Skip to main content

C6 mt eden clg 31 jan 2018

Page 1

C6: Mt Eden stormwater realignment works CLG meeting – 31st of January, 2018


CRL C6 project


March Construction C6 PROJECT •

Founded 1971

•

March Family

•

Christchurch based but NZ focused

•

Infrastructure but concentrate on in ground

•

Bought by Vinci SA at the end of 2017

•

Vinci SA is a French organisation which is one of the largest construction companies in the world


Bessac •

France based (Saint-Jory, near Toulouse)

•

Over 40 years in business

•

MTBM manufacturer as well as installer

•

140km of tunnels in last 10 years

•

>30 TBMs from 0.5mØ – 5.5mØ


The Tunnel

•

Single drive from Water St to Nikau St

•

Less time taken for construction of the tunnel

•

Tunnelling method involves the use of an AVN 2000 AB MTBM

•

All tunnelling works completed from Water Street


The Shafts Water St (the Drive Shaft) 16m deep secant pile construction • 8.5m internal diameter • 0.75m piles bored with a Soilmec SR40 drill rig (50 tonne) • 50-80 tonne crawler crane Mt Eden Rd 18m deep access chamber • 2.5m internal diameter • Casing installed by Liebherr LRB155 (70 tonne) drill rig • 50-80 tonne crawler crane Nikau St (the receiving shaft) 15m deep shaft • 9.4m internal diameter stepped down to 5.6mØ • Pre cast concrete caissons • 50-80 tonne crawler crane • 30-35 ton excavator with rock breaker


Timing/Programme •

First site works – Mid February at Water St with hoardings going up followed by Mt Eden Rd and Nikau St

•

Works will then be continuous from this period through until January 2019 at Water St and Nikau St. Mt Eden Rd will be to some extent dependent on tunnelling progress.

•

GPTs: GPT1 (Boston Rd-late February) GPT2 (Boston Rd-Mid March) GPT3 (Normanby Rd-Early April) Completion will be early May with each GPT taking about four weeks.

• • • •


Impacts •

Hours of Work: • 7.00am to 7.00pm • 24 hours for MTBM

•

Noise: • Rock breaking at Nikau St • Generators at Water St • General construction activity

•

Traffic: • Site establishment of plant • Truck movements


Summary •

The work sites are quite contained with activities restricted to within the boundaries apart from truck movements.

•

March and Bessac have good reputations when it comes to working with communities

•

The MBJV will at all times keep communication open

•

Contacts: Graeme Inglis on 027 4557299 or the 0800 CRLTALK (2758255)

•

Martin Hughes on 027 3846576