Auckland City Rail Link In association with:
ENABLING WORKS CONTRACT 2 Emergency Spill Response Plan Separable Portion 1 – Cut and Cover Works Document Ref: CRL-PAT-HSE-CON-PLN-001040 Revision: 04 FINAL 21st MARCH 2016
COMMERCIAL IN CONFIDENCE
This page intentionally left blank.
DOCUMENT INFORMATION Organisation:
Connectus
Document Title:
Emergency Spill Response Plan
Fulcrum Document Number:
CRL-PAT-HSE-CON-PLN-001040
Document based on MMS No:
n/a
Client:
Auckland Transport
Project:
CRL Enabling Works: Contract Two
Location:
Auckland CBD
Project No:
2665
REVISION HISTORY Rev 1
Date 16/10/2015
Details ST
1
Draft for Connectus Review
st
Author
Approver
J. Bennett
C. Hind
01
27/10/2105
1 Draft for AT review
J Bennett
C. Hind
02
30/10/15
Draft for Consultation
J Bennett
C. Hind
03
25/02/2016
Draft for Connectus and AT Review
J. Bennett
C. Hind
04
21/03/16
Final
J Bennett
C Hind
This document remains the property of Connectus. Its contents are confidential and shall not be reproduced, destroyed or given away without the express, written permission of Connects. The electronic version of this document in MMS Database on designated server(s) is the Master Copy and is a controlled document. Unless specifically noted thereon, other copies of this document are uncontrolled.
This page intentionally left blank
GLOSSARY Term
Definition
ACZ
Active Construction Zone (D and E relate to the Project works) – identified during the consenting process to delineate construction methodology for different areas of the project.
CRL
City Rail Link
CEPs
Construction Execution Procedures
CEMP
Construction Environmental Management Plan
CLG
Community Liaison Group
CSA
Construction Support Area
CTMP
Chemical Treatment Management Plan
ESCP
Erosion and Sediment Control Plan
ESRP
Emergency Spill Response Plan
EHS
Environmentally Hazardous Substances
ESM
Environment and Sustainability Manager
ITA EMP
Industrial and Trade Activities Environmental Management Plan
MSDS
Material Safety Data Sheet
PPE
Personal Protective Equipment
SDS
Safety Data Sheets
This page intentionally left blank.
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
Table of Contents
...............................................................................................3 Document information .........................................................................................................................3 Revision History ..................................................................................................................................3 Glossary .............................................................................................................................................5 1
Introduction........................................................................................................................9 1.1
Purpose
11
1.2
Relevant consent conditions
11
2
Project Description........................................................................................................... 12 2.1
3
Summary of methodology
12
Site activities ................................................................................................................... 13 3.1
Site Description
13
3.2
Hazardous Substances
13
4
Spill response .................................................................................................................. 15 4.1
Small Spills of less than 20l
15
4.2
Moderate Spills in Excess of 20L
16
4.3
Large Spills in Excess of 40 L
16
4.4
Dry Material Spillage
17
4.5
Evacuation
17
5
Spill management Equipment .......................................................................................... 19
6
Roles and responsibilities ................................................................................................ 20
7
Emergency contacts ........................................................................................................ 22
8
Training ........................................................................................................................... 23
9
Document review ............................................................................................................. 23
Appendix A Drawings ......................................................................................................................... A Appendix B Record of CLG Comments .............................................................................................. B
Page 7
Connectus Project #: 2665
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
This page intentionally left blank.
Page 8
Connectus Project #: 2665 Client: Auckland Transport
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040 Revision: 04, Date: 21 March 2016
1 INTRODUCTION The City Rail Link (CRL) project comprises the construction, operation and maintenance of a 3.4 km underground passenger railway, running between Britomart Station and the North Auckland Rail Line in the vicinity of Mt Eden station. The works relating to this Emergency Spill Response Plan (ESRP) constitute part of the enabling works for the CRL. The works (the Project) involve the construction of twin rail tunnels within the Albert Street road corridor from Customs Street West to Wyndham Street. The tunnels will be constructed using a staged cut and cover method and are expected to take 33 months to complete. Figure 1 outlines the extent of works for the Project. This ESRP has been prepared by AECOM New Zealand Limited (AECOM) and forms part of the Construction Environmental Management Plan (CEMP) for the Project. The ESRP specifically relates to conditions 52 and 96 of the resource consent conditions, R/REG/2014/5430 and 5436, respectively).
