Skip to main content

CRL Community group Mt Eden February 2021

Page 1

Mt Eden Community Liaison Group meeting 24 February 2021


Helpful hints for this virtual meeting • During this meeting, the presenters will not be able to see or hear you, but you’ll be able to watch and listen to them • On the right hand-side of your screen there is a question panel. We encourage you to write questions or comments for our presenters as the meeting progresses • We’d appreciate it if you could use your name and possibly which local street you live or work on when you submit your question or comment

• Please note that your comment won’t appear to all viewers until we publish it • If you’re asking a question about a specific slide in tonight’s presentation, it would be helpful if you could take note of that slide number so we can bring it back up on screen to refer to if need be.

2


Agenda • Introduction • Mt Eden Communications & Engagement Team

• Mt Eden Station site overview • Tunnelling overview

• North Auckland Line (Western Line Integration) overview • Social Impact & Business Disruption Report • Development Response update

• Q&A

3


Mt Eden Communications & Engagement Team

We are here to:

• Ensure our neighbours and key stakeholders are informed about works taking place on site

• Find opportunities to engage and collaborate with you

• Answer your queries or concerns

4


Communications & Community Engagement update • Te Manawa, Visitor Information Centre opening soon • Info Hub & public perimeter site tours on the first Tuesday of each month

• Reviewing our notification process to ensure we are keeping our neighbours and key stakeholders notified in the best way possible • Aiming for CLG meetings every 2 months moving forward • We welcome feedback on items CLG members would like to hear more about at future meetings 5


Thibaut L'Hopital Mt Eden Station Project Manager

6


Mt Eden Station site overview Key activities to date: 1. Utilities diversion (including temporary syphon and Huia 2 preparation) 2. Construction of portal and other temporary retaining walls 3. First pour of the western CRL cut and cover tunnel slab 4. Excavation of portal 5. Excavation of eastern end of CRL platform 6. Excavation of eastern link tunnel ramp for TBM access 7. Structural works for tunnel enabling works (spoil basin, segment storage slab) 8. Western grade separation piling and start of capping beam

7


Mt Eden Station site – key activities to date 1

2 4 6 3 2

5 1

6 2 1

6 Mt Eden demolition area

6

1

8


Mt Eden Station site overview Key activities this year: 1. Permanent utilities diversion (drainage and Huia 2 switch over) 2. Construction of eastern CRL cut and cover tunnel 3. Construction of top down portion of lower cut and cover tunnel (piling/roof slab only) 4. First pour of the western cut and cover tunnel walls and roof under Huia 2 5. Excavation of western end of CRL platform and construction of platform 6. Western grade separation continues with capping beam, install props and cross over structure (West to East) 7. Foundation works for the station building and ventilation house 8. Excavation on site near base of Ruru St for deep stormwater and wastewater. 9


Mt Eden Station site – key activities this year

1 4 7 8

2

‘

5

Mt Eden demolition area

3 1 7

6 1

10


Benjamin Leyat TBM Plant Manager

11


Tunnelling overview Key activities to date: • Assembly of the TBM Shield, and on display at the Boring Day Out on 6 Dec 2020 • Completion of first cavern to launch the TBM: 51 m • Tunnel lining segment precast factory launch • Site installation ongoing • Technical area • Mechanical workshop • Spoil basin building

12


Tunnelling overview Key activities this year: • TBM preparation and assembly • TBM launch – late April • Excavation of second mined tunnel – starts April • Excavation of the third mined tunnel later in the year • TBM reaches Karangahape Road - August • TBM break out in Aotea - November • TBM disassembly and return to Mt Eden site ahead of preparation for the second tunnel drive

13


Preparing the portal area for the TBM launch

14


Preparing the portal area for the TBM launch

Water treatment plant assembly XX %

TBM Crossing Bridge Installed

15


Tunnelling Technical Area

16


First mined tunnel preparation for TBM launch

17


TBM logistics area – conveyor belt, spoil basin and concrete segments storage

18


Nick Adams Deputy Construction Manager – North Auckland Line

19


North Auckland Line (Western Line Integration) overview Key works to date: • Achieved single line running on existing Up Main and removed existing Down Main

20


North Auckland Line (Western Line Integration) overview Key activities to date: • Completed key activities during the Christmas block of line • Completed eastern half of new Mt Eden Road bridge and switched traffic over to eastern side of road

21


North Auckland Line Overview Key activities this year: • All activities are geared towards installation of the new Down Main and its commissioning early next year. • Construction of four bridges (Normanby Road Temporary Services Bridge, Normanby Road bridge, Mt Eden Road bridge and Porters Avenue bridge). • Construction of two grade separation structures. • Removal of the level crossings at Normanby Road and Porters Avenue.

