Karangahape Station Early Works Construction Noise and Vibration Delivery Work Plan
CRL-KRD-RME-LKA-PLN-800003 Revision: Final Date: October 2019
Page 1
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Construction Noise and Vibration Delivery Work Plan CRL-KRD-RME-LKA-PLN-800003 This document is uncontrolled when printed. This document should be printed in colour
Revision Status Revision
Date
Version details
Prepared By
Approved By
A
30/09/2019
Draft for Auckland Council and Independent Peer Review
Sharon Yung
Peter Roan
0
21/10/2019
Final for submission to Auckland Council – incorporating council review & independent review comments
Sharon Yung
Peter Roan
Approval Status Name/Title Prepared by:
Sharon Yung
Signature
Date 21/10/2019
Acoustic Engineer
Reviewed by:
Claire Drewery
21/10/2019
Technical Director - Acoustics Approved by:
Peter Roan Link Alliance – Consents Lead
Page 2
| Karangahape Road Station Early Works
21/10/2019
Construction Noise and Vibration Delivery Work Plan
Table of contents 1. Introduction ................................................................................................ 5 1.1
Karangahape Station ......................................................................................................... 5
1.2
CNV DWP Staging .............................................................................................................. 6
1.3
Purpose of the CNV DWP................................................................................................... 6
1.4
Relevant Conditions .......................................................................................................... 7
1.5
Sustainability ................................................................................................................... 13
1.6
DWP Review and updates ............................................................................................... 13
1.7
CNV DWP Author ............................................................................................................. 13
2. Karangahape Early Works ......................................................................... 14 2.1
Overview of Works .......................................................................................................... 14
2.2
Hours of Operation .......................................................................................................... 14
2.3
Key personnel .................................................................................................................. 15
3. Construction Noise and Vibration Criteria ................................................ 16 3.1
Construction Noise Criteria.............................................................................................. 16
3.2
Vibration Criteria – Building Damage .............................................................................. 16
3.3
Vibration Criteria – Amenity ............................................................................................ 17
3.3.1.
Day time criteria ....................................................................................................... 17
3.3.2.
Night time criteria .................................................................................................... 17
4. Equipment Noise and Vibration Source Data ........................................... 18 4.1
Noise Sources .................................................................................................................. 18
4.2
Vibration Sources ............................................................................................................ 19
5. Affected Parties / Notable Receivers ........................................................ 20 5.1
Noise ............................................................................................................................... 20
5.2
Vibration – Building Damage ........................................................................................... 21
5.3
Site Specific Construction Noise and Vibration Management Plan (SSCNVMP) ............... 21
6. General Management Procedures and Mitigation Measures ................... 22
Page 3
6.1
Training ........................................................................................................................... 22
6.2
Construction Vehicles, Traffic and Deliveries ................................................................... 22
6.3
Plant and Equipment ....................................................................................................... 22
6.4
Pneumatic Breakers......................................................................................................... 23
6.5
Piling and Compaction ..................................................................................................... 24
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan 6.6
Noise Barriers and Enclosures ......................................................................................... 24
6.7
Traffic tyre noise.............................................................................................................. 24
6.8
Scheduling of Activities ................................................................................................... 25
7. Communication ......................................................................................... 26 7.1
Communication ............................................................................................................... 26
7.1.1.
Notable and Sensitive Receivers ............................................................................... 26
7.1.2.
Engagement Methods .............................................................................................. 26
7.2
Complaints Procedure ..................................................................................................... 27
8. Monitoring ................................................................................................ 28 8.1
Noise ............................................................................................................................... 28
8.2
Vibration ......................................................................................................................... 30
8.3
Reporting......................................................................................................................... 32
8.4
Building Condition Surveys .............................................................................................. 32
9. Contingency Measures .............................................................................. 33 9.1
Management Process ...................................................................................................... 33
9.2
Noise ............................................................................................................................... 33
9.3
Vibration – Building Damage ........................................................................................... 33
9.4
Vibration – Amenity ........................................................................................................ 34
9.5
Additional measures........................................................................................................ 34
Appendix A: ISCA Requirements ..................................................................... 35 Appendix B: Construction Noise Contours ...................................................... 36 Appendix C: Construction Vibration Contours ................................................ 37 Appendix D: Record of Communication .......................................................... 38 Appendix E: SSCNVMP .................................................................................... 48 Appendix F: Noise Monitoring Template ........................................................ 49 Appendix G: Vibration Monitoring Template ................................................. 51 Appendix H: Record of CLG, IPR and Auckland Council Comments ................ 53 H1. CLG Comments .......................................................................................... 53 H2. Auckland Council Comments .................................................................... 54 H3. IPR Comments ........................................................................................... 56 Appendix I: Noise and Vibration Measurements of Equipment ..................... 72 Page 4
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
1. Introduction The City Rail Link (CRL) project comprises the construction, operation and maintenance of a 3.4 km underground passenger railway, running between Britomart Station and the North Auckland Rail Line in the vicinity of Mt Eden Station. The CRL also involves the construction of two new underground stations at Aotea and Karangahape and a redeveloped Mt Eden Station (refer to Figure 1-1). The design and construction of the CRL infrastructure between the Aotea and Mt Eden Stations is being delivered by the Link Alliance.
Figure 1-1: CRL Route and Location
This Construction Noise and Vibration Delivery Work Plan (CNV DWP) has been prepared in relation to construction of the new Karangahape Station.
1.1 Karangahape Station The Karangahape Station consists of two entrances, one at Beresford Square / Pitt Street and the other at Mercury Lane, linked together by platforms with two mined tunnels approximately 32m below Pitt Street. The Station will also comprise equipment rooms, ventilation systems and emergency egress at both Mercury Lane and Beresford Square / Pitt Street. Given the nature and scale of the Karangahape Station construction, works will be undertaken in a staged manner, involving: Page 5
Early works (demolition, network utility relocation and site establishment works) – to be undertaken from October 2019 through to early 2020; Main construction works (construction of the station and mined tunnels for the rail tracks) – to be undertaken from early 2020 through to later 2023; and Public realm reinstatement – likely to be undertaken from late 2022 to late 2024.
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
1.2 CNV DWP Staging To reflect the staged construction approach for the Karangahape Station, development of this CNV DWP will be undertaken in stages. This first revision of this CNV DWP addresses the Karangahape Station early works. The early works are detailed in the Construction Environmental Management Plan (CEMP), and summarised in Section 2 of this CNV DWP. This CNV DWP will be revised in the future to include the main construction activities and public realm reinstatement.
1.3 Purpose of the CNV DWP In accordance with CRL designation Condition 36, the purpose of this CNV DWP is to identify and provide for implementation of the Best Practicable Option (BPO) to avoid, remedy or mitigate adverse noise and vibration effects resulting from construction during the Karangahape Station early works. It identifies the noise and vibration performance standards that must, where practicable, be complied with and details the management and control methodologies to be implemented in order to achieve compliance. Where compliance cannot be achieved, the CNV DWP identifies BPO mitigation measures to be implemented on a site specific basis. This CNV DWP will be implemented throughout the entire construction period and will be the primary tool for the management of construction noise and vibration effects resulting from the Karangahape Station early works. It is a ‘living document’ which may be updated as the works progresses and working conditions become clearer. Providing that the noise and vibration effects at the affected properties are either reduced or maintained at the same level as a result of implementing the mitigation measures identified in this CNV DWP, it is not intended to re-submit the CNV DWP to Auckland Council for re-approval. This CNV DWP has been developed to enable consultation with and feedback from the Karangahape Community and Business Liaison Group (CLG); and review by the Independent Peer Reviewer (IPR) prior to submission to Auckland Council (as per designation Conditions 7 and 11, and resource consent Condition 19). A record of consultation outcomes is included in Appendix H. This CNV DWP forms part of the CEMP for the Karangahape early works.
Page 6
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
1.4 Relevant Conditions Table 1-1 identifies the designation conditions relevant to this CNV DWP and where they are addressed in the document. Table 1-1: Construction noise and vibration conditions and location in the CNV DWP
Conditio n Number
Relevant Section of DWP
Condition Communications – Notable Noise and Vibration Receivers
16.1
16.2
A SSCNVMP shall be prepared for all Notable Noise and Vibration Receivers (refer Condition 39). As part of the SSCNVMP (and further to Condition 15 of this designation), the Requiring Authority shall undertake communication and consultation, as soon as reasonably practicable (and at least once following confirmation of construction timing and methodology), with any Notable Noise and Vibration Receivers located within 200 metres of blasting, or within 100 metres (either horizontally or vertically) of the designation footprint for other construction activities. Communication and consultation with these parties should focus on a collaborative approach to manage the adverse effects from construction noise and vibration while works are undertaken in the vicinity.
7.1
The Requiring Authority shall undertake on-going communication and consultation with notable noise and vibration receivers throughout the duration of construction occurring in the vicinity. This communication shall be reported back to the “key contacts” (see Condition 13) and the Auckland Council Consent Monitoring officer for their review and confirmation of any further action to be undertaken. The Auckland Council Consent Monitoring Officer shall advise the Requiring Authority of its recommendation within 10 working days of receiving this information from the Requiring Authority. Project Standards - Construction Noise
7.1
Construction noise shall comply with the following Project Standards (unless otherwise provided for in a SSCNMP which is approved under Condition 37, 39 or 40):
3.1 (Bear Park not impacted by Karangahap e works)
Receiver Type Occupied commercial and industrial buildings (including offices)
31.1
Sensitive Noise and Vibration Receivers (excluding offices)
Early Childhood Education Centres (whilst occupied during normal opening hours) Bear Park Early Childhood Education Centre at 32 Akiraho Street (whilst occupied during normal opening hours)
31.2
Page 7
Monday to Saturday
Sundays and Public Holidays
At all other times
0700 – 2200
0700 – 2200
2200 – 0700
75 dB LAeq
75 dB LAeq
75 dB LAeq
75 dB LAeq
65 dB LAeq 1
60 dB LAeq
90 dB LAFmax
80 dB LAFmax2
75 dB LAFmax
35 dB LAeq in sleeping areas
35 dB LAeq in sleeping areas
65 dB LAeq in outdoor playing areas Construction noise shall be measured and assessed in accordance with the provisions of NZS 6803:1999 Project Standards - Construction Vibration
| Karangahape Road Station Early Works
8.1
Construction Noise and Vibration Delivery Work Plan Conditio n Number
Condition
Relevant Section of DWP
Construction vibration (including blasting) shall comply with the following Project Standards for building damage (unless otherwise provided for in a SSCVMP which is approved under Condition 38, 39 or 40) Long-term Short-term (transient) vibration1 (continuous) vibration PPV at PPV at the foundation at a Type of PPV at horizontal frequency of Structure horizontal plane of plane of highest floor 1-10Hz 10-50 Hz 50-100 Hz highest floor (mm/s) (mm/s) (mm/s) (mm/s) (mm/s) 33.1
33.2
Commercial/ 20 20 – 40 40 – 50 40 10 Industrial Residential/ 5 5 – 15 15 – 20 15 5 School Historic or sensitive 3 3–8 8 – 10 8 2.5 structures Note: 1. Standard DIN 4150-3:1999 defines short-term (transient) vibration as “vibration which does not occur often enough to cause structural fatigue and which does not produce resonance in the structure being evaluated”. Long-term (continuous) vibration is defined as all other vibration types not covered by the short-term vibration definition. Construction vibration (including blasting) shall be measured in accordance with German Standard DIN 4150-3:1999.
3.2 8.2
Project Standards - Construction Vibration (Amenity) Between the hours of 10pm and 7am vibration generated by construction activities (excluding blasting) shall not exceed: 34.1
3.3
(a) a Peak Particle Velocity (PPV) of 0.3mm/s when measured at any part of the floor of any bedroom; (b) a noise level of 35 dB LAeq(15min) when measured in any bedroom. Between the hours of 7am and 10pm vibration generated by construction activities (excluding blasting) shall not exceed:
34.2
(a) A Peak Particle Velocity (PPV) of 1mm/s as measured on the floor of the receiving room for residentially occupied habitable rooms, bedrooms in temporary accommodation and medical facilities; and
3.3
(b) A Peak Particle Velocity (PPV) of 2mm/s as measured on the floor of the receiving room for retail and office spaces (including work areas and meeting rooms); 34.3
The limits in 34.1 and 34.2 shall only be investigated and applied upon the receipt of a complaint from any building occupant. They shall not be applied where there is no concern from the occupant of the building.
34.4
Where the limits in 34.1 and 34.2 are found (through measurement) to be exceeded then a SSCVMP shall be prepared for that receiver (Condition 38).
3.3
Appendix E
Construction Noise and Vibration DWP For the avoidance of doubt, this condition is applicable to the management of construction noise and vibration on all receivers, including sensitive and notable receivers.
36.1
Page 8
A Construction Noise and Vibration DWP shall be prepared and implemented. The objective of the Construction Noise and Vibration DWP is to provide for the development and implementation of identified best practicable option to avoid, remedy or mitigate the adverse effects on receivers of noise and vibration resulting from construction.
| Karangahape Road Station Early Works
This DWP
Construction Noise and Vibration Delivery Work Plan Conditio n Number
Condition
Relevant Section of DWP
The Construction Noise and Vibration DWP shall: (a) Adopt the noise and vibration standards for construction set out in Conditions 31, 32, 33 and 34 of these designations; 36.2
3
(b) Be generally consistent with the draft Construction Noise and Vibration management plan submitted as part of the Notice of Requirement documentation (dated 23 August 2013); and (c) Identify methods to achieve best practicable option for mitigating adverse effects.
6
To achieve this objective, the Construction Noise and Vibration DWP shall include: (a) The roles and responsibilities of the noise and vibration personnel in the contractor team with regard to managing and monitoring adverse noise and vibration effects;
2.3
(b) That piling and road cutting will be restricted to between the hours of 7am to 7pm, Monday to Saturday;
2.2
(c) Construction machinery and equipment to be used and their operating noise and vibration levels;
4
(d) Identification of construction activities that are likely to create adverse noise and vibration effects, the location of these in the construction site areas, and the distance to comply with the Project Criteria in Conditions 31, 32, 33 and 34;
4
(e) The timing of construction activities that are likely to create an adverse noise and vibration effect; (f) The location of sensitive noise and vibration receivers; (g) A record of communication and consultation with sensitive noise and vibration receivers. The record must include a clear explanation of where any comments from sensitive receivers have not been incorporated in the Construction Noise and Vibration DWP, and the reasons why not. This information must be included in the Construction Noise and Vibration DWP provided to both the Independent Peer Review Panel and Auckland Council as part of the Outline Plan process specified in Condition 11; 36.3
(h) Specific measures to address the concerns raised by those sensitive receivers;
2.2 5 Appendix D
Appendix D &E
(i) Specific training procedures for construction personnel including: (i) The project noise and vibration performance standards for construction (conditions 31, 32, 33 and 34);
6.1
(ii) Information about noise and vibration sources within the construction area and the locations of sensitive noise and vibration receivers; and (iii) Construction machinery operation instructions relating to mitigating noise and vibration; (j) Methods and measures to mitigate adverse noise and vibration effects including, but not limited to, structural mitigation such as barriers and enclosures, the scheduling of high noise and vibration construction, use of low noise and vibration machinery, temporary relocation of affected receivers or any other measures or offer agreed to by the Requiring Authority and the affected receiver;
6
(k) The proposed methods for monitoring construction noise and vibration to be undertaken by a suitably qualified person for the duration of construction works including:
8
(i) Updating the predicted noise and vibration contours based on the final design and construction activities;
8
(ii) Confirm which buildings are to be subject to a pre and post building condition survey in accordance with Condition 46. This includes consideration of those buildings in Appendix One and Two to these conditions; Page 9
| Karangahape Road Station Early Works
8.4
Construction Noise and Vibration Delivery Work Plan Conditio n Number
Condition
Relevant Section of DWP
(iii) The timing and location for monitoring of buildings during construction is required (Note that the flow charts contained in Appendices B and C of Appendix J of the technical noise and vibration report provided as part of the Notice of Requirement should be used as a guide);
8
(iv) Identifying appropriate monitoring locations for receivers of construction noise and vibration;
8
(v) Procedures for working with the Communication and Consultation Manager to respond to complaints received on construction noise and vibration, including methods to monitor and identify noise and vibration sources;
7.2
(vi) Procedures for monitoring construction noise and vibration and reporting to the Auckland Council Consent Monitoring officer; and
8
(vii) Procedures for how works will be undertaken should they be required as a result of the building condition surveys;
8
(l) Cross references to the specific sections in the Communication and Consultation Plan which detail how landowners and occupiers are to be communicated with around noise and vibration effects.
7
Site Specific Construction Noise Management Plan (SSCNMP) For the avoidance of doubt, this condition does not apply to MediaWorks 37.1
37.2
The objective of a SSCNMP is to detail the best practicable option to avoid, remedy or mitigate adverse effects on a receiver resulting from construction noise that does not comply with the Project Noise Standards. Further to the Construction Noise and Vibration DWP in Condition 36, a SSCNMP shall be prepared for any receiver or activity for which air overpressure is either predicted or measured to exceed the limits in Condition 32, or where construction noise is either predicted or measured to exceed the Project Noise Standards in Condition 31, except where the exceedance of the standards in Condition 31 is less than 5 decibels and does not exceed: (a) 0700-2200: 1 period of up to 2 consecutive weeks in any 2 months (b) 2200-0700: 1 period of up to 2 consecutive nights in any 10 days
37.3
For predicted exceedances of less than 5 decibels (refer 37.2) monitoring shall be undertaken to confirm the actual noise levels. If exceedance is shown to be more than 5 decibels, or the period exceeds those detailed, then a SSCNMP will be prepared.
37.4
Condition not relevant to Karangahape early works SSCNMPs will identify: (a) The extent to which noise may exceed the Project Noise Standards in Condition 31 or the overpressure limits in Condition 32; (b) The timing and duration of any exceedance; (c) Details of the type of activity causing any exceedance;
37.5
(d) The summary of the communication and consultation undertaken with the receiver. The summary must include a clear explanation of where any comments have not been incorporated, and the reasons why not. This information must be included in the SSCNMP provided to both the Independent Peer Review Panel and Auckland Council as part of the Outline Plan process specified in Condition 11; (e) The methods and measures to mitigate noise effects, including but not limited to, potential to offer temporary relocation of affected receivers, alternative ventilation, faรงade sound insulation improvements, building condition surveys in the case of overpressure generated by blast events, or other offers made by the Requiring Authority and whether these have been agreed to by the affected receiver; (f) The reasons why the management and mitigation measures and methods reflect best practicable option.
Page 10
| Karangahape Road Station Early Works
Appendix E .
Construction Noise and Vibration Delivery Work Plan Conditio n Number 37.6
Condition
Relevant Section of DWP
The SSCNMP shall be submitted for the review of Auckland Council as part of the Outline Plan. The works shall then be undertaken in accordance with the SSCNMP confirmed by the Requiring Authority as part of the Outline Plan. Site Specific Construction Vibration Management Plan (SSCVMP)
38.1
The objective of a SSCVMP is to detail the best practicable option to avoid, remedy or mitigate adverse effects on a receiver resulting from vibration that does not comply with the Project Vibration Standards.
38.2
Further to the Construction Noise and Vibration DWP in Condition 36, a SSCVMP shall be prepared: (a) For any unoccupied building, structure or infrastructure for which construction vibration is either predicted or measured to exceed the Project Vibration Standards in Condition 33; (b) Where a complaint or concern is raised and the vibration level exceeds the amenity levels of Condition 34.2(a) and 34.2(b); (c) In response to other concerns or complaints where required (refer Condition 17). (d) For the properties listed in Condition 37.4. Where the amenity limits in Conditions 34.2(a) and 34.2(b) are exceeded:
38.3
(a) Best practicable management of vibration must be applied; and (b) The vibration activity shall be scheduled to avoid disturbance. If this is not practicable then reasonable respite periods shall be provided to reduce vibration exposure.
