WHENUA ARTIST

3410-4.1 STRUCTURAL STEEL WORK - REFER TO STRUCTURAL ENGINEER

4933-4.1 PERFORATED - ALUMINIUM BALUSTRADE SAFETY SCREEN PERFORATED ARCHITECTURAL ALUMINIUM SCREEN

FOLDED WELDED STEEL CANOPY - SHOP SPRAYED PAINTED LIGHT GREY

PERFORATED ALUMINIUM BALUSTRADE SCREEN @ 1140mm CTRS U.N.O. FIXING AT 200 MAX CRS. ANTI-GRAFFITI COATING 3mm FOLDED STAINLESS STEEL LIFT SURROUND METALWORK HIGH POLISH FINISH

3130-4.2 PRECAST CONCRETE STAIR - REFER TO STRUCTURAL ENGINEERS

26 PERSON LIFT - SCHINDLER

6614FS-4.1 FREEDOM STEPMASTER® SMN 211 NOSING

4924-4.4 STAINLESS STEEL - HANDRAILS AND BALUSTRADES Ø50mm STAINLESS STEEL HANDRAIL AND FABRICATED STANCHIONS TO ENGINEERS LOADINGS

7451A ACO HEELGUARD IRON THRESHOLD DRAIN PROPRIETARY STAINLESS STEEL CHANNEL DRAIN

Plot Date: 2/07/2020 3:42:34 p.m.

Office:

THESE DRAWINGS ARE FOR "BUILDING CONSENT/ CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR ON-SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK. AURECON, JASMAX, AND MOTT MACDONALD WILL NOT BE HELD LIABLE.

FINAL STAGE C - FOR BUILDING CONSENT CLIENT

ORIGINAL SIZE

THESE DRAWINGS ARE FOR "BUILDING CONSENT/CONSTRUCTION" CONDITIONAL ON COORDINATION AND INCLUSION OF ALL BUILDING CONSENT CONDITIONS RELATING TO THIS PROJECT. THESE DRAWINGS CANNOT BE USED FOR OFF-SITE FABRICATION AND/OR SITE CONSTRUCTION UNTIL A BUILDING CONSENT HAS BEEN GRANTED AND ANY CONDITIONS OF THE CONSENT INCORPORATED IN THE FOR CONSTRUCTION DOCUMENTATION SET. SHOULD THE CONTRACTOR PROCEED WITH OFF-SITE FABRICATION OR ON-SITE CONSTRUCTION PRIOR TO BUILDING CONSENT THEY DO SO AT THEIR OWN RISK, JASMAX WILL NOT BE HELD LIABLE

REV A B C D E F G H

DATE 03-12-19 20-12-19 28-02-20 13-03-20 20-03-20 09-04-20 17-04-20 03-07-20

REVISION DETAILS 60% DETAILED DESIGN PRELIMINARY - ISSUED FOR INFORMATION FOR PROCUREMENT ONLY DRAFT STAGE C DRAFT STAGE C FOR REVIEW WIP FOR LINK ALLIANCE ISSUED DETAILED DESIGN (STAGE C ) UPDATED - ISSUED DETAILED DESIGN (STAGE C )

Internal Only Internal Only Internal Only Internal Only External External External

APPROVAL

SCALE

SIZE

BUILDING CONSENT

A1 DRAWN

Jasmax

KIWIRAIL DOCUMENT No. PROJECT

CITY RAIL LINK

APPROVED DATE

DESIGNED

AU CO CK L ST UN AN AM CIL D P

Filename:

AUCKLAND COUNCIL STAMP

PORTERS AVENUE FOOTBRIDGE (BRIDGE 31B NAL) 3D STAIRS - WYNYARD ROAD

TITLE

Jasmax B. RYDER B. RYDER

CHECKED

Jasmax

B. RYDER

DOCUMENT

PROJECT

ZONE

DISCIPLINE

ELEMENT

TYPE

SHEET

CRL

NAL

ARC

000

DRG

1067

REVISION

H


Appendix D – Record of Consultation D.1 CLG Comments A CLG was held via Microsoft Teams on 27 May 2020 and the comments received and response provided are recorded in Table D-1. Table D-1: CLG Comments and Responses Comment

Response

There will be another bridge 100 metres away - why not just build one?

