Auckland City Rail Link In association with:
ENABLING WORKS CONTRACT 1 TRANSPORT ACCESS AND PARKING DELIVERY WORK PLAN
Document ref: CRL-BTM-ENV-DOW-PLN-000322
Revision: 7 FINAL June 2016
COMMERCIAL IN CONFIDENCE Tonkin & Taylor Ltd | 105 Carlton Gore Rd, Newmarket, Auckland 1023, New Zealand PO Box 5271, Wellesley St, Auckland 1141 P +64-9-355 6000 F +64-9-307 0265 E akl@tonkintaylor.co.nz
Version history Rev.
Date
Version details
Prepared by
Reviewed by
1
November 2015
Draft for Auckland Transport Review
J Ho, M Williams
P Roan, R Purdy
2
December 2015
Draft for CLG review
M Williams
R Jenkins
3
January 2016
Draft for Independent Peer Review
M Williams
R Purdy, R Jenkins
4
April 2016
Draft incorporating revised BTC designation conditions, Peer Review and Auckland Council comments
M. Williams
R Purdy, P Roan
5
May 2016
Draft incorporating CLG review comments
M. Williams
J Urquhart, P Roan
6
May 2016
Draft incorporating CLG review and Independent Peer Review comments for Auckland Transport Review
M. Williams
J Urquhart, P Roan, R Jenkins
7
June 2016
Final
M. Williams
J Urquhart, P Roan, R Jenkins
Distribution Date
Version
Issued to
Quantity & type
Approved for the DSBJV by
23 November 2015
Draft
Auckland Transport for review
1x Electronic
D Burtenshaw
23 December 2015
Draft
CLG for review
1x Electronic
D Burtenshaw
29 January 2016
Draft
Independent Peer Review
1x Electronic
D Burtenshaw
18 May 2016
Draft
GLG review
1x Electronic
D Burtenshaw
27 May 2016
Draft
Auckland Transport for review
1x Electronic
D Burtenshaw
2 June 2016
Final
Auckland Transport
1x Electronic 1 x Hard copy
D Burtenshaw
This document remains the property of DSBJV. Its contents are confidential and shall not be reproduced, destroyed or given away without express, written permission of DSBJV. The electronic version of this document in FULCRUM on designated serves(s) is the Master Copy and is a controlled document. Unless specifically noted, thereon, other copies of this document are uncontrolled. \\albtpfile.ttgroup.local\data\rep\auckland\live\tt\projects\30850\30850.0500 planning\30850.0502 (transport)\workingmaterial\dwp\crl-btm-env-dow-pln-000322 - final 2 june 206.docx
Transport Access and Parking Delivery Work Plan
June 2016
Table of contents 1
2
3
4
Introduction 1.1 Purpose of the Transport, Access and Parking DWP 1.2 Relevant Conditions 1.3 DWP Review and updates 1.4 Spatial References Project Description 2.1 Overview 2.2 Construction Methodology 2.2.1 Early activities to facilitate construction 2.2.2 Stage 1 works – Temporary accommodation works 2.2.3 Stage 2 works – Former CPO building works 2.2.4 Stage 3 works – Lower Queen Street and CPO works 2.2.5 Stage 4 works – BTC modifications and project reinstatement 2.2.6 Summary of key construction activities 2.2.7 Construction Support Areas 2.3 Construction Programme Summary 2.4 Construction Traffic Generation 2.4.1 Construction Traffic Summary 2.4.2 Construction Workforce 2.4.3 Workforce Travel Management Plan Existing Transport Network and conditions 3.1 Road Form and Use 3.1.1 Description of road network 3.1.2 Temporary Traffic Management (TTM) Levels and Road Hierarchy 3.2 Cyclists and Pedestrians 3.2.1 Pedestrian Infrastructure 3.2.2 Pedestrian Demand 3.2.3 Cycle Infrastructure 3.2.4 Cycle Demand 3.3 Public Transport 3.4 Kerbside Management and Parking 3.5 Freight 3.6 Concurrent Projects and Developments 3.6.1 AT and Other Public Works 3.6.2 Private developments Proposed Traffic Management 4.1 Temporary Traffic Management Parameters and Objective 4.1.1 Objective 4.1.2 Notable parameters 4.1.3 Applied Standards 4.2 Utilities 4.3 Traffic Sequence Summary 4.4 Traffic sequencing diagrams 4.5 Vehicle tracking 4.6 Traffic Signals 4.6.1 General 4.6.2 Queen Street / Customs Street / Lower Queen Street 4.6.3 Commerce Street / Quay Street 4.6.4 New Commerce midblock pedestrian signals 4.6.5 Lower Queen Street / Quay Street 4.6.6 Commerce Street / Customs Street
Transport Access and Parking Delivery Work Plan
1 1 2 12 12 13 13 13 13 13 14 14 14 14 16 17 17 17 18 18 19 19 19 20 21 21 21 22 23 24 25 27 28 28 29 32 32 32 32 34 35 35 37 41 41 41 41 41 41 41 42
June 2016
4.7
5
6
Lines and Signs 4.7.1 Line Markings and Delineation 4.7.2 Traffic Management Signs 4.8 Pavements 4.9 Barriers and Hoardings 4.9.1 Barriers 4.9.2 Hoardings 4.10 Hours of Work 4.11 Site Access 4.11.1 General 4.11.2 Residential Zoned Land and Educational Facilities 4.11.3 Galway Street Site Access 4.11.4 Tyler Street Site Access 4.11.5 Lower Queen Street Site Access 4.11.6 Access during Canopy Removals 4.12 Property Access 4.12.1 General 4.12.2 Alternative Parking Arrangements 4.12.3 Alternative Transport Arrangements 4.12.4 21 Queen Street service access 4.13 Construction Traffic Routes 4.14 Sediment Management 4.15 Public Transport (Bus) Prioritisation 4.16 Active Transport Prioritisation 4.16.1 Pedestrian measures 4.16.2 Cyclist measures 4.17 Travel Demand Management 4.18 Planned Mitigation measures 4.19 Potential further mitigation measures 4.20 Contingency Planning 4.20.1 General procedures 4.20.2 Emergency vehicle access 4.20.3 Adjacent building evacuation 4.21 Alternative Transport Solutions 4.21.1 Minimising Spoil Generation 4.21.2 Pre-Fabrication and Rail Deliveries 4.21.3 Alternative Transport Assessment Assessment of Traffic Effects 5.1 General Approach 5.2 Traffic Operation Tests 5.3 Traffic Modelling Summary 5.3.1 Network wide statistics 5.3.2 Travel time along key routes 5.3.3 Sensitivity testing 5.3.4 Modelling conclusions Assessment of General Effects 6.1 Public Transport 6.2 Pedestrians and Cyclists 6.2.1 Pedestrian Assessment 6.2.2 Methodology 6.2.3 Assumptions and Limitations 6.2.4 Pedestrian Reassignment 6.2.5 Pedestrian Levels of Service 6.3 Emergency Services
Transport Access and Parking Delivery Work Plan
42 42 42 42 43 43 43 43 44 44 45 48 48 48 49 51 51 51 51 52 52 56 57 57 58 59 60 61 62 64 64 64 64 65 65 65 65 67 67 68 68 68 70 77 77 79 79 79 79 79 80 80 81 82
June 2016
7
8
9
6.4 Taxi Operators, Parking and Service Traffic 83 Monitoring 85 7.1 Monitoring Requirements 85 7.2 On-going Continuous Monitoring of Travel Time 86 7.3 Travel Times and Additional Congestion Mitigation Triggers 87 7.3.1 Determination of Indicative Travel Time Triggers 87 7.3.2 Determination of Monitoring Travel Time Triggers during Construction Phase 87 7.3.3 Monitoring of Local Road Traffic Conditions and Temporary Traffic Controls89 Communication and Stakeholder Interface 91 8.1 General 91 8.2 All other stakeholders 91 8.3 Complaints 92 8.4 Temporary Traffic Management coordination and process 92 Review and Updating of the DWP 94 9.1 DWP Review 94 9.2 DWP Updates 94
Appendix A :
Workforce Travel Plan
Appendix B :
TTM Levels and Road Hierarchy Plan
Appendix C :
Britomart Streetscape Plans
Appendix D :
Construction Staging Plans
Appendix E :
Temporary Station Plans
Appendix F :
Vehicle Tracking Sketches
Appendix G :
Cut and Cover Pipejack and Britomart Modelling Report – Rev 2 (AECOM) –
Appendix H :
Cut and Cover Pipejack and Britomart Modelling Report – Rev 0
Appendix I :
Auckland City CBD TDM Overview
Appendix J :
Pedestrian Assessment
Appendix K :
Bus Changes Phase 1 and Phase 2
Appendix L :
Quay Street Cycleway Consultation Plan
Appendix M :
Indicative (DRAFT) Monitoring Trigger Times
Appendix N :
CLG and Independent Peer Review Comments & Response
Appendix O :
NZTA Review
Transport Access and Parking Delivery Work Plan
June 2016
Glossary of terms Term
Definition
AC
Asphaltic Concrete
Active Transport
Walking and cycling (as trips in their own right or as part of a public transport journey)
AECOM
AECOM NZ Limited
AT
AT
ATCoP
AT Code of Practice (document prescribing AT’s adopted design standards and practices, such as for infrastructure devices, corridor access management and temporary traffic management)
ATEED
Auckland Tourism, Events and Economic Development (an Auckland Council organisation)
ATOC
AT Operations Centre
Barnes’ Dance
An exclusive pedestrian phase that allows crossing in all directions
BTC
Britomart Transport Centre
CAR
Corridor Access Request (also used colloquially to refer to the Corridor Access team at AT)
CBD
Central Business District
CCI
City Centre Initiatives (an AC organisation)
CEMP
Construction Environmental Management Plan
CMJ
Central Motorway Junction (i.e. Spaghetti junction linking the Southern, North-western, Northern and Port motorway links)
CoPTTM
NZTA Code of Practice for temporary Traffic Management (national standard for TMP documentation, signage and practice)
CPTED
Crime Prevention Through Environmental Design
CPO
Former Chief Post Office building
CRL
City Rail Link
Design Vehicle
The largest vehicle able to use a section of road
DSBJV
Downer Soletanche Bachy Joint Venture – the contractor for this enabling works project
DWP
Delivery Work Plan
EBD
Eastbound
ECI
Early Contractor Involvement
EED
Engineering Exception Decision (approval for specific relaxation of standards or alternate engineering treatment, made by the AT CAR team)
ITA
Integrated Transport Assessment
MTC
Manual Traffic Controller
NBD
Northbound
NZTA
New Zealand Transport Agency
NoR
Notice of Requirement
Precinct
The developer of the Downtown Shopping Centre site (including CRL enabling works within the site) and their contractor (Fletcher Construction)
PT
Public Transport (i.e. buses, ferries and rail services)
RCA
Road Controlling Authority (i.e. AT for CBD surface roads and NZTA for the motorway and state highway network)
SBD
Southbound
Transport Access and Parking Delivery Work Plan
June 2016
Term
Definition
SOV
Single Occupant Vehicles
STMS
Site Traffic Management Supervisor
TAP
Transport, Access and Parking DWP
TBC
To Be Confirmed
TCC
Traffic Control Committee (responsible for legal approval of changes to traffic control devices such as loading zones and bus stops)
TDM
Travel Demand Management ( also referred to as ‘TD’, led by AT’s Commute team))
The Project
The Britomart Enabling Works Project
TOP
Tactical Operations Plan group (joint AT and NZTA group responsible for the daily management and optimisation of traffic within the CBD and immediate surrounds with the aim of minimising congestion through best operational practice and planning.
TSL
Temporary Speed Limit
TMP
Traffic Management Plan
TTMP
Temporary Traffic Management Plan
VMS
Variable Message Sign
WAP
Work Access Permit (the result of a CAR for an individual discrete activity or stage TMP)
WBD
Westbound
Transport Access and Parking Delivery Work Plan
June 2016
1
1
Introduction
The City Rail Link (CRL) project comprises the construction, operation and maintenance of a 3.4 km underground passenger railway, running between Britomart Station and the North Auckland Rail Line in the vicinity of Mt Eden station. The works relating to this Transport, Access and Parking Delivery Work Plan (DWP) constitute part of the enabling works for the CRL. The works (the Project) involve the construction of an extension to the existing passenger rail network from the current termination point within the Britomart Transport Centre (BTC), westwards underneath the former Chief Post Office building (CPO) and lower Queen Street. The Project footprint is shown by the blue shaded area in Figure 1.1 below.
LEGEND CRL alignment BTC designation CRL designation C1 worksite
Figure 1.1: Project Footprint
1.1
Purpose of the Transport, Access and Parking DWP
This Transport, Access and Parking DWP has been prepared to manage the adverse effects of construction of the Project on the transport network. It sets the framework for the subsequent development of Traffic Management Plans (TMP) for individual activities and will be implemented throughout the Project life cycle. The DWP is required under Condition 25 of the CRL designation and Condition 24 of the BTC designation. The objective of the DWP is to so far as is reasonably practicable, avoid, remedy or mitigate the adverse effects of construction on transport, pedestrian safety and amenity, parking and property access. This is to be achieved by: a b c d
Managing the road transport network for the duration of construction by adopting the best practicable option to manage congestion; Managing pedestrian safety and amenity; Maintaining pedestrian access to private property at all times; and Providing on-going vehicle access to private property to the greatest extent possible.
The DWP addresses the following: 
A summary of the existing transport environment, including the road network, pedestrian and cycling provisions, public transport and parking;
Transport Access and Parking Delivery Work Plan
June 2016
2
Proposed traffic management measures associated with managing the effects of the Project works on the transport network;
An assessment of the effects of the works on the transport network, including traffic and the public transport and pedestrian and cycling network;
Monitoring methods; and
Communications processes.
This DWP has been prepared by AECOM New Zealand Limited (AECOM) for the Downer Soletanche Bachy Joint Venture (the Contractor - DSBJV) and forms part of the Construction Environmental Management Plan (CEMP) for the Project.
1.2
Relevant Conditions
Table 1.1 outlines the designation conditions relevant to this Transport, Access and Parking DWP and where they are addressed in the document. Table 1.1: Transport, Access and Parking Conditions and section where addressed in the DWP Condition No.
Condition
Relevant section of DWP CRL Designation Conditions
CRL 18.1
The Requiring Authority and its contractor shall work collaboratively with the New Zealand Transport Agency (NZTA) during the preparation of the Traffic, Access and Parking DWP (Conditions 25, 27, 28, 29, and 30) in relation to confirming the management of adverse transport effects on the road network. A record of this consultation and outcomes shall be included in the Traffic, Access and Parking DWP. The Requiring Authority shall consult with the NZTA throughout the duration of construction on any changes or updates to the Traffic, Access and Parking DWP which relate to the management of the road network.
9.1 Appendix O
CEMP Requirements CRL 20.1
In order to give effect to the objective in Condition 19.1, the CEMP must provide for the following: (d) A Travel Management Plan for each construction site outlining onsite car parking management and methods for encouraging travel to the site using forms of transport other than private vehicle to assist in mitigating localized traffic effects.
Appendix A: Workforce Travel Plan
CEMP Construction Works Requirements CRL 21.1
In order to give effect to the objective in Condition 19.1, the CEMP shall include the following details and requirements in relation to all areas within the surface designation footprint where construction works are to occur, and / or where materials and construction machinery are to be used or stored: (a) Where access points are to be located and procedures for managing construction vehicle ingress and egress to construction support and storage areas;
4.11
(b) Methods for managing the control of silt and sediment within the construction area;
4.14
Transport, Access and Parking
Transport Access and Parking Delivery Work Plan
June 2016
3 Condition No.
Condition
Relevant section of DWP
CRL 25.1
A Transport, Access and Parking DWP shall be prepared to manage the adverse effects of construction of the City Rail Link, or any part of it, on the transport network.
This document
CRL 25.2
The objective of the Transport, Access and Parking DWP is to so far as is reasonably practicable, avoid, remedy or mitigate the adverse effects of construction on transport, parking and property access. This is to be achieved by:
CRL 25.3
(a) Managing the road transport network for the duration of construction by adopting the best practicable option to manage congestion;
4.15 4.16 4.17 4.18 4.19
(b) Maintaining pedestrian access to private property at all times; and
4.12
(c) Providing on-going vehicle access to private property to the greatest extent possible.
4.12
To achieve the above objective, the following shall be included in the Transport, Access and Parking DWP: (a) The road routes which are to be used by construction related vehicles, particularly trucks to transport construction related materials, equipment, spoil, including how the use of these routes by these vehicles will be managed to mitigate congestion, and to the greatest extent possible, avoid adverse effects on residential zoned land and education facilities;
4.13
(b) Transport route options for the movement of construction vehicles carrying spoil, bulk construction materials or machinery shall be identified and details provided as to why these routes are considered appropriate routes. In determining appropriate routes, construction vehicles carrying spoil, bulk construction materials or machinery shall as far as practicably possible only use roads that: (i) Form part of the regional arterial network; (ii) Are overweight / over dimensioned routes; (iii) Or other routes (specified below) where no other practical option is available.
4.13
(c) For the purposes of this condition the following routes (that at the time this designation was confirmed were not part of the regional arterial network and / or overweight / over dimensioned) shall be used where practicable for the movement of construction vehicles carrying spoil, bulk construction materials or machinery: (i) Ngahura Road, for trucks heading to/from Eden Terrace construction site; (ii) Dundonald Street and Basque Road, for trucks heading to/from the Newton Station construction sites; (iii) Pitt Street (between Hobson Street and Hopetoun Street), Beresford Square, Mercury Lane, Canada Street and Upper Queen Street (between Canada Street and Karangahape Road), for trucks heading to/from Karangahape Station construction sites; (iv) Wellesley Street (between Nelson Street and east of Albert Street), Cook Street (between Mayoral Drive and Hobson Street) and Mayoral Drive (between Wellesley Street and Cook Street) for trucks heading to/from Aotea Station construction sites;
4.13
Transport Access and Parking Delivery Work Plan
June 2016
4 Condition No.
Condition
Relevant section of DWP
(v) Nelson Street (north of Wellesley Street), Hobson Street (north of Cook Street) and Lower Albert Street, for trucks heading to/from the Albert Street and Downtown construction sites. (d) Where other routes are necessary (other than those routes identified above), the Transport, Access and Parking DWP shall identify any residential zoned land and education facilities and shall provide details on how adverse effects from these vehicle movements are to be mitigated through such measures as: (i) Communication and consultation (in accordance with Condition 15 of this designation) with these properties in advance of the vehicle movements occurring; (ii) Restricting vehicle movements on Monday to Friday to between 9.30am and 4pm, and on Saturday to between 9am and 2pm.
4.13
(e) Proposed temporary road lane reductions and / or closures, alternative routes and temporary detours, including how these have been selected and will be managed to mitigate congestion as far as practicably possible and how advance notice will be provided;
4.12 4.13
(f) How disruption to the use of private property will be mitigated through: (i) Ensuring pedestrian and cycle access to private property is retained at all times; (ii) Providing vehicle access to private property as far as practicably possible at all times, except for temporary closures where landowners and occupiers have been communicated and consulted with in reasonable advance of the closure; and (iii) How the loss of any private car parking will be mitigated through alternative car parking arrangements.
4.12
(g) Where an affected party unexpectedly finds their vehicle blocked in as a result of a temporary closure, the Requiring Authority shall (within reasonable limits) offer alternative transport such as a taxi, rental car, or other alternative. Note: For the purposes of designation Conditions 25, 27, 28, 29 and 30 “temporary closure� is defined as the following: (i) In place for less than six hours, the Requiring Authority shall communicate and consult on the closure at least 24 hours in advance, but is not required to offer or provide alternative parking arrangements, though it may choose to offer this on a case by case basis in consultation with the affected party; and (ii) In place for between six and 72 hours, the Requiring Authority shall communicate and consult on the closure at least 72 hours in advance, and will offer and provide where agreed with the affected party alternative parking arrangements. The alternative parking arrangement should be as close to the site affected as is reasonably practicable.
4.12
(h) How disruption to use of the road network will be mitigated for emergency services, public transport, bus users, taxi operators, freight and other related vehicles, pedestrians and cyclists through: (i) Prioritising, as far as practicably possible, pedestrian and public transport at intersections where construction works are occurring; (ii) Relocating bus stops and taxi stands to locations which, as far as practicably possible, minimise disruption; and
4.12 4.15 4.16 4.17 4.20 6.1 6.2 6.3
Transport Access and Parking Delivery Work Plan
June 2016
5 Condition No.
Condition
Relevant section of DWP
(iii) Identifying alternate heavy haul routes where these are affected by construction works.
6.4
(i) Cross references to the specific sections in the Communication and Consultation Plan that detail how emergency services, landowners, occupiers, public transport users, bus and taxi operators, and the general public are to be consulted with in relation to the management of the adverse effects on the transport network.
8.1
(j) The alternative (to road) transport options that are available (including the option of rail use at the main construction site adjacent the North Auckland Rail Line) and that have been considered and assessed for the transportation of spoil. This will include as applicable: (i) Benefits that could be provided by alternative options; (ii) Potential adverse effects associated with alternative options; (iii) Where an alternative option is proposed, methods for managing potential adverse effects; and (iv) Reasons for either adopting or not adopting alternative transport options.
4.21
Monitoring of Transport Network Congestion CRL 26.1
To achieve the objective of Condition 25.2(a), the Requiring Authority will undertake monitoring of the transport network and implement additional mitigation measures as required to manage congestion to achieve the best practicable option.
4.17 4.18 4.19 7.1 7.2 7.3 7.4
CRL 26.2
The purpose of the monitoring is to monitor congestion on the transport network by measuring average delays for traffic travelling along specified routes. The evaluation times will be: (a) The average travel times over the weekday two hour morning peak period; and (b) The average travel times over the weekday two hour evening peak period; and (c) The average weekday Inter-peak travel times between 9am to noon, noon to 2pm and 2 to 4pm.
7.1
CRL 26.3
The Requiring Authority shall carry out continuous monitoring for the duration that construction of the City Rail Link is occurring. The intention is that this monitoring is to be continuous, although it is acknowledged that there may be occasional malfunctions.
7.2
CRL 26.4
If a congestion incident occurs (such as an accident), the monitoring during the affected period will be considered unrepresentative.
7.2 7.3
CRL 26.5
Monitoring shall commence six months prior to construction of the City Rail Link to establish a baseline of existing transport congestion.
7.1
CRL 26.6
The traffic monitoring will establish whether the City Rail Link construction works have increased traffic delays as follows: (a) Either by more than 10 minutes (from the monitoring previously undertaken in accordance with this condition) (b) Or if the travel times are more than three minutes or 30% greater than the forecast modelled increases along that route (according to the most recent traffic model test of that scenario, undertaken prior to the start of
7.1 7.2 7.3 Appendix M
Transport Access and Parking Delivery Work Plan
June 2016
6 Condition No.
Condition
Relevant section of DWP
construction. The modelled time is to be based on the Auckland City Centre SATURN traffic model or a different traffic model approved by the Requiring Authority). (c) The 30% above shall only apply for an increase predicted to be over four minutes. CRL 26.7
If the travel times exceed the above criteria on any one of the specified routes, then additional mitigation shall be implemented by the Requiring Authority in its role as the Road Controlling Authority (under its statutory obligation). The additional mitigation could include but is not limited to advertising alternative routes, removing on street car parking or implementing operational measures, such as lane reconfigurations or signal phasing, to increase capacity on the surrounding network where reasonably possible at that time.
4.19
CRL 26.8
The purpose of additional mitigation measures is to mitigate the increases in traffic delays, reducing these to below the levels identified in Condition 26.6 as far as is reasonably achievable.
4.19
CRL 26.9
For the purposes of this condition, the following are the specified routes: (a) Wellesley Street (between Victoria Street and Princes Street) (b) Victoria Street (between Wellesley Street and Princes Street) (c) Customs Street/Fanshawe Street (between Nelson Street and Tangihua Street) (d) Quay Street/Lower Hobson Street (between Fanshawe Street/Hobson Street and Tangihua Street) (e) Nelson Street/Hobson Street (between Pitt Street and Fanshawe Street) (f) Queen Street (between Mayoral Drive and Customs Street) (g) New North Road/Symonds Street (between Dominion Road and Newton Road) (h) Mount Eden Road (between Normanby Road and Symonds Street) (i) Khyber Pass Road between the southern motorway ramps and Symonds Street if this route is to be used by construction related trucks (j) Newton Road between the northwestern motorway ramps and Symonds Street
7.1
CRL 26.10
The specified routes shall exclude whichever east-west route has its intersection with Albert Street closed at the time of the surveys.
7.1
Transport, Access and Parking: Specific Requirements (Britomart to Mayoral Drive) CRL 27.2
(a) How construction works will be undertaken to mitigate congestion on Albert Street, Wellesley Street, Victoria Street, Customs Street, and Quay Street including retaining east-west traffic movements across Albert Street on Customs Street, Victoria Street and Wellesley Street;
4.3 4.4 4.6 4.15 4.16 4.17 4.18 4.19
(b) The timing and sequencing of temporary road lane reductions and / or closures, and the alternative routes and temporary detours to be used, including: (i) How these have been selected and will be managed to, where practicable, mitigate congestion on the surrounding road network;
4.3 4.4 4.6 4.15 4.16
Transport Access and Parking Delivery Work Plan
June 2016
7 Condition No.
Condition
Relevant section of DWP 4.17 4.18 4.19
(c) How disruption to the use of private property located immediately adjacent the designation with access onto Galway Street, Tyler Street, Queen Elizabeth Square, Customs Street, Albert Street, Victoria Street and Wellesley Street will be mitigated through: (i) Providing vehicle access to private property as practicably possible at all times; (ii) Retaining local vehicle access to properties located along Albert Street (which may include only left in, left out access ); (iii) Retaining access for loading and unloading of goods located along the service lane on the eastern side of Albert Street, between Victoria Street and Wellesley Street ; and; (iv) Providing an on street loading bay on Customs Street, Lower Albert Street or Lower Queen Street to provide servicing to 21 Queen Street if access during construction cannot be provided to the existing loading bay area for 21 Queen Street, accessed from Lower Albert Street;
4.12
(d) How disruption to the use of the local road network will be mitigated for private bus users, pedestrians and cyclists through: (i) Providing, where practicable, for the continued operation of private bus operators from hotels and other pick up / drop off locations in the city centre area (cross references to the Communication and Consultation Plan for consulting with private bus operators shall be included in the CEMP and Traffic, Access and Parking DWP); and (ii) Retaining pedestrian and cycle access through Lower Queen Street and / or Queen Elizabeth Square to provide access to and from the Ferry terminal and Customs Street.
4.15 4.16 4.17 4.12
BTC Designation Conditions1 CEMP Requirements BTC 19.1
In order to give effect to the objective in Condition 18.1, the CEMP must provide for the following: (d) A Travel Management Plan for each construction site outlining onsite car parking management and methods for encouraging travel to the site using forms of transport other than private vehicle to assist in mitigating localized traffic effects.
Appendix A
CEMP Construction Works Requirements BTC 20.1
In order to give effect to the objective in Condition 18.1, the CEMP shall include the following details and requirements in relation to all areas within the surface designation footprint where construction works are to occur, and / or where materials and construction machinery are to be used or stored: (a) Where access points are to be located and procedures for managing construction vehicle ingress and egress to construction support and storage areas
4.11
(b) Methods for managing the control of silt and sediment within the construction area;
4.14
1
Conditions as attached to Auckland Transport’s Confirmation Notice of 17 March 2016 on Notice of Requirement to alter the Britomart Transport Centre Designation
Transport Access and Parking Delivery Work Plan
June 2016
8 Condition No.
Condition
Relevant section of DWP
Transport, Access and Parking BTC24.1
Transport, Access and Parking DWP shall be prepared to manage the adverse effects of construction of the Project on the transport network.
BTC24.2
The objective of the Transport, Access and Parking DWP is to so far as is reasonably practicable, avoid, remedy or mitigate the adverse effects of construction on transport, pedestrian safety and amenity, parking and property access. This is to be achieved by:
BTC24.3
This document
(a) Managing the road transport network for the duration of construction by adopting the best practicable option to manage congestion.
4.15 4.16 4.17 4.18 4.19
(b) Managing pedestrian safety and amenity.
4.16 6.2
(c) Maintaining pedestrian access to private property at all times.
4.12
(d) Providing on-going vehicle access to private property to the greatest extent possible.
4.12
To achieve the above objective, the following shall be included in the Transport, Access and Parking DWP: (aa) The traffic management measures to be in general accordance with the draft temporary traffic management plans 4205003-CS2802 Rev B and 4205003CS2803 Rev B.
Appendix C 2.3 4.3 4.4
(bb) The name, job title, and contact details for the person who will be responsible for dealing with traffic congestion complaints
8.2
(a) Proposed temporary road lane reductions and / or closures, alternative routes and temporary detours, including how these have been selected and will be managed to mitigate congestion as far as practicably possible and how advance notice will be provided.
4.3 4.12
(b) Details of widening of footpaths resulting in: (i) Road lane narrowing in Commerce Street. (ii) Road lane narrowing in Galway Street and Tyler Street outside the CPO building .
2.3 4.3
(c) How the displacement of taxi parking spaces, mobility impaired parking spaces and short and long-term parking spaces will be mitigated through relocation generally in accordance with the Flow Transportation Specialists Transport Assessment, dated May 2015, Figure 10 Proposed Parking Plan, including but not limited to the temporary use of the bus stop located outside 2 Queen Street and 152 Quay Street for short term parking during the Project works construction period.
6.4
(d) How pedestrian circulation and safe movement will be maintained: (i) On Commerce Street, between Tyler Street and Galway Street. (ii) On Galway Street. (iii) At or adjacent to the intersections of Commerce Street with Customs Street and Quay Street.
4.8 4.9 4.16 6.2
(e) Details of the reversal of the direction of traffic flow along Tyler Street.
4.3
Transport Access and Parking Delivery Work Plan
June 2016
9 Condition No.
Condition
Relevant section of DWP
(f) How disruption to the use of private property will be mitigated through: (i) Ensuring pedestrian and cycle access to private property is retained at all times. (ii) Providing vehicle access to private property as far as practicably possible at all times, except for temporary closures where landowners and occupiers have been communicated and consulted with in reasonable advance of the closure. (iii) How the loss of any private car parking will be mitigated through alternative car parking arrangements.
4.12
(g) How disruption to use of the road network will be mitigated for emergency services, public transport, bus users, taxi operators, freight and other related vehicles, pedestrians and cyclists through: (i) Prioritising, as far as practicably possible, pedestrian and public transport at intersections where construction works are occurring. The objective with regard to pedestrians is to ensure that satisfactory and safe movement is maintained, at or adjacent to the construction works. (ii) With regard to public transport, prioritisation could also apply beyond intersections where travel time savings can be achieved. (iii) Relocating bus stops and taxi stands to locations which, as far as practicably possible, minimise disruption. (iv) Identifying alternate heavy haul routes where these are affected by construction works.
4.12 4.15 4.16 4.17 4.20 6.1 6.2 6.3 6.4
(h) Details of the management of pedestrians on the footpath in the case of an emergency in or evacuation of a building immediately adjacent to a work site.
4.20
(i) Details of how general traffic access along lower Queen Street will be managed in light of the requirement to remove the current general traffic prohibition at the Lower Queen Street / Quay Street intersection.
4.4 8.1
(j) Cross references to the specific sections in the Communication and Consultation Plan that detail how emergency services, landowners, occupiers, public transport users, bus and taxi operators, and the general public are to be consulted with in relation to the management of the adverse effects on the transport network.
8
(k) How traffic control, monitoring/surveys and reporting of traffic movements and conditions at the intersections of Quay Street/Commerce Street, Tyler Street/Commerce Street, Galway Street/Commerce Street and Customs Street/Commerce Street, shall be carried out during six week periods at the commencement of the following Project construction phases:
7.3.3
(i) Site preparation and Station Plaza accommodation works (ii) Britomart Station modification works (including work to the CPO building). (l) Detailing the purpose of the monitoring/surveys and reporting of traffic movements and conditions at the intersections of Quay Street/Commerce Street, Tyler Street/Commerce Street, Galway Street/Commerce Street and Customs Street/Commerce Street, which is to identify the need and make up of ongoing temporary traffic control during the Project construction period, in these locations, if required.
7.3.3
(m) Inclusion of the following requirements:
7.3.3
Transport Access and Parking Delivery Work Plan
June 2016
10 Condition No.
Condition
Relevant section of DWP
(i) Traffic surveys shall be undertaken by a suitably qualified independent person, 3 months prior to construction of the Project commencing to establish a baseline of existing transport congestion. (ii) Temporary traffic control measures shall be in place between the hours of 7.30am - 9.30am and 3pm – 6pm Monday to Friday inclusive, prior to works commencing on each construction phase and remain in place for six weeks. During this six week period: a. Traffic monitoring/ surveys shall be undertaken by a suitably qualified independent person, during the first four weeks between the hours of 7.30am - 9.30am and 3pm – 6pm Monday to Friday inclusive to monitor construction traffic impacts on the identified intersections. b. At the conclusion of the four week monitoring period a written report shall be prepared by a suitably qualified independent person describing the observations and providing recommendations for the make-up of ongoing temporary traffic control during the Project construction period if required. The recommendations of the report are binding on the Requiring Authority. This report shall be available prior to the six week temporary traffic control period ending. c. The report required by condition 24.3(m)(ii)(b) shall be provided to all property owners and occupiers of the sites that are identified in Appendix 2, in accordance with condition 16.4(c) BTC24.4
No permanent closure of Tyler Street and Galway Street will be undertaken during the construction of the project.
4.11 4.11
BTC24.5
Temporary full width road closure of Tyler Street and Galway Street shall be limited to no more than 10 closures per annum per road and restricted to the length of Tyler and Galway Streets running between the eastern façade of the Chief Post Office and Commerce Street.
4.11
BTC24.6
Temporary full width road closures shall be for no longer than any continuous period of three hours in any 12 hour period. Any closure for any longer period shall be limited to a maximum of eight hours between the hours of 11pm and 7am, Monday to Sunday.
4.12.1
BTC24.7
Any temporary full width road closure for three hours or less shall be upon 24 hours prior notice, and the Requiring Authority shall communicate and consult on such matters as timing and access arrangements on the closure at least 24 hours in advance, but is not required to offer or provide alternative parking arrangements, though it may choose to offer this on a case by case basis in consultation with the affected party.
4.12.1
BTC24.8
Any temporary full width road closure in excess of three hours shall require 72 hours prior notice, the Requiring Authority shall communicate and consult on such matters as timing and access arrangements on the closure at least 72 hours in advance, and will offer and provide where agreed with the affected party alternative parking arrangements. The alternative parking arrangement should be as close to the site affected as is reasonably practicable.
BTC24.9
Communication and consultation of the advance notice of any temporary full width road closures shall be undertaken with all property owners and
4.12.1
Transport Access and Parking Delivery Work Plan
June 2016
11 Condition No.
Condition
Relevant section of DWP
occupiers of the sites that are identified in Appendix 2, in accordance with condition 16.4(c).
BTC24.10
BTC24.11
Where an affected party unexpectedly finds his/her vehicle blocked in as a result of a temporary closure, the Requiring Authority shall (within reasonable limits) offer alternative transport such as a taxi, rental car, or other alternative.
4.12.3
If the Requiring Authority receives complaints from the public regarding the achievement of satisfactory and safe pedestrian movement being maintained, at or adjacent to the construction works, then these complaints shall be investigated. If the complaints are considered by the Requiring Authority/ Council to be justified, then mitigation measures shall be considered by the Requiring Authority which could include, but should not be limited to
8.2
(a) providing fencing to guide pedestrian movement, or (b) modifying signal timings and phases for the benefit of pedestrians, where reasonably practicable at that time. 4.7.1
BTC24.12
The Requiring Authority shall ensure that access to and egress from the Quay Street entrance to the Britomart carpark (located at 88 Quay Street) is maintained by installing a “keep clear� marking across the Britomart carpark entry/exit. The Requiring Authority shall ensure that no trucks larger than a 11.5m rigid truck travel to or from or make deliveries to or from the respective work site areas between the hours of 7.30am to 9.30am and 3pm to 6pm.
4.10
BTC24.13
Methods to restrict project construction vehicles using Tyler Street and Galway Street east of Commerce Street for the duration of the construction of the Project.
4.13
BTC24.14
Transport Access and Parking Delivery Work Plan
June 2016
12 CRL Britomart to Wyndham Street Enabling Works Resource Consents R/REG/2010/5430, R/LUC/2014/5428, R/REG2014/5432, R/REG2014/5435, R/REG/2014/5436, R/REG/2014/5437 Regional Consent Condition 36
1.3
The Consent Holder shall, so far as is it is reasonably practicable, avoid, remedy or mitigate the adverse effects of construction on transport, parking and property access. This is to be achieved through the following objectives: a. managing the road transport network for the duration of the construction by adopting the best practicable option to manage congestion; b. maintaining pedestrian access to private property at all times; and c. providing on-going vehicle access to private property to the greatest extent possible. Advice Note 1: Condition 36 refers to objectives to be achieved. The requirement to provide mechanisms to achieve these objectives is included in the relevant CRL or Britomart Transport Centre designation conditions. Advice Note 2: This resource consent does not provide approval to close or occupy temporarily Tyler or Galway Streets. If such actions are required they will be sought and managed under the CRL designation and / or an application to vary the Britomart Transport Centre designation.
4.3 4.12 4.13 4.15 4.16 4.17 4.18 4.19 5.1 6.1 6.2 6.3
DWP Review and updates
This DWP is a living document that will be reviewed and updated as needed during the course of the Project as traffic and working conditions change and individual Traffic Management Plans (TMPs) are issued (with re-approval of the DWP as required). The DWP will guide the preparation of individual TMPs and Project Corridor Access Request (CAR) applications. These TMPs will be submitted to AC with the resulting individual Work Access Permits (WAPs) for certification as being consistent with the strategies of the DWP as they are developed.
1.4
Spatial References
For ease of reference it is noted that in this DWP Queen and Commerce Streets are referred to as running north-south while the crossroads of Quay, Tyler, Galway and Customs Streets are referred to as running east-west. Traffic is thus referred to as moving northbound (NBD), southbound (SBD), westbound (WBD) or eastbound (EBD). Bus and rail services travelling to the Britomart area are referred to as being inbound or citybound, while those travelling away from the Britomart area out to suburban Auckland are referred to as being outbound.
Transport Access and Parking Delivery Work Plan
June 2016
13
2
Project Description
2.1
Overview
The Project involves the construction of an extension to the existing passenger rail network from the current termination point within the BTC, westwards underneath the CPO building and lower Queen Street. Separate works are being undertaken to continue the rail tunnels from this point under the Downtown Shopping Centre site (which is being redeveloped by Precinct Properties), and then up Albert Street. The Project will involve significant works beneath the CPO, with the construction of two new rail tunnels extending westwards beneath the basement floor level. In lower Queen Street, sheet piling will be extended across the road corridor, excavation undertaken to form the tunnels followed by reinstatement of the road corridor following the completion of works. During construction, existing ticketing and retail functions and pedestrian access to the station will be accommodated in Station Plaza, at the rear of the CPO building. Surface works will also be required in QEII Square associated with the Downtown Shopping Centre redevelopment, including construction of the CRL rail tunnels beneath this site (Precinct Properties scope of work). A detailed description of the construction works is provided in the CEMP.
2.2
Construction Methodology
The Project construction works will occur in four main stages (plus some early works activities to facilitate the Project) as outlined below.
2.2.1
Early activities to facilitate construction
Prior to the commencement of the Project, Auckland Transport (AT) has undertaken a number of activities to facilitate and support the Project and implement the ‘New Network’ bus service plan. These include:
The second phase of CBD bus changes2, which have included the removal of bus services and shelters from lower Queen Street, Tyler Street and Galway Street, along with changes to bus services and stops in Commerce Street; and
Changes to the streetscapes at the rear of the BTC, specifically widening of footpaths and kerbside management of the adjacent sections of Tyler Street, Commerce Street and Galway Street.