Page 9
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
Figure 1 Extent of Project Works
Page 10
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
1.1
Revision: 04, Date: 21 March 2016
PURPOSE
Environmentally Hazardous Substances (EHS) will be present throughout the Project construction areas. This ESRP relates to the management of spills of EHS’s and the prevention of adverse environmental effects to sensitive receivers. This ESRP has been developed to set out spill management procedures for the Project works as required by the Project Industrial and Trade Activities Environment Management Plan (ITA EMP) (Appendix K of the CEMP) and the Project Chemical Treatment Management Plan (CTMP) (Appendix D of the Project Erosion and Sediment Control Plan (ESCP)). This ESRP forms an appendix to the Project CEMP (Appendix T) This ESRP has been prepared in consultation with a Community Liaison Group (CLG) prior to submission to Auckland Council (as per resource consent condition 19). A record of consultation outcomes is included in Appendix B.
1.2
RELEVANT CONSENT CONDITIONS
Relevant consent conditions are provided in Table 1 below: Table 1 Relevant Resource Consent Conditions
Consent Condition
Consent Requirement
Land use consent R/REG/2014/5430
The CTMP shall include, but not be limited to, the following matters:
Earthworks – Condition 52
e) A spill contingency plan Discharge permit R/REG/2014/5436 - Condition 96
d) an Emergency Spill Response Plan (which includes the provision that all spills over 20 litres, or any spill of Environmentally Hazardous Substances that has entered the stormwater system, a water-body or has contacted unsealed ground, shall be reported immediately to the Auckland Council’s 24 Hour Pollution Hotline (09-377-3107));
Page 11
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
2 PROJECT DESCRIPTION This section presents a summary of the Project in relation to the matters required to be addressed by the ESRP. A detailed description of the construction works is provided in the Project CEMP.
2.1
SUMMARY OF METHODOLOGY
The Project involves a staged cut and cover method to construct two parallel rail tunnels within the Albert Street road corridor between Customs Street and Wyndham Street. The total length of the tunnel for the Project will be 340m. A number of utilities are required to be removed, relocated, or supported during construction. Generally, the Project works will consist of: 1.
Utilities relocation and exposure
2.
Piling and capping beam and deck construction within Albert Street
3.
Piling and road deck construction within the Customs Street Intersection
4.
Trench Excavation, including using shotcrete and Rock Dowelling
5.
Construction and waterproofing of the rail tunnels
6.
Backfilling of the trench, including Pile Cap Demolition and construction of the new road pavement
A range of supporting activities will also occur in the Project Construction Support Areas (CSA) 4, 5 and 6. Further detail on these activities is provided in the Project ITA EMP. The locations of the CSAs are shown in Appendix A of this ESRP. Chemical treatment will be required to assist with flocculation and settlement of sediment entrained in surface water runoff and groundwater on the site. The location of water treatment devices are identified in the Project ESCP (Appendix I of the Project CEMP). Stormwater from the Project construction areas will be treated as per the Project ESCP and runoff from the CSA’s will be managed as set out in the Project ITA EMP.
Page 12
Connectus Project #: 2665 Client: Auckland Transport
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040 Revision: 04, Date: 21 March 2016
3 SITE ACTIVITIES 3.1
SITE DESCRIPTION
The Project comprises Active Construction Zones (ACZ) D and E (Figure 2), which were identified during the CRL Britomart to Wyndham enabling works consenting process to delineate construction methodology for different work areas. Additionally a range of supporting activities will occur in the Project CSAs. Drawings in Appendix A show the proposed site layout across the Project area, including the location of hazardous substance storage, spill kits, equipment storage and stockpile areas within CSA 4/5 and CSA 6. Spillages within the ACZs will be managed and cleaned up on site and any contamination of rain water or groundwater within the trench will be treated as per the ESCP prior to release or disposal. Spillages within the CSAs will be managed and controlled within the CSA and spill risk will be managed through structural and procedural controls. In the event that a spill incident exceeds these controls, it will be managed in accordance with the provisions of this ESRP. Figure 2 Location of ACZs D and E
3.2
HAZARDOUS SUBSTANCES
Hazardous substances will be kept on site within specified hazardous substances storage areas within the CSAs. These areas will be bunded and hazardous substances kept in secure containers. A list of all hazardous substances kept on site during the construction phase will be maintained in the project Hazardous Substances Register (CRL-PAT-HSE-CON-REG-001042). An indicative list is included in Table 2, which provides material types and estimated maximum quantities. Safety Data Sheets (SDS) for each hazardous substance will be maintained on site in the following locations: 