•

Each bridge has a functional role to fulfil.

•

Porters Ave Bridge Provides connectivity in a north-south direction between Wynyard Road and Porters Avenue and to the east or west along Dominion Road or New North Road. Critically this bridge also has a double function allowing numerous utilities to cross the rail trench.

•

Fenton Street to Ngahura Street bridge provides connectivity to the new station via an extension to Nikau Street. This bridge also provides an emergency escape from the station (NAL platform) without crossing tracks.

•

The wires are not yet fully designed so therefore information was not available for inclusion in the Render.

•

The wires will be similar to those present currently, but relocated above the new track locations.

Have you provided for East-West movements of pedestrians from heavy rail at Mt. Eden Station to buses/light rail running North-South down Dominion Road?

•

Connectivity to Dominion Road is provided through the existing street network. There is currently no certainty regarding light rail.

•

The Station will be designed to connect more directly with Ruru Street in a direction out to Mt Eden Road where a large number of buses go. There is also a connection via Ruru Street up to New North Road where there will be bus stops. There will also be an extension via Nikau Street into Ngahura Street which will provide a connection via Fenton/Porters.

Why does the bridge narrow to a pinch point midway across the tracks?

•

To reduce the bulk of the bridge down as much as possible. Technically the bridge is only required to be 2.5 metres wide, however the lifts at either end add to the width. An alternative design would be for

Why are there no overhead electrical train wires shown on visual renders during presentation?

Page 27

| Mt Eden Main Works


the bridge to be 6 metres wide for its full length, but this would make it too bulky and imposing. The proposed design solution is for the bridge to be pulled it in ‘at the waist’ to reduce the bulk and the appearing size. What environmental impact thought been given to using materials that will reduce visual impact of wear and tear, e.g. soot etc on glass and balustrades?

•

Patterns help a lot. Part of the reason why there is a design on the lift shaft is to help hide the wear and tear. The pattern is embedded between the glass, and the outer layer of the glass has an anti-graffiti film on it as well. This will help hide the scratching of the glass. The balustrade on the stairs also is power coasted with anti-graffiti and will enable it to be cleaned easier. The pattern itself does a lot to hide dirt as it’s not a flat surface so doesn’t show the markings as easily. All the concrete surfaces are coasted so it does stain. We try to use robust materials as much as we can. Auckland Transport have also instructed that they want long life, durable materials which has dictated what we will build the bridge out of.

Will the CCTV cameras cover the area around the pedestrian and vehicle access area of Porters Ave? The reason I ask is we have problems sometimes with tenants dumping furniture they don't want in this area. CCTVs would be a good deterrent

•

There will be 100% CCTV coverage of the bridge. This includes, the stairs, lifts, spaces either side of the bridge and under the bridge.

Page 28

| Mt Eden Main Works


D.2 Affected Party / Affected in Proximity Party Comments The CLG meeting held via Microsoft Teams on 27 May 2020 was open to all affected and affected in proximity parties. The comments received and responses provided are recorded in Table D-2. Table D-2: Affected Parties / Affected in Proximity Parties Comments and Response Comment

Response

The design looks higher and longer than the original (reference) design, far more imposing. Is this absolutely necessary?

•

The challenge has been to satisfy the technical requirements, such as weather and privacy screening, while trying to minimise the height and bulk of the structure. Technical requirements necessitate a 1.8 m high balustrade in the centre of the bridge. There is also a necessity to provide some weather screening at the entrance of the lifts, and for privacy screening for the buildings on either side of the bridge.

•

The design strikes a line from the stairs being the low point, to the lift on the other side being the high point.

•

The visually open design of the perforated balustrade helps to mitigate the ‘heavy look’ a solid panel would create. The visual renders make the bridge look heavier than it will actually appear.

•

The lift in plan is 4.1m x 3.9m. The lift shaft itself is 10 metres high on Wynyard Road, and at the other end it will be slightly different because the land is sloping so it will 12 metres on Porters Avenue.

•

The lift size has been minimised by keeping the machine rooms as small as possible.

•

Watercare and Vector require access to the services for maintenance. This is more easily achieved from on the bridge as provided within the design.