2.2.2
Stage 1 works – Temporary accommodation works
Stage 1 of the Project involves the construction of the temporary station facilities in Station Plaza to the rear of the BTC, including construction of a temporary extension to the existing ‘Glasshouse’ building and other enabling works. The plans for the proposed streetscape works are included in Appendix C and are in accordance with those nominated in the BTC conditions (24.3(aa)). During this stage, all work will be staged to allow continuous public access to the CPO during operating hours and the upper floors of the CPO can remain tenanted. Construction access / loading zones and set down areas will be established on the BTC site adjacent to the Glasshouse at the rear of the CPO (next to Tyler and Galway streets). Refer to Table 2.1 for a summary of key construction activities. Lower Queen Street will be closed to vehicles between Tyler Street and Galway Street however pedestrian and cycle access will be maintained in all stages and at all times. As at present, cyclists will
2
The first phase removed scheduled bus services from Albert Street north of Victoria Street as of Sunday 18 October 2015
Transport Access and Parking Delivery Work Plan
June 2016
14 be required to dismount when moving between road carriageway and building entries via the footpath; this may occur for longer distances than is presently the case. Lower Queen Street will be used by general traffic to provide exit to Customs Street and Quay Street for general traffic from Galway Street and Tyler Street respectively. The direction of Tyler Street will be reversed prior to the commencement of the Project in order to allow construction access to the CPO loading zone on Tyler Street (Construction Support Area C).
2.2.3
Stage 2 works – Former CPO building works
Once construction of the temporary station has been completed, works will commence in the CPO (removal of fixtures and fitting, ground floor demolition and piling works) and the CPO will be closed to the public. Rail platforms will be accessed using the new temporary station entry in Station Plaza with the main entrance located on Commerce Street and side entrances on Galway and Tyler Streets. Secondary access from Takutai Square (between Gore Street and Britomart Place) will remain unchanged during the Project. Refer to Table 2.1 for a summary of key construction activities. The use of lower Queen Street by general traffic will continue to be restricted to those exiting from Galway Street to Customs Street and entering Tyler Street from Quay Street.
2.2.4
Stage 3 works – Lower Queen Street and CPO works
In the early part of Stage 3, lower Queen Street will continue to be closed to vehicles between Tyler Street and Galway Street. Pedestrian and cycle movement between Quay and Customs streets will be maintained at all times. As at present, cyclists will be required to dismount when moving between road carriageway and building entries via the footpath; this may occur for longer distances than is presently the case. The closure of lower Queen Street to vehicle traffic between Galway and Tyler streets will take place after the May 2017 World Masters Games to be held in Auckland. Excavation will take place beneath lower Queen Street (between Galway and Tyler streets) and the CPO to establish the rail tunnels. Stage 3 also involves the backfilling of the lower Queen Street and CPO excavations and the commencement of reinstatement works. The CPO will also be reinstated and re-opened to the public at the end of Stage 3. Refer to Table 2.1 for a summary of key construction activities. Stage 3 of the Project will require the most traffic management and is the most significant stage in terms of potential effects on the transport network.
2.2.5
Stage 4 works – BTC modifications and project reinstatement
Stage 4 involves the reinstatement of construction areas, and works within the BTC to tie in the new rail tunnels to the existing track alignment and removal of the temporary accommodation buildings in Station Plaza.
2.2.6
Summary of key construction activities
A summary of the key construction activities to be undertaken in each Project area is outlined in Table 2.1 below. Refer to the CEMP for a detailed description of the construction works. Summary diagrams of the four main work stages are provided in Appendix D. These summary plans also indicate construction loading zone positions and traffic direction.
Transport Access and Parking Delivery Work Plan
June 2016
15 Table 2.1:
Summary of key construction activities by location3
Construction locations
Key construction activities
CPO
Station Square (rear of BTC)
Construction of temporary station facilities and services Closure of internal road and vehicle crossings to Station Plaza short term parking area
Lower Queen Street
Closure of lower Queen Street to vehicles from Tyler Street to Galway Street Excavation and tunnelling Construction of temporary pedestrian footbridge over the excavation along the western footpath of lower Queen Street. Backfilling of excavation Reinstatement of lower Queen Street Construction Support Area B – accessed via lower Queen Street
Galway Street
Construction Support Area A located adjacent to the Glasshouse within the BTC site – vehicle access via Galway Street Localised footpath widening and changes to pedestrian crossings (undertaken by others, prior to commencement of Project) Removal of bus stop shelters on Galway Street
Tyler Street
Direction of traffic flow on Tyler Street reversed (undertaken by others, prior to commencement of Project) Localised footpath widening and changes to pedestrian crossings (undertaken by others, prior to commencement of Project) Access to CPO provided by new vehicle crossing Construction Support Area C located adjacent to the Glasshouse within the BTC site – vehicle access via Tyler Street Changes to bus stops (undertaken by others, prior to commencement of Project)
Commerce Street
Localised footpath widening and changes to pedestrian crossings (undertaken by others, prior to commencement of Project) Changes to bus stops (undertaken by others, prior to commencement of Project)
Queen Elizabeth II Square
Removal of the raised floor while retaining retail and heritage fixtures Saw cutting and demolition of the CPO ground floor Installation of guide walls and diaphragm walls to the designed depth Installation of underpinning structures to provide support for the CPO Excavation and tunnelling Construction of base slabs, infill walls, and structural walls Construction of structural members to replace underpinning beams Transfer load and removal of underpinning beams. Reinstatement of floors, underpasses, fixtures, and fittings Modification of stairs of suit the new configuration Tie-in tunnels to existing track alignments
Subject to construction activities associated with redevelopment of the Downtown Shopping Centre (Precinct Properties scope of works)
3
Note these activities are not in order of programme. Works noted as being undertaken by others and prior to the commencement of this Project are required for the commencement of the Downtown Shopping Centre redevelopment and Albert Street tunnel works as well as this benefitting this Project.
Transport Access and Parking Delivery Work Plan
June 2016
16
2.2.7
Construction Support Areas
Three construction support areas (CSAs) are required to support the construction works (refer to Table 2.2 and Figure 2.1). All storage of material and equipment associated with the construction works shall take place within the boundaries of the designation. Table 2.2:
Construction Support Areas
Construction Support Area
Location
Construction zone supported
Area
Key Plant/Activities
A
Galway Street
Supports temporary accommodation works in Station Square
400 m2
Material storage Crane location and access to CSA A and the CPO Stormwater and groundwater treatment tanks
B
Lower Queen Street
Supports CPO and lower Queen Street construction
3,500 m2
Bentonite treatment plant Jet grout pump and mixing plant Material storage
C
Tyler Street -
Provides construction access to the CPO
400 m2
Temporary site office and workers amenities during Stage 1 of the Project Material storage Crane location and access to CSA C and the CPO Main vehicle entrance to the CPO building
Figure 2.1: CRL Enabling Works C1 – Construction Support Areas
Transport Access and Parking Delivery Work Plan
June 2016
17 Note: Blue hatched areas on Figure 2.1 show the areas within lower Queen Street that will be maintained as traffic lanes in order to provide vehicle access from lower Queen Street to Tyler Street and Galway Street into lower Queen Street
2.3
Construction Programme Summary
The construction works will commence in July 2016 and take approximately 48 months. A summary of the construction programme and key milestones relevant to traffic management planning are described in Table 2.3. Table 2.3:
Summary of indicative key milestones relevant to traffic management
Stage
Description
Dates
Duration
Stage 1 – Temporary station access, construction of temporary accommodation in Station Plaza and streetscape works
Construction of temporary station facilities and access in Station Plaza to the rear of the BTC Removal of bus stops, shelters and canopies from Tyler and Galway Streets Kerbside management changes Construction of new vehicle crossing on Tyler Street Remove existing stairs and escalators Other enabling works
July 2016 to January 2017
7 months
Stage 2 – CPO building works, piling, removal of CPO ground floor
Construction of dust and noise barriers Strip out CPO CPO ground floor demolition CPO diaphragm wall construction commences
January 2017 to May 2017
4 months
Stage 3 – piling, CPO underpinning excavation, tunnel construction and backfilling.
CPO diaphragm wall construction Underpinning of CPO Lower Queen Street Piling CPO and lower Queen Street excavation Tunnel Construction Backfill excavation Lower Queen Street reinstatement Reinstate and re-open CPO
May 2017 to March 2020
34 months
Stage 4 – Reinstatement & station fit out
Streetscape reinstatement Tie in rail tunnels with existing track alignment Removal of temporary station accommodation in Station Plaza
April 2020 to June 2020
3 months
2.4
Construction Traffic Generation
2.4.1
Construction Traffic Summary
Overall, the predicted volume of construction traffic generated by the Project will be relatively low. Traffic volumes are anticipated to average approximately seven vehicles per hour and 70 per day over a ten hour workday during the busiest stages of the Project. Construction traffic will be spread across the several site accesses and loading zones in Tyler, Galway and lower Queen Streets. Minimal workforce parking will be provided on-site and vehicle access to the Project area will be restricted to material delivery, spoil removal and service vehicles (for example sediment disposal and
Transport Access and Parking Delivery Work Plan
June 2016
18 fuel supply). The anticipated overall volume of spoil to be removed is approximately 20,000m³ which is relatively modest. Spoil is proposed to be loaded directly onto truck and trailers and transported from the site. As shown in Table 2.4, daily vehicle movements (trucks and light vehicles) during the Project are expected to vary from approximately 40 vehicles / day in Stage 1, to a peak of approximately 75 vehicles / day in Stages 2 and 3. These figures exclude third party vehicles associated with the installation changes to traffic management and temporary works installation, streetscape, service alterations or other discrete traffic events (typically weekend or night time), and the delivery of large specialist plant or road sweeping. Table 2.4:
Summary of indicative key milestones relevant to traffic management Light Vehicles Per Day
Trucks Per Day
Total Vehicles Per Day
Stage 1 – Temporary western station access
30
4 to 10
34 - 40
Stage 2 – CPO under pinning & tunnel excavation
40
20 to 35
60 – 75
Stage 3 – Tunnel construction
40
20 to 35
60 – 75
Stage 4 – Reinstatement & station fit out
30
4 to 10
34 - 40
2.4.2
Construction Workforce
Initial estimates indicate that the Project workforce will vary from approximately 60-80 staff during Stages 1 and 4, to 20-40 staff during Stages 2 and 3 as outlined in Table 2.5. Table 2.5:
Summary of indicative Project workforce staff numbers
Construction Stage
Staff Numbers
Stage 1 – Temporary station accommodation
60-80
Stage 2 – CPO building works
20-40
Stage 3 – Tunnel construction
20-40
Stage 4 – Reinstatement & station fit out
60-80
Additional third party staff (such as traffic management contractors) are not included in Table 2.5.
2.4.3
Workforce Travel Management Plan
Minimal on-site parking will be provided for the Project workforce. It is expected that staff vehicle trips will be minimised through car sharing, use of public transport, off-peak shift starts (especially in the morning) and working during typical construction hours of 7am to 7pm Mondays to Saturdays. The Project workforce will be provided with public transport travel information, and encouraged to use public transport or car pool if they choose to drive and use nearby public car parks. Further details are provided in the full site specific Workforce Travel Plan presented in Appendix A. The low levels of parking that will be provided in the Project area, along with implementation of the Workforce Travel Plan will serve to reduce congestion in the Project area.
Transport Access and Parking Delivery Work Plan
June 2016
19
3
Existing Transport Network and conditions
This section provides a summary of the existing transport network conditions and infrastructure in the Project area. The two Integrated Transport Assessments (ITA) prepared for the CRL Notice of Requirement (NoR) and the alteration to BTC designation NoR processes should be referred to for further information on the existing form and operations of the local road network surrounding the Project area.
3.1
Road Form and Use
A number of roads are located adjacent or near to the Project area and will be directly affected by the Project as shown in Figure 3.1.
Figure 3.1: Key roads around the Project area (Map source: Auckland Council GIS)
3.1.1
Description of road network
3.1.1.1
Lower Queen Street
The section of lower Queen Street adjacent to the BTC comprises a single lane corridor (of approximately 8 metres in width) in each direction. A number of bus stops servicing the Northern Express bus services, along with services for West Auckland and Central Auckland are located in lower Queen Street. Given its proximity to public transport services and connection between the Queen Street valley and the waterfront (and Ferry services), lower Queen Street is subject to high pedestrian flows. Between Tyler Street and Galway Street, lower Queen Street is used by buses only, however, general traffic from these streets are able to turn onto lower Queen Street towards Customs Street and Quay Street respectively.
Transport Access and Parking Delivery Work Plan
June 2016
20 3.1.1.2
Customs Street
Customs Street is a major arterial running in the east-west direction through the CBD, and caters for all modes of transport. Customs Street is typically a seven lane corridor; however one lane in each direction caters for bus stops, vehicle parking, and taxi stands in addition to left turn movements. The centre lane provides for medians and right turn lanes. 3.1.1.3
Commerce Street
Commerce Street is located to the east of the BTC. It primarily caters for bus services using Galway and Tyler Streets, but also serves as a minor connector for general traffic traveling between Quay Street to the north and Customs Street to the south. Commerce Street has one lane in each direction and a number of bus stops and parking bays. 3.1.1.4
Tyler and Galway Streets
Tyler and Galway Streets (to the west of Commerce Street and to the north and south of the BTC) are single lane one way streets catering mainly for buses and taxis heading east from Britomart. 3.1.1.5
Quay Street
Quay Street is a major arterial running in the east-west direction and has two lanes eastbound and three westbound traffic lanes. Quay Street mainly serves general traffic and buses at present; however a segregated cycleway will be established on the northern (harbour) side of the road using the current kerbside lane and sections of shared path prior to the commencement of the Project. The kerbside westbound lane is a dedicated bus lane east of Commerce Street. There are parking restrictions along Quay Street and a small number of bus stops.
3.1.2
Temporary Traffic Management (TTM) Levels and Road Hierarchy
The features described above and the prescribed Temporary Traffic Management (TTM) from the AT Code of Practice (ATCoP) are summarised in Table 3.1. The applicable TTM levels and road hierarchy designations are also shown diagrammatically in Appendix B. Table 3.1:
Road form and required TTM
Street name
Road hierarchy
TTM level
Existing typical lane arrangement
Lower Queen Street
Local
L
One northbound and southbound bus lane
Queen Street (South of Customs Street)
Collector
2L
Two northbound and southbound general lanes
Commerce Street (North of Customs Street)
Local
1
One northbound and southbound general lane
Commerce Street (South of Customs Street)
Collector
1
One northbound and southbound general lane
Customs Street
District Arterial
2
Three eastbound lanes (including a parking / bus stop / left turn lane) Median lane with right run pockets Three westbound lanes (including parking / bus stop / left turn lane)
Galway Street
Local
1
One westbound general lane west of Commerce Street
Transport Access and Parking Delivery Work Plan
June 2016
21 Street name
Road hierarchy
TTM level
Existing typical lane arrangement
One eastbound general lane east of Commerce Street Tyler Street (West of Commerce Street)*
Local
L
One westbound general lane*
Tyler Street (East of Commerce Street)
Local
1
One eastbound general lane
Gore Street (North of Galway Street)
Local
1
One northbound and southbound general lane
Gore Street (South of Galway Street)
Collector
1
One northbound and southbound general lane
Quay Street**
Strategic Arterial
2
Three eastbound lanes (including right turn lane / median) Three westbound lanes (including left turn / bus / parking lane)
* The traffic direction of Tyler Street is to be reversed in Stage 2 of the Project ** Quay Street lanes to be reduced and median removed typically to accommodate separated, two way cycleway along northern side prior to main enabling works
3.2
Cyclists and Pedestrians
3.2.1
Pedestrian Infrastructure
In general, existing pedestrian provision in the Project area can be summarised as:
Footpaths are present on both sides of all streets in the Project area.
Footpaths on lower Queen Street, Quay Street, and Customs Street are generally 3.5 metres in width or greater, and up to 10 metres wide on lower Queen Street. Footpaths on Galway Street, Tyler Street and Commerce Street are narrower at around 2.3 metres.
Quay Street, lower Queen Street, and Commerce Street have little veranda/canopy cover meaning they are exposed to the elements during rainy and windy conditions. All other streets in the Project area generally have reasonable veranda/canopy cover.
The topography for all streets within the Project area is flat.
The intersections of lower Queen Street / Customs Street, Queen Street / Quay Street, and Customs Street / Commerce Street provide Barnes’ Dance phases (an exclusive pedestrian phase that allows crossing in all directions).
3.2.2
Pedestrian Demand
Pedestrian surveys were undertaken around the Project area between Tuesday 28 July and Thursday 30 July 2015. The surveys were undertaken during the morning peak (7-9am), inter-peak (12-2pm) and evening peak (4-6pm) periods at:
All three entrances on the western side of the former CPO building;
Pedestrian movements along both sides of lower Queen Street;
Pedestrian movements along both sides of Galway Street, Tyler Street, Commerce Street, Quay Street, and Customs Street; and
Transport Access and Parking Delivery Work Plan
June 2016
22
All crossing movements at the intersection of Quay Street and lower Queen Street.
The survey results show very high levels of pedestrian activity on the western side of the former CPO building and lower Queen Street. This is due to public transport facilities located on lower Queen Street and the BTC. The evening peak is the heaviest peak.
3.2.3
Cycle Infrastructure
Cycle infrastructure present within the Project area is outlined in Table 3.2 (refer also Figure 3.2). Table 3.2:
Cycle Infrastructure on key corridors around the Project
Road
Cycle lanes
Cycle boxes
Other cyclist facilities
Lower Queen Street
None
None
None
Commerce Street
None
None
None
Customs Street
None
None
None
Galway Street
None
None
None
Tyler Street
None
None
None
Quay Street
None
Both Quay Street approaches at the intersections of Quay Street / lower Queen Street, and Quay Street / Commerce Street
Shared path east of lower Queen Street
In terms of future cycleways in the Project area and wider CBD:
The Quay Street cycleway is currently planned to be constructed before the start of the Project and is expected to increase the volume of cyclists passing the Project area. The removal the median traffic lane on Quay Street, which currently accommodates right turning movements, will reduce general traffic capacity on this east-west route. The Quay Street cycleway plans are shown in Appendix L.
The completion of the Nelson Street cycleway and the Quay Street cycleway is expected to improve connectivity between the west of the CBD and Britomart, bringing in more cyclists towards Lower Queen Street and the Project area.
Transport Access and Parking Delivery Work Plan
June 2016
23
Figure 3.2: Cycle Infrastructure in the Auckland CBD (Source: AT)
3.2.4
Cycle Demand
AT undertakes cycling surveys on a regular basis at Tamaki Drive / The Strand, Quay Street, and the Auckland Ferry Terminal as part of the Cycle Monitor Report. Cyclist counts from surveys undertaken in 2013 are shown in Table 3.3.
Transport Access and Parking Delivery Work Plan
June 2016
24 Table 3.3:
Cyclist Daily Counts (Source: AT Cycle Monitor)
Location
Average Daily Cycle Counts (2013)
Quay Street / Hobson Street
511
Quay Street / lower Queen Street
825
Quay Street / Britomart Place
182
Tamaki Drive / The Strand
1163
Auckland Ferry Terminal
516
The results show that cyclist numbers around the Project area are currently low to moderate. The Quay Street Cycleway Preliminary Design Report4 states that cyclist numbers recorded at the intersection of Tamaki Drive / The Strand, and at the Auckland Ferry Terminal have declined slightly since 2007. Cyclist numbers are expected to increase in the future as the Quay Street, Nelson Street, and Beach Road cycleway projects are completed, increasing cyclist connectivity around the city centre.
3.3
Public Transport
The BTC and the surrounding streets are a major transport hub within Auckland. In general, the following bus routes are currently served locally as shown in Figure 3.3.
Western routes on Quay Street and lower Queen Street;
Eastern and Central routes on Galway and Tyler Streets;
Eastern and Airport routes on Commerce Street; and
Northern Express on lower Queen Street.
The Northern Express services use the Northern Busway, which together with the rail network form the Rapid Transport Network, which is strategically the highest level of PT infrastructure and service. Access to these services will be moved to the western side of lower Albert Street before the start of the Project.
4
“City Centre Cycle Routes, Quay Street Cycleway”, prepared by Flow Transportation Specialists, December 2014
Transport Access and Parking Delivery Work Plan
June 2016
25
Figure 3.3: Existing bus services around Project area (aerial image source: Auckland Council GIS)
Ferry services are located north west of BTC while train services are located within the BTC. These public transport services are a major contributor to the high levels of pedestrian activity in the area.
3.4
Kerbside Management and Parking
The existing kerbside management types in the Project area are shown in Figure 3.4.
Transport Access and Parking Delivery Work Plan
June 2016
26
Figure 3.4: Kerbside management around Project area (Map source: Auckland Council GIS)
An off-street drop-off and parking area is located in Station Square to the rear of the BTC and is accessed via Commerce Street (refer Figure 3.5). A total of 12 parking spaces are provided in this space, consisting of:
Nine P5 spaces for pick up and drop off only;
Two disabled parking spaces with 30 minute time limits; and
One space for Britomart staff and operations.
A parking survey undertaken by Flow Transportation Specialists in April 2015 found that the use of the carparks in this area was moderate in the morning (7:00 am to 9:00 am) and interpeak (12:00 pm to 2:00 pm) periods, with maximum usage of five and eight spaces occupied respectively. During the evening peak the maximum usage noted was 11 parking spaces. Further detail of the parking usage is included in the ITA prepared for the alteration to BTC designation.
Transport Access and Parking Delivery Work Plan
June 2016
27
Figure 3.5: Existing kerbside management around Project area – note inverted orientation compared to other plans in this DWP (Source: Britomart NoR ITA)
3.5
Freight
Customs Street is the closest over-dimension (OD) route to the Project area. Albert Street is currently a nominated route, however will cease to be an OD route with implementation of the CRL cut and cover works along Albert Street. No OD or OW routes are directly affected by the Project. Refer to Figure 3.6.
Figure 3.6: CBD OD routes (source: NZTA OD map 27)
Transport Access and Parking Delivery Work Plan
June 2016
28
3.6
Concurrent Projects and Developments
3.6.1
AT and Other Public Works
Various public projects are to be constructed in the CBD during construction of the Project. Table 3.4 below summarises known upcoming projects within the CBD. Whilst the majority of these projects will not impact on the Project area directly, they will alter traffic patterns around the CBD and the Project area. It should be noted that this list of projects is not exclusive and there may be additional minor (and possibly major) public works implemented over the life of the Project. Table 3.4:
Relevant concurrent sector public projects
Project
Status
Programme
Impact to Enabling Works
CRL Enabling Works – cut and cover tunnel (Contract 2)
ECI phase construction methodology development
Construction start – May 2016 Construction end – November 2018
Reduction of Customs/Albert signals and short side road closures (including potentially Swanson Street east).
PT Phase 1
In service
Complete
Prioritisation of public transport for TDM. Reduction of general traffic capacity. On various streets but notably Wellesley and Victoria.
PT Phase 2
Design underway
Operational 17 April 2016
Prioritisation of public transport for TDM, notably bus lanes on Queen Street with reduction of general traffic capacity (especially on Fanshawe Street).
Nelson Street Cycleway Phase 1
In service
Complete
Reduction of general vehicle capacity during construction and when operational on Nelson. Promotion of cycling for TDM.
Nelson Street Cycleway Phase 2
Design to be finalised
Construction start – August 2015. Operational by – May 2016
Reduction of general vehicle capacity during construction and when operational. Promotion of cycling for TDM.
Quay Street Cycleway (Stage 1)
Design to be finalised
Construction start – February 2016 Operational by start of May 2016
Reduction of general vehicle capacity on Quay Street (primary diversion route during Customs Street works) during construction and when operational.
Watercare Halsey Street Rising Main
Under construction, methodology of latter stages TBC
Construction – Underway Operational by – April 2016
Reduction of general vehicle capacity during construction due to launch pit located in the Fanshawe Street kerbside lane.
Ports of Auckland Stormwater Outfall work
Design to be finalised
TBC
Negligible traffic network impact expected with maintenance of traffic lanes.
Beach Road cycleway
In service
Complete
Off-road so negligible traffic network impact expected.
Federal Street cycleway
Design to be finalised
TBC
Negligible traffic network impact expected. Promotion of cycling for TDM in support of project.
Transport Access and Parking Delivery Work Plan
June 2016
29 Figure 3.7 shows the location of these projects (but not all public works projects in the wider CBD such as the Nelson Street cycleway bridge works over CMJ). The Quay Street Cycleway project is located immediately to the north of the Project works, and will reduce capacity on Quay Street. This facility will be operational before the Project. In summary, the projects will cumulatively increase traffic congestion as a result of reduced lane and intersection capacity (temporary reduction during construction and permanent reduction when operational). The impacts on traffic flow within the CBD as a result of these projects have been included in the SATURN model prepared to assess the overall impact to traffic congestion and travel time during the period of the Project. Additional information on the programme and associated traffic for these and major private developments is described in the modelling report attached as Appendix G.
Figure 3.7: Relevant concurrent public projects (Map source: Auckland Council GIS)
3.6.2
Private developments
Table 3.5 describes known private developments within the CBD with the potential for notable temporary traffic management interaction. These developments are shown in Figure 3.8.
Transport Access and Parking Delivery Work Plan
June 2016
30 Table 3.5:
Major concurrent private sector projects (confirmed and proposed)
Development
Status
Programme
Permitted haul route
1 Mills Lane Office Tower and Hotel (the former Herald site at 4656 and 58 Albert Street)
Resource consents granted
TBC
TBC
35 Albert Street (Park Residences)
Under construction
Completion unknown
Albert-Swanson-Hobson. This development is primarily accessing the site from the west and this will be increased with an upcoming proposal to widen the loading zone on Swanson Street West and make the section between Albert Federal streets WBD one-way only.
NDG Auckland Centre
Project is consented. Construction planning underway. Contractor not engaged yet.
Construction planned to start in August 2016 with perimeter piling including Victoria frontage Hotel opening mid-2019
TBC, but currently expected to be to and from Victoria Street
51-53 Albert Street
Consented
June 2016, TBC
TBC, but developer seeking construction access from rear of site to avoid use of Albert Street during cut and cover works.
NZ International Convention Centre ( Sky City)
Consented
Construction starts – November 2015. Operational by – April 2019
TBC, but expected to be Hobson and Nelson Streets with some use of Wellesley Street and others for local circulation
75 Victoria Street residences
Under construction
Completion unknown
TBC, but likely to be: Nelson Street / Hobson-Victoria-Albert-WellesleyNelson / Hobson
Downtown Shopping Centre redevelopment
Under construction
May 2016 to September 2018
TBC, but likely to be Quay-lower Queen-site-lower Albert-Quay
The modelling report attached as Appendix G to this DWP provides further detail of the assumed programme, traffic generation and haul routes for these projects based on information available at the time of writing this DWP. It should be noted that most of these projects are being developed in parallel to the Project and therefore a conservative approach to assessment and interaction is needed.
Transport Access and Parking Delivery Work Plan
June 2016
31
Figure 3.8: Relevant concurrent private projects and known haul routes (Map Source: Auckland Council GIS)
Transport Access and Parking Delivery Work Plan
June 2016
32
4
Proposed Traffic Management
4.1
Temporary Traffic Management Parameters and Objective
4.1.1
Objective
The objective of this Transport Access and Parking DWP is to so far as is reasonably practicable, avoid, remedy or mitigate the adverse effects of construction on transport, pedestrian safety and amenity, parking and property access. This is to be achieved by: a b c d
Managing the road transport network for the duration of construction by adopting the best practicable option to manage congestion. Managing pedestrian safety and amenity. Maintaining pedestrian access to private property at all times. Providing on-going vehicle access to private property to the greatest extent possible.
In practical terms, this means providing for the connectivity and access described in the ITA’s prepared to support the CRL NoR and alteration to BTC designation NoR processes so far as reasonably practicable, in particular maintaining access to properties on Tyler and Galway Streets, and minimising impact on the surrounding road network. Additional measures to mitigate congestion (but which would alter connectivity and community expectations as envisaged by the designations) are identified for further investigation if traffic monitoring or stakeholder feedback suggests they are warranted. The likely value of some of these additional measures has been assessed through early modelling. These and other mitigation measures (such as developing an additional left turn lane on Commerce Street) are being considered by AT’s bus and road network and road operations teams with the cooperation of NZTA for faster deployment if needed (refer to section 7 of this DWP). It is also recognised that while the effects of this Project will be relatively modest, the likely cumulative effects of the Project, along with other public and private projects proposed within the CBD will be significantly greater than previously noted. This uncertainty in the overall traffic condition and levels of congestion will persist as the timing and method of public and private developments continue to evolve. If the traffic impacts are less palatable than anticipated, then changes to traffic management measures in the wider network may be required but are not anticipated within the Britomart Precinct. The modal priorities adopted are: 1 2 3 4
4.1.2
Active transport; Public transport; Service vehicles / taxis / freight; and General traffic (including construction traffic).
Notable parameters
The following notable parameters have been included in the development of management concepts, layouts and modelling associated with this DWP:
Active and public transport will be prioritised where possible to encourage mode shift and reduce congestion.
Pedestrian and cycle access to property will be maintained at all times.
The sites will not typically be attended by Manual Traffic Controller (MTC) or Site Traffic Management Supervisor (STMS) staff outside normal daytime working hours.
Oversize or specialist plant, such as the piling and diaphragm wall rigs, will be walked into the site as required from semi-trailer vehicles in lower Queen or Commerce streets.
Transport Access and Parking Delivery Work Plan
June 2016
33
The majority of the Project activity apart from works in lower Queen Street will be contained inside the CPO building.
The majority of works will be undertaken between 7am-7pm.
The Project area will be accessed by trucks up to 11.5m in length only during the morning and afternoon peak traffic periods5. Larger vehicles, such as truck and trailer or semi-trailers, may be used outside of these periods for discrete events; but typically only for delivery of large plant, stopping on lower Queen Street, Commerce Street, Customs Street or Quay Street, and after normal working hours.
Wheel washes will be executed manually due to the lack of space available for a drive through type wheel wash (refer to the Project Erosion and Sediment Control Plan at Appendix M to the CEMP for further detail).
The design vehicles required to provide suitable access to the worksite and adjacent properties are shown in Figure 4.1. These include access for resident car, rubbish and delivery vehicles; construction trucks of typically 11.5m rigid but up to semi-trailer size; and 13.5m buses to and from Commerce Street for scheduled buses which may include double-deckers in the future.
Fire Service access will be maintained at all times to the CPO worksite and adjacent buildings. The appropriate design vehicle is the larger type 5 or 6 aerial tender, which is equivalent to a 12.6m tour coach for swept path analysis purposes.
5
Defined in the BTC conditions as being 0730-0930hrs and 1500-1800hrs respectively
Transport Access and Parking Delivery Work Plan
June 2016
34
Figure 4.1: Design vehicles and relevant movements (Map source: Auckland Council GIS)
4.1.3
Applied Standards
This DWP has been developed to meet the requirements of the CRL and BTC designation Conditions, and in accordance with ATCoP and CoPTTM. The individual TMP controls and drawings that will be developed for the Project will also be bound by these standards and this DWP. A number of Engineering Exception Decisions (EED) will be required under CoPTTM for a coherent and suitable TMP regime to be provided in the CBD environment, such as: due to the influence of block length on taper length and signage spacing, road / movement closures and potentially overlapping TMPs for different projects; reduced detour signage, and barrier systems6. These EED’s are consistent with those typically and previously applied successfully on similar projects in Auckland 6
Required to prevent errant vehicle access to the cut and cover tunnel excavation
Transport Access and Parking Delivery Work Plan
June 2016
35 and the CBD. This will be particularly important to ease project TMP issues and ensure that the travelling public is not confused by overlapping or closely spaced TMP signage.
4.2
Utilities
Vector installed a new joint trench for a 22 KW line upgrade along lower Queen Street in December 2015. These works have been completed.
4.3
Traffic Sequence Summary
Traffic sequencing has been developed from the Project construction methodology and is primarily driven by the lower Queen Street works (Stage 3). Stage 3 is the critical traffic sequencing stage and is important in terms of maintaining access for businesses with entrances on Galway Street and Tyler Street, as well as ensuring pedestrians and cyclists are prioritised (refer to Table 4.1 and Figures 4.2 to Figure 4.5). For temporary partial closures of Galway, Tyler and Commerce Streets planned to occur in Stage 1, at least 48 hours prior notice will be given to surrounding businesses. Table 4.1:
Traffic management features of each construction stage
Stage
Temporary Traffic Management Features
Stage 1 – Temporary western station access and streetscape
Temporary footpath or partial closures (while retaining car access past) on Galway Street to allow: -
Footpath widening and strengthening
-
Removal of redundant signs, bus shelters, canopies, and street furniture
-
Construction of new zebra crossing and speed table
Temporary footpath or partial closures (while retaining car access past) on Tyler Street to allow: -
Footpath widening and strengthening
-
Construction of truck driveway vehicle crossing or mountable kerb to the CPO truck access
-
Installation of footpath protection slab
-
New zebra crossings, and loading zone
-
Removal of redundant signs, bus shelters, canopies, and street furniture
Short term partial closures of Galway Street and Tyler Street east of Commerce Street to: -
Remove redundant signage and update road markings
Temporary partial closure of Commerce Street (utilising the bus stop areas while maintaining car passage) to: -
Remove a redundant bus stop in the northbound direction
-
Installing pre-formed SCATS loops and road-markings
-
Install new bus stops and undertake kerb cutbacks
-
Removal of pram crossings and redundant street furniture
-
Installation of new signalised crossing opposite the temporary station
Regular partial carriageway and footpath closures (while maintaining car passage) of Tyler and Galway Streets for Project access to contractor areas at rear of CPO (e.g. material deliveries and spoil removal)
Transport Access and Parking Delivery Work Plan
June 2016
36 Stage
Temporary Traffic Management Features Permanent closure of lower Queen Street between Tyler Street and Galway Street to motorised traffic while retaining foot and cycle movements at all times
Stage 2 – CPO Under pinning & tunnel excavation
Infrequent daily footpath closures of Galway Street for around 15-30 minutes to allow unloading of materials and delivery of goods for businesses Partial carriageway and footpath closures (while allowing car passage) of Tyler and Galway Streets for Project access to contractor areas at rear of CPO (e.g. material deliveries and spoil removal) Use of construction loading zones in lower Queen Street for spoil removal and materials deliveries
Stage 3 – tunnel construction
Infrequent and temporary daily footpath closures of Galway Street for around 15-30 minutes to allow unloading of materials and delivery of goods for businesses Partial carriageway and footpath closures (while allowing car passage) of Tyler and Galway Streets for Project access to contractor areas at rear of CPO (e.g. material deliveries and spoil removal) Use of construction loading zones in lower Queen Street for spoil removal and materials deliveries
Stage 4 – Reinstatement & station fit out
Partial carriageway and footpath closures of Tyler and Galway Streets for Project access to contractor areas at rear of CPO (e.g. material deliveries and spoil removal) Use of construction loading zones in lower Queen Street for spoil removal and materials deliveries Infrequent daily footpath closures of Galway Street for around 15-30 minutes to allow unloading of materials and delivery of goods for businesses Partial and at times full width closures of Galway Street and Tyler Street for streetscape reinstatement
Transport Access and Parking Delivery Work Plan
June 2016
37
4.4
Traffic sequencing diagrams
Traffic sequencing diagrams are shown in Figure 4.2 to Figure 4.5.
Figure 4.2: Traffic sequencing and closure requirements for Stage 1
Transport Access and Parking Delivery Work Plan
June 2016
38
Figure 4.3: Traffic sequencing and closure requirements for Stage 2 June 2016
39
Figure 4.4: Traffic sequencing and closure requirements for Stage 3
Transport Access and Parking Delivery Work Plan
June 2016
40
Figure 4.5: Traffic sequencing and closure requirements for Stage 4 June 2016
41
4.5
Vehicle tracking
Tracking curve sketches have been completed to confirm suitable swept path provision is made for the required design vehicles as part of the streetscape amendments undertaken by AT prior to the start of the Project. Critical tracking diagrams for the streetscape works and construction loading zone access (including reversing manoeuvres) are included in Appendix F. These curves show that adjustments to centreline locations and footpath widths will be required to accommodate fire appliance entries into Galway Street and Tyler Street. The curves also show that a left turn out of Commerce Street into Customs Street West can be undertaken safely at the same time as a right turn into Commerce Street.
4.6
Traffic Signals
4.6.1
General
The phasing for the amended signalised intersections (as a result of redundant movements during the Project period) are shown in the modelling report attached as Appendix G. The phase times shown in this report will provide a basis for signal timing, coordination and optimisation (to minimise congestion and prioritise the movement of pedestrians and public transport as appropriate in balance with the overall outcome sought of minimising congestion on the wider network and maintaining pedestrian and road safety) by ATOC.
4.6.2
Queen Street / Customs Street / Lower Queen Street
Physical and phase changes will not be required at the intersection of Queen Street / Customs Street as the existing carriageway will be utilised and both lower Queen Street approaches run in separate phases, and the current approach lanes will be used by Galway Street traffic. The intersection will however need to be re-optimised by ATOC as traffic patterns will be altered due to the closure of lower Queen Street entry to general traffic and buses. The lower Queen Street departure lane from the intersection with Customs Street will be closed to general traffic, as presently exists. This lane may be used by construction traffic associated with the Downtown (Commercial Bay) redevelopment but not this Project. Signage text will be confirmed with AT road operations but will be of the type ‘road closed (or appropriate turn ban signs), authorised vehicles only’.
4.6.3
Commerce Street / Quay Street
No physical changes are initially proposed to the signals at the intersection of Quay Street and Commerce Street as a result of the Project (noting that they will be amended for the Quay Street cycleway project). Additional measures may be implemented for pedestrian safety and prioritisation if identified by on-going safety and performance monitoring.
4.6.4
New Commerce midblock pedestrian signals
A new signalised pedestrian crossing will be installed on Commerce Street, directly outside the main entrance to the temporary station, as part of the streetscape and bus change works. This pedestrian crossing is expected to be heavily used and a short cycle time will be required to prevent waiting pedestrians from blocking the interim access to Britomart. The detailed design of these new signals will be undertaken prior to the start of works with the approval of AT and ATOC.
4.6.5
Lower Queen Street / Quay Street
No physical changes are required to the lower Queen / Quay signals as a result of this Project, as it will use the lanes currently provided or amended by the Quay Street cycleway project. Changes to the signal control software to remove the exit phase from lower Queen Street and the shrouding of Transport Access and Parking Delivery Work Plan
June 2016
42 NBD signals will be required once lower Queen Street is closed to through traffic and Tyler Street is reversed in Stage 2. The northbound lanes will be blocked with traffic barriers unless required by the Downtown (Commercial Bay) contractor. This phase reduction (i.e. removing the phase for the exit from lower Queen Street onto Quay Street) will allow reallocation of green time to the more critical east-west movement. The amendment of signal software and phasing will be undertaken in conjunction with ATOC and the Downtown (Commercial Bay) redevelopment contractor prior to the start of work on Stage 2. Due to the reversal of Tyler Street prior to the commencement of the Project, general traffic wanting to access Tyler Street will need to use Quay Street and lower Queen Street (between Quay and Tyler Streets).
4.6.6
Commerce Street / Customs Street
As part of the assessment of traffic effects (refer to Section 5.3 of this DWP), Sidra modelling has been undertaken for the intersection of Commerce Street and Customs Street. The modelling found that an additional lane on the Commerce Street north approach is required to add capacity, and prevent queues overflowing and impeding efficient operation of the bus stops on Commerce Street. As with all signals in the Project area and wider CBD network, the intersection phasing and times at this intersection will be optimised to maximise pedestrian safety and movement in balance with the overall outcome sought of minimising network congestion and delay. The additional lane will require a new loop. This permanent traffic loop will be ‘cut in’, requiring saw cutting and closure of Commerce Street to traffic entering from Customs Street as a short duration (less than one day) discrete weekend event. Southbound buses on Commerce Street will still be able to use the intersection and service maintained by working west of the existing traffic lane. A night time closure of the intersection to complete these works is unlikely to be appropriate due to the noise of the saw cutting and its proximity to sensitive noise receivers, however, noise mitigation may be possible and this is addressed under the provisions of the Construction Noise and Vibration DWP for the Project.
4.7
Lines and Signs
4.7.1
Line Markings and Delineation
The long term nature of the Project construction works and traffic stages will require the use of painted line markings for delineation where possible. Stick on tape type line markings will be used for footpath pedestrian guidance lines between the new Britomart station entry, the Northern Busway stops on lower Albert Street and the Ferry building, as well as on Fort Street. The use of this type of marking will allow it to be removed at the completion of works with minimum damage to existing footpath surfaces. Keep clear markings will be installed across the westbound lanes of Quay Street at the entry to the public carpark located at 88 Quay Street (see also note on Figure 4.2).
4.7.2
Traffic Management Signs
The temporary traffic management signage required will be mounted on existing infrastructure (e.g. existing sign poles or streetlight columns) where possible, or ground mounted on semi-permanent mounts to reduce maintenance requirements and costs over the extended project duration. Exact sign placement will depend to some degree on local service location in relation to post foundations.
