City Rail Link In association with:
DETAILED DESIGN Albert Street Canopy Removal and Utility Relocation Erosion and Sediment Control Management Plan
Document Ref: CRL-PAT-RME-000-PLN-0101 Revision: 4 10th May 2018
INTERNAL WORKING DOCUMENT COMMERCIAL IN CONFIDENCE
Contents 1
2
3
4
Introduction
1
1.1
Overview
1
1.2
Purpose
2
1.3
Scope
2
1.4
Report Structure
2
Project and Site Description
3
2.1
General
3
2.2
Key Phases and Considerations
3
2.3
Site Layout
4
2.4
Site Levels and Catchment
4
2.5
Site Overland Flow Paths
5
2.6
Construction Related Works
6
2.7
Site Management
7
Erosion and Sediment Control
9
3.1
Design Philosophy
9
3.2
Design Principles
9
3.3
Earthworks
9
3.4
Settlement Tank Sizing
10
3.5
Erosion and Sediment Control Measures
10
3.6
Monitoring
12
Conclusion
14
Appendices Appendix A Glossary of Abbreviations Appendix B Glossary of Terminology Appendix C Drawings
Figures Figure 1 – Location and extent of the Project Figure 2 – CSA overland flow paths and upstream catchment (retrieved from Auckland Council GIS 03/10/17)
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
1 5
i CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
Tables Table 1 - Appropriate areas and earthworks volumes for C2.2 Utilities relocation 9 Table 2 - Summary of proposed shared utilities trench groundwater inflow rates and rainfall volumes 10
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
ii CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
1
Introduction
1.1
Overview
City Rail Link Limited (CRLL) is the requiring authority responsible for the construction of the City Rail Link (CRL) in accordance with the conditions of the CRL Designation 1714. The works associated with the Albert Street Canopy Removal (C2.1) and Utility Relocation (C2.2), which is referred as the Project in this report, are authorised by CRL Designation 1714 and the CRL Aotea to North Auckland Line regional resource consents1 (A2N resource consents). The main purpose of the Project is to streamline a critical path activity for the future construction of Aotea Station. This report outlines the Erosion and Sediment Control Management Plan (ESCP) for the Project, taking into consideration the conditions of the A2N resource consents. The works are related to the removal or cut-back of 4 No. of building entrance canopies and the relocation of existing utilities along the western edge of Albert Street. The Project will be executed along approximately 220m of road frontage, along and directly in-line with an existing pedestrian walkway and will extend into the Victoria Street and Wellesley Street intersections with Albert Street, in order to connect the existing utilities with the new re-aligned utilities. Refer Figure 1 below. Figure 1 – Location and extent of the Project
This ESCP has been developed by Aurecon New Zealand Limited (Aurecon) to describe the proposed erosion and sediment control measures and practices to minimise the effects of construction activities of the Project on the receiving environments. The ESCP provides a methodology and management approach which confirms that the Project can be implemented in a controlled manner, ensuring that impacts on the environment from sediment and erosion are less than minor. Requirements associated with making any amendments to this ESCP (if required) will be detailed in the Construction Environmental Management Plan (CEMP). The ESCP is an appendix to the CEMP which has been prepared as required by A2N resource consent conditions 53-58. We note that the content of this report has been written with reference to the ongoing detailed design. 1 Auckland Council reference R/LUC/2016/1890, R/REG/2016/1892, R/REG/2016/1895, R/REG/2016/1896, REG/2016/1897, R/REG/2016/1898, R/REG/2016/1899, R/REG/2016/1900 and R/REG/2016/2038
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
1 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
1.2
Purpose
The purpose of this ESCP is to fulfil the A2N resource consent condition compliance requirements for mitigation and management of erosion and sedimentation related effects. It outlines the control measures to be implemented within the construction support area (CSA) by the contractor to manage erosion and sediment in line with the relevant legislative requirements as stated in the CRL designation condition #21.1 (b) and (c). This ESCP shall be read in conjunction with the Aotea Station Utilities Management Plan CRL-AOTUTI-000-PLN-0010 (particularly Section 4 and Appendix I: Preliminary design drawings) and the Construction Environmental Management Plan (CRL-PAT-RME-000-RPT-0100). These two documents define the design and construction methodology for the Project.
1.3
Scope
This ESCP provides a summary of the proposed erosion and sediment control measures relevant to the Albert Street Canopy Removal and Utility Relocation. It relates to all temporary works required for the following (refer Figure 1): Removal or cut-backs of 4 No. of building canopies attached to the existing buildings on the western side of Albert Street; Construction of new shared utilities trench along the western footpath of Albert Street; Connections to existing utility networks at the Victoria and Wellesley Street intersections with Albert Street; Removal of existing utilities made redundant by the installation and connection of the new utilities. The implementation and monitoring of controls discussed within this ESCP are in accordance with Auckland Council (AC) Guideline Document 2016/005 “Erosion and Sediment Control Guide for Land Disturbing Activities in the Auckland Region.� Technical reporting for groundwater, contaminated land, water quality, noise pollution and air quality matters are addressed by separately in the Construction and Environmental Management Plan.
1.4
Report Structure
The structure of the ESCP is designed to provide a logical and practical framework for the management of erosion and sediment control measures as it relates to the Project. The ESCP has the following key sections: Section 2 provides the Project general description, key phases and considerations, a detailed description of the site (also referred as CSA) and the required construction related works; Section 3 provides a detailed description of the erosion and sediment control measures proposed for the CSA; All drawings referenced throughout the report are attached in Appendix C of this report.
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
2 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
2
Project and Site Description
2.1
General
The Project works involve the removal of canopies attached to existing buildings on the western side of Albert Street between Victoria Street and Wellesley Street as well as relocation of existing utilities under the western footpath into an isolated, shared utilities trench located between the property boundary line and the western edge of the future station pile wall. It includes disconnection of utilities from existing network and connection to the new network installed within the shared utilities trench. The following 4 No. of building canopies need to be removed prior to the construction of shared utilities trench: 99 Albert Street (AA Building) 105 Albert Street (Manhattan Apartments) 109-125 Albert Street (Sky City Building) 135 Albert Street (Auckland Council Building) The realigned utilities within the shared utilities trench include: Stormwater pipeline; Wastewater pipeline; Potable water supply main; Ducts for high voltage (HV) and low voltage (LV) cables; Ducts for telecommunication cables. The width of the shared utilities trench varies between 1.15m and 1.85m, with total length of approximately 220m. Due to the depth of the existing stormwater and wastewater lines, this trench needs to be 4.0m deep. Hydrovac is used to expose ground up to 1.5m depth to ensure the existing utilities or connections are identified, isolated and protected prior to excavating another 2.5m deep using an excavator. The location of the shared utilities trench is selected based on the level of accuracy of the information gathered for the existing underground utilities. Therefore, if any clash is identified on site, the relevant NUOs and the Engineer are to be notified for further directions. The detailed design for Contract C2.2 utilities relocation is still to be completed in coordination with the relevant NUOs.
2.2
Key Phases and Considerations
The following are some key phases to be considered for the Project: In order for Contract C2.2’s utilities relocation works to commence, the existing utilities, particularly Chorus cables need to be diverted away and via Federal Street as these utilities are currently along the proposed shared utilities trench location. These diversion works are currently being selfperformed by the NUOs; Federal Street Diversion of utilities including civil works (ducts and pits), hauling of cables through new ducts and cutovers from the existing network to the new network are to be completed prior to commencement ofC2.2 works;
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
3 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
Detailed design for C2.2 to be completed in coordination with the relevant NUOs; C2.1 and C2.2 Construction works are anticipated to take approximately 15 months based on the Contractor and CRLL’s best knowledge of underground services. Should additional complexity or additional underground services be encountered during the course of the Project, then the Project duration will extend beyond 15 months; , Works are expected to commence in January 2018; and This Project is viewed by CRLL as enabling works, which first need to be completed before work on Aotea Station (in this area) can commence.
2.3
Site Layout
The location and extents of the CSA are shown in Figure 1 and on drawing CRL-AOT-UTI-000-DRG0101 included in Appendix C. The CSA, approximately 2250m2, is occupied by the entire western footpath and the carriageway up to the centreline of Albert Street, between Victoria Street and Wellesley Street. As a result, this will require lane(s) closure and provision of an alternative pedestrian access route. Temporary vehicle access to properties will also need to be established during construction. Refer to Transport, Access and Parking Delivery Work Plan attached as Appendix E of the CEMP report for details.