38.4
The limits in condition 33 may be relaxed by a SSCVMP but only for a building, structure or infrastructure that has been assessed by a suitably qualified and experienced structural engineer and where it has been deemed to be capable of withstanding higher vibration levels without sustaining building or structural damage, and where appropriate vibration and building condition monitoring regimes are in place. SSCVMPs will identify: (a) The timing and duration of any exceedance; (b) Details of the type of activity giving rise to any exceedance; (c) Site Specific vibration criteria that addresses the issue(s) of concern (i.e. building damage, amenity and sensitive equipment). Site Specific criteria shall be determined by a suitably qualified independent vibration expert;
38.5
(d) The summary of the communication and consultation undertaken with the receiver. The summary must include a clear explanation of where any comments have not been incorporated, and the reasons why not. This information must be included in the SSCVMP provided to both the Independent Peer Review Panel and Auckland Council as part of the Outline Plan process specified in Condition 11; (e) The methods and measures to mitigate vibration effects, including but not limited to, investigating alternative low-vibration construction methods, undertaking high-vibration works outside sensitive times, vibration barriers, building condition surveys, potential to offer temporary relocation of affected receivers, or other offers made by the Requiring Authority and agreed to by the affected receiver. (f) The reasons why the management and mitigation measures and methods reflect best practicable option.
38.6
The SSCVMP shall be submitted for the review of Auckland Council. The works shall then be undertaken in accordance with the SSCVMP confirmed by the Requiring Authority as part of the Outline Plan.
Appendix E
Notable Noise and Vibration Receivers 39.1
Page 11
Further to Condition 36, the Requiring Authority and its contractor, in conjunction with a suitably qualified expert, shall work collaboratively with each notable receiver during the | Karangahape Road Station Early Works
Appendix E
Construction Noise and Vibration Delivery Work Plan Conditio n Number
Condition preparation of a SSCNVMP to confirm the extent and management of adverse effects on each Notable Receiver.
39.2
In addition to the Construction Noise and Vibration DWP, a SSCNVMP shall be prepared for each identified Notable Receiver. The objective of the SSCNVMP is to detail the best practicable option to avoid, remedy or mitigate adverse noise and vibration effects on each Notable Receiver.
39.3
The Requiring Authority shall consult with the notable receiver throughout the duration of construction and update the SSCNVMP as required to achieve the objective in 39.2.
39.4
The SSCNVMP shall include: (a) The level at which noise and vibration effects on the notable receiver will unreasonably interfere with its operation. This will enable development of the site specific criteria. (b) Construction activities and equipment which are likely to create adverse noise and vibration effects and the location and timing of these in relation to the notable receiver; (c) The methods and measures associated with the worksite including, but not limited to, structural mitigation such as barriers and enclosures, use of low noise and vibration machinery and the scheduling of high noise and vibration construction; (d) The methods and measures associated with the notable receiver building or operation including, but not limited to, potential for isolation of sensitive areas and equipment, dampening of reradiating surfaces and temporary relocation of affected receivers that are proposed to minimise adverse noise and vibration effects on the notable receiver; (e) Details about the methods to be adopted by the Requiring Authority to minimise construction noise and vibration effects on the notable receiver and the anticipated effectiveness of those methods; (f) A summary of the communication and consultation undertaken with the notable receiver. The summary must include a clear explanation of where any comments have not been incorporated and the reasons why not. (g) Offers made by the Requiring Authority to the notable receiver to mitigate effects and the response by the operators, such as relocation, and whether those offers were accepted or not by the notable receiver;
39.5
If the parties cannot agree on any of the matters above they shall each appoint a suitably qualified and independent expert, who shall jointly appoint an independent and suitably qualified third expert who shall certify the following matters to be included in the SSCNVMP: (a) The level at which noise and vibration effects on the notable receiver unreasonably interfere with its operation (the certified noise and vibration limit); (b) The mitigation methods and measures within the worksite (at source) including, but not limited to, structural mitigation such as barriers and enclosures, use of low noise and vibration machinery and the scheduling of high noise and vibration construction; (c) The mitigation methods and measures at the notable receiver including but not limited to: isolation of sensitive areas and equipment; dampening of reradiating surfaces; any response to such offers; and temporary relocation of affected receivers; (d) Whether or not the mitigation methods and measures reflect best practicable management; and (e) Whether or not the residual effects are likely to cause significant disruption to the activities of the notable receiver.
39.6
Following the above process the SSCNVMP shall be submitted for the review of Auckland Council as part of the Outline Plan. For the avoidance of doubt, the Requiring Authority shall not be entitled to make any changes to the SSCNVMP through the Outline Plan process following any agreement reached with the notable receiver and/or through the above certification process without the consent of the notable receiver. The works shall then be undertaken in accordance with the SSCNVMP confirmed by the Requiring Authority as part of the Outline Plan process.
Page 12
| Karangahape Road Station Early Works
Relevant Section of DWP
Construction Noise and Vibration Delivery Work Plan
1.5 Sustainability The Link Alliance is seeking an Infrastructure Sustainability Council of Australia (ISCA) Infrastructure Sustainability (IS) Rating. Further details can be found in the CEMP and Sustainability Rating Management Plan. Project sustainability requirements that relate directly to this CNV DWP are included in Appendix A. These requirements are imbedded within this CNV DWP to ensure that sustainability is a key focus and ‘the way we do things’. In some cases the IS requirements and sustainability goals enhance the designation and consent requirements.
1.6 DWP Review and updates This CNV DWP is a live document that will be reviewed at least annually, or as a result of a material change to the project, or to address unforeseen adverse noise and vibration effects arising from construction, or unresolved complaints. Any material changes to this CNV DWP must be approved by Auckland Council prior to any on-site activity reliant upon the change commencing. Refer to the CEMP for further detail on the review and updating process.
1.7 CNV DWP Author This CNV DWP has been prepared by Sharon Yung, Acoustic Consultant at AECOM and reviewed by Claire Drewery the nominated Acoustics Specialist for the Project. Claire has 17 years’ professional experience as an acoustic consultant and she holds a Diploma in Acoustics and Noise Control. Sharon and Claire are Members of the Institute of Acoustics (IOA).
Page 13
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
2.
Karangahape Early Works 2.1 Overview of Works
Early works will be undertaken to establish the site of the new Karangahape Station in advance of the main construction works. The early works are detailed in the CEMP with an overview provided in Table 2-1. Table 2-1: Overview of Karangahape Early Works
Works location
Overview of construction activities
Beresford Square / Pitt Street
Relocation of network utilities located within the footprint of the new Karangahape Station in Beresford Square / Pitt Street; Removal of street trees and the demolition of the café / toilet in Beresford Square; Establishment of the Beresford Square Construction Support Area to provide site offices, construction vehicle parking, laydown areas and storage of plant and equipment etc.; and Closure of Beresford Square to vehicle traffic (other than construction traffic) while retaining pedestrian and cycle access. Removal of existing street furniture where required, such as seating, street lighting (to be replaced with temporary lighting).
Mercury Lane
Relocation of network utilities located within the footprint of the new Karangahape Station in Mercury Lane; and Establishment of the Mercury Lane Construction Support Area within to provide site offices, construction vehicle parking, laydown areas and storage of plant and equipment etc. Establishment of the Mercury Lane Station temporary working platform.
It should be noted that the demolition of buildings and above ground structures within the Mercury Lane Construction Support Area are authorised by the CRL Enabling Work Outline Plan – Karangahape Road Demolition Works (Auckland Council reference OPW60339200), confirmed in June 2019, and does not form part of this CNV DWP.
2.2 Hours of Operation Works will generally be undertaken between 7am and 10pm Monday to Saturday. Designation Condition 36.3(b) requires that piling and road cutting will be restricted to between the hours of 7am to 7pm, Monday to Saturday.
Page 14
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
2.3 Key personnel The key personnel responsible for this CNV DWP are identified in Table 2-2. Refer to the CEMP for further detail on roles and responsibilities. Table 2-2: Key Personnel
Role
Name
Karangahape Station Project Manager
Jonathan Hill
Karangahape Station Construction Manager
Dan Trotman
Environmental and Sustainability Manager
Sarah Sutherland
Karangahape Station Stakeholder and Communication Manager
Johanna McIntosh
Acoustics Specialist
Claire Drewery
Noise and Vibration Monitoring
Joe Grimes
Vibration Monitoring – Trained Site Personnel
TBC
Noise Monitoring - Trained Site Personnel
TBC
All personnel working on the Project, including subcontractors, are responsible for following the requirements of this CNV DWP. They must be briefed on this CNV DWP and sign an induction form and any noise and vibration schedules that relate to the work they will be carrying out.
Page 15
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
3. Construction Noise and Vibration Criteria 3.1 Construction Noise Criteria Construction noise will be measured and assessed in accordance with New Zealand Standard NZS6803:1999 “Acoustics – Construction Noise”. Construction noise will be managed to comply with the Project Standards (unless otherwise provided for in an approved Site Specific Construction Noise Management Plan (SSCNMP)). The Project Standards for construction noise are specified in CRL designation Condition 31 and provided in Table 3-1. These noise levels are applicable 1m from any building façade. Table 3-1: Construction Noise Limits Monday to Saturday 0700 – 2200
Sundays and Public Holidays 0700 – 2200
All other times 2200 – 0700
Occupied commercial and industrial buildings (including offices)
75 dB LAeq
75 dB LAeq
75 dB LAeq
Sensitive Noise and Vibration Receivers (excluding offices)
75 dB LAeq
65 dB LAeq
60 dB LAeq
90 dB LAFmax
80 dB LAFmax
75 dB LAFmax
Receiver type
Note: Sensitive receivers (usually building occupants) whose amenity needs to be considered with regards to noise and/or vibration effects; includes but is not limited to dwellings, hotels, educational facilities (including day care facilities), hospitals, places of worship, laboratories, studios, theatres and auditoria.
Section 4.1 of the CNV DWP details equipment and associated noise levels for construction activities. Section 9 of the CNV DWP details how construction activities will be measured/ assessed against the noise criteria. If any construction activity cannot practicably comply with the limits in Table 3-1, a SSCNMP will be prepared in accordance with designation condition 37 (refer to Table 1-1 in Section 1.4 of this CNV DWP).
3.2 Vibration Criteria – Building Damage Construction vibration will be measured and assessed in accordance with German Standard DIN 4150-3:1999 “Structural Vibration – Part 3 Effects of Vibration on Structures”. Construction vibration will be managed to comply with the Project Standards for building damage (unless otherwise provided for in an approved Site Specific Construction Vibration Management Plan (SSCVMP)). The construction vibration limits are specified in CRL designation Condition 33 and provided in Table 3-2. Table 3-2: Construction Vibration Limits – Building Damage Long-term (continuous) vibration
Short-term (transient) vibration* Type of structure
PPV at the foundation at a frequency of:
PPV at horizontal plane of highest floor (mm/s)
PPV at horizontal plane of the highest floor (mm/s)
1 – 10 Hz (mm/s)
10 – 50 Hz (mm/s)
50 – 100 Hz (mm/s)
Commercial / Industrial
20
20-40
40-50
40
10
Residential / School
5
5 – 15
15 – 20
15
5
Historic or sensitive structures
3
3–8
8 – 10
8
2.5
Page 16
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan * DIN 4150-3:1999 defines short-term (transient) vibration as “vibration which does not occur enough to cause structural fatigue and which does not produce resonance in the structure being evaluated” Long-term (continuous) vibration is defined as all other vibration types not covered by the short-term vibration definition.
Section 4.2 of this CNV DWP details equipment and vibration emission radii for construction activities. Section 9 of this CNV DWP details how construction activities will be measured/ assessed against the vibration criteria. If any construction activity cannot practicably comply with the limits outlined in Table 3-2, a SSCVMP will be produced in accordance with designation Condition 38 (refer to Table 1-1 in Section 1.4 of this CNV DWP).
3.3 Vibration Criteria – Amenity 3.3.1. Day time criteria Between the hours of 7am and 10pm vibration generated by construction activities (excluding blasting) shall not exceed: a
b c
A Peak Particle Velocity (PPV) of 1mm/s as measured on the floor of the receiving room for residentially occupied habitable rooms, bedrooms in temporary accommodation and medical facilities; A Peak Particle Velocity (PPV) of 2mm/s as measured on the floor of the receiving room for retail and office spaces (including work areas and meeting rooms); and Designation Condition 34.3 states that the limits identified in Sections 3.3.2 and 3.3.1 of this CNV DWP need only be investigated and applied upon the receipt of a complaint from any building occupant. They shall not be applied where there is no concern from the occupant of the building.
When a complaint occurs, and the limits are found (through measurement) to be exceeded then a SSCVMP shall be prepared for that receiver.
3.3.2. Night time criteria Night time works are not expected to take place for the Early works. If any works occurs between the hours of 10pm and 7am, noise and vibration generated by construction activities (excluding blasting) shall not exceed: a
a Peak Particle Velocity (PPV) of 0.3mm/s when measured at any part of the floor of any bedroom; and
b
a noise level of 35 dB LAeq(15min) when measured in any bedroom.
Page 17
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
4. Equipment Noise and Vibration Source Data 4.1 Noise Sources Various construction activities and pieces of equipment will act as noise sources on site during the early works. Table 4-1 details predicted noise levels from the likely significant noise sources at various receiver setback distances. The noise data has been taken from British Standard 5228-1:2009 “Code of practice for noise and vibration control on construction and open sites�, manufacturers data or the AECOM database of noise measurements. The noise levels do not account for mitigation. The noise levels detailed in Table 4-1 are placeholders, and actual equipment noise levels and model numbers will be recorded and updated within the table when work commences. Updates will be provided as an appendix to this CNV DWP. The noise levels detailed in Table 4-1 allow identification of the need for mitigation or management to achieve compliance with the Project noise criteria. Section 6 of this CNV DWP provides details of management procedures and mitigation measures. Table 4-1: Equipment noise levels
SPL (dB LAeq) Equipment
Sound power level (dB LwA)
5m
10m
20m
50m
Excavator (3-5T)
93
71
65
59
51
Excavator (5-8T)
99
77
71
65
57
Excavator (8-25T)
111
89
83
77
69
Excavator w/ Pick
116
94
88
82
74
Crane Lorry
105
83
77
71
63
Crane
105
83
77
71
63
Cherry Picker
106
84
78
72
64
Truck
109
87
81
75
67
Saw Cut
116
94
88
82
74
Hydrovac
104
82
76
70
62
Drilling (handheld)
113
91
85
79
71
Drilling (large)
114
92
86
80
72
Piling - (Sheet)
116
94
88
82
74
Chainsaw
114
92
86
80
72
Plate Compactor
110
88
82
76
68
Roller Compactor
107
85
79
73
65
Scaffolding
108
86
80
74
66
Welding
101
79
73
67
59
Noise contour maps showing predicted construction noise levels at receivers adjacent to the work sites are presented in Appendix B. Page 18
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
4.2 Vibration Sources Some construction activities are predicted to generate high levels of vibration including excavation, compaction, sheet piling and breaking. Table 4-2 summarises the setback distance from each of these activities inside of which exceedance of the building damage criteria detailed in Section 3.2 of this CNV DWP may occur at the foundation of receiving buildings. The table will be kept up to date and be representative of the actual equipment on-site and include the results of on-site vibration monitoring. The vibration monitoring procedure is detailed in Section 8.2 of this CNV DWP. Table 4-2: Vibration emission radii for building damage criteria
Vibration Criteria Radii (m) Commercial (20 mm/s)
Equipment
Residential (5 mm/s)
Historic/ Vibration Sensitive (3 mm/s)
Excavator (3-8T)
1.1
4.5
7.5
Excavator (8-25T)
1.2
4.7
7.8
Excavator w/ Pick
1.1
4.5
7.5
Truck
0.2
0.9
1.5
Drilling (large)
1.8
7.2
12
Piling - Sheet
3
12
20
Plate Compactor
0.3
1.2
2.0
Roller Compactor
2.1
8.4
14
Vibration contours showing the distance at which the building damage criteria is predicted to be exceeded based on the highest vibration generating equipment are presented in Appendix C.
Page 19
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
5. Affected Parties / Notable Receivers 5.1 Noise Table 5-1 identifies buildings where construction activities are predicted to exceed the Project noise limits. A SSCNMP is required for these properties and has been prepared in accordance with designation Condition 37 (refer to Table 1-1 in Section 1.4 of this CNV DWP) dependent on activities and building type. Table 5-1: Buildings predicted to receive noise levels exceeding the Project noise limits
Address
Building type/ comments
1 Beresford Square
Commercial
1 Cross Street
Commercial
4-6 Beresford Square
Mixed Use
8-14 Beresford Square
Mixed Use
19 Beresford Square
Mixed Use
16-18 Beresford Square
Commercial
22 Beresford Square
Mixed Use
12 East Street
Mixed Use
14 East Street
Mixed Use
16 East Street
Residential
18 East Street
Residential
21 East Street 1
Commercial
23 East Street
Commercial
27 East Street
Mixed Use
29 East Street
Commercial
80-82 Pitt Street
1
Commercial
238 Karangahape Road
Mixed Use
243 Karangahape Road
Commercial
3 Mercury Lane
Commercial
283 Karangahape Road
Cultural
59 Pitt Street
Commercial
61-65 Pitt Street
Commercial
68 Pitt Street
Commercial
70-74 Pitt Street
Commercial
78 Pitt Street
Church
9 Mercury Lane
1
10/39 Pitt Street Note 1: Notable receiver
Page 20
| Karangahape Road Station Early Works
Theatre Residential
Construction Noise and Vibration Delivery Work Plan
5.2 Vibration – Building Damage Table 5-2 identifies the buildings that may be at risk of exceeding the building damage vibration limits. Historic buildings have been determined from discussions with the Built Heritage specialist. A Site Specific Construction Vibration Management Plan (SSCVMP) will be prepared in accordance with designation condition 38 (refer to Table 1-1 in Section 1.4 of this CNV DWP) for receivers where vibration is predicted to exceed the building damage vibration limits. Table 5-2: Buildings predicted exceed Project vibration limits
Address
Building Classification
1 Beresford Square
Historical / vibration sensitive
1 Cross Street
Historical / vibration sensitive
4-6 Beresford Square
Historical / vibration sensitive
8-14 Beresford Square
Historical / vibration sensitive
19 Beresford Square
Historical / vibration sensitive
16-18 Beresford Square
Historical / vibration sensitive
22 Beresford Square
Residential
14 East Street
Historical / vibration sensitive
16 East Street
Residential
18 East Street
Historical / vibration sensitive
21 East Street
Historical / vibration sensitive
23 East Street
Historical / vibration sensitive
27 East Street
Historical / vibration sensitive
238 Karangahape Road
Historical / vibration sensitive
243 Karangahape Road
Historical / vibration sensitive
283 Karangahape Road
Historical / vibration sensitive
47 Pitt Street
Historical / vibration sensitive
59 Pitt Street
Historical / vibration sensitive
61-65 Pitt Street
Historical / vibration sensitive
9 Mercury Lane
Historical / vibration sensitive
5.3 Site Specific Construction Noise and Vibration Management Plan (SSCNVMP) The designation conditions allow for SSCNMPs and SSCVMPs to be combined to form SSCNVMPs. The Karangahape early works SSCNVMP in Appendix E of this CNV DWP therefore considers both construction noise and vibration.