4.8
Pavements
The footpath on Tyler Street between the CPO access and the road carriageway will be reinforced through the use of 100mm concrete overlays on top of plastic sheeting to protect the existing footpath surface. The edges of this overlay will be ramped to meet equitable access requirements and gradients for pedestrians. Transport Access and Parking Delivery Work Plan
June 2016
43 A section of the kerbline along the southern side of Tyler Street will be changed to mountable kerb to aid in truck movements to and from the northern CPO site access and support area. This approach is preferred because: 
A temporary ramp in the gutter line from the road level over the existing kerb and then higher to atop the pavement protection overlay would intrude into the after-hours loading zone, making its use difficult (i.e. delivery trucks would be tilted into the adjacent lane); and

Construction of an angled formal industrial vehicle crossing would be potentially disruptive to underground utilities (requiring their lowering possibly to avoid damage) and create a possible trip hazard for pedestrians moving to and from the northern temporary station entry.
Details of the construction of the footpath widening and other streetscape changes are given in Appendix C.
4.9
Barriers and Hoardings
4.9.1
Barriers
The lower Queen Street trench will be surrounded by a concrete barrier system to minimise the likelihood of errant vehicles entering the excavation (notably from the northern side where general traffic may approach the site from the direction of Quay Street). Truck and other movement within the site will be protected within the worksite by an edge restraint system atop the barriers (required to meet the requirements of working at heights as well). Concrete barriers will not be used (cones and barricades will be instead) for the streetscape or any service alteration works due to the relatively short duration and transient nature of those works, along with the need to withdraw the working area to ensure constant thoroughfare along Tyler Street and Galway Street (refer to section 4.3 of this DWP).
4.9.2
Hoardings
Work sites will be surrounded by hoardings to an overall height of at least 2 m (above the concrete barriers where relevant). Higher temporary hoardings will be provided between piling works and pedestrian areas to protect passing pedestrians from any (unexpected) debris falling from piling machines during tunnel works. Hoardings used during Stage 1 of the Project, which will be located along the Commerce, Galway and Tyler Street frontages) will be designed in a way that takes suitable account of amenity and traffic issues. In subsequent Project stages, longer-term hoardings (which are located back from the traffic lanes and therefore do not pose a distraction or side friction effect to drivers) may include Project signage and information boards and signage promoting local businesses with potentially reduced passing trade opportunities. Hoarding signage will be developed by the DSBJV and AT Communications team, in conjunction with the requirements of the Urban Design DWP and Social Impact and Business Disruption DWP. AT will engage with Cooper and Company on the design of any signage required in relation to the Britomart Precinct, as detailed in Section 6.3.2.3 of the Social Impact and Business Disruption DWP.
4.10
Hours of Work
Typical Project construction hours will be 7:00 am to 7:00 pm Monday to Saturday. As noted in Section 4.1.2 of this DWP, the BTC designation conditions prohibit trucks larger than an 11.5m rigid truck using Tyler or Galway streets during the morning and afternoon peak traffic periods. On occasion, larger vehicles (such as semi-trailer low loaders) will be required to service the Project area outside normal business hours for the delivery of large excavators, piling rig and other machinery. This restriction will be included in the individual TMPs, enforced by the contractor and all
Transport Access and Parking Delivery Work Plan
June 2016
44 Project staff, delivery drivers and sub-contractors advised accordingly during site induction, subcontract agreements and commissioning. A number of discrete events will be needed for the installation of traffic management measures, the delivery of large plant to the site and minor alterations to signals at the intersection of Commerce / Customs Streets. These activities will be undertaken as weekend works when motorised and pedestrian traffic is significantly reduced. No night works are currently envisaged. Each site access area will be attended by an MTC during operational hours to manage vehicle access, with a Project wide STMS available in accordance with normal practice.
4.11
Site Access
4.11.1
General
Access to the Project area will be undertaken with the aid of a MTC at each site access with STMS assistance. Machine and truck access directly into the CPO will be via Tyler Street, with some spoil loaded directly onto trucks and some spoil transported with a conveyor belt to the lower Queen Street loading zones where MTCs will divert vehicles around reversing trucks. The majority of spoil will be loaded from lower Queen Street on to trucks and transported off site. Galway Street will predominantly be used for material deliveries. Pedestrians will be diverted away from conflict areas on Tyler Street and Galway Street during periods of truck movement. Project related construction trucks and heavy traffic (including buses) will be banned from using Tyler Street and Galway Street east of Commerce Street (refer to Figure 4.6) . While the Project cannot ban general (non-Project related) truck use or private bus services (such as for local deliveries, private tourism bus companies or other construction projects) through general signage, this restriction will be enforced by the appointed Project contractor monitoring, driver instruction, staff induction (including for sub-contractors), sub-contractor agreements and conditions of TMP and resulting Work Access Permits. AT has notified NZBUS, AT bus subcontractors, of the heavy traffic ban via flyers providing updates on changes to traffic management (refer to Figure 4.6). This restriction is expected to be self-enforcing in large part due to the narrow nature of the streets beyond Commerce Street. The allowed haul routes for each site access confirm this and are described in Section 4.13 of this DWP.
Transport Access and Parking Delivery Work Plan
June 2016
45
Figure 4.6: Notice provided to NZBUS, AT bus subcontractors, notifying bus drivers of heavy traffic ban on Galway and Tyler streets east of Commerce Street and Gore Street.
4.11.2
Residential Zoned Land and Educational Facilities
In addition to the local street network of Tyler, Galway and Commerce streets surrounding the Project area, Project construction traffic will access the site using the regional arterial network and other roads nominated in CRL designation Condition 25.3. Specifically, CRL designation Condition 25.3(d) requires consideration of additional controls to manage potential adverse effects from construction traffic where it passes through residentially zoned land and past education facilities. The haul routes nominated in this DWP (refer to Section 4.13) do not include roads through residentially zoned areas (as distinct from residentially occupied) as defined in the Auckland Council District Plan Transport Access and Parking Delivery Work Plan
June 2016
46 (ACDP)(Central Area Section) (refer to Figure 4.6). Accordingly, additional controls on construction traffic access are not required in this regard. Regular consultation and fore-warning of changes to traffic controls will be provided to all stakeholders in the Project area (not just limited to residential and educational facilities) and the wider community through the normal Project communication measures (refer to the Project Communication and Consultation Plan for further detail on these measures). The nearest educational facility to the Project is the New Zealand Maritime School located at 132-138 Quay Street, which is located on part of the regional arterial network. The users of this school are relatively small in number and indistinguishable from other users of local offices/properties. Accordingly, additional controls are not required in this regard to manage construction traffic in the vicinity of this facility.
Transport Access and Parking Delivery Work Plan
June 2016
47
Figure 4.7: CBD Residential Zoned Land (ACDP (Central Area Section) Planning Map Part 14.1)
Transport Access and Parking Delivery Work Plan
June 2016
48
4.11.3
Galway Street Site Access
As shown in Figure 4.7, material deliveries to the Galway Street construction/storage area (CSA A) will occur from the current footpath area next to the road corridor. Cones will be placed next to the kerb to separate the unloading operation from drivers and pedestrians. Vehicle movements will not be impeded although there will be some local constriction of pedestrian movements immediately adjacent to the material delivery area (the southern footpath and crossings to the east and at the loading zone will however be available to users at this time) and traffic flows are noted as very low, allowing similar informal shared zone operation of the street as at present. While trucks are accessing CSA A, the adjacent mid-block zebra crossing will be closed by the attending MTC. During this time, pedestrians will be able to use the secondary crossing located on Galway Street approximately 40 m to the west. It is noted that pedestrians will be encouraged to approach the temporary station entry from the direction of Commerce Street or use the western entry to the station at Takutai Square, and thus reduce demand on this movement and control. Vehicles delivering smaller items will park on the footpath adjacent to the CPO and unload directly into the storage area. Vehicles delivering larger items will need to park on part of the carriageway and crane the materials into the storage area. To retain access to Galway Street when larger items are being delivered, DSBJV and AT will co-ordinate delivery times to ensure sufficient space is provided for vehicles to safely pass delivery vehicles. Temporary full width road closures of Galway Street running between the eastern façade of the CPO and Commerce Street will be limited to no more than 10 closures per annum as required by BTC designation condition 24.5.
4.11.4
Tyler Street Site Access
A number of temporary footpath closures on Tyler Street will be necessary for the transport of construction machinery into the CPO. To reduce disruption to pedestrians, these closures will generally take place between 5:00 am and 7:00 am where permitted by the designation conditions. During these footpath closures, pedestrian and vehicle access to private properties on Tyler Street will be maintained as shown in Figure 4.7. Access into the CPO will be via reverse manoeuvring. Access to the western station entry will be restricted at times while the footpaths adjacent to the CPO are closed for construction truck access to the CPO and associated contractor areas. During this time pedestrian and cyclist access to the Britomart station will be maintained through diversion of pedestrians to temporary crossing points on Tyler and Galway Streets and use of alternate entries. Vehicle access will be maintained as driveway entrances into the CPO will only take place during gaps in traffic. The volume of traffic on Tyler Street is very low so there will be large gaps and driveway entrances can take place without causing any delay. One MTC will be assigned to find gaps in traffic to avoid closure of the street, a second MTC will guide the truck driver, and a third MTC will close the footpath with expandable barriers. Temporary full width road closures of Tyler Street running between the eastern façade of the CPO and Commerce Street will be limited to no more than 10 closures per annum as required by BTC designation condition 24.5.
4.11.5
Lower Queen Street Site Access
In Stage 3, there will be two accesses into the trench site – the main entry will be via a reversing movement from lower Queen Street to the south of the trench, while the auxiliary entrance will involve a direct entry from the north of the trench, and reversing back out onto lower Queen Street. Entries and exits into the work site will again be controlled by using MTC. Vehicle access on Galway
Transport Access and Parking Delivery Work Plan
June 2016
49 Street and lower Queen Street will not be impeded as there is sufficient space for a truck to reverse into the site without blocking traffic.
4.11.6
Access during Canopy Removals
Temporary partial closures of Galway Street and Tyler Street are required to provide space for a crane to park on the shoulder. Footpaths under the canopies will need to be closed, with pedestrians diverted to the other side of the road for safety as there is a potential fall zone under the canopy roofs. The canopies will be removed in stages to retain pedestrian access into the Britomart station. When the Tyler Street canopies are removed, no works will be undertaken on Galway Street and vice versa. Vehicle access to Galway Street and Tyler Street will be maintained, although the carriageway will be narrowed to provide a safety zone adjacent to the canopy removals.
Transport Access and Parking Delivery Work Plan
June 2016
50
Figure 4.8: Project area and Adjacent Property Access Transport Access and Parking Delivery Work Plan
June 2016
51
4.12
Property Access
4.12.1
General
Pedestrian and cycle access to buildings adjacent to the Project area will be maintained at all times. The majority of streetscape elements will be built without the need for closures. The following streetscape elements will require the works across the road to be done in two halves so that traffic flow can be maintained or as weekend closures:
Raised speed table and zebra crossing on Galway Street at Commerce Street junction;
Mid-block zebra crossing on Galway Street;
Mid-block signalised pedestrian crossing on Commerce Street; and
Zebra crossing on Tyler Street at Commerce Street junction.
These streetscape elements will be completed with short term closures outside business hours to minimise disruption to neighbouring businesses. The closures will only be required between the eastern façade of the CPO and Commerce Street for both streets. 72 hours’ notice will be provided to the affected parties when these planned closures exceed three hours in length, and vehicles will be detoured around the worksite via Customs Street or Quay Street. For closures of less than three hours, at least 48 hours prior notice will be given. The ducting for the Commerce Street crossing will be installed as a discrete weekend event with single lane, alternating flow arrangement. The footpath extensions on Galway Street can be completed without full carriageway closures, while works on Commerce Street may require partial or one way closures. This can be achieved by reducing the speed limit to 30kph and applying minimum lane widths of 2.75m plus 0.3 m shyline against barriers consistent with CoPTTM (this speed is self-enforcing due to the tight geometry). Pedestrian safety and movements will be maintained by diverting pedestrians to the other side of the road and use of the existing station entry on lower Queen Street. On-street parking and loading in adjacent to the footpath widening will be temporarily prevented with the remaining long term alternate sites installed prior to the footpath widening.
4.12.2
Alternative Parking Arrangements
Where vehicular parking access to properties cannot be provided during discrete events, alternative parking for the residents, staff and clients of adjacent buildings will be provided at the following nearby locations if required during the closures of Tyler and Galway streets:
Downtown Car Park (approximately 500 metres or 6 minutes’ walk); and
Britomart Car Park (approximately 350 metres or 4 minutes’ walk).
The Project will lease a number of car parks at either of these locations, and an assigned car park will be offered to the affected business at one of these locations for use during closures exceeding three hours. TT will also allow the use of some of the bus stop located outside 2 Queen Street and 152 Quay Street for short-term parking and as a loading zone. This will be returned to PT use at the end of the Project.
4.12.3
Alternative Transport Arrangements
Residents or tenants of buildings within or adjacent to the Project area will be informed well in advance of events, such as temporary road closures, in order to allow suitable travel arrangements to be made. Despite, this, should residents/tenants have urgent travel requirements and be unexpectedly ‘blocked in’ as the result of a temporary closure, taxi vouchers will be provided to
Transport Access and Parking Delivery Work Plan
June 2016
52 these residents by the Project team through the contractor’s nominated Traffic Complaints Manager (refer to Section 8.2 of this DWP for details) or the Site Manager. It is a clear expectation of the Project team that residents/tenants will be provided with greater notice than the 48 or 72 hour periods (outlined in the designation conditions) of these planned, discrete events in order to allow for alternative arrangements to be made beforehand. Rental cars were considered, however the closest rental facilities are located on Beach Road, which is approximately 10 minutes’ walk away.
4.12.4
21 Queen Street service access
Although not directly impacted by this Project, it is noted that CRL designation Condition (27.2(c)(iv)) requires the provision of alternative parking for Zurich House (21 Queen Street) when the building’s current vehicle access off lower Albert Street is closed as part of the wider CRL enabling works (the Albert Street cut and cover works and the Downtown Shopping Centre (Commercial Bay) development). The existing on-street loading zones on each side of Queen Street immediately north of Customs Street and on the northern side of Customs Street immediately east of lower Queen Street will be available for the use of 21 Queen Street service vehicles. An on-street loading zone is not possible on lower Albert Street due to the construction compound and support areas for the Albert Street cut and cover tunnel and Downtown Shopping Centre redevelopment requiring the entire road frontage for safe operation and set down. Customs Street kerbside space is occupied by the Albert Street tunnel compound and Downtown Shopping Centre redevelopment loading area on the northern side of the road; and elsewhere in the adjoining blocks for bus stops. The kerbside space on lower Queen Street between Galway Street (and the tunnel works) and Customs Street may be required for site access for the Downtown Shopping Centre redevelopment and is also to be the site of activation measures by Auckland Council to ensure its ongoing vitality during the construction period and encourage foot traffic to the local area. It is noted that it is not possible to dedicate an on-street facility (e.g. loading zone or parking) to a private party under AT policy.
4.13
Construction Traffic Routes
Access is required to the Project area from the motorway network and wherever possible by the arterial network with high amenity areas avoided as far as practical. Furthermore, the travelled distance on the CBD road network has sought to be minimised. As shown in Figure 4.13, the Project construction access routes have been set to minimise coinciding with those to be used for the Downtown Shopping Centre redevelopment or Albert Street construction traffic, and to avoid large associated concentrations of traffic where possible. Secondary routes have been identified to allow for alternative paths in the event of a traffic incident and to enable AT to manage congestion on a network basis. Figure 4.9 to Figure 4.12 outline the site access routes for each construction stage.
Transport Access and Parking Delivery Work Plan
53
Figure 4.9: Stage 1 - Access into Project area (Map source: Auckland Council GIS)
Transport Access and Parking Delivery Work Plan
June 2016
54
Figure 4.10: Stage 2 - Access into Project area (Map source: Auckland Council GIS)
Figure 4.11: Stage 3 - Access into Project area (Map source: Auckland Council GIS)
Transport Access and Parking Delivery Work Plan
55
Figure 4.12: Stage 4 - Access into Project area (Map source: Auckland Council GIS)
Transport Access and Parking Delivery Work Plan
June 2016
56
Figure 4.13: Primary and secondary construction traffic routes to and from the motorway system using the arterial network (Map source: Open Street Map)
4.14
Sediment Management
Manual vehicle cleaning will occur on the hardstand areas within the site before the departure of each truck from the Project area. All water and sediment from the site will be managed in accordance with the provisions of the Project Erosion and Sediment Control Plan. Road sweeping will be undertaken as a discrete activity, where necessary, and will require a rolling closure. Where possible this activity will be undertaken outside peak traffic periods in order to minimise disruption.
Transport Access and Parking Delivery Work Plan
57 However, immediate cleaning may be required occasionally to comply with other consent conditions.
4.15
Public Transport (Bus) Prioritisation
To mitigate the impacts of the Project on the bus network and generate mode shift from single occupant vehicles (by making bus travel quicker and more reliable), AT has developed a programme of network changes and bus priority measures to ensure that the majority of people can still move in, around, and out of the CBD. Wherever possible, the bus priority changes proposed are aligned with the future New Network bus routes for the central area. In effect, the Project is bringing forward parts of the New Network changes within the CBD in order to mitigate the impacts of the works. The changes will take place in two phases: Phase 1 – new bus lanes, bus stops and shelters, and proposed bus parking on:
Wyndham Street
Wakefield Street
Fanshawe Street and Halsey Street
Wellesley Street
Victoria Street
Hobson Street
Albert Street and Mayoral Drive.
Phase 2 – new bus routing and bus stops on:
Queen Street
Customs Street/ Beach Road
Britomart and the surrounding road network.
The Phase 1 works have been designed, and subsequently approved through the Traffic Controls Committee (TCC) by resolution and have been operating since mid-October 2015. The details of the Phase 2 works are currently being refined and are expected to go to consultation and TCC for legal resolution and approval in the latter part of 2015 or early 2016. The ‘Go Live’ date for Phase 1 of the bus route changes was 18 October 2015 and the Phase 2 works and changes became operational on 17 April 2016. These dates were selected so that the bus changes are in place for 2-3 weeks before the major construction activity associated disruption occurs and patrons are used to the new arrangements. The proposed alterations address and resolve changes to on-street parking and service kerbside space allocations as well as bus stops. These have also been developed and resolved with the proposed stormwater realignment and cut and cover tunnel works in mind. Schematics of the proposed bus network changes are included in Appendix K including current and proposed bus networks.
4.16
Active Transport Prioritisation
The designation conditions require traffic management measures to be implemented to ensure that pedestrian and cycle access to private property is retained at all times. The conditions require the prioritisation (safety and efficiency) of pedestrians and specify desirable treatments to enhance cycling conditions at the intersections affected by the Project (as far as practically possible). Key aims of this requirement are considered to be maintaining the vitality of the local area, encouraging the
Transport Access and Parking Delivery Work Plan
June 2016
58 reduction of single occupant vehicles, and achieving mode shift to reduce traffic demand and congestion.
4.16.1
Pedestrian measures
The following specific measures will be implemented to prioritise or otherwise improve the amenity, safety and capacity of the pedestrian environment:
Footpath widening on critical sections of Galway Street and Tyler Street to increase the footpath widths of both streets to 4.5 metres and 4.0 metres respectively. This will achieve a good level of service assuming no diversion of pedestrians to other routes and will accommodate reassigned pedestrian movements comfortably. Further information on Pedestrian Assessments undertaken in the Project area are provided in Appendix J.
Pedestrians will be encouraged to use the new BTC station entrance via Quay Street – Commerce Street and Fort Street – Commerce Street or Customs Street – Commerce Street or the Takutai Square entrance to reduce pedestrian load on Galway Street. Wayfinding signs will be installed at key decision points (see Figure 4.14) on the major approach routes and between transport modes to advertise the location of the new entrance. The form of the signage is to be confirmed with AT through the Urban Design DWP but will, as a minimum, consist of construction type custom warning signage of the type shown in Figure 4.15 with the text “To Britomart and Trains” or similar. The wording of the signage will be agreed with AT and the CAR team through the CAR process and is intended to reduce the use of Tyler Street and Galway Street from lower Queen Street by pedestrians and therefore minimise potential interaction with construction traffic and associated risk.
Figure 4.14: Indicative wayfinding routes and primary sign locations
Transport Access and Parking Delivery Work Plan
59
Figure 4.15: Example of temporary wayfinding signage at decision points (Brisbane photo credit: M Williams)
A blue tape line will be installed between the BTC station entry, the ferry terminal, northern busway platform and Queen Street (including via Fort Street) on the footpath similar to those used in airports or hospitals.
A new station entrance will be built with an 8.0 metre wide pedestrian entrance on Galway Street and Commerce Street, and a 4.0 metre wide pedestrian entrance on Tyler Street. These entrances were found to be sufficiently wide to accommodate pedestrian demands.
A new signalised pedestrian crossing will be built on Commerce Street opposite the entrance to the new station where none existed previously.
A 5 metre wide pedestrian footbridge will be constructed over the construction trench site on lower Queen Street. This will maintain connectivity and protect pedestrians from falling into the trench.
4.16.2
Cyclist measures
The following specific measures will be implemented to prioritise or otherwise improve the amenity, safety and capacity of the cycling environment (refer Figure 4.16):
Cyclists will be encouraged towards the Beach Road Cycleway and the new Quay Street Cycleway once this is operational.
Cyclists who are heading to the Britomart station will be encouraged to use the new station entrance on Commerce Street or the Takutai Square entrance with wayfinding signs similar to those for pedestrians. Lifts will remain in operation during construction at both the new station and Takutai Square. Bike parking will be retained at the corner of Tyler Street and Commerce Street.
Cyclists who are heading to the Britomart station will be encouraged to dismount and use the western footpath to access Britomart Station from the direction of Quay Street through the installation of signage.
Cyclists will be required to dismount and walk where a safe environment for cycling cannot be provided, for instance on the pedestrian footbridge over lower Queen Street. This will be notified through the installation of appropriate signage.
Transport Access and Parking Delivery Work Plan
June 2016
60
Figure 4.16: Cyclist detour destinations
4.17
Travel Demand Management
AT are undertaking a CBD wide TDM campaign and suite of interventions with the aspiration of reducing SOV trips by approximately 4000 trips (approximately 10-15% of demand) in the peak traffic periods. Achievement of this goal will reduce congestion (i.e. travel time improvements) normally associated with school and other holiday periods. This work is being undertaken separate to this Project by AT’s TD Unit and is being driven by both the CRL enabling works and the large number of public and private developments occurring concurrently within the CBD. The TD campaign consists of a range of interventions which include measures such as the bus priority works described in this DWP, increased PT capacity (all modes), CBD wide active transport infrastructure improvements, and information campaigns. An overview of the campaign supplied by the AT TD Unit is presented as Appendix I. The physical and information supply tasks of this campaign along with early communications messaging have already commenced at the time of preparing this DWP; and include information sessions at major buildings and the installation of bus priority lanes for the Phase 1 bus changes. The TDM changes started with the amended bus network changes for Bus Phase 1 becoming operational on Sunday 18 October 2015. The activities of the wider TDM campaign will continue throughout the duration of the CRL project with particular effort preceding major events such as the start of this Project and the start of the main cut and cover tunnel works. This Project will contribute to the overall CBD TDM effort through the pedestrian priority and cycle measures described in Section 4.16 of this DWP, the Workforce TDM measures described in Section 2.4.3 of this DWP, and wider CRL communications measures described in Section 5.3 of the CEMP.
Transport Access and Parking Delivery Work Plan
61 The Project will benefit from the implementation of the TDM campaign and associated infrastructure through reduced traffic demand on the CBD network and resulting mitigation of traffic congestion. Sensitivity modelling of the effects of SOV trip suppression was explored in early modelling of the CRL Albert Street stormwater main realignment works which overlap (see the modelling report prepared by Flow Transportation Specialists presented in Appendix H). This modelling suggested overall network travel time benefits of 12% with a 5% reduction in SOV (i.e. general traffic) volumes as a result of TDM measures. It was noted that this network figure hides local network effects such as on the critical arterial road corridors identified in the NoR for the CRL designations for specific monitoring. However, the sensitivity testing at a route level does indicate mitigation of travel time increases, particularly at the sought trip suppression 7rates of 10-15%.
4.18
Planned Mitigation measures
The planned network congestion mitigation measures included in this DWP and assessed in the modelling include:
The planned public transport prioritisation (bus priority) measures described in Section 4.15 and detailed for the Phase 1 changes in Appendix K.
Active transport prioritisation as detailed in Section 4.16.
The management and interaction of traffic measures across the city has been allocated to the established Traffic Operations Plan group jointly run by AT and NZTA. This group is responsible for the management of temporary works and traffic incidents (i.e. planned and unplanned traffic congestion management) on a One System basis. This tactical level group is overseen at a higher level by a strategic steering group of senior managers form each organisation with allocated decision making delegated authority.
Undertaking a TDM campaign as described in this DWP. This campaign being run by AT aims to reduce single occupant vehicle trips in the morning commuting peak by approximately 4,000 trips. This will be achieved by simultaneously implementing a combination of initiatives including encouraging people to change the time they travel, work from home occasionally, and change mode from single occupant car trips to walking, cycling, bus, train, ferry and carpooling; and supported by increased public transport capacity. Additional information is provided in Appendix I.
Banning the WBD right turn from Victoria Street into Federal Street to prevent blockage of the following through traffic in the absence of a passing opportunity
Banning the inter-peak filtered right turn movement from Albert Street (north) into Swanson Street (west) to prevent blockage of the road to following traffic on Albert Street.
The methodology of the Watercare project for Wynyard Quarter stormwater upgrades involving pipe works in Halsey Street (Fanshawe Street to Victoria Street) has been altered to avoid closure of this link through the use of trenchless installation (i.e. pipe jacking) and resulting increase in traffic congestion in the city and around the stormwater main realignment work sites (especially the Victoria Street and Wellesley Street corridors).
The Quay Street cycleway project scope and programme has been adjusted so that the interim cycleway construction works will be completed and operational before the start of the CRL main cut and cover tunnel works (and associated congestion). In addition, the interim cycleway will be off-road at the intersection with lower Hobson Street and between the lower Queen Street and Commerce Street intersections, allowing for retention of the turn pockets to improve through traffic conditions and minimise blockage potential. The tunnel works at the
7
Note that ‘trip suppression’ in modelling terms refers to the reduction in general traffic (e.g. private car) trips and not a suppression of journeys by people to and from work, entertainment and educational activities (and which are taken up by other modes such as walking, cycling, bus and other PT use).
Transport Access and Parking Delivery Work Plan
June 2016
62 Albert Street and Customs Street intersection will reduce overall network east-west capacity and result in traffic diversion to parallel routes, including Victoria Street, Wellesley Street and the Quay Street corridor. During the peak periods, the capacity of the latter corridor should be maximised (i.e. construction activity requiring further lane closures should be avoided) in order to mitigate congestion around the stormwater main realignment work sites. The change in programme and scope does this to the benefit of the Project.
4.19
The right-turn into lower Queen Street from Quay Street will be banned for construction traffic in the evening traffic peak period to minimise the occurrence and length of this phase to maximise east-west movement capacity.
Potential further mitigation measures
Additional network changes and general traffic management which might be included:
Removing the right turn from Wellesley Street east into Albert Street north to reduce the number of phases and allow reallocation of green time to the cross town through route. This option was included in the original modelling undertaken by Flow Transportation Specialists (Rev 0) but was not adopted or assessed in the revised (Rev 1) modelling to meet community connectivity expectations (refer to Appendix G and H). The comparison between the two modelling revisions however suggests that this intervention could relieve congestion on the Wellesley corridor by as much as 60-100 seconds in the critical evening peak. This high value option could be installed at very short notice simply through the installation of no right turn signage, without the need for alteration of signal plant or software change.
Banning the right turn from Wellesley Street (west) into Mayoral Drive and thereby reducing the cycle by one phase allowing green time reallocation. This may place excessive pressure on the Victoria Street corridor through traffic displacement. Further modelling of the wider network effects of this proposal would be required before implementation. Minor changes to signal plant (i.e. covering of the right turn arrow aspects) and signal controller software would be needed.
Permitting the SBD right turn movement into Swanson Street (west) from Albert Street, which would potentially relieve pressure on the right turn movements into Victoria Street and Wellesley Street, or allow one of these right turns to be banned. This would allow reallocation of green time to one or both of these more congested cross-town routes at the Albert Street intersections. This intervention could only be undertaken while the Swanson shaft work site for the CRL Albert Street stormwater main realignment project is not in place (in the early stages of this Project).
Allowing the right turn from Albert Street into Victoria Street (east) and then removing the right turn from Albert Street into Wellesley Street (east) – Wellesley Street is under more pressure than the Victoria corridor and serves an arguably higher strategic function in being one of two bus priority corridors (the other being Fanshawe / Customs Streets). As a result both general traffic and buses in Wellesley Street may benefit from travel time reductions. This intervention has not been investigated to date.
Encourage peak spreading through a campaign to stagger work start times in different precincts of the CBD and thus relieve traffic demand and congestion as well as space on public transport. This technique has been employed with some success overseas (e.g. Brisbane) and could be suggested to the AT TD Unit if required. For example the Wynyard Quarter area and west of Albert Street businesses could be encouraged to start at 7am, those between Albert Street and Anzac Avenue at 8am and those east of Anzac Avenue at 9am.
The displacement of through traffic onto the motorway network and localised congestion associated with weave and merge manoeuvres on the NBD lanes near the Fanshawe Street and Wellington Street on-ramps is expected to result in significant diversion of NBD traffic to
Transport Access and Parking Delivery Work Plan
63 the Grafton Gully on-ramps, which can experience severe congestion at times. This may result in travel time increases and trip reliability issues for traffic accessing the port and motorway network on the eastern side of the CBD due to queue back onto Stanley Street and affect the Southern Motorway access. A principal reason for this flow breakdown and resulting congestion is the uncontrolled weave between access roads and on-ramps to the respective motorways at the head of the gully. By ramp metering the access to the Northern and Northwestern motorways, this weave could be controlled and the effects minimised or avoided. It is understood that this and related measures are being considered for early investigation and pre-planning (including potentially the pre-installation of communication ducts which can take an extended period and might delay a more timely response) jointly by AT and NZTA, but that this activity has not commenced.
The displacement of through traffic from the CBD onto the motorway ring (which is the intended function of this infrastructure) may require increased ramp metering management across the wider motorway network. It is understood that investigation into this and related measures is being considered for early investigation and pre-planning jointly by AT and NZTA, but that this has not yet commenced.
Potential congestion associated with additional traffic using the motorway in the critical NBD section could be addressed through closure of the Wellington Street on-ramp (at least to general traffic with buses from Wellesley Street being diverted to use it). This would potentially remove flow breakdown associated with the merge and weave associated with densely packed on and off ramps. This change would likely result in additional use of the Curran Street on-ramp, involving some loss of amenity to residents of that area (although intended and made possible by infrastructure). It is understood that this and related measures are being considered for early investigation and pre-planning jointly by AT and NZTA, but that this has not yet commenced.
Adoption of signal pre-emption and phase extension technology such as PTIPS using predetection to actively prioritise bus movements (albeit at some cost to general traffic). This approach is central to BRT and LRT operations on surface road corridors. It may have the added benefit of attracting more mode shift through reliability gains as well as travel time savings. This measure has wider network and technology implications and has not been investigated to date.
The retention of the kerbside lanes on Albert Street at the Victoria Street and Wellesley Street intersections. This would require the banning of the left-turn movements for the entire duration of this Project as they are not geometrically possible from that position into the narrow side road receiving lanes. This intervention would increase throughput on the Albert Street approaches allowing green time reallocation to the congested crossroads but would alter CBD and local property connectivity. It would however also require a significant reorganisation of the bus network in the case of the Wellesley Street turn. While relatively easy to implement, this measure has not been investigated in detail to date and would involve long term changes to property access and connectivity (perhaps not anticipated by the resource consent).
Northbound through traffic could be banned at the intersection of Albert Street and Customs Street in order to reduce traffic demand on Quay Street.
Place signs for the southern approach of lower Queen / Quay Street and western approach of the Commerce / Galway intersections stating “local traffic only”. This will help to reduce traffic volumes turning into the Britomart Precinct area.
Construction traffic management by restricting deliveries/ spoil removal during peak hours for the project and encouraging light vehicles leaving the work site to avoid critical intersections (such as Commerce Street / Customs Street).
Transport Access and Parking Delivery Work Plan
June 2016
64
Upon commencement of construction, if unforeseen local traffic issues arise, the Project team will contact the Project traffic specialist to assess and determine appropriate traffic management measures to be implemented to resolve such issues in conjunction with the CBD Tactical Operations Plan group (see section 8.4 of this DWP).
4.20
Contingency Planning
4.20.1
General procedures
If there is a major safety incident or traffic crash on or around the Project site, staff will abide by the generic procedures described in the TMP full form pro-forma8. The major aspects of these requirements are not to interfere with the scene of an accident involving serious harm other than to prevent further harm, and provide assistance to the emergency services at their direction. Should the entry of vehicles to site cause excessive delay to following traffic (i.e. more than normally associated with use of a driveway on the roads around the Project and as defined in CoPTTM as being five minutes in duration), the MTC shall cease the site access manoeuvre (i.e. return the vehicle to a position clear of through traffic) until the localised queuing has eased.
4.20.2
Emergency vehicle access
Fire tender appliances will be able access the CPO and the Lower Queen Street work sites as normal. Fire service aerial tenders require 5.5 metres of carriageway width to deploy their outriggers for full boom use. The narrowed lanes on Galway Street and Tyler Street may push the outriggers onto the footpath where there is a possibility of collapse due to underground services beneath the high point loads. To mitigate this, the fire service will be advised (though prior consultation and the CAR process) to partially mount the kerb before deploying outriggers to ensure they use the existing carriageway beneath the footpath overlay. These changes will be included in the building incident plans to be prepared and enacted by the fire service. The safe area to deploy outriggers will be clearly marked on the footpath widening.
4.20.3
Adjacent building evacuation
The footpaths adjacent to the work sites will be unchanged or narrowed from their present conditions, and therefore there will be no impact on the existing adjacent building evacuation procedures or paths (as no pedestrians should be entering the live traffic lanes in the existing condition). As such, no specific footpath management measures are proposed beyond the following:
The Project Manager and relevant site supervisor will be advised of the incident and the potential interruption of construction operations or site closure, and the emergency services advised as appropriate.
The site MTC or STMS will move to the footpath to discourage pedestrians from entering the relevant end of the affected footpath ‘corridor’. The public will be encouraged to use the designated informal or formal crossings at each end of the worksites in the normal way to avoid the affected footpath corridor. The TC / STMS may be helped in this by other staff members at the direction of the site supervisor. It should be noted that no Project staff
8
This is the standard CoPTTM document detailing the TMP details for an individual TMP application; and includes details of the road environment, proposed traffic management measures, activities and timings, contingency planning, EED decisions, communications planning, monitoring and records, key staff contact details, and RCA approval – essentially the contents of this TTMP focussed on individual TMPs and including key staff contacts
Transport Access and Parking Delivery Work Plan
65 member has any power to prevent those intent on passing through the area from using the footpath or evacuating a building.
The TC / STMS must stay near the site access to ensure its continuing safe operation and diversion of construction traffic as appropriate.
If the work site is affected by the incident and site closure is requested or appropriate for workforce safety, the project staff will make the worksite safe and evacuate to a designated assembly point using footpaths and designated crossings, as nominated in the site specific safety plan. The site supervisor or representative will withdraw to a nearby safe location to liaise with emergency services.
Project staff will defer to the emergency services on their arrival.
4.21
Alternative Transport Solutions
Minimisation of spoil and truck movements have been considered during the development of the Project construction methodology. A number of alternative transport solutions have also been investigated with the aim of reducing construction traffic generation.
4.21.1
Minimising Spoil Generation
During internal demolition of the CPO ground floor, large concrete slabs will be removed from the site by rail and crushed off-site. Smaller slabs of concrete will be crushed on-site and used to back fill after construction.
4.21.2
Pre-Fabrication and Rail Deliveries
Large items such as the new escalators for the temporary station connecting B2 and B1 will be brought in by rail. Pre-fabrication and offsite construction will also be employed extensively to reduce the amount of spoil generated on site.
4.21.3
Alternative Transport Assessment
Alternative transport solutions have been investigated with the aim of reducing truck movements on the network as described in Table 4.2. Table 4.2:
Alternative transport assessments
Alternative Options
Description
Transport and remove all materials by rail
Transporting materials by rail would remove a significant portion of heavy vehicle trips through the city. However the increase in rail demand would disrupt passenger train services at Britomart, ultimately resulting in a risk that patronage numbers would fall and fail to meet the targets for funding. The double handling of materials and the need for additional dust, sediment, contaminants, and water controls (and risks) both on and offsite result in this option being considered infeasible.
Remove spoil by conveyor belt and barge
A conveyor belt could be constructed along lower Queen Street to transport spoil to barges in the harbour. This would remove vehicles carrying excavation spoil from the network; however delivery of materials will still need to be transported by truck. This option is not considered feasible as the conveyor belt will need to be enclosed and the spoil dampened to reduce dust. Additional double handling and de-watering of the spoil will be required at the dump site along with containment and treatment of discharges at the
Transport Access and Parking Delivery Work Plan
June 2016
66
Alternative Options
Description barge loading and unloading points. The conveyor belt would also need to be built over Quay Street, creating additional traffic management requirements and imposing additional consenting and cost impacts to the project.
In summary, transportation of spoil and the majority of materials by road is the best method for environmental protection and cost even though the additional truck traffic is likely to cause increases in congestion and delay to the Auckland CBD road network.
Transport Access and Parking Delivery Work Plan
67
5
Assessment of Traffic Effects
5.1
General Approach
An assessment of indicative traffic effects for the Project has been based on traffic modelling using the following approach:
The modelling has used the existing, approved 2021 Auckland City Centre SATURN model for the AM, daytime Interpeak and PM peak periods. This model was used for the ITA supporting the CRL designation NoR and is the most suitable available for the preparation of this DWP. The modelling identifies the scale of impact to travel times on the nominated routes under each scenario by comparison to the modelled base case scenario.
Known network changes have been based upon changes in the public transport network and construction phasing which have then been applied in the model to approximate changes in network capacity and operation.
Model outputs have been extracted to provide an aggregate network view of the impacts and specific corridor measures to meet consent conditions.
Several rounds of traffic modelling have been completed for the overall CRL enabling works (i.e. including the various enabling works packages). Appendix G details the latest modelling covering the duration of this Project and the Albert Street CRL cut and cover works, with early modelling detailed in the Technical Note (dated 31st July 2015, by Flow Transportation Specialists) attached in Appendix H9. The modelling has been updated to assess the effects of the developed construction methodology cumulatively with other major projects in the CBD. The CBD is currently a very dynamic environment with many major private and public projects proposed and developing since the ITA was prepared. These projects either directly change the road network or generate significant construction traffic and have been incorporated with the best and most recent knowledge available. The consenting of further projects or confirmation of construction programmes may add further congestion to the network and effect travel times observed throughout the duration of the Project. As with all traffic modelling, the redistribution of traffic and resulting travel time changes implicitly assumes perfect knowledge of drivers as to the most efficient path between points. Practically this is considered to occur after a settling period of 1-2 weeks following any major traffic layout or operational change during which monitoring may yield misleading results. The modelling does not directly allow for mode shift or ‘trip suppression’ but rather shows the impact of accommodating the current traffic demands. The beneficial impact of this on network travel times (as a result of TDM) has been explored through sensitivity testing of traffic movements within the CBD (excluding reductions in traffic passing through the model with origins and destinations outside the CBD), and is discussed Appendix G. The modelling also does not allow for peak spreading of traffic demands i.e. that people will undertake their journeys earlier or later than the nominal two hour peak period modelled, thus reducing traffic volumes and the congestion experienced. Again, the model assesses impacts of current traffic demand levels with the imposed network changes. This assessment without reduction of traffic volumes as a result of mode shift or peak spreading is considered to be conservative and appropriate for the consideration of the impacts of the 9
Note that the initial modelling described in Appendix O accidentally included a Barnes Dance phase at the Victoria / Albert intersection in the basecase scenario. This addition decreased the performance of this intersection and the wider basecase network performance as a hole with the result that the comparisons of the tested options under-estimate the scale of forecast travel time increases somewhat.
Transport Access and Parking Delivery Work Plan
June 2016
68 cumulative travel time and traffic effects of the Project works in conjunction with those of other projects.