2.4
Site Levels and Catchment
The CSA is located on relatively flat ground which falls from approximately RL 27.0m at the southwest corner (from Wellesley St intersection) and RL 25.0m at the northwest corner (from Victoria St intersection) towards a low point on the western kerbline outside property 99 Albert Street (AA building) at approximately RL 24.0m where a double catchpit exists. The CSA has an upstream catchment of approximately 1.452ha (refer Figure 2). Approximately 85% of the runoff from this catchment is contained within the existing buildings and conveyed directly into the local stormwater network. The remaining upstream catchment from Wellesley Street and Victoria Street is contained within the road corridor and conveyed to inlets at either side of the CSA. Therefore, flows from this external catchment are not shown to enter and will continue to be excluded from the site during construction. Surface runoff from the CSA itself drains to the existing catchpits located on the western site of Albert Street, a standard catchpit is located outside 109-125 Albert Street (Sky City Building) and a double catchpit is located outside 99 Albert Street (AA building).
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
4 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
Figure 2 – CSA overland flow paths and upstream catchment (retrieved from Auckland Council GIS 03/10/17)
2.5
Site Overland Flow Paths
Auckland Council GIS shows the location of the CSA conflicts with the Overland Flow Path (OFP) from the upstream catchments and is predicted to be inundated by surface water as a result of 1 in 100 year rainfall event (refer Figure 2). However, the upstream catchments are managed and conveyed within the local stormwater network, resulting in minimal surface runoff entering the CSA during the majority of storm events. In addition, the topography of Wellesley Street and Victoria Street is in such
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
5 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
a way that the surface runoff from these streets will be generally directed further down the intersection towards Queen Street.
2.6
Construction Related Works
2.6.1
Canopy Removal / Cut-backs
The canopy removal or cut back works, specifically the extent of removal, is different for each building, however there are common methodologies that will apply to each stage, and similar tools and techniques will be used throughout, as mentioned below: Terminate any and all power supplies to the canopy and relocate any and all plant, equipment and signage currently located on those parts of the canopy to be removed; Erect scaffold, dismantle and remove building canopy or cut-back to agreed position; − Remove glazing/panel/roof sections, − Remove roof/secondary supports between main support beams, and − Remove primary support beams. Install weatherproof flashing to building façade where required and make good.
2.6.2
Utilities Relocation
Following canopy removals or cut-backs, below ground works will commence for the installation of the utilities within the shared utilities trench as listed: The construction of the shared utilities trench is proposed to commence from north (Victoria Street/Albert Street intersection) and progressing towards the south (Wellesley Street/Albert Street intersection); Mark out proposed footprint of trench selection. Identify and locate existing utilities on surface; Saw cut and remove existing footpath pavement (pavement is primarily asphalt surfacing, with isolated granite tile inserts); Expose up to 1.5m depth using hydro-excavation and locate all existing utilities within the western footpath as well as existing building foundations along boundary to confirm extent and/or clash with proposed shared utilities trench; Locate, protect and isolate all existing utilities on site for further excavations; Excavate trench to maximum 4m depth using excavator. Care to be taken for working around struts and utilities. Provide temporary strutting and shoring to trench sides with timber or trench shield as appropriate; Install new stormwater and wastewater pipelines and manholes starting at downstream end and working south. Cut over building connections to newly installed system once downstream is installed and connected to existing network; Install polystyrene wall adjacent to eastern side of trench (western side of future station pile to act as a guide wall for future piling); Backfill approximately half trench depth and install a new potable water supply main closer to the eastern side of the shared utilities trench; Lay new ducts for power and telecommunication cables, place and compact trench backfill where possible. Excavation for draw pits and joint bays and connection points to be left open. This section of the work includes power and communication outages, which will be planned and coordinated with building occupants, to minimise disruption;
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
6 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
NUOs to haul new cables through the new ducts and cutover existing network to new network; Place bedding material and compact remaining sections of ducts; Remove abandoned utilities that are within the western footpath; and Backfill and reinstate footpath to match existing levels and surface.
2.7
Site Management
2.7.1
Establishment
Preparation of the site will involve the following activities: Temporary traffic management (refer Appendix E of the CEMP report for details); Erosion and sediment control measures as detailed in Section 3 and on the drawings attached in Appendix C of this report; Installation of temporary fences and hoardings along site boundary and designation of entry and exit locations; Establishment of barriers and hot-mix diversion bunds along the boundary of the CSA; Establishment of site amenities, offices and storage areas; and Location and protection of existing utilities.
2.7.2
Provision of Access
An alternative access route for pedestrians will be provided either through containers or via the undercroft of the buildings. Existing vehicle access to properties 105 Albert Street (Manhattan Apartment) and 109-125 Albert Street (Sky City Building) will be maintained and controlled by Traffic Controllers (TCs).
2.7.3
Storage and Site Activities
Material removed from the site will predominantly consist of the following: Excavation of trench using hydro-excavation (~540m3); and Excavated materials during formation of shared utilities trench (~900m3). It is proposed that the excavated slurry material (using hydro-excavation) is immediately pumped and loaded into the hydro-excavation truck. Whilst material removed using excavators is also to be loaded directly into waiting trucks and disposed offsite as early as possible. Any spoil that should be stockpiled temporarily shall be stored on the up-slope side of the trench if possible or in a stabilised area which is away from the overland flow paths or within 1m of hazard areas such as kerb and channels, stormwater inlets, paved footpaths or driveways. It is expected that about 7 linear metre of trench will be excavated per day, which is approximately 20m3 per day. About 90m2 of temporary spoil storage area is proposed at the CSA as shown on the drawings. Any such material stored on site will be covered by geotextile fabric during inclement weather to reduce sediment runoff and dust migration. Provision has also been made to allow for storage of pipelines and ducts onsite. The following site activities are envisaged while carrying out the construction related works mentioned in Section 2.6: Earthworks from controlled disturbed areas;
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
7 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
Disposal of excavated spoil off-site; Construction / demolition waste is likely to be stored in skips and removed on a regular basis as required; Concrete trucks are likely to be washed out, off-site; Hazardous construction materials (if any) are proposed to be stored in an isolated area designated for this purpose; Loading and unloading of construction materials from trucks; Storage for construction materials, such as geotextiles, formwork (timber and steel), petrol (including diesel); Waste storage and collection; Separation of excavated material from slurry generated using Hydrovac; Importation of backfill material; and Construction of groundwater and stormwater collection, treatment measures and connections to existing network.
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
8 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
3
Erosion and Sediment Control
3.1
Design Philosophy
The construction environment of the Project related works is a highly developed urban environment predominantly formed of hard impervious paved areas and buildings. Given the nature of the surrounding environment and the proposed direct disposal of the spoil material offsite, sediment generative activities shall be largely contained within the excavations themselves. In addition, maintaining controls within the excavation will result in minimal effect on the surface and the surrounding built environment.
3.2
Design Principles
Erosion and sediment control measures will be established to minimise the extent of soil erosion and sediment yield from the CSA during construction. It will be implemented and monitored in accordance with AC “Erosion and sediment control guide for land disturbing activities” in the Auckland Region, known as GD05. This GD05 is an update of AC Technical Publication 90 (TP90) “Erosion and sediment control guidelines for land disturbing activities” in the Auckland Region and supersedes that guideline. All silt control measures shall be fully established throughout the CSA before physical works proceed in that area. The removal of the silt control devices and the reinstatement of the surrounding ground upon completion of the works shall form part of the civil component of the Project works and will be managed by the contractor.
3.3
Earthworks
The approximate earthworks volumes for the shared utilities trench installation and removal of abandoned utilities are summarised in Table 1. All material excavated are expected to be loaded straight onto trucks. However, if materials are to be stockpiled on site temporarily before removal offsite then designated stockpile area as shown on the drawings shall be used. All volumes are estimated in-situ with no allowance for bulking. Table 1 - Appropriate areas and earthworks volumes for C2.2 Utilities relocation
Description
Depth (m)
Area (m2)
Excavation (m3)
Backfill (m3)
Shared utilities trench (approx. 1.5m Wide x 4.0m Deep) Excavation using hydro-excavation*
1.5
360
540
415
Excavation using Excavator
2.5
360
900
870
1.5
560
820
840
-
-
2260
2125
-
-
230
215
-
-
2490
2340
**Removal of abandoned utilities Excavation using hydro-excavation* Sub-Total Contingency to fulfil consent requirements (10%) Total
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
9 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
*Excavated slurry material is constantly loaded into the truck as it is excavated. **Refers to abandoned utilities under the western footpath that are within 1.5m depth only and excavated using hydro-excavation. Removal of all other abandoned utilities will be undertaken as part of Contract C3 works.