Page 21
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
6. General Management Procedures and Mitigation Measures The early works have the potential to exceed the relevant construction noise and vibration limits at the closest receivers. To avoid or minimise exceedances it is vital that appropriate mitigation methods and measures are utilised. This DWP identifies the methods to achieve best practicable option for mitigating adverse effects during the construction works. These methods and measures will include, but not be limited to, those detailed in this section of the CNV DWP.
6.1 Training Procedures relating to environmental training, including noise and vibration site management procedures, are detailed in the Karangahape early works CEMP. As a minimum, before commencing work on site all personnel will receive training based on this CNV DWP and relevant to their scope of works. If required, specific training will be provided for site personnel. Training will cover:
Roles and responsibilities for managing noise and vibration. Familiarisation with noise and vibration limits. Details of noise and vibration sources on-site. Noise and vibration mitigation and management procedures. Location of sensitive and notable receivers. Construction noise and vibration effects on receivers. Details of any operational requirements and constraints identified through communication and consultation. Complaints management procedures.
6.2 Construction Vehicles, Traffic and Deliveries Noise mitigation methods and measures for construction vehicles, traffic and deliveries shall include, where practicable:
Fitting engine exhausts with silencers. Using broadband reversing alarms. Minimising slamming doors. Minimising speed and engine revs. Controlling / limiting noise from vehicle stereos being operated on site. Minimising the use of horns. Turning engines off when stationary for extended periods of time. Placing bedding layer or resilient liner in truck trays. Using rubber seals around tailgates. Use of rubber tracks to eliminate squeal wherever possible. Minimising track squeal from tracked equipment such as excavators, by maintaining tracks regularly.
6.3 Plant and Equipment Designation Condition 21.1 (m) requires that site offices and less noisy construction activities be located at the edge of the construction yards where practicable (refer to the CEMP for further detail on the layout of the Beresford and Mercury Lane Construction Support Areas). Page 22
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan Plant and equipment noise and vibration mitigation methods and measures shall include, where practicable:
Selecting plant and equipment with low noise and vibration emission levels. Turning off plant and equipment or throttle them down to a minimum when not in use. Selecting appropriately sized equipment for the task. Using mufflers and engine covers/screens where appropriate. Ensuring equipment is operated in the correct manner and correctly maintained, including replacement of engine covers, repair of defective silencing equipment, tightening of rattling components, repair of leakages in compressed air lines and shutting down of equipment not in use. Avoiding, where practicable, the night-time use of equipment which generates impulsive noise, including:
impact piling dropping materials from a height metal-to-metal contact on equipment.
Minimising drop height of materials when transferring (e.g. loading and unloading vehicles and storage areas). Enclosing generators with an effective muffler. Using power from Vector Electricity Network rather than from generators. Reducing noise and vibration emissions from plant that has the potential to exceed the criteria by installing silencers, vibration isolation or other appropriate mitigation. Maximising the distance between the engine exhausts of fixed plant and the nearest sensitive building façade. Placing tools and equipment on the ground, rather than dropping. Covering surfaces with resilient material where tools / equipment are placed. Not dragging equipment on the ground. Minimising the need for striking bare metal with tools. Where spoil is being loaded into a dump truck, or fill materials are being unloaded from a dump truck, position the truck to minimise tracking movements. Managing noise generated from the use of concrete, including by limiting noise generated by aggregate loading or by hammering the mixing. Using broadband reversing alarms on all mobile equipment.
6.4 Pneumatic Breakers Noise and vibration mitigation methods and measures for breaking activities shall include, where practicable:
Page 23
Selecting equipment for the job that takes into account the need to minimise the length of time taken to complete the operation and minimise noise generation. Not “blank” firing the hammer. The activating valve should only be operated with the hammer in contact with the surface to be broken. Keeping breaker bushes and shafts greased as necessary. Using the correct chisel / tip shape for the type of material being broken.
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Using acoustic screens which block line of sight between breaker and sensitive receivers where work is contained within a compact area.
6.5 Piling and Compaction Noise and vibration mitigation methods and measures for piling and compaction activities shall include, where practicable:
Minimising cable slap and chain clink. Providing mufflers and engine covers/screens on plant where appropriate. Removing obstructions which may exacerbate vibration transmission where appropriate, prior to piling operations.
6.6 Noise Barriers and Enclosures Noise barriers or enclosures will be used in areas where the noise limits are predicted to be exceeded, and where they provide effective mitigation. Noise barriers will generally only be effective for ground floor receivers where noise levels would be reduced by approximately 10 dB. For a noise barrier to be effective it must physically obstruct line of sight between the noise source and receiver. Receivers on the first floor and above will be able to see over the noise barrier and it will provide little attenuation. An effective noise barrier is constructed as follows:
Positioned to physically obstruct line of sight between the construction work and receiver, where this is practicable. Positioned as close as practicable to the noisy construction activity. Abutted or overlapped to provide a continuous screen with no gaps at the base or between panels. Be a minimum of 1.8m high.
Noise barriers may be constructed from plywood with a minimum surface mass of 10kg/m 2. Proprietary products such as Flex Shield are available that have a lower surface mass but provide the same or better levels of noise attenuation. Flex Shield barriers shall be utilised during utilities relocation and piling due to the temporary/ mobile nature of these works. Relocatable noise barriers shall be erected around all utilities relocation work sites and around all piling sites. Noise enclosures should be utilised where practicable as they provide better attenuation to receivers above ground floor level. Where enclosures are proposed their design will be agreed with the Project Acoustics Specialist.
6.7 Traffic tyre noise Vehicle movements may cause temporary decks, steel plates and manholes to rock or move, giving rise to nuisance noises. Sharp changes in the level of the road surface may result in tyre noise. Link Alliance will use the following methods to reduce noise from these sources so far as reasonably practicable, especially where the noise source will exist for long periods: Page 24
Firmly fix traffic decks to the road or other structural elements to prevent motion. | Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Placing rubber beneath traffic decks and steel road plates where movement occurs. Providing smooth transitions between changes in road surface level. Ensuring manhole covers are fitted correctly.
6.8 Scheduling of Activities Scheduling of construction activities can be a key tool for managing construction noise and vibration effects. The time of day and the duration of the construction activities will be adjusted after consultation, where possible, to avoid particularly sensitive times for affected receivers. Consideration will also be given to respite periods and avoidance of activity on certain days (if requested by affected neighbours), where practicable. Night time disturbance to nearby residential receivers will be reduced by carrying out noisy activities during the day.
Page 25
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
7. Communication 7.1 Communication Good stakeholder communication practices are a key component for the management of noise and vibration disruption from construction activities. Prior to construction commencing, clear communication channels will be established between the Link Alliance and those in the community identified in the CNV DWP as being potentially affected by the early works construction activities. It is important that the Link Alliance provide information to these parties in a transparent and consistent manner in relation to potential adverse construction noise and vibration effects, duration, along with mitigation and management measures that will be implemented during the works.
7.1.1. Notable and Sensitive Receivers Designation Condition 16.1 requires that communication and consultation is undertaken, as soon as reasonably practicable (and at least once following confirmation of construction timing and methodology), with any Notable Noise and Vibration Receivers located within 100 metres of the designation footprint. On-going communication and consultation will be undertaken with notable noise and vibration receivers throughout the duration of construction occurring in the vicinity as outlined in Section 7.1.2 below. This communication will be reported back to the “key contacts” (see designation Condition 13) and the Auckland Council Compliance Monitoring officer for their review and confirmation of any further action to be undertaken. Designation Condition 36.3(g) requires a record to be kept of communication and consultation with sensitive receivers with regard to construction noise and vibration impacts. A record of communication and consultation with sensitive receivers is provided in Appendix D of this CNV DWP. The record includes details of when the communication/ consultation occurred, comments were received from the sensitive receivers and where the comments have been incorporated into the CNV DWP or where they have not, the reasons for this.
7.1.2. Engagement Methods The Karangahape Station Stakeholder and Communication Manager has a key responsibility to keep the community and stakeholders informed of construction activities as outlined in the early works Communication and Consultation Plan (CCP). The following methodology sets out expectations for stakeholder engagement with regards to noise and vibration generated by the construction works, with detail also provided in Sections 6 and 7 of the CCP:
Page 26
A contact person will always be available during works, and the project contact details will be prominently displayed at the entrance to the site(s) so that they are clearly visible to the public. Individual notification shall be provided and meetings offered to all neighbours that are predicted to experience noise or vibration levels that exceed the limits detailed in Section 3 of the CNV DWP after the BPO mitigation as detailed in Section 6 has been applied. Where it is impractical to avoid an exceedance, communication and consultation shall be undertaken with the receiver to identify methods and measures to mitigate the adverse effects of construction, including identifying why the selected management and mitigation measures and methods reflect the best practicable option. | Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
The Karangahape Station Stakeholder and Communication Manager will make contact with the affected and notable receivers identified in Table 5-1 and Table 5-2 to engage in a consultative process prior to construction. This may involve a face to face meeting or be carried out over the phone as suits the needs of the receiver. The Link Alliance will provide the affected and notable receivers identified in Table 5-1 and Table 5-2 with the following information:
An overview of the works proposed, including duration, activities to be undertaken, potential impacts etc.; The site and facilities layout; Dates for key milestones (road closures, site establishments and disestablishment etc.); and Project contact details for general queries or complaints.
Where changes are made to any of the above items, in particular to hours of operation or to likely duration of the operation, the affected and notable receivers identified in Table 5-1 and Table 5-2 will be notified.
As required, ongoing engagement throughout the works with Notable Noise and Vibration receivers and any other neighbours raising concerns. Regular notifications (at least monthly) will be provided to affected receivers with an update on the progress of the works, and the specific activities (including locations) due to be undertaken next. A record will be kept of all communications in Appendix D of this CNV DWP. All concerns and complaints regarding construction noise and vibration will be managed in accordance with Section 7.2 of this CNV DWP.
7.2 Complaints Procedure Procedures relating to the management of environmental complaints (including construction noise and vibration) are detailed within Section 7 of the CCP. All complaints will be addressed in accordance with these procedures and a record of the complaint and the Link Alliance response maintained in a Project Complaints Register. The Link Alliance will provide Auckland Council's Team Leader Central Monitoring with contact details for the Karangahape Station Stakeholder and Communications Manager to ensure the Council can pass on any Karangahape early works related noise complaints to the Link Alliance quickly.
Page 27
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
8. Monitoring 8.1 Noise Construction noise will be measured and assessed in accordance with the requirements of New Zealand Standard NZS 6803: 1999 “Acoustics - Construction Noise” Noise monitoring will be conducted by the Acoustic Specialist or trained noise monitoring staff as identified in Section 2.3 of this CNV DWP. The equipment noise levels detailed in Table 4-1 are placeholders. All equipment that is predicted to exceed 75 dB LAeq at 5m will be measured, where practicable, when first operating on site. Actual equipment noise levels at 5m and equipment model numbers will be recorded. Due to the temporary nature of the works, construction monitoring shall be undertaken during first occurrence on site of excavation, saw cutting and other phases of construction when noise has potential to exceed the limits or and in response to reasonable noise complaints. Noise monitoring shall also be undertaken if the construction methodology changes, such that noise criteria may be exceeded at other locations. The SSCNVMPs identify monitoring locations and the timing of monitoring at the most affected receivers. In addition to the monitoring identified in the SSCNVMPs, noise monitoring will be carried out at positions representative of noise sensitive locations at appropriate periods to check ongoing compliance with the construction noise limits. The monitoring position will be at ground floor level. Noise will be measured 1m from the most affected façade of the building, or in the area which relates to a noise complaint. If it is not practicable to measure at this position, measurements will be taken at a representative location and adjusted for distance and façade reflections if necessary. Measurements will also be taken at a known distance, such as 5m, from the noise generating equipment to establish source noise levels. Additional measurement positions may be necessary if the initial measurement results indicate that noise may exceed criteria at other areas of the building façade. These measurements will be undertaken 1m from the façade if windows are normally open or inside the building if windows are normally closed. Where internal measurements are required it will be necessary to control noise from local sources, such as people using the telephone, to ensure only construction noise is measured. Noise monitoring will be conducted for 10-15 minutes at each measurement position, during representative construction activity. The noise level will be reported with the measurement duration (e.g. 65 dB LAeq (15min)) Figure 8-1 outlines the process to be followed when monitoring noise.
Page 28
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Figure 8-1: Noise Monitoring Flowchart
Page 29
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
8.2 Vibration Construction vibration levels will be measured and assessed in accordance with the requirements of German Standard DIN 4150-3:1999 “Structural vibration – Part 3: Effects of vibration on structures”. Due to the temporary nature of the works, vibration monitoring shall be undertaken during first occurrence on site of excavation, saw cutting and other phases of construction when vibration has potential to exceed the limits or and in response to reasonable noise complaints. Noise monitoring shall also be undertaken at identified SSCNVMP locations and if the construction methodology changes, such that vibration criteria may be exceeded at other locations. Vibration monitoring shall only be undertaken by the Acoustic Specialist or trained vibration monitoring staff as identified in Table 2-2 of this CNV DWP. Vibration shall initially be measured at the closest building foundations (usually at basement or ground floor level) and this requires consent to access the building of interest. Additional measurement positions may be necessary if the initial measurement results indicate that vibration may exceed criteria within other areas of the building. It may also be necessary to measure vibration levels in the habitable areas of buildings in response to a complaint. Vibration monitoring will be conducted during representative construction activities and comprise measurements of peak particle velocity (PPV) at one second intervals. The duration of the vibration measurements will be sufficient to capture the highest vibration level from the source. The vibration monitoring equipment (geophones) will be fixed to building structural members (e.g. with clamps, or weighed down with sandbags). The geophones will ideally be located at or near the façade of the building facing the vibration source and will be located away from areas where extraneous vibration (e.g. from footfall or building services) could affect the results. Vibration monitoring shall also be undertaken in response to reasonable vibration complaints, or if the construction methodology changes such that vibration criteria may be exceeded at other locations. Figure 8-2 outlines the process to be followed when monitoring vibration. Note that matters relating to building condition survey and response to damage are set out in Sections 8.4 and 9.3.
Page 30
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Figure 8-2 Vibration monitoring flowchart
Page 31
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
8.3 Reporting All noise and vibration monitoring shall be summarised in a report and submitted to the Karangahape Station Stakeholder and Communication Manager and the Environmental and Sustainability Manager within one week of the assessment. The reports shall be kept at the site office and made available to Auckland Council upon request. A noise monitoring template is presented in Appendix F. A vibration monitoring template is presented in Appendix G.
8.4 Building Condition Surveys A pre-construction building condition survey will be undertaken at all of the identified buildings detailed in the Table 5-2 before the early works construction begins. Designation Condition 46 describes the process for building condition surveys. The building condition surveys will generally be undertaken as follows:
The building surveys will be undertaken by an independent senior qualified person. The survey shall include:
Any information about the type of foundations; Existing levels of damage (aesthetic, superficial, affecting levels of serviceability); Whether observed damage is associated with structural damage; Susceptibility of building or structure to further movement; and Photographic evidence.
The Link Alliance will provide the building condition survey structure survey report to the property owner and the Council within 15 working days of the survey being undertaken. If requested by a building or structure owner where a pre-construction survey was undertaken, the Link Alliance will undertake a visual inspection. The Link Alliance shall carry out visual inspections of the surrounding ground and external building facades of the listed buildings adjacent to any trench works to monitor any deterioration or movement of any pre-existing cracks.
The buildings may require further surveys during construction if complaints are made or if the vibration criteria have been exceeded. A post-construction condition survey of the same buildings will be conducted a week after the conclusion of works in the area that have the potential to generate vibration at levels approaching or exceeding the limits in Condition 33. A report will then be prepared. Where a post-construction building condition survey confirms that the building has deteriorated as the result of construction the damage will be rectified.
Page 32
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
9. Contingency Measures This section describes contingency measures to be implemented in the event that the noise and/or vibration limits specified within this CNV DWP and/or in an approved SSCNVMP are exceeded. The Karangahape Station Stakeholder and Communication Manager will liaise with affected receiver (refer Section 7 of this CNV DWP) throughout the following processes.
9.1 Management Process Where any construction activity is predicted and/or measured to exceed the construction noise or vibration limits the following process will be applied:
Check that the BPO and all relevant management measures have been implemented. The Karangahape Station Stakeholder and Communication Manager will engage with all affected parties, to understand their particular sensitivities, including times, activities and locations. The Karangahape Station Stakeholder and Communication Manager or nominated representative shall be available 24/7 during the proposed works. Carry out noise and/or vibration monitoring of the construction activity to verify the extent of any adverse effects. Implement further mitigation and/or contingency measures to avoid significant adverse effects as practicable and agreed with the affected party (refer Sections 9.2 to 9.5 of this CNV DWP).
9.2 Noise If noise monitoring demonstrates non-compliance with the noise limits identified in the approved SSCNVMP, the following procedures shall be implemented:
Undertake additional noise measurements, as necessary, to determine the extent of the exceedance. Discuss additional mitigation options with the Karangahape Station Project Manager as soon as the extent of the exceedance has been determined. This may include immediately stopping works. Undertake noise measurements once recommended mitigation measures have been implemented to confirm that the mitigation has been effective and the noise limits are now being met for the periods agreed. Preparation of a report recording the findings of the survey and detailing additional mitigation or management options. Copies of the report will be provided to CRLL, the Station Project Manager, Karangahape Station Communication and Consultation Manager and the Environmental and Sustainability Manager.
9.3 Vibration – Building Damage If vibration monitoring demonstrates non-compliance with the vibration building damage limits identified in the approved SSCNVMP, the construction activity responsible for the exceedance shall cease as soon as safe and practicable to do so. A detailed building condition survey shall then be undertaken by a suitably qualified engineer to determine if any damage has occurred. The survey shall include, but not be limited to, the following: Page 33
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Comparison of existing condition of building including existing levels of any aesthetic damage or structural damage against pre-construction building survey. Recording (including photographs) the major features of the buildings including location, type, construction, age and present condition, including defects (cracks). Preparation of a report recording the findings of the survey. A copy of the report will be given to the building owner and another copy will be kept at the site office.
If damage has not occurred then that activity can continue provided the measured vibration level is not exceeded further. If minor damage has occurred, such as cosmetic cracks, further mitigation will be applied if practicable. However, the activity can continue provided the measured vibration level is not exceeded further. If moderate or severe damage has occurred and the best practicable option has been implemented, it will be necessary to stop work, if safe to do so, and investigate alternative construction methods. All damage due to construction activities will be repaired within a reasonable timeframe after the construction phase ceases.
9.4 Vibration – Amenity If a complaint is made by a building occupant with regard to vibration levels, vibration monitoring will be conducted in the relevant rooms of the building. If the limits are found to be exceeded then a SSCVMP will be prepared for that receiver.
9.5 Additional measures Where noise and vibration impacts are unavoidable and significant after all reasonable and practicable measures are implemented, alternative mitigation measures, such as temporary relocation or the provision of architectural treatments, will be considered. Temporary relocation involves the relocation of affected occupants for short periods of time where all reasonable and practicable measures and respite periods are implemented and further mitigation is impractical. Architectural treatments may also be sought and involve the provision of alternative ventilation where windows are to remain closed in order to further mitigate noise effects.
Page 34
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Appendix A: ISCA Requirements The table below identifies the ISCA Credit Requirements relevant to this CNV DWP and where they are addressed in the document. Credit
Requirement*
Relevant Section of CNV DWP
Other relevant Information / Comments
Noise DIS-2 Level 1
Measures to mitigate noise during construction [and operation] have been identified and implemented
3, 4, 5, 6, 7, 8 and 9, Appendix B, D, E, F
Refer also to the Site Specific Construction Noise Management Plans and the Historic Character DWP
DIS-2
Monitoring of noise is undertaken at appropriate intervals and in response to complaints during construction.
8, 9, Appendix E, F, I
Refer also to the Communication and Consultation Plan
For construction, modelling and monitoring demonstrates no recurring or major divergences from the noise management process in ISCA approved noise guidelines.
