Mt Eden upcoming works

Page 1

Connecting CRL to the Western Line Before the CRL opens in 2024, a number of works also need to be undertaken along the rail-corridor at Mt Eden to connect the new CRL lines with the existing Western Line track.

Mt Eden Station

Link Alliance and City Rail Link Ltd are working on the design development of CRL’s Western Line connections, which include some significant changes to the rail network through the Mt Eden area.

Information on upcoming works

An overview of CRL’s Western Line works • Installation of turn-outs (or ‘scissor tracks’) at two locations within the rail corridor, adjacent to the end of Haultain Street and Mt Eden Prison. These enable trains to be safely switched to the track located further away from construction activity.

February 2020

• Closing Porters Ave vehicle crossing, creating cul-de-sac streets on either side and constructing a new pedestrian and cycle overbridge. • Relocation of the Huia 2 watermain at Fenton Street.

Looking towards the new Fenton to Ngahura overbridge.

• Closing Mt Eden Station for both safety and operational reasons while construction is underway and running trains on a single line through the rail corridor (while works happen on the opposite side).

• Building a new pedestrian and cycle overbridge over the tracks between Fenton and Ngahura Streets to provide access to the new station building. Please refer to our Western Line integration brochure for more detailed information.

• Building a temporary pedestrian and utilities bridge over the railway at Normanby Road to clear the way for permanent works.

Where to go for more information

• Closing the Normanby Road level crossing and constructing a new road bridge over the rail line. Normanby Road may need to be closed for up to six months to complete this grade separation.

Visit the Mt Eden page of City Rail Link’s website at CityRailLink.co.nz If you have any questions or concerns about project works in the Mt Eden area, please contact the Link Alliance’s Mt Eden Station team

• Re-aligning the Normanby / Boston / Nugent roundabout. • Building trenches and rail-over-rail bridges for the track rising up out of the tunnels to ground level. CO

LA0005_09.03.20

0800 CRL TALK and choose option 5 for Mt Eden

• Widespread changes to rail infrastructure, including signals, over-head electrical lines, track and refurbishment of the existing Mt Eden station platform. U

LD

mteden@linkalliance.co.nz BASQ

RY

ST

RE

UE R OAD

OUT

REET

EET

ET

STR

RE

Powerstation

NUG

T

RU

EE

ET

TR

RE

ENT

City Side Baptist Church

IS

ST RU

ND

T

CK RA

S

SH

E

PO

NEW Pedestrian Overbridges

F AT

OR

MS

3&

4

E RT

EXISTING PLA TFORMS

EE

T

BO

BOSTON ROAD

NEW Entrance NEW

RU R

U ST

REET

D UN

CR

L LP

TR

RO AD

T TR

FLOW

EE US KA

NEW

TR N

NI

KS

ER ST

AS Existing Station Entrance

EW

E ET

. XT

OC

ER GR O UN D

EXT.

EN

UR

AD RO

D AD

ED

AH NG

DE

OU

T

T

ST

UN

R RG

EE

TR AC KS

M

EA

Mt Eden Station

TR

EXT.

E

US KA NI

REET

NU

ET

E AV

RE

A

ST

NI

H RT

ET

LEIG

ST

E

I RG

EW

O

RE

AR

TT LO

R KO

AR

VI

N

N

ST

BUR

ER

N

AU IK

H ST

AD RO

EXM

EN

ORTH ROAD

OW FL

CE LA

NEW N

N

ED

LP

ET

T

AL ND

WA TER

STR

EET

1&2

RS Existing Station Entrance

Existing Station Entrance

T

ENFIELD STREET

AKIRAHO STREET

ET

TRE

RY S

AD RO

EN LA0005 MtBREden Upcoming Works Brochure.indd 1-2

HAROLD

D

E

STREET

RO AD

R YA

NU

EN

YN

VE DA

The Link Alliance will design, construct and deliver CRL’s twin rail tunnels, two new underground stations and a new Mt Eden station building. The Link Alliance includes seven companies with a wealth of experience in delivering large-scale infrastructure projects in New Zealand and overseas. ED

W

OO TW

CRL/Underground Track Simplified map indicative only - not to scale

MA

ET

SYLVAN AVENU The companies in the Link Alliance are: Vinci Construction Grands Projet S.A.S, Soletanche Bachy International E EAST NZ, Downer New Zealand Ltd, Tonkin & Taylor, AECOM New Zealand Ltd, WSP Opus, City Rail Link Ltd.

SYLVAN AV

ENUE WES

AD RO BY

O NT

RE

AN

E

ST

D ROA

RM

NU

IN TA UL HA

E RE

DER

NO

E AV

FE

T NS

STO

D OA NR

As part of the City Rail Link (CRL) project the existing Mt Eden train station will be enlarged and redeveloped to incorporate a modern new station building with elevated views of Maungawhau and a platform for the new CRL line. The station will also remain a stop for the existing Western Line services, making it a busy rail junction. LAU

NEW Station Access

MT

RE

M

RE

H ST

ET

N

ST

CH

IN

IE

Galbraiths Alehouse

From Mt Eden Station, the new CRL line will run under the Newton ridge and central motorway junction before it reaches new stations at Karangahape and Aotea and the redeveloped Britomart Station (which will be a two-way through station once CRL opens in 2024). The new architecturally-designed station will feature floor-to-ceiling basalt stone cladding to represent the Mt Eden volcanic cone, crater and pa terraces, with similar designs in paved areas. The station design also includes a basalt stone feature wall reminiscent of lava

flow, drawing water from a re-opened natural spring nearby. The main access to the redeveloped station will be via an extended Ruru Street, which will provide a new connection to Mt Eden Road. Other planned road layout changes, such as an extension of Flower and Nikau Streets, will also improve connectivity within the local area. When it opens in 2024, the CRL will enable Auckland’s rail network to double in capacity to carry up to 54,000 passengers an hour at peak times.