22


North Auckland Line – Grade Separation Structures • Two grade separation structures are being installed. • These are concrete troughs which house the new tracks run to/from the CRL tunnels along with supporting the new Down Main which passes over top.

• Constructed in a 'top down' manner to expedite installation of Down Main.

23


Craig Mathieson & John Daly Planning

24


Social Impact & Business Disruption (SIBD) Overview • Designation condition 61.2

• How disruption to businesses, residents can be avoided, remedied, and mitigated • Specific issues:

• Disruption to traffic and access • Loss of customers • Loss of amenity • Impacts to community facilities 25


Annual Report - Overview • Designation condition 61.8 Condition 61.8

• Provides overview of changes to the SIBD environment • Analyses matters raised by the community • Outlines how these matters have been responded to

The Requiring Authority shall prepare an annual report on the identification, monitoring, evaluation and management of the effects outlined in the Social Impact and Business Disruption DWP together with a summary of matters raised by the community, and how these have been responded to. The report shall be presented to the Community Liaison Groups.

26


Statistics – Matters raised by the community Noise and Vibration

46

Access / Parking

40

Disruptive work hours

24

Customer / Business Effects

20

Amenity

15

Air Quality

15

Communication

15

Other

12

Stress / Financial Concerns

4

Servicing and Deliveries

4

Safety

4

Visibility and wayfinding

2 0

5

10

15

20

25

30

35

40

45

50

Number of Complaints 27


Statistics – Location of complaint Akiraho Street Fenton Street Mt Eden Road Ruru Street Flower Street Shaddock Street Boston Road Normanby Road Did not specify Other Exmouth Street Enfield Street New North Road Ngahura Street Eden Crescent Brentwood Ave Nikau Street

28 15 14

10 8 7 7 5 3 3 3 3 3 2 2 2 2

0

5

10

15

20

25

30

Number of Complaints 28


Statistics – Method of complaint Email

64

Phone

48

In Person

4

Meeting

1

0

10

20

30

40

50

60

70

Number of Complaints 29


Statistics – Complaint made by 3 10

Did not Specify Member of the Public Business

65

39

Residential

30


Link Alliance responses • Monitored conditions to confirm compliance with DWP’s (i.e. noise and vibration monitoring). • Complaints investigated to ensure compliance with designation conditions. Where possible, noisy or disruptive works delayed / undertaken at different times.

• Communicated to key stakeholders and public about upcoming works. • Erected wayfinding and business promotion signage. • Responded to complaints with input from Site Supervisors and Site Managers. • Held meetings and information sessions with public and stakeholders. 31


Development Response & Communications Activity • Artwork for hoardings by local artists. Holding connected art events.

• Using sustainable products and recycled materials in hoarding art. • Strong relationships with Uptown Business Association leading to partnership on engagement events. • ‘Boring Day Out’ event, unveiling the TBM • Crane naming event and prize giveaways.

32


Diana Veitch Development Response Manager

33


Development Response Development response is the planning and implementation of tools to mitigate the impacts of large-scale development, and cumulative impacts of construction activity on people. Put simply, it’s about supporting the community whilst also making it easier for teams to deliver projects. Collectively, development response unites the strengths of existing business-as-usual activities and pulls together resources and teams in a coordinated and responsive way to support projects’ planning and delivery.

34


Key activities • Partnership with Uptown Business Association to deliver regular events that enhance the area and draw in customers

35


• Coffee giveaways to thank neighbours for their patience during disruption

• Artwork for hoardings by local artists. Holding connected art events

• Using sustainable products and recycled materials in hoarding art

• Ensuring traffic management keeps access to businesses and residences open

• Audits of site perimeter for accessibility and cleanliness 36


Questions & Answers

37


For more information • City Rail Link website - www.cityraillink.co.nz • 0800 CRL TALK – choose option 5 for Mt Eden Station • Email the Mt Eden Station team at mteden@linkalliance.co.nz