8, 9, Appendix E, F, I
Level 1 DIS-2 Level 2
Vibration Measures to mitigate vibration during construction [and operation] have been identified and implemented
3, 4, 5, 6, 7, 8 and 9, Appendix C, D, E, G
Refer also to the Site Specific Construction Vibration Management Plans and the Historic Character DWP
DIS-3 Level 1
Monitoring of vibration is undertaken at appropriate intervals and in response to complaints during construction.
8, 9, Appendix E, G, I
Refer also to the Communication and Consultation Plan
DIS-3
For construction, modelling and monitoring demonstrates no exceedances of vibration goals for structural damage to buildings and structures.
8, 9, Appendix E, G, I
DIS-3 Level 1
Level 1
Refer to the ISCA Rating Tool for full details of the requirements
Page 35
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Appendix B: Construction Noise Contours
Page 36
| Karangahape Road Station Early Works
174-178 19 1-19 7 7
184 2 0 3-2 07 2 0 2
40 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
29 -41
12A
2 0
C ross S tree t
e nu ve sA rey G
P o yn to nT errace
IS O A 32 9 7 m m x4 2 0 m m
°
2
2 38
49
1-5/1 59 24 243
1 19
2 51-2 53 8-14
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
9 A -9 C
284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
29
309
3 312
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7 2 5
C L IE N T :
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 0
4 0
326 -334
B u ild in gU se C o m m e rcia l C a rP a rk
8 0
1 0 0M e te rs
C o n stru ctio nA re a s
15-19
17
C IT YR A ILL IN K
P R O J E C T :
N o iseC o n to u rs
K a ra n g a h a p e
Z O N E :
6 0d B 6 5d B
C u ltu ra l
7 0d B
F ireS ta tio n
7 5d B
R e sid e n tia l
6 0
B u ild in g stob ed e m o lish e d
2 7
13
C h ru ch
M ix e dU se
C R E A T O RID:
14
2 3
treet thS u o S
21
treet sS alato G
treet ayS D
36
0
2 70 2 78-280
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
Sta te H igh w ay 1
e ar u Sq rd o sf re e B
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
4-6
K ara ng ah ap eR oa d
6 1-6 5
8 0d B
S tu d io
8 5d B
T h e a tre
≤ 9 0d B
P re d ic te dc o n s tru c tio nn o is ele v e ls M e rc u ryL a n e-S ta g e1
T IT L E :
D O C U M E N T :
P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 2 4
R E V IS IO N
0
174-178 19 1-19 7 7
184 2 0 3-2 07 2 0 2
40 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
29 -41
12A
2 0
C ross S tree t
e nu ve sA rey G
P o yn to nT errace
IS O A 32 9 7 m m x4 2 0 m m
°
2
2 38
49
1-5/1 59 24 243
1 19
2 51-2 53 8-14
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
9 A -9 C
284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
29
309
3 312
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7 2 5
C L IE N T :
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 0
4 0
326 -334
B u ild in gU se C o m m e rcia l C a rP a rk
8 0
1 0 0M e te rs
C o n stru ctio nA re a s
15-19
17
C IT YR A ILL IN K
P R O J E C T :
N o iseC o n to u rs
K a ra n g a h a p e
Z O N E :
6 0d B 6 5d B
C u ltu ra l
7 0d B
F ireS ta tio n
7 5d B
R e sid e n tia l
6 0
B u ild in g stob ed e m o lish e d
2 7
13
C h ru ch
M ix e dU se
C R E A T O RID:
14
2 3
treet thS u o S
21
treet sS alato G
treet ayS D
36
0
2 70 2 78-280
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
Sta te H igh w ay 1
e ar u Sq rd o sf re e B
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
4-6
K ara ng ah ap eR oa d
6 1-6 5
8 0d B
S tu d io
8 5d B
T h e a tre
≤ 9 0d B
P re d ic te dc o n s tru c tio nn o is ele v e ls M e rc u ryL a n e-S ta g e2
T IT L E :
D O C U M E N T :
P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 2 5
R E V IS IO N
0
174-178 19 1-19 7 7
184 2 0 3-2 07 2 0 2
40 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
29 -41
12A
2 0
C ross S tree t
e nu ve sA rey G
P o yn to nT errace
IS O A 32 9 7 m m x4 2 0 m m
°
2
2 38
49
1-5/1 59 24 243
1 19
2 51-2 53 8-14
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
9 A -9 C
284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
29
309
3 312
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7 2 5
C L IE N T :
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 0
4 0
326 -334
B u ild in gU se C o m m e rcia l C a rP a rk
8 0
1 0 0M e te rs
C o n stru ctio nA re a s
15-19
17
C IT YR A ILL IN K
P R O J E C T :
N o iseC o n to u rs
K a ra n g a h a p e
Z O N E :
6 0d B 6 5d B
C u ltu ra l
7 0d B
F ireS ta tio n
7 5d B
R e sid e n tia l
6 0
B u ild in g stob ed e m o lish e d
2 7
13
C h ru ch
M ix e dU se
C R E A T O RID:
14
2 3
treet thS u o S
21
treet sS alato G
treet ayS D
36
0
2 70 2 78-280
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
Sta te H igh w ay 1
e ar u Sq rd o sf re e B
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
4-6
K ara ng ah ap eR oa d
6 1-6 5
8 0d B
S tu d io
8 5d B
T h e a tre
≤ 9 0d B
P re d ic te dc o n s tru c tio nn o is ele v e ls P ittS tre e t-S ta g e1
T IT L E :
D O C U M E N T :
P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 3 1
R E V IS IO N
0
174-178 19 1-19 7 7
184 2 0 3-2 07 2 0 2
40 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
29 -41
12A
2 0
C ross S tree t
e nu ve sA rey G
P o yn to nT errace
IS O A 32 9 7 m m x4 2 0 m m
°
2
2 38
49
1-5/1 59 24 243
1 19
2 51-2 53 8-14
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
9 A -9 C
284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
29
309
3 312
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7 2 5
C L IE N T :
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 0
4 0
326 -334
B u ild in gU se C o m m e rcia l C a rP a rk
8 0
1 0 0M e te rs
C o n stru ctio nA re a s
15-19
17
C IT YR A ILL IN K
P R O J E C T :
N o iseC o n to u rs
K a ra n g a h a p e
Z O N E :
6 0d B 6 5d B
C u ltu ra l
7 0d B
F ireS ta tio n
7 5d B
R e sid e n tia l
6 0
B u ild in g stob ed e m o lish e d
2 7
13
C h ru ch
M ix e dU se
C R E A T O RID:
14
2 3
treet thS u o S
21
treet sS alato G
treet ayS D
36
0
2 70 2 78-280
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
Sta te H igh w ay 1
e ar u Sq rd o sf re e B
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
4-6
K ara ng ah ap eR oa d
6 1-6 5
8 0d B
S tu d io
8 5d B
T h e a tre
≤ 9 0d B
P re d ic te dc o n s tru c tio nn o is ele v e ls P ittS tre e t-S ta g e2
T IT L E :
D O C U M E N T :
P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 3 0
R E V IS IO N
0
174-178 19 1-19 7 7
184 2 0 3-2 07 2 0 2
40 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
29 -41
12A
2 0
C ross S tree t
e nu ve sA rey G
P o yn to nT errace
IS O A 32 9 7 m m x4 2 0 m m
°
2
2 38
49
1-5/1 59 24 243
1 19
2 51-2 53 8-14
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
9 A -9 C
284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
29
309
3 312
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7 2 5
C L IE N T :
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 0
4 0
326 -334
B u ild in gU se C o m m e rcia l C a rP a rk
8 0
1 0 0M e te rs
C o n stru ctio nA re a s
15-19
17
C IT YR A ILL IN K
P R O J E C T :
N o iseC o n to u rs
K a ra n g a h a p e
Z O N E :
6 0d B 6 5d B
C u ltu ra l
7 0d B
F ireS ta tio n
7 5d B
R e sid e n tia l
6 0
B u ild in g stob ed e m o lish e d
2 7
13
C h ru ch
M ix e dU se
C R E A T O RID:
14
2 3
treet thS u o S
21
treet sS alato G
treet ayS D
36
0
2 70 2 78-280
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
Sta te H igh w ay 1
e ar u Sq rd o sf re e B
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
4-6
K ara ng ah ap eR oa d
6 1-6 5
8 0d B
S tu d io
8 5d B
T h e a tre
≤ 9 0d B
P re d ic te dc o n s tru c tio nn o is ele v e ls P ittS tre e t-S ta g e3&4
T IT L E :
D O C U M E N T :
P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 3 1
R E V IS IO N
0
174-178 19 1-19 7 7
184 2 0 3-2 07 2 0 2
40 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
29 -41
12A
2 0
C ross S tree t
e nu ve sA rey G
P o yn to nT errace
IS O A 32 9 7 m m x4 2 0 m m
°
2
2 38
49
1-5/1 59 24 243
1 19
2 51-2 53 8-14
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
9 A -9 C
284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
29
309
3 312
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7 2 5
C L IE N T :
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 0
4 0
326 -334
B u ild in gU se C o m m e rcia l C a rP a rk
8 0
1 0 0M e te rs
C o n stru ctio nA re a s
15-19
17
C IT YR A ILL IN K
P R O J E C T :
N o iseC o n to u rs
K a ra n g a h a p e
Z O N E :
6 0d B 6 5d B
C u ltu ra l
7 0d B
F ireS ta tio n
7 5d B
R e sid e n tia l
6 0
B u ild in g stob ed e m o lish e d
2 7
13
C h ru ch
M ix e dU se
C R E A T O RID:
14
2 3
treet thS u o S
21
treet sS alato G
treet ayS D
36
0
2 70 2 78-280
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
Sta te H igh w ay 1
e ar u Sq rd o sf re e B
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
4-6
K ara ng ah ap eR oa d
6 1-6 5
8 0d B
S tu d io
8 5d B
T h e a tre
≤ 9 0d B
P re d ic te dc o n s tru c tio nn o is ele v e ls C S A
T IT L E :
D O C U M E N T :
P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 3 2
R E V IS IO N
0
Construction Noise and Vibration Delivery Work Plan
Appendix C: Construction Vibration Contours
Page 37
| Karangahape Road Station Early Works
°
174-178 12A
2 0
40
7
184 2 0 3-2 07 2 0 2 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
P o yn to nT errace
19 1-19 7
e nu ve sA rey G
IS O A 32 9 7 m m x4 2 0 m m
P o yn to nT errace
2
2 38
49
1-5/1 59 24
6 1-6 5
4-6 1 2 51-2 53 8-14
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
re ua q S d or f s re Be
2 70
9 A -9 C
2 78-280 284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
3
21
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7
14
2 5
326 -334
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
B U IL D IN G S O U T S ID EO FW O R K SA R E A H IS T O R IC /V IB R A T IO NS E N S IT IV E
0
2 0
C O M M E R C IA L
C R E A T O RID:
4 0
6 0
8 0
1 0 0M e te rs
15-19
17
6 A
R E S ID E N T IA L C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 7
13
339 335
C L IE N T :
2 3
treet thS u o S
312
treet sS alato G
treet ayS D
36
29
309
A uck lan d-H am ilto nM oto rw ay
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
19
K ara ng ah ap eR oa d
243
30
V IB R A T IO NC O N T O U R S C O M M E R C IA L- 2 0 M M /S
C IT YR A ILL IN K
P R O J E C T :
K a ra n g a h a p e
Z O N E :
R E S ID E N T IA L- 5 M M /S H IS T O R IC /V IB R A T IO NS E N S IT IV E- 3 M M /S
C O N S T R U C T IO NA R E A S
T IT L E :
D O C U M E N T :
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs M e rc u ryL a n e-S ta g e1 P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 1 5
R E V IS IO N
0
°
174-178 12A
2 0
40
7
184 2 0 3-2 07 2 0 2 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
P o yn to nT errace
19 1-19 7
e nu ve sA rey G
IS O A 32 9 7 m m x4 2 0 m m
P o yn to nT errace
2
2 38
49
1-5/1 59 24
6 1-6 5
4-6 1 2 51-2 53 8-14
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
re ua q S d or f s re Be
2 70
9 A -9 C
2 78-280 284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
3
21
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7
14
2 5
326 -334
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
B U IL D IN G S O U T S ID EO FW O R K SA R E A H IS T O R IC /V IB R A T IO NS E N S IT IV E
0
2 0
C O M M E R C IA L
C R E A T O RID:
4 0
6 0
8 0
1 0 0M e te rs
15-19
17
6 A
R E S ID E N T IA L C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 7
13
339 335
C L IE N T :
2 3
treet thS u o S
312
treet sS alato G
treet ayS D
36
29
309
A uck lan d-H am ilto nM oto rw ay
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
19
K ara ng ah ap eR oa d
243
30
V IB R A T IO NC O N T O U R S C O M M E R C IA L- 2 0 M M /S
C IT YR A ILL IN K
P R O J E C T :
K a ra n g a h a p e
Z O N E :
R E S ID E N T IA L- 5 M M /S H IS T O R IC /V IB R A T IO NS E N S IT IV E- 3 M M /S
C O N S T R U C T IO NA R E A S
T IT L E :
D O C U M E N T :
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs M e rc u ryL a n e-S ta g e2 P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 1 6
R E V IS IO N
0
°
2
174-178 12A
2 0 19 1-19 7
184 2 0 3-2 07
2 0 2
40
78
211
6 0
2 08-212
215 6 8
214
2 2 5
80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
e nu ve sA rey G
7
70-74
2 38
49
6 1-6 5 243
4-6 1 19
2 51-2 53
K ara ng ah ap eR oa d
1-5/1 59
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
170
183
P o yn to nT errace
24
30
M erc ury Lan e
246 -2 54
3-5
M ercu ryL an e
2 56
8-14
9
2 58-26 4
11-13
re ua q S rd o sf re e B
2 70
9 A -9 C
2 78-280
284
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
284-286
29 0
283
16
29 2-300
18 8
12
treet astS E
30 3-307
29
3 312
36
31
315-32 5
32 2-324 32 7 L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t.
14
21 15-19
17
0
2 0
4 0
D O C U M E N T :
6 0
8 0
1 0 0M e te rs
K a ra n g a h a p e
Z O N E :
T IT L E :
C R E A T O RID:
C IT YR A ILL IN K
P R O J E C T :
T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
C O M P A N YN U M B E R:6 2 6 7 8 7 0
7 2 3 2 52
treet thS u o S
309
treet sS alato G
treet ayS D
t ee Str un eto op H
29 5
C L IE N T :
C an ad aS tree t
26 8 10/39
Sta te H igh w ay 1
IS O A 32 9 7 m m x4 2 0 m m
16 6
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs P ittS tre e t-S ta g e1 P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 3 3
R E V IS IO N
0
°
174-178 12A
2 0
40
7
184 2 0 3-2 07 2 0 2 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
P o yn to nT errace
19 1-19 7
e nu ve sA rey G
IS O A 32 9 7 m m x4 2 0 m m
P o yn to nT errace
2
2 38
49
1-5/1 59 24
6 1-6 5
4-6 1 2 51-2 53 8-14
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
re ua q S d or f s re Be
2 70
9 A -9 C
2 78-280 284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
3
21
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7
14
2 5
326 -334
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
B U IL D IN G S O U T S ID EO FW O R K SA R E A H IS T O R IC /V IB R A T IO NS E N S IT IV E
0
2 0
C O M M E R C IA L
C R E A T O RID:
4 0
6 0
8 0
1 0 0M e te rs
15-19
17
6 A
R E S ID E N T IA L C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 7
13
339 335
C L IE N T :
2 3
treet thS u o S
312
treet sS alato G
treet ayS D
36
29
309
A uck lan d-H am ilto nM oto rw ay
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
19
K ara ng ah ap eR oa d
243
30
V IB R A T IO NC O N T O U R S C O M M E R C IA L- 2 0 M M /S
C IT YR A ILL IN K
P R O J E C T :
K a ra n g a h a p e
Z O N E :
R E S ID E N T IA L- 5 M M /S H IS T O R IC /V IB R A T IO NS E N S IT IV E- 3 M M /S
C O N S T R U C T IO NA R E A S
T IT L E :
D O C U M E N T :
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs P ittS tre e t-S ta g e2 P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 2 1
R E V IS IO N
0
°
2
174-178 12A
2 0 19 1-19 7 184 2 0 3-2 07 2 0 2
40 78
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
e nu ve sA rey G
7
70-74
2 38
49
6 1-6 5 243 4-6 1 19
2 51-2 53
K ara ng ah ap eR oa d
1-5/1 59
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
170
183
P o yn to nT errace
24
30
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56
8-14
9
2 58-26 4
11-13
re ua q S rd o sf re e B
2 70
9 A -9 C
2 78-280 284
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
284-286 29 0
283
16
29 2-300
18 8
12
treet astS E
30 3-307
29 3 312
36 31
315-32 5 32 2-324 32 7
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
14
B U IL D IN G S O U T S ID EO FW O R K SA R E A H IS T O R IC /V IB R A T IO NS E N S IT IV E R E S ID E N T IA L
C O M P A N YN U M B E R:6 2 6 7 8 7 0
0
2 0
C O M M E R C IA L
C R E A T O RID:
4 0
6 0
8 0
1 0 0M e te rs
21
7 2 3 2 52
15-19
treet thS u o S
309
treet sS alato G
treet ayS D
t ee Str un eto op H
29 5
C L IE N T :
C an ad aS tree t
26 8 10/39
Sta te H igh w ay 1
IS O A 32 9 7 m m x4 2 0 m m
16 6
17
V IB R A T IO NC O N T O U R S C O M M E R C IA L- 2 0 M M /S
C IT YR A ILL IN K
P R O J E C T :
K a ra n g a h a p e
Z O N E :
R E S ID E N T IA L- 5 M M /S H IS T O R IC /V IB R A T IO NS E N S IT IV E- 3 M M /S
C O N S T R U C T IO NA R E A S
T IT L E :
D O C U M E N T :
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs P ittS tre e t-S ta g e3 P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 3 3
R E V IS IO N
0
°
174-178 12A
2 0
40
7
184 2 0 3-2 07 2 0 2 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
P o yn to nT errace
19 1-19 7
e nu ve sA rey G
IS O A 32 9 7 m m x4 2 0 m m
P o yn to nT errace
2
2 38
49
1-5/1 59 24
6 1-6 5
4-6 1 2 51-2 53 8-14
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
re ua q S d or f s re Be
2 70
9 A -9 C
2 78-280 284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
3
21
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7
14
2 5
326 -334
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
B U IL D IN G S O U T S ID EO FW O R K SA R E A H IS T O R IC /V IB R A T IO NS E N S IT IV E
0
2 0
C O M M E R C IA L
C R E A T O RID:
4 0
6 0
8 0
1 0 0M e te rs
15-19
17
6 A
R E S ID E N T IA L C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 7
13
339 335
C L IE N T :
2 3
treet thS u o S
312
treet sS alato G
treet ayS D
36
29
309
A uck lan d-H am ilto nM oto rw ay
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
19
K ara ng ah ap eR oa d
243
30
V IB R A T IO NC O N T O U R S C O M M E R C IA L- 2 0 M M /S
C IT YR A ILL IN K
P R O J E C T :
K a ra n g a h a p e
Z O N E :
R E S ID E N T IA L- 5 M M /S H IS T O R IC /V IB R A T IO NS E N S IT IV E- 3 M M /S
C O N S T R U C T IO NA R E A S
T IT L E :
D O C U M E N T :
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs P ittS tre e t-S ta g e4 P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 1 9
R E V IS IO N
0
°
174-178 12A
2 0
40
7
184 2 0 3-2 07 2 0 2 78
70-74
211
6 0
2 08-212
215 6 8
214
2 2 5 80
4
2 29 35 8 2 842
P ittS treet
47
C ross S tree t
P o yn to nT errace
19 1-19 7
e nu ve sA rey G
IS O A 32 9 7 m m x4 2 0 m m
P o yn to nT errace
2
2 38
49
1-5/1 59 24
6 1-6 5
4-6 1 2 51-2 53 8-14
M erc ury Lan e
246 -2 54 3-5
M ercu ryL an e
2 56 9
2 58-26 4
11-13
re ua q S d or f s re Be
2 70
9 A -9 C
2 78-280 284 284-286 29 0
283
16 29 5
29 2-300
18 8
12
treet astS E
30 3-307
3
21
31
315-32 5 32 2-324
St at e H ig hw ay 1
32 7
14
2 5
326 -334
L in kA llia n c eh a sp re p a re dth isd o c u m e n tfo rth es o leu s eo fth ec lie n ta n dfo ras p e c ific p u rp o s e ,e a c ha se x p re s s lys ta te dinth ed o c u m e n t.N oo th e rth irdp a rtys h o u ldre lyo nth is d o c u m e n tw ith o u tth ew ritte nc o n s e n to fL in kA llia n c e .L in kA llia n c eu n d e rta k e sn od u ty ,n o r a c c e p tsa n yre s p o n s ib ility ,toa n yth irdp a rtyw h om a yre lyu p o no ru s eth isd o c u m e n t. T h iss k e tc hisc o n fid e n tia la n ds h a ll o n lyb eu s e dfo rth ep u rp o s eo fth isp ro je c t
B U IL D IN G S O U T S ID EO FW O R K SA R E A H IS T O R IC /V IB R A T IO NS E N S IT IV E
0
2 0
C O M M E R C IA L
C R E A T O RID:
4 0
6 0
8 0
1 0 0M e te rs
15-19
17
6 A
R E S ID E N T IA L C O M P A N YN U M B E R:6 2 6 7 8 7 0
2 7
13
339 335
C L IE N T :
2 3
treet thS u o S
312
treet sS alato G
treet ayS D
36
29
309
A uck lan d-H am ilto nM oto rw ay
ne La se ou H oa m Sa
2 2
2 59 -281 16 -18
C an ad aS tree t
26 8 10/39
t ee Str un eto op H
P a th :\\N za k l1 fp 0 0 1 \p ro je cts\6 0 5 X \6 0 5 6 0 7 7 8 \4 0 0 _ T E C H \4 1 1 _ A co u stics\G IS \0 2 _ M a p s\C R L C 3 _ A co u stics\1 8 1 2 1 2 _ C R L C 3 _ A co u stics.a p rx
19
K ara ng ah ap eR oa d
243
30
V IB R A T IO NC O N T O U R S C O M M E R C IA L- 2 0 M M /S
C IT YR A ILL IN K
P R O J E C T :
K a ra n g a h a p e
Z O N E :
R E S ID E N T IA L- 5 M M /S H IS T O R IC /V IB R A T IO NS E N S IT IV E- 3 M M /S
C O N S T R U C T IO NA R E A S
T IT L E :
D O C U M E N T :
P re d ic te dc o n s tru c tio nv ib ra tio nc o n to u rs C S A P R O J E C T
Z O N E
C R L
K R D
R G A N IS A T IO N D IS C IP L IN E O
A C V
C 3
T Y P E
S H E E T
S K E
0 0 2 3
R E V IS IO N
0
Construction Noise and Vibration Delivery Work Plan
Appendix D: Record of Communication
Page 38
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan Address of Sensitive Receiver
Representatives
Date
1 Beresford Square – Residential
1
-
1 Cross Street
Meeting with occupants – a range of commercial and a single residential
21/08/19
Interview with the business owner
21/08/19
4-6 Beresford Square – Northern Bar
8-10 Beresford Square – Theta Inc
Interview with building manager
20/08/19
12 Beresford Square – Bravo Hospitality
Page 39
Interview with the business owner
| Karangahape Road Station Early Works
20/08/19
Comments
Resolution
-
-
Offices operate standard business hours, 8:30am to 5:30pm. Poor insultation from noise due to building construction Occupants would like to be kept informed about timing of noise intensive works to schedule meetings around them
Mobile noise barriers will be installed around noisy works and notification to be given 24 hours in advance of activities involving concrete cutting, breaking, piling, compacting and use of the hydro vac. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, piling, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage.