•

Given increased train frequency and the difficulty of accessing the rail corridor, it’s not practicable or safe for network utility operators to only have access to utilities under the bridge span from within the rail corridor.

•

This was considered, however it created issues of proximity of the lift to the kerb,

(raised by Mr Martin van Zonneveld)

What are the three external dimensions of the lifts? (raised by Mr Martin van Zonneveld)

Could all of the services be installed under the bridge span, allowing to have the bridge safety walls to be open mesh pattern rather than solid? Gas and water services look very bulky. (raised by Mr Martin van Zonneveld)

Why is the bridge lift entrance placed near 5 Porters Ave, building, creating an isolated vulnerable entry area? As a woman, the lift should be placed on the

Page 29

| Mt Eden Main Works


other side of the stairs, where it is more visible, offering safer passage

and the entrance would be vulnerable to traffic on that side of the road. •

This design would also mean that there would be a long stair down the side of 5 Porters Avenue itself, which would create its own safety issues forming a narrow space with limited activation, limited overview and a blind corner at the footpath return down Haultain Street. The design provides a level of ‘openness’ and activation reinforcing legitimate usage.

•

An independent safety review of the design has been undertaken by Flow Transportation Specialists Ltd, which concluded the design represents an appropriate balance between road safety and compliance with design principles.

•

The raised table at the intersection helps reduce vehicle speeds to ensure the intersection can be navigated safely, particularly where the road kinks to the right. It also helps pedestrians crossing at road level, especially those coming towards the lifts from Fenton Street.

•

The length of the table is also intended to facilitate larger vehicle movements in terms of accommodating the wheel base length. This allows the front or rear wheels of a large vehicle to get onto the table before dropping down and avoids vehicles ‘bottoming out’.

What real world testing has been done to ensure that full height semi-trailers with 40’ containers on board are able to easily and safely negotiate the turn into and out of Haultain Street from Wynyard Street?

•

While there hasn’t been ‘real world’ testing of the turn, a computer simulation called ‘Vehicle Tracking’, using a large 11.5 metre truck, has been modelled. While tight, the model demonstrates these vehicles can enter and exit the area.

So where are all the people who work in Haultain St supposed to park?

•

The nearest parking is to the south on Wynyard Road and on Brentwood Avenue.

Do you have projected numbers of persons, daily using this bridge?

•

Based on a pedestrian count from 2017, there were approximately 100 people in the morning and afternoon at the peak time who used the crossing.

•

It is anticipated that over time, once the new Mt Eden Station is finished and potential development around the station is

Why has so much emphasis been given to pedestrian access on each side of Wynyard Rd including a crossing table where there is so little pedestrian activity compared to the high level of business vehicular traffic. This crossing table will be a major hassle to heavy vehicle access.

(raised by Mr Martin van Zonneveld)

Page 30

| Mt Eden Main Works


completed, pedestrian numbers will increase. How much land will be taken from 5 Porters Ave on the Wynyard Road and Haultain Street side of the existing building?

•

On the Wynyard Road side there is no land take in respect of the property referred to as ‘5 Porters Avenue’. On the HaultainStreet side of the property there is some relatively minor land take to allow sufficient footpath and road width. This land take is in the order of 600-800 millimetres, however this will be confirmed when the detailed design of the bridge and road layout is finalised.

A full length semi-trailer is up to 22m long. How will that navigate the turn from Wynyard Road into Haultain Street?

•

The design does not provide for a semitrailer of this size to navigate the turn. Such a vehicle will have a larger turning circle than the design allows for and would currently be unable to access properties along Haultain Street without reverse manoeuvring along the street.

Why not remove the elevators, then the bridge will only need to be 2.5m wide? Disabled users would easily be able to use the Fenton/Ngahura Street bridge, 90 metres to the north, and also gain access to the train station. (raised by Mr Martin van Zonneveld)

•

Accessibility for all users across the overbridge is required by Auckland Transport and in accordance with the conditions of the CRL designation. The provision of disabled access across the overbridge avoids severance for those users coming to / from New North Road.

Why have the seats at the base of the stairs that were shown in the reference design been removed? I believe older people might have need of those.