5.2
Traffic Operation Tests
Five main scenarios were tested as described in the main CRL works modelling report attached as Appendix G. In summary: Tests 4d-6a consider different side road closure scenarios along Albert Street during the installation phases, the Wolfe Street diversion and with all the stormwater main diversion pipe-jacking shafts in place with varying levels of construction traffic from different projects and the Tyler Street reversal required for the Britomart works coming into effect in Test 6a. Test 7 has the trench installation and Customs / Albert intersection works complete and associated excavation traffic but has only the Victoria Main pipe-jacking shaft in place. The Barnes Dance at Wellesley / Albert is removed. Test 8 is similar to Test 7 but has Victoria Street back to normal configuration (i.e. the shaft removed and the Barnes Dance removed). 
All of the tests include the revised Quay Street layout and right turn restriction into Lower Queen for construction trucks during the evening peak traffic period. Construction traffic generation for various projects, taken from consenting documents and more recent planning along with plots of their assumed haul routes, are included in the modelling report given in Appendix G. The configuration and phasing of amended intersections is also presented in this report.
5.3
Traffic Modelling Summary
5.3.1
Network wide statistics
Network statistics provide a comparative base from which to understand how changes impact on overall travel. Network travel times and distances for each scenario have been extracted for general traffic, construction trucks and buses. Increases in person hours travelled indicate increased congestion or that people are taking a different route and travelling further. Increases in the total kilometres travelled indicate that people are changing routes to avoid congestion. Little weight should be given to the absolute values presented in Table 5.1and Table 5.2 as the total travel times and distances are largely dependent on the size of the network modelled. The statistics, however, provide an indicative measure of the potential disruption to traffic caused by each modelled scenario, relative to each other. Table 5.1shows the network wide travel times and travel distances for the modelled scenarios for general traffic. These summary statistics are compared to the revised Rev1 Base Case. The travel time and travel distance presented are in the same format as Rev1 outputs. Travel times in personhours are calculated by using 1.2 persons per vehicle and bus occupancy of 30 people. This provides consistency with earlier reports.
Transport Access and Parking Delivery Work Plan
69 Table 5.1: C2 SP1
Summary statistics – General traffic Rev 1 Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
10,080 (+1,120)
10,290 (+1,330)
10,370 (+1,410)
10,000 (+1,040)
9,340 (+390)
(+1,120)
6,220 (+580)
6,790 (+1,160)
6,510 (+870)
6,340 (+710)
6,020 (+380)
(+1,330)
17,920 (+3,230)
18,380 (+3,690)
18,450 (+3,760)
17,730 (+3,040)
17,040 (+2,350)
177,380
179,750 (+2,370)
180,220 (+2,840)
181,170 (+3,790)
180,170 (+2,790)
179,280 (+1,900)
144,910
147,630 (+2,730)
147,790 (+2,880)
149,040 (+4,130)
148,350 (+3,440)
147,470 (+2,570)
195,600
200,500 (+4,900)
200,840 (+5,240)
201,830 (+6,230)
200,200 (+4,600)
199,350 (+3,750)
Travel Time (person-hours) Morning Peak Interpeak Evening Peak
8,960
Travel Distance (vehicle-km) Morning Peak Interpeak Evening Peak
All scenarios are predicted to show large cumulative impacts on the general traffic with no improvement in network wide travel times when compared to the Rev1 Base Case. No improvement in travel times is predicted due to the reduction of Albert Street north and south approach to single lanes. Scenario 5 and 6 are predicted to result in a relatively large increase in travel time which represents the greatest traffic restrictions due to piling for cut and cover works along Albert Street. Scenario 7 and 8 performs better when compared to Scenarios 5 and 6 as they represent the period where piling, the Customs / Albert intersection road deck and the stormwater main diversion are complete. All scenarios are predicted to result in longer travel distances for the network as a whole when compared to the Rev1 Base Case. Scenario 5 and 6 are predicted to result in a relatively large increase in travel distance that represents the greatest traffic restrictions due to piling for cut and cover works along Albert Street. Scenario 8 results in the lowest increase in travel distance as they represent the period where piling is complete. Table 5.2 shows the network wide travel times and travel distances for the modelled scenarios, for buses and construction trucks. All scenarios are predicted to have large cumulative impacts on the buses and construction traffic with no improvement in network wide travel times when compared to the Rev1 Base Case. The majority of this apparent worsening is due to construction trucks (which are in general traffic lanes) being coded in the model as fixed flows as are buses, and which the model reports on together (i.e. reports fixed flows without regard to mode or use of priority lanes). Scenario 7a and 8a performs better for buses and construction traffic when compared to scenario 5a and 6a as they represent the period where piling is complete – as is the case for general traffic.
Transport Access and Parking Delivery Work Plan
June 2016
70 Table 5.2: C2 SP1
Summary Statistics – Buses and Construction Trucks Rev 1 Base
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
4,220
5,390 (+1,170)
5,660 (+1,430)
5,860 (+1,630)
5,670 (+1,440)
5,420 (+1,200)
1,810
2,700 (+890)
2,820 (+1,010)
3,040 (+1,230)
3,000 (+1,190)
2,860 (+1,050)
4,940
7,820 (+2,880)
8,160 (+3,230)
8,350 (+3,410)
7,630 (+2,690)
7,630 (+2,690)
2,240
2,950 (+710)
2,990 (+760)
3,190 (+950)
3,190 (+950)
3,190 (+950)
1,100
1,880 (+780)
1,930 (+830)
2,120 (+1,020)
2,120 (+1,020)
2,120 (+1,020)
2,250
2,990 (+740)
3,030 (+780)
3,230 (+980)
3,090 (+830)
3,240 (+980)
Case Travel Time (person-hours) Morning Peak Interpeak Evening Peak
Travel Distance (vehicle-km) Morning Peak Interpeak Evening Peak
Based on our revised model outputs, the following are noted:
No significant difference in travel times and travel distances between scenarios 5a and 6a
Significant increase in travel times and travel distances for all scenarios when compared to the Rev1 Base Case
Significant increase in travel times for buses / construction trucks predicted for all scenarios when compared to the Rev1 Base Case
No significant difference in travel times and travel distances predicted between scenarios 7a and 8a
Scenario 7a and 8a performs better for general traffic, buses and construction traffic when compared to scenario 4d, 5a and 6a as they represent the period where piling is complete
5.3.2
Travel time along key routes
Travel times along key routes specified in the CRL designation conditions have been extracted from the model. These travel times provide average travel times over an hour period. As an average these figures will under-represent the travel time when compared to more common engineering measures such as the 85th percentile and maximum travel time. It is also noted that the model cannot represent peak spreading (i.e. when motorists start their journey earlier or later in order to achieve a personally acceptable journey time and level of service) and so may conservatively overrepresent congestion to some degree. It should be noted that only around one third of the Mount Eden Road route is included in the model. This is not expected to change any conclusions of the modelling as the cumulative impacts of all the projects in the CBD are largely restricted to the area north of SH1. The ten routes specified in Condition 26.9 of the designation conditions were assessed and are shown in Figure 5.1.
Route 1: Wellesley Street (between Victoria Street and Princes Street)
Route 2: Victoria Street (between Wellesley Street and Princes Street)
Transport Access and Parking Delivery Work Plan
71
Route 3: Customs Street/Fanshawe Street (between Nelson Street and Tangihua Street)
Route 4: Quay Street/Lower Hobson Street (between Fanshawe Street/Hobson Street and Tangihua Street)
Route 5: Nelson Street/Hobson Street (between Pitt Street and Fanshawe Street)
Route 6: Queen Street (between Mayoral Drive and Customs Street)
Route 7: New North Road/Symonds Street (between Dominion Road and Newton Road)
Route 8: Mount Eden Road (between Normanby Road and Symonds Street)
Route 9: Khyber Pass Road between the southern motorway ramps and Symonds Street if this route is to be used by construction related trucks
Route 10: Newton Road between the north western motorway ramps and Symonds Street
Figure 5.1: Journey Time Routes (as per CRL designation Condition 26.9)
Transport Access and Parking Delivery Work Plan
June 2016
72 Forecast changes in journey times are colour coded as shown in Table 5.3 and are consistent with previous reporting while Table 5.3 to Table 5.6 show the forecast travel time changes. Journey time plots comparing the revised modelled scenario for the ten key routes are provided in the updated modelling technical note in Appendix G. Table 5.3: Colour Scale for Changes to Journey Times (consistent with the original pipe jack modelling ITA and initial test reporting) Journey Time Increases
Journey Time Reductions
Increases under 30 seconds
Reductions under 30 seconds
Increases between 30 seconds and 60 seconds
Reductions between 30 seconds and 60 seconds
Increases between 60 seconds and 120 seconds
Reductions between 60 seconds and 120 seconds
Increases over 120 seconds
Table 5.4:
Average Morning Peak Journey Times (seconds)
Route (Direction)
Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Wellesley Street (EBD)
380
550 (+170)
560 (+180)
560 (+190)
480 (+100)
450 (+70)
Wellesley Street (WBD)
390
560 (+170)
600 (+210)
590 (+200)
530 (+140)
440 (+50)
Victoria Street (EBD)
400
630 (+230)
660 (+260)
670 (+270)
670 (+270)
460 (+60)
Victoria Street (WBD)
450
610 (+160)
710 (+260)
610 (+160)
580 (+120)
500 (+50)
Customs Street (EBD)
210
290 (+80)
290 (+80)
320 (+110)
330 (+120)
320 (+110)
Customs Street (WBD)
290
330 (+50)
500 (+220)
370 (+90)
350 (+60)
330 (+50)
Quay Street (EBD)
180
240 (+60)
230 (+50)
250 (+70)
250 (+70)
250 (+70)
Quay Street (WBD)
280
310 (+40)
380 (+100)
340 (+70)
320 (+50)
320 (+50)
Nelson Street (NBD)
340
410 (+80)
430 (+100)
430 (+90)
370 (+40)
350 (+20)
Hobson Street (SBD)
250
320 (+80)
320 (+70)
310 (+60)
290 (+50)
280 (+30)
Queen Street (NBD)
500
540 (+40)
510 (+10)
530 (+30)
540 (+40)
500
Queen Street (SBD)
480
590 (+110)
500 (+20)
540 (+60)
570 (+90)
620 (+140)
New North Road (NBD)
190
190
190
190
190
190
New North Road (SBD)
150
150
150
150
150
150
Transport Access and Parking Delivery Work Plan
73
Route (Direction)
Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Mt Eden Road (NBD)*
120
120
110
120
120
110
Mt Eden Road (SBD)*
40
40
40
40
40
40
Khyber Pass Road (EBD)
130
130
130
130
130
130
Khyber Pass Road (WBD)
120
120
120
120
120
120
Newton Road (EBD)
270
280 (+10)
290 (+20)
300 (+40)
300 (+40)
300 (+30)
Newton Road (WBD)
140
140
140
140
140
140
*The SATURN model only covers the northern half of the Mt Eden Rd route.
Based on model outputs for the morning peak:
A significant increase in travel time for Wellesley and Victoria Street for scenarios 4d, 5a, 6a and 7a that are directly affected by stormwater main realignment work sites and cut and cover works along Albert Street.
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and increased in travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
Traffic using Quay Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
Scenario 8a experiences a lower travel time when compared to scenario 4d, 5a, 6a and 7a as it represents the period where piling is complete.
Table 5.5:
Average Interpeak Peak Journey Times (seconds)
Route (Direction)
Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Wellesley Street (EBD)
350
410 (+60)
420 (+70)
420 (+70)
400 (+50)
380 (+40)
Wellesley Street (WBD)
380
470 (+90)
490 (+110)
490 (+100)
410 (+30)
400 (+20)
Victoria Street (EBD)
380
630 (+250)
640 (+260)
640 (+260)
650 (+270)
430 (+50)
Victoria Street (WBD)
390
570 (+180)
680 (+290)
570 (+180)
570 (+180)
430 (+30)
Customs Street (EBD)
240
270 (+30)
270 (+30)
290 (+50)
310 (+80)
290 (+60)
Customs Street (WBD)
290
340 (+50)
520 (+230)
380 (+90)
350 (+60)
330 (+40)
Quay Street (EBD)
200
250 (+60)
250 (+60)
260 (+60)
270 (+70)
260 (+60)
Quay Street (WBD)
270
320 (+50)
410 (+140)
380 (+110)
350 (+80)
350 (+80)
Transport Access and Parking Delivery Work Plan
June 2016
74
Route (Direction)
Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Nelson Street (NBD)
180
250 (+70)
260 (+80)
250 (+70)
240 (+60)
230 (+50)
Hobson Street (SBD)
200
220 (+20)
220 (+20)
210 (+20)
210 (+20)
210 (+10)
Queen Street (NBD)
460
520 (+60)
510 (+50)
520 (+60)
540 (+80)
510 (+50)
Queen Street (SBD)
460
610 (+150)
540 (+80)
560 (+100)
640 (+190)
630 (+180)
New North Road (NBD)
130
130
130
130
130
130
New North Road (SBD)
140
140
140
140
140
140
Mt Eden Road (NBD)
80
80
80
80
80
80
Mt Eden Road (SBD)
50
50
50
50
50
50
Khyber Pass Road (EBD)
110
120
120
120
120
120
Khyber Pass Road (WBD)
130
130
140
130
130
130
Newton Road (EBD)
180
180
180
180
180 (+10)
180 (+10)
Newton Road (WBD)
160
160
170 (+10)
170 (+10)
160
160
*The SATURN model only covers the northern half of the Mt Eden Rd route
Based on the model outputs for the inter-peak the following can be observed:
A significant increase in travel time for Victoria Street for scenarios 4d, 5a, 6a and 7a that are directly affected by pipe jacking work sites and cut and cover works along Albert Street.
Traffic using Wellesley Street has an increase of 70 to 110 seconds for scenarios 4d, 5a and 6a. No significant increase in travel time for scenarios 7a and 8a.
Traffic using Queen Street Southbound has an increase of 80 to 190 seconds for all scenarios.
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and increased in travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
Traffic using Quay Street, Hobson Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
Scenario 8a operates with lower travel time when compared to scenario 4d, 5a, 6a and 7a as it represents the period where piling is complete.
Transport Access and Parking Delivery Work Plan
75 Table 5.6:
Average Evening Peak Journey Times (seconds)
Route (Direction)
Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Wellesley Street (EBD)
520
730 (+210)
720 (+200)
710 (+180)
770 (+250)
780 (+260)
Wellesley Street (WBD)
470
770 (+310)
790 (+320)
790 (+330)
640 (+180)
500 (+30)
Victoria Street (EBD)
410
710 (+300)
790 (+380)
790 (+380)
910 (+500)
470 (+60)
Victoria Street (WBD)
680
840 (+160)
1,100 (+420)
1,010 (+330)
830 (+150)
800 (+120)
Customs Street (EBD)
230
280 (+40)
280 (+40)
330 (+90)
330 (+100)
300 (+70)
Customs Street (WBD)
330
410 (+80)
570 (+240)
460 (+130)
370 (+50)
360 (+30)
Quay Street (EBD)
190
240 (+50)
250 (+50)
270 (+80)
270 (+80)
260 (+70)
Quay Street (WBD)
270
280 (+10)
320 (+60)
300 (+30)
280 (+20)
280 (+20)
Nelson Street (NBD)
290
370 (+80)
410 (+120)
390 (+100)
360 (+70)
330 (+40)
Hobson Street (SBD)
560
840 (+270)
870 (+310)
830 (+270)
750 (+190)
710 (+150)
Queen Street (NBD)
590
640 (+50)
650 (+50)
640 (+50)
610 (+20)
610 (+10)
Queen Street (SBD)
680
890 (+210)
940 (+260)
880 (+200)
770 (+90)
800 (+120)
New North Road (NBD)
210
210 (-10)
210
210 (-10)
210
260 (+50)
New North Road (SBD)
150
150
150
150
150
150
Mt Eden Road (NBD)
140
140
140
140
140
140
Mt Eden Road (SBD)
60
60
60
60
60
60
Khyber Pass Road (EBD)
140
140
140
140
140
140
Khyber Pass Road (WBD)
170
170
170 (+10)
170
170
160
Newton Road (EBD)
160
160 (+10)
170 (+10)
170 (+10)
170 (+10)
170 (+10)
Newton Road (WBD)
190
240 (+50)
240 (+50)
200 (+10)
190
190
*The SATURN model only covers the northern half of the Mt Eden Rd route
Transport Access and Parking Delivery Work Plan
June 2016
76 Based on the model outputs for the evening peak the following can be observed:
Victoria Street east and west and Wellesley Street westbound are the worst affected routes in scenarios 4c, 5, 6 and 7 with significant increase in travel time of 150 to 450 seconds. Wellesley Street westbound has an increase of 150 to 360 seconds for scenarios 4c, 5, 6 and 7. Travel time for Wellesley Street eastbound direction varies between 180 to 260 seconds for all scenarios.
A significant increase in travel time for Wellesley and Victoria Street for scenarios 4c, 5, 6 and 7 that are directly affected by stormwater main realignment work sites and cut and cover works along Albert Street.
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and increased in travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
Traffic using Nelson Street northbound will have an increase in travel time from 110 to 120 seconds for scenarios 4C, 5, 6 and 7.
Traffic using Hobson Street southbound will have an increase in travel time from 130 to 300 seconds for all scenarios.
Traffic using Quay Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
Scenario 7 and 8 operates with lower travel time when compared to scenario 4C, 5 and 6 as they represent the period where piling is complete.
As expected, analysis of the travel time along the city centre routes show that the biggest delay on both the Wellesley Street and Victoria Street routes occurs at the intersection with Albert Street. Figure 5.2 presents an example of the delay caused by Albert Street when travelling westbound along Wellesley Street and eastbound along Victoria Street during the evening peak period. Scenarios 4d, 5a, 6a and 7a experience excessive delays at the Wellesley / Albert Street and Victoria / Albert Street intersection. The delays at the other intersections along Victoria and Wellesley Street are similar to the Base Case. This pattern is typical across all the peak periods. The Queen Street intersection is also a notable point of delay to these cross-town routes and there is an opportunity to prioritise the cross corridors over Queen Street which is less affected by delay. Vehicles travelling westbound along Wellesley Street and eastbound along Victoria Street would have a travel time similar to the Base Case if the delay at Albert Street intersection could be reduced to the Base Case delay. The travel time and traffic volume graphs are provided in Appendix G.
Transport Access and Parking Delivery Work Plan
77
Figure 5.2: Example of delay at intersection with Albert Street
5.3.3
Sensitivity testing
Sensitivity testing was undertaken to assess the potential impact of banning private development (i.e. NZ International Convention Centre, NDG Auckland Centre and 1 Mills Lane) construction trucks during the morning and evening peak traffic periods, as described in the attached modelling report (see Appendix G). This shows a reduction in peak travel times across the network of 6-9%. Sensitivity testing undertaken as to the potential effect of mode shift resulting from bus priority and other TDM measures suggests an improvement of 12% with a 5% mode shift in the evening peak see Appendix H. A mode shift of 10-15% can reasonably be expected in line with Auckland and international experience.
5.3.4
Modelling conclusions
The Albert Street cut and cover tunnel works (C2) and Britomart underpinning and tunnel works (C1/this Project) are expected to have similar or lesser traffic impacts than predicted by the modelling undertaken in the ITA’s prepared to support the CRL NoR and the BTC alteration to designation, along with the resource consents for the Albert Street stormwater main realignment (the CRL enabling works). Since the ITAs were prepared for the wider CRL enabling works, a large number of major public and private projects have come to fruition, or are expected to come to fruition, during the construction of the wider CRL enabling works. These additional projects are expected to significantly increase the overall extent of cumulative traffic delays within the CBD during construction of the CRL enabling works. The worst period in terms of traffic delays will be during the simultaneous construction of the Albert Street stormwater main realignment and cut and cover works, when there is also high private development activity in the CBD requiring demolition and excavation works. This is evidenced by the drop in travel time delay in test 8a, which is relatively close to current conditions and those anticipated by the modelling to support the NoRs and resource consents without the additional public and private works that have come to light in the past few months.
Transport Access and Parking Delivery Work Plan
June 2016
78 A significant proportion of the forecast travel time increases stem from a reduction in lane capacity due to the Customs / Albert intersection road deck works being done simultaneously with the stormwater main realignment works on the alternate routes. The creation of additional bus lanes and cycleways within the CBD is also a large factor in reducing general traffic capacity on the network. In addition, the cumulative impacts of private development projects in the CBD are greater than previously identified, with the NZ International Convention Centre, the NDG Auckland Centre building, and 1 Mills Lane being the largest contributors to traffic congestion. In particular, spoil removal from the Convention Centre project is expected to surpass all other projects combined and generate high construction traffic volumes along Hobson Street and Nelson Street (and also impose an additional phase at Hobson / Wellesley). Additional information on the cumulative impacts of these private developments is provided in Appendix G. Construction traffic generation for the Albert Street cut and cover tunnel works and the subject Project, is light by comparison to the Convention Centre and Downtown Shopping Centre redevelopment projects. To summarise the elements contributing to the increase in cumulative effects on the surrounding transport network, the following are noted:
Permanent bus and cycle lanes replacing general traffic lanes on key detour routes for the CRL enabling works including:
Victoria Street
Wellesley Street
Queen Street
Hobson Street
Customs Street
Nelson Street
Beach Road
Quay Street
The Customs / Albert intersection road deck works – 1 year required for the Albert Street cut and cover works.
Pipe jack shafts for the Albert Street stormwater main realignment – up to 18 months only (1 year overlap with the CRL Albert Street cut and cover works).
Lower Albert Street to accommodate the Albert Street site compound and Downtown Shopping Centre loading and site access – duration of works, approximately 2.5-3 years
High construction traffic volumes for the wider CRL enabling works, public works and private developments (notably NZICC and Downtown Centre) – 2-3 years
Victoria / Albert and Wellesley / Albert Barnes Dance phases needed when approach lanes reduced to single lanes – 18 months.
The extra truck exit phase required for the safe exit trucks of from the Convention Centre main loading zone on Hobson Street at the Wellesley Street signals (to address conflict between through trucks and left turning general traffic movements) – 2-3 years.
Lower Albert to Quay Street left turn general traffic capacity loss to provide bus reliability – permanent change.
The traffic model does not take peak spreading or any potential mode shift to public transport into account, nor allow for optimisation of the network to balance effects across routes or optimise the most affected. The effects predicted by the model are likely to be conservative and actual traffic delays less severe.
Transport Access and Parking Delivery Work Plan
79
6
Assessment of General Effects
6.1
Public Transport
Bus operations will become more reliable and quicker with the proposed priority and rerouting changes (as described in Section 4.15 and Appendix K of this DWP). This will be due to both reduced impedance when travelling through the system, and lesser travel distances overall as demonstrated by the modelling (refers to Appendices G and H). Some passengers will need to walk further to their bus stops with the reorganisation of the service routes under the new network (resulting in part from the removal of bus services from Albert Street required by the CRL enabling works). There is also an increased distance between the BTC and the Northern Express services, which will be relocated to lower Albert Street. Reduction in footpath widths and the exposed nature of the route may result in fewer passengers making the transfer between BTC and the Northern Express. These effects will be partially mitigated by the use of wayfinding signage and advertising to inform pedestrians of the changes to the network.
6.2
Pedestrians and Cyclists
6.2.1
Pedestrian Assessment
A high level pedestrian assessment has been undertaken from principles outlined in the Highway Capacity Manual and Austroads to determine pedestrian Levels of Service and identify any potential bottlenecks or safety issues.
6.2.2
Methodology
Pedestrian surveys around Britomart have been used to build a picture of existing pedestrian movements in the area. Pedestrian movements to and from the main doors into Britomart have then been reassigned into the side and rear doors for the construction period and required widths for a Pedestrian Level of Service C calculated (refer Figure 6.1).
Britomart Pedestrian Surveys - July 2015
Total Pedestrian Demand
New Station Exit and Entry Layout
Reassigned Pedestrian Movements
Pedestrian Levels of Service
Figure 6.1: Pedestrian Assessment Methodology Overview
Transport Access and Parking Delivery Work Plan
June 2016
80 A number of data sources have been used to inform the pedestrian assessment. These include:
A pedestrian survey was undertaken at a number of count sites around Britomart for the week beginning 27 July 2015 to measure pedestrian volumes.
Pedestrian profile surveys for the whole station and for each exit at Britomart were completed by Beca in 2013 as part of the Britomart Station Modelling Report.
6.2.3
Assumptions and Limitations
Assumptions and limitations for this assessment are listed below:
No changes are assumed to bus and rail schedules.
The effects of pedestrian platooning due to traffic signals are not included.
Pedestrian throughput at any entrances and exits into Britomart are assumed to be determined by the widths of the walkway rather than constrained by any pedestrian interactions inside the building.
Special events resulting in high public transport use (such as Christmas in the Park) have not been analysed as part of this assessment.
This pedestrian assessment exercise is high level in nature and aimed at identifying potential bottlenecks, rather than a detailed pedestrian modelling exercise.
The effects of waiting passengers at the Commerce Street signalised crossing have been excluded.
Levels of Service have been determined by calculating the peak flow per minute. 15 minute flows have been converted into minute flows on a pro-rata basis after which a peaking factor of 10% is then applied.
6.2.4
Pedestrian Reassignment
Pedestrian reassignment has been undertaken to simulate the closure of the main BTC entrances on lower Queen Street, and the CPO accesses on Galway Street and Tyler Street. To represent the worst case scenario, pedestrians originally using the lower Queen Street entrances to the BTC are assumed to be accessing the station using the side doors on Galway Street and Tyler Street. Table 6.1 below outlines the reassignment of pedestrian movements and any splitting of movements. Table 6.1:
Reassigned movements
ID
Original Movement
Reassigned Movement
1
South Door on lower Queen Street
New Galway Street door via Galway Street
2
Centre Door on lower Queen Street
Split 50/50 between Galway and Tyler Street doors
3
North Door on lower Queen Street
New Tyler Street door via Tyler Street
4
Galway Street Door – To and from West
New Galway Street door via Galway Street
5
Galway Street Door – To and from East
Commerce Street main entrance via Galway Street
6
Tyler Street Door – To and from West
New Tyler Street door via Tyler Street
7
Tyler Street Door – To and from East
Commerce Street main entrance via Tyler Street
Transport Access and Parking Delivery Work Plan
81
Figure 6.2: Original and Reassigned BTC Pedestrian Movements
Figure 6.2 outlines the reassignment of pedestrian movements from the closed entrances at the CPO to the new entrances at the rear of the BTC (Station Square and the Glasshouse). Following the reassignment, a number of key bottlenecks were identified. These are:
Galway Street Footpath
Tyler Street Footpath
The new Galway Street side doors
The new Tyler Street side doors
The new station entry.
The PM peak is the critical peak, with around 2,900 pedestrians movements counted in the 15 minute peak between 5:00 pm and 5:15 pm. The AM peak has less pedestrian demand, with around 2,100 pedestrians counted in the 8:15 am to 8:30 period.
6.2.5
Pedestrian Levels of Service
Required access widths for pedestrian Level of Service C (LoS C) are shown for the AM peak bottleneck analysis in Table 6.2. Table 6.2:
AM Peak Bottleneck Analysis
Bottleneck Analysis
Pedestrians Per Minute
Required Width for LoS C
Available Width
Galway Street South Footpath
45
1.1 m
4.5 m
Tyler Street South Footpath
26
0.6 m
4.0 m
Transport Access and Parking Delivery Work Plan
June 2016
82
Bottleneck Analysis
Pedestrians Per Minute
Required Width for LoS C
Available Width
New Galway Street side door
32
0.8 m
8.0 m
New Tyler Street side door
34
0.8 m
4.0 m
New station entry
20
0.5 m
8.0 m
As shown in Table 6.2, all pedestrian movements are adequately catered for and surpass the Level of Service C requirements by some margin in the AM peak. Table 6.3:
PM Peak Bottleneck Analysis
Bottleneck Analysis
Pedestrians Per Minute
Required Width for LoS C
Available Width
Galway Street South Footpath
73
1.8 m
4.5 m
Tyler Street South Footpath
30
0.8 m
4.0 m
New Galway Street side door
63
1.6 m
8.0 m
New Tyler Street side door
28
0.7 m
4.0 m
New station entry
66
1.6 m
8.0 m
Table 6.3 outlines the required access widths in the PM peak. Again, all pedestrian movements are adequately catered for and surpass the Level of Service C requirements. In summary, pedestrians are provided with sufficient width to move freely along footpaths and into accesses, and a Level of Service C is attained or surpassed – even in the worst case scenario where all pedestrian movements are reassigned to the closest side door. It is anticipated that pedestrian demands on Tyler Street and Galway Street will be reduced through the wayfinding measures proposed and that the above analysis is therefore conservative. The analysis suggests that there will be sufficient standing room on the western side of the new Commerce Street pedestrian crossing. If on-going monitoring suggests it is required, this pedestrian crossing could be widened and pedestrian fencing installed along the kerbline to improve safety. It is noted that users of this entry will most likely have bypassed the Takutai Square entry and that the main entry to the station is likely to be the southern one on Galway Street which will be obvious to patrons approaching from the Queen Street valley by either lower Queen Street of Fort Street – Commerce Street routes. It is also noted that the amount of through pedestrian traffic will potentially be reduced with the closure of the Downtown Shopping Centre for redevelopment to the west. The walkway area through the block to the east will provide ample pedestrian waiting room on the eastern side; although if crowding because of the crossing and bus stops is judged to interfere with north-south pedestrian movement then markings or a change in paving finish / type indicating a clear path could be installed.
6.3
Emergency Services
Emergency services are not expected to be restricted in terms of connectivity or accessibility when moving under lights in an emergency due to the relatively open nature of the Project road arrangements. Additional congestion in the CBD generally may reduce response times for emergency services. However, as previously noted the increase in bus lanes which are available to them (under lights) will offset or negate much of this change by providing a means to by-pass the majority of congestion and queueing (such as on Queen, Victoria and Wellesley streets), unless specific response corridors and signal plans are developed. This change has been acknowledged in discussions with the emergency services for consideration in incident planning. Figure 6.3 shows likely response routes to
Transport Access and Parking Delivery Work Plan
83 the Project area (note that there is an Ambulance base opposite the uptown fire station on Pitt Street near the bottom right of the image). Fire service aerial tenders require 5.5 metres of carriageway width to deploy their outriggers for full boom use. The narrowed lanes on Galway Street and Tyler Street may push the outriggers onto the footpath where there is a possibility of collapse due to underground services beneath the high point loads. To mitigate this, the fire service will be advised to partially mount on the kerb before deploying outriggers to ensure they use the carriageway. The former carriageway area will be marked to guide the placement of outriggers onto the former strengthened carriageway. Any changes would be included in the building incident plans to be prepared and enacted by the fire service.
Figure 6.3: Summary of emergency service response routes to the Project area
6.4
Taxi Operators, Parking and Service Traffic
Table 6.4 outlines the changes to kerbside management undertaken to create working space for the Project and mitigate losses of parking.
Transport Access and Parking Delivery Work Plan
June 2016
84 Table 6.4:
Parking Changes and Relocation
Facilities
Existing
New
Mobility parking
2 lost due to building
2 x provided on Galway Street
BTC space
1 lost due to building
1 x provided on Galway Street
Taxi stand
3 lost due to footpath widening on Galway Street
4 provided 2 on Galway 2 on Tyler Street
P5 spaces
9 lost due to building
9 provided on Galway and Tyler Street east of Commerce Street
P10 spaces
3 lost due to footpath widening on Tyler Street
Decision made by parking not to replace these
Loading zones
1 x 23m LZ lost on Tyler Street due to footpath widening 1x 12m LZ on Galway Street east of Commerce Street
1 x 11m LZ provided on Tyler Street but operational outside construction hours only 1 x 12m LZ relocated further east on Galway Street
On street parking
7 x Central City Parking Zone (CCPZ) on Galway Street 6 x CCPZ on Tyler Street
Replaced by P5 and taxi stands. Loss 13 CCPZ spaces.
New Bus stop by Quay Street
Existing P10 parking indented space for 1 cars
Loss of 1 P10 spaces for new bus stop
Taxi stands will be relocated from the western side of Galway Street to the eastern side of Galway Street and Tyler Street (east of Commerce Street). P5 parking spaces will also be provided in the same area. Overall there is a net loss of 13 CCPZ metered parks and up to 4 P10 spaces, while taxi and loading zones are retained. There is a public paid car park located on Britomart Place (opposite Takutai Square) available for longer term parking to mitigate the loss of Central City Parking Zone (CCPZ) metered parks and P10 parking spaces. In summary the effects are less than minor.
Transport Access and Parking Delivery Work Plan
85
7
Monitoring
7.1
Monitoring Requirements
CRL designation Condition 26 specifies monitoring of travel times on ten key main routes across the CBD, against those observed before the Project works and forecast change during the works as shown in Figure 7.1. Additional mitigation measures are required if monitoring indicates that the travel time exceeds the trigger time. The trigger times are calculated as per Condition 26 of the CRL designation regarding the monitoring requirements: 
If the modelled forecast time is less than or equal to 4 minutes above the observed base case time, the trigger time for that route is defined to be 3 minutes greater than the forecast time.

Otherwise, if the forecast time is more than 4 minutes above the observed base case time, the trigger time is defined to be 30% greater than the forecast time. The routes for which this condition applies are marked with an asterisk in the travel time tables.
Figure 7.1: Journey Time Routes specified by the CRL designation conditions
Transport Access and Parking Delivery Work Plan
June 2016
86
7.2
On-going Continuous Monitoring of Travel Time
In order to have continuous monitoring data to hand (and not be reliant on third party data), AT commissioned a Bluetooth data mining system is to be installed on the six northern monitoring routes specified by the designation conditions. This system became operational on 2nd October 2015 and will provide a reliable and statistically significant data set on those routes. The Bluetooth system installed is currently used in central Christchurch and samples typically 10-15% of vehicles passing the sensor, providing a continuous stream of data and hundreds of data points in the peak traffic periods of particular interest. It provides real time feedback to the TOP group (and thus AT road operations, network optimisation and ATOC teams) through control room dashboard reporting and can be used to investigate congestion associated with a particular incident. It is proposed to use this improved data source to update the observed data and resulting forecast and trigger times given in the preceding section of this DWP prior to the start of construction activity (with the agreement of Auckland Council). Although not specified in the designation, it is proposed to provide monthly reporting10 of travel times on the specific routes. Reporting and active monitoring will also be undertaken by the AT road operations team after each major traffic switch. It has been agreed that a 1-2 week settling period will be made for travel time reporting after a major TMP switch. This period is typical after a network change and allows drivers to adapt to road conditions (as some will ignore on-site and more general pre-publicity). Abnormal travel times resulting from traffic incidents will be excluded from the average travel time performance figures reported and used as assessment against trigger levels. There are two types of traffic incident that will effect (and distort) average travel time assessment, planned and unplanned incidents and will justify data exclusion for a particular period.
Planned incidents include events such as special or major events (e.g. the annual Santa Parade) and short term construction events in the carriageway (e.g. over-dimension vehicle movements).
Unplanned incidents are more common and include traffic crashes, breakdowns, emergency utility or construction works (e.g. a burst water main or building instability requiring demolition such as the Griffiths Building Wellesley Street currently), spills and protests.
Long term planned events such as changes to the transport network (e.g. construction of the proposed LRT system) or major building developments may require reassessment and modelling of trigger times. To aid in this, AT also have access to the ‘Snitch’ data source (similar to the system used by NZTA), which is GPS based and will provide a cross check on the Bluetooth data and wider view of the network. A daily log of traffic events and activity will need to be maintained to enable abnormal incident days to be identified when reporting on travel time performance eon the prescribed routes and wider network. In addition, AT will continue with normal real time monitoring of traffic performance and treatment effectiveness including bus travel times (GPS linked to real time passenger information system and contract performance management) and kerbside management and adjust, optimise or improve TMP measures in conjunction with the project team.
10
Note: the TOP group is currently reporting weekly on CBD performance and network optimisation activities and effectiveness
Transport Access and Parking Delivery Work Plan
87
7.3
Travel Times and Additional Congestion Mitigation Triggers
7.3.1
Determination of Indicative Travel Time Triggers
Existing average (mean) travel times for the ten specified routes have been obtained for the 12 months to August 2015. The use of 12 month averages is considered appropriate to account for the effects of potential incidents on the wider road network and seasonal variation in traffic flow. This data has been supplied by NZTA from commercially provided GPS data11 for each of the three modelled forecast periods. The number of observations available for each route and period from this system are commercially sensitive and are not available to the Project as a third party under NZTA’s data agreement. The observed average travel times before the construction works are given in the tables of Appendix M alongside the indicative forecast travel times for the two major traffic periods for the Project (i.e. before and after the start of the Britomart underpinning and Albert Street cut and cover tunnel works). The application of the scale of the travel times forecast by the modelling to the observed travel times as a percentage rather than absolute model values is considered appropriate as the 2021 SATURN models include an allowance for annual traffic growth which will not directly align with the observed 2014 / 2015 data period before the start of works.
7.3.2
Determination of Monitoring Travel Time Triggers during Construction Phase
As previously noted, the Auckland CBD is currently and expected to continue to present a very dynamic traffic environment; as the result of on-going changes to nature and timing of the road network, public transport mode share, major project site access haul routes and construction traffic from public works and private developments. An indication of the scale of development expected during (and before) the Project is given by Figure 7.2. Since the traffic modelling was prepared (and more recently updated) for this DWP a number of major public and private project programmes have slipped which affects the physical form and loading of the network and thus the modelled network and applied traffic.
Figure 7.2: Illustration of expected developments in relation to the wider CRL enabling works (CRL projects shown in yellow and stormwater main realignment shown in red)
11
Anonymised data provided by a GPS mapping supplier and including data from various user groups such as taxis, freight vehicles and buses
Transport Access and Parking Delivery Work Plan
June 2016
88 Although the traffic models and process is considered to be robust and valuable in identifying the scale of effect and determination of mitigations measures and their potential effectiveness, it is considered that the models and this DWP should be updated during the project to provide more meaningful travel time trigger values. This should occur closer to the time of each relevant major traffic event through the course of the Project when traffic and network conditions can be more confidently agreed and assessed. The traffic models and the trigger time table in Appendix M will be updated by the following process:
Establish ‘New Basecase’ 3-4 weeks before start of physical works for the Britomart underpinning and cut and cover tunnel, along with the Albert Street cut and cover tunnel (and notably the Customs / Albert intersection reduction). This ‘New Basecase’ will include the changes identified previously in this DWP for the Phase 1 and 2 bus, cycleway, major development traffic and stormwater main realignment (Pipe Jack) projects. It will be based on the Scenario / Test 3 model established for the stormwater main realignment TTMP (and subsequent models referred to previously).
Obtain observed travel time data for the northern six (CBD group) monitoring routes from the AT Bluetooth system for the preceding six months (or more if available).
Obtain updated observed travel time data for the southern four (Mt Eden group) monitoring routes from the NZTA GPS system for the preceding year.
Update the Test 412 model 3-4 weeks before the start of physical works on the Britomart underpinning, cut and cover tunnel and Albert Street cut and cover tunnel projects13 to reflect actual road network and traffic conditions.
Compare the updated Test result against the ‘New Basecase’ to derive percentage scale of effect and then apply this to the updated observed travel time data (as done for the indicative travel time triggers and already certified trigger times of the stormwater main realignment project TTMP14. The observed travel times for this new basecase will be maintained as a comparison point throughout the project for consistency of reference (recognising that each test model includes the cumulative impact of network changes included in the ‘New Basecase’).
Update the remaining Test models 3-4 weeks before identified major changes in road network or traffic conditions. Although dependent on the timing of various projects the following events are considered likely to require model updates:
Customs Street (East) further reduced and both sides Wyndham temporarily closed – Test 5
Wolfe St diversion removal with left turn exit from NBD service lane only, Tyler Street reversal, and Customs Street (West) is further reduced – Test 6
Customs / Albert bridge works & trench installation complete – Test 7
Pipe jack complete, long-term Albert Street operation – Test 8
Albert Street works complete but Britomart underpinning continues – New Test 9 (an update of test 8).
The following model items will also be considered for update after assessment of their potential influence at the time of assessment:
12
The letter following each model is due to an update or alternate scenario tested, Test 4d will therefore become Test 4e The modelling of these two projects is essentially identical with the Albert Street works being more influential in terms of changes to the physical road network. 14 It is expected that the observed data will underestimate travel times to a degree due to the reductions in road network capacity during that period due to bus, cycle lane and turn restrictions. 13
Transport Access and Parking Delivery Work Plan
89
7.3.3
Major project network features, haul routes and construction truck volumes (including stormwater main realignment, Downtown Centre, New Zealand International Convention Centre, NDG Auckland Centre, 1 Mills Lane and Ports of Auckland stormwater)
Private development peak hour site access restrictions
Observed mode shift due to TDM campaign.