Operates Monday to Saturdays 3pm till late Bar tables are outside on the street Open doors are required for ventilation, in the summer 80% of their patrons sit outside Concern about noise and lack of visibility affecting their business
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, piling, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Noisy activities outside this property to be scheduled before 3pm, where practicable.
Office building on Level 1 & 2, operates Monday to Fridays during normal office hours 8:30am – 5:30pm Would like works to take place after business hours as noise is a concern
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, piling, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Noisy activities outside this property to be scheduled outside of office business hours where practicable. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them with advance notification.
Operates Monday to Friday 8:30am to 5:00pm Concerned about noise as noise can currently be heard through the trickle vents
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise
Construction Noise and Vibration Delivery Work Plan may be audible inside the building during concrete cutting, breaking, piling, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. 15 Beresford Square – Hopetoun Alpha
2
-
-
-
16-18 Beresford Square – Centurion Sauna
1
-
-
-
22 Beresford Square – Residential Flats
Interview with Building manager / resident
15/10/19
12 East Street Residential
2
-
-
14 East Street – Residential
Interview with one resident
23/08/19
16 East Street
Page 40
To be partly demolished 1
| Karangahape Road Station Early Works
-
Main concern from building manager is noise disruption for the residents and access to the carpark. The building is naturally ventilated. Noise concern from residents overlooking Beresford Square during daytime due to working from home. Keeping windows and doors closed during the summer is not an option.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. -
Owner states there are two flats over a ground floor commercial office in this building and his is the one facing away from the Mercury Lane CSA. Not concerned about noise as not in during the day. His neighbor overlooks the Mercury Lane construction site, and concerns about noise and dust from demolition work.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Vibration may be perceptible but will not be at a level that causes building damage.
-
-
Construction Noise and Vibration Delivery Work Plan 18 East Street Residential
Interview with owner
21/08/19
Owner concerned about noise impacts on the occupants. Access to the building not provided to inspect potential noise intrusion
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Vibration may be perceptible but will not be at a level that causes building damage.
21 East Street – UnoLoco Event Management
Interview with the business owner
05/09/19
Operates normal business hours with regular client meetings held in the office. Ground floor is parking only and first floor is open plan office with two meeting room. There is a sound booth round back for recordings which is used when required. Meeting room and reception is at the front. Air condition unit needs to be turned off when sound booth is in use. CRL is carrying out a building survey next week. Concerns about noise and vibration for their clients and staff that are based in the office and during recordings.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. Noise will be intermittent throughout the early works period. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time when recordings are not taking place. Vibration may be perceptible but will not be at a level that causes building damage. It is recommended windows to be kept closed during works and notice of noisy works to be given 24 hours in advance.
Operates normal business hours. Garage front is set back about 15m from the road side. Front is an empty container used for storage and parking. Major concern about noise as services and business relies on listening to the car noise to identify problems. Also concerned about the closure of road around the site to do the test runs. Only has a shutter gate and the garage is natural ventilated via the shop front. Would like some barriers or acoustic attenuation.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Mobile noise barriers to be installed around noisy works to provide some mitigation. It is recommended shutters are kept closed during the high noise generating activities detailed above where practical.
Usually out to work during the day but one resident in 2A South Street works from home
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting,
23 East Street – European motor services
Interview with the business owner
22/08/19
25/27 East Street (2/2A South Street) Residentials Page 41
Interview with resident block representative
| Karangahape Road Station Early Works
05/09/19
Construction Noise and Vibration Delivery Work Plan
29 East Street – International Earth Sciences Ltd
Interview with the business owner
05/09/19
Ideally would like works to be kept within the hours between 8am – 6pm. Appreciate there will be noise and vibration
breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Noisy works to be scheduled between 8am and 6pm, where practicable. Vibration may be perceptible but will not be at a level that causes building damage.
A monitoring / geotech company and has already spoken to someone regarding the social impacts. Stated they will be carrying out their own noise and vibration monitoring in house and will be contacting the council as soon as the limits are breached. They have their own monitoring equipment in the office and they are sensitive to vibrations. Concerned about the demolition in regards to hazardous materials and rat control.
Mobile noise barriers to be installed around noisy works With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Vibration may be perceptible, and monitoring is to be carried out at this property. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them.
29 East Street – Electric Bike Team
Interview with the business owner
05/09/19
Not concerned about noise and vibration as long as access was maintained.
No comments to incorporate as owner has no noise or vibration concerns.
29 East Street – Think concept (Level 1)
Interview with business staff
05/09/19
An IT consultant company with mainly remote customer which ring into the office. Concern about noise and vibration as they already can hear and feel the traffic along East St and the adjacent State Highway. Currently looking to install glass partition meeting rooms next to the façade. Notification regarding high impact works would be appreciated.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Vibration may be perceptible but will not be at a level that causes building damage. Advance notice to be given for noisy works.
Page 42
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan 238 Karangahape Road – Commercial GF, Level 1-4 Residential flats
Interview with building manager
22/08/19
Commercial properties apart from Zambero on corner of building does not have façade access on Mercury Lane. No concerns about noise for commercial properties within the building as shielded by the façade. Concerns about vibration as heritage building which has been requiring repairs to the back south-east façade for a while and there are concerns about safety and stability of the façade with the construction work coming. A building survey is required There is a mixture of residents in the building from professional works to retirees whom are in during the daytime.
Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Vibration may be perceptible but will not be at a level that causes building damage. Vibration monitoring to take place as detailed in Table 4-3 of the SSCNVMP. A pre-construction building survey to be carried out.
Concerns about construction noise impacts during peak periods (afternoons and evenings, Thursday to Sunday)
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, piling, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Noisy works to be scheduled outside of peak hours where practicable.
243 Karangahape Road – Pitt St Pub
Interview with Pitt St Pub manager
20/08/19
243 Karangahape Road – Calendar Girls
1
-
-
-
283 Karangahape Road – Samoa House
1
-
-
-
49 Pitt Street - Beggs
Interview with business operator
16/10/19
Operates Monday to Friday 9am to 5pm and Saturdays 9am to 3pm. Main concern is regarding the lack of carparking for their customers which is an important factor for their business
Have downsized their business to 1/3 of the building footprint in preparation of the disruption.
Doors are generally kept open to Pitt street and for ventilation. Noise and vibration are not a big concern. Page 43
| Karangahape Road Station Early Works
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, piling, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Noisy works to be scheduled outside of peak hours where practicable.
Construction Noise and Vibration Delivery Work Plan Want more consistent and accurate communications about schedules of work 59 Pitt Street – Graphic Design (Level 1)
Interview with the business owner
20/08/19
Noise concern when meeting with clients within the office. Sometimes can operate on weekends depending on workload and projects Commented roof chips often fall down when building shakes.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation/notification will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them.
59 Pitt Street – Waves Vintage
Interview with the business owner
21/08/19
Not concerned about noise and vibration
No comments to incorporate as owner has no noise or vibration concerns.
59 Pitt Street – Tattoo Parlour
Interview with the business owner
20/08/19
Operates Tuesday to Saturdays 11:00 to 18:00 Reception is at the front of the façade with background music and needle sounds dominating inside. Mostly concerned about access.
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Noisy works to be scheduled before 11am, where practicable.
Operates Tuesdays to Saturdays with extended hours on Wednesday and Thursday from 10:00 to 20:30. Construction work is during the busiest time of the year. Commented noise is unbearable during the current trail trench investigations but glad there will be hoarding for actual works. Have loud background music in shop to mask construction, can operate as hairdressers in noise but not preferred.
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Noisy works to be scheduled before 10am, where practicable.
Open every day of the week. Shop has a record player which is sensitive to vibrations Does have mechanical ventilation but unsure if it is still operational. Generally, experience noisy conditions already and concerned about the increased noise affecting business.
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage.
59 Pitt Street – Vada
Interview with the business owner
21/08/19
59 Pitt Street – Fabriks
Interview with the business owner
20/08/19
Page 44
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan Vibration may be perceptible and during periods of concrete cutting, breaking, piling and compacting the record player may be affected. 61 Pitt Street – Johnny feedback coffee shop
Interview with the business owner
20/08/19
Operates Monday to Saturday 07:00-16:00 Major concerns about noise and visibility as no façade and shop opens with roller doors
Mobile noise barriers will be installed around noisy works whilst equipment is operational. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Vibration may be perceptible but will not be at a level that causes building damage.
65 Pitt Street - Tokyo Loco Bowl
Interview with the business owner
23/08/19
Main concern about access for customers.
Background music is present and façade is mainly glazing.
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage.
68 Pitt Street
3
-
-
70-74 Pitt Street – Chatham Apartments
Interview with the building owner
11/10/19
The owner was concerned about noise impacts, particularly in the CEO office which directly overlooks the works on the first floor. The meeting rooms overlooking the construction works have very high reverberation times. Residential flats are from Level 2 upwards and set back slightly. The building is naturally ventilated
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them.
Generally open throughout day during standard business hours and occasional evenings for community groups, weddings, performing arts and offices. Main concern about access
Concern about vibration effect on stain glass windows.
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage.
78 Pitt Street – Methodist Church
Page 45
Interview with building manager
| Karangahape Road Station Early Works
20/08/19
-
Construction Noise and Vibration Delivery Work Plan Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Vibration may be perceptible but will not be at a level that causes building damage. Further investigation is required. 80 Pitt Street – Flying Out Records
Interview with store manager
21/08/19
82 Pitt Street – Def
Interview with the business owner
20/08/19
3-5 Mercury Lane –BK Hostel
Page 46
Interview with the Business manager
| Karangahape Road Station Early Works
20/08/19
Operates everyday 10:00-18:00 Shop spans over ground floor and level 1 with some additional offices Have live music events once a month on Saturday afternoons between 2:30pm -5:00pm Concerns about noise and vibration levels affecting recordings taken in the basement between 8:30am and 10am on Wednesday and Thursday They can currently hear sirens go past when in the basement.
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Vibration may be perceptible but will not be at a level that causes building damage. Noisy works outside this building to be scheduled outside of 8:30am – 10am on Wednesday and Thursday whilst recordings are taking place. No noisy works to be scheduled during live music events. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them.
Operates Monday to Friday 9:30am – 6:00pm and weekends between 10:00am to 5:00pm Has background music and generally keeps front door opens and road traffic noise can be heard Not too concerned about noise, would like notice and require access maintained
Further consultation to take place to inform schedule of works.
Operates all hours Main concern about noise disturbing customers during sleeping hours and access maintained
With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them.
Construction Noise and Vibration Delivery Work Plan 9 Mercury Lane – Mercury Lane Theatre
Interview with building manager
16/10/19
10/39 Pitt Street
2
-
Mercury theatre is a heritage building and is currently in use as a venue hire. The venue is in regular use from different parties from dance classes, studio filming, to small concerts etc Noise and sensitive activities will be dependent on the use of the theatre. Not majorly concerned about noise as they generate their own but due to heritage status vibration monitoring is requested. Theatre is naturally ventilated through the roof system only. Windows are not well sealed and fire escape doors are poorly sealed. Works outside the theatre on Mercury lane could be clearly heard in the main auditorium. Some refurbishment and renovation is required on the building and this might happen within the time of the CRL construction works.
Mobile noise barriers to be installed around noisy works. With the mitigation and management measures detailed in Section 6 of the CNV DWP and Table 4-1 of the SSCNVMP, noise may be audible inside the building during concrete cutting, breaking, compacting and use of the hydro vac. However, noise will be intermittent and over a limited duration of only 5 days per stage. Vibration will be perceptible and at worst case may be at levels which could cause building damage during CSA establishment. Further consultation will take place with the affected parties before works begin to determine if the works can be scheduled for a time that least impacts them. Long Term Noise and vibration monitoring is recommended for this property.
-
-
Note: 1. 2. 3.
Page 47
Relationship needs to be managed, meeting time to be arranged Not consulted as owner/manager was unavailable. Not consulted as property is currently vacant.
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Appendix E: SSCNVMP
Page 48
| Karangahape Road Station Early Works
Karangahape Station Early Works Appendix E Site Specific Construction Noise and Vibration Management Plan
Revision: Final October 2019
Page 1
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Site Specific Construction Noise and Vibration Management Plan This document is uncontrolled when printed. This document should be printed in colour
Revision Status Revision
Issue Date
Major Changes
Changed By
Approved By
A
30/09/2019
Initial draft
S Yung
Peter Roan
0
21/10/2019
Final –incorporating IPR and AC review comments
S Yung
Peter Roan
Approval Status Name/Title
Signature
Date
Prepared by:
Sharon Yung Acoustic Engineer
21/10/2019
Reviewed by:
Claire Drewery Technical Director – Acoustics
21/10/2019
Controlled by:
Claire Drewery Technical Director – Acoustics
21/10/2019
Approved by:
Peter Roan Link Alliance – Consents Lead
21/10/2019
Page 2
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Table of contents 1. Introduction ................................................................................................ 4 1.1
Objective ........................................................................................................................... 4
1.2
Site Plan............................................................................................................................. 4
2. Affected Noise and/or Vibration Receivers ................................................ 5 2.1.1.
Affected receivers ...................................................................................................... 5
3. Karangahape Early Works Activities ........................................................... 6 4. Façade performance and internal noise levels ........................................... 7 4.1
Noise ................................................................................................................................. 7
4.2
Vibration ......................................................................................................................... 28
5. Communication and Consultation ............................................................ 34 5.1
Consultation to inform this SSCNVMP ............................................................................. 34
6. Monitoring ................................................................................................ 35
Page 3
6.1
Noise Monitoring............................................................................................................. 35
6.2
Vibration Monitoring....................................................................................................... 35
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
1. Introduction This Site-Specific Construction Noise and Vibration Management Plan (SSCNVMP) forms part of the Construction Noise and Vibration Delivery Work Plan (CNV DWP) for the Karangahape Station early works. The early works involve tree removal and demolition, network utility relocations, and the establishment of Construction Support Areas in Beresford Square and Mercury Lane. This SSCNVMP provides a specific assessment of construction noise and vibration effects from the early works that are predicted to exceed the Project Standards for construction noise and vibration specified in the CRL designation conditions. This SSCNVMP should be read in conjunction with the Karangahape early works CNV DWP Document ref CRL-KRD-RME-LKA-PLN-800003 dated 18/10/19, which contains further details of the proposed works, Project Standards, monitoring, general mitigation measures and other information relevant to this SSCNVMP.
1.1 Objective The objective of this SSCNVMP is to detail the best practicable option to avoid, remedy or mitigate adverse effects on receivers resulting from construction noise and/or vibration that does not comply with the Project Standards set out in Section 3 of the CNV DWP. This SSCNVMP has been prepared in accordance with designation Conditions 37, 38, and 39.
1.2 Site Plan The location of the Karangahape early works is shown in Figure 1-1. Active work areas are shown in red shading while on-street parking closures are shown in yellow shading.