3.4
Settlement Tank Sizing
It is anticipated that the groundwater table at the site is below the bottom of the shared utilities trench and therefore, only a minimal groundwater ingress is expected into the trench. Refer to the Groundwater Monitoring and Contingency Plan, attached as Appendix L of the CEMP report with regards to the potential for, and management of, groundwater at the worksite. Table 2Error! Reference source not found. below provides a summary of inflows and settlement tank volume required for a worst case scenario where up to half the total length of the trench is open. Settlement tanks have been sized to cater for the direct rainfall into the trench, the volume of which is estimated as 2% of the open excavation area. Table 2 - Summary of proposed shared utilities trench groundwater inflow rates and rainfall volumes
Shared utilities trench
220m L x 1.5m W
Groundwater Inflow Rate (m3/d)
Groundwater Treatment Volume (m3)
Open Excavation Area (m2)
Volume for Stormwater Management (m3)***
Minimum Settlement Tank Volume (m3)
0
0
180
3.6
3.6
*** In accordance with the Auckland Council GD05 (2016), the required additional volume estimated for the open trench is equal to 2% of the open excavation areaError! Reference source not found.. According to Auckland Council GD05, stormwater flows have been calculated based on Auckland Regional Council TP108 guidelines for Stormwater Run-off Modelling. The 24hr rainfall intensity used was for the 10 year ARI design flow and allows for climate change. Thus the 6hr 1 in 5-year storm event, as prescribed by the ISCA Sustainability Rating system is complied with. The management system is proposed to consist of two in-line settlement tanks. The first tank will be the discharge tank for the pumped discharge and the other will provide secondary settlement prior to discharge to the stormwater system. Given the extent of earthworks, flocculent treatment would not be required for the Project. Settlement in both tanks will be monitored throughout the construction period and sediment will be regularly removed as required to ensure optimum management in maintained. It is noted that if stormwater/groundwater flows exceed the maximum pump rate the open excavations will be inundated. As no groundwater in-flows are expected, and surface flows from upstream catchments have been diverted around the site, the risk of dirty water from the excavations overtopping the trench and discharging uncontrolled is considered low. It will be the responsibility of the contractor to appropriately manage the construction site during storm events.
3.5
Erosion and Sediment Control Measures
3.5.1
Proposed control measures
Sediment loading is anticipated to be low as construction works will be undertaken using the following controls to minimise erosion potential and reduce sediment loads to the receiving stormwater network prior to discharge from the CSA (refer to drawing CRL-AOT-UTI-000-DRG-013x series for details): Isolation of CSA – The work site shall include perimeter hoardings and temporary fencing to ensure separation of the work site from the public;
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
10 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
Diverting Road runoff – Ensure hot-mix bund is installed adjacent to the proposed works. As shown on drawing CRL-AOT-UTI-000-DRG-0102, the hot mix bund is positioned below site hoarding and abovethe existing pavements to divert the clean water runoff away from the CSA to existing catchpits in the vicinity of the work site; Stormwater Inlet Protection – The existing network at the CSA is a fully reticulated pipe network common to a developed urban environment. All catchpits within and in the vicinity of the works site to be protected using filter cloth across inlets or alternative inlet protection measures in accordance with GD05. No discharge of surface or groundwater to wastewater systems is proposed. Treating surface water – Surface site runoff within the CSA shall generally be collected along the existing kerb and channel and directed to existing catchpits with inlet protection. Where flows cannot be collected prior to discharge from the site, filter socks (or similar measures), shall be put in place to ensure flows are collected and treated prior to discharge from site; Settlement tanks – All surface and groundwater flows to be collected by localised sumps within the excavation area and pumped to the settlement tanks located within the CSA prior to discharge. Note limited groundwater ingress is expected due to groundwater table being lower than the bottom of shared utilities trench; Open Excavation – Excavated material shall be loaded straight onto trucks, where possible. Refer Section 3.5.2 for details if spoil/fill or demolition debris is to be stored on site temporarily; Water Quality – Batch dosing of stormwater flows may be required subject to water quality testing conducted on the final discharge. A testing regime shall be established at the discharge point of all CSA treatment facilities to ensure minimum water quality standards are met. Water quality testing requirements are outlined within the Water Quality Assessment appended to the Auckland City Rail Link Aotea Station to NAL project Resource Consent package. Note that if the testing determines that the flocculent treatment is required at the site, then a Flocculent Treatment Plan is required to be prepared and submitted to AC for certification prior to proceeding further with the construction works. Stabilised site surface – The entire CSA shall be maintained as a stabilised surface except at the location of the shared utilities trench; Site Access Points (SAPs) will be provided at two locations adjacent to where the existing vehicle access to buildings (such as Manhattan apartment and SkyCity hotel) are to be maintained. These areas are expected to be impervious stabilised areas (asphalt) however if bare earth is exposed, stabilised entry/exit points shall be provided with basic vehicle wash-down facilities to prevent transport of sediment off site; Loading trucks – Vehicles such as loading trucks will be parked on the carriageway adjacent to the kerb (within the site hoardings) and are not expected to be accessing the exposed areas. Therefore, wash-down areas and facilities are not proposed at the CSA. However, if vehicles access the exposed areas, then a wash-down area and facility will need to be provided to ensure vehicles leaving the site are ‘clean’. A water cart will be available on call to wet down any temporary stockpiles and/or pavement areas to prevent dust movement. Road sweeping will be carried out along the adjacent streets where trucks leave the site to ensure that no residual material is left behind which may be hazardous to traffic and pedestrians; and Wet weather – During an unforeseen rainfall event that limits carrying out the work, the work shall be stopped and the erosion and sediment control measures shall be checked to ensure they are operating correctly, and upgraded or modified where necessary prior to commencing work again; Control measures are illustrated on the drawings included in Appendix C of this report.
3.5.2
Site Spoil, Fill Material and Demolition Debris
Storage of excavated spoil, engineering fill, drainage materials or demolition debris will be limited at the worksite for the Project. It is proposed that excavated material for the construction of the shared utilities trench will be removed directly from site as it is excavated. However, provision has been made for temporary spoil storage within the CSA for short-term durations. Any such spoil shall be laid over and covered by geotextile fabric to minimise sediment runoff and dust migration at the end of each day
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
11 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
or when rain is forecast. Silt socks shall be provided around the spoil storage area to prevent transport of sediment. Stockpiles shall be located as indicated on the drawings and shall not be located in an area where runoff cannot be controlled.
3.5.3
Contamination
Any suspected contaminated materials encountered will be immediately notified to the Engineer and appropriate disposal methods agreed. Refer to the Contamination Delivery Work Plan (CDWP), attached as Appendix H of the CEMP report with regards to the potential for, and management of, contamination at the worksite. In the event any hazardous construction materials or soil are encountered these will be stored in an isolated area designated for this purpose and managed in accordance with the CDWP.
3.5.4
Reinstatement and Rehabilitation
The canopies removed from the existing buildings are likely to remain detached until the Aotea Station roof is constructed. New canopies are proposed to be installed post Aotea Station roof construction as part of the future CRL Contract 3 works. On completion of the utilities relocation works, the contractor will be required to: Remove abandoned or redundant utilities from the station wall piling line; All excavations to be backfilled with approved material; Footpath pavement to be reinstated to match existing levels and finish in accordance with ATCOP standards; Reinstatement of any suspended or protected utilities during construction; Remove erosion and sediment controls including hot-mix bund; The contractor shall reinstate all pavements affected by construction to match the existing pavement; and Disestablishment of site and handover to relevant authority.
3.6
Monitoring
As part of implementing the ESCP, the contractor will provide ongoing site monitoring to ensure that all proposed erosion and sediment control measures are installed correctly and continue to operate effectively and in the manner that was intended for the full duration of the works. All controls shall be inspected as a minimum fortnightly and following any heavy rain events to ensure devices continue to operate effectively. A maintenance and inspections regime shall be established in consultation with the relevant AC representative and may require more regular inspections subject to the risk profile associated with each measure. A log of inspections and maintenance to the control systems shall be recorded and kept onsite at all times. ESC construction quality checklists for each measure are also available in Appendix C of the Auckland Council GD05 (June 2016) which may be used on site for guidance. Additional monitoring may also be determined as required as a result of the water quality testing and monitoring carried out on site discharges. Testing and monitoring requirements in relation to water quality are provided within the Water Quality Assessment appended to the Auckland City Rail Link Aotea Station to NAL project Resource Consent package. Section 9.2 in the above document specifies the following regime to be followed: 1. Receiving environment (prior to commencement of construction):
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
12 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
a. Water quality (every 2 months) b. Freshwater Ecology (once per year) 2. During Operation/Construction: a. Daily for first week b. Weekly for the remainder of the first month c.