Monitoring of Local Road Traffic Conditions and Temporary Traffic Controls
The BTC designation conditions15 require monitoring surveys of traffic at key intersections around the Project worksite for a six week period at the commencement of the Station Plaza accommodation works (Stages 1 and 4)16 and Britomart Station modification works(Stages 2 and 3). These studies will consider the during the weekday morning (7:30 – 9:30 am) and afternoon (3:00 – 6:00 pm) peak traffic periods. A baseline traffic study is similarly required three months before the start of Project works. The traffic studies are to be undertaken by a suitably qualified and intendent person, who will then make binding recommendations to AT on on-going traffic management including any changes to the traffic management instituted at the start of works. These traffic surveys and traffic engineering assessments will be commissioned by AT directly and not the DSBJV contractor17. In making binding recommendations for any additional temporary traffic management measures or controls, the Independent Person will need to ensure that proposed measures retain sufficient flexibility for on-going operations. This will be necessary to ensure that local access and conditions are not prioritised at expense of continuing achievement of the overarching NOR and BTC designation outcome of minimising congestion and maximising pedestrian and public transport movement. Reasonable access to the construction site and support areas is also necessary. As these traffic surveys are required to be independent, it is not appropriate for this DWP to nominate the type or duration of these traffic surveys and studies however the following scope and understanding is noted. The intersections required to be monitored are:
Quay Street / Commerce Street;
Tyler Street / Commerce Street;
Galway Street / Commerce Street; and
Customs Street / Commerce Street.
In addition it is suggested to undertake traffic surveys for the baseline and Stage 1 traffic studies at the following intersections which will allow for meaningful consideration of changes in travel conditions relative to conditions before the start of works:
Lower Queen Street / Quay Street; and
Customs Street / Lower Queen Street / Queen Street.
15
Conditions 24.3(l), (m) and (n) Noting that changes to streetscape and bus routing are being undertaken prior to certification of this DWP and the start of this Project through a separate contract. 17 To maintain independence the following companies will be excluded from undertaking these studies: Aurecon (AT Principal Technical Advisor), AECOM (DSBJV temporary traffic advisor), Tonkin + Taylor (DSBJV planning advisor), T2 Traffic and Transportation Consultants (AC certification advisor, bus New Network infrastructure and bus change consultant, and Britomart streetscape interim changes designer), Flow Transportation Specialists (BTC traffic consultant for BTC and NOR designation), Traffic Design Group (Commercial Bay contractor temporary traffic advisor) 16
Transport Access and Parking Delivery Work Plan
June 2016
90 The following aspects of traffic operations may be monitored:
Traffic volumes (these may be by direct observation i.e. manual survey or automated video survey; or from traffic signal detector loop counts with sample surveys of turning movements to assess turning proportions of shared movement (i.e. common detector loop) lanes;
Queuing and delay at intersections (these may be by direct observation i.e. manual survey; GPS or manual floating car; or electronic surveillance such as Bluetooth data mining or GPS);
Pedestrian movements (by direct observation i.e. manual survey; or by video survey) and
General traffic operation observations (by traffic engineer or other suitably qualified person), notably of pedestrian movements and conditions.
The BTC conditions prescribe a four week monitoring period after the start of each major stage of works with report describing the observations and provide recommendations for ongoing traffic control to be implemented by AT produced by the Independent Person during the following two weeks. It is noted that the period of survey substantially includes the normally expected 1-2 week traffic settling period. Traffic studies during such settling periods are considered to be poor practice as data gained during this period generally will not provide representative data to base decisions on with respect to further mitigations. It is suggested that traffic be surveyed for two or three representative week days during Weeks 2 or 3 of the nominated six week survey and investigation period.
Transport Access and Parking Delivery Work Plan
91
8
Communication and Stakeholder Interface
8.1
General
This TAP DWP has been developed in conjunction with the following parties (as previously discussed throughout this DWP in relation to specific elements of the TMP design and strategy):
AT CRL project team.
DSBJV (the Britomart contractor).
Connectus JV (the Albert Street contractor)
Traffic Management Coordination Group (TMCG)18 (tactical level) – fortnightly / monthly meetings of STM’s of the various projects in the wider CRL area for the coordination of potentially overlapping traffic management schemes (e.g. sign and delineator placement, access requirements).
Emergency services (and especially the Fire Service).
AT sub-consultants for the bus change programme (and thus representatives of AT’s teams for cycling, PT, road operations and others).
AT project teams for the Quay Street cycleway and Nelson Street cycleway.
AT PT service disruption and planning team.
Various developers (seeking or holding consent or TMPs and WAPs – including ensuring that proposed TMP strategies and measures are compatible with the Project).
Section 5.3 of the CEMP and Section 11 of the Communication and Consultation Plan set out the communication and consultation procedures and periods that will be followed to advise affected parties and the general public of the proposed temporary traffic management works. The following are noted for early and on-going consultation and agreement in regards to traffic matters:
NZTA (and the Auckland Motorway Alliance).
AT bus service disruption planning team.
Affected businesses and residents using Tyler Street accesses (2 Queen Street, 148 Quay Street and 152 Quay Street).
Affected businesses and residents on Galway Street (Mercure Hotel, McDonalds).
Opportunities will be explored by the AT CRL team to provide daily updates on traffic events to mapping organisations such as Google, Navman and TomTom in addition to the dedicated Project website.
8.2
All other stakeholders
All other stakeholders within Project area will be consulted with in regards to traffic matters on a regular, ongoing basis throughout construction of the project. The Project Communication and Consultation Plan outlines the strategy, tools and process to undertake and manage communication and engagement between the DSBJV, Project stakeholders and the community throughout construction of the Project. In particular, the plan sets out communication procedures in relation to the following matters for residents, road users, educational facilities and businesses potentially affected by the construction works: 18
Consultation prior to the commencement of construction; Now disestablished in favour of the Tactical Operations Plan (TOP) group
Transport Access and Parking Delivery Work Plan
June 2016
92
Notice periods for changes to pedestrian and vehicle access;
Regular updates on construction progress;
Key dates for major milestones such as road closure and re-opening; and
Communication on any other matters potentially affecting residents or business operations in the vicinity of the works.
8.3
Complaints
A complaints management process has been developed for the Project. Further details on complaint procedures and dispute resolution are provided in Section 5.3.1 of the CEMP and Section 13 of the CCP. Traffic (motorised, bus or active modes) related complaints will first be referred to the Project Director for assessment and addressed where they are judged to involve more than maintenance of agreed measures. Local traffic complaints should be addressed to: Dale Burtenshaw DSBJV Project Director Mobile: +64 21 115 1819 E-mail: Dale.Burtenshaw@downer.co.nz 130 Kerrs Rd, Wiri, Auckland 2104
8.4
Temporary Traffic Management coordination and process
During the development of the enabling works design and this DWP AT established a strategic level Traffic Management Coordination Group (TMCG) to coordinate the TMPs of the various large (and small as required) projects in the CBD. This group met fortnightly to coordinate traffic management issues between projects at a planning level and has contributed to the development and refinement of this DWP. The TMCG included representatives of major projects (including the two CRL enabling works, Precinct Group Downtown Shopping Centre redevelopment contractor and those of the other major private developers as appropriate), the AT CAR, road operations and ATOC teams, ATEED and CCI. NZTA and its agents from the Auckland Motorway Alliance (tasked with the efficient operation of the Auckland motorway network) have been involved in the development of this DWP through open invitation to the TMCG, supply of baseline travel time data, on-going review of the draft document and continuing assessment and planning of motorway management measures in conjunction with normal planning and management for recent rapid population growth traffic and events such as the upcoming opening of the Waterview connection. NZTA have confirmed that they support the project and have formed the TOP group with AT to this end. The final, formal feedback from NZTA is attached as Appendix O of this DWP with commentary provided in the response to condition 18.1 in the Independent Peer Reviewer response presented in Appendix N of this DWP. For the delivery of the project the responsibility for traffic management of the project effects (outside the immediate construction area and coordination of projects is to be passed to the established Tactical Operations Plan group which is a joint initiative of AT and NZTA to manage planned and unplanned congestion management and incident response on a ‘One Network’ basis. This group is overseen by a steering group of senior AT and NZTA managers and will draw on subject matter experts including the CRL and other project teams as needed. Monthly reporting to the PCG, Steering Group and on to the AT and NZTA boards is expected. Figure 8.1 shows the structure of the TOP group, reporting line and organisational commitment (not shown is the AMA team represented by NZTA in the working group as needed).
Transport Access and Parking Delivery Work Plan
93
Figure 8.1: The structure and initial staffing of the Tactical Operations Plan group
Transport Access and Parking Delivery Work Plan
June 2016
94
9
Review and Updating of the DWP
This DWP has undergone a review process with the relevant CRL Community Liaison Group (CLG), NZTA and an external Independent Peer Reviewer. An explanation of how any comments from the CLG, NZTA and Peer Reviewer have been addressed is provided at Appendix N and Appendix O of this DWP respectively).
9.1
DWP Review
This DWP will be updated throughout the course of the Project to a b
To reflect any material changes associated with the changes to the traffic environment, construction works, natural environment or due to unresolved complaints; and As part of the annual management review of the DWP.
The annual review will be undertake by the Project Management team and AT representatives. The management review will be organised by the Environmental and Sustainability Manager and the Project team will be informed of any changes to this DWP through the regular Project communications processes. The review will take into consideration:
Compliance with the CRL and BTC designation Conditions, and resource consent conditions, the CEMP, this and other DWPs and EMPs (including site specific plans) and material changes to these plans.
Any significant changes to construction activities or methods.
Key changes to roles and responsibilities within the Project team.
Changes in industry best practice standards.
Changes in legal or other requirements (social and environmental legal requirements, consent conditions, AT objectives and relevant policies, plans, standards, specifications and guidelines).
Results of inspections, monitoring and reporting procedures associated with the management of adverse effects during construction.
Comments or recommendations from Auckland Council regarding the CEMP, this and other DWPs and EMPs.
Unresolved complaints and any response to complaints and remedial action taken to address the complaint.
9.2
DWP Updates
The process for updating this DWP as a result of a material change to the Project or the annual review, is as follows (refer to CRL designation Condition 23 and BTC designation Condition 22 for further information):
Any material change to this DWP must be consistent with the purpose and objective of the relevant conditions listed in Table 1.1 of this document.
Affected parties and the CLG must be notified of the review and any material change proposed to this DWP.
This DWP must clearly document the comments and inputs received from affected parties in relation to any material changes, along with a clear explanation of where any comments have not been incorporated, and the reasons why not.
Transport Access and Parking Delivery Work Plan
95 
Any material change proposed to this DWP shall be subject to an independent peer review as required by CRL Condition 11 and BTC designation Condition 12.
Any material change proposed to this DWP relating to an adverse effect shall be submitted for approval to Auckland Council Compliance and Monitoring Officer, at least 10 working days prior to the proposed changes taking effect. If any changes are not agreed, the relevant provisions of the RMA relating to approval of outline plans shall apply. A copy of the original TAP DWP document and subsequent versions will be kept for the Project records, and marked as obsolete. Each new / updated version of this DWP documentation will be issued with a version number and date to eliminate obsolete DWP documentation being used. A summary of the review process will be provided annually to Auckland Council and otherwise be made available on request.
Transport Access and Parking Delivery Work Plan
June 2016
Appendix A:
Workforce Travel Plan
Auckland City Rail Link In association with:
ENABLING WORKS CONTRACT 1 WORKFORCE TRAVEL PLAN
Document ref: CRL-BTM-ENV-DOW-PLN-000283
Revision: 4 FINAL JUNE 2016
COMMERCIAL IN CONFIDENCE Workforce Travel Plan
FINAL
Version history Rev.
Date
Version details
Prepared by
Reviewed by
1
November 2015
First draft
S. Dove
M. Williams
2
January 2016
Draft for Independent Peer Review
S. Dove
R Purdy, P Roan
3
April 2016
Final draft
S. Dove
D. Burtenshaw, R Purdy, M. Williams
4
June 2016
Final
S. Dove
J Urquhart, P Roan, R Jenkins
Distribution Date
Version
Issued to
Quantity & type
Approved for the DSBJV by
December
Draft
Auckland Transport
1 x Electronic
D Burtenshaw
23 December
Draft
Community Liaison Group
1 x Electronic
D Burtenshaw
29 January 2016
Draft
Independent Peer Review
1 x Electronic
D Burtenshaw
April 2016
Draft
Independent Peer Review
1 x Electronic
D Burtenshaw
9 May 2016
Draft
Independent Peer Review
1 x Electronic
D Burtenshaw
18 May 2016
Draft
Community Liaison Group
1 x Electronic
D Burtenshaw
2 June 2016
Final
Auckland Transport
1 x Electronic 1 x Hard Copy
D Burtenshaw
This document remains the property of DSBJV. Its contents are confidential and shall not be reproduced, destroyed or given away without express, written permission of DSBJV. The electronic version of this document in FULCRUM on designated serves(s) is the Master Copy and is a controlled document. Unless specifically noted, thereon, other copies of this document are uncontrolled. p:\30850\30850.0500 planning\30850.0502 (transport)\issueddocuments\final 2 june\appendix a - final workforce travel plan crl-btmenv-dow-pln-000283.docx
Workforce Travel Plan
JUNE 2016
Table of contents 1
Introduction 1.1 Purpose of the Workforce Travel Plan
1 1
2
Project Description 2.1 Overview 2.2 Construction Stages 2.3 Project Staff
2 2 2 2
3
Travel Plan Objectives
3
4
Site Travel Information 4.1 Working Hours 4.2 Physical Infrastructure 4.3 Accessibility
4 4 4 5
5
Management 5.1 Management Structure 5.2 Parking Management 5.3 Staff Inducements
7 7 7 7
6
Travel Mode Measures 6.1 Introduction 6.2 Active Modes 6.2.1 Facilities 6.2.2 Promotion & Incentives 6.3 Public Transport 6.4 Car Pooling & Van Pooling 6.4.1 Car Pooling 6.4.2 Van Pooling 6.5 Organisational Measures 6.5.1 Logistics 6.5.2 Promotion 6.6 Communications
8 8 8 8 8 9 9 9 10 10 10 10 10
7
Expected Outcomes
12
8
Monitoring and Review
13
Appendix A :
Action Plan
Appendix B :
Site Layout Plans
Workforce Travel Plan
JUNE 2016
Glossary of abbreviations Acronym
Definition
AT
Auckland Transport
BTC
Britomart Transport Centre
CBD
Central Business District
CPO
Former Chief Post Office Building
CRL
City Rail Link
DSBJV
Downer Soletanche Bachy Joint Venture
DWP
Delivery Work Plan
TDM
Travel Demand Management
Workforce Travel Plan
JUNE 2016
1
1
Introduction
The City Rail Link (CRL) project comprises the construction, operation and maintenance of a 3.4 km underground passenger railway, running between Britomart Station and the North Auckland Rail Line in the vicinity of Mt Eden station. The works (the Project) involve the construction of an extension to the existing passenger rail network from the current termination point within the Britomart Transport Centre (BTC), westwards underneath the former Chief Post Office building (CPO) and Lower Queen Street.
1.1
Purpose of the Workforce Travel Plan
Travel Planning is an internationally recognised process where a workplace, working in conjunction with the Council, implements and promotes safer and more sustainable travel options for its staff. Travel plan measures help communicate opportunities for staff to use sustainable travel modes safely, along with incentives to do so. This Workforce Travel Plan has been prepared to outline onsite car parking management and methods for encouraging staff travel to the site using forms of transport other than private vehicle in order to assist in mitigating localised traffic effects during the Project. This Workforce Travel Plan is required under CRL designation Condition 20.1(d) and BTC designation Condition 19.1(d). Through the development and implementation of the measures within this travel plan it is envisaged that the workplace staff will strive towards using sustainable modes of travel and thereby alleviating congestion around the construction areas of Auckland City Centre. This Workforce Travel Plan has been prepared by AECOM for the Downer Soletanche Bachy Joint Venture (the Contractor - DSBJV) and forms part of the Transport Access and Parking Delivery Work Plan (DWP) for the Project. This Workforce Travel Plan has been drafted to generally follow Auckland Transport’s (AT) workplace travel plan template.
Workforce Travel Plan
JUNE 2016
2
2
Project Description
2.1
Overview
The Project involves the construction of an extension to the existing passenger rail network from the current termination point within the BTC, westwards underneath the CPO Building and Lower Queen Street. Separate works are being undertaken to continue the CRL tunnels from this point under the Downtown Shopping Centre site (which is to be redeveloped by Precinct Properties), and up Albert Street. The Project will involve significant works beneath the CPO, with the construction of two new tunnels extending westwards beneath the basement floor level. In Lower Queen Street, sheet piling will be extended across the road corridor, excavation undertaken to form the tunnels followed by reinstatement of the road corridor following the completion of works. During construction, existing ticketing and retail functions and pedestrian access to the station will be accommodated in Station Plaza, at the rear of the CPO building. Surface works will also be required in QEII Square associated with the Downtown Shopping Centre redevelopment, including construction of the CRL rail tunnels beneath this site (Precinct Properties scope of work). Following the completion of works, the Project area will be reinstated. A detailed description of the construction works is provided in the CEMP.
2.2
Construction Stages
The Project will take approximately 48 months to complete, between July 2016 and June 2020. The main construction work stages will be as follows: Stage 1 – Temporary station accommodation in Station Plaza and streetscape works (approximately July 2016 to January 2017) Stage 2 – CPO demolition and piling works (January 2017 to May 2017) Stage 3 – CPO and Lower Queen Street underpinning (CPO), piling, excavation, tunnel construction, backfilling and reinstatement (May 2017 to March 2020) Stage 4 – Streetscape reinstatement, removal of temporary accommodation and tie-in new tunnels with existing rail alignment (April 2020 to June 2020).
2.3
Project Staff
During the Project there is anticipated to be between 20 and 80 total staff on site for the majority of the time, based on work type activity. However, there may possibly be 100+ staff on site on two occasions; during temporary accommodation works (Stage 1 of the Project) and CPO rebuilding works (end of Stage 3 of the Project). Between 10 and 30 engineering and administration staff will be office based during the Project.
Workforce Travel Plan
JUNE 2016
3
3
Travel Plan Objectives
The development and implementation of this Workforce Travel Plan is required by the CRL and BTC Designation Conditions and recommended practice by AT’s Travel Demand (Commute) team. This travel plan is consistent with the intent of the wider Central Business District (CBD) TDM Plan 1 being undertaken by the Commute team to support the wider CRL project and to manage and mitigate traffic congestion during the works. The main purpose of the plan is to minimise the use of private cars by staff travelling to and from the Project area during construction works, in order to assist with efficient traffic management. The following objectives are therefore key to the success of the travel plan: 1
To reduce vehicle congestion around the Project area and provide leadership by example to the CBD community in this regard.
2 3
To facilitate the uptake of sustainable travel modes by staff travelling to/from the Project area. To ensure the safety of staff travel within proximity to the Project area.
4
To encourage Project staff to embed physical activity into their commute.
These objectives are inter-linked, as reducing vehicle movements around the Project area has safety benefits (through reduced conflict potential), wider environmental benefits (through reduced emissions), along with health benefits for staff (through increased physical activity, especially for office staff). The benefits of implementing travel plan measures can also include improved site management and efficiency. For example, providing less commuter car parks in the Project area frees up space for other activities or greater storage capacity. In addition, reduced congestion around the Project area will lead to fewer business trip delays. Reduced congestion around the Project area will improve local accessibility for the general public and reducing the number of car trips coming into the city centre will contribute to AT meeting their TDM Plan targets.
AT’s draft Travel Demand Management (TDM) Plan. This forms part of measures to reduce number of daily vehicle trips coming into Auckland City Centre by 4,000, to enable the current network functionality within the CBD to be maintained during construction works disruption. 1
Workforce Travel Plan
JUNE 2016
4
4
Site Travel Information
4.1
Working Hours
The Project area will typically operate during standard construction hours of 7am to 7pm Mondays to Saturdays. However, staff will potentially finish earlier on Saturdays.
4.2
Physical Infrastructure
Construction support areas (site compounds) will primarily provide for: Site offices (during Stage 1 of the Project); Material / spoil storage, set down and handling; Staff facilities (e.g. briefing and rest areas, OSH spaces including showers and first aid, toilets); Minor trades access and parking. Construction support areas may also provide for staff or visitor parking if space permits. Figure 4.1 provides an indicative layout plan of the Project area. While Figure 4.1 outlines the site layout for Stage 3 of the construction works, the offices and facilities will be in the same or similar locations throughout the Project.
Figure 4.1: DRAFT Site layout
Workforce Travel Plan
JUNE 2016
5 The Project area will have two main work sites as follows: Work site
Description
CPO building
This will be the main work site for the majority of the workforce. Half a floor within the CPO building will be utilised for Project office space (to house 10 to 30 office based staff). This office will have access to toilets and shower facilities currently available within the CPO building. Toilets will be provided in the temporary works station area, at ground level. Showers, lockers and a staff room will be provided on the floor above. The DSBJV is looking to provide a secure bicycle storage area, potentially in the contractor’s area south of the glass house.
Lower Queen Street Cut and Cover site
The temporary works area will also house storage areas, a first aid room, and workshops as appropriate. A small number of site car parks will be provided in the Downtown car park building for the use of Project staff.
4.3
Accessibility
As staff have not yet been recruited for the construction works, staff home locations are not known. For this travel plan it has therefore been assumed that staff will be travelling into the site from all areas around Auckland. Once staff home locations are known, the travel plan action plan can be tailored accordingly. Census 2013 ‘main means of travel to work’ data along with 2015 traffic survey data 2 has been assessed to gain an indication of the mode split anticipated by staff working at the site. Table 4.1 details percentage estimates from this analysis. Table 4.1:
Census mode of travel data
Mode of Travel
Census 2013: Main means of travel to work for employed people (%) Living in Auckland region
Car/van, as driver Car/van, as passenger Public transport Active mode Other (incl. didn’t work that day, worked from home, motorcycle etc.)
Working in CBD (workplace address)
65% 4% 7% 5%
Living in New Zealand 62% 4% 5% 8%
19%
21%
Traffic survey data 2015: Travel mode split for people entering CBD in AM peak
55%
50%
27% 12%
43% 7%
7%
-
Sustainable transport mode access to the work site is good due to the central city location, therefore it is anticipated that the mode split estimates will reflect those of the Census data from CBD workers column, and also in line with the traffic survey data mode split. These percentages have been used to inform mode split targets for this travel plan. A reasonable walking catchment covers the central city residential areas, along with the closer suburbs of Newmarket, Ponsonby and Newton. Temporary workers are most likely to be 2
Auckland Transport Travel Demand team 2015 traffic survey data
Workforce Travel Plan
JUNE 2016
6 accommodated in central city apartments/hotels, from which access to the site would be only a short walk. Cycling access to the site is improving from Auckland Isthmus residential areas. For example, Grafton Gully cycleway now connects the Northwestern Cycleway through motorway and urban areas to Beach Road. This will soon be extended to Britomart via Quay Street, creating an almost entirely offroad cycle route from Te Atatu to the city centre and waterfront. This project is one part of the wider Auckland Cycle Network, which is improving Auckland’s cycling connections. The work site has excellent accessibility by bus, train and ferry services from all areas of Auckland as it is adjacent to Britomart train station and across the road from the bus and ferry terminals. In addition, the regional bus service terminal at Sky City is only 10 minutes’ walk southwest of the site.
Workforce Travel Plan
JUNE 2016
7
5
Management
5.1
Management Structure
The DSBJV Project Director, will have overall responsibility to authorise and oversee the implementation and monitoring of travel management measures. To do this, the Project Director will be supported by a travel working group, along with being responsible for liaising with other CRL Project site managers on any CRL wide travel initiatives. The proposed working group would include the following members and roles: Project Director DSBJV) – Chair Administrator (DSBJV) – Secretary Zero Harm Manager (DSBJV) –Site facilities/SH&E manager Sue Philbin (AT) – CRL TDM Plan Manager (Commute team leader) Kate Brill (AT) – CBD Workplace Travel Plan Co-ordinator. This group will be responsible for driving sustainable travel and safety measures, reporting quarterly to management.
5.2
Parking Management
Car parking in the Downtown car park will be provided for senior management staff, an estimate of 10 spaces will be required. Assignment of these car parks will be at the Project Director’s discretion. There is also an option to utilise further spaces in the Downtown car park for site visitor spaces (predominantly sub-contractor and site vehicles). Specialist sub-contractors needing to bring tools or materials to site will use the designated site loading zones for delivery but will not be able to park on-site due to the sites spatial constraints. Permanent office based or field staff will generally not be provided a car parking space in line with the CBD environment and Project principle of TDM leadership and example to the wider community. Use of sustainable and public transport by Project staff will be encouraged. Van pooling will be investigated through this travel plan, in conjunction with the Project travel plan activities. This includes assessing the potential to brief staff off-site outside the city centre at a temporary park and ride site(s), and van pool staff into the site for daily work commencement.
5.3
Staff Inducements
During the staff recruitment process, work site travel information will be included in the contract pack. This is discussed in more detail in Section 6 of this Plan. There is also the option to obtain staff home locations at this stage, and the working group to assess viability for van pooling from a temporary park and ride location, in conjunction with the CRL C1 working group. Travel advice will be provided as an integral part of the staff health & safety site induction process. This will be in the form of a site access information sheet, and a tour of the active travel facilities and allocation of personal lockers as appropriate. Refer to Section 5.2.2 for AT incentives to use public transport.
Workforce Travel Plan
JUNE 2016
8
6
Travel Mode Measures
6.1
Introduction
The AT Commute3 programme provides Auckland workplaces the information and planning tools to help staff find more options for commuting to work. This programme, along with the draft CRL TDM Plan activities programme, has been used as the structure of this travel plan action plan, providing support to the measures and ensuring consistency across CBD workplace travel planning activities. This section provides details of the travel plan measures. These are summarised, along with timescales and delivery responsibilities in the appended Action Plan. The measures will be implemented to encourage reduced Project related vehicle trips. This will assist with the wider target of removing 4,000 vehicle trips coming into the city centre daily to alleviate congestion issues caused by construction network disruption. This target will enable the current network functionality within the CBD to be maintained, based on the Project works disrupting the city street network calculations.
6.2 Active Modes This section of the Action Plan includes means by which active travel (cycling and walking) will be promoted and encouraged by Project staff. These measures include both promotional and facilities measures and are linked with the Walking and Cycling AT Commute packages.
6.2.1 Facilities The DSBJV supports the provision of end of trip facilities designed to encourage workers to cycle/walk to work. Toilet blocks and showers are available within the Project area and 20-40 lockers will be provided. The DSBJV is also looking to provide bicycle storage racks, which will be located in the contractor’s area south of the Glasshouse. These end of trip facilities will enable staff to cycle/run to work, or do physical activity during their lunch break. Showers on the first floor of the temporary station area and within the site offices in the CPO building. Bicycle storage rack in the contractor’s area south of the glass house which will be secure and preferably covered. Lockers on the first floor of the temporary station area; it is anticipated that these are lockers are for work gear but could also be used for personal gear, with locker keys / key codes allocated during the staff induction process. Additional standalone lockers could be hired for the duration of the project, if required.
6.2.2 Promotion & Incentives Promotion of walking and cycling through health and wellbeing campaigns, and incentives for staff to use these modes include the following. The majority of these measures are supported by AT’s
3
https://at.govt.nz/driving-parking/commute
Workforce Travel Plan
JUNE 2016
9 TDM team and therefore resources are available at no cost from the AT CBD workplace travel plan co-ordinator. Provide cycle maps (e.g. https://at.govt.nz/cycling-walking/auckland-cycle-run-walkwaymaps/ Hold walk/cycle to work events, in line with national walk/cycle to work month (February) and AT’s proposed “Walk in to work out” (February) and “Love to Ride” (March) campaigns. Offer cycle training courses and/or trial bike hire scheme to staff, through AT programmes.
6.3 Public Transport The following measures are means by which public transport measures will be promoted and encouraged during the Project: Incentivise use of public transport through offering the AT ‘Give it a go’ 4 pass. This pass is offered to drivers who are travelling in the peak period (7-9am). The AT Commute team calculate the cost of each applicant’s commute by public transport and a HOP card is credited with 2 weeks funds for the applicant to trial public transport for free. The applicant will also receive journey planning advice. This is the current ‘Give it a go’ pass methodology and may change to a 2 week concession pass approach, however it will still provide an incentive for staff to trial public transport. Promotion of AT online journey planner (https://at.govt.nz/bus-train-ferry/journey-planner/) and online public timetable links (https://at.govt.nz/bus-train-ferry/timetables/) Information on how to access the site using public transport – information packs for staff for inclusion in induction, and information sheet for visitors.
6.4 Car Pooling & Van Pooling 6.4.1 Car Pooling Car pooling is a good option for staff to share the cost of travelling to work by car, especially if public transport is not a feasible option. AT supports carpooling as an alternative transport option and has established priority lanes, priority parks (at Albany Bus Station, Birkenhead Ferry Terminal and Half Moon Bay Ferry Terminal) and transit lanes across Auckland for car poolers to use. AT provides a free, secure online car pool matching service:
5
Let’s Carpool is open to individuals and registration is free. It enables staff to find car pool matches and choose whether to car pool on a single occasion or regularly. AT also offers workplaces the option of setting up dedicated schemes to encourage staff to register. In this instance the staff numbers are not necessarily high enough to warrant this, however, this could be an option across all CRL construction sites. Therefore the following measures can be provided for: Promote staff registration on AT’s Let’s Carpool website to find car pool matches. This can be done in conjunction with the wider AT’s city centre car pooling campaigns. Set up a Let’s Carpool scheme for all CRL construction site staff. 4 5
‘Give it a go’ pass is subject to AT Commute terms and conditions. http://www.letscarpool.govt.nz
Workforce Travel Plan
JUNE 2016
10
6.4.2 Van Pooling There is an opportunity for van pooling, to reduce congestion on site and conduct non-site based activities elsewhere. As part of wider CRL Project, AT owned site compound locations have been identified for spoil storage purposes. It is anticipated that spoil will not be stored on-site and will only be used as limited backfill in certain instances. Therefore, there is a potential opportunity to utilise one of these sites as an additional off-site compound, where staff briefings and hazard analysis could be conducted and act as a park and ride location for workers to be van pooled into site. This would free up vital space at the construction sites and reduce congestion. If this progresses there is an opportunity for such a scheme to also service the C1 site. However, further investigation work is needed to be carried out to determine the financial and practicalities of this option (including any consenting, if required) as there is potential cost to the contractors which may make this strategy impractical. Investigate additional off-site compound, in conjunction with CRL C2 site management, including park and ride and van pooling hub.
6.5 Organisational Measures The following measures will be implemented on site to encourage reduced vehicle trips. Unfortunately due to the nature of the construction site, flexitime/working from home and teleconferencing/videoconferencing will not be available as staff will be required on site full time.
6.5.1 Logistics Large construction sites create large vehicle traffic flows. To reduce the impact of these flows deliveries to the site will be consolidated. Construction traffic is already restricted to outside peak hours by consent conditions, but further vehicle trips will be removed through logistics planning and potential use of a centralised set down area / staging compound away from the main works. Consolidate material deliveries: Create a plan to manage/co-ordinate site deliveries.
6.5.2 Promotion Promotional measures have already been mentioned in previous sections, but will also be listed as individual measures here to provide further details. These measures are multi-modal and will ensure all sustainable travel mode options are considered based on applicability. Staff induction travel briefing: An information pack on travel options for Project staff, as part of the safety briefing. Sustainable travel expo: AT led expo on site in a communal area at various significant stages of construction / change of workforce. This will involve an information stand and AT advisors on standby to help staff with travel queries. This could be carried out in conjunction with the expo’s at nearby tower blocks, through AT’s CRL TDM Plan.
6.6 Communications Transport communications will be provided to staff through information provision at interviews/with contracts, during the staff induction process, and through promotional events/expos. All staff will be
Workforce Travel Plan
JUNE 2016
11 given a travel information pack at their induction which will include information on the work site’s travel policy, walking and cycling facilities, local public transport services, car pool and van pool options and parking regulations. This will be tailored in accordance with work site security. Any work site information provided to staff through an intranet will provide an opportunity to post travel links (journey planner etc). Visitors and suppliers will be provided with a site travel access information sheet, providing multimodal options and noting construction access restriction time periods.
Workforce Travel Plan
JUNE 2016
12
7
Expected Outcomes
The expected outcomes resulting from the implementation of the above measures are both quantitative and qualitative, and are shown as targets within the Action Plan (appended). The quantitative mode split targets have been informed by Census 2013 ‘main mode of travel to work’ data and 2015 traffic survey data, as explained in Section 4. Sustainable transport mode access to the Project area is good due to the central city location, especially with the site being located at Britomart train station and adjacent to bus and ferry terminals. Therefore it is anticipated that the mode split achievable will reflect/better this mode split accordingly. In addition, if a van pooling scheme is put in place, it is estimated that up to a quarter of workers (predominantly labourers) will be able to utilise such a service. These percentages will vary throughout the work site duration due to the transient nature of the workforce; however, these targets should be realistic when the work site is at staff capacity. Staff travel inductions should be 100% achievable, if embedded into the site safety induction process. And any sustainable travel expo’s should reach at least half of the staff at a given time. As a result of reaching the suggested targets, the expected number of vehicle trips coming into the site on a typical weekday morning would be in the order of 30, excluding deliveries. However, this is a rough estimate and more accurate traffic impact assessments are included in the Project Transport Access and Parking DWP.
Workforce Travel Plan
JUNE 2016
13
8
Monitoring and Review
The Action Plan (refer to Appendix A) details the responsibilities and timeframes for the implementation of the measures outlined in this Plan. This includes the site manager and facilities manager, supported by AT’s CBD travel plan co-ordinator. The Action Plan is also a reference list on which to base travel monitoring and reviews during the workplace duration, to comply with consent conditions and notices of requirement. Monitoring of the outcomes of the travel plan, in relation to the targets, will be carried out biannually due to the transient nature of the size of the workforce. It is suggested that monitoring be carried out by three methods to obtain the data required: Staff travel survey: A survey of staff to determine their main mode of travel to work and reason for doing so. This will be done through a quick online survey, or alternatively a simple tick box approach on a site entry sign-in sheet. AT’s Travel Demand team can provide assistance with this survey through the Commute programme, annually during October/November. Facilities survey: An administrator will carry out a quick assessment of usage of active travel end of trip facilities, and staff inductions check. Traffic survey: A survey of number of vehicles entering the site in the morning across a week. This is likely to be undertaken in conjunction with traffic surveys required for the wider Traffic Management Plan.
Workforce Travel Plan
JUNE 2016
Appendix A:
Action Plan
The following table provides a consolidated travel plan action plan listing the key actions, targets, delivery timeframe (assuming construction starts May 2016) and responsibility. The action delivery timeframes have been aligned with the wider CRL TDM activity schedule. This is a working action plan and can be updated as planning work progresses. Table 8.1:
Travel Plan Action Plan
Key Action:
Target:
Timeframe for delivery of measure:
Person/ Department Responsible for delivery of measure:
Walking and Cycling
10% mode share
Bike rack – secure and preferably covered
July 2016
Site Manager
Lockers
July 2016
Site Manager
Cycle maps
July 2016
Online
Promotion events
July 2017
AT CBD travel plan co-ordinator
Cycle training courses / trial bike hire scheme
July 2017
AT CBD travel plan co-ordinator
Showers
(Already provided)
Public Transport
50% mode share
Promotion of AT online journey planner and timetables
July 2016
Site Manager
PT ‘Give it a go’ passes (or alternative)
September 2016
AT CBD travel plan co-ordinator
Site access information sheets – staff and visitors
July 2016
Site Manager
Set up Let’s Carpool CRL scheme
July 2016
AT CRL Communications Manager
Promote Let’s Carpool
October 2016
Site Manager – aligned with AT’s city wide car pooling campaigns
Car pooling
Workforce Travel Plan
5% mode share
JUNE 2016
Other Van pooling
Up to 25% mode share (at site staff capacity)
July 2016
Site Manager – in conjunction with other CRL site managers
Consolidate material deliveries
Logistics plan
August 2016
Logistics Manager
Staff induction travel briefing
100% of staff receive briefing
Continuous
Site Manager
Sustainable travel expo – at site or in nearby tower building, in conjunction with AT CRL TDM Plan
50% of staff attend
September 2016
AT CBD travel plan co-ordinator
Workforce Travel Plan
JUNE 2016
Appendix B:
TTM Levels and Road Hierarchy Plan
LEGEND Level 2 Level 2L Level 1 Level L
Appendix C:
Britomart Streetscape Plans
QUEEN STREET
EXTENT OF WORK
EXTENT OF WORK
RELOCATED PRAM CROSSING
CUSTOMS STREET EAST
3.9m
2.2m
2.3m
NEW KERB EXTENSION
TYLER STREET
REFER TO CUSTOMS STREET CONSTRUCTION PLAN
QUAY STREET
NEW DRIVEWAY
GALWAY STREET
NEW PEDESTRIAN CROSSING
NEW LOADING ZONE
2.5m
4.5m
REFER TO CUSTOMS STREET CONSTRUCTION PLAN
NEW DISABLED PARKINGS
CONSTRUCT NEW KERB AND CLOSE EXISTING VEHICLE ACCESSES
NEW RAISED PEDESTRIAN CROSSING
JOIN LINE D REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
EXTENT OF WORK
EXTENT OF WORK
NEW PEDESTRIAN CROSSING
JOIN LINE D CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/11/15
DRAWN
HC
01/11/15
DRAWING CHECK
SD
21/01/16
DESIGN CHECK
PM
21/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK BRITOMART, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 1 OF 2
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2801
A
QUAY STREET
TYLER STREET
GALWAY STREET
REFER TO CUSTOMS STREET CONSTRUCTION PLAN
NEW RAISED TABLE
NEW KERB EXTENSION
JOIN LINE D
NEW PRAM CROSSING NEW PEDESTRIAN CROSSING
4.3m
3.5m COMMERCE STREET
3.0m
JOIN LINE D
EXTENT OF WORK
EXTENT OF WORK
RELOCATED PRAM CROSSING
4.1m
3.0m
2.5m
NEW SIGNALISED CROSSING
CUSTOMS STREET EAST
NEW LANES
NEW BUS STOP
NEW PRAM CROSSING
NEW KERB RELOCATE STREET LIGHT
QUAY STREET
REFER TO CUSTOMS STREET CONSTRUCTION PLAN
TYLER STREET
GALWAY STREET
REQUIRES RESOURCE CONSENT BEFORE WORK CAN COMMENCE
EXTENT OF WORK
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
EXTENT OF WORK
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/11/15
DRAWN
HC
01/11/15
DRAWING CHECK
SD
21/01/16
DESIGN CHECK
PM
21/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK BRITOMART, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 2 OF 2
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2802
A
Appendix D:
Construction Staging Plans
N
QUAY ST
STAGE 1 CONSTRUCTION ACTIVITIES JULY 2016 TO JANUARY 2017
100
CONSTRUCT TEMPORARY FACILITIES (INCLUDING NEW STAIRS) REMOVE EXISTING STAIRS AND ESCALATORS REMOVE/RELOCATE PUBLIC ARTWORK ROAD AND FOOTPATH ALIGNMENTS MODIFIED
80
90
EMERGENCY EGRESS MAINTAINED WHILE UPPER CPO IS TENANTED
70
TRAFFIC DIRECTION REVERSED ON TYLER ST
SITE ACCESS
SITE EGRESS REMOVE CANOPIES
50
60
QUEEN ELIZABETH II SQUARE
40
LAYDOWN AREA
PRECINCT
SITE EGRESS
10
20
30
(NOT PART OF WORKS)
ORIGINAL SCALE OF MM.
0
CONSTRUCTION ZONE WORK PHASED TO ALLOW EMERGENCY ONLY PUBLIC ACCESS DURING OPERATING HOURS SITE ACCESS
CPO TO REMAIN OPEN. UPPER FLOORS REMAIN TENANTED LAYDOWN AREA
SITE EGRESS
SITE ACCESS COMMERCE ST
QUEEN ST
GALWAY ST
REMOVE CANOPIES
REV
AMENDMENT
BY NAME
DATE
CITY RAIL LINK ENABLING WORKS CONTRACT 1 STAGE 1 OVERVIEW TEMPORARY STATION ENABLING WORKS
CONTRACT No.