Key: CRL Designation Boundary
Figure 1-1: Site location – Karangahape Station Early Works
Page 4
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
2. Affected Noise and/or Vibration Receivers 2.1.1. Affected receivers Receivers where noise and/or vibration levels from the early works are predicted to exceed project noise or vibration standards, along with the relevant building uses, are listed in Table 2-1. Table 2-1: Affected receivers
Address
Use
Historic/ Vibration Sensitive Classification
Minimum Distance to Works (m)
1 Beresford Square
Commercial
Y
1
75
-
3
1 Cross Street
Commercial
Y
1
75
-
3
4-6 Beresford Square
Mixed Use
Y
1
75*
90*
3
8-14 Beresford Square
Mixed Use
Y
1
75*
90*
3
19 Beresford Square
Mixed Use
Y
1
75*
90*
3
16-18 Beresford Square
Commercial
Y
1
75
-
3
22Beresford Square
Mixed Use
N
1
75*
90*
5
12 East Street
Mixed Use
N
10
75*
90*
20
14 East Street
Mixed Use
Y
1
75*
90*
3
16 East Street
Residential
N
1
75*
90*
5
18 East Street
Residential
Y
0
75*
90*
3
21 East Street
Commercial1
Y
10
75
-
3
23 East Street
Commercial
Y
10
75
-
3
27 East Street
Mixed Use
Y
10
75*
90*
3
29 East Street
Commercial
N
10
75*
90*
20
1
Noise Criteria, dB LAeq
Noise Criteria, dB LAFmax
Vibration Criteria, mm/s
80-82 Pitt Street
Commercial
N
20
75
-
20
238 Karangahape Road
Mixed Use
Y
1
75*
90*
3
243 Karangahape Road
Commercial
Y
1
75
-
3
3 Mercury Lane
Commercial
Y
10
75
-
3
283 Karangahape Road
Cultural
Y
1
75*
90*
3
49 Pitt Street
Mixed Use
Y
1
75*
90*
3
59 Pitt Street
Commercial
Y
1
75
-
3
61-65 Pitt Street
Commercial
Y
1
75
-
3
68 Pitt Street
Commercial
Y
20
75
-
3
70-74 Pitt Street
Commercial
Y
8
75
-
3
78 Pitt Street
Church
Y
3
75*
90*
3
Y
1
75*
90*
3
N
12
75*
90*
5
1
9 Mercury Lane
Theatre
10/39 Pitt Street
Residential
Page 5
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
*This is the Monday to Saturday 07:00 to 22:00 noise criteria. The majority of works will be carried out during this period. For residential receivers the noise limit is reduced to 65 dB L Aeq & 80 dB LAFmax on Sundays and Public Holidays between 07:00 to 22:00 and to 60 dB LAeq & 75 dB LAFmax at all other times. Note 1: Notable Receiver
3. Karangahape Early Works Activities A general overview of construction activities for early works along with proposed start and end dates, are shown in Table 3-1. Table 3-1: Overview of Karangahape Early Works
Works location
Overview of construction activities
Approximate Duration
Beresford Square / Pitt Street
Relocation of network utilities located within the footprint of the new Karangahape station in Beresford Square / Pitt Street.
Jan – Feb 2020 – approximately 5 months
Removal of street trees and the demolition of the café / Q1 2020 – approximately 3 toilet in Beresford Square. months Establishment of the Beresford Square Construction Q1 2020 – approximately 3 Support Area (CSA) to provide site offices, construction months vehicle parking, laydown areas and storage of plant and equipment etc. Mercury Lane
Relocation of network utilities located within the footprint of the new Karangahape station in Mercury Lane; and
Q4 2019 – Q1 2020 – approximately 5 months
Establishment of the Mercury Lane Construction Support Area to provide site offices, construction vehicle parking, laydown areas and storage of plant and equipment etc. Construction of the temporary Station working platform
Q1 2020 – approximately 4 months
Details of the construction equipment that is likely to be used for the above activities and the associated noise levels can be found in Section 4.1 of the CNV DWP. Details of the equipment that is expected to generate high levels of vibration can be found in Section 4.2 of the CNV DWP. Note that the equipment levels detailed in the CNV DWP are placeholders. All equipment will be measured operating independently when work commences on site and the actual equipment noise/vibration levels and model numbers recorded and updated within the respective tables in the CNV DWP.
Page 6
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
4. Façade performance and internal noise levels 4.1 Noise The early works, including Construction Support Area establishment, are located in close proximity to a number of receivers, meaning that predicted internal noise levels at these receivers will be high. Use of a concrete saw, concrete breaker, plate compactor, roller compactor, drilling equipment, hydro excavation and piling equipment has the potential to exceed the Project Standards for construction noise. An enclosure over high noise generating equipment, such as the concrete saw, is unlikely to be practical in a number of locations due to space restrictions on site. However, this will be reviewed on a case by case basis and, where practicable, enclosures will be utilised. The works will be of a relatively short duration and concrete cutting, breaking, compacting and piling activities will only take place for a short time period. It will be necessary to consult further with each affected receiver identified in this SSCNVMP before works begin so that noisy activities can be scheduled, where possible, for a time that least impacts them. However, even with the above mitigation and management measures implemented and noise barriers installed as outlined in the CNV DWP, the noise levels predicted at the most exposed façade of a number of properties will still exceed the Project Standards by more than 5 dB during some construction activities. These properties are detailed in Table 4-1 along with an estimate of the current façade performance and the worst-case internal noise levels anticipated to be received during early works.
Page 7
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Table 4-1: Estimated internal noise levels
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
1 Beresford Square
Ground Floor and above: Commercial use 2
90 - 95 dB
Based on external observations façade is around 40% single glazed openable windows and 60% masonry. Mechanical ventilation unknown. Estimated attenuation provided by the façade when windows closed is predicted to be around 30 dB Rw with windows closed.
60 – 65 dB Disturbance to users and potential annoyance to staff and customers.
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage whilst piling works takes place. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Consultation required with affected party before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Page 8
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
1 Cross Street
Ground Floor and above: Multiple businesses and single residential
100 – 105 dB Worst case due to piling
50% masonry and 50% single glazed windows. Openable windows with no mechanical ventilation. Estimated attenuation provided by the façade when windows closed is predicted to be around 25- 30 dB Rw.
70 – 75 dB Annoyance and disturbance to staff, customers and residents. Sleep disruption if carried out during night-time/early morning hours. There may be difficulty in hearing fire alarms etc
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above.
(including attenuation provided to ground floor by noise barrier)
Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for sleeping areas in the inner city. Noisy works will occur outside the flats for a period of days. 4-6 Beresford Square
Page 9
Ground Floor: Northern Bar
90 – 95 dB (including attenuation provided to ground floor by noise barrier around construction area)
Façade is masonry wall with around 95% single glazing and openable French doors. There is no mechanical ventilation to the property,
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
60 - 65 dB (With doors closed) Annoyance to staff and customers
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage whilst piling works takes place. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. 1. Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking, piling and compacting during noise sensitive periods. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Noise barriers will be installed around the works which will provide screening to the ground floor. Noisy activities outside this property to be scheduled before 3pm, where practicable.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
60 – 65 dB Reduction in work efficiency and concentration, disturbance to meetings
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage.
only natural ventilation via French doors. The attenuation provided by the façade when doors closes is estimated around 30 dB Rw. The estimated façade performance with the door open is 15 dB Rw. 8-10 Beresford Square
12 Beresford Square
Page 10
First Floor and above: Theta Inc
Ground Floor: Bravo Hospitality
90 – 95 dB
90 - 95 dB (including attenuation provided to ground floor by noise barrier around construction area)
All levels are mechanically ventilated with 100% single glazed façade. Estimated attenuation provided by the façade is predicted to be around 30 dB Rw.
The façade is 100% glazed with 10mm laminated glass façade. The store is mechanically ventilated with trickle vents through the façade. The estimated attenuation provided by the façade is predicted to be around 30 dB Rw.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
60 – 65 dB Annoyance to staff and customers, speech clarity may be affected
Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact. Noise barriers will be installed around the works which will provide screening to the ground floor. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
19 Beresford Square
Ground floor: Hopetoun Alpha 2
80 – 85 dB
Based on external observations façade is set back from the street and seems 90% masonry with a single access door, and 10% double height windows. Presence of mechanical ventilation unknown. Estimated façade attenuation is predicted to be around 35 dB Rw with windows closed.
45 – 50dB Impulsive noises may cause annoyance during events.
Noise barriers will be installed around the works which will provide screening to the ground floor.
Based on external observations facade is 90% single glazing and 10% masonry. Small areas of glazing are openable with trickle vents visible. Estimated façade attenuation is around 20-25 dB Rw with windows closed.
70-75 dB (with windows closed) Annoyance and disturbance to staff and customers throughout the day and night time.
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Consultation required to identify scheduled times that causes least impacts.
Façade consists of 40% masonry and 60% single glazed openable windows and a single glazed sliding
60 - 65dB
Works will be intermittent in nature and will occur outside residential block for the duration of the early works.
(including attenuation provided to ground floor by noise barrier around construction area)
16-18 Beresford Square
Ground Floor and above: Centurion Sauna1
90 - 95 dB
22 Beresford Square
First Floor and above: Residential flats
90 - 95 dB (First floor)
Page 11
(including attenuation provided to ground floor by noise barrier around construction area)
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Annoying and disturbing for residents. Sleep
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
door facing the works location.
disruption if carried out during nighttime/early morning hours or for residents that sleep during the day.
1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods.
Estimated attenuation provided by the façade is around 30dB Rw.
Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for sleeping areas in the inner city. Noisy works will occur outside the flats for a period of days. 12 East Street
Ground floor and above: Residential 2
Page 12
80 – 85 dB (including attenuation provided to ground floor by noise barrier around construction area)B
Observation from the exterior indicates façade facing work sites is 100% masonry. Back of building not accessible. Estimated attenuation based on observation of façade is around 35 dB Rw with windows closed.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
45-50 dB . Sleep disruption if carried out during night-time/early morning hours or for residents that sleep during the day. Internal noise levels during utility works are likely to exceed
Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact. Mechanical ventilation may be considered for main works.
Works will be intermittent in nature and will occur outside residential block for the duration of the early works at CSA establishment site. 1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods.
Address
14 East Street
Floor
External Noise Level dB LAeq
Ground Floor: Studio Q
90 - 95 dB
First Floor: Residential Flats
90 - 95 dB
(including attenuation provided to ground floor by noise barrier around construction area)
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
the 35 – 40 dB LAeq criteria of AS2107:2016 for sleeping areas in the inner city. Noisy works will occur outside the flats for a period of days
Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact. Mechanical ventilation may be considered for main works.
Façade consists of masonry and single glazing (50%) Estimated attenuation provided by the façade is around 30dB Rw.
60– 65 dB Annoyance and reduction in work efficiency
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment. Works will be intermittent in nature throughout the duration of the Early Works.
Façade consists of masonry and single glazing. Estimated attenuation provided by the façade is around 30dB Rw.
60 - 65dB
Impacted mainly by CSA establishment and works will be intermittent in nature. Works will occur at the back of the residential flats during daytime hours only.
Annoying and disturbing for residents. Sleep disruption if carried out during nighttime/early morning hours. Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of
Page 13
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. Locate stationary equipment such as generators away from flats. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact..
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
AS2107:2016 for sleeping areas in the inner city. Noisy works will occur outside the flats for a period of days. 18 East Street Residential
Ground Floor: Residential
90 - 95 dB (including attenuation provided to ground floor by noise barrier around construction area)
Façade is a light weight partition weatherboard with single glazed windows. Access to back façade where most impacted was not given. Estimated façade attenuation is around 25 dB Rw.
65 – 70 dB Annoying and disturbing to residents. Sleep disruption if carried out during nighttime/early morning hours. There may be difficulty in hearing fire alarms etc Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for sleeping areas in the inner city. Noisy works will occur outside the flats for a period of days.
Page 14
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment and works will be intermittent in nature. Works will occur at the back of the residential flats during daytime hours. 1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. 4.Locate stationary equipment such as generators away from flats. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
21 East Street
Ground Floor and above: UnoLoco Event Management
75 – 80 dB
Office on first floor has exposed steel roof with no insulation and exposed mechanical ventilation system. Façade facing the works consists mainly of single glazing with openable windows making up 80% of the façade and 20% masonry. Windows are usually left open during summer for ventilation. Estimated façade attenuation with windows closed is around 25 dB Rw.
50 – 55 dB (At first floor) Annoyance and reduction in work efficiency. Recordings may be affected.
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above. Impacted mainly by CSA establishment and works will be intermittent in nature throughout the duration of early works. 1.Manage unnecessary impact sounds. 2. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. 3. 24 hours advance notification for noisy activities to co-ordinate sound recording events within office. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
23 East Street
Ground Floor: European motor services
75 – 80 dB (including attenuation provided to ground floor by noise barrier around construction area)
Façade is set back approx. 13m from the roadside. 50% façade consists of one small single glazed window in a concrete blocks wall shield by a storage container overhead, and 50% façade is shutter roller door which is kept open. No mechanical ventilation available. Estimated attenuation provide 20-25dB Rw with shutters closed and
65 - 70 dB (with shutters open)
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment and works will be intermittent in nature throughout the duration of early works.
Page 15
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
55 – 60 dB ( with shutters closed) Annoyance to staff and disruption of carrying out mechanical services
24 hours advance notification for noisy activities. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
50 – 55 dB Annoyance and disturbing to residents. Sleep disruption if carried out during nighttime/early morning hours.
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment and works will be intermittent in nature. Works will occur at the back of the residential flats during daytime hours.
10-15 dB Rw with shutters open. 25/27 East Street / (2/2A South Street) Residential
Ground Floor and above: Residential Flats
75 – 80 dB (including attenuation provided to ground floor by noise barrier around construction area)
Two storey terrace house with openable single glazed windows Attenuation provided by the façade is around 25 dB Rw with windows closed.
Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for sleeping areas in inner city. Noisy works will occur outside the flats for a period of days. 29 East Street
Page 16
Ground floor: Carpark, Electric Bike Team, International Earth Sciences IESE Ltd
75 – 80 dB (including attenuation provided to ground floor by noise barrier around construction area)
Façade is 100% single glazing. Bike Shop’s façade consists of 60% of the overall ground floor façade. Windows are not openable. Due to the terrain, the two commercial businesses on
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
45 – 50 dB Annoyance and disturbance to staff and customers
1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods before 8am and after 6pm. 4.Locate stationary equipment such as generators away from flats.
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment and works will be intermittent in nature. Works will occur at the back of the residential flats during daytime hours.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
the ground floor have a street level carpark situated directed underneath. There is no mechanical ventilation for the bike shop, but there is one for IESE. Estimated façade attenuation is around 30 dB Rw.
238 Karangahape Road
Page 17
Specific Mitigation Measures - Best Practicable Option (BPO)
1.Noisy activities must be scheduled with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods.
First floor: Think concepts
85 – 90 dB
Façade is 100% single glazing with mechanical ventilation within. Estimated façade attenuation is around 30 dB Rw.
55 - 60 dB Concentration disturbance to staff and speech clarity on headphones may be affected.
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above. 1.Noisy activities must be scheduled with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Ground Floor: Various commercial retails
90 – 95 dB
Main façade of retail spaces faces into the building atrium. Back of retail space is masonry with renovation works required Estimated attenuation provided by the façade is around 35dB Rw.
55 – 60 dB Annoyance to staff and customers
Screening provided to ground floor by noise barriers around construction works.
(including attenuation provided to ground floor by noise barrier around construction area)
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Building manager is concerned about vibration on building façade and monitoring will be undertaken.
Address
Page 18
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
First floor and above: Residential Flats
90 – 95 dB
Flats façades consists of concrete walls with 2m high openable single glazed windows. Openable area is approx. 20% of overall glazing. Flat sizes varies over floors. Attenuation provided by the façade on corner flat with two large glazing areas is estimated to be around 30dB Rw.
60 – 65 dB Annoying and disturbing to residence. Sleep disruption if carried out during nighttime/early morning hours.
Works will be intermittent in nature and will occur outside residential block for the duration of the early works.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for sleeping areas in inner city. Noisy works will occur outside the flats for a period of days.
1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
243 Karangahape Road
Ground floor: Pitt St Pub
90 - 95 dB
Façade is 50% masonry and 50% single glazing windows. Air lock entrance with wooden door kept open onto the glazing door within. Mechanical ventilation is available. Attenuation provided by the façade is estimated to be around 35dB Rw with door closed.
55 – 60 dB Annoyance to staff and customers but not to a level that interferes with businesses with background music
Noise barriers will be installed around the works which will provide screening to the ground floor. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage.
283 Karangahape Road Page 19
(including attenuation provided to ground floor by noise barrier around construction area)
First Floor and above: Calendar Girls 1
90 - 95 dB
Observation from the exterior show façade consists of 70% masonry with 30% glazing. Unknown if mechanical ventilation is present inside or if windows are openable. Estimated attenuation provided by façade is predicted to be around 3035dB Rw with windows and doors closed.
60 – 65 dB Annoyance to staff and customers but not to a level that interferes with businesses with loud background music
Ground Floor: Samoa House 1
90 - 95 dB
Observation from the exterior show façade is 60% light weight cladding with 25% glazing and 15% open
65 – 70dB Potential annoyance depending on usage
(including attenuation provided to ground floor
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Noisy works to be scheduled before peak operating period (afternoons and evenings Thursdays to Sunday) Noise barriers will be installed around the works which will provide screening to the ground floor. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Consultation required with the affected party before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Noise barriers will be installed around the works which will provide screening to the ground floor. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a
Address
49 Pitt Street
59 Pitt Street
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
by noise barrier around construction area
with shutters. Use around façade is unknown but mechanical vents are visible. Estimated attenuation based on observation is predicted to be around 25 dB Rw with windows and doors closed.
Ground Floor: Beggs
90 – 95 dB
Façade is 50% masonry and 50% single glazed windows. Access to is via a single glazed double doors which are kept open for ventilation. No mechanical ventilation is available. Attenuation provided by the façade is estimated to be around 30dB Rw.
60 – 65 dB Annoyance to staff and customers but not to a level that interferes with businesses
Ground floor: Vada, Waves, Fabriks, Tattoo Parlour
90 – 95 dB
Each shop’s façade consists around 80-100% single glazing windows with glazed doors. No mechanical ventilation available. Attenuation provided by the façade is estimated to be around 30dB Rw.
60 – 65 dB Annoyance to staff and customers but not to a level that interferes with businesses
(including attenuation provided to ground floor by noise barrier around construction area)
(including attenuation provided to ground floor by noise barrier around construction area)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Consultation required with the affected party before works begin to determine if noisy works can be scheduled for a time that causes least impact. Noise barriers will be installed around the works which will provide screening to the ground floor. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. 24 hours advance notification to be given before noisy works takes place. Noise barriers will be installed around the works which will provide screening to the ground floor. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Further consultation will take place with the affected parties before works begin to determine if noisy works
Page 20
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
can be scheduled for a time that causes least impact. Noisy works to be scheduled between 8am and 10am before business open.
First floor: Graphics Design
90 – 95 dB
Façade is double height with 50% single glazing and 50% masonry. Mechanical ventilation is available with openable windows. Estimated attenuation provided by the façade is around 30dB Rw with windows closed.
60 – 65 dB Annoyance and reduction in work efficiency, meetings and concentration may be disrupted.
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage on both Beresford Square and Pitt Street. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
61 Pitt Street
Page 21
Ground Floor: Johnny Feedback coffee shop
90 - 95 dB (including attenuation provided to ground floor by noise barrier around construction area)
Coffee shop has no façade, shop opens with roller doors onto the street. No attenuation provided by the façade.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
90 - 95 dB Disruption to business, staff and customers
Screening provided to ground floor by noise barriers around construction works. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Localised enclosure around noisy equipment to be considered if practicable. 24 hours advance notification to be given before noisy works takes place. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact. 65 Pitt Street
68 Pitt Street
Page 22
Ground Floor: Tokyo Loco
Ground Floor and above 3
90 -95 dB (including attenuation provided to ground floor by noise barrier around construction area)
80-85 dB (including attenuation provided to ground floor by noise barrier around construction area)
Full single glazing façade with no mechanical ventilation. Open plan kitchen dining with extractor fan. Door is kept open during summer for ventilation. Estimated attenuation with door closes is around 30dB Rw and with door open is around 20dB Rw.