Monthly for the remainder of the first year
Following the above regime, the testing regime will be reviewed and amended as required. The analysis of the water quality and consitituents is provided in Section 10 of the above report.
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
13 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
4
Conclusion
As part of the Albert Street Canopy Removal and Utility Relocation, the removal or cut back of four building entrance canopies, the excavation of 220m of shared utilities trench, and the relocation of various utilities will be necessary. These works will require specific erosion and sediment control measures to be implemented in accordance with the conditions of the consent to manage the environmental effects of the construction works. This ESCP provides a framework for identifying and implementing erosion and sediment yields during construction works. A design philosophy and a number of design principles have been provided, along with specific control methodologies for the Project works. The proposed sediment and erosion controls have been developed in such a way that they align with the proposed construction methodology. All controls shall be fully established before any physical works are undertaken and monitored in accordance with the Auckland Council GD05 (June 2016). Based on the proposed sediment and erosion controls detailed within this report, the effects of the Albert Street Canopy Removal and Utility Relocation temporary works may be managed in accordance with the statutory regulations and best management practices, to the extent that effects are expected to be less than minor.
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
14 CRL-PAT-RME-000-PLN-0101 Project 239933 | 10 May 2018 | Revision 4
Appendices
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
Appendix A Glossary of Abbreviations
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
The following abbreviations have been used throughout this City Rail Link Erosion and Sediment Control Management Plan and are listed below for reference. Abbreviation AC AEE CEMP CSA CRL CRLL GD05 ESCP NAL RMA TCs
Description Auckland Council Assessment of Environmental Effects Construction Environmental Management Plan Construction Support Area City Rail Link project City Rail Link Limited Auckland Council Guideline Document for Erosion and Sediment Control (2016) Erosion and Sediment Control Plan North Auckland Line Resource Management Act 1991 Traffic Controllers
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
Appendix B Glossary of Terminology
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
The following terminology has been used throughout this City Rail Link Erosion and Sediment Control Management Plan and are listed below for reference. Term Flocculants Groundwater Hoarding North Auckland Line the Project Spoil Settlement Tank
Description A chemical which causes suspended particles in a liquid to aggregate which then induces settlement Water located underground in pore spaces within the soil mass Temporary fencing/barriers enclosing a construction site An existing railway line which runs from Newmarket through to Swanson and beyond Works related to Albert Street Canopy Removal (C2.1) and Utility Relocation (C2.2) Excavated material Chamber for storage of groundwater to filter sediments prior to discharge into stormwater network
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
Appendix C Drawings
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
SW
SW
14
SW
SW
SW
SW
SW
SW
SW
SW
KEY PLAN
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
30
SW
SW
SW SW
SW SW
SW
SW SW
42
SW SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW SW
FUTURE UTILITIES ROOF TRENCH TO BE CONSTRUCTED AS PART OF C3 WORKS
40
43
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW 225Ø
SW SW
SW
SW
SW
UNKNOWN
SW
ALBERT STREET SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
8
SW
225Ø UNKNOWN
4-10 4
SW
SW
1/2-4/2
SW
37
SW
98-102
138
112
106
SW
SW
120-130 104
SW
47
SW
37-41
FUTURE UTILITIES ROOF TRENCH TO BE CONSTRUCTED AS PART OF C3 WORKS
SW
15-31
SW
SW
24 SW
SW
SW
20
SW
27-35
SW
SW
SW
SW
39
SW
SW
SW
SW SW
SW SW
SW
20
SW
SW
9-11
SW
SW
SW
SW
11-25
SW
SW
SW
SW SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
EXISTING STORMWATER LINE
PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES PROPOSED HOT MIX BUND
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
PROPOSED CONSTRUCTION SUPPORT AREA (CSA)
SW
SW
WELLESLEY STREET
202
SW
SW
SW
198
SW
SW
EXISTING KERB AND CHANNEL
190
182
SW
SW
58
SW
SW
EXISTING CRL DESIGNATION BOUNDARY
SW
68
LEGEND
SW
100
88
86
210
SW
66
56
SW
49
SW
SW
VICTORIA STREET
SW
PROPOSED PEDESTRIAN ACCESS ROUTE THROUGH BUILDING
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0101.dwg
SW
44
VEHICLE ACCESS TO SKYCITY BUILDING
SW
75
15
SW
71
SW
COUNCIL BUILDING
67 69
13
129-135
SKYCITY BUILDING
VEHICLE ACCESS TO MANHATTAN APARTMENTS
52
11
SW
MANHATTAN APARTMENTS
AA BUILDING
57-59
1
125
99 44
SW
103 51-53
PROPOSED SITE HOARDING
SW
59-63
SW
SW
0
10
20m
SCALE 1:500
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
SCALE
SIZE
1:500
A1
DRAWN
FOR APPROVAL NOT FOR CONSTRUCTION .
B.KARNAN
B.NEWNS
ORIGINAL SIZE
60
80
100
200
300
400
500
PROPOSED CONTAINER PEDESTRIAN WALKWAY PROPOSED SITE ACCESS POINT (SAP) FUTURE AOTEA STATION PILES
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET GENERAL ARRANGEMENT PLAN
TITLE
B.NEWNS
R.DONNELLY 40
DATE
PROPOSED PEDESTRIAN ROUTE
CITY RAIL LINK
PROJECT
22.03.18
CHECKED
20mm
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
APPROVED
E.ALVAREZ DESIGNED
0
PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS
SW
SW
5
REV 1.0 2.0 3.0
205
1.
3. CLIENT
201-203
PROPOSED TEMPORARY FENCE
PROPOSED SHARED UTILITIES TRENCH
2.
SW
87
195
NOTES
SW
72
187
SW
SW Auckland 22/03/2018 4:21:25 p.m.
77-85
SW
PROPOSED BARRIER 93
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0101
3.0
700
800
SEDIMENT AND EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ENVIRONMENTAL MANAGEMENT FOR THE DURATION OF THE PROJECT. THIS SHALL INCLUDE FOR MANAGEMENT OF EARTHWORKS METHODS, SITE RUNOFF AND DISCHARGES, EROSION AND SEDIMENT, WIND-BLOWN DUST, NOISE, AND PROTECTION OF ARCHAEOLOGICAL TREASURES AND FLORA AND FAUNA AS APPROPRIATE. 2. NO WORK SHALL COMMENCE UNTIL THE CONTRACTOR, VIA A SUITABLY EXPERIENCED PERSON, HAS SUBMITTED TO THE ENGINEER, AN ENVIRONMENTAL MANAGEMENT PLAN OR SERIES OF PLANS COVERING OVERALL ENVIRONMENTAL MANAGEMENT AND GAINED APPROVAL FOR THE PROPOSED WORKS. WHERE APPLICABLE THE PLANS SHALL ALSO BE SUBJECT TO THE APPROVAL OF AUCKLAND COUNCIL. 3. SITE ACCESSES ONTO PUBLIC ROADS SHALL BE ESTABLISHED TO THE REQUIREMENTS OF AUCKLAND TRANSPORT AND ACCESS TO AND FROM THE SITE SHALL BE SOLELY VIA THE APPROVED ACCESS POINT.
INDICATIVE CONTAINER PATHWAY (AS REQUIRED)
SITE HOARDING ON HOT-MIX BUND (AS REQUIRED) W-BEAM BARRIER HOT MIX BUND
EXISTING SURFACE
CLEAN WATER DIVERSION 1O
N2
N2
200
1O
DIRTY WATER DIVERSION
SECTION
4. WASHDOWN FACILITIES AND A ROAD CLEANING REGIME SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF WORKS AND MAINTAINED FOR THE DURATION OF THE WORKS. ALL VEHICLES LEAVING THE SITE SHALL BE WASHED. EXTERNAL ROADS SHALL BE KEPT CLEAN OF DUST AND DEBRIS. 5. SEDIMENT AND EROSION MANAGEMENT DEVICES SHALL BE IN PLACE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES AND SHALL BE MAINTAINED THROUGHOUT AND BEYOND THE CONSTRUCTION WORKS. 6.
1:25
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0102.dwg
-
ALL CATCHPITS WITHIN AND IN THE VICINITY OF WORK SITE SHALL BE PROTECTED USING FILTER CLOTH ACROSS INLETS OR ALTERNATIVE INLET PROTECTION MEASURES IN ACCORDANCE WITH GD05. NO DISCHARGE OF SURFACE WATER OR GROUNDWATER TO WASTEWATER SYSTEM IS PERMITTED.
