C2 risk register for utilities relocation

Page 1

Auckland City Rail Link ENABLING WORKS CONTRACT 2 Appendix U: Risk Register Service Relocation Separable Portion 1 – Cut and Cover Works

Appendix U Risk Register Service Relocation

In association with:

COMMERCIAL IN CONFIDENCE


Project / Facility No: 2719

Scope of Work covered in Risk Services Relocation Risk Review 19/01/2016 Description of Risk Review Date: Name Job Title Safety Manager David Young Utilities Manager Mark Anderson

Risk Review Date:

Risk Review Date:

Services Relocation Organisation Connectus Connectus

Description of Risk Review Name

Job Title

Engineer

Engineer

Supervisor

Supervisor

Risk Review Date:

Description of Risk Review

Name

Organisation

Job Title

Organisation

Safety Advisor Environment Advisor

Description of Risk Review Name

Job Title

Safety Advisor Environment Advisor Engineer Supervisor

Organisation

Safety Advisor Environment Advisor Engineer Supervisor

HSE RISK REGISTER Consequence (C) A- Low, B- Moderate, C- Serious, D-Major, E-Catastrophic VERY HIGH RISK Intolerable risk – do not commence activity.

Hierarchy of control applied

4

Underground cables 5

Damage to services 6

Cable strike Gas leak, water damage, loss of services, electrical shock, hazardous, toxic

Use of excavator or backhoe to excavator striking workers/ excavate trenches general public

8

Equipment, materials etc. near Objects falling onto personnel the edge of the trench in the trench

9

Access and egress 10

11

Trench cave-ins

Air quality in trenches Lifting materials and equipment into deep shear sided trenches with plant

Personnel falling into the trench Lack of oxygen or contaminated atmosphere

Machine striking personnel

exclusion zones

x

Possible

Serious

High

Barriers , Demarkation Approved TMPs

x

Possible

Serious

High

SWI K017 Traffic Management on the Worksite SWI K035 Working close to traffic Hoarding fenceing barrier signage

Pedestrian Management planning Ensure cables are identified prior to excavation and hydro excavation or hand dig with insulated tools Hydro excavation, Hazard management, as built plans, procedures Fencing Barriers erected Pedestrian management planning Permit to Excavate shoring , battering Benching >1.5m. safe access / egress

SWI K053 Trenching & Excavations Permit to Excavate

Possible

Major

High

Explosion, electrical shock, toxic

Safety

SWI K053 Trenching & Excavations Permit to Excavate

Possible

Major

High

Plant failure causing damage to equipment/ property

Safety

SWI K001 Operating Plant

Likely

Major

Very High

Safety

SWI K053 Trenching & Excavations Permit to Excavate

Likely

Major

Very High

SWI K053 Trenching & Excavations

Possible

Serious

High

deliiation /Barriers

Safety

SWI K053 Trenching & Excavations SWI K009 Using ladders

Possible

Serious

High

safe access / egress secured ladder extending 1m past stepping off point

Safety

SWI K053 Trenching & Excavations

Possible

Serious

High

atmospheric testing

Safety

SWI K053 Trenching & Excavations

Possible

Major

High

plan work to exclude persons from trench whilst materials are lifted

Injury, burns or death - network outage or damage

serious bodily injury Objects falling onto personnel causing cuts, lacerations and Safety head injuries

fractures and lacerations causing loss of consciousness, respiratory illness, poisoning

causing serious bodily injury

Isolation

High

Rare

Major

Moderate

Unlikely

Serious

Moderate

Rare

Moderate

Low

x

Rare

Serious

Low

x

Possible

Moderate

Moderate

Rare

Major

Moderate

Rare

Major

Moderate

Unlikely

Serious

Moderate

Unlikely

Serious

Moderate

Unlikely

Serious

Moderate

Rare

Major

Moderate

SWI K031 Work Near Plant

Safety

7

Working in trenches

Major

Risk Score

Pedestrian management

Safety Personnel being struck by vehicles members of the public injured Safety by site activities

Unlikely

Additional Controls

Consequence

Work close to traffic 3

Traffic on public or internal roads pedestrian safety through and around work site

Personnel being bit by moving plant causing serious bodily Safety injury

System / Current Controls

Control Implementation

Residual Risk Assessment

Likelihood

2

(Health Safety Environment)

Risk Score

work near plant

Plant and personnel in close proximity to each other

Risks (Unwanted Event)

Consequence

1

Hazards (Potential For Harm)

Likelihood

Risk Source Activity / Job Step

PPE

Primary Risk Assessment

Item No.

EXTREME RISK Intolerable risk – do not commence activity.

Engineering

HIGH RISK Undesirable risk – do not commence activity.