•

The provision of seating in these areas was reviewed and found to be inappropriate in the context of these environments and the functional nature of where they were located. The CPTED assessment identified a desire to design the space as a thoroughfare rather than a place to linger due to a lack of activity generators within this area.

Page 31

| Mt Eden Main Works


D.3 Mana Whenua Table D-3: Mana Whenua Comments and Response Comment

Response

CRL Mana Whenua Forum – 12th September 2019 Kaitiaki noted that while the cultural narrative provided under the contract Minimum Requirements surrounding Tiriwa and Wairere has significance in the story of greater Auckland “tawhiti ke nga korero” they are quite a distance from the Maungawhau area and mana whenua felt there was an opportunity to explore narratives more pertinent to Maungawhau to inform design opportunities. Suggested narratives identified included: − “Te korero o Mataoho” – the story of Mataoho, was identified as a more significant narrative to Maungawhau that can be used as a design driver − “Te Pa” - the Pa (Maori village) that once was situated on Maungawhau and references to its history. − “Te Whau” – the rakau (tree) that is indigenous to Maungawhau and is unique in its material properties and the traditional uses which may be explored. − “Mataaho” – the deity that lived within “Te Ipu o Mataaho” – the bowl of Mataaho and is related to Ruaumoko (the god of seismic forces), informing a narrative that created the volcanic landscape of Tamaki Makaurau with Maungawhau at its centre. − “Mara” – the various gardens that were used to sustain the people of Te Pa o Maungawhau. − “Puna” – the stream that was used to also sustain the people of Te Pa o Maungawhau – referenced also in Maungawhau stations water wall design. − “Te ingoa” (the name) – Te ipu o Mataaho

•

It was agreed that Mana Whenua would go back and consult their respective iwi to confirm the specific key narratives to be brought forward for the bridge designs and the wider Maungawhau station precinct. The representatives subsequently caucused these narratives at a Design Hui on 24 September 2020 and agreed common threads, providing a final outline to guide the Link Alliance.

CRL Mana Whenua Design Hui – 24th September 2019 Mana whenua noted opportunity to consider emphasising Maungawhau as they key cultural narrative, in particular Mataaoho / Mataoho.

•

Designers subsequently explored such opportunities within the overbridge design and provided conceptual ideas at the next Mana Whenua Forum for feedback.

Mana Whenua to lead the naming of the bridge, which could take place after the design is developed.

•

Process is on-going and being led by CRLL.

Views to Maungawhau and where feasible, views from Maungawhau to the bridge should be considered as part of the design and context.

•

Designers subsequently explored this within the overbridge design and provided conceptual ideas at the next Mana Whenua Forum for feedback.

Page 32

| Mt Eden Main Works


•

A list of artists was put forward by the kaitiaki representatives to the hui, with the intention that an artist would work directly with the Link Alliance to incorporate the narrative into the bridges. It was agreed that Mana Whenua would go back and consult their respective iwi to confirm a ‘short list’ of preferred artists from each iwi group.

A list of artists was put forward by each iwi group following the hui held on 24th September.

•

From the ‘short list’ mana whenua subsequently identified their preferred artist, with relevant experience, for codesign opportunities on the Porters Avenue overbridge.

Guidance was provided on the use of local kupuhou (new works) to use moving forward: − Bridge – “Arawhata” in place of “Piriti” − Basalt stone - “Karā” in place of “Ōnewa” − “Mataaoho” agreed as the spelling going forward by mana whenua.

•

Link Alliance adopted correct usage as identified.

Mana whenua identified a need to consider the surrounds of the Maungawhau Station and utilise Mataaoho as the basis for the narrative to drive the design. (with the Station main wall of karā the central ‘piece’ and the other opportunities emanating from that)

•

The overbridge design is to use Mataaoho as the basis for the cultural narrative.

It was noted that there are opportunities for the five new bridges (Porters Avenue, Fenton Street, Ruru Street, Mt Eden Road and Normanby Road) to all work with the various ‘states’ that Mataaoho providing a whakapapa back to Maungawhau. E

•

Each bridge design will respond to a given state within the various Mataaoho elemental states, with the involvement of an iwi approved artist. The Porters Avenue overbridge is to focus on the solidified form karā (basalt).