7. BATCH DOSING OF STORMWATER FLOWS MAY BE REQUIRED SUBJECT TO WATER QUALITY TESTING CONDUCTED ON THE FINAL DISCHARGE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE WATER QUALITY ASSESSMENT FOR THE SITE-WORN MATERIALS TO ALLOW BENCHMARK TESTING OF THE EFFECTIVENESS OF THE PROPOSED FLOCCULANT AND REQUIRED DOSAGE RATE TO IMPROVE THE QUALITY OF THE WATER PRIOR TO DISCHARGE TO THE STORMWATER NETWORK. 8. SEDIMENT AND EROSION CONTROL FACILITIES SHALL INCORPORATE FENCING AND OTHER MEASURES NECESSARY TO MAINTAIN WORKER AND PUBLIC SAFETY AT ALL TIMES. 9. IF SEDIMENT AND EROSION CONTROL FACILITIES ARE FOUND TO BE DEFICIENT OR OTHERWISE NOT CONSISTENTLY ACHIEVING DESIRED OUTCOMES THE CONTRACTOR SHALL TAKE IMMEDIATE ACTION TO CORRECT THE PROBLEMS WHICH MAY INCLUDE MODIFICATIONS TO OR REPLACEMENT OF ORIGINAL FACILITIES. ALL MODIFICATIONS OR CHANGES TO THE SYSTEMS SHALL BE BASED ON DESIGN BY A SUITABLY QUALIFIED PERSON ENGAGED BY THE CONTRACTOR AND EXCEPT FOR URGENT WORKS, SHALL BE PROVIDED TO THE ENGINEER FOR CONSIDERATION PRIOR TO THEIR IMPLEMENTATION. 10. AT ALL TIMES RUNOFF FROM UNDISTURBED AREAS SHALL BE DIVERTED AROUND AREAS BEING DISTURBED AND AREAS BEING DISTURBED AT ANY TIME SHALL BE MINIMISED. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REGULARLY INSPECTING EROSION AND SEDIMENT CONTROL FACILITIES AND RECORDING THE INSPECTIONS AND CONDITION. AS A MINIMUM ALL DEVICES SHALL BE INSPECTED WEEKLY AND AFTER SIGNIFICANT RAIN EVENTS. SEDIMENT TANKS, FENCES AND THE LIKE SHALL BE CLEANED WHEN CAPACITY IS REDUCED BY 25% OR IF INSTRUCTED BY THE ENGINEER OR AUCKLAND COUNCIL. 12. SEDIMENT AND EROSION CONTROL DEVICES SHALL BE REMOVED FROM SITE AND THE AREAS OCCUPIED BY THEM, TIDIED TO A STABILISED PRE-EXISTING OR DESIGN CONTOUR WHEN IT IS ACCEPTED BY THE ENGINEER THAT THE AREAS OF DISTURBANCE HAVE ACHIEVED ACCEPTABLE STABILISATION. 13. DURING AN UNFORESEEN RAINFALL EVENT THAT LIMITS CARRYING OUT THE WORK, THE WORK SHALL BE STOPPED AND THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED TO ENSURE THEY ARE OPERATING CORRECTLY, AND UPGRADED OR MODIFIED WHERE NECESSARY PRIOR TO COMMENCING WORK AGAIN.
300mm
AGGREGATE
COURSE GEOTEXTILE
RUNOFF WATER
SEDIMENT BUILD UP
CESSPIT GRATE
CROSS SECTION
CATCHPIT PROTECTION DETAIL (REFER TO GD05 SECTION F1.6) NOT TO SCALE
12/4/2017 3:09:21 PM
Auckland
A
CLIENT 250
0
500
REV DATE REVISION DETAILS 1.0 26.10.17 DRAFT FOR CRLL TO REVIEW 2.0 05.12.17 ISSUED FOR APPROVAL
1000mm
APPROVED B.NEWNS B.NEWNS
SCALE
SIZE
AS SHOWN
A1
DRAWN
.
DESIGNED
B.KARNAN
ORIGINAL SIZE
40
60
80
100
200
300
400
CONTRACTS 2.1 & 2.2 EROSION AND SEDIMENT CONTROL GENERAL NOTES AND TYPICAL DETAILS
TITLE
B.NEWNS B.NEWNS
R.DONNELLY 20mm
DATE
05.12.17
CHECKED
0
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ
SCALE 1:25
FOR APPROVAL
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0102
2.0
700
800
SW
WORKING ZONE
AREA (m²)
WORKING ZONE
AREA (m²)
PROPOSED CONSTRUCTION SUPPORT AREA
2250
SPOIL STORAGE AMENITIES SETTLEMENT TANKS STORAGE CONTAINER EXCAVATORS (EACH)
90 5 12 16 30
SW
SW
SW
SW
SW
SW
SW
SW
SW
VICTORIA STREET
SW
SW SW SW
SW SW
X
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW SW
X
SW
SW SW
X
SW
225Ø UNKNOWN
SW
SITE ACCESS POINTS (SAPs)
SW
ALBERT STREET
JOIN SHEET 2
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
20T EXCAVATOR
SW
SKIP
SW
TEMPORARY SPOIL STORAGE
SW
STORAGE CONTAINER
SW
SETTLEMENT TANKS (MIN. 5m³ VOLUME EACH)
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
X
SW
SW
SW
SW
SW
225Ø UNKNOWN
SW
SW
SW
X
SW
X
SW
SW
X
X
X SW
SW
SW
X
X
SW SW
KEY PLAN
TEMPORARY WORK AREAS
TEMPORARY WORK AREAS
TEMPORARY SPOIL STORAGE
SW
SW
SW
REFER NOTE 3
SW
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0111.dwg
SW
SITE AMENITY
SKYCITY BUILDING MANHATTAN APARTMENTS
SW
SW
AA BUILDING
LEGEND 1.
SW
VICTORIA STREET
SW
EXISTING CRL DESIGNATION BOUNDARY
NOTES
SW
SW
2.
SW
3.
SW
4.
SW
Auckland
SW
5.
SW
SW
22/03/2018 4:22:45 p.m.
6.
1
0
2
4m
CLIENT
7. REV 1.0 2.0 3.0
SCALE 1:100
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
SCALE
SIZE
1:200
A1
DRAWN
FOR APPROVAL NOT FOR CONSTRUCTION .
B.KARNAN
B.NEWNS B.NEWNS
R.DONNELLY ORIGINAL SIZE
40
60
80
100
200
300
400
500
EXISTING STORMWATER LINE
SW
PROPOSED STORMWATER LINE PROPOSED CONSTRUCTION SUPPORT AREA (CSA) PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES PROPOSED HOT MIX BUND PROPOSED SITE HOARDING PROPOSED BARRIER PROPOSED TEMPORARY FENCE PROPOSED SILT FILTER SOCK BUND PROPOSED SHARED UTILITIES TRENCH PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS PROPOSED PEDESTRIAN ROUTE PROPOSED CONTAINER PEDESTRIAN WALKWAY PROPOSED SITE ACCESS POINT (SAP) FUTURE AOTEA STATION PILES
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET - SHEET 1 SITE LAYDOWN AREA
TITLE
22.03.18
CHECKED
20mm
DATE
SW
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ DESIGNED
0
EXISTING KERB AND CHANNEL
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. PROPOSED TEMPORARY FENCE ARE TO BE MIN. 1.8m HIGH WIRED FENCE COVERED WITH DUST FILTER CLOTH. FENCE ARE TO BE ADJUSTED FOR TRUCK / EXCAVATOR ACCESS AS REQUIRED. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0111
3.0
700
800
SW
SW SW
SW
SW SW
KEY PLAN
PROPOSED CONSTRUCTION SUPPORT AREA
2250
SW
90 5 12 16 30
SW
SPOIL STORAGE AMENITIES SETTLEMENT TANKS STORAGE CONTAINER EXCAVATORS (EACH)
SW
SW
SW
SW
WELLESLEY STREET
SW
SW
SW
SW
SW
SW
SW
SW
AREA (m2)
SW
WORKING ZONE
SW
AREA (m2)
SW
WORKING ZONE
SW
TEMPORARY WORK AREAS
TEMPORARY WORK AREAS
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
ALBERT STREET SITE ACCESS POINTS (SAPs)
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SKIP
SW SW
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0112.dwg
SW
SW
SW
REFER NOTE 3
SW
SW
SW
SW
20T EXCAVATOR TEMPORARY STORAGE PIT
SW
SW
SKIP
SW
SW
SITE AMENITY
SKYCITY BUILDING
SW
SW
LEGEND
SW
SW
MANHATTAN APARTMENTS
SW
SW
COUNCIL BUILDING
7.