880201-250
DWG. SCALE (A3 Original)
1:500 @ A3 DRAWING No.
REVISION
STAGE 1 CONSTRUCTION
09.05.2016
N
QUAY ST
STAGE 2 CONSTRUCTION ACTIVITIES JANUARY 2017 TO MAY 2017
100
CONSTRUCT DUST/NOISE BARRIERS STRIP OUT CPO CPO GROUND FLOOR DEMOLITION CPO DIAPHRAGM WALL CONSTRUCTION (BEGIN) B2 TEMPORARY ACCOMMODATION WORKS
80
90
MAIN CONSTRUCTION ACCESS INTO CPO. BUS SHELTERS REMOVED. SITE FENCED AND GLASSHOUSE PROTECTED. SITE PARKING PROVIDED ALONG TYLER ST
70
TRAFFIC DIRECTION REVERSED ON TYLER ST
TYLER ST
PRECINCT
CONSTRUCTION ZONE ALL PUBLIC ACCESS TO CPO CLOSED. UPPER FLOORS VACATED BY TENANTS AND USED AS SITE OFFICES AND STORAGE UNDERTAKE CPO WORKS AND COMMENCE DIAPHRAGM WALL INSTALLATION
WORK AREA SECURELY FENCED
ORIGINAL SCALE OF MM.
0
10
20
30
(NOT PART OF WORKS)
DRYWALL BENTONITE TREATMENT AREA
PUBLIC ACCES NEW STATION LAYOUT IN OPERATION
NOISE/DUST BARRIER BETWEEN CONSTRUCTION AND PUBLIC AREAS
PUBLIC ACCESS
GALWAY ST COMMERCE ST
40
50
60
QUEEN ELIZABETH II SQUARE
QUEEN ST
GALWAY AND COMMERCE STREETS UNAFFECTED
REV
AMENDMENT
BY NAME
DATE
CITY RAIL LINK ENABLING WORKS CONTRACT 1 STAGE 2 OVERVIEW CPO DEMOLITION AND PILING WORKS
CONTRACT No.
880201-250
DWG. SCALE (A3 Original)
1:500 @ A3 DRAWING No.
REVISION
STAGE 2 CONSTRUCTION
09.05.2016
N
QUAY ST
STAGE 3 CONSTRUCTION ACTIVITIES MAY 2017 TO MAR 2020 B2 ACCOMMODATION WORKS & B1-B2 ESCALATOR COMPLETE QUEEN ST PILING CPO AND QUEEN ST EXCAVATION UNDERPINNING CPO BREAK-THROUGH INTO PRECINCT WORKS TUNNEL CONSTRUCTION BACKFILL QUEEN ST REINSTATEMENT STATION BOH B2 WORKS CPO REBUILD
100
SITE BOUNDARY EXTENDED TO QUAY ST
80
90
AUXILIARY SITE ACCESS
70
TRAFFIC DIRECTION REVERSED ON TYLER ST
TYLER ST
40
50
60
QUEEN ELIZABETH II SQUARE
PRECINCT
CONSTRUCTION ZONE PUBLIC ACCESS TO CPO REMAINS CLOSED. UPPER FLOORS USED AS SITE OFFICES AND STORAGE COMPLETE UNDERPINNING, EXCAVATION AND CONCRETE WORKS READY TO CPO OPEN
ORIGINAL SCALE OF MM.
0
10
20
30
(NOT PART OF WORKS)
PEDESTRIAN ACCESS MAINTAINED VIA TEMPORARY FOOTBRIDGE OVER EXCAVATION
QUEEN ST CLOSED TO VEHICLES BETWEEN TYLER AND GALWAY. PEDESTRIAN ACCESS MAINTAINED
PUBLIC ACCES
CONSTRUCTION ZONE (BACK OF HOUSE AREA)
NEW STATION LAYOUT IN OPERATION
PUBLIC ACCES
DEMOLISH OFFICES AND CUT THROUGH SECANT PILE WALL
GALWAY ST
REV
AMENDMENT
GALWAY AND COMMERCE STREETS UNAFFECTED
QUEEN ST
SITE BOUNDARY AT QUEEN ST / CUSTOM ST INTERSECTION (EXTENDED TO CUSTOM ST)
COMMERCE ST
SITE ACCESS
BY NAME
DATE
CITY RAIL LINK ENABLING WORKS CONTRACT 1 STAGE 3 OVERVIEW PILING, EXCAVATION, CONCRETE WORK AND BACKFILL
CONTRACT No.
880201-250
DWG. SCALE (A3 Original)
1:500 @ A3 DRAWING No.
REVISION
STAGE 3 CONSTRUCTION
09.05.2016
N
QUAY ST
STAGE 4 CONSTRUCTION ACTIVITIES APR 2020 TO JUN 2020
70
80
90
100
CPO OPEN REINSTATEMENT OF QUEEN, TYLER & GALWAY & STATION PLAZA TIE IN RAIL TUNNELS TO EXISTING RAIL AT STATION LINE REMOVE TEMPORARY ACCOMMODATION
NEW PUBLIC REALM REINSTATEMENT
60
QUEEN ELIZABETH II SQUARE
TRAFFIC DIRECTION REVERSED ON TYLER ST
TYLER ST
40
50
REMOVE TEMPORARY ACCOMMODATION BUILDING
PRECINCT
10
20
30
(NOT PART OF WORKS)
0
CPO OPEN ORIGINAL SCALE OF MM.
PUBLIC ACCESS CONSTRUCTION ZONE TIE INTO EXISTING RAIL ALIGNMENT AT STATION LEVEL
QUEEN ST REOPENED
GALWAY AND COMMERCE STREETS UNAFFECTED
QUEEN ST
REV
AMENDMENT
COMMERCE ST
GALWAY ST
BY NAME
DATE
CITY RAIL LINK ENABLING WORKS CONTRACT 1 STAGE 4 OVERVIEW UNDERPINNING REMOVAL AND CPO FIT-OUT
CONTRACT No.
880201-250
DWG. SCALE (A3 Original)
1:500 @ A3 DRAWING No.
STAGE 4 CONSTRUCTION
REVISION
09.05.2016
Appendix E:
Temporary Station Plans
LEGEND NoR DESIGNATION BRITOMART DESIGNATION EXTENT OF WORKS BOUNDARY CONSTRUCTION ZONE
CUSTOMS STREET EAST
LEVY COMMERCE STREET
EXCELSIOR
OLD SOFRANA
BARRINGTON
MERCURE
MOBILITY PARKING
DOWNTOWN SHOPPING CENTRE
ZURICH BUILDING NoR DESIGNATION FOLLOWS BOUNDARY
BRITOMART CENTRAL SOUTH
EXISTING GLASSHOUSE
CPO
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
BUS
NEW TEMPORARY ACCOMMODATION
EXISTING CANOPY
TE ARA TEHUHU WALKWAY
QUEEN STREET
EXIT EXIT EXIT
TAKUTAI SQUARE
STANBETH
BUS
GORE STREET
MASONIC CLUB
N
AUSTRALIS HOUSE
DOWNTOWN SHOPPING CENTRE
EXIT
BRITOMART CENTRAL NORTH LOADING
TYLER STREET CLIENT
CAPTAIN COOK BUILDING
NORTHERN STEAMSHIP BUILDING
MARITIME BUILDING
UNION HOUSE
HARBOUR VIEW
PREVIOUSLY CUSTOMS HOUSE
ENDEANS
HSBC
CONSTRUCTION HOARDING LINE (APPROX LOCATION)
PROPOSED WORKS TO ADJACENT SITES & ROADING ARE UNDER SEPARATE CONSENTS.
REV A B C D
DATE 19/10/15 10/12/15 11/03/16 18/03/16
REVISION DETAILS FOR COORDINATION DETAIL DESIGN 100% AT REVIEW BUILDING CONSENT
APPROVAL Liam Wythes Liam Wythes Liam Wythes
QUAY STREET
SCALE
SIZE
1 : 500
A1
DETAILED DESIGN NOT FOR CONSTRUCTION
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
DRAWN
APPROVED
Jasmax
DATE
DESIGNED
FERRY BUILDING
Chris Jack / Martin Walton CHECKED
Liam Wythes
Martin Walton
PROJECT
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST. TITLE
Plot Date: 18/03/2016 3:38:17 p.m.
Office:
TEMPORARY WORKS PROPOSED SITE PLAN 1
TEMPORARY WORKS - SITE PLAN
0013
SCALE @ A1 1 : 500
DOCUMENT
BUILDING CONSENT ORIGINAL SIZE 0
20mm
40
60
80
100
200
300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 0113 700
REVISION
D 800
S6
S5
S4
S3
S2
S1
LEGEND BRACING ELEMENT FIRE RATING -/60/60
1
1
1
2
0220
0420
0221
0420
FIRE RATING -/60/60 EXISTING FIRE RATING -/120/120 BACK OF HOUSE ACCOMMODATION RELOCATED UP TO GROUND IN STATION PLAZA TEMPORARY ACCOMMODATION - DEMOLISH
FIRE RATING -/120/120 EXISTING CONSTRUCTION ZONE
EXISTING CONSTRUCTION
SA B2.119 B2.242 PLATFORM LEADERS OFFICE
TPTXX
GARDENS REMOVED & TEMP. FLOOR INSTALLED
STATION TEAM LEADERS OFFICE
NT E NS B2.120 O C EXISTING STAIR 4 E AT R PA E IN S T OU T I 1200 MIN WF B2.240 E QUIET ROOM N UP
EXISTING TRACK
SB TRACK BED
B2.241 TRAIN MANAGERS OFFICE
EXISTING BUFFER STOP RELOCATED TO ACCOMMODATE NEW OFFICE
1.
PT24 : DENOTES WALL TYPES KEY, REFER TO 0800 SERIES DRAWINGS
2.
SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUT WITHOUT PRIOR APPROVAL OF THE ARCHITECT
3.
ALL INTERNAL PARTITIONS ARE DIMENSIONED TO THE FACE OF FRAMING UNLESS NOTED OTHERWISE. SET OUT ALL WALLS FIRST PRIOR TO FRAMING.
4.
FOR SETOUT DIMENSION OF ALL HANDBASINS, SINKS AND CLEANER'S SINKS, REFER TO 0570 SERIES DRAWINGS
5.
DOOR NIBS ON HINGE SIDE 100MM UNLESS DETAILED OR NOTED OTHERWISE
6.
FOR STRUCTURAL SETOUT PLANS, REFER TO 0280 SERIES DRAWINGS
7.
FOR REFLECTED CEILING PLANS, REFER TO 0300 SERIES DRAWINGS
8.
FOR STAIRS DETAILS, REFER TO 0820 SERIES DRAWINGS
9.
FOR TOILET LAYOUT AND DETAILS, REFER TO 0570 SERIES DRAWINGS
10.
FOR FINISHES PLANS, REFER TO 0880 SERIES DRAWINGS
B2.118 STAFF ROOM
B2.121 STORE
UP 4300 TEMP. STAIR T21B
FUTURE PLATFORM EDGE
BASE SLAB INFILLS TO OVER TRACK
6505
ON HOLD
EXISTING PLATFORM
NEW MANUAL GATE
3800
SC
WALL TYPE - REFER 800 SERIES DWGS FOR DETAILS
N T I ENT U O NS T I F CO W E NE RAT PA MALEB2.150 LOCKER ROOM E S
EXISTING HELP POINT SEATING EXIST. LIFT 2
SALVAGE ID 43 VENDING MACHINE
ON HOLD EXISTING GATELINE
TRACK BED
1
EXIST. STAIR 2
0410
UP
TEMP HOARDING ACCESS
N
NEW MANUAL GATE
TB2.102
CLEANERS STORE
CORRIDOR
B2 PLATFORM CONCOURSE - UNPAID
B2 PLATFORM CONCOURSE PAID
15300
SD
B2.108
B2.111
EXIST. ESC 1.3
TB2.101
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
EXIST. ESC 1.2
CONSTRUCTION ZONE
B2.112
B2.110
Room
LIFT MACHINE ROOM
EXIST. ESC 1.1 NEW MANUAL GATE FUTURE ESCALATOR PIT. REFER ENABLING WORKS UP
TRACK BED
CLIENT EXISTING STAIR 1 EXISTING GATELINE
ON HOLD
VENDING MACHINE
SALVAGE ID 43 EXIST. LIFT 1 REUSED SEATING
REV A B C D E F
NT SE N CO
TE RA A EP B2.151 NS I FEMALE LOCKER T U O ROOM FIT 6505 W E N 3800
SE
EXISTING PLATFORM
EXISTING HELP POINT
BASE SLAB INFILLS TO OVER TRACK
FUTURE PLATFORM EDGE
EXISTING TRACK
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
EXISTING EXCESS FARE KIOSK
2 0410
DATE 31/08/15 23/09/15 19/10/15 10/12/15 11/03/16 18/03/16
UP
SCALE
SIZE
As indicated
A1
4300 TEMP. STAIR T20B
B2.163
TRACK BED
SHOWER
ON HOLD
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION DETAIL DESIGN 100% AT REVIEW BUILDING CONSENT
APPROVAL
Liam Wythes Liam Wythes Liam Wythes
DETAILED DESIGN NOT FOR CONSTRUCTION
DRAWN
B2.122
APPROVED
Jasmax
STORE
DATE
DESIGNED
SF
Chris Jack / Martin Walton
NT E S ON B2.117 C B2.160 MSB-1-1 ATE R SHOWER EPA S T IN U B2.115 ITO MSB-1 F W E N B2.113
EXISTING STAIR 3
SG
B2.162
CHECKED
MALE TOILETS
Martin Walton
B2.161
Liam Wythes PROJECT
FEMALE TOILETS
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST.
GARDENS REMOVED & TEMP. FLOOR INSTALLED
TITLE
Plot Date: 18/03/2016 3:35:30 p.m.
Office:
TEMPORARY WORKS FLOOR PLAN - LEVEL B2 1
TEMPORARY WORKS - LEVEL B2 - SECTOR 1
1
1
0223
0222
DOCUMENT
SCALE @ A1 1 : 100
BUILDING CONSENT ORIGINAL SIZE 0
20mm
40
60
80
100
200
300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 0211 700
REVISION
F 800
S6
S5
S4
S3
S2
S1
LEGEND BRACING ELEMENT FIRE RATING -/60/60
1
2
0420
0420
FIRE RATING -/60/60 EXISTING FIRE RATING -/120/120 FIRE RATING -/120/120 EXISTING CONSTRUCTION ZONE HOARDING & ACCESS TO UNDER TEMP STAIR. BY CONTRACTOR
SA 1
1
PORTION OF STONE WALL REMOVED FOR ACCESS STAIR
0822
B1.113
EXISTING CONSTRUCTION
TPTXX
WALL TYPE - REFER 800 SERIES DWGS FOR DETAILS
0828
Room
SB
PT24 : DENOTES WALL TYPES KEY, REFER TO 0800 SERIES DRAWINGS
2.
SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUT WITHOUT PRIOR APPROVAL OF THE ARCHITECT
3.
ALL INTERNAL PARTITIONS ARE DIMENSIONED TO THE FACE OF FRAMING UNLESS NOTED OTHERWISE. SET OUT ALL WALLS FIRST PRIOR TO FRAMING.
4.
FOR SETOUT DIMENSION OF ALL HANDBASINS, SINKS AND CLEANER'S SINKS, REFER TO 0570 SERIES DRAWINGS
5.
DOOR NIBS ON HINGE SIDE 100MM UNLESS DETAILED OR NOTED OTHERWISE
6.
FOR STRUCTURAL SETOUT PLANS, REFER TO 0280 SERIES DRAWINGS
7.
FOR REFLECTED CEILING PLANS, REFER TO 0300 SERIES DRAWINGS
8.
FOR STAIRS DETAILS, REFER TO 0820 SERIES DRAWINGS
9.
FOR TOILET LAYOUT AND DETAILS, REFER TO 0570 SERIES DRAWINGS
10.
FOR FINISHES PLANS, REFER TO 0880 SERIES DRAWINGS
B1.103
B1.115 B1.114
1.
EXISTING STAIR 4 + 14
Room
Room
B1.111
B1.110
PLENUM
Room
TEMP. STAIR T21B UP
ALLOW TO PROVIDE TEMPORARY BALUSTRADE TO PLATFORM SCREEN WHEN TEMP STAIRS REINSTATED AFTER PORTAL IS CREATED
B1.112
UP EXISTING COLUMN
TEMP. STAIR T21A
Room
TEMP. STAIR T23
SC FLOOR ABOVE
UP
BRIDGE ABOVE
1
EXISTING LIFT
EXIST. STAIR 2 UP
0410
UP
N CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
EXIST. ESC 1.3 SIGN ABOVE
SD
EXIST. ESC 1.2
EXISTING SMOKE CURTAIN ABOVE
TEMPORARY HOARDING
CONSTRUCTION ZONE
EXIST. ESC 1.1 MAIN FIRE RATED HOARDING
BRIDGE ABOVE
UP
UP EXISTING STAIR 1
TEMPORARY SERVICES CABLE BRIDGE TO BE INSTALLED ABOVE EXISTING CEILING MESH. REFER DWG-360 FOR DETAILS.
CLIENT
EXISTING LIFT EXISTING COLUMN UP
REV A B C D E F
SE TEMP. STAIR T20A
ALLOW TO PROVIDE TEMPORARY BALUSTRADE TO PLATFORM SCREEN WHEN TEMP STAIRS REINSTATED AFTER PORTAL IS CREATED
UP
DATE 31/08/15 23/09/15 19/10/15 10/12/15 11/03/16 18/03/16
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION DETAIL DESIGN 100% AT REVIEW BUILDING CONSENT
APPROVAL
Liam Wythes Liam Wythes Liam Wythes
TEMP. STAIR T20B
2
UP
SCALE
SIZE
As indicated
A1
0410
B1.108
B1.106
B1.105
B1.104
Room
Room
PLENUM
Room
NOT FOR CONSTRUCTION
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
DRAWN
APPROVED
Jasmax
DATE
DESIGNED
SF
B1.102
Chris Jack / Martin Walton
STORAGE
B1.109
CHECKED
EXISTING STAIR 3
Martin Walton
Liam Wythes PROJECT
B1.107 Room
1
PORTION OF STONE WALL REMOVED FOR ACCESS STAIR
0820
EXISTING STATION PLANT B1
SG
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST.
1 0826
HOARDING & ACCESS TO UNDER TEMP STAIR
TITLE
TEMPORARY WORKS FLOOR PLAN - LEVEL B1
Office: Plot Date: 18/03/2016 3:35:53 p.m.
DETAILED DESIGN
1
TEMPORARY WORKS - LEVEL B1 - SECTOR 1 SCALE @ A1 1 : 100
DOCUMENT
BUILDING CONSENT ORIGINAL SIZE 0
20mm
40
60
80
100
200
300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 0212 700
REVISION
F 800
T2
S5 BOUNDARY LINE
S6
S4
T1
T3 S3
NoR DESIGNATION FOLLOWS BOUNDARY LINE
1 0420
1
S2
LEGEND
S1
2
BRACING ELEMENT
0420
FIRE RATING -/60/60 FIRE RATING -/60/60 EXISTING
1
0230
DOWNERS PROPOSED HOARDING LINE
FIRE RATING -/120/120
0233
FIRE RATING -/120/120 EXISTING CONSTRUCTION ZONE
EXISTING CONSTRUCTION
SA LINE OF ROOF OVER
STATION ENTRY L - TEMP
BRIGADE INLET DIRECTIONAL SIGN
PROPOSED TEMPORARY CONSTRUCTION SUPPORT AREA
TPTXX
1.
PT24 : DENOTES WALL TYPES KEY, REFER TO 0800 SERIES DRAWINGS
2.
SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUT WITHOUT PRIOR APPROVAL OF THE ARCHITECT
3.
ALL INTERNAL PARTITIONS ARE DIMENSIONED TO THE FACE OF FRAMING UNLESS NOTED OTHERWISE. SET OUT ALL WALLS FIRST PRIOR TO FRAMING.
4.
FOR SETOUT DIMENSION OF ALL HANDBASINS, SINKS AND CLEANER'S SINKS, REFER TO 0570 SERIES DRAWINGS
5.
DOOR NIBS ON HINGE SIDE 100MM UNLESS DETAILED OR NOTED OTHERWISE
6.
FOR STRUCTURAL SETOUT PLANS, REFER TO 0280 SERIES DRAWINGS
7.
FOR REFLECTED CEILING PLANS, REFER TO 0300 SERIES DRAWINGS
8.
FOR STAIRS DETAILS, REFER TO 0820 SERIES DRAWINGS
9.
FOR TOILET LAYOUT AND DETAILS, REFER TO 0570 SERIES DRAWINGS
10.
FOR FINISHES PLANS, REFER TO 0880 SERIES DRAWINGS
SECURITY GATES
TG.168
SB GL.108 EXISTING STAIR 14
TG.162
TG.164
REVENUE PROTECTION OFFICE
COMMS
RETAIL
FFL 3800 TEMP. STAIR T23
GL.109
NEW TEMP. STAIR T21
TG.166
AIR INTAKE
FIRE SERVICE ACCESS TO BRIGADE INLET ONLY
GL.110
GL.107
WATER SKYLIGHT PUMP
280
KITCHEN
HWC
WC LOBBY
CASH ROOM
FFL 3900 UP
TG.167
TG.165
TG.169
TICKETING
DB
ACC TOILET
NEW TEMP. STAIR T21 UP
uPVC DP VRD
4265
VRD NEW AUTOMATIC DOORS THROUGH EXISTING GLASS LOUVRES, REMOVE LOUVRES, PROTECT & REINSTALL
TG.153 OFFICE
PHP EXISTING LIFT
5092
6570
EXTG. COLUMN CUT DOWN TO FIT UNDER BRIDGE EXTENSION
OVERHANG FOR NEW CANOPY
FFL 3900
TG.154 CUSTOMER SERVICE
CS1
CS2
STATION ENTRY I
1 0410
TB
NEW BRDIGE ACCESS TO TEMPORARY STAIRS B1 CCONOURSE BELOW
TG.151 PLAZA CONCOURSE
TC 4265
CS3
CS4
6570
REUSED SEATS FROM CPO SALVAGE ID 42
EXTG. COLUMN CUT DOWN TO FIT UNDER BRIDGE EXTENSION
EXISTING LIFT
OVERHANG FOR NEW CANOPY PAYPHONE BINS
TD
4265 VRD
VRD
VRD
TG.178 ATM TG.174 CORRIDOR
ACC TOILET
TG.172
TG.170
FEMALE TOILETS
MALE TOILETS
FIRE EGRESS
FFL 3900
TG.173 TG.181
REV A B C D E F
NEW AUTOMATIC DOORS THROUGH EXISTING GLASS LOUVRES, REMOVE LOUVRES, PROTECT & REINSTALL
uPVC DP
280
SE
CLIENT
RELOCATED EXISTING GATE
RETAIL
AREA FOR STAFF LOCKERS SHOWN DASHED
B1 CCONOURSE BELOW
NEW BRIDGE ACCESS TO TEMPORARY STAIRS
TEMP.SLIDING CROWD CONTROL SECURITY GATES ADDITIONAL TO DOORS
TG.152
WC LOBBY
NEW TEMP. STAIR T20 UP
SICK BAY
GL.105 HWC
GL.106
TG.179
AIR INTAKE
AT STAFF LOCKERS
TG.175 ACC TOILET
TG.177
GL.104
COMS
SCALE
SIZE
As indicated
A1
?
NEW TEMP STAIR 22
APPROVAL
Liam Wythes Liam Wythes Liam Wythes
DETAILED DESIGN NOT FOR CONSTRUCTION
DRAWN
APPROVED
TRANSFORMER
Jasmax
SF
TG.176
TG.180
SWITCH ROOM
RUBBISH
DATE
DESIGNED
Chris Jack / Martin Walton
SECURITY GATES
CHECKED
Liam Wythes
Martin Walton
PROJECT
LINE OF ROOF OVER
SG
1
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST.
PROPOSED TEMPORARY CONSTRUCTION SUPPORT AREA
J-TEMP STATION ENTRY
1
TITLE
0231
TEMPORARY WORKS FLOOR PLAN - LEVEL GROUND
0234 DOWNERS PROPOSED HOARDING LINE
Office: Plot Date: 18/03/2016 3:36:35 p.m.
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION DETAIL DESIGN 100% AT REVIEW BUILDING CONSENT
NEW TEMP. STAIR T20
RISER 5 m²
0410
DATE 31/08/15 23/09/15 19/10/15 10/12/15 11/03/16 18/03/16
UP
TRANSFORMER
2 Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
FIRE RATED TEMPORARY CONSTRUCTION HOARDING
STATION ENTRY I
EXISTING CANOPY ABOVE
NEW DECK OVER WATER SKYLIGHT
FFL 3900
TEMPORARY CONSTRUCTION HOARDING BELOW
STATION ENTRY I
SECURITY GATES SOFFIT ABOVE
STATION ENTRY K - TEMP
7600
SD
COMMERCE STREET
BINS
N
TA
TG.161
TG.163
FIRE EGRESS
SC
NEW FOOTPATH EXTENSION
BRIGADE INLET
WALL TYPE - REFER 800 SERIES DWGS FOR DETAILS
1
TEMPORARY WORKS - LEVEL GROUND SCALE @ A1 1 : 100
DOCUMENT
BUILDING CONSENT ORIGINAL SIZE 0
20mm
40
60
80
100
200
300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 0213 700
REVISION
F 800
TEMPORARY ACCOMMODATION
EXISTING GLASSHOUSE
EXISTING CPO CLOSED FOR ALTERATIONS
23725
RL
CPO ROOF LEVEL
19410
RL
CPO LEVEL 3
RL 15910 14980
TEMP ACCOM - CANOPY
RL
CPO LEVEL 2
10580
RL
CPO LEVEL 1
RL 8150
CONSTRUCTION ZONE
TEMP ACCOM - ROOF
RL 3900
3900
TEMP WORKS - GROUND
RL
CPO GROUND LEVEL
RL -300 B1 WEST END CONCOURSE
RL -6750 B2 WEST END PLATFORM
1
LONG SECTION - TEMPORARY WORKS
0211
SCALE @ A1 1 : 200
TEMPORARY ACCOMMODATION
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
EXISTING GLASSHOUSE
EXISTING CPO CLOSED FOR ALTERATIONS
CLIENT
23725
RL
CPO ROOF LEVEL
19410
RL
CPO LEVEL 3
RL 15910 14980
TEMP ACCOM - CANOPY
RL
CPO LEVEL 2
10580
REV A B C D E F
DATE 31/08/15 23/09/15 19/10/15 10/12/15 11/03/16 18/03/16
SCALE
SIZE
1 : 200
A1
CONSTRUCTION ZONE
TEMP ACCOM - ROOF
Liam Wythes Liam Wythes Liam Wythes
DETAILED DESIGN NOT FOR CONSTRUCTION
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
DRAWN
APPROVED
Jasmax RL 3900
3900
TEMP WORKS - GROUND
CPO GROUND LEVEL
DATE
DESIGNED
RL
Chris Jack / Martin Walton CHECKED
Liam Wythes
Martin Walton RL -300
PROJECT
B1 WEST END CONCOURSE
RL -1175
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST.
PLENUM LEVEL
RL -6750
TITLE
TEMPORARY WORKS SECTIONS - LONGITUDINAL SECTIONS
Office:
B2 WEST END PLATFORM
Plot Date: 18/03/2016 3:38:57 p.m.
APPROVAL
RL
CPO LEVEL 1
RL 8150
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION DETAIL DESIGN 100% AT REVIEW BUILDING CONSENT
DOCUMENT
ORIGINAL SIZE 0
20mm
40
60
80
100
2
LONG SECTION - TEMPORARY WORKS
0211
SCALE @ A1 1 : 200
200
BUILDING CONSENT 300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 0410 700
REVISION
F 800
LEGEND NoR DESIGNATION TRACK CENTRELINE STATION BOX
CUSTOM STREET EAST
PEDESTRIAN FOOTPATHS AND ROADWAY PART OF SEPARATE URBAN REALM DESIGN WORKS PACKAGE
LEVY
OLD SOFRANA
TAXI
BARRINGTON
MERCURE
5 MINUTE PARK
GALWAY STREET
ZURICH BUILDING
STATION ENTRY
BUS
BRITOMART CENTRAL SOUTH
STATION PLAZA REINSTATED IN SEPARATE CONTRACT
QUEEN STREET
STATION ENTRY
BUS
QUEEN STREET CLOSED AS PART OF SEPARATE URBAN REALM DESIGN WORKS PACKAGE TO LATER DETAIL
STATION ENTRY
BUS
STATION ENTRY
NEW PRECINCT DEVELOPMENT NOT IN CONTRACT
BRITOMART CENTRAL NORTH
?????
DOWNTOWN SHOPPING CENTRE
EXCELSIOR
COMMERCE STREET
STANBETH
STATION ENTRY
GORE STREET
MASONIC CLUB
ROAD DIRECTION REVERSED AT END OF ENABLING WORKS (REFER URBAN REALM DESIGN)
N
AUSTRALIS HOUSE
EXISTING QUEEN STREET KERBLINE
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
? ?
BUS
TYLER STREET
CLIENT
CAPTAIN COOK BUILDING
NORTHERN STEAMSHIP BUILDING
MARITIME BUILDING
UNION HOUSE
CUSTOMS HOUSE
HARBOUR VIEW BUILDING
PEDESTRIAN FOOTPATHS AND ROADWAY PART OF SEPARATE URBAN REALM DESIGN WORKS PACKAGE
ENDEANS
HSBC
REV DATE REVISION DETAILS A 19/10/15 FOR COORDINATION B 18/12/15 PERMANENT - DETAIL DESIGN 100%
ROAD DIRECTION REVERSED AT END OF ENABLING WORKS (REFER URBAN REALM DESIGN)
QUAY STREET
APPROVAL Liam Wythes
EXISTING QUEEN STREET KERBLINE
SCALE
SIZE
1 : 500
A1
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
FERRY BUILDING
DETAILED DESIGN NOT FOR CONSTRUCTION
DRAWN
APPROVED
Jasmax
DATE
DESIGNED
Chris Jack / Martin Walton CHECKED
Liam Wythes
Martin Walton
PROJECT
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST. TITLE
CIRCULATION DRAWING TAKEN FROM Z:\Documents\22 Queen Street Diagrams/237344-XR-C-PRO-Downtown Bus Terminal_Inset Option Plot Date: 18/12/2015 9:19:12 p.m.
Office:
PROPOSED SITE PLAN
DOCUMENT
FOR DETAILED DESIGN ORIGINAL SIZE 0
20mm
40
60
80
100
200
300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 1013 700
REVISION
B 800
S5
S4
S3
S2
S1
DRIVERS REST AREA AND FACILITIES RETAINED UNTIL CRL COMMISSIONING. PROVIDE ACCESS.
1
1
4203
4204
EXISTING STAIR RETAINED
NEW ACCESS DOOR
B2.141 FEMALE TOILET
ZONE KEY
SA
LEGEND
REAR CAVITY ACCESS REQUIRED TO SERVICE SECANT WALL DRAIN. EXISTING RETAINED
EXISTING SERVICE STAIR CUT IN HALF AND REUSED
FFL -6750
100
EXISTING STAIR
NoR DESIGNATION TRACK CENTRELINE FIRE RATING -/60/60 FIRE RATING -/60/60 EXISTING
B2.118
UP
B2.120 EXISTING STAIR 4
FIRE RATING -/120/120
DRIVER'S REST AREA
REMOVE EXTG FIRE RATED ROLLER SERVICE DOOR
FIRE RATING -/120/120 EXISTING UP
B2.121
FFL -8050
NEW WALL
CONSTRUCTION ZONE
CORRIDOR
SB
NEW STAIR 60
EXISTING CONSTRUCTION
-6750
TRACK ACCESS STAIR RETAINED
STONE
DOOR RETAINED AT ENABLING PHASE TO PROVIDE ACCESS TO DRIVER'S REST AREA. TO BE REMOVED AT CRL PHASE
WALL
B2.109 OHLE
ACCESS GATE & EXISTING GLASS BALUSTRADE REINSTATED. SALVAGE ITEM ID 55
NEW BARR IER
PLENUM ABOVE
NEW PLATFORM EDGE AND RELOCATED BALUSTRADE
TUNNEL TEMPORARILY BLOCKED OFF
3. ALL INTERNAL PARTITIONS ARE DIMENSIONED TO THE FACE OF FRAMING UNLESS NOTED OTHERWISE. SET OUT ALL WALLS FIRST PRIOR TO FRAMING.
PORTION OF WALL REMOVED FOR CRL MAIN
4. FOR SETOUT DIMENSION OF ALL HANDBASINS, SINKS AND CLEANER'S SINKS, REFER TO 5500 SERIES DRAWINGS
SS MESH FRAME SERVICES SHROUD TO CONCEAL SERVICES TRANSITION FROM B1 TO B2
B2.133
EXISTING PLATFORM
EXIST. LIFT 2 PHP
1 2211
SOUTH SERVICE ACCESS
EXISTING PLATFORM DIFFUSERS REMOVED
5901
CRL U P MAIN
SC
6. FOR STRUCTURAL SETOUT PLANS, REFER TO 2400 SERIES DRAWINGS
1
TEMPORARY ACCESS STAIR. BUILDERS WORK
1
4101
5. DOOR NIBS ON HINGE SIDE 100MM UNLESS DETAILED OR NOTED OTHERWISE
4101
1
7. FOR REFLECTED CEILING PLANS, REFER TO 3000 SERIES DRAWINGS 8. FOR STAIRS DETAILS, REFER TO 7620 SERIES DRAWINGS 9. FOR TOILET LAYOUT AND DETAILS, REFER TO 5700 SERIES DRAWINGS
2212 10. FOR FINISHES PLANS, REFER TO 7900 SERIES DRAWINGS DB
EXISTING PLATFORM
NEW BARRIER
EXISTING TRACK
2. SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUT WITHOUT PRIOR APPROVAL OF THE ARCHITECT
NEW BALUSTRADE MESH COVER & GLASS BOX REMOVED FROM COLUMN
11. SELECTION AND DISTRIBUTION OF VRD TO BE CONFIRMED BY CLIENT PRIOR TO FRAMING OF WALL
UP SMOKE CURTAIN LINE ABOVE MODIFIED FOR ADDITIONAL DROP
UP
B2.125 COM
B2.116 PLATFORM CONCOURSE - PAID
FFL -6750 EXIST. ESC 1.3 UP
Room
B2.129 CORRIDOR
B2.138
CLEANERS ROOM
B2.136
AREA WEST OF DASHED RED LINE INDICATES AREA PART OF CONTRACT
ESCALATOR STEP STORAGE
EXISTING ESCALATORS
EXIST. ESC 1.1 UP
EXISTING TRACK
B2.126
SD
1 4102
B2.110 LIFT ROOM
REAR CAVITY ACCESS REQUIRED TO SERVICE SECANT WALL DRAINS
B2.128 SIGNAL
B2.135 NEW ESC 1.4
GAS
B2.127 FCU
EXIST. ESC 1.2 UP
NEW ESCALATOR
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
B2.108
B2.137
EXISTING PLATFORM
LV
UNALLOCATED
EXISTING PLATFORM
4102
12. FOR REINSTATED SALVAGE ITEMS REFER SCHEDULE CRL-BTM-ARC-000SCH-0007
B2.124
EXIST. STAIR 2
N
UP
1
1. PT24 : DENOTES WALL TYPES KEY, REFER TO 7500 SERIES DRAWINGS
NEW ROLLE FIRE RAT E R SER VICE D D OOR
STONE WORK OVER NEW AND EXISTING WALL
B2.123
EXISTING TRACK
UP
1
CHIEF POST OFFICE (CPO)
01
1 4201
... | DRG | 2112
BRITOMART STATION
NEW OPENING AND DOOR IN EXISTING BLOCK WALL
QUEEN STREET
S6
PSD
UP
DOOR SIZE
UP UP UP
CLIENT
NEW STAIR 1 substrate
B2.130 FIRE INTERVENTION STAIR
1
1
UP
2214
2213 PHP
EXIST. LIFT 1
B2.132 CORRIDOR
4103
B2.131
NEW STAIRS SUPPORTED ON CORBELS
EXISTING PLATFORM
1
4103
B2.134
SE
NORTH SERVICES ACCESS
PLENUM ABOVE
B2.112 POLICE BOX
NEW BARRIER
DATE 31/08/15 23/09/15 19/10/15 18/12/15
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION PERMANENT - DETAIL DESIGN 100%
APPROVAL
Liam Wythes
TEMPORARY ACCESS STAIR. BUILDERS WORK
ACCESS GATE & EXISTING GLASS BALUSTRADE REINSTATED. SALVAGE ID54
EXISTING TRACK
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
REV A B C D
NEW BARRIER
EXISTING PLATFORM
SS MESH FRAME SERVICES SHROUD TO CONCEAL SERVICES TRANSITION FROM B1 TO B2
NEW BALUSTRADE
NEW DOOR FOR ACCESS TO DECOMMISSIONED ROOM
TRACK ACCESS STAIR RETAINED
UP
NEW ACCESS DOOR
PORTION OF WALL REMOVED FOR CRL MAIN
NEW STAIR 61
TUNNEL TEMPORARILY BLOCKED OFF
SCALE
SIZE
As indicated
A1
CRL DOWN MAIN
DETAILED DESIGN NOT FOR CONSTRUCTION
DRAWN
APPROVED
Jasmax
STONE WALL
DATE
DESIGNED
SF
Chris Jack / Martin Walton UP
B2.113
B2.117
EXISTING STAIR 3
FFL -8050
B2.122
CHECKED
CORRIDOR
Liam Wythes
Martin Walton
FFL -6750
MSB-1.1
B2.114 PROJECT
PLATFORM MANAGERS ROOM
EXISTING SERVICE STAIR CUT IN HALF AND REUSED
B2.115 MSB-1
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST.
DOORS & WINDOWS REMOVED STONE WORK OVER WITH NEW CONC. BLOCK LINTEL
Office: Plot Date: 18/12/2015 9:34:53 p.m.