The horizontal part of the Porters Avenue overbridgewas spoken to as a faceted sculptural – arawhata, to be made of steel. Works required to explore various finishes, e.g. matt or polished, black and blackness in relation to karā [basalt]. Link to early stone tools used on the abundant fields surrounding Maungawhau.

•

This idea on the structural arawhata element was subsequently explored collaboratively by mana whenua and the architectural and engineering teams to further develop the design.

The lift shaft and stair surrounds will be prominent, supporting elements of the horizontal arawhata, forming the gateway to arriving and leaving the area/station precinct. This provides opportunity for the artist to work with Mana Whenua’s agreed brief and the architectural team to create a response to narrative of the Brief. These supporting elements (literally and

•

This idea was subsequently explored collaboratively by mana whenua and the architectural and engineering teams to further develop the design.

Involvement of Mana Whenua artists to work with the bridge design team on the fulfilment of the narrative into the bridge.

CRL Mana Whenua Forum – 1st October 2019

CRL Mana Whenua Design Hui – 9th Oct 2019

Page 33

| Mt Eden Main Works


figuratively) might also reflect caring and upholding of core values.

CRL Mana Whenua Design Hui – 22nd Oct 2019 The narrative focus for the bridges should be on the various states of Mataaoho. For Porters Avenue Bridge, the focus should be on a solid raw/sophisticated response.

Page 34

| Mt Eden Main Works

•

It was agreed at the design hui that the ‘hull’ of the walkway would be an architectural response only and no artist involvement is necessary.

•

Artist inputs would be in relation to the balustrades and glass frit patterning to the lift shift glazing.


D.4 Further Consultation with Owner of 5 Porters Avenue CRLL and Link Alliance met with Mr Martin van Zonneveld (one of the owners of 5 Porters Avenue) again on 12 June 2020. The comments received and responses provided are recorded in Table D-4. Further technical assessment in relation to Porters Avenue overbridge was undertaken by Jasmax in response to the matters raised by Mr van Zonneveld. Table D-4: Mr Martin van Zonneveld Comments (12 June 2020) and Response Comment from Martin van Zonneveld

Response from Link Alliance

The bridge is significantly different to the reference design as presented to the Environmental Court in 2017. Utility services were not indicated previously, and Mr van Zonneveld had no recollection of these services being presented to the Court.

•

The design of the proposed Porters Avenue overbridge has already made provision for the conveyance of network utilities across the railway corridor. This was part of the initial court renders and was previously discussed at the meeting with Mr van Zonneveld on 28 February 2020.

The cost / benefit analysis for having two bridges is not efficient.

•

The need for two overbridges (Fenton Street and Porters Avenue) was confirmed by the 2017 Environment Court direct referral proceedings.

There have been changes to the design of the overbridge since it was presented to the Environment Court, including the offset of the bridge in relation to the 5 Porters Avenue property boundary, increased balustrade height, and removal of the runnel ramp from the design.

•

It was explained to Mr van Zonneveld that the footprint of the overbridge is now 4m from the 5 Porters Avenue property boundary. This exceeds the minimum 3.5m separation agreed during the Environment Court proceedings and subsequently specified in CRL designation Condition 47.2(b)(xi).

•

The runnel ramp has not been removed from the design.

Concern regarding the need to cross centre line of road.

•

A road safety audit (RSA) has been undertaken for this traffic movement.

Lack of sunlight to 5 Porters Avenue is a key concern.

•

The architectural designer, Jasmax, has subsequently undertaken further analysis on the shading effects of the overbridge on 5 Porters Avenue. The analysis found that shading to 5 Porters Avenue is limited to the morning periods during autumn/winter for the eastern façade due to the orientation of the site and buildings.

There has been a lack of consultation.

•

Two one-on-one meetings were held with Mr van Zonneveld on 28 February and 12 June 2020 to discuss the design of the Porters Avenue overbridge and his concerns. Some design changes were made

Page 35

| Mt Eden Main Works


in response to his comments, such as consideration of privacy versus light admission, where the fretting and mana whenua design inclusion on the lift shaft was reviewed. Mr van Zonneveld does not want the bridge to be constructed and has spoken to all 240 submitters from the 2017 Environment Court proceedings who, apart from three, concur with his feelings.

