Auckland City Rail Link ENABLING WORKS CONTRACT 2 Appendix P: ISCA Requirements Separable Portion 1 – Cut and Cover Works
Appendix P ISCA Requirements
In association with:
COMMERCIAL IN CONFIDENCE
Connectus Project #: 2665 Client: Auckland Transport
Construction Environmental Management Plan Doc. No. CRL-PAT-ENV-CON-PLN-000898 Revision: 07, Date: 1 June 2016
APPENDIX P: ISCA REQUIREMENTS AT and Connectus are seeking an Infrastructure Sustainability Council of Australia (ISCA) Infrastructure Sustainability (IS) Rating for the CRL Enabling Works. This appendix details IS requirements that are different, or additional to the Project’s Consent Requirements. It is essential that these requirements are met to achieve the Project’s sustainability goals, however they are not consent or designation requirements to be certified by Auckland Council. These IS rating requirements are included as an appendix because they are not yet fixed. They remain subject to change as the Project’s sustainability program evolves. Applicable ISCA requirements that relate to this CEMP are listed below along with their associated target Levels. ISCA Category
Target Level
Requirements
How we aim to achieve this
DIS 5
1
Measures to prevent light spill during construction have been identified and implemented
Site lighting will be established with shading or baffels to prevent light spill beyond the site boundary (except light necessary for pedestrian and traffic safety) A night site light audit will be conducted within a week of establishing night works lighting equipment.
Page P