1
0
2
4m
CLIENT
REV 1.0 2.0 3.0
SCALE 1:100
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
ORIGINAL SIZE
80
100
200
300
400
SW SW
SW
SW
SW
SW
SW
PROPOSED TEMPORARY FENCE PROPOSED SILT FILTER SOCK BUND
PROPOSED PEDESTRIAN ROUTE PROPOSED CONTAINER PEDESTRIAN WALKWAY PROPOSED SITE ACCESS POINT (SAP) FUTURE AOTEA STATION PILES
SIZE
1:100
A1
DRAWN
SW
PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS
SCALE
SW
PROPOSED SHARED UTILITIES TRENCH
FOR APPROVAL NOT FOR CONSTRUCTION
CITY RAIL LINK
PROJECT
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET - SHEET 2 SITE LAYDOWN AREA
APPROVED
E.ALVAREZ
.
DATE
TITLE
22.03.18
B.NEWNS B.NEWNS
R.DONNELLY 60
SW
PROPOSED BARRIER
B.KARNAN
40
SW
PROPOSED SITE HOARDING
CHECKED
20mm
SW
PROPOSED HOT MIX BUND
DESIGNED
0
SW
PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES
SW
22/03/2018 4:25:07 p.m.
6.
PROPOSED CONSTRUCTION SUPPORT AREA (CSA)
SW
Auckland
5.
PROPOSED STORMWATER LINE
SW
4.
EXISTING STORMWATER LINE
SW
SW
3.
SW
SW
2.
EXISTING KERB AND CHANNEL
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. 2.REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. PROPOSED TEMPORARY FENCE ARE TO BE MIN. 1.8m HIGH WIRED FENCE COVERED WITH DUST FILTER CLOTH. FENCE ARE TO BE ADJUSTED FOR TRUCK / EXCAVATOR ACCESS AS REQUIRED. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
SW
1.
WELLESLEY STREET
EXISTING CRL DESIGNATION BOUNDARY
NOTES
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0112
3.0
700
800
SW SW
SW
SW
SW
SW
SW
525Ø
SW
SW
SW
375Ø RC
SW
SW SW
SW SW
225Ø
43
X
X
SW
47 SW
SW
SW
X SW
SW
X
SW
X
SW
X
Ø UNKNOWN 225 SW SW SW
SW
225Ø RC
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SKIP
SW
SW
C
SW
SW
SW
300Ø RC SW
SW
SW
TEMPORARY SPOIL STORAGE
ØR
SW
STORAGE CONTAINER
225
SW
525Ø
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
X
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
5Ø 37
1530Ø OVOID
225Ø UNKNOWN
SW
SW
SW
X
SW
SW
X
X
SW
X
SW
SW
X
X
98-102
112
106
X
SW
104
SW
SW
SW
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0121.dwg
SW
SW
300Ø CI-CL
20T EXCAVATOR
SW SW
SITE AMENITY
SW
103 99 SW
51-53
SETTLEMENT TANKS (MIN. 5m³ VOLUME EACH)
AA BUILDING
SW
44
MANHATTAN APARTMENTS
TEMPORARY SPOIL STORAGE TO BE USED ONLY WHEN LOADING TRUCKS ARE NOT AVAILABLE ON SITE. WHEN LOADING TRUCKS ARE AVAILABLE, TEMPORARY SPOIL ARE TO BE DISPOSED OFF SITE FIRST.
LEGEND EXISTING CRL DESIGNATION BOUNDARY
NOTES
SW
SW
1.
SW
2.
SW
3.
4.
SW
57-59
5.
SW
Auckland
SW
52
SW
SW
22/03/2018 4:25:51 p.m.
6.
67 CLIENT 2.5
0
5
7. REV 1.0 2.0 3.0
10m
SCALE 1:250
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
SCALE
SIZE
1:250
A1
DRAWN
FOR APPROVAL NOT FOR CONSTRUCTION .
B.KARNAN
B.NEWNS B.NEWNS
R.DONNELLY ORIGINAL SIZE
40
60
80
100
200
300
400
500
EXISTING STORMWATER LINE
SW
PROPOSED STORMWATER LINE PROPOSED CONSTRUCTION SUPPORT AREA (CSA) PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES PROPOSED HOT MIX BUND PROPOSED SITE HOARDING PROPOSED BARRIER PROPOSED TEMPORARY FENCE PROPOSED SILT FILTER SOCK BUND PROPOSED SHARED UTILITIES TRENCH PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS PROPOSED PEDESTRIAN ROUTE PROPOSED CONTAINER PEDESTRIAN WALKWAY PROPOSED SITE ACCESS POINT (SAP) FUTURE AOTEA STATION PILES
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET - SHEET 1 SITE LAYOUT AND TTM
TITLE
22.03.18
CHECKED
20mm
DATE
SW
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ DESIGNED
0
EXISTING KERB AND CHANNEL
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. PROPOSED TEMPORARY FENCE ARE TO BE MIN. 1.8m HIGH WIRED FENCE COVERED WITH DUST FILTER CLOTH. FENCE ARE TO BE ADJUSTED FOR TRUCK / EXCAVATOR ACCESS AS REQUIRED. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0121
3.0
700
800
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
37
138
SW
SW
120-130
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
ALBERT STREET
SW
SW
SW
SW
SITE AMENITY
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
20T EXCAVATOR TEMPORARY STORAGE PIT
SW
SW
SW
SW
SKIP
SW
SW
REFER NOTE 3
COUNCIL BUILDING
SW
129-135
SW
SW
SW
SW
SW
SW
SKYCITY BUILDING
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0122.dwg
SW
SW
125
Auckland
PROPOSED SHARED UTILITIES TRENCH
5.
22/03/2018 4:26:28 p.m.
PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS
18m SEMI-TRAILER ENTRY AND EGRESS CLIENT 2.5
0
5
SCALE 1:250
6.
PROPOSED CONTAINER PEDESTRIAN WALKWAY PROPOSED SITE ACCESS POINT (SAP)
7.
FUTURE AOTEA STATION PILES REV 1.0 2.0 3.0
10m
PROPOSED PEDESTRIAN ROUTE
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
SCALE
SIZE
1:250
A1
DRAWN
FOR APPROVAL NOT FOR CONSTRUCTION .
DESIGNED
B.KARNAN
ORIGINAL SIZE
40
60
80
100
200
300
400
B.NEWNS 500
SW SW
SW
SW
SW
SW
SW
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET - SHEET 2 SITE LAYOUT AND TTM
TITLE
B.NEWNS
R.DONNELLY 20mm
DATE
22.03.18
CHECKED
0
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ
SW
PROPOSED SILT FILTER SOCK BUND
SW
4.
PROPOSED TEMPORARY FENCE
SW
PROPOSED BARRIER
SW
PROPOSED SITE HOARDING
SW
3.
PROPOSED HOT MIX BUND
SW
PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES
2.
SW
PROPOSED CONSTRUCTION SUPPORT AREA (CSA)
SW
PROPOSED STORMWATER LINE
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. PROPOSED TEMPORARY FENCE ARE TO BE MIN. 1.8m HIGH WIRED FENCE COVERED WITH DUST FILTER CLOTH. FENCE ARE TO BE ADJUSTED FOR TRUCK / EXCAVATOR ACCESS AS REQUIRED. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
SW
SW
SW
NOTES 1.