•

The Environment Court proceedings confirmed the need for the Porters Avenue overbridge.

Mr van Zonneveld would like to see the renders indicating the sunlight/shadow implications at different locations around the building.

•

As discussed above, Jasmax has undertaken a further solar shading analysis and the findings have been sent to Mr van Zonneveld.

Discussion on land requirement for Haultain Street.

•

The Link Alliance will discuss with Auckland Transport the possibility of a slightly narrower cross-section for Haultain Street in this location, so that less land acquisition is required along the Haultain Street frontage of 5 Porters Avenue. This will not significantly change the streetscape arrangement set out in this Urban Design DWP.

The lift shaft transparency is a big improvement on the original design.

•

Noted.

The design of the fret pattern (etched pattern on glass) on the stairs should be more transparent and less opaque.

•

Further assessment by the design team has identified that the current pattern on the stair balustrades achieves a suitable balance between (sometimes conflicting) issues such as safety, privacy and sunlight admission for adjoining properties, and the agreed cultural design narrative. The design of these balustrades is being developed further to create a more ‘open’ feeling to the roadside areas only to address comments raised by the Auckland Urban Design Panel.

Request for the costings of the bridge.

•

An ‘order of cost’ will be provided to Mr van Zonneveld, subject to confirmation following completion of the procurement process for the new bridge.

Request for solar shading studies.

•

As discussed above, Jasmax has undertaken a further solar shading analysis.

Consider possibility of reducing footpath width at Haultain Street to 9m.

•

As explained above, this is the subject of further discussion with Auckland Transport.

Page 36

| Mt Eden Main Works


D.5 Independent Peer Review The UD DWP was reviewed by Rob Pryor from LA4 Landscape Architects Ltd and feedback was received on 14 July 2020. Rob Pryor considers â&#x20AC;&#x153;the DWP and design initiatives will result in a high quality urban streetscape environment in keeping with, and complimentary to the surrounding landscape and urban design context and proposed wider Mt Eden Main Worksâ&#x20AC;?, and no changes were requested.

Page 37

| Mt Eden Main Works


D.6 Auckland Council – Urban Design Panel The Urban Design DWP was presented to the Urban Design Panel on 21st July 2020 to provide an update on the Porters Avenue pedestrian and cycle overbridge. The comments received and responses provided are recorded in Table D-5. Table D-5: Urban Design Panel Comments and Response Comment from Urban Design Panel

Response from Link Alliance

Height The height of the bridge has increased materially from the reference design. The Panel defers to a separate planning analysis to confirm what if any extent of additional height is permissible.

•

As outlined within section 3.1 of Appendix A. This site falls within the Eden Terrace neighbourhood and is bound by surrounding properties that are zoned Business - Mixed Use. Of the controls in place, the rules that may be of relevance to the proposal are: −

−

Buildings in the Business - Mixed Use Zone have height restrictions of 18m total (16m occupiable height + 2m for roof); this includes 3 Porters Ave, 5 Porters Ave and 1 Fenton Street. The properties at 2,4 and 6 Porters Ave are subject to Height Variation Control measures under the unitary plan. Buildings in this zone are afforded variable height restrictions of 21m (19m occupiable height + 2m roof). These properties are the hatched blue areas shown in Fig 3.2.2 overleaf.

The proposal does not exceed these height limits, nor does it precludd developments occurring on adjacent sites in accordance with these rules, as demonstrated in Fig 4.9.1 and 4.9.2 of Appendix A. There are no specific Designation Condition requirements for height. Height The Panel understands that services need to be accommodated within the bridge and that there are required minimum clearances that must be achieved between those and the rail line / trains. However the Panel is concerned that as the bridge gets higher and the number of stairs to be traversed ‘up and over’ it increases, this becomes a disincentive to potential users. It also increases practical CPTED concerns relating to the disconnection between users of the street and the ability to see to the deck level (which was possible in the reference design and is an unfortunate loss). The Panel recommends that the Applicant demonstrate the bridge deck is as low to the ground, and requires the