A full set at the project office

A sub-set at each storage location relevant to the specific materials being stored
Page 13
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
Table 2 Indicative List of EHS to be stored on Site
Material Petrol
Quantity Estimate 40L
Biodiesel
Type of Storage
CSA 4/5
CSA 6
20L Jerry Cans - in a storage container
y
y
Bunded tanks
2000L double bunded liftable tank
2000L double bunded liftable tank
Form release agent (Probably Formol)
100L
20L buckets
Y
Y
Concrete retarder (Probably Rugasol C, C Extra and MH Extra
100L
20L buckets
Y
Y
Cement and Grout Products
1 tonne approx
Dry product 25kg bags
Y
Y
Spray paint - Survey line marking
20-40 spray cans
Boxes of cans
Y
Y
CRC
10 Cans
Boxes of cans
Y
Y
Motor Oil - various
10L
4L bottles
Y
Y
Grease - Various
5kg
Tubes
Y
Y
Oxygen
5 large bottles
Type G - Compressed gas bottles
Y
Y
Acetylene
5 large bottles
Type G -Compressed gas bottles
Y
Y
LPG
5 Standard Bottles
Compressed gas bottles
Y
Y
Bentonite
100 kg
25 kg Bag of dry powder in bags - to be mixed on site
Y
Y
Hydraulic Oil - Various
240L
Maybe a drum, maybe only 100L in bottles.
Y
Y
Chemical Flocculent (Erosion and Sediment Control)
tba
20L pails
Y
Y
Page 14
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
4 SPILL RESPONSE The management of spills will differ depending on the quantity and type of material involved. Table 3 outlines the Incident Ratings assigned in the CEMP as they relate to spill incident reporting. Incident reporting procedures are detailed within Section 4.3.21 of the Project CEMP and outlined in Table 4 below. Table 3 Spill Incident Rating
Spill Size
Contained within on site controls
Escapes on site controls but remains on site
Enters stormwater drainage system thus effects extend off site
Less than 20L
Insignificant
Minor
Minor
20 L – 39L
Minor
Serious
Serious
40L and over
Serious
Serious
Serious
Table 4 Environmental Incident Notification
Severity Level
Notification requirement to ATCRL Construction Management
Incident Report Form to ATCRL Construction Management
Investigation Team
Investigation Report to be supplied to ATCRL
Insignificant
Via monthly report
n/a
n/a
n/a
Minor
Within 12 Hours
Within 48 Hours
Connectus
Within 10 Working Days
Serious
Immediately upon identification
As soon as practical but within 12 Hours
ATCRL & Connectus Management to allocate resources as appropriate
Within 10 Working Days
Sections 4.1 to 4.5 of this ESRP outline the relevant spill response procedures for the different spill size/type. Figure 3 provides a graphical representation of these procedures.
4.1
SMALL SPILLS OF LESS THAN 20L
Small spills have been defined as those less than 20L since this is the volume which triggers contact through the Auckland Council Pollution Hotline. Spills of this volume are deemed “insignificant” incidents in accordance with Table 11 of the Project CEMP, provided that they are contained within established controls and are not released from site. They will be managed on site as set out below:
Based on visual inspection from a safe distance, estimate volume of spill and identify substance. If access is available protect any nearby drains to prevent spill from entering.
Page 15
Connectus Project #: 2665 Client: Auckland Transport
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040 Revision: 04, Date: 21 March 2016
Refer to SDS and determine if it is safe to contain and clean up without specialist help. If it is safe to do so put on appropriate Personal Protective Equipment (PPE), stop the spill if possible and use on site spill kit to contain and clean up spillage.
Contain the spill using sand bags, absorbent booms or powders. Allow the spill to absorb into the spill clean-up materials.
Decontaminate PPE in a manner that ensures wash waters do not enter the stormwater system or the receiving environment.
Report incident to supervisor and Environment and Sustainability Manager (ESM) and log in incident recording system as required under Section 4.3.21 (Table 11) of the Project CEMP.
Dispose of spill residual and clean-up materials in labelled container and place in specified waste chemical and oils storage area.
4.2
MODERATE SPILLS IN EXCESS OF 20L
Moderate spills are determined to be between 20L and 39L. An incident that breaches established controls but with no effect beyond the site boundary would be determined as a “minor” incident, whilst those that breach consent or cause environmental effects beyond the site boundary are deemed to be “serious”. The procedures to be followed are as above if the spill can be safely contained on site. If this is not possible then the emergency services or specialist spill response contractor will be required to clean up the spill as set out in section 4.3 below. All spills of Environmentally Hazardous Substances over 20 litres that have entered the stormwater system, a water-body or have contacted unsealed ground, shall be reported immediately to the Auckland Council’s 24 Hour Pollution Hotline The incident will be logged and reported as set out in Section 4.3.21 (Table 11) of the Project CEMP.