EXISTING STORMWATER LINE
SW
EXISTING KERB AND CHANNEL SW
SW
EXISTING CRL DESIGNATION BOUNDARY
SW
LEGEND
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0122
3.0
700
800
SW 375Ø RC SW
SW
1530Ø OVOID SW SW
525Ø SW
SW
SW
SW
SW
SW
VICTORIA STREET
SW SW SW SW
225Ø SW
43
KEY PLAN
120-130
X
X
SW
SW
104 112
X
SW
SW
SW
SW
SW
SW
X
SW
SW
X
SW
225Ø UNKNOWN
SW
225Ø RC SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
1120Ø OVOID
JOIN SHEET 2
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
225 Ø
SW
SW
SW
SW
300Ø CI-CL
SW
SW
SW
20T EXCAVATOR
300Ø RC SW
SKIP
SW
300Ø RC
TEMPORARY SPOIL STORAGE
SW
STORAGE CONTAINER
ØR C
SW
225
SW
SW
SW
SW
ALBERT STREET
SW
SW
SW
SW
SW
SW
SW
SW
X
SW
SW
SW
525Ø SW
SW
5Ø 37
1530Ø OVOID
225Ø AC
225Ø UNKNOWN
SW
X
SW
X
SW
SW
X
X
SW
106
X
98-102
SW
SW
SW
47
RC
TEMPORARY SPOIL STORAGE
SW SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0131.dwg
SW
SETTLEMENT TANKS (MIN. 5m³ VOLUME EACH)
51-53
SW
SW
44
REFER NOTE 8
PROPOSED OPEN DIVERSION TRENCH TO ALLOW FOR DIRTY WATER DIVERSION IF 99 THE INLET PROTECTION IS INADEQUATE DUE TO SEVERE WEATHER (AS REQUIRED)
CONTINUE DIRTY WATER DIVERSION ACROSS VEHICLE CROSSING
SITE AMENITY
103
LEGEND EXISTING CRL DESIGNATION BOUNDARY EXISTING KERB AND CHANNEL EXISTING CONTOURS (0.5m INTERVAL) SW
PROPOSED TEMPORARY PIPE FOR PUMPING DIRTY WATER TO SETTLEMENT TANKS
SKYCITY BUILDING
MANHATTAN APARTMENTS
AA BUILDING
EXISTING STORMWATER LINE
SW
EXISTING STORMWATER CATCHPIT
SW
EXISTING OVERLAND FLOW PATH
SW
1.
2.
52 SW
57-59
INLET PROTECTION (REFER NOTE 8)
3. SW
VICTORIA STREET
PROPOSED STORMWATER CATCHPIT
NOTES
SW
4.
SW
5.
6.
Auckland
525Ø SW
67
7. SW SW
22/03/2018 4:27:31 p.m.
69
8.
SW
71
CLIENT 2
0
4
9. REV 1.0 2.0 3.0
8m
SCALE 1:200
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
SCALE
SIZE
1:200
A1
DRAWN
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. PROPOSED TEMPORARY FENCE ARE TO BE MIN. 1.8m HIGH WIRED FENCE COVERED WITH DUST FILTER CLOTH. FENCE ARE TO BE ADJUSTED FOR TRUCK / EXCAVATOR ACCESS AS REQUIRED. DURING AN UNFORESEEN RAINFALL EVENT THAT LIMITS ON CARRYING OUT THE WORK, THE WORK SHALL BE STOPPED AND THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AND UPGRADED OR MODIFIED WHERE NECESSARY PRIOR TO COMMENCING WORK AGAIN. FILTER CLOTH (OR SIMILAR) INLET PROTECTION TO BE USED ON EXISTING CATCHPITS. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
FOR APPROVAL NOT FOR CONSTRUCTION .
DESIGNED
B.KARNAN
B.NEWNS B.NEWNS
R.DONNELLY 20mm ORIGINAL SIZE
40
60
80
100
200
300
400
500
PROPOSED CONSTRUCTION SUPPORT AREA (CSA) PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES PROPOSED HOT MIX BUND PROPOSED SITE HOARDING PROPOSED BARRIER PROPOSED TEMPORARY FENCE PROPOSED SILT FILTER SOCK BUND PROPOSED SHARED UTILITIES TRENCH PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS PROPOSED PEDESTRIAN ROUTE PROPOSED SITE ACCESS POINT (SAP) FUTURE AOTEA STATION PILES
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET - SHEET 1 EROSION AND SEDIMENT CONTROL PLAN
TITLE
22.03.18
CHECKED
0
DATE
CLEAN WATER DIVERSION DISCHARGE POINT FOR FLOWS FROM SITE
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ
DIRTY WATER DIVERSION
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0131
3.0
700
800
SW
SW SW
SW
SW SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
1/2-4/2 SW
37 138
SW
SW
120-130
WELLESLEY STREET
SW
SW
SW
SW
42
KEY PLAN
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
ALBERT STREET
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SKIP
EXISTING CONTOURS (0.5m INTERVAL)
PROPOSED BARRIER
Auckland
PROPOSED TEMPORARY FENCE PROPOSED SILT FILTER SOCK BUND
7.
PROPOSED SHARED UTILITIES TRENCH PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS 8.
PROPOSED PEDESTRIAN ROUTE PROPOSED SITE ACCESS POINT (SAP)
9.
FUTURE AOTEA STATION PILES
CLIENT 2
0
4
REV 1.0 2.0 3.0
8m
SCALE 1:200
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL
APPROVED B.NEWNS B.NEWNS CRL DESIGNATION BDY UPDATED, TRENCH WORKS ON WELLESLEY ST REMOVED B.NEWNS
SCALE
SIZE
1:200
A1
DRAWN
NOT FOR CONSTRUCTION .
ORIGINAL SIZE
80
100
200
300
400
DATE
SW SW SW SW
SW
SW
WELLESLEY STREET
SW
SW
CONTRACTS 2.1 & 2.2 WESTERN ALBERT STREET - SHEET 1 EROSION AND SEDIMENT CONTROL PLAN
TITLE
22.03.18
B.NEWNS B.NEWNS
T.NEL 60
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ B.KARNAN
40
56
49
FOR APPROVAL
CHECKED
20mm
SW
SW SW
DATE 26.10.17 05.12.17 22.03.18
DESIGNED
0
SW
6.
PROPOSED SITE HOARDING
SW
PROPOSED HOT MIX BUND
5.
SW
PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES
4.
500
44
SW
PROPOSED CONSTRUCTION SUPPORT AREA (CSA)
SW
3.
SW
CLEAN WATER DIVERSION DISCHARGE POINT FOR FLOWS FROM SITE
SW
DIRTY WATER DIVERSION
SW
2.
EXISTING OVERLAND FLOW PATH
SW
INLET PROTECTION (REFER NOTE 8)
SW
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. PROPOSED TEMPORARY FENCE ARE TO BE MIN. 1.8m HIGH WIRED FENCE COVERED WITH DUST FILTER SOCK. THESE ARE TO BE ADJUSTED ON SITE FOR TRUCK / EXCAVATOR ACCESS AS REQUIRED. DURING AN UNFORESEEN RAINFALL EVENT THAT LIMITS ON CARRYING OUT THE WORK, THE WORK SHALL BE STOPPED AND THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AND UPGRADED OR MODIFIED WHERE NECESSARY PRIOR TO COMMENCING WORK AGAIN. FILTER CLOTH (OR SIMILAR APPROVED) INLET PROTECTION TO BE USED ON EXISTING CATCHPITS. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
SW
1.
SW
PROPOSED STORMWATER CATCHPIT
NOTES
SW
EXISTING STORMWATER CATCHPIT
22/03/2018 4:28:36 p.m.
SW SW
PROPOSED TEMPORARY PIPE FOR PUMPING DIRTY WATER TO SETTLEMENT TANKS
129-135
COUNCIL BUILDING
SKYCITY BUILDING
EXISTING STORMWATER LINE
SW
REFER NOTE 8
SW
EXISTING KERB AND CHANNEL
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0132.dwg
EXISTING CRL DESIGNATION BOUNDARY
GAP TO BE PROVIDED UNDER FENCE TO ENABLE DIRTY WATER DIVERSION TO REACH DOWNSTREAM CATCHPIT
SW
LEGEND
PROPOSED OPEN DIVERSION TRENCH TO ALLOW FOR DIRTY WATER DIVERSION IF THE INLET PROTECTION IS INADEQUATE DUE TO SEVERE WEATHER (AS REQUIRED)
SW
CONTINUE DIRTY WATER DIVERSION ACROSS VEHICLE CROSSING 125
SW
REFER NOTE 8
SW
SW
SW
SW
20T EXCAVATOR TEMPORARY STORAGE PIT
SW
SW
SKIP
SW
SW
SITE AMENITY
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0132
3.0
700
800
SW
SW
X
SW
X
X
X
SW
SW
SW
X SW
SW
X
SW
SW
X SW
SW
ALBERT STREET
SW
SW SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
225
ØR
SW
SW SW
SW
SW
STORAGE CONTAINER SW
ALBERT STREET
TRENCH REQUIRED FOR STORMWATER CONNECTION TO EXISTING NETWORK
SW
525Ø
SW
SW
SW
SW
SW
1530Ø OVOID
SW
225Ø RC
SW
SW
SW
SW
SW
SW
SW
SW
X
SW
SW
5Ø 37
VICTORIA STREET
KEY PLAN
C SW SW
SW
EXISTING CRL DESIGNATION BOUNDARY SW
300Ø CI-CL
LEGEND EXISTING KERB AND CHANNEL
SW
SW
EXISTING CONTOURS (0.5m INTERVAL)
SW
NOTES
SW
1.
SW
2. AA BUILDING
SW
3.