T ST EDWIN

REET

9/03/20 11:21 AM


What’s happening in the Mt Eden Station area As we finish the enabling works to create the construction site for CRL’s new Mt Eden Station building and underground rail tunnels, we will begin our main works in the Mt Eden area. Station-related works can be loosely grouped into four phases. These phases will overlap as different work starts and finishes around the station construction area. Dates given are indicative but will be confirmed as planning is finalised.

Site set-up and demolition works ACTIVITIES

INDICATIVE DATES

Asbestos removal and salvage of any reusable materials from within buildings in the Mt Eden demolition area.

December 2019 to April 2020

Demolition of CRL-owned buildings – starting at the top corner of the block bounded by Nikau, Flower and Shaddock Streets (where the tunnel portal for the TBM will be constructed).

Late September 2019 to Q2 2020

Works to enable the launch of the Tunnel Boring Machine Relocation of underground utility services within the construction area

From January 2020

Construction of the tunnel portal: piling, excavation and ground retention for the tunnel entrance at the corner of Flower and Nikau Streets and demolition of redundant stormwater shaft.

From February 2020

Excavation of two trenches into the portal area, initially to enable movement of the TBM but ultimately to form the new CRL railway lines that connect to the existing North Auckland (Western) Line – this excavation will include removal of basalt, which will be managed by a series of controlled blasts using small explosive charges (similar to that used in CRL’s Contract 6 works in this area) in order to avoid prolonged rock breaking activities.

Starting March 2020

Mining of a short section of tunnel at the entrance of the tunnel portal to launch the TBM.

From August 2020

The Mt Eden Station plaza

What to expect during the next stages of work • Truck movements.

Main construction works for Mt Eden Station

• Construction hoardings to secure the site, help minimise noise and dust for neighbouring properties and create a visual barrier from the works. • Closure of Shaddock Street, between Flower and Nikau / Ruru Streets in the middle of our construction site (traffic will go down Nikau and Flower Streets).

Construction of an additional Mt Eden Road bridge, located north of the existing one, to enable a rail trench for the CRL line to be built underneath. Temporary diversion of utilities in this location is expected to start in Q1 2020, with the bridge construction to commence Q2 2020.

Diversion of utilities starts mid 2020

Construction of a new Ruru Street bridge (located within the CRL construction site, just south of Nikau Street), including relocation of Huia 2 watermain. The bridge will eventually have a CRL platform underneath it.

Huia 2 watermain Q4 2020

• Crawler cranes

Ruru Street Bridge Q3 2021

• Some blasting and trench excavation

Launch of the TBM from the Mt Eden tunnel portal – spoil from the TBM drive will be retrieved from Mt Eden and transported off-site.

February 2021

• Concrete works

Construction of the new Mt Eden Station building.

Early Q1 2021 to late 2022

Bridge construction starts Q3 2020

Public Realm Enhancements Reinstatement of the public realm environment, including extensions to Ruru, Nikau and Flower Streets to create improved connectivity through the wider station precinct.

From 2023

• Reopen the Flower Street diversion to traffic. • Some noise and dust from the excavation, construction, and piling works. • Excavators • Piling • Construction of a sediment pond to catch any water from the TBM spoil and treat it before it leaves the construction site • Launch of the Tunnel Boring Machine (TBM) • Conveyor system used to bring spoil from the TBM out of the tunnels to the surface, where it will be trucked off site. • Normal hours of work: Monday to Friday, 7am-7pm; Saturday 7am-2pm.

• Continue to use an on-site concrete crusher (next to the rail corridor to minimise noise nuisance) to reduce concrete waste that would otherwise need to be trucked off-site and enable the re-use of crushed material for temporary roads within the construction site. • Introduce measures to control soil movement, including washing the wheels of trucks before they leave the site. • Use water to suppress dust. • Install monitoring equipment to measure air quality, ground-water levels and ground and building movement. • Use noise-reduction blankets to muffle noisy work, and/or erect enclosures around plant and equipment to minimise noise pollution. This includes a noise enclosure over the TBM spoil removal conveyor system, to help muffle any noise this activity generates. • Maintain access to public and private property. • Manage contractor parking to avoid occupying on-street car parking spaces. • Attended noise and vibration monitoring when work is anticipated to be particularly disruptive. This ensures we comply with the permitted construction noise levels specified in our consent conditions. • Keep you informed of planned works, and provide plenty of advance notice for any works that will cause extra noise, dust, vibration or that may have to take place outside of our normal hours of work.

Expect to see bike parking, trees, landscaping and street furniture, with good sightlines at the station entry and exit for increased safety.

Ruru St extension

LA0005 Mt Eden Upcoming Works Brochure.indd 4

What we’ll do to minimise the impact of these works on you:

The bridge from the CRL line to Western Line at Mt Eden station

Managing the impacts of our construction activity Just as we did during the planning phase for our enabling works, we are now preparing a suite of management plans for Auckland Council approval that set out how we will manage the effects of our main construction works on people and the environment. These management plans include specific measures to address environmental effects such as noise, vibration, traffic, air quality, contamination, silt and sediment, and groundwater and settlement. We are also preparing a Social Impact and Business Disruption management plan, and in doing so are seeking input from people

living and working within the vicinity of the construction area. We need to understand how people could be affected so that the management plans we prepare are as effective and responsive as possible. We incorporate this feedback into the management plans and submit them to Council for approval. Once approved, the construction teams will undertake the work in a manner that ensures the measures outlined in the management plans are in place to minimise the effects on the environment and impacts to nearby businesses and residents.