60 – 65 dB (Door Closed) Annoyance to staff and customers
Screening provided to ground floor by noise barriers around construction works.
Observation from exterior shows façade consists of around 20% glazing and 80% masonry. Unknown if mechanical ventilation is present.
45 – 50 dB (windows and doors closed) Mild annoyance to users
Screening provided to ground floor by noise barriers around construction works.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage.
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Attenuation provided by the façade is estimated to be around 35 dB Rw with windows and doors closed. 70-74 Pitt Street
78 Pitt Street
First Floor and above: Chatham Apartments-
Methodist Church
80 – 85 dB (including attenuation provided to ground floor by noise barrier around construction area)
90 – 95 dB (including attenuation provided to ground floor by noise barrier around construction area)
Page 23
Specific Mitigation Measures - Best Practicable Option (BPO)
neighbouring properties over an additional 2 day period per stage. Consultation required with the affected party before works begin to determine if noisy works can be scheduled for a time that causes least impact.
The building is a masonry construction with large sash windows. The windows are approx. 40% of the facade have lightweight glass and no seals. Estimated attenuation with windows closed is around 30 dB Rw on Level 1.
50-55 dB Disturbance to staff and users of meetings rooms. Reduced concentration and productivity.
Screening provided to ground floor by noise barriers around construction works.
Masonry façade with around 40% high arched single glazing windows. Attenuation provided by the façade is around 30-35dB Rw.
60 – 65 dB Annoyance to staff and customers
Screening provided to ground floor by noise barriers around construction works. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. On going communication regarding timings of works and advance notice to be given.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Consultation required with the affected party before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
80-82 Pitt Street
Ground Floor: Flying Out Records, Def
90 - 95 dB
Façade consists of 50-70% single glazing windows with natural ventilation reliant on keeping doors open. Estimated attenuation with door closes is around 30dB Rw and with door open is around 20dB Rw.
60 – 65 dB (door closed) Recording and music events may be affected. General annoyance to staff and customers
Screening provided to ground floor by noise barriers around construction works.
(including attenuation provided to ground floor by noise barrier around construction area)
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage. Noisy works should be avoided outside this building between 8:30am – 10am on Wednesday and Thursday whilst recordings are taking place.
3-5 Mercury Lane
Page 24
Ground Floor: Mercury Bar and Gaming
80 – 85 dB (including attenuation provided to ground floor by noise barrier around construction area)
Façade has 50% masonry and 50% single glazing windows. Double single glazed door Attenuation provided by the façade is around 30-35dB Rw.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
50 - 55 dB Light annoyance to staff and customers
Screening provided to ground floor by noise barriers around construction works.
Address
9 Mercury Lane
Page 25
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
First Floor and above: BK Hostel
85 – 90 dB
Façade consists 40% masonry and 60% single glazing operable windows. No mechanical ventilation Attenuation provided by the façade is around 30-35dB Rw.
50 – 55 dB Sleep disturbance to guests. Sleep disruption if carried out during nighttime/early morning hours.
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above.
Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for hotels bedrooms in inner city areas. Noisy works will occur outside the flats for a period of days.
1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods.
55 – 60 dB Annoyance to users but potentially masked with background music during venue use.
Screening provided to ground floor by noise barriers around construction works.
Ground Floor and above: Mercury Theatre
90 – 95 dB (including attenuation provided to ground floor by noise barrier around construction area)
Facade consists of 70% masonry and 30% glazing. Attenuation provided by the façade is estimated around 35 dB Rw.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Works will be intermittent in nature and will not occur directly outside hostel.
Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighbouring properties over an additional 2 day period per stage.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
Further consultation with affected party to determine if works can be scheduled for a time that causes least impact on users. 10/35 Pitt Street
Ground Floor and above: residential2
80 – 85 dB (including attenuation provided to ground floor by noise barrier around construction area)
Observation from the exterior indicates façade directly facing site is 100% masonry. However, adjacent façade is 90% glazing. Attenuation provided depending on directivity ranges between 35 dB to 25 dB Rw.
55 – 60 dB as worst case through glazing Sleep disturbance to residents. Sleep disruption if carried out during nighttime/early morning hours. Internal noise levels during utility works are likely to exceed the 35 – 40 dB LAeq criteria of AS2107:2016 for bedrooms in inner city areas. Noisy works will occur outside the flats for a period of days during site establishment
Page 26
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Screening provided to ground floor by masonry wall separating receptor from site. The benefit of screening provided by noise barriers will be reduced at first floor level and above. Works will be intermittent in nature but will be present throughout the CSA establishment. 1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. 4.local screening for noisy equipment Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Address
Floor
External Noise Level dB LAeq
Façade Build-up / Expected performance (dB Rw)
Expected Worst-Case Internal Noise Level (dB LAeq) with Mitigation/ Potential Effects
Specific Mitigation Measures - Best Practicable Option (BPO)
Note:
Page 27
1. 2.
Relationship needs to be managed, meeting time to be arranged – façade observations from the exterior only Not consulted as owner/manager was unavailable – façade observations from exterior only
3.
Not consulted as property is currently vacant – façade observations from exterior only.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
4.2 Vibration In addition to the general vibration mitigation measures outlined in Section 6 of the CNV DWP, the specific vibration mitigation measures outlined in Table 4-2 shall be implemented if the initial on-site vibration monitoring at the closest building foundations demonstrates that the building damage vibration limits will be exceeded. Table 4-2: Vibration Mitigation Measures
Equipment/process
Vibration control measures
Excavators, bobcats, loaders
Grease tracks regularly. Avoid unnecessary revving of engines and banging of buckets on the ground. Use smaller equipment where possible.
Excavator mounted rock breaker
Use lower vibration generating equipment such as a handheld jack hammer
Roller compactor (17t)
Use a smaller compactor, less than 10t
Site specific vibration mitigation measures are included in Table 4-3.
Page 28
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Table 4-3: Site Specific Vibration Mitigation Measures
Address
Minimum Distance to works (m)
Building Type
1 Beresford Square
1
Historical / vibration sensitive
1 Cross Street
1
Historical / vibration sensitive
4-6 Beresford Square
1
Historical / vibration sensitive
8-14 Beresford Square
1
Historical / vibration sensitive
19 Beresford Square
1
Historical / vibration sensitive
Page 29
Specific Mitigation Measures Vibration may be felt within 1 Beresford Square during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high-vibration emitting activities scheduled outside of sensitive hours, when building occupants may be affected. Vibration may be felt within 1 Cross Street during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Vibration may be felt within 4-6 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high-vibration emitting activities scheduled before 3pm, when building occupants may be affected after opening hours. Vibration may be felt within 8-14 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Vibration may be felt within 19 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high-vibration emitting activities scheduled outside of sensitive hours, when building occupants may be affected when venue is operating.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Address
Minimum Distance to works (m)
Building Type
16-18 Beresford Square
1
Historical / vibration sensitive
22 Beresford Square
1
Residential
14 East Street
1
Historical / vibration sensitive
16 East Street
1
Residential
18 East Street
1
Historical / vibration sensitive
21 East Street
10
Historical / vibration sensitive
Page 30
Specific Mitigation Measures Vibration may be felt within 16-18 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high-vibration emitting activities scheduled outside of sensitive hours, when building occupants may be affected when venue is operating. Vibration may be felt within 22 Beresford Square during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Further liaison will take place and high-vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping. Vibrations may be felt during the use of excavators, drilling, and compactors for the CSA establishment. Further liaison will take place and high-vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping. Vibrations will be felt during the use of excavators, drilling and compactors for the CSA establishment. Further liaison will take place and high-vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping. Vibrations may be felt during the use of excavators, drilling and compactors for the CSA establishment. Further liaison will take place and high-vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping. Vibration may be felt within 21 East Street during the use of excavators, drilling and compactors within 15m of the building throughout the period of CSA establishment. Vibrations will be intermittent in nature and should not be more than 5 days for each stage. Advance notice to be given for high-vibration emitting activities. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Address
Minimum Distance to works (m)
Building Type
23 East Street
10
Historical / vibration sensitive
27 East Street
10
Historical / vibration sensitive
238 Karangahape Road
1
Historical / vibration sensitive
243 Karangahape Road
1
Historical / vibration sensitive
283 Karangahape Road
1
Historical / vibration sensitive
Page 31
Specific Mitigation Measures The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Vibrations may be felt within 23 East Street during the use of excavators, drilling and compactors within 15m of the building throughout the period of CSA establishment. Vibrations will be intermittent in nature and should not be more than 5 days for each stage. Further liaison will take place and high-vibration emitting activities scheduled outside of sensitive activities, when building occupants may be affected. Vibrations may be felt during the use of excavators, drilling and compactors for the CSA establishment. Further liaison will take place and high-vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping. Vibration may be felt within 238 Karangahape Road during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. High vibration emitting activities to be scheduled outside of early morning and evening hours, when building occupants may be sleeping. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Vibration may be felt during the use of excavators, drilling and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high-vibration emitting activities scheduled outside of sensitive activities and events when building occupants may be affected. Vibration may be felt during the use of excavators, drilling and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high-vibration emitting activities scheduled outside of sensitive activities and events when building occupants may be affected.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Address
49 Pitt Street
Minimum Distance to works (m)
1
Building Type
Specific Mitigation Measures
Historical / vibration sensitive
Vibration may be felt within 49 Pitt Street during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage along Beresford Square and Pitt Street. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibrationemitting equipment where practicable.
59 Pitt Street
1
Historical / vibration sensitive
61-65 Pitt Street
1
Historical / vibration sensitive
9 Mercury Lane
1
Historical / vibration sensitive
Page 32
Vibration may be felt within 59 Pitt Street during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage along Beresford Square and Pitt Street. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Vibration may be felt within 61-65 Pitt Street during the use of excavators, drilling, piling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage along Beresford Square and Pitt Street. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Vibration may be felt within 9 Mercury Lane during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Vibrations will be intermittent in nature, and may also be felt throughout the period of CSA establishment. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Address
Minimum Distance to works (m)
Building Type
Specific Mitigation Measures Advance notice to be given during high-vibration emitting activities.
Page 33
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
5. Communication and Consultation Section 7 of the CNV DWP details the communication and engagement procedures to be implemented during the early works in relation to construction noise and vibration effects. The complaints process is detailed in Section 7.2 of the CNV DWP.
5.1 Consultation to inform this SSCNVMP Consultation with the affected parties identified in this SSCNVMP took place in mid-August 2019. Topics that were covered included:
Sequencing of construction activities; Likely construction equipment and associated noise and vibration levels; Proposed mitigation and management measures; Building construction typologies/characteristics; Operational hours of businesses; and The operating environment that is required for respective businesses likely impacted by the works.
Further details of the meetings and comments made by the affected parties are provided in Appendix E of the CNV DWP.
Page 34
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
6. Monitoring Section 8 of the CNV DWP provides details of the methodology for noise and vibration monitoring to be undertaken during the early works.
6.1 Noise Monitoring Noise monitoring will be carried out when use of the concrete saw, hydro excavations and concrete breaker begins within 20 metres of the buildings identified in Table 6-1. The monitoring will be carried out at first floor level unless it is not possible to gain access. Table 6-1: Noise Monitoring Locations
Receiver 22 Beresford Square
Monitoring Location 1m from façade of building
1 Cross Street
1m from façade of building
9 Mercury Lane
1m from façade of building
21 East Street
1m from façade of building
14 East Street
1m from façade of building
29 East Street
1m from façade of building
80 Pitt Street
1m from façade of building
70 Pitt Street
1m from façade of building
61 Pitt Street
1m from façade of building
59 Pitt Street
1m from façade of building
6.2 Vibration Monitoring Vibration monitoring will be carried out when works begin on site to determine actual equipment vibration levels and the attenuation provided by local ground conditions. If the initial vibration monitoring demonstrates that the emission radius for the excavator is similar to that identified in the CNV DWP, then the monitoring as detailed below will be carried out. If this monitoring demonstrates that vibration levels are significantly lower, then fewer properties may require monitoring. If they are higher, more properties may require monitoring. Vibration monitoring will be carried out at the following receivers when use of the piling rig, excavator, hand-held concrete breaker or plate compactor occur within 10 metres of the building: Page 35
1 Cross Street 9 Mercury Lane 21 East Street 238 Karangahape Road 8-14 Beresford Square 22 Beresford Square 59 Pitt Street 61 Pitt Street. | Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Vibration monitoring will be carried out at the following receivers when use of the excavator or piling occurs within 5 metres of the building:
Page 36
9 Mercury Lane 1 Cross Street 22 Beresford Square 61 Pitt Street.
| Karangahape Station Early Works – Site Specific Construction Noise and Vibration Management Plan
Construction Noise and Vibration Delivery Work Plan
Appendix F: Noise Monitoring Template Date: _ _ / _ _ / 20 _ _ Equipment set used
Operator: Model:
Serial No. :
Date of last calibration: _ _ / _ _ / 20 _ _ MEASUREMENT DESCRIPTION Machinery / operational noise (Not at a receiver)
Noise at a receiver location
Construction location:
Receiver address:
Distance to machinery / operation:
(m)
Distance to receiver:
(m)
Describe noise sources (e.g. roller, piling, generator) and the location relative to the receiver:
Describe any other unrelated noises (e.g. traffic noise) and the location relative to the receiver:
Describe any reflecting surfaces (e.g. walls, buildings) and the location relative to the receiver:
Describe any other factors such as barriers/terrain, or relative elevations of sources and receivers:
It is useful to attach an aerial photograph where possible. If this is done include the following details: Location of site activity
Measurement Locations
Location of reflecting surfaces
Relative heights
Locations of unrelated sources
Intervening barriers/terrain
It is also useful to include photographs or diagrams of the measurement location, the major sound sources, and any other details you believe may be useful. Additional documents attached
Page 49
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan MEASUREMENT DETAILS
Location reference
Time
Measurement duration, t
LAeq(t)
LAFmax
Adjustment for façade reflection
Equipment operating on site
Sounds heard at measurement location (note dominant and LAFmax sounds) Construction equipment
____h Constant noise Cyclic noise
__:__ _ _ . _ dB
_ _ . _ dB
_ _ . _ dB
_ _ . _ dB
_ _ . _ dB
_ _ . _ dB
_ _ . _ dB
_ _ . _ dB
min:sec
____h Constant noise Cyclic noise
__:__ min:sec
____h Constant noise Cyclic noise
__:__ min:sec
____h Constant noise Cyclic noise
__:__ min:sec
NOTES Please include any issues that were encountered during the measurements or other factors that may influence the validity of this measurement.
Page 50
| Karangahape Road Station Early Works
Other sources
Compliance achieved (y/n)
Construction Noise and Vibration Delivery Work Plan
Appendix G: Vibration Monitoring Template Date: _ _ / _ _ / 20 _ _ Equipment set used
Operator: Model:
Serial No. :
Date of last calibration: _ _ / _ _ / 20 _ _ MEASUREMENT DESCRIPTION Machinery / operational vibration (Not at a receiver)
Vibration at a receiver location
Construction location:
Receiver address:
Distance to machinery / operation:
(m)
Horizontal Distance to receiver:
(m)
Floor Number: Describe vibration sources (e.g. roller, piling, concrete breaking) and the location relative to the receiver:
Describe any other unrelated vibration (e.g. traffic, other construction, footfall, lifts) and the location relative to the receiver:
Describe geometry of foundation (e.g. walls, buildings) and the location relative to the receiver:
Describe the coupling method (geophone to structure)
Describe approximate composition of ground between source and receiver (e.g. basalt, sandstone)
Describe structural resonance observed, if any. For example swaying at higher floors – note the approximate frequency and magnitude.
It is useful to attach an aerial photograph where possible. If this is done include the following details: Location of site activity
Measurement Locations
Location of intervening geometry
Relative heights
Locations of unrelated sources
Changes in composition of terrain
It is also useful to include photographs or diagrams of the measurement location including building plans where available, the major vibration sources, and any other details you believe may be useful. It is important to note whether the measurement was at the foundation, or in the plane of the highest floor. Additional documents attached
Page 51
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan MEASUREMENT DETAILS
Location reference
Time
Measurement PPV duration, t
Dominant axis of movement
Dominant frequency, Hz
Equipment operating on site
Vibrations observed at measurement location
(y/n) Construction equipment
____h Continuous Transient
__:__ min:sec
__._ mms-1
____h Continuous Transient
__:__ min:sec
__._ mms-1
____h Continuous Transient
__:__ min:sec
__._ mms-1
____h Continuous Transient
__:__ min:sec
__._ mms-1
NOTES Please include any issues that were encountered during the measurements or other factors that may influence the validity of this measurement.
Page 52
| Karangahape Road Station Early Works
Compliance achieved
Other sources
Construction Noise and Vibration Delivery Work Plan
Appendix H: Record of CLG, IPR and Auckland Council Comments H1. CLG Comments A Karangahape CLG meeting was held on 17th September to discuss the Karangahape early works and for the CLG to provide comments / feedback on the CEMP and sub-plans, including this CNV DWP. Comments were received from the CLG on this CNV DWP as follows: CLG Member
Comment
Response
Resident of apartment in 283 Karangahape Road
Construction was noticed on Sunday evening at 22:00, and vibration was felt within the building during construction works. Equipment used was described as possibly being a plate compactor.
Concerns discussed at the meeting about mitigation measures and control. No change to the CNV DWP made.
Building Owner of 29 East Street
Expressed concerns about noise and vibration from demolition and construction woks, and concerns regarding noise from trucks arriving and departing the site on Mercury Lane / East Street. Owner plans to discuss the situation with the tenants and requested ongoing monitoring of levels during project construction.
Update SSCNVMP to include noise monitoring at 29 East Street.
Representatives of Methodist Church
Queried about whether the properties at 235 Karangahape Road should be included within vibration mitigation table. Would like ongoing communication with contractor regarding timing of construction works going forward.
Explained property is outside of vibration contour limits and hence not included within the table. Update SSCNVMP to include communications request.
Page 53
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
H2. Auckland Council Comments Auckland Council Peer Reviewer
Comment
Response
Mr Daniel Winter
Construction Noise Conditions, rules and assessment criteria are generally all set out correctly. Section 3.3.2 on page 17 of the CNVDWP only refers to vibration but includes a noise rule, so should refer to noise and vibration. The flow chart on page 29 first box states to carry out the noise monitoring in accordance with CNVDWP section10. I cannot find section 10.
Noted and changes made to CNV DWP.
Construction Vibration On page 30 of the CNVDWP the vibration monitoring methodology options includes the use of cable ties. The vibration monitoring equipment (geophones) will be fixed to building structural members (e.g. with clamps, cable ties, or weighed down with sandbags). We do not recommend the use of cable ties as they can cause issues with compliance with the DIN standard monitoring procedures.
Noted and changes made to CNV DWP.
Also on page 30 it states vibration shall initially be measured at the closest building foundations (usually at basement or ground floor level) and this requires consent to access the building of interest.
Communication has happened with some of the building owners/occupiers to discuss vibration logging in their building. It is an ongoing process.
The following have been listed as sites where vibration monitoring is required to be undertaken. 1 Cross Street 9 Mercury Lane 21 East Street 238 Karangahape Road 8-14 Beresford Square 22 Beresford Square 59 Pitt Street 61 Pitt Street. Has any communication been made with building owners/occupiers regarding access to undertake vibration assessments or to assess the possible location of geophones?
Page 54
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Auckland Council Peer Reviewer
Comment
Response
Table 4-3 includes that vibration will be undertaken as follows: Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. We suggest the details in the SSCNVMP match up with the CNVDWP, which requires vibration is assessed at the closest building foundations (usually at basement or ground floor level) and any other details known at this stage.