1
COM
EXISTING STAIR RETAINED
SG TITLE
BRITOMART STATION PERMANENT WORKS FLOOR PLAN - LEVEL B2
EXISTING STATION SERVICES DECOMISSIONED
1
1
1
4201
4203
4204
DOCUMENT
ORIGINAL SIZE 0
20mm
1
FLOOR PLAN - LEVEL B2 - BRITOMART STATION SECTOR
1101
SCALE @ A1 1 : 100
40
60
80
100
200
FOR DETAILED DESIGN 300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 2111 700
REVISION
D 800
S2
S1 CANOPY REINSTATED WHERE REMOVED FOR CONSTRUCTION WORK
CANOPY REINSTATED
1
C7
IN SEPARATE CONTRACT
4201
1
1
4203
4204
BRITOMART STATION
STATION ENTRY I
WAYFINDING INFORMATION SIGN B ACCESS HATCHES FOR UNDERGROUND SERVICES. REFER TO CIVIL PACKAGE
QUEEN STREET
S3
CHIEF POST OFFICE (CPO)
01
S4
ZONE KEY EDNE
S5
... | DRG | 2132
S6
SA
LEGEND NoR DESIGNATION TRACK CENTRELINE FIRE RATING -/60/60 FIRE RATING -/60/60 EXISTING
GLASSHOUSE RAILINGS REINSTATED. SALVAGE ID 66
FIRE RATING -/120/120
BICYCLE PARKING 25 SPACES
FIRE RATING -/120/120 EXISTING CONSTRUCTION ZONE
SB
GL.108
EXISTING CONSTRUCTION
EXISTING STAIR 14
ARTWORK REINSTATED
GL.109 AIR INTAKE
GL.107 BRIGADE INLET
BARRIER ALONG GRID 3 BEAM FACE WHERE REMOVED FOR TEMPORARY STAIR REINSTATED. SALVAGE ID 40
GL.110
2. SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUT WITHOUT PRIOR APPROVAL OF THE ARCHITECT
STONEWALL PLANTER AND STAINLESS STEEL POLES REINSTATED. SALVAGE ITEMS: ID36, ID26. GARDEN TO LATER DETAIL
L AL W
WATER SKYLIGHT PUMP 5 m²
1. PT24 : DENOTES WALL TYPES KEY, REFER TO 7500 SERIES DRAWINGS
ED AT ST IN RE
Sim
GLASSHOUSE LIGHTING REINSTATED. SALVAGE ITEM ID 67
1 4101
3. ALL INTERNAL PARTITIONS ARE DIMENSIONED TO THE FACE OF FRAMING UNLESS NOTED OTHERWISE. SET OUT ALL WALLS FIRST PRIOR TO FRAMING. 4. FOR SETOUT DIMENSION OF ALL HANDBASINS, SINKS AND CLEANER'S SINKS, REFER TO 5500 SERIES DRAWINGS
FIRE EGRESS I
GLASSHOUSE LOUVRES, STEEL COLUMN, NIBS AND FINISHES REINSTATED WHERE OPENING REMOVED. SALVAGE ID 34
MESH SCREEN ENCLOSURES REINSTATED WHERE REMOVED AS PART OF TEMPORARY WORKS. SALVAGE ID 37
1 5801
UP 5. DOOR NIBS ON HINGE SIDE 100MM UNLESS DETAILED OR NOTED OTHERWISE
SC
6. FOR STRUCTURAL SETOUT PLANS, REFER TO 2400 SERIES DRAWINGS
1 7686
EXISTING GLASSHOUSE CHANNEL DRAINS AND GRATINGS
1 4101
UP
EXIST. LIFT 2
8. FOR STAIRS DETAILS, REFER TO 7620 SERIES DRAWINGS
NEW STAIR 11
B1 CONCOURSE LEVEL BELOW
GLASSHOUSE LOUVRES, NIBS AND FINISHES REINSTATED WHERE OPENING REMOVED. SALVAGE ID 34
7. FOR REFLECTED CEILING PLANS, REFER TO 3000 SERIES DRAWINGS
9. FOR TOILET LAYOUT AND DETAILS, REFER TO 5700 SERIES DRAWINGS 10. FOR FINISHES PLANS, REFER TO 7900 SERIES DRAWINGS UP
REINSTATED ESC. 6.2 Sim
1 7417
11. SELECTION AND DISTRIBUTION OF VRD TO BE CONFIRMED BY CLIENT PRIOR TO FRAMING OF WALL
EXISTING GLASS GATES REINSTATED. SALVAGE ID 68
12. FOR REINSTATED SALVAGE ITEMS REFER SCHEDULE CRL-BTM-ARC-000SCH-0007
UP
VRD
REINSTATED ESC. 6.1
1 GLASS BRIDGE BAUSTRADES REINSTATED. SALVAGE ID 39
N
7590
GLASSHOUSE AUTODOORS AND OPENING REINSTATED. SALVAGE ID 52
1 COMMERCE STREET
REINSTATED STATION PLAZA. WORKS IN SEPARATE CONTRACT
4102
WATER SKYLIGHT REINSTATED. SALVAGE ID 15
STATION ENTRY I
BOLLARDS FOR DOOR SECURITY 1.5m CTRS
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
G.112
G.111
GATE LINE GLASS BRIGE - UNPAID
SD
GLASS BRIDGE - PAID
1
CE
4102
FFL 3900
NEW ACO DRAIN AND HEELGUARD CHANNEL DRAINS AND GRATINGS TO MATCH EXISTING REINSTATED ACROSS ENTRANCE
GLASS BRIDGE BAUSTRADES REINSTATED. SALVAGE ID 39
EXISTING GLASS GATES REINSTATED. SALVAGE ID 68
VRD
CLIENT
UP
1
REINSTATED ESC. 5.1
7417 UP
NEW ESC. 5.2 GLASSHOUSE LOUVRES, NIBS AND FINISHES REINSTATED WHERE OPENING REMOVED. SALVAGE ID 34
MESH SCREEN ENCLOSURES REINSTATED WHERE REMOVED AS PART OF TEMPORARY WORKS. SALVAGE ID 38
1
EXIST. LIFT 1 B1 CONCOURSE LEVEL BELOW
UP
NEW STAIR 10
1
4103
4103
BARRIER ALONG GRID 3 BEAM FACE WHERE REMOVED FOR TEMPORARY STAIR REINSTATED. SALVAGE ID 40
WA LL RE INS TA TE D
FIRE EGRESS I
GLASSHOUSE LOUVRES, STEEL COLUMN, NIBS AND FINISHES REINSTATED WHERE OPENING REMOVED. SALVAGE ID 34
GL.105
REV A B C D
1 7686
SE
DATE 31/08/15 23/09/15 19/10/15 18/12/15
STONEWALL PLANTER AND STAINLESS STEEL POLES REINSTATED. SALVAGE ITEMS: ID36, ID26. GARDEN TO LATER DETAIL
GLASSHOUSE LIGHTING REINSTATED. SALVAGE ITEM ID 67
GL.106
Liam Wythes
5801
AIR INTAKE
SCALE
SIZE
As indicated
A1
GL.104 Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
APPROVAL
2
TRANSFORMER
TRANSFORMER
1
DETAILED DESIGN NOT FOR CONSTRUCTION
DRAWN
ARTWORK REINSTATED
APPROVED
Jasmax
5915
DATE
DESIGNED
SF
Chris Jack / Martin Walton DGE.001.1
CHECKED
BICYCLE PARKING 25 SPACES
GLASSHOUSE RAILINGS REINSTATED. SALVAGE ID 66
7415
PROJECT
STATION ENTRY I
ACCESS HATCHES FOR UNDERGROUND SERVICES. REFER TO CIVILS PACKAGE
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST. SG TITLE
BRITOMART STATION PERMANENT WORKS FLOOR PLAN - LEVEL GROUND
Office:
EDNE
NEW MIMIC PANEL BRIGADE ASSEMBLY FOR INTERVENTION STAIRS
BICYCLE PARKING
CANOPY REINSTATED WHERE REMOVED FOR CONSTRUCTION WORK
CANOPY REINSTATED IN SEPARATE CONTRACT
1
FLOOR PLAN - LEVEL GROUND - BRITOMART STATION SECTOR
1103 ORIGINAL SIZE
0
20mm
1
1
1
4201
4203
4204
60
80
100
200
DOCUMENT
FOR DETAILED DESIGN
SCALE @ A1 1 : 100
40
300
Liam Wythes
Martin Walton
1
WAYFINDING INFORMATION SIGN B
Plot Date: 18/12/2015 9:24:04 p.m.
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION PERMANENT - DETAIL DESIGN 100%
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 2131 700
REVISION
D 800
1
... | DRG | 2131
01 STATION ENTRY H
1
C5
C4
4206
VM
VRD
VM
VRD
C3
1
C2
C1
4207
VRD
PHP
NEW STAIR 33
NEW STAIR 34
G.021
4104
CA
BRITOMART STATION
CHIEF POST OFFICE (CPO)
ZONE KEY
1
LEGEND
4104
RETAIL
NoR DESIGNATION
G.022
G.023
RETAIL
RETAIL
CORRIDOR
1
ENTRY
G.015
I
STATION ENTRY G I
QUEEN STREET
C6
1 4205
01
C7
... | DRG | 2133
S1
TRACK CENTRELINE FIRE RATING -/60/60 FIRE RATING -/60/60 EXISTING INFORMATION BOARD
2231
FIRE RATING -/120/120 FIRE RATING -/120/120 EXISTING
B6
B5
B4
B3
B2
CB
CONSTRUCTION ZONE
EXISTING CONSTRUCTION PHP
G.014
VRD - WM
MSB
1. PT24 : DENOTES WALL TYPES KEY, REFER TO 7500 SERIES DRAWINGS
G.013
VRD - WM
MSB
STATION ENTRY A
10
G.012
VRD - WM
MSB
2. SUBSTITUTION FOR OR AMENDMENT OF SPECIFIED DETAILS OR MATERIALS SHALL NOT BE CARRIED OUT WITHOUT PRIOR APPROVAL OF THE ARCHITECT EXISTING CANOPIES RETAINED
3. ALL INTERNAL PARTITIONS ARE DIMENSIONED TO THE FACE OF FRAMING UNLESS NOTED OTHERWISE. SET OUT ALL WALLS FIRST PRIOR TO FRAMING.
1
G.010
UP
2232
FIRE EGRESS
EXCESS FARE WINDOW
EXISTING RAMP REINSTATED
G.011 CPD
C6
C5
C4
C3
C2
STATION ENTRY B
1 NEW STAIR 11
4105
UP
4. FOR SETOUT DIMENSION OF ALL HANDBASINS, SINKS AND CLEANER'S SINKS, REFER TO 5500 SERIES DRAWINGS 5. DOOR NIBS ON HINGE SIDE 100MM UNLESS DETAILED OR NOTED OTHERWISE 6. FOR STRUCTURAL SETOUT PLANS, REFER TO 2400 SERIES DRAWINGS
CC
1 4105
UP
7. FOR REFLECTED CEILING PLANS, REFER TO 3000 SERIES DRAWINGS 8. FOR STAIRS DETAILS, REFER TO 7620 SERIES DRAWINGS 9. FOR TOILET LAYOUT AND DETAILS, REFER TO 5700 SERIES DRAWINGS
FUTURE KIOSK ZONE
10. FOR FINISHES PLANS, REFER TO 7900 SERIES DRAWINGS UP
EXIST. LIFT 1
REINSTATED ESC. 6.2
11. SELECTION AND DISTRIBUTION OF VRD TO BE CONFIRMED BY CLIENT PRIOR TO FRAMING OF WALL
UP
12. FOR REINSTATED SALVAGE ITEMS REFER SCHEDULE CRL-BTM-ARC-000SCH-0007
UP
REINSTATED ESC. 6.1 D6
D5
D4
D3
EXIST. LIFT 2
CD
G.001
PHP
CPO -UNPAID
N
FFL 3900
G.002
G.006
CPO GATELINE - PAID
VESTIBULE
FFL 5225
NEW STAIR 39
1
CPO ENTRY I
G.111 GLASS BRIDGE - PAID
UP
1
CE
UP
4106
CONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK NO BUILDING WORK SHALL PROCEED UNTIL BUILDING CONSENT HAS BEEN GRANTED FOR THE WORK DESCRIBED. DO NOT SCALE OFF THIS DRAWING FOR ALL STRUCTURAL STEELWORK REFER TO STRUCTURAL ENGINEER’S DRAWINGS FOR VERIFICATION OF MEMBER SIZES
4106
NEW STAIRS TO REPLACE EXISTING
F6
F5
F4
FUTURE KIOSK ZONE
F3
EXIST. STAIR UP
CF
UP
EXIST LIFT
REINSTATED ESC. 5.1
CLIENT
UP
UP
NEW ESC. 5.2 UP
NEW STAIR 10
UP
STATION ENTRY C
UP
1 4107
G5
G4
G3
G2
G1
CG
FIRE EGRESS
EXISTING STAIR UP EXISTING RAMP REINSTATED
UP
UP
STATION ENTRY D
VRD - WM
1 2234
1 4107
1350
1 VRD - WM 7636
REV A B C D
DATE 31/08/15 23/09/15 19/10/15 18/12/15
APPROVAL
Liam Wythes
1 2233 EXISTING CANOPIES RETAINED
2
REVISION DETAILS FOR COORDINATION FOR COORDINATION FOR COORDINATION PERMANENT - DETAIL DESIGN 100%
VRD - WM
SCALE
SIZE
As indicated
A1
DETAILED DESIGN NOT FOR CONSTRUCTION
Filename: C:\Revit\CRL_BTM_ARC_000_MD3_STATION_R15_JAT.rvt
7635
G.035 3
APPROVED
Jasmax
7635
DATE
DESIGNED H6
H5
H4
H3
H2
Chris Jack / Martin Walton
CH
CHECKED
Liam Wythes
Martin Walton
VM
FIRE EGRESS
FIRE DOORS ON AUTO HOLD OPENS
SG STATION ENTRY E
1
Office:
G.027
G.026
G.025
CUSTOMER SERVICE
TICKETING
RETAIL
I
G.034 LOBBY
AUCKLAND CITY RAIL LINK EC1 BRITOMART & LOWER QUEEN ST.
ENTRY
STATION ENTRY F
PROJECT
4108
Plot Date: 18/12/2015 9:22:16 p.m.
DRAWN
STATION LOCATOR SIGN & INFORMATION. SIGNAGE OVERLAY B
VRD - WM
FIRE INTERVENTION STAIR 30
1
. PHP
G.033 VRD - WM VRD - WM VRD - WM
OFFICE CSC
G.032 G.031 STAFF WC
TITLE
4108
G.030
G.029
G.028
STAFF KITCHENETTE
CORRIDOR
CASH ROOM
CHIEF POST OFFICE (C.P.O.) - PERMANENT WORKS FLOOR PLAN - LEVEL GROUND
CORRIDOR
CJ
ORIGINAL SIZE 0
20mm
40
1
FLOOR PLAN - LEVEL GROUND - CPO SECTOR
1103
SCALE @ A1 1 : 100
60
80
100
DOCUMENT
1
1
4206
FOR DETAILED DESIGN
4207
200
300
400
500
600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL BTM ARC 000 DRG 2132 700
REVISION
D 800
Appendix F:
Vehicle Tracking Sketches
12.50
2.20
6.85
SU TRUCK
meters
Width Track Lock to Lock Time Steering Angle
: : : :
2.50 2.50 6.0 36.6
11.50
1.30
7.10
LARGE RIGID TRUCK meters Width Track Lock to Lock Time Steering Angle
: : : :
2.50 2.50 6.0 41.6
11.50
1.30
7.10
LARGE RIGID TRUCK meters Width Track Lock to Lock Time Steering Angle
: : : :
2.50 2.50 6.0 41.6
Appendix G:
Cut and Cover Pipejack and Britomart Modelling Report – Rev 2 (AECOM) –
Auckland CRL Enabling Works 23-Nov-2015
City Rail Link Enabling Works Traffic Modelling Albert Street Tunnel & Britomart Underpinning Scenario Testing
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
City Rail Link Enabling Works Traffic Modelling Albert Street Tunnel & Britomart Underpinning Scenario Testing
Client: Auckland Transport ABN: N/A
Prepared by AECOM New Zealand Limited 8 Mahuhu Crescent, Auckland 1010, PO Box 4241, Auckland 1140, New Zealand T +64 9 967 9200 F +64 9 967 9201 www.aecom.com
23-Nov-2015
Job No.: 60344327
AECOM in Australia and New Zealand is certified to the latest version of ISO9001, ISO14001, AS/NZS4801 and OHSAS18001.
© AECOM New Zealand Limited (AECOM). All rights reserved. AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this document. This document has been prepared based on the Client’s description of its requirements and AECOM’s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Quality Information Document
City Rail Link Enabling Works Traffic Modelling
Ref
60344327
Date
23-Nov-2015
Prepared by
Sebastian Lourdusamy, Michelle Ye
Reviewed by
Andrew Foy
Revision History Authorised
Revision Date
Details
A
13-Nov-2015
B
23-Nov-2015
Revision
Name/Position
Signature
For issue to client
Marcus Williams – CRL ECI Phase Traffic Manager
Original signed
For re-issue to client
Marcus Williams – CRL ECI Phase Traffic Manager
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Table of Contents 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0
Overview Model and Software Version Control Modelling to date Rev2 C2 SP1 Modelling Scenarios Construction Trucks Signal Phasing and Node Graphic Traffic Flow Difference Plots Network Statistics Travel Times Travel Times for Consent Conditions Sensitivity Analysis of Construction Truck Volumes Conclusions
1 1 1 2 3 4 4 5 6 12 13 15
Appendix A Details of PJ 4a Scenario
A
Appendix B Construction Truck Routes and Frequencies
B
Appendix C Development Programme for Construction Works
C
Appendix D Base Case Flow Plots and Scenario Flow Difference Plots
D
Appendix E Travel Time Bar Graphs
E
Appendix F Travel Time and Volume Graphs
F
Appendix G Signal Phasing & Node Graphics
G
Appendix H Intersection VC Plots
H
Appendix I Travel Times against Observed Travel Times
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
I
AECOM
1.0
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Overview
The purpose of this report is to document the outputs of traffic modelling tests undertaken to replicate the proposed temporary traffic management associated with the construction that involves cut and cover works along Albert Street (C2-SP1) and Britomart / CPO works (C1). The scenarios tested are therefore for periods after 2 May 2016. A report from AECOM, dated 11 September 2015, reports on the revised modelling tests of the proposed temporary traffic management associated with the pipe jacking works that are based on the original SATURN model provided by Flow. The revised modelling tests were based on the existing 2021 Auckland City Centre SATURN model (AM, Interpeak and PM peak periods), consistent with previous traffic modelling of the project for consent and as used for initial SP2 pipe jack TTMP planning and assessment. This report summarises the outputs for the updated modelling tests undertaken for each scenario that includes traffic management during construction for cut and cover works along Albert Street (C2-SP1) and Britomart / CPO works (C1). The revised Pipe Jacking Test 4a model (from September 2015 – Rev1 SATURN Model) was used to create models for each scenario. The travel times reported are average travel times over a one hour period.
2.0
Model and Software Version Control
As per report dated 11 September 2015, to ensure consistency in calibration and comparisons the same software version has been used for traffic assignment. SATURN version 11.2.05 is used for all model assignments. Prior to undertaking the Rev1 scenario tests for revised SP2 pipe jack TTMP planning and assessment, a complete set of results for Rev0 was created and compared to previously assigned networks. This confirmed that acceptably consistent model outputs were generated.
3.0
Modelling to date
The modelled scenarios to date are: ·
July 2015 - Rev0 modelling to test the proposed temporary traffic management associated with the pipe st jacking works within Auckland’s city centre (technical note, 31 July 2015).
·
September 2015 - Rev1 modelling to report on the revised modelling tests for the proposed temporary th traffic management associated with the pipe jacking works within Auckland’s city centre (report, 11 September 2015).
·
Early November 2015 – Rev1 C2 SP1 to report on traffic management operations during construction for proposed cut and cover works along Albert Street (C2-SP1) and Britomart / CPO works (C1).
·
Late November 2015 – Rev2 C2 SP1 with updates to Rev1 C2 SP1 (summarised in this report). The Rev2 C2 SP1 models have been updated prior to issue to include: o o o o
o o
o
Addition of construction traffic and controls associated with the New Zealand International Convention Centre, NDG Auckland Centre 1 Mills Lane developments. Refined tunnel works sequencing. Lower Albert / Quay Street intersection with a kerbside bus only lane, shared left and right middle lane and right turn only outside lane at the southern leg. Existing lane arrangement for Quay Street retained between Lower Queen and Commerce streets in all periods, i.e. there is separated right turn bays into Queens Wharf (WBD) and Commerce St (EBD) and the cycleway will be off-road. Quay Street cycleway modelled as per th consultation plans supplied by Auckland Transport dated 19 November 2015. Tyler Street one way direction reversed for Scenario 6a, 7a and 8a. Construction trucks not allowed to turn right from Quay Street into Lower Queen St during the PM peak. General traffic wanting to access the properties on Tyler St will still be able to do this. All Precinct and C1 trucks were routed to access the worksite from the east during the PM peak via Quay Street. Construction trucks travelling into Mills Lane during the PM peak will access via Beach Road for Scenario 8a.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
1
AECOM
4.0
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Rev2 C2 SP1 Modelling Scenarios
Five Scenarios (4d, 5a, 6a, 7a and 8a) have been modelled to include the traffic management proposed during construction for cut and cover works along Albert Street (C2-SP1) and Britomart / CPO works (C1). The scenarios include proposed CBD developments, Auckland Transport and Auckland Council projects, CRL pipe jack works (C2-SP1) and CRL Britomart/ CPO works. The revised Pipe Jacking Test 4a model is used as a basis to create models for each scenario and includes: ·
CRL Pipe jack works - Construction at Victoria main shaft, Swanson Shaft and Wellesley shaft. OMS shaft works complete but interim lane arrangement in place due to Victoria main shaft works
·
Public transport changes - Phase 1 and Phase 2 PT changes in place
·
Nelson Street cycleway - Stage 1 operational and construction of Stage 2
·
CRL cut and cover trenching works - Enabling works at Albert / Customs consisting of the removal of one WBD through lane and the OMS work site works complete, and the interim two-lane traffic arrangement in place. East-west lanes at the Customs / Albert intersection reduced to a single through and left turn lane with NBD traffic on Albert diverted to Customs Street and Hobson Street by reversal of Wolfe Street (Wolfe Street reversal in scenarios 4d and 5a only).
·
CRL Britomart and Precinct works
The details on the network operations of PJ 4a are provided in Appendix A. The modelled scenarios are as follows: ·
Scenario 4d (TMP Stage 1): Represents the traffic conditions at the commencement of piling for cut and cover works along Albert Street (C2-SP1). o o o o o o o o o o
·
Scenario 5a (TMP Stage 3): Represents the period that has greatest traffic restrictions due to piling for cut and cover works along Albert Street (C2-SP1) and is the same as Scenario 4d with the following changes. o o o
·
Albert Street north and south approach reduced to single lanes Victoria 2 shaft open (OMS) and, therefore, a single lane for Victoria Street east approach Increase Customs Street east approach to two lanes Increase Customs Street west approach to two lanes Remove Wyndham Street east approach closure Wyndham Street east and west approach reduced to single lanes Albert Street southbound traffic to use service lane between Wyndham and Victoria Street Additional through phase at Hobson / Wellesley Street intersection for construction trucks Albert / Quay Street intersection with a kerbside bus only lane, shared left and right middle lane and right turn only outside lane at the southern leg Existing lane arrangement retained between Lower Queen and Commerce streets in all periods, i.e. there are separated right turn bays into Queens Wharf (WBD) and Commerce St (EBD) and the cycleway will be off-road
Reduce Customs Street east approach to a single lane Both Wyndham Street east and west approach closed Albert Street southbound traffic not on service lane between Wyndham and Victoria Street
Scenario 6a (TMP Stage 8): Represents the period that has greatest traffic restrictions due to piling for cut and cover works along Albert Street (C2-SP1) and is the same as Scenario 5a with the following changes. o o o o o o o o o
Albert Street south approach to Customs Street open to left turn only traffic Customs Street west approach reduced to a single lane Wolfe Street diversion removed, modelled as existing one way, but left out only Wyndham Street east and west approaches open to traffic, but left in left out only Swanson Street east approach open to traffic Left in left out for the Albert / Swanson Street and Albert / Wyndham Street intersections Tyler Street one way direction reversed Victoria Street shaft 2 (OMS) removed Albert Street southbound traffic to use service lane between Wyndham St and Victoria Street
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
2
AECOM
·
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Scenario 7a (TMP Stage 10): Represents the period where piling is complete, and the trench along Albert Street (C2-SP1) restricts east-west traffic movements between Customs Street and Wyndham Street and is the same as Scenario 6a with the following changes. o o o o o o
·
Albert Street south approach to Customs Street open to left, through and right turn traffic Customs Street west and east approach to two lanes Mills Lane approach closed, left in from Albert Street only Swanson Street east left out into Albert Street only, i.e., no vehicles left in from Albert St Left in left out for the Swanson Street west approach, Albert / Wyndham Street and Wolfe / Albert Street Intersections Wellesley / Albert Street intersection works complete shaft removed and Barnes Dance phase removed to alleviate corridor congestion by green time reallocation.
Scenario 8a (TMP Stage 10): Represents the long-term traffic conditions that will exist with the trench and service lanes in place. It is the same as scenario 7a but with the PT phase 1 scenario at Albert Street / Victoria Street intersection without a Barnes Dance phase. PT phase 1 is the scenario representing approximately October 2015 traffic conditions, following the first phase of bus priority measures intended to mitigate the effects of the CRL construction.
The period after the completion of the Albert Street works has not been modelled as it will be clearly much improved. Key features during this non-modelled period include the permanent lane reductions for bus and cycle lanes, reduced Albert Street lanes for the urban design (TBC), new bus routes (TBC), C1 Britomart works and the private development traffic.
5.0
Construction Trucks
The model includes truck traffic from a number of construction projects occurring in the model area. The construction truck volumes and routes are shown in Appendix B. The following parameters and assumptions were used to model the construction trucks: ·
Construction trucks were not allowed to turn right from Quay Street into Lower Queen St during the PM peak. General traffic wanting to access the properties on Tyler St will still be able to do this. All Precinct and C1 trucks were routed to access the worksite from the east during the PM peak via Quay Street.
·
Construction trucks travelling into Mills Lane during the PM peak will access via Beach Road for Scenario 8a.
·
Daily construction truck volumes are distributed evenly across a working day of 10 hours. A range of sizes of construction trucks is expected to operate during construction.
·
A factor of 2 was used to convert heavy truck vehicles into PCU’s (average of regional truck fleet) that is consistent with original assessment. Using a factor of 3 is expected to have marginal impact on the model outputs.
·
Construction trucks from SP2 of CRL C2 were not included. It was assumed that due to their low truck volumes, these would not have any noticeable impact.
·
Construction trucks for other CBD developments, Auckland Transport and Auckland Council projects, as well as CRL pipe jack works (C2-SP1), are included.
·
Where there were multiple routes to one construction site, the model assumes an even split in traffic volumes. The one exception to this is the Sky City Convention Centre construction site, where it was assumed that half the construction traffic would use the eastern entrance, and a quarter would use each of the western and southern entrances.
·
Although modelled as fixed flows like buses, construction trucks are assigned to general traffic and not bus lanes.
The development programme for the construction works is provided in Appendix C.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
3
AECOM
6.0
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Signal Phasing and Node Graphic
The signal phasing and node graphics for the C2 SP1 intersections affected by the cut and cover works are provided in Appendix G, for the following intersections. ·
Albert Street / Customs Street
·
Albert Street / Wolfe Street
·
Albert Street / Swanson Street
·
Albert Street / Wyndham Street
·
Albert Street / Victoria Street
·
Albert Street / Wellesley Street
·
Hobson Street / Wellesley Street
·
Victoria Street / Federal Street
·
Halsey Street / Fanshawe Street
·
Quay Street / Commerce Street
·
Lower Albert Street / Quay Street
·
Queen Street / Quay Street
·
Gore Street / Quay Street
·
Commerce Street / Quay Street
·
Queen Street / Tyler Street
·
Commerce Street / Tyler Street
The volume capacity plots for nodes within the network for all scenarios are provided in Appendix H.
7.0
Traffic Flow Difference Plots
The traffic flow difference plots for C2 SP1 models are provided in this report. The plots illustrate the predicted traffic effects of the various scenarios assessed, by comparing the modelled traffic flows of each C2 SP1 scenario with those of the Rev1 Base Case. All scenarios display redistributions when compared to the Rev1 Base Case. Based on our model outputs, there are: ·
Reduced traffic on Albert Street due to reducing the north and south approach to single lanes during all peak periods, for all scenarios
·
Increased traffic on Nelson Street and Hobson Street due to lane reduction on Albert Street during all peak periods, for all scenarios
·
Reduced traffic on Quay Street due to increasing capacity on the east and west approach of Customs Street during all peak periods, for all scenarios
·
Custom Street typically decreases in traffic volume although there are some increases when capacity increases through phase reductions
·
Reduction in traffic on Wyndham Street due to approach closures and left restrictions during all peak periods
·
A similar pattern of traffic redistribution observed for Scenario 7a and 8a
·
Increased pressure on the motorway network for all scenarios during the evening peak period due to northbound traffic rerouting to the port onramp from Tamaki Drive and the eastern parts of the CBD.
Flow difference plots comparing the modelled traffic flows of each scenario with the Rev1 Base Case are provided in Appendix D. These plots show the traffic redistribution. Note that the scale used is greater than that used by Flow consultants.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
4
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
8.0
Network Statistics
Network statistics provide a comparative base from which to understand how changes impact on overall travel and include the sum effect of changes on local and other roads not reported on otherwise. Network travel times and distances for each scenario have been extracted for general traffic, construction trucks and buses. Increases in person hours travelled indicate increased congestion or that people are taking a different route and travelling further. Increases in the total kilometres travelled indicate that people are changing routes to avoid congestion. Little weight should be given to the absolute values presented in Table 1 and Table 2 as the total travel times and distances are largely dependent on the size of the network modelled. The statistics, however, provide an indicative measure of the potential disruption to traffic caused by each modelled scenario, relative to each other. Table 1 shows the network wide travel times and travel distances for the modelled scenarios for general traffic. These summary statistics are compared to the revised Rev1 Base Case. The travel time and travel distance presented are in the same format as Rev1 outputs. Travel times in person-hours are calculated by using 1.2 persons per vehicle and bus occupancy of 30 people. This provides consistency with earlier reports. Table 1
Summary Statistics – C2 SP1 General Traffic
C2 SP1
Rev 1 Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Travel Time (person-hours) Morning Peak
8,960
10,080 (+1,120)
10,290 (+1,330)
10,370 (+1,410)
10,000 (+1,040)
9,340 (+390)
Interpeak
5,630
6,220 (+580)
6,790 (+1,160)
6,510 (+870)
6,340 (+710)
6,020 (+380)
Evening Peak
14,690
17,920 (+3,230)
18,380 (+3,690)
18,450 (+3,760)
17,730 (+3,040)
17,040 (+2,350)
Travel Distance (vehicle-km) Morning Peak
177,380
179,750 (+2,370)
180,220 (+2,840)
181,170 (+3,790)
180,170 (+2,790)
179,280 (+1,900)
Interpeak
144,910
147,630 (+2,730)
147,790 (+2,880)
149,040 (+4,130)
148,350 (+3,440)
147,470 (+2,570)
Evening Peak
195,600
200,500 (+4,900)
200,840 (+5,240)
201,830 (+6,230)
200,200 (+4,600)
199,350 (+3,750)
All scenarios are predicted to have large impacts on the general traffic with no improvement in network wide travel times when compared to the Rev1 Base Case. No improvement in travel times is predicted due to the reduction of Albert Street north and south approach to single lanes, and overall reduction in lane capacity due to replacement with cycle and bus lanes. Scenario 5a and 6a are predicted to result in a relatively large increase in travel time which represents the greatest traffic restrictions due to piling for cut and cover works along Albert Street. Scenario 8a performs better when compared to scenario 5a and 6a as it represents the period where piling is complete. All scenarios are predicted to travel longer distances when compared to the Rev1 Base Case. Scenario 5a and 6a are predicted to result in a relatively large increase in travel distance that represents the greatest traffic restrictions due to piling for cut and cover works along Albert Street. Scenario 8a results in the lowest increase in travel distance as they represent the period where piling, Victoria Street and Wellesley Street works are complete. It should be noted that all periods improve in scenario 8a when the pipe jack works are complete and the constraints on Victoria Street and Wellesley Street are removed. This improvement is muted by the permanent lane reduction to accommodate bus lanes however.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
5
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Table 2
Summary Statistics – C2 SP1 Buses and Construction Trucks
C2 SP1
Rev 1 Base Case
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Travel Time (person-hours) Morning Peak
4,220
5,390 (+1,170)
5,660 (+1,430)
5,860 (+1,630)
5,670 (+1,440)
5,420 (+1,200)
Interpeak
1,810
2,700 (+890)
2,820 (+1,010)
3,040 (+1,230)
3,000 (+1,190)
2,860 (+1,050)
Evening Peak
4,940
7,820 (+2,880)
8,160 (+3,230)
8,350 (+3,410)
7,630 (+2,690)
7,630 (+2,690)
Travel Distance (vehicle-km) Morning Peak
2,240
2,950 (+710)
2,990 (+760)
3,190 (+950)
3,190 (+950)
3,190 (+950)
Interpeak
1,100
1,880 (+780)
1,930 (+830)
2,120 (+1,020)
2,120 (+1,020)
2,120 (+1,020)
Evening Peak
2,250
2,990 (+740)
3,030 (+780)
3,230 (+980)
3,090 (+830)
3,240 (+980)
Table 2 shows the network wide travel times and travel distances for the modelled scenarios, for buses and construction trucks. All scenarios are predicted to have large impacts on the buses and construction traffic with no improvement in network wide travel times when compared to the Rev1 Base Case. Bus travel times and distances are predicted to increase for all scenarios due to the removal of bus lanes and reduction of Albert Street north and south approach to single lanes. Scenario 8a performs better for buses and construction traffic when compared to scenario 5a, 6a and 7a as it represents the period where piling Victoria and Wellesley Street works are complete. The increases seen are primarily due to the addition of construction trucks rather than bus changes. Based on our revised model outputs, we note the following: ·
No significant difference in travel times and travel distances between scenarios 5a and 6a
·
Significant increase in travel times and travel distances for all scenarios when compared to the Rev1 Base Case
·
Significant increase in travel times for buses predicted for all scenarios when compared to the Rev1 Base Case
·
No significant difference in travel times and travel distances predicted between scenarios 7a and 8a
·
Scenario 8a performs better for general traffic, buses and construction traffic when compared to scenario 5a and 6a as it represents the period where piling and the pipe jack works are complete.
9.0
Travel Times
Travel times along key routes associated with the consent conditions have been extracted from the model. These travel times provide average travel times over an hour period. As an average, these figures will under-represent th the travel time when compared to more common engineering measures such as the 85 percentile and maximum travel time. It is also noted that the model is based on annual dates and does not represent yearly or major event high downward periods. The ten routes assessed are as follows. ·
Route 1: Wellesley Street between Victoria Street and Princes Street
·
Route 2: Victoria Street between Wellesley Street and Princes Street
·
Route 3: Customs Street/Fanshawe Street between Nelson Street and Tangihua Street
·
Route 4: Quay Street and Lower Hobson Street between Fanshawe Street and Tangihua Street
·
Route 5: Nelson Street/Hobson Street between Pitt Street and Fanshawe Street
·
Route 6: Queen Street between Mayoral Drive and Customs Street
·
Route 7: New North Road/Symonds Street between Dominion Road and Newton Road
·
Route 8: Mount Eden Road between Symonds Street and Enfield Street
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
6
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
·
Route 9: Khyber Pass Road between SH 1 motorway ramps and Symonds Street
·
Route 10: Newton Road between SH 16 on ramps and Symonds Street
The NoR defines the Mount Eden Road route between Symonds Street and Normanby Road. The SATURN model does not extend beyond Enfield Street and only covers approximately a third of the Mount Eden Road. However, traffic using the route via Mount Eden Road is expected to have no significant difference in travel time and flows between scenarios as Mount Eden Road is located far (approximately three kilometres) from the construction site with no alternate route to the city centre. Figure 1 shows the travel time routes. The levels of impact1 and forecast changes in travel times are colour coded as shown in Table 3. Travel time plots comparing the modelled scenario for the ten key routes are provided in Appendix E. Table 3
Colour Scale for Changes to Travel Times
Level of Impact
Travel Time Increases
Travel Time Reductions
Negligible
Increases under 30 seconds
Reductions under 30 seconds
Minor
Increases between 30 seconds and 60 seconds
Reductions between 30 seconds and 60 seconds
Major
Increases between 60 seconds and 120 seconds
Reductions between 60 seconds and 120 seconds
Significant
Increases over 120 seconds
1
an arbitrary definition used to express the level of impact
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
7
AECOM
Figure 1
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Travel Time Routes
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
8
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Table 4 to Table 6 present the revised modelled travel times for the ten routes assessed. Table 4
Average Rev2 Morning Peak Travel Times (seconds)
Route (Direction) Base Case Scenario 4d Scenario 5a Scenario 6a Wellesley 550 560 560 380 Street (EBD) (+170) (+180) (+190) Wellesley 560 600 590 390 Street (WBD) (+170) (+210) (+200) Victoria Street 630 660 670 400 (EBD) (+230) (+260) (+270) Victoria Street 610 710 610 450 (WBD) (+160) (+260) (+160) Customs Street 290 290 320 210 (EBD) (+80) (+80) (+110) Customs Street 330 500 370 290 (WBD) (+50) (+220) (+90) Quay Street 240 230 250 180 (EBD) (+60) (+50) (+70) Quay Street 310 380 340 280 (WBD) (+40) (+100) (+70) Nelson Street 410 430 430 340 (NBD) (+80) (+100) (+90) Hobson Street 320 320 310 250 (SBD) (+80) (+70) (+60) Queen Street 540 510 530 500 (NBD) (+40) (+10) (+30) Queen Street 590 500 540 480 (SBD) (+110) (+20) (+60) New North 190 190 190 190 Road (NBD) New North 150 150 150 150 Road (SBD) Mt Eden Road 120 120 110 120 (NBD)* Mt Eden Road 40 40 40 40 (SBD)* Khyber Pass 130 130 130 130 Road (EBD) Khyber Pass 120 120 120 120 Road (WBD) Newton Road 280 290 300 270 (EBD) (+10) (+20) (+40) Newton Road 140 140 140 140 (WBD) *The SATURN model only covers the northern half of the Mt Eden Road route
Scenario 7a 480 (+100) 530 (+140) 670 (+270) 580 (+120) 330 (+120) 350 (+60) 250 (+70) 320 (+50) 370 (+40) 290 (+50) 540 (+40) 570 (+90)
Scenario 8a 450 (+70) 440 (+50) 460 (+60) 500 (+50) 320 (+110) 330 (+50) 250 (+70) 320 (+50) 350 (+20) 280 (+30) 500 620 (+140)
190
190
150
150
120
110
40
40
130
130
120
120
300 (+40)
300 (+30)
140
140
Based on model outputs for the morning peak: ·
A significant increase in travel time for Wellesley and Victoria Street for scenarios 4d, 5a, 6a and 7a that are directly affected by pipe jacking work sites and cut and cover works along Albert Street.
·
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and increased in travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
·
Traffic using Quay Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
·
Scenario 8a experiences a lower travel time when compared to scenario 4d, 5a, 6a and 7a as it represents the period where piling is complete.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
9
AECOM
Table 5
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Average Rev2 Interpeak Travel Times (seconds)
Route (Direction) Base Case Scenario 4d Scenario 5a Scenario 6a Wellesley 410 420 420 350 Street (EBD) (+60) (+70) (+70) Wellesley 470 490 490 380 Street (WBD) (+90) (+110) (+100) Victoria Street 630 640 640 380 (EBD) (+250) (+260) (+260) Victoria Street 570 680 570 390 (WBD) (+180) (+290) (+180) Customs Street 270 270 290 240 (EBD) (+30) (+30) (+50) Customs Street 340 520 380 290 (WBD) (+50) (+230) (+90) Quay Street 250 250 260 200 (EBD) (+60) (+60) (+60) Quay Street 320 410 380 270 (WBD) (+50) (+140) (+110) Nelson Street 250 260 250 180 (NBD) (+70) (+80) (+70) Hobson Street 220 220 210 200 (SBD) (+20) (+20) (+20) Queen Street 520 510 520 460 (NBD) (+60) (+50) (+60) Queen Street 610 540 560 460 (SBD) (+150) (+80) (+100) New North 130 130 130 130 Road (NBD) New North 140 140 140 140 Road (SBD) Mt Eden Road 80 80 80 80 (NBD)* Mt Eden Road 50 50 50 50 (SBD)* Khyber Pass 110 120 120 120 Road (EBD) Khyber Pass 130 130 140 130 Road (WBD) Newton Road 180 180 180 180 (EBD) Newton Road 170 170 160 160 (WBD) (+10) (+10) *The SATURN model only covers the northern half of the Mt Eden Road route
Scenario 7a 400 (+50) 410 (+30) 650 (+270) 570 (+180) 310 (+80) 350 (+60) 270 (+70) 350 (+80) 240 (+60) 210 (+20) 540 (+80) 640 (+190)
Scenario 8a 380 (+40) 400 (+20) 430 (+50) 430 (+30) 290 (+60) 330 (+40) 260 (+60) 350 (+80) 230 (+50) 210 (+10) 510 (+50) 630 (+180)
130
130
140
140
80
80
50
50
120
120
130
130
180 (+10)
180 (+10)
160
160
Based on the model outputs for the interpeak the following can be observed: ·
A significant increase in travel time for Victoria Street for scenarios 4d, 5a, 6a and 7a that are directly affected by pipe jacking work sites and cut and cover works along Albert Street.
·
Traffic using Wellesley Street has an increase of 70 to 110 seconds for scenarios 4d, 5a and 6a. No significant increase in travel time for scenarios 7a and 8a.
·
Traffic using Queen Street Southbound has an increase of 80 to 190 seconds for all scenarios.