4.3
LARGE SPILLS IN EXCESS OF 40 L
Spills in excess of 40L (one 10 gallon drum) would be deemed a serious incident. The following procedure will be followed.
Carry out a visual inspection from a safe distance to identify the spilt substance, the approximate volume and assess if it is safe to contain the spill.
Review the SDS. Spills of toxic, oxidizing or flammable substances in excess of 40 L (10 gallon drum) will be referred to specialist spill response contractors and if required Emergency Services.
Put on appropriate PPE.
Evacuate the immediate area.
The incident will be reported immediately to the site supervisor and as soon as possible to the Auckland Council Pollution Hotline.
Whilst waiting for the specialists, cover stormwater drains where possible and prevent release from migration of the spill using spill containment booms or sand bags if safe to do so.
Decontaminate PPE in a manner that ensures wash waters do not enter the stormwater system or the receiving environment.
Page 16
Connectus Project #: 2665 Client: Auckland Transport
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040 Revision: 04, Date: 21 March 2016
Following clean up either the specialist contractor will remove the material from site or if safe to do so may contain the spilt material and relocate to the specified waste chemical and oil storage area for later disposal.
Report incident to supervisor and ESM and log in incident recording system as required under Section 4.3.21 (Table 11) of the Project CEMP.
4.4
DRY MATERIAL SPILLAGE
It is possible that dry materials such as cement and grout materials may be spilled on site. These will be cleaned up on site as quickly as possible using the following procedure:
4.5
Carry out a visual inspection from a safe distance to identify the spilt substance, the approximate volume and assess if it is safe to contain the spill.
Review the MSDS and adopt appropriate PPE.
Cordon off the area to prevent vehicle or pedestrian access to the spill and therefore prevent tracking of contaminants across the site.
Protect/cover any downstream stormwater catchpits to prevent the material entering the stormwater system.
As soon as possible, clean up the spillage using a spade or similar and place the waste material in a labelled container for safe removal from site.
Following clean up relocate to the specified waste chemical and oil storage area for later disposal.
Decontaminate PPE in a manner that ensures wash waters do not enter the stormwater system or the receiving environment.
Report incident to supervisor and ESM and log in incident recording system as required under Section 4.3.21 (Table 11 of the Project CEMP).
EVACUATION
Spillage of large quantities of flammable liquids, corrosive substances, the release of a hazardous gas or the ignition of a flammable substance will require urgent evacuation of the immediate area and any area immediately down wind or downstream of the escape. The site supervisor and emergency services will be contacted immediately.
Page 17
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
Figure 3 Flow Chart of Spill Response Process
Page 18
Connectus Project #: 2665
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
5 SPILL MANAGEMENT EQUIPMENT A range of spill response equipment will be available on site as listed below:
EHS Spill Kits, 240L Bins- each kit to contain absorbent pads, absorbent media, shovel or similar, labelled waste bags/containers for use following clean up.
Oil absorbent boom
General containment boom
Drain Covers
Clean up equipment such as buckets, mops, rake, sturdy plastic bags
PPE including eye protection, PVC gloves, disposable overalls
Fire extinguishers
Page 19
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
6 ROLES AND RESPONSIBILITIES The key management roles in relation to environmental management during construction are outlined in the Project CEMP. Specific roles relating to this ESRP are detailed in Table 5. Table 5 Environmental management responsibilities
Organisation
Role
Organisation Role Responsibilities
Requiring Authority, Consent Holder and Project Manager
Overall responsibility for project compliance and performance in relation to environment, quality assurance and incident management. Obtaining any additional consents required during construction. Key contact for monitoring compliance. Attendance at monthly meetings with Connectus ‘Key contact’ and Auckland Council Consent Monitoring Officers.
Health & Safety Manager
Compliance with Health & Safety and incident management.
Project Director
Overall responsibility for site environmental management. Review and approve CEMP, including ESRP and other sub-plans.
Cut and Cover Construction Manager
Reviewing and reporting on environmental performance. Inspection of works to assess compliance with the ESRP. Ensure spill management equipment is stocked and available.