Noted and changes made in the CNV DWP and SSCNVMP
The flow chart on page 29 first box states to carry out the vibration monitoring in accordance with CNVDWP section10. We cannot find section 10. The flow chart recommends a choice of actions for if building damage occurs depending on whether it is minor or moderate damage. We recommend that damage of any kind results in stop work.
Page 55
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
H3. IPR Comments DWP
Response No.
Section
Condition
Comments
Response
7.1.1
16 & 39
The referenced section, 7.1.1 repeats the condition 16 requirements but needs to actually define the Notable Receivers. 4 Notable Receivers are within the project vicinity and should be identified and assessed as required by Condition 16.1 and 16.2 as they are within 100m of work sites. 1. Mercury Theatre due to its theatre usage and basement level recording facilities. 2. Radio recording Studio, kFM 106.9 at 208 Karangahape Road 3. 21 East St has recording functionality 4. 80 Pitt St has recording functionality
Notable receivers defined in Table 5-1. 21 East St and 80 Pitt St updated as notable receivers in Table 5-1. 208 Karangahape Road not an affected receiver thus not added.
1
2.2
36.3e
Section 2.2 responds to 36.3(e) by noting overall work hours, not the times when the adverse effects (eg worst case) will occur. This should be expanded.
Noise and vibration generating activities can occur anytime during the hours of operation. We cannot provide any further detail at this stage.
2
4
36.6d
Noise distance contours are provided and are understood to be based on a SWL of 116 Which may either be a vibropiling rig or concrete saw cutter. Vibration contours are understood to reflect either a breaker/excavator or vibrodriven piler. However, the Vibration contours are plotted against the short term (e.g. transient impulses) criteria rather than the Long term (continuous) criteria. Roller Compactors and Vibro-pilers should be plotted with long term criteria
Vibration generated by roller compactors and vibro-piling works occurs over discrete short periods of time, with the entire works generally only occurring for a few hours dependent on the extent of the worksite. This duration is short term and not enough to cause structural fatigue in a building. Short-term vibration is considered to be vibration which does not occur often enough to cause structural fatigue, and which does not produce resonance in the structure. Buildings typically have resonant frequencies around 4 Hz, while the energy of sheet piling is typically between 31.5 and 63Hz. Considering the vibration would not occur long enough to cause structural fatigue and would not cause building resonance, it would be considered short-term in accordance with the definition
3
Page 56
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan provided by DIN4150. Therefore, Long term criteria will not been plotted. 4.1
36.3c
Para 2 notes a new appendix will be provided to capture confirmed noise levels. A place holder for this new appendix should be included with a list of what it needs to be populated (model #, SWL, type of activity) Table 4-1 Noise values presume free field conditions which are not going to exist at the K road works with so many surrounding buildings. Would suggest a more realistic distance propagation is presented and noted as such.
Appendix J Heading added for measurements of equipment.
4
Noise values in Table 4-1 are free field but are placeholders. A 3D noise model has been generated for the project which considers other factors such as ground absorption and façade reflections. The 3D model has been used to assess noise levels against the criteria. Contour Maps in Appendix C and D shows the more realistic distance propagations.
4.1
36.3c
Hydrovac levels are noted to be highly variable and quite noticeable due to their extended periods of operation. Selection of quiet equipment for this item is critical. (We note previous Aotea DWP used 107 vs 104 dBA but expect the actual range is much greater)
Noted
5
4.1
36.3c
Sheet piling driving is understood to be vibration driven but this should be clearly stated as the vibration contours do not align with this (refer other comments on stand-off distances)
Sheet piling vibration contours are based on short term criteria as responded in previous comment above. Refer to Response 3.
6
4.2
36.3c
A similar appendix to that referred to in 4.1 should be provided to capture confirmed vibration levels. A place holder for this new appendix should be included with a list of what it needs to be populated - (model #, mm/s, type of activity). For example, Roller compactors have a wide range of vibration energy depending on the % chance of exceedance, roller width, amplitude. Similarly, important parameters should be defined or vibro-piling, and drilling that have potential for significant vibration generation.
Appendix J Heading added for measurements of equipment.
7
4.2
36.3c
Vibro-Piling (refer comment in 4.1) plate compactor, roller compactor is "long term' vibration sources under DIN 4150 and the radii should reflect the lower criteria.
Separate contours will not be provided. Please refer to response 3.
8
Page 57
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan Vibration contours should be presented as 'short term' and 'long term' to reflect the varied criteria. This may be most usefully done with a separate set of Contours in Appendix D. 6
36.3j
No mention is made of localized enclosures for concrete cutting, nor do the predictions of noise reflect that. Mobile concrete cutting barriers have been observed being used outside 99 Albert St on 9 Oct 2019 and were effective for reducing later noise spread. "Refer attached photos. This should be pursued and documented as BPO given the extent of exceedances expected. Use of lower vibration piling equipment seems necessary to avoid significant breaches of project criteria
Updated in SSCNVMP Section 4.1 to include localized enclosure where practicable.
9
Low vibration selection is already part of mitigation measures.
6.1
36.2c
6.1 could usefully reference 6.2-6.8 so all those being trained fully understand implementation of all requirements. E.g. Training should specifically cover the effective use of mitigation measures, not just the need for the mitigation measure. It is common to see temporary noise barriers poorly installed and thus ineffective presumably due to workers not understanding that the poor installation makes them ineffective.
Noted
10
6.1
36.3h
Section 6.1 relates to Training, not management of sensitive receiver concerns as mentioned on Page 9.
Updated.
11
6.2
36.2c
Use of rubber tracks to eliminate squeal wherever possible
Added to section 6.2
12
8
36.3k(i)
Council's SME to review any changes to contours expected from alterations to DWP
No changes to contours are being made.
13
8.4
36.3k(vii)
The portion on how works (presumably rectification works) will be undertaken is relatively brief and could be usefully expanded.
We consider this section to be sufficient and no further details to be added.
14
App C
36.3f
Noise contour plots have labelled some residential buildings as commercial. E.g.
Labelling of buildings have been updated for -10/39 and 8/39 Pitt St
15
Page 58
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan - 238 K Road -3-5 Mercury Lane -27 East st -10/39 and 8/39 Pitt St -49 Pitt St
-49 Pitt St -27 East St 238 K Road and 3-5 Mercury Lane are listed as mixed use and considered correct.
App C & E
36.3g
Missing a number of sensitive receivers a. Studio at 208-212 K road / 4 cross St b. 246-254 K road c. 36 Day St apartments d. 238 K Road is referenced as commercial but has several levels of apartments e. 49 Pitt St f. 47 Pitt St g. 60 Pitt St h. 84 Pitt St (understood to be represented by “80-82 Pitt Street” but this should be clarified) i. 8/39 Pitt St (understood to be represented by “10/39 Pitt Street” but this should be clarified)
d. 238 K road is referenced a Mixed Use acknowledging the residentials on Level1 and above. Building manager was consulted with for commercial and residential properties f. 47 Pitt St is not predicted to exceed site specific criteria with screening in place h. Represented by “80-82 Pitt Street” i. Represented by “10/39 Pitt Street” All other properties do not exceed the levels required to be included in the SSCNVMP.
16
Fig 8-1
36.3, k(iii)
Requirement to monitor noisy equipment (+75dBA@5m) for the first time only leads to a change in Schedules but doesn't lead to any changes to mitigation or planning for noise control. This flow chart and monitoring aspect needs updating to actually result in management of effects.
We consider flow chart is fit for purpose.
17
See response 16
18
SSCNVMP Comments (Condition 37) Table 4-1
Page 59
37.2
Missing a number of sensitive receivers a. Studio at 208-212 K road / 4 cross St b. 246-254 K road c. 36 Day St apartments d. 238 K Road is referenced as commercial but has several levels of apartments not addressed
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan e. 49 Pitt St f. 47 Pitt St g. 60 Pitt St h. 84 Pitt St (understood to be represented by “80-82 Pitt Street” but this should be clarified) i. 8/39 Pitt St (understood to be represented by “10/39 Pitt Street” but this should be clarified) Table 4-1
37.5a
External noise level is given which can be used to compare to 75 dBA limit but simpler for some readers to be able to clearly see the extent of exceedance
We consider the level of detail provided is appropriate for purpose.
19
3
37.5c
Note "CSA" is not defined. Presume this refers to Construction Support Area. Actual activities in CSA not defined (reference is made on page 6 of SSCNVMP to 4.2 of DWP but the DWP list (table 4-1) does not delineate what equipment goes where.
Defined CSA in Table 3-1. Activities of CSA are defined in staging drawings.
20
App E
37.5d
A large number of recipients have concerns that are listed as needing to be followed up on. It would likely assist the completeness of this work to have a column or similar that can be ticked when all aspects of concern for the receiver are understood and quantified.
We do not consider this to be required.
21
App E
37.5e
Competing and complex preferences for timing of works is common. E.g. 4-6 Beresford Street prefers Before 3pm, 8-10 Beresford St adjacent prefers after 5:30pm. Across the road, 59 Pitt St wants 8-10am and 1 Beresford square is yet to be consulted. A clear plan needs to be pulled together to ensure timing preferences are understood and are able to be tracked for contractors to best follow.
Noted
22
Some buildings are within vibration emission radii where ‘minor damage’ has the potential to occur due vibration generating equipment. This is based on worst-case assumptions for ground type and vibration source characteristics.
23
SSCVMP comments (Condition 38) 4.2
Page 60
38.4
There is no structural or other evidence presented that the many proposed exceedances of the project criteria are appropriate. There are currently 19 buildings shown as exceeding the Condition 33 criteria with no justification
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan as required by Condition 38.4. This approach should be urgently reviewed.
4.2
Page 61
38.5e
The purpose of vibration emission radii is to identify areas where management and monitoring of vibration levels may be required, as opposed to an accurate assessment of predicted vibration levels at receiver locations. This is the general approach taken on most construction projects involving equipment which generates significant vibration.
Mitigation measures are listed in Table 4-2 of SSCNVMP, but this does not cover the worst case of piling. Does the mitigation method of using a 10T roller compactor necessarily provide the reduction in vibration required? More details and acceptable standoff distance should be given so contractor knows when to use smaller equipment at what proximity to heritage buildings.
This table lists additional mitigation measures to the CNV DWP Section 6. Piling mitigation is in Section 6.5. Selection of smaller compacter is a mitigation measure to further reduce vibrations in addition to general measures as listed in the CNV DWP.
24
The following properties have not yet been assessed: 12 East St- Commercial – Above amenity limit of 2mm/s for office. No mitigation or SSCVMP offered 29 East St – Commercial - Above amenity limit of 2mm/s for office. No mitigation or SSCVMP offered 80 Pitt St – Historical / vibration sensitive – More than 2.5mm/s expected given proximity of 3mm/s contour at façade. SSCVMP required 3-5 Mercury Lane – Historical / vibration sensitive – More than 2.5mm/s expected given proximity of 3mm/s contour at façade. SSCVMP required 47 Pitt St – Commercial - – Above amenity limit of 2mm/s for office. No mitigation or SSCVMP offered 49 Pitt St – Historical/ vibration sensitive – more than 5mm/s expected. No assessment done. SSCVMP required.
Amenity limits are only applicable in the event of a complaint as per Designation condition 34.3, therefore no SSCVMP is required at this stage. 49 Pitt Street has been added.
25
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Specific Property SSCVNMP Comments - Noise Address
Specific Mitigation Measures Offered
Comments
Response
1 Cross Street
Screening provided to ground floor by noise barriers around construction works. The benefit of screening provided by noise barriers will be reduced at first floor level and above. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage whilst piling works takes place. Noise levels may still exceed the criteria whilst works are occurring outside neighboring properties over an additional 2 day period per stage. 1. Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds. 3. Minimise periods of concrete cutting, breaking, piling and compacting during noise sensitive periods. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Consider offering temporary relocation if people are going to be exposed to 70-75 dBA. Above 65 dBA, there may be difficulty hearing fire alarms etc.
The work proposed are to be relatively limited in duration (around 5 days) which would imply intensive treatments such temporary relocation are not reasonable at this stage of works.
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment and works will be intermittent in nature. Works will occur at the back of the residential flats during daytime hours. 1.Noisy activities must be scheduled for a time outside sleeping hours, with notice given 24 hours in advance. 2.Manage unnecessary impact sounds.
Consider offering temporary relocation if people are going to be exposed to 70dBA. Above 65 dBA, there may be difficulty hearing fire alarms etc.
18 East Street – Residential
Page 62
| Karangahape Road Station Early Works
Response No. 26
Comment about fire alarms have been added to potential effects column.
See Response 26
27
Construction Noise and Vibration Delivery Work Plan 3. Minimise periods of concrete cutting, breaking and compacting during noise sensitive periods. 4.Locate stationary equipment such as generators away from flats. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact. 23 East Street
Screening provided to ground floor by noise barriers around construction works. Impacted mainly by CSA establishment and works will be intermittent in nature throughout the duration of early works. 24 hours advance notification for noisy activities. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
55-60 and 65-70 dBA would result in difficulty hearing on phone when talking to customers. What assistance be provided for this?
This property has an office space with enclosed doors and windows which disruption to conversations can be reduced.
28
61 Pitt Street
Screening provided to ground floor by noise barriers around construction works. Worst-case noise levels will be intermittent in nature and will occur when works are directly outside over a period of 1-3 days per stage. Noise levels may still exceed the criteria whilst works are occurring outside neighboring properties over an additional 2 day period per stage. 24 hours advance notification to be given before noisy works takes place. Further consultation will take place with the affected parties before works begin to determine if noisy works can be scheduled for a time that causes least impact.
Additional mitigation is surely required here with expected levels of 90-95 dBA. Can more effective and enclosing barriers be used here given extremely high levels expected? Levels above 85 dBA are an OH&S concern and I cannot be reasonable to expect businesses and customers to wear hearing protection as the BPO.
The work proposed are to be relatively limited in duration (around 5 days). Localised enclosure around equipment to be consider if practicable. This has been added.
29
Page 63
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
Specific property SSCVMP Comments - Vibration
Response ID
Address
Building Type
Specific Mitigation Measures
IPR Comment
Response
1 Beresford Square
Historical / vibration sensitive
Vibration may be felt within 1 Beresford Square during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high vibration emitting activities scheduled outside of sensitive hours, when building occupants may be affected.
2-5mm/s expected. No mitigation offered to meet Building damage limits
Vibration levels generated by construction works are highly variable and dependent on the model of equipment used on site, the local geology and the operator. Consistent with the DWP vibration monitoring has been recommended to clarify levels at the commencement of the activities. The mitigation is clearly identified as investigating alternative vibration emitting equipment to reduce impacts and comply with the applicable criteria (3mm/s for historical and 5mm/s for residential).
30
1 Cross Street
Historical / vibration sensitive
Vibration may be felt within 1 Cross Street during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and
Description of 'may be felt' seems inadequate in light of 2-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
Vibration levels generated by construction works are highly variable and dependent on the model of equipment used on site, the local geology and the operator. The occupants may be located in a range of locations throughout the building which would contribute to their individual impact. Given the variability in both the source vibration, the building response and the individuals location, the vibration may be felt, or it may not be. Due to coupling losses across the building vibration levels of 20mm/s would not be achieved and even 10 mm/s is very unlikely for individuals to be exposed to.
31
Page 64
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan select low vibration-emitting equipment where practicable.
Consistent with the DWP vibration monitoring has been recommended to clarify levels at the commencement of the activities. The mitigation is clearly identified as investigating alternative vibration emitting equipment to reduce impacts and comply with the applicable criteria (3mm/s for historical, 5mm/s for residential and 20mm/s for commercial).
4-6 Beresford Square
Historical /Vibration sensitive
Vibration may be felt within 4-6 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high vibration emitting activities scheduled before 3pm, when building occupants may be affected after opening hours.
2-5mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
See response 30
32
8-14 Beresford Square
Historical / vibration sensitive
Vibration may be felt within 8-14 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Monitoring will be carried out once construction works begin within 10
2-5mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
See response 30
33
Page 65
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. 19 Beresford Square
Historical / vibration sensitive
Vibration may be felt within 19 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high vibration emitting activities scheduled outside of sensitive hours, when building occupants may be affected when venue is operating.
Description of 'may be felt' seems inadequate in light of 2-10mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
See response 31
34
16-18 Beresford Square
Historical / vibration sensitive
Vibration may be felt within 16-18 Beresford Square during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high vibration emitting activities scheduled outside of sensitive hours, when building occupants
2-5mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
See response 30
35
Page 66
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan may be affected when venue is operating. 22 Beresford Square
Residential
Vibration may be felt within 22 Beresford Square during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Further liaison will take place and high-vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping.
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 5mm/s or amenity criteria
See response 31
36
14 East Street
Historical / vibration sensitive
Vibrations may be felt during the use of excavators, drilling, and compactors for the CSA establishment. Further liaison will take place and high vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping.
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s or amenity criteria
See response 31
37
Page 67
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
16 East Street
Residential
Vibrations will be felt during the use of excavators, drilling and compactors for the CSA establishment. Further liaison will take place and high vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping.
Description of 'may be felt' seems inadequate in light of 5-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
See response 31
38
18 East Street
Historical / vibration sensitive
Vibrations may be felt during the use of excavators, drilling and compactors for the CSA establishment. Further liaison will take place and high vibration emitting activities scheduled outside of early morning and evening hours, when building occupants may be sleeping.
Description of 'may be felt' seems inadequate in light of 5-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s
See response 31
39
238 Karangahape Road
Historical / vibration sensitive
Vibration may be felt within 238 Karangahape Road during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. High vibration emitting activities to be scheduled outside of early morning and evening hours, when building occupants may be sleeping. Monitoring will be carried out once construction works begin within 10 metres of the building to determine
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s.
See response 31
40
Page 68
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. 243 Karangahape Road
Historical / vibration sensitive
Vibration may be felt during the use of excavators, drilling and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high vibration emitting activities scheduled outside of sensitive activities and events when building occupants may be affected.
Description of 'may be felt' seems inadequate in light of 1-5mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s. Note amenity limits also likely to be important for pub's due to rattling glasses
See response 31 Noted for amenity
41
283 Karangahape Road
Historical / vibration sensitive
Vibration may be felt during the use of excavators, drilling and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Further liaison will take place and high vibration emitting activities scheduled outside of sensitive activities and events when building occupants may be affected.
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s.
See response 31
42
Page 69
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan
59 Pitt Street
Historical / vibration sensitive
Vibration may be felt within 59 Pitt Street during the use of excavators, drilling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage along Beresford Square and Pitt Street. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable.
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s.
See response 31
43
61-65 Pitt Street
Historical / vibration sensitive
Vibration may be felt within 61-65 Pitt Street during the use of excavators, drilling, piling and compactors within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage along Beresford Square and Pitt Street. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s.
See response 31
44
Page 70
| Karangahape Road Station Early Works
Construction Noise and Vibration Delivery Work Plan select low vibration-emitting equipment where practicable. 9 Mercury Lane
Page 71
Historical / vibration sensitive
Vibration may be felt within 9 Mercury Lane during the use of excavators, drilling, compactors and piling within 10m of the building. However, vibration will be intermittent in nature and over a limited duration of 5 days per stage. Vibrations will be intermittent in nature, and may also be felt throughout the period of CSA establishment. Monitoring will be carried out once construction works begin within 10 metres of the building to determine the actual levels of vibration from the equipment used. The Project team will review the construction methodology and select low vibration-emitting equipment where practicable. Advance notice to be given during high-vibration emitting activities.
| Karangahape Road Station Early Works
Description of 'may be felt' seems inadequate in light of 1-20mm/s expected. No mitigation offered to meet Building damage limits of 2.5mm/s.
See response 31
45
Construction Noise and Vibration Delivery Work Plan