Substitution

MODERATE RISK LOW RISK Tolerable – Broadly acceptable - Tolerable – With identified controls fully implemented. Manage by routine procedures.

Elimination

Risk Rating (R)

Administration

Likelihood (L) 1 = Rare, 2 = Unlikely, 3 = Possible, 4 = Likely, 5 = Almost Certain

x

x

x

x

x

x

x

x

By Whom

When

Review / Comments


12

Egress from trench made difficult during emergency

Ground water

Ground water in trench

Contaminated soil discovery

Acid sulphate, or other form of contaminated soils Land or water contamination

13

14

Work with asbestos 15

Work in a confined space

Asbestos Inhalation of airborne fibres Reduced oxygen access and or egress Asphixiation, entrapment

16

Power U/G

Service Strike

Injury or death, damage to property/equipment

Service Strike

Fire, explosion Injury or death

17

Gas Risks 18

Comms

Service Strike

Water

Service Strike

minor injury, flooding

Sewer

Service Strike

veils desease

21

Weather conditions 22

Fatigue management

Exhaustion Falling load, load swinging, machine overturning causing serious bodily injury

work at height Exposure to noise

Working in noisy conditions

Using hazardous substances

Contact with substance through inhalation, ingestion or skin absorption causing burns, skin infection, pulmonary Use of Hazardous Substances disease Back injury and other sprains and strains caused by Lifting and carrying materials incorrect manual handling and equipment technique

lifting & slinging 24

26

27

Manual handling

Moderate

Moderate

Possible

Serious

High

Possible

Major

High

Possible

Catastrophic

Very High

Safety

SWI K032 Work Near Underground Services,

Possible

Catastrophic

Very High

Safety

SWI K032 Work Near Underground Services,

Possible

Catastrophic

Very High

Safety

SWI K032 Work Near Underground Services,

Possible

Moderate

Moderate

Safety

SWI K032 Work Near Underground Services,

Possible

Moderate

Moderate

Health

SWI K032 Work Near Underground Services,

Possible

Serious

High

Health

SWI K037 Sunburn & Skin Cancer SWI K038 Thermal Stress, Heat SWI K038 Thermal Stress- Cold

Possible

Moderate

Moderate

Health

SWI K084 Fitness for Work

Possible

Moderate

Moderate

Possible

Serious

High

Likely

Major

Suffer from dehidration or hyperthermia, sun burn

Lifting materials and equipment Working at height where it is reasonably foreseeable that a person would be injured in a fall.

23

25

Hot or cold weather conditions Working long hours without regular breaks

Possible

Minor injury

19

20

SWI K053 Trenching & Excavations Permit to Excavate EPI L018 Acid Sulphate Environmental Soils, EPI L015 Land Contamination SWI K072 Work with Safety Asbestos SWI K019 Confined space Safety entry Safety

SWI K012 Lifting & Slinging Safety SWI K036 Work at Height

Falling from work area and Safety falling objects causing serious bodily injury Noise induced hearing loss

Safety Health Safety Environment

Safety

check of trench each day by competent person

asbestos Management plan. Licenced removal contractor Training, compertence, confined space entry permit Ensure asbuilt plans are on site, services are marked out, relevant permits have been issued and stanover by utilities owner when required Ensure asbuilt plans are on site, services are marked out, relevant permits have been issued and stanover by utilities owner when required Ensure asbuilt plans are on site, services are marked out, relevant permits have been issued Ensure asbuilt plans are on site, services are marked out, relevant permits have been issued

x

x

x

Possible

Low

Low

x

Rare

Serious

Low

x

x

Rare

Major

Moderate

x

x

Unlikely

Serious

Moderate

x

x

Rare

Serious

Low

x

x

Rare

Serious

Low

x

Unlikely

Low

Low

x

Unlikely

Low

Low

x

Rare

Serious

Low

x

Rare

Moderate

Low

x

Unlikely

Moderate

Low

Unlikely

Serious

Moderate

Rare

Major

Moderate

Unlikely

Moderate

Low

Rare

Moderate

Low

Unlikely

Serious

Moderate

inoculations, training

x

SPF30 Sunscreen, long and longs

training, competency, exclusion zones

x

x

x

x

x

x

x

x

x

training, work at height permit.

Very High Containment netting, tool

x

lanyards SWI K044 Exposure to Noise SWI K071 Storage & Use of Hazardous Substances, EPI L008 Storage and Handling of Hazardous Substances SWI K081 Manual Handling

Possible

Serious

High

Likely

Serious

High

consideration of substitutions.limit volumes,

Likely

Serious

High

Team Lifts. Mechanical assistance

x

x

x

x

x