Overview • Why do we need it? • Where is it going? • What will it do? • When is it happening? • What are its traffic challenges? • What progress on consents and property? • What will it look like?
3
Auckland in 2041
• • •
• •
Auckland is pivotal to the social, economic and cultural development of New Zealand 2,500,000 More than 700,000 new residents
Click to edit Master title style An extra 400,000 dwellings
Twice as many city centre and city fringe residents and employees City Centre student numbers up by 30%
City centre producing 25% of Auckland’s GDP - currently 17%
2,000,000
1,500,000
Growth to 2041
1,000,000
500,000
729,000
0 Auckland
Christchurch Wellington
Waikato
Bay of Plenty
Otago
Growth in Auckland to 2041
Auckland's growth in perspective
We are adding the equivalent populations of Wellington and Christchurch to Auckland in the next 30 years
4
Auckland rail patronage growth- 25% last year
5
Vertical alignment
6
7
Citywide benefits
8
Albert St developments- 170K sq metres and growing
9
Programme
10
Construction zones
11
Pipe Jacking • •
Move storm water pipe under Albert St to the east. Includes shafts at: • Albert St/Swanson St • Albert St/Victoria St • Albert St/Wellesley St
12
13
Draft start dates 2015 Nov
Dec
2016 Jan
Feb
Mar
Apr
Contract 1
Queen Street
May
Jun
Jul
2017 Aug
Sep
Oct
CPO (Civil Works) Demolition starts
Downtown DSC
Contract 2
Dec
Jan
Feb
Apr
- Tyler and Galway Street (access change, buses removed and reversing Tyler) - Lower Queen Street buses removed - Interim bus plan operational
Britomart Temp Accom
Pipe jack
Nov
Victoria St (east/west constraint)
Albert St cut and cover
Lower Albert St (partially closed to through traffic) Albert St (Victoria to Custom) service lanes only)
Custom St/Albert St intersection
May
14
Traffic challenge
Congestion conditions. Expected congestion – additional bus priority lanes as mitigation.
PT Objectives: - Retain levels of service. - Allow for customer growth. - Target mode shift to PT.
Buses need to move out of lower CBD for CRL –51% of trips affected.
Stage 1 complete Stage 2 in design for 17/4/16
Bus stop and route changes
15
Virtually every bus route has to change primarily because of the closure of Albert St and Britomart to buses. Needed to ensure that bus passengers could still easily access downtown and connect to the train station and ferry services. Over a year of analysis and modelling by AT, Aurecon and Flow to assess how to shift the buses within the city centre Numerous options were explored.
Mode shift during construction ďƒ˜ During early work construction it is important that current and forecast demands on the road network can be supported, so that the city keeps moving ďƒ˜ To achieve this, a mode shift towards bus, trains, ferries and active transport (walking and cycling) is needed.
16
Bus Priority Measures To address the changes to bus routes and the need to encourage a mode shift a range of bus priority measures were proposed : •
24/7 Bus priority lanes (improved amenity – reliability, punctuality for customers)
•
Bus route diversions
•
Future planning – the majority of the bus lanes will remain in place after the CRL early works are completed
17
Phase 1 – bus priority measures
18
Challenges and lessons learnt - Phase 1 Importance of working closely with range of teams within AT. Change in Bus Parking signage. Additional warning signage for Bus Lanes when they start mid-block.
Clear communications regarding bus route changes.
19
Phase 2 – bus priority measures
20
Challenges and lessons learnt - Phase 2
21
Importance of working closely with range of teams within AT Moving Adshel shelters Resource Consent requirements under Proposed Auckland Unitary Plan (PAUP)
Consents
22
Consent lodged
Hearing
Appeal
Hearing Result
NoR 2012
2013
2014
2015
Pipejack 2014
2015
None
Approved
Enabling works regional consents 2014
2015
None
Approved
Britomart NoR 2015
November 2015
?
?
?
NoR Alterations 2015/16
?
?
?
?
Main works regional consents 2016
?
?
?
?
NoR confirmed
Property • • • • • •
Vast majority of the 68 surface properties needed have been acquired Most in main construction site adjacent to Mt Eden Station About $90m spent on property Sub surface negotiations start next year CRL portfolio has about 40,000 sqm of property - most commercial Less than 5% vacancy
23
Britomart Station – temporary facilities
24
25
Lower Queen St public space concept
26
Lower Albert Street – Before and After
27
Aotea Station- concepts
28
Karangahape Station- concept
•
•
Catalyst for urban development Future proofed for possible development
29
Mt Eden Station - concept
30
Transport - Conclusions • There is an established way of approach transport appraisal based on straight line growth forecasts and values of time with fixed population and employment patterns, but it is not clear that it reflects what actually happens • In reality transport drives land use patterns just as much as land use drives transport demand