Page 38

| Mt Eden Main Works

•

The determining factors setting the bridge height are the soffit clearance to Hautain Street and Pantograph zones of the rail corridor. Refer Figure 4.2.2 within Appendix A. The bridge has been set as low as possible to these constraints.


least possible number of steps for users, as is technically possible. Lighting Especially in light of the likely loss of visual connection from the street to the bridge deck (due to its height above street level), the Panel agrees that lighting to deter crime and enhance perceptions of safety will be critical. Exact details of lighting were not available, but the Panel recommends that the brightest possible extent of lighting on the bridge, stairs and street plazas adjacent to the stairs be put in place. This would be subject only to managing nuisance effects on immediate neighbours, which should be an exercise in lighting placement and housing / shield design rather than accepting an inferior lighting outcome. It may be necessary to install active video surveillance on the deck if reliable natural public surveillance cannot be achieved.

Visual permeability vs. privacy The Panel does not agree that an optimal design outcome has yet been achieved. Whilst there is a clear need for privacy in specific locations, the perforated screen adopted has diminished important opportunities for visibility of the bridge stairs, the expression of an invitation to users by way of being visually open and welcoming, and to highlight the architectural qualities of the bridge itself. The Panel is not convinced that the screen design will function in a manner that would allow meaningful inter-visibility between both sides. The Panel is concerned with what appears to be a largely blank wall up the eastern side of the Wynyard Road Page 39

| Mt Eden Main Works

•

Inset spot lighting is provided below the solid section of the balustrade along bridge deck to both sides of the bridge

•

Inset spot lighting is provided below the central handrails on the stairs and handrails on the stairs directly adjacent the lift.

•

Lighting is provided to the lift canopies at both ground and bridge deck level.

•

Lighting is provided within the lift shaft and lift cab.

•

CCTV cameras are provided mounted off the side of the canopy screens and external to the lift cab on the upper deck providing 100% coverage down the stairs and along the bridge deck.

•

CCTV cameras are provided external to the lift cab at the ground levels providing coverage entering/existing the lift.

•

CCTV cameras are provided below the bridge deck against the abutments providing coverage across Haultain street and the termination of Porters Avenue

•

CCTV cameras are provided giving coverage of the area between the stairs and No.3 Porters Avenue.

•

The above provides appropriate levels of lighting and CCTV coverage addressing the concerns raised. Lighting levels have been coordinated with CCTV coverage to ensure correct lighting levels are achieved. Lighting has been designed to minimise any spill to adjacent properties.

•

We will reconsider how to [optimise] visual permeability through the balustrade to the stairs (and under stairs) to both sides of the bridge, the deck level balustrade and the sides of the Wynyard Road elevator closest to the neighbouring office. While managing/adapting a continued reference to the Mana Whenua narrative and the requirement to maintain an already agreed level of privacy and sunlight to surrounding building occupants.


stairwell. This has the characteristics of defensive architecture. While the perforations may be appreciable to viewers up close, from further back this will appear as a flat, 2-storey tall surface. The Panel is concerned that this is making the bridge less inviting than is required and giving it some negative aesthetic undercurrents akin to a guard tower and parapet / battlement structure. That should be avoided. Given that by its nature the bridge has many asymmetrical aesthetic qualities, the Panel does not agree that the need for privacy on some parts of the bridge should then be determinative of a relatively uniform screening design along it. The Panel strongly recommends reconsideration of how to maximise visual permeability through the balustrade to the stairs and to the deck level (where it is not necessary to provide privacy to direct neighbouring buildings), on both sides of the bridge. As part of this, the Panel considers it would be possible to refine the Wynyard Road under-stair screening design so as to maximise views from the street to the visually interesting bridge structure itself. The Panel notes that it is not suggesting that the aesthetic narrative is necessarily incompatible with this; it may well be possible to devise an adaptation of the perforation pattern used to date but in a way that it allowed much more visual porosity – such as ‘inverting’ the pattern so that the current perforations became solid and the solid element became the perforations. The Panel notes however that it has no firm view on how the Applicant could go about addressing this. The Panel also suggests that it may be appropriate to increase screening in one or more sides of the Wynyard Road elevator relative to the closest neighbouring office building.

Page 40

| Mt Eden Main Works

•

This reconsideration will be carried out in collaborative process with the artist and architect.