SW
51-53
SW
44
4.
SW
TRENCH REQUIRED FOR VECTOR ASSETS CONNECTION TO EXISTING NETWORK
5.
SW
6.
SW
VICTORIA STREET
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0133.dwg
SW
SW
SW
TRENCH REQUIRED FOR WASTEWATER CONNECTION TO EXISTING NETWORK
8. 9.
SW
22/03/2018 4:29:32 p.m.
SW
Auckland
SW
7.
SW
10.
57-59
CLIENT 2
0
4
REV 1.0 2.0 3.0
8m
SCALE 1:200
DATE 26.10.17 05.12.17 22.03.18
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL CRL DESIGNATION BOUNDARY UPDATED
APPROVED B.NEWNS B.NEWNS B.NEWNS
SCALE
SIZE
1:100
A1
DRAWN
FOR APPROVAL NOT FOR CONSTRUCTION .
B.KARNAN
B.NEWNS
ORIGINAL SIZE
60
80
100
200
300
400
500
PROPOSED TEMPORARY PIPE FOR PUMPING DIRTY WATER TO SETTLEMENT TANKS EXISTING STORMWATER CATCHPIT PROPOSED STORMWATER CATCHPIT INLET PROTECTION (REFER NOTE 8) EXISTING OVERLAND FLOW PATH DIRTY WATER DIVERSION CLEAN WATER DIVERSION DISCHARGE POINT FOR FLOWS FROM SITE PROPOSED CONSTRUCTION SUPPORT AREA (CSA) PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES PROPOSED HOT MIX BUND PROPOSED SITE HOARDING PROPOSED BARRIER PROPOSED TEMPORARY FENCE PROPOSED SILT FILTER SOCK BUND PROPOSED SHARED UTILITIES TRENCH PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS PROPOSED PEDESTRIAN ROUTE PROPOSED SITE ACCESS POINT (SAP) FUTURE AOTEA STATION PILES
CONTRACTS 2.1 & 2.2 VICTORIA STREET INTERSECTION EROSION AND SEDIMENT CONTROL PLAN
TITLE
B.NEWNS
R.DONNELLY 40
DATE
EXISTING STORMWATER LINE
CITY RAIL LINK
PROJECT
22.03.18
CHECKED
20mm
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. TRENCHES SHOWN ON THIS DRAWING ARE TO BE EXCAVATED USING HYDROVAC AND THEREFORE EXCAVATED MATERIAL ARE REMOVED FROM SITE IMMEDIATELY. WHEN NOT WORKING, COVER TRENCH WITH ROAD PLATES AND RAMP THE EDGES WITH COLDMIX ASPHALT TO KEEP THE SURFACE WATER AWAY FROM THE TRENCH. BACKFILL AS MUCH OF THE TRENCH AS SOON AS POSSIBLE. FILTER SOCK (OR SIMILAR) INLET PROTECTION TO BE USED ON EXISTING CATCHPITS. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
APPROVED
E.ALVAREZ DESIGNED
0
SW
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0133
3.0
700
800
SW
SW SW
SW
KEY PLAN
SW
SW
SW
WELLESLEY STREET
SW
SW SW
SW
SW
SW
SW
SW SW
42
LEGEND
1/2-4/2
37 SW
SW
EXISTING CRL DESIGNATION BOUNDARY EXISTING KERB AND CHANNEL
SW
SW
EXISTING CONTOURS (0.5m INTERVAL) SW
SW
PROPOSED TEMPORARY PIPE FOR PUMPING DIRTY WATER TO SETTLEMENT TANKS
SW
SW SW
EXISTING STORMWATER LINE
EXISTING STORMWATER CATCHPIT
SW
SW
PROPOSED STORMWATER CATCHPIT INLET PROTECTION (REFER NOTE 8)
SW
SW
EXISTING OVERLAND FLOW PATH DIRTY WATER DIVERSION
SW
SW
CLEAN WATER DIVERSION DISCHARGE POINT FOR FLOWS FROM SITE PROPOSED CONSTRUCTION SUPPORT AREA (CSA) SW
PROPOSED OPEN TRENCH TO REMOVE ABANDONED SERVICES
SW
SW
SW
ALBERT STREET
PROPOSED HOT MIX BUND PROPOSED BARRIER
SW
SW
PROPOSED SITE HOARDING
PROPOSED SILT FILTER SOCK BUND
SW
SW
PROPOSED TEMPORARY FENCE
PROPOSED TEMPORARY VEHICLE / PEDESTRIAN ACCESS PROPOSED PEDESTRIAN ROUTE
SW
SW
SW
SW
PROPOSED SHARED UTILITIES TRENCH
FUTURE AOTEA STATION PILES
SW
SW
PROPOSED SITE ACCESS POINT (SAP)
2.
4.
SW
WELLESLEY STREET
5.
SW
SW
SW
6.
SW
SW
SW
SW
SW
3.
44
SW
SW
SW
SW
SW
SW
129-135
TRENCH REQUIRED FOR CHORUS OR COMMUNICATION CABLES CONNECTION TO EXISTING NETWORK
1.
SW
SW
pw:\\designshare.au.aurecon.info:PW_PROD_AU\Documents\Projects\23xxxx\239933 - City Rail Link CDE\01-WIP\Drawings\CRL-AOT-UTI-000-DRG-0134.dwg
NOTES
SW
SW
SW
SW
7.
8. 9.
SW
SW
Auckland
56
SW
SW
SW
SW
22/03/2018 4:33:07 p.m.
10.
CLIENT 2
0
4
REV 1.0 2.0 3.0
8m
SCALE 1:200
DATE 26.10.17 05.12.17 22.03.18
49
REVISION DETAILS DRAFT FOR CRLL TO REVIEW ISSUED FOR APPROVAL
APPROVED B.NEWNS B.NEWNS CRL DESIGNATION BDY UPDATED, TRENCH WORKS ON WELLESLEY ST REMOVED B.NEWNS
SCALE
SIZE
1:200
A1
DRAWN
FOR APPROVAL NOT FOR CONSTRUCTION .
B.KARNAN
ORIGINAL SIZE
60
80
100
200
300
400
CONTRACTS 2.1 & 2.2 WELLESLEY STREET INTERSECTION EROSION AND SEDIMENT CONTROL PLAN
TITLE
B.NEWNS B.NEWNS
T. NEL 40
DATE
22.03.18
CHECKED
20mm
CITY RAIL LINK
PROJECT
APPROVED
E.ALVAREZ DESIGNED
0
REFER TO TEMP. TRAFFIC MANAGEMENT PLANS (PREPARED BY CONTRACTOR) FOR DETAILS ON TRAFFIC LANE(S) CHANGES AND CLOSURES. REFER TO CRL-AOT-UTI-000-DRG-0102 FOR EROSION AND SEDIMENT CONTROL MEASURES GENERAL NOTES AND TYPICAL DETAILS. EXCAVATOR IS TO BE PARKED ON THE FOOTPATH CLOSER TO SOUTHERN END OF OPEN TRENCH. LOCATION WILL CHANGE FROM NORTH TO SOUTH DEPENDING ON TRENCH PROGRESS. HOT-MIX BUND AT VEHICLE CROSSINGS ARE TO BE MADE MORE LIKE A SPEED HUMP FOR SAFE VEHICLE CROSSING. HOT-MIX BUND SHALL BE CONSTRUCTED IN SUCH A WAY THAT THERE WILL BE NO LOW POINT ALONG THE BUND THAT COULD POTENTIALLY CAUSE LOCAL FLOODING. TRENCHES SHOWN ON THIS DRAWING ARE TO BE EXCAVATED USING HYDROVAC AND THEREFORE EXCAVATED MATERIAL ARE REMOVED FROM SITE IMMEDIATELY. WHEN NOT WORKING, COVER TRENCH WITH ROAD PLATES AND RAMP THE EDGES WITH COLDMIX ASPHALT TO KEEP THE SURFACE WATER AWAY FROM THE TRENCH. BACKFILL AS MUCH OF THE TRENCH AS SOON AS POSSIBLE. FILTER SOCK (OR SIMILAR) INLET PROTECTION TO BE USED ON EXISTING CATCHPITS. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH CRL-PAT-RME-000-RPT-0101 (ESCP REPORT).
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
AOT
UTI
000
DRG
0134
3.0
700
800
This page has been intentionally left blank.
Aurecon | Mott MacDonald | Jasmax | Grimshaw I ARUP
Auckland Office Level 4, Aurecon House 139 Carlton Gore Road Auckland 1023 New Zealand T +64 9 520 6019 F +64 524 7815