Environment and Sustainability Manager (ESM)
Inspections, auditing and checking of environmental management practices and procedures. On-site compliance with ESRP, consent conditions and other requirements and tracking compliance information. Report to Auckland Transport changes to construction techniques or natural environmental changes which require alterations to existing consents or new resource consents. Prepare, review and update of CEMP, including ESRP and other sub-plans. Facilitate and oversee environmental monitoring. Update and maintain the environmental portion of the Project Risk Register. Training of all staff including subcontractors. Key contact for monitoring compliance. Attendance at monthly meetings with Connectus ‘Key contact’ and Auckland Council Consent Monitoring Officers.
Auckland Transport
Connectus
Page 20
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Subcontractors
Revision: 04, Date: 21 March 2016
Project & Site Engineers
Development, management and monitoring of Construction Execution Procedures (CEPs). Including incorporating environmental and sustainability requirements into the detailed CEPs developed on site. Overseeing subcontractors.
Site Managers
Adherence to the CEMP and sub-plans, including this ESRP.
Page 21
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
7 EMERGENCY CONTACTS In addition to the personnel specified in Table 7 of the Project CEMP (Section 4.1.3), other key contacts in relation this ESRP are outlined in Table 6: Table 6 Key Contacts Role
Name
Organisation
Phone
Person Responsible for ESRP
ESM
Alasdair Mawdsley
(021) 240 4153
alasdair.mawdsley@mcdgro up.com
Project Director
Chris Powell
Connectus
(021) 596 036
chris.powell@mcdgroup.com
Communication and Consultation Manager
Allan HowardSmith
Connectus
(021) 361 158
alan.howardsmith@hawkins.co.nz
Auckland Council – Team Leader Central Monitoring
Fiona Harte
Auckland Council
(021) 828 369
Fiona.Harte@aucklandcounc il.govt.nz
Public complaint contact number
-
Auckland Transport
(09) 447 4343
CRLProject@aucklandtransp ort.govt.nz
Fire Service
-
-
111
-
Police
-
-
111
-
Ambulance
-
-
111
-
Auckland Council Pollution Hotline
-
-
(09) 377 3107
-
Watercare Services Limited (for any discharges to sewer)
-
-
(09) 442 2222
-
National Poisons Centre
-
-
0800 764766
-
Spill Response NZ
0800 877 455
TBC
Nominated Spill Response Contractor
Page 22
Connectus Project #: 2665 Client: Auckland Transport
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040 Revision: 04, Date: 21 March 2016
8 TRAINING The Project Induction will include a presentation of the requirements of management plans, incident response, emergency procedures and spill management. Specific spill response training will be provided to all site staff involved in the handling of Hazardous substances. Training will include:
A review of responsibilities under the ESRP
A review of the hazardous substances on site
Responsibilities during a spill
A hands on review of the contents of a spill kit
A practical demonstration of the use of hydrocarbon specific absorbent material to remove hydrocarbons from water
Further detail on environmental training is described in Section 4.2 of the CEMP.
9 DOCUMENT REVIEW This ESRP will be reviewed as part of the CEMP suite of documents and as described in Section 5.7 of the CEMP.
Page 23
Connectus Project #: 2665
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
APPENDIX A DRAWINGS
Page A
SW SW SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW S W
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
CATCHMENT AREAS: ALBERT ST TRENCH AREA: 2400m2 CONSTRUCTION DECK DRAINING TO TRENCH: 1300m2
SW
SW SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
A 0354
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
続 続
続
SW
続
Connectus Project #: 2665 Client: Auckland Transport
Emergency Spill Response Plan Doc. No. CRL-PAT-HSE-CON-PLN-001040 Revision: 04, Date: 21 March 2016
APPENDIX B RECORD OF CLG COMMENTS
Page B
Connectus
Emergency Spill Response Plan
Project #: 2665
Doc. No. CRL-PAT-HSE-CON-PLN-001040
Client: Auckland Transport
Revision: 04, Date: 21 March 2016
Comment ID
Date
Time
Forum
Commenter
11
8/11/2015
-
Via Email
Ross Boswell
Comment I'm surprised that argon is listed as an environmental hazard. It is an inert gas, non-toxic but heavier-than-air so venting of a significant quantity might cause a hazard to workers in a confined space such as an excavation. With a stirring breeze it will be harmlessly dissipated in the atmosphere. It doesn't seem feasible to "contain" it. 5L seems an insignificant quantity in terms of hazard
Resolution Table 2 in Section 3.2 Hazardous Substances has the following change made: Argon has been removed from the indicative list of EHS stored on site.
Page 1