·
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and increased in travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
·
Traffic using Quay Street, Hobson Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
·
Scenario 8a operates with lower travel time when compared to scenario 4d, 5a, 6a and 7a as it represents the period where piling is complete.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
10
AECOM
Table 6
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Average Rev2 Evening Peak Travel Times (seconds)
Route (Direction) Base Case Scenario 4d Scenario 5a Scenario 6a Wellesley 730 720 710 520 Street (EBD) (+210) (+200) (+180) Wellesley 770 790 790 470 Street (WBD) (+310) (+320) (+330) Victoria Street 710 790 790 410 (EBD) (+300) (+380) (+380) Victoria Street 840 1,100 1,010 680 (WBD) (+160) (+420) (+330) Customs Street 280 280 330 230 (EBD) (+40) (+40) (+90) Customs Street 410 570 460 330 (WBD) (+80) (+240) (+130) Quay Street 240 250 270 190 (EBD) (+50) (+50) (+80) Quay Street 280 320 300 270 (WBD) (+10) (+60) (+30) Nelson Street 370 410 390 290 (NBD) (+80) (+120) (+100) Hobson Street 840 870 830 560 (SBD) (+270) (+310) (+270) Queen Street 640 650 640 590 (NBD) (+50) (+50) (+50) Queen Street 890 940 880 680 (SBD) (+210) (+260) (+200) New North 210 210 210 210 Road (NBD) (-10) (-10) New North 150 150 150 150 Road (SBD) Mt Eden Road 140 140 140 140 (NBD)* Mt Eden Road 60 60 60 60 (SBD)* Khyber Pass 140 140 140 140 Road (EBD) Khyber Pass 170 170 170 170 Road (WBD) (+10) Newton Road 160 170 170 160 (EBD) (+10) (+10) (+10) Newton Road 240 240 200 190 (WBD) (+50) (+50) (+10) *The SATURN model only covers the northern half of the Mt Eden Road route
Scenario 7a 770 (+250) 640 (+180) 910 (+500) 830 (+150) 330 (+100) 370 (+50) 270 (+80) 280 (+20) 360 (+70) 750 (+190) 610 (+20) 770 (+90) 210
Scenario 8a 780 (+260) 500 (+30) 470 (+60) 800 (+120) 300 (+70) 360 (+30) 260 (+70) 280 (+20) 330 (+40) 710 (+150) 610 (+10) 800 (+120) 260 (+50)
150
150
140
140
60
60
140
140
170
160
170 (+10)
170 (+10)
190
190
Based on the model outputs for the evening peak the following can be observed: ·
Victoria Street east and west and Wellesley Street westbound are the worst affected routes in scenarios 4d, 5a, 6a and 7a with a significant increase in travel time of 150 to 500 seconds. Wellesley Street westbound has an increase of 180 to 330 seconds for scenarios 4d, 5a, 6a and 7a. Travel time along Wellesley Street eastbound direction varies between 180 to 250 seconds for all scenarios.
·
A significant increase in travel time for Wellesley and Victoria Street for scenarios 4d, 5a, 6a and 7a that are directly affected by pipe jacking work sites and cut and cover works along Albert Street.
·
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and increased in travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
·
Traffic using Nelson Street northbound will have an increase in travel time from 80 to 120 seconds for scenarios 4d, 5a, 6a and 7a.
·
Traffic using Hobson Street southbound will have an increase in travel time from 120 to 260 seconds for all scenarios.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
11
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
·
Traffic using Quay Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
·
Scenario 8a operates with lower travel time when compared to scenario 4d, 5a, 6a and 7a as it represents the period where piling is complete.
As expected, analysis of the travel time along the city centre routes show that the biggest delay on both the Wellesley Street and Victoria Street routes occurs at the intersection with Albert Street. Figure 2 displays an example of the delay caused by Albert Street when travelling westbound along Wellesley Street and eastbound along Victoria Street during the evening peak period. Scenarios 4d, 5a, 6a and 7a experience excessive delays at the Wellesley / Albert Street and Victoria / Albert Street intersection. The delays at the other intersections along Victoria and Wellesley Street are similar to the Base Case. This pattern is typical across all the peak periods. The Queen Street intersection is also a notable point of delay to these cross-town routes and there is an opportunity to prioritise the cross corridors over Queen Street which is less affected by delay. Vehicles travelling westbound along Wellesley Street and eastbound along Victoria Street would have a travel time similar to the Base Case if the delay at Albert Street intersection could be reduced to the Base Case delay. The travel time and traffic volume graphs are provided in Appendix F.
Figure 2
10.0
Example of delay at intersection with Albert Street
Travel Times for Consent Conditions 2
The consent conditions state that additional mitigation measure may be required if monitoring indicates that the delay to traffic has increased: a.
Either by more than 10 minutes above the previous monitoring
b.
Or if the surveyed times are more than three minutes or 30% greater than the modelled forecast. The 30% increase to derive consent trigger only applies if the difference between the Base Case and the modelled scenario forecast is greater than four minutes. The modelled time is to be based on the Auckland City Centre SATURN traffic model or a different traffic model approved by Auckland Transport). The forecast change has been applied to annual observed travel times on the ten monitoring routes as a percentage rather than absolute change.
The percentage changes and resulting monitoring travel times are given in Appendix I along with the forecast model times for the ten routes that must be monitored in accordance with consent condition 15. These tables show that the 10-minute threshold from the Base Case generally far exceed the modelled increases in travel and the 3 minute or 30% thresholds for each corridor.
2
Condition 15 of the Main Decision regarding the monitoring requirements
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
12
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
11.0
Sensitivity Analysis of Construction Truck Volumes
A sensitivity analysis was undertaken to test the impacts of private development construction truck volumes based on the worst case scenario (Test) 6a that has high construction truck generation and the overall worst network performance. The original analysis is based on daily construction truck volumes that are distributed evenly across a working day of 10 hours. The sensitivity analysis test the impacts of the trucks operating during the interpeak hours in between 10 am to 4 pm across a working day for the NDG Auckland Centre, (SkyCity) NZ International Convention Centre (NZICC) and 1 Mills Lane building projects undertaken by private developers. The following parameters were used to undertake sensitivity analysis for the construction trucks: ·
Trucks are distributed evenly during the inter-peak hours for the NDG tower, SkyCity Convention Centre and Mills Lane project. No construction trucks allowed during morning and evening peak period and volumes reassigned to the inter-peak.
·
Additional through phasing at Hobson Street / Wellesley Street intersection for construction trucks exiting the NZICC Hobson loading zone removed and green time reallocated to Wellesley Street.
Table 7 shows the hourly construction truck volumes used for the original and sensitivity analysis for all peak periods. The sensitivity analysis is based on the construction trucks operating during interpeak hours when traffic flows are lower so that access can be carried out with impact on other road users. Table 7
Hourly Construction Truck Volumes
Inbound Construction Activity
Scenario 6A
Outbound
Scenario 6A_S
Scenario 6A
Scenario 6A_S
All Peak
AM / PM
Interpeak
All Peak
AM / PM
Interpeak
NDG tower via Southern
19
0
32
19
0
32
SkyCity West Entry
8
0
13
8
0
13
SkyCity East Entry
16
0
27
16
0
27
SkyCity South Entry
8
0
13
8
0
13
Mills Lane via Southern
18
0
30
18
0
30
Table shows the summary statistics for the general traffic and buses and construction trucks for the original and sensitivity analysis for all peak periods. A negative difference represents an improvement to the overall network performance. Table 8
Summary Statistics – Sensitivity Analysis
Rev 2 C2 SP1
General Traffic Scenario 6A
Scenario 6A_S
Buses and Construction Trucks Difference
Scenario 6A
Scenario 6A_S
Difference
5,860
5,000
-15%
(+1,630)
(+780)
3,040
3,810
(+1,230)
(+2,000)
8,350
6,540
(+3,410)
(+1,610)
3,190
2,700
(+950)
(+460)
2,120
2,440
(+1,020)
(+1,350)
3,230
2,740
(+980)
(+490)
Travel Time (person-hours) Morning Peak Interpeak Evening Peak
10,370
9,730
(+1,410)
(+770)
6,510
6,870
(+870)
(+1,240)
18,450
16,700
(+3,760)
(+2,010)
-6% +6% -9%
+25% -22%
Travel Distance (vehicle-km) Morning Peak Interpeak Evening Peak
181,170
180,130
(+3,790)
(+2,750)
149,040
149,860
(+4,130)
(+4,950)
201,830
199,690
(+6,230)
(+4,090)
-1% +1% -1%
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
-15% +15% -15%
13
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
*Scenario 6a_S is the modelled scenario for sensitivity analysis of construction truck volumes. Table 9 shows the forecast travel times for the key corridor for the original and sensitivity analysis for all peak periods. Table 9
Peak Hour Travel Times – Sensitivity Analysis
Route (Direction) Wellesley Street (EBD) Wellesley Street (WBD) Victoria Street (EBD) Victoria Street (WBD) Customs Street (EBD) Customs Street (WBD) Quay Street (EBD) Quay Street (WBD) Nelson Street (NBD) Hobson Street (SBD) Queen Street (NBD) Queen Street (SBD) New North Road (NBD) New North Road (SBD) Mt Eden Road (NBD)* Mt Eden Road (SBD)* Khyber Pass Road (EBD) Khyber Pass Road (WBD) Newton Road (EBD) Newton Road (WBD)
AM Peak Scenario 6A 6A_S diff 560 550 -10 590 570 -20 670 660 -10 610 650 40 320 310 -10 370 370 0 250 240 -10 340 330 -10 430 420 -10 310 300 -10 530 520 -10 540 550 10 190 190 0 150 150 0 120 120 0 40 40 0 130 130 0 120 120 0 300 280 -20 140 140 0
Interpeak Scenario 6A 6A_S diff 420 410 -10 490 480 -10 640 650 10 570 580 10 290 290 0 380 390 10 260 260 0 380 360 -20 250 260 10 210 220 10 520 520 0 560 560 0 130 130 0 140 140 0 80 80 0 50 50 0 120 120 0 130 130 0 180 190 10 170 170 0
PM Peak Scenario 6A 6A_S diff 710 650 -60 790 660 -130 790 730 -60 1,010 890 -120 330 320 -10 460 390 -70 270 260 -10 300 320 20 390 390 0 830 600 -230 640 640 0 880 800 -80 210 210 0 150 150 0 140 150 10 60 60 0 140 140 0 170 170 0 170 160 -10 200 200 0
3
The impacts of the sensitivity analysis by comparing scenario 6a and 6a_S are: ·
No noticeable difference in network travel distances between scenarios 6a and 6a_S for general traffic.
·
15 to 22% reduction in network travel time during the morning and evening peak period, and 25% increase in travel time during the interpeak period for scenario for 6a_S.
·
15% reduction in network travel distance during the morning and evening peak period, and 15% increase in travel distance during the interpeak period for scenario 6a_S.
·
Slight improvement in travel time of 10 to 20 seconds typically for the key routes during the morning peak, except traffic using Victoria Street westbound has an increase of 40 seconds for scenario 6a_S.
·
No noticeable difference in travel time for the key routes during the interpeak, this shows that construction trucks cause less inconvenience during the interpeak period.
·
Significant improvement in travel time (of up to 30% compared to basecase) for the routes along Wellesley Street, Victoria Street, Hobson Street, Customs Street westbound and Queen Street Southbound during the evening peak for scenario 6a_S.
·
Removal of construction trucks has reduced travel time by 120 and 60 seconds for the westbound and eastbound traffic along Victoria Street and Wellesley Street during the evening peak. Reduction in travel time of 70, 80 and 230 seconds along Customs Street westbound, Queen Street southbound and Hobson Street southbound during the evening peak.
The modelled and observed travel time for all scenarios including the scenario 6a_S modelled for sensitivity analysis is provided in Appendix I along with the changes in percentage delay growth.
3
Scenario 6a_S is the modelled scenario for sensitivity analysis of construction truck volumes.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
14
AECOM
12.0
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Conclusions
Based on the modelled scenario outputs and travel time analysis the impacts of the scenarios assessed are: ·
Reducing capacity along Albert Street to accommodate cut and cover works has increased pressure and travel time on the Wellesley Street, Victoria Street, Queen Street, Nelson Street and Hobson Street.
·
Reduced traffic on Albert Street due to reducing the north and south approach to single lanes during all peak periods, for all scenarios.
·
Increased traffic on Nelson Street and Hobson Street due to lane reduction on Albert Street during all peak periods, for all scenarios.
·
Reduced traffic on Quay Street due to increasing capacity on the east and west approach of Customs Street during all peak periods, for all scenarios.
·
Increased traffic on Customs Street due to increasing capacity on the east and west approach during all peak periods, for all scenarios.
·
A significant increase in travel time for Wellesley and Victoria Street for scenarios 4d, 5a, 6a and 7a that are directly affected by pipe jacking work sites and cut and cover works along Albert Street.
·
Wellesley Street westbound and eastbound has a significant increase of 180 to 330 seconds and 180 to 260 seconds for scenarios 4d, 5a, 6a and 7a during the evening peak period.
·
Victoria Street westbound and eastbound has a significant increase of 160 to 400 seconds and 300 to 500 seconds for scenarios 4d, 5a, 6a and 7a during the evening peak period.
·
Traffic using Quay Street, New North Road, Mount Eden Road, Khyber Pass Road and Newton Road will have negligible difference in travel time.
·
Scenario 8a operates with lower travel time when compared to scenario 4d, 5a, 6a and 7a as it represents the period where piling is complete.
·
Increased pressure on the motorway network for all scenarios during the evening peak period.
·
Increase in construction trucks volume causes less inconvenience to road users during the interpeak period. Removal of construction trucks during the peak period provides significant travel time benefits during the evening peak and slight travel time benefits during the morning peak. Site access to off-road developments should be restricted to the inter-peak period only.
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\CRL EW main_ModellingReport-Rev2-V3.docx Revision A – 23-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
15
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix A
Details of PJ 4a Scenario
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
Details of Pipe Jack Scenario 4a Scenario Basic description Pipe Jack A July 2016 traffic scenario with works Testing 4a (PJ associated with the CRL enabling works at 4a) Britomart, Albert Street and at the
Work
Network Changes
CRL PJ Works
Victoria Street west shaft, Victoria Street east shaft and Wellesley Street shaft in operation Bus lanes on Wellesley Street, Victoria Street, Hobson Street, Halsey Street and Mayoral Drive;
Bus Phase 1
Bus routes shifted off Albert Street (north of Victoria Street), some North Shore services shifted to Wellesley Street
Bus Phase 2
Bus lanes on Queen Street and Customs Street/Beach Road;
Downtown Shopping Centre that includes: 1) Work at all four pipe jack work sites and the second phase of bus priorities
Nelson Street 2) Quay Street cycleway under construction Cycleway and one pipe jack work site open to traffic; and major development traffic included (e.g. Quay Street C1 and Precinct) cycleway City Rail Link cut 3) CRL enabling works at Albert / Customs and cover and consisting of the removal of one WBD Britomart works through lane; and the OMS work site works complete and the interim two lane traffic arrangement in place 4) First TBM drive being to Swanson Street and the east-west lanes at the Customs / Albert intersection reduced to a single through and left turn lane with NBD traffic on Albert diverted to Customs Street and Hobson Street by reversal of Wolfe Street.
Bus routes shifted off lower Queen Street Stage 1 operational on Nelson Street between Union Street and Victoria Street Stage 2 under construction (Lower Hobson Street southbound service lane closed) Under Construction on Quay Street (two lanes each direction during the commuter peaks, with a shared right turn and through lane; two eastbound lane off peak with right turns banned except at Queen Street) Cycle & pedestrian phase (25 + 5 secs) at Commerce / Quay intersection Queen Street closed (Customs Street to Quay Street), except to construction traffic; Right turn into Federal Street from Victoria Street is banned, and east approach reduced to 2 lanes (bus & general lane) Wyndham Street (east) closed at Albert Street One westbound through lane removed on Customs Street at Albert Street intersection Removed bus only restrictions on Halsey Street Updated intersection layout at Halsey / Fanshawe Street intersection Right turn ban from Wellesley Street (east) into Albert Street (north) removed & split approach phasing for east leg, Intergreen time of 8 seconds changed to 5 seconds Swanson Street approach to Albert Street closed Customs Street approach to Albert Street reduced to one lane for both approaches OMS shaft now open, i.e. traffic restrictions removed Wellesley / Albert - Left turn ban removed from SBD Albert Street to Wellesley Street Wellesley / Albert - Right turn ban into Albert Street (north) removed & split approach phasing for east leg, Intergreen time of 8 seconds changed to 5 seconds Wolfe Street – Wolfe Street one way direction reversed Wolfe / Albert – Left turn into Wolfe Street from Albert Street included Wolfe / Albert – NBD through from south approach banned Wolfe / Albert – NBD left turning vehicles from Albert St to Customs St redirected through Wolfe St Wolfe / Hobson – Left turn into Wolfe Street from Hobson Street removed Lower Albert Street northbound only from Customs Street to the HSBC building access; Double left turn from Lower Albert Street into Quay Street;
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix B
Construction Truck Routes and Frequencies
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
Construction Truck PCUs per hour Route Name Route Description 4D 5A Scenario 6A 7A 8A
WQ (Rev 0) Wynyard Quarter via Southern 3 3 3 3 3
WQ (Rev 0) Wynyard Quarter via Northwestern 3 3 3 3 3
Pre
NDG
SkW
Precinct* 42 40 45 35 40
NDG 20 19 19 19 8
Skycity West entry 7 8 8 8 4
SkE
SkS
Skycity East Skycity South entry entry 15 7 16 8 16 8 17 8 8 4
Mil
C1Q
Mills Lane 10 14 18 10 10
CRL C1 (via Quay St) 3 3 9 9 6
C1C
C2A
CRL C1 (via CRL C2 SP1 Customs St) (via Albert St) 3 6 3 8 9 8 9 8 6 20
*Note: Construction trucks will not be allowed to turn right from Quay St into Lower Queen St during the PM peak. This only affects the Precinct route, which travels into Precinct via Quay St (instead of Nelson St) in the PM peak.
Daily Construction Vehicles C2- SP1 Trucks Light veh Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16
0
12
C2 - SP2 Trucks Light veh 16 8 41 8 45 8 56 8 43 8 43 8
Trucks
C1 Light veh
PRECINCT Trucks Light veh
13 13 13
NDG Trucks Light veh
24 24 24
SKYCITY Trucks Light veh 0 17 10 17 30 17 30 17 140 17 120 17
MILLS Trucks Light veh
0 10 25
9 9 9
TOTAL Trucks Light veh 16 25 51 25 75 25 99 58 206 58 201 70
May-16
24
12
43
8
10
30
13
24
120
17
25
9
235
100
Jun-16
24
12
27
8
10
30
50
24
130
17
65
9
306
100
Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19
24 24 38 38 38 38 38 38 38 67 67 67 81 98 123 71 99 45 45 45 45 45 17 17 17
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
27 47 23 19 19 19 19 19 19
8 8 8 8 8 8 8 8 8
10 10 10 10 10 50 50 50 50 50 50 50 50 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 10 10 10 10 10 10 10
30 30 30 30 30 80 80 80 80 80 80 80 80 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 30 30 30 30 30 30 30
50 200 188 188 250 175 213 163 138 163 163 150 150 188 175 138 113 113 113 63 63 50 50 50 50 50 50 50 38 38 38 38 38 38 38
24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
120 140 150 150 140 150 160 160 50 50 50 50 50 70 70 70 40 60 60 60 40 40 40 40 40 40 40 40 40 40 40 20 20 0
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
45 45 45 65 65 85 85 45 45 45 45 45 45 45 45 45 45 45 20 20 20 20 20 20 20 20 20 20 20 20
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
282 562 544 560 612 607 655 565 430 485 395 382 406 470 466 377 380 336 311 257 237 244 216 216 216 199 199 199 167 142 122 102 108 88 78 40 20 20 20 0
112 112 112 112 112 162 162 162 162 154 154 154 154 114 114 114 114 114 114 114 114 114 114 114 114 102 102 102 102 92 83 83 83 83 66 42 12 12 12 12
6 96 90 90 90 90 90 90 90 110 20 20 30 34 18 18 48 38 38 34 34 54 54 54 54 54 54 54 34 34 34 34 40 40 30 30 20 20 20 0
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
Scenario 4 Scenario 5
Scenario 6 Scenario 7
Scenario 8
Mili - Mills Lane in*
Milo - Mills Lane out
*Note: In Scenario 8, construction trucks travelling into Mills Lane during the PM peak will go via Beach Road.
SkEi - Skycity East in
SkEo - Skycity East out
SkSi - Skycity South in
SkSo - Skycity South out
SkWi - Skycity West in
SkWo - Skycity West out
NDGi - NDG in
NDGo - NDG out
Prei - Precinct in*
Preo - Precinct out
*Note: Construction trucks will not be allowed to turn right from Quay St into Lower Queen St during the PM peak. The Precinct route "Prei" will travel into Precinct via Quay St (instead of Nelson St) during the PM peak.
C1Qi - C1 via Quay in
C1Qo - C1 via Quay out
C1Ci - C1 via Customs in
C1Co - C1 via Customs out
C2Ai - SP1 via Albert in
C2Ao - SP1 via Albert out
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix C
Development Programme for Construction Works
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
C2 SP2 - MODELLING TESTS Swanson Shaft Victoria 1 Victoria 2 Wellesley Wyndham (East) Wolfe Customs St Lower Queen Lower Albert Precinct
PJ1
Scenario 5A
Redirection 1 Lane each way Closed SBD closed
0
1
2
3
4
5
Stage 1: Temporary western station access and streetscape
Phase 1 operational Phase 2 construction + phase 1 operational Halsey: Gaunt-Pakenham shut Halsey: Vic park TBM Phase 1 cons Phase 1 operational Quay St construction Operational
Phase 2 construction
Phase 2 operational Operational with RT ban into Queen
6
5/12/2016
28/11/2016
21/11/2016
7/11/2016
14/11/2016
31/10/2016
24/10/2016
17/10/2016
3/10/2016
10/10/2016
26/09/2016
19/09/2016
12/09/2016
5/09/2016
29/08/2016
22/08/2016
15/08/2016
8/08/2016
1/08/2016
25/07/2016
18/07/2016
11/07/2016
4/07/2016
27/06/2016
20/06/2016
6/06/2016
13/06/2016
30/05/2016
Scenario 4D
C1 - BRITOMART Lower Queen Tyler St reversal
CBD DEVELOPMENTS PRECINCT NDG SKYCITY MILLS LANE
23/05/2016
PJ3
C2 SP1 - CUT AND COVER WORKS STAGE Customs/ Albert Lower Albert SBD closed Albert NBD closed NBD 1 lane, LT to Fanshawe NBD 1 lane, TH/ LT/ RT to Fanshawe 2 Lane Customs EBD 1 Lane 3 Lane Customs WBD 2 Lane 1 Lane Reverse Wolfe Closed Mills Closed East closed Swanson West closed East closed Wyndham West closed Swanson Albert St (EBD/ WBD) Wyndham Albert St (NBD/ SBD) 2 lanes
OTHER AT / AC PROJECTS Bus projects WC Halsey St Nelson St cycleway Quay St cycleway Beach Rd cycleway
16/05/2016
9/05/2016
2/05/2016
25/04/2016
18/04/2016
11/04/2016
4/04/2016
28/03/2016
21/03/2016
7/03/2016
PJ2
14/03/2016
29/02/2016
22/02/2016
15/02/2016
8/02/2016
1/02/2016
25/01/2016
18/01/2016
11/01/2016
4/01/2016
28/12/2015
21/12/2015
14/12/2015
2016 7/12/2015
30/11/2015
23/11/2015
9/11/2015
16/11/2015
2/11/2015
2015
C2 SP2 - MODELLING TESTS Swanson Shaft Victoria 1 Victoria 2 Wellesley Wyndham (East) Wolfe Customs St Lower Queen Lower Albert Precinct
OTHER AT / AC PROJECTS Bus projects WC Halsey St Nelson St cycleway Quay St cycleway Beach Rd cycleway CBD DEVELOPMENTS PRECINCT NDG SKYCITY MILLS LANE
8
9
10
Stage 2 - CPO under pinning and tunnel excavation
10
Stage 3 - tunnel construction
Phase 1 and 2 operational
26/02/2018
19/02/2018
5/02/2018
12/02/2018
29/01/2018
22/01/2018
8/01/2018
15/01/2018
1/01/2018
25/12/2017
Scenario 8A
Redirection 1 Lane each way Closed SBD closed
7
18/12/2017
4/12/2017
Scenario 7A
11/12/2017
27/11/2017
20/11/2017
13/11/2017
6/11/2017
30/10/2017
23/10/2017
9/10/2017
16/10/2017
2/10/2017
25/09/2017
18/09/2017
11/09/2017
4/09/2017
28/08/2017
21/08/2017
14/08/2017
7/08/2017
31/07/2017
24/07/2017
17/07/2017
3/07/2017
10/07/2017
26/06/2017
19/06/2017
5/06/2017
12/06/2017
29/05/2017
22/05/2017
8/05/2017
15/05/2017
1/05/2017
24/04/2017
17/04/2017
3/04/2017
10/04/2017
27/03/2017
20/03/2017
6/03/2017
13/03/2017
27/02/2017
20/02/2017
6/02/2017
13/02/2017
30/01/2017
23/01/2017
16/01/2017
9/01/2017
2/01/2017
26/12/2016
6A
C2 SP1 - CUT AND COVER WORKS STAGE Customs/ Albert Lower Albert SBD closed Albert NBD closed NBD 1 lane, LT to Fanshawe NBD 1 lane, TH/ LT/ RT to Fanshawe 2 Lane Customs EBD 1 Lane 3 Lane Customs WBD 2 Lane 1 Lane Reverse Wolfe Closed Mills Closed East closed Swanson West closed East closed Wyndham West closed Swanson Albert St (EBD/ WBD) Wyndham Albert St (NBD/ SBD) 2 lanes C1 - BRITOMART Lower Queen Tyler St reversal
19/12/2016
12/12/2016
2017
OTHER AT / AC PROJECTS Bus projects WC Halsey St Nelson St cycleway Quay St cycleway Beach Rd cycleway CBD DEVELOPMENTS PRECINCT NDG SKYCITY MILLS LANE
11 - Decomission
Stage 4 - reinstatement and station fitout
3/06/2019
27/05/2019
20/05/2019
6/05/2019
13/05/2019
29/04/2019
22/04/2019
8/04/2019
15/04/2019
1/04/2019
25/03/2019
18/03/2019
11/03/2019
4/03/2019
25/02/2019
18/02/2019
11/02/2019
4/02/2019
28/01/2019
21/01/2019
14/01/2019
7/01/2019
31/12/2018
24/12/2018
17/12/2018
3/12/2018
10/12/2018
26/11/2018
19/11/2018
12/11/2018
5/11/2018
29/10/2018
22/10/2018
15/10/2018
8/10/2018
1/10/2018
24/09/2018
17/09/2018
3/09/2018
10/09/2018
27/08/2018
20/08/2018
6/08/2018
13/08/2018
30/07/2018
23/07/2018
9/07/2018
16/07/2018
2/07/2018
25/06/2018
18/06/2018
4/06/2018
11/06/2018
28/05/2018
21/05/2018
7/05/2018
14/05/2018
30/04/2018
23/04/2018
9/04/2018
16/04/2018
2/04/2018
26/03/2018
2019
Redirection 1 Lane each way Closed SBD closed
C2 SP1 - CUT AND COVER WORKS STAGE Customs/ Albert Lower Albert SBD closed Albert NBD closed NBD 1 lane, LT to Fanshawe NBD 1 lane, TH/ LT/ RT to Fanshawe 2 Lane Customs EBD 1 Lane 3 Lane Customs WBD 2 Lane 1 Lane Reverse Wolfe Closed Mills Closed East closed Swanson West closed East closed Wyndham West closed Swanson Albert St (EBD/ WBD) Wyndham Albert St (NBD/ SBD) 2 lanes C1 - BRITOMART Lower Queen Tyler St reversal
19/03/2018
5/03/2018
C2 SP2 - MODELLING TESTS Swanson Shaft Victoria 1 Victoria 2 Wellesley Wyndham (East) Wolfe Customs St Lower Queen Lower Albert Precinct
12/03/2018
2018
C2 SP2 - MODELLING TESTS Swanson Shaft Victoria 1 Victoria 2 Wellesley Wyndham (East) Wolfe Customs St Lower Queen Lower Albert Precinct
Redirection 1 Lane each way Closed SBD closed
C2 SP1 - CUT AND COVER WORKS STAGE Customs/ Albert Lower Albert SBD closed Albert NBD closed NBD 1 lane, LT to Fanshawe NBD 1 lane, TH/ LT/ RT to Fanshawe 2 Lane Customs EBD 1 Lane 3 Lane Customs WBD 2 Lane 1 Lane Reverse Wolfe Closed Mills Closed East closed Swanson West closed East closed Wyndham West closed Swanson Albert St (EBD/ WBD) Wyndham Albert St (NBD/ SBD) 2 lanes C1 - BRITOMART Lower Queen Tyler St reversal OTHER AT / AC PROJECTS Bus projects WC Halsey St Nelson St cycleway Quay St cycleway Beach Rd cycleway CBD DEVELOPMENTS PRECINCT NDG SKYCITY MILLS LANE
28/10/2019
21/10/2019
7/10/2019
14/10/2019
30/09/2019
23/09/2019
9/09/2019
16/09/2019
2/09/2019
26/08/2019
19/08/2019
5/08/2019
12/08/2019
29/07/2019
22/07/2019
8/07/2019
15/07/2019
1/07/2019
24/06/2019
17/06/2019
10/06/2019
2019
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix D
Base Case Flow Plots and Scenario Flow Difference Plots
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
10
70
60
60
2770 27
506050
3020
2060 20
SATURN
860
60 20 30
506 0
27 70
1090
0 86
20 302 50 0
Atkins Ltd / DVV / ITS
78
190
30
0 69 80
300 78
30 0
0 14 50
50
80
11 0
30
900
130
78 30
70 260
300
210
80
0
73 0
10 0
67
14 0
340
30 0
50
35 0
50
370
450
34 0
45 0
990
250
70
1030
940
11 0
1010
240 100 20
0
240
105 0
70 0
230 0
0 64
990
82 0
79 0
60
68 0
0
86
50
0
75
900
194 0
100
540
29 40
750
26 90
900
540
51 0
68 0
37 0
430
280 89 0
88 0
0
50
0
36
0 43
12 70
264 040 0
55 0 10 30
0 84 440
200 380
440 490
850
70
1410
63 0 850 74 0
7 20
12 70 86 0
13 70
810 860
12 00 30 80
137 0
870
81 0 191 0
840
115 0
810
880
46 0
91 0
81 0
910
480
10 40
63 0
650
1020
150
310
27
0
50
430
440
200
20
80
250
640
260
130
190
820
83
850
59 0
920
58 0
130
91 70
560
11
7010
51
50
0
8320
20
610
470
880
0
0
170
85
690
860 1480 46
0
0 670
50
70
13
54
500
1090
770
0
680 600
0
420 170
70
640
920
130
55
0
170
39 0
10 0 190
90
580
680
68 0
0
51 120
440 530
80 0
820 820
77 0 210
630
340
260 660
100
180
12
00
13 10 82 0
810
740
160 950
490
1610
1100
540
0
90
70
27 0
60 60 50
280
18 0
48 0
120
60 210 12 0
50 14 0
12 0
190
65 0 90
0 65 70
6 50
64 0
12 80
89 0
18 0
75 0
18 0 750
180
100
1100
0
20
702
1160
1150
1100
20 0
720
670
80
130
1000
50
90 190
100 60
310
150
70
70
350
230 26 0
26 0 21 0
14 0 15 0 12 0
310
1160 12 00
13 60
69 0
21 0
19 0
210
180
50
750
90
1610
170
100
60
140
47 0
180
22 0
300
0 73
730 85 0
60
39 0
27 0 30 0
15 0
44 0 98 0
38 0 21 0
670
1090
49 80
15 0
17 0
17 0
20 0
80
51 0
160
80
17 0
50
200
80
34 0
180
29 0
80 30 0
32 0
320 0
23 029 0
23 029
28 57 0 0
580
76 0
900
58 0 580
550 490 210
38 0
54 0
98 0
80 160 80
980
1480
0 42
10 70
12 0
440
360
70
81 0
16 80
0 21
1617 900
56 0
1627 000
230 23016 80
17 00 24 0
0 16 50 43
100
70 16 70 106 0
17 80
106 0
78 0
36 0
40 20 65 0
21 90
14 80
1850
16 80 3290
980
780
1330
49 80
4210
18 0
35 011 00
0 21
35 0
23 00
24 50
32 10
3130 0
119
1480
50 18 80 14
18 50 13302350 1480
23 50
14 80
4210 1480
11 10
41 0
0 45
10 15
70
240
23 30
13 60
180
210 60
32 50
32 10
50
87 0
360
0 177
530
83
1610
68 0
330
390
182 0 51 0
150
360 950
960
630
50
850 0 390
40 16
80
0
640
1520
49 0
10 0
83
0
10 0 60 50
29 60
0 63
110
11 010011 0
60 0 20
120
350
0
74
290
21 0
60
89 0
410
90
360
20 0
41 0
42 0
0 85 0
41 0
330
180
35 0
0
37 0
94
16 30
80
440
81
390 0
32 0
10
18 0
53 0
940
1080
12 70
18 0
980
0
13 90 97 0
960
1020
10
420
590
45 0
710
720
10
0 58
60 12
0 81
0
1050
0
0
94 0
89 0
780
630
240
0 58
0 0 15 126
0 13
10
37 0
12 0
832
0
18
438
0 89 0 51
710
0 96
0 80
210
630
0 79
0 86
500
79
0 54
0
0 40
510
0 11
20
00
24
620
640
420
64 10 0 20
47 0
75
0
66 0
640
0
18 20
50
27
59 0 0 52
1110
25
Colour Bands 0.00 100.00 500.00 1000.00 2000.00 4000.00 6000.00
1050
630
0 44
70
110
50
1020
114 0
0 62
0 52
100
0
50
820
0
80 0
570
50
700
690
0
80 0
0
90
1460
790
44
71 80
142
1140
690 0
250 62
95 0
Bandwidths = 1250./mm
51
1400
1050
630
90
0 97
0
13
660
170
99 0
15 0
17 0
70
50
0
25 0
75 00
1400
152
80
980
20
0 62
0
1020
130
610
37
71
570
1200
0 18
146
64 0
40
10
20 12
00 75
0
90 51
85
1520
1020 108
80
0
90
0 50
90
110
50
950
0 59
26
70
62 120 0
50
48
0
0 10
40
0 13
0 62
200
23 0
110
1520
13 40 0 54
10 0
80 0
79
0
0 28 0 11
21
0
110
80
14 0
0
11
10 19
330 1000
980
0
1580
80 19
0
0
510 421
20 00
62
56
70
51
0 32
110
0
80 30
70 66
180 10 0 900
10
0 55
0
60
00
50 11
0 21
0 17
0
67
66 70
2000
1070
0
Demand flow
500
270
90
110
77
17
0
0 80
20
86
45
240
16
12 60
56 0
1070
00 20
50
21
390
1770
0 85
4
0 10
70
160
15
110
610
0
40 29
16 0
470
10 30
1690
2000 440
90 0
760
10
0 14
1210
560
98 0
89 0
250
0
4980
420
70
0
11
970
750
230
0 59
0 40
970
0
0 421 90
34 0
480
1990
0
50
10 60 11
750
590
70
0 45
56
90
0 16
80 11
960
450
620
40
48 0
43 0
340
10
680 72 0
300
0 53
16 0
1070
0
86 0
0 41
270
129
100
40
18
0 89
120
0
0 14
300
900
1060
00
87 0
0 15
15 0
180
0 64
106
180
1010
770
0 31
10
4980 350
140
290
430
110 650
290
0
31
440
50
650
130
130
910
12
0
0
150
150
1020
13 70
0 65
0
120
65
1070
4210
0 102
102 0
64
20
0 102 1480
0 11
13
900
990
80
0
0
0
0
11
120
10
270
0 10
530
860
0
0
1060
110 90
47
16
1060
840
0
4210
82
17
1740
580
12
8
0 62
210
100
190
0
0 78
18 0
0
0
40
1180
90
90 0
0
50
720
87
900
0 105
210
85
33
60
0
40 12
110
820
690
28 0
0
0
70
1060
0 50
25 0
67
085 0
73 16
120
820
1060
250
600
2350
540
80 14
0 65
90 36
760 60
70 0
14
0
11
29 0
0
31 0
50
94 0
60
29
610
14 0
0
22
60
60
29
0
200
160
120
0 52
76 0
28 0
Link Annot: 970
0 15
130
28 0
220
60
0 0 44
60
14
0
1050
80
99 0
100
0
440
0 44
37
290
540
280
75 0
72
160
1050
60
990
22 0
220
1050
12 0
37
190
60
31 0
0
76 0
90
110
90 32
36
50
720
670
0 45
15 0
99 0
410
60
18 0
80
600
0
35 0
550
49 0
520
50 18
650
750
21 27 0
70
70
0
93 0
37
360
0 80
170
250
50
66 0
21 0 90
0 51 130
53 0
64 0
70
0
12 12 0 0 0
80 60
90
170
690
90
50
0 20
0
87 0
0
10 32
580
620
48
50
16
50
50 0 39
0
0
50
90 32 0 5 18
11 0
50
85
590 0 82
39
38 0
15 0
28
390
28 0
38 0
19 0
89 0
390
85
52 0 30 0
80
26
200
240 90
38 0
210
3290 0 185
4060
50
390
50
41 0
190 80
0
38 0
50
0 20
190
22 0
18 0
47 0
0 78
0 69
29 0
0
80
0
530
12 20
11 0
0 51
0
39 80 0
44 0 310
20
33
52
60 26 0
0
11 70 74
39 0
47 0
170
0
0 59
41
53 0
90
0
130
480
770
80
90
0 46
650
220
80
41 0 0
98
20 0
39 0
27 0
280
4060
650
180
16
57 0
3290 2760
70
470
55 160 0
1280
97 0
90
1310
1190
1130
870
16 90
760
26 0
240
0
50
200
180
Scale 18061
1570
850
70
38 0
0
540
0
540
780 37
11
690
490
18 0
180
740
0
590
90
750
75
50
31 0
31 0
210
100
950
650
50
100
950
1180
1010
1010
160
0
1000
3290 2760
86
16 0
70
670
780
21 0
99 0
910
60 70
32 0
50 0
60
1600
98 0
41
0
80
14 0
43 0
970
0
900
70
22 0
29 0
970
90
960
880
80
12 0
480
90
0
134
650
820
12
110
1310
510
210 0 115
510
520 230
20 0
17 0
960
1260
1060
13 0
81 0
1320
210 1150
950
0 32
820
0
89
900
1510
80
98 0
10 0 12 300 660 300 0
0
130
4060
450
70
860
60
300
0 33
330
29 0
0
120
210
0
750
21
0 59
20 0
1550 230
1560 230
900
630
0
1560
60
60
20
110
41
18
540 0 155 230
1790
60
10 0
360
230
60
1110
18
330
590
460
0
360
30
1680
110 3290 2760
10 50
490
150
1550
51 0
4060
0 49
590
230
0
0
0 406 60 40
23
90
530
260
0 85
11
50
90
330
60
38
40
0 620
130 00 14 50 21
20 13 0
210
70 19 1470 0
90 32 27 60
38 0
0 59
760
62
220
1510
200
14
140
20 0 100
60
101 0
125 0
400
19
110
200
906 0 3227
406 0
960
21 0
110
101 0 100
1520
550
60
470
320
180
200
100
140
50 70
41 0
820
230
5070
1_fam21_CRL_ Basecase.UFS
850 14 40
130
22 0
2376 290 0 196 0
490
70
730
100 80
21 0
1
70
11
900
240
507 0
540
70
120
17
0
810
100
78 30
490 81 6
Auckland CBD Model: 2021 AM Peak: Basecase 18-11-15
18-11-15 AECOM AUSTRA
30 10 0 30 22 303 2210
51
0
3470
1480 34
80 14
SATURN
0 61
540
610
70
3 22 03 10 0
148 0
34 70
40 52
13 0
60
40
49 50
52 40
190
70
49 0
60 10 0
430
180 330
35 0
28 0
80
1060
880
270
50
100 0
50
690
690
910
65 0
78 0
50
195 0
0 61
0
90
51
165 0
50 710
22 00
490
44 0
11 0
61 0
0 46
119 0
13 40
46 0 62
0
47 0
26 90
710
490
46 0 680
0 80 470
870
64 0 870 90 0
6 20
280
13 40 84 0
87 0 119 08 40
11 00
60 16
840
870 630
199 0 570
760
119 0
00 11
530
46 0
48 0
38 0 11 90
470 50 0
380
47 0
470
260
50
380
250
260 530
170
170
1070
510
790
510
150
160
180
830
80
430
80
790
70
340
280
250 70 50
210 33 0
27 0
32 0 320
280 72 0
40
70
360 320
250 450
400 450
65 0
530
10 00 58 0
610
560
830
50
80
16 0
60
50
38 0
25 0 270
0 28
0
70
6 30
62 0
10 90
58 0
25 0
60 0
27 0 600
170
270
50
600
13 0
250
150
100
0
80
130
120
110
15 0
90
50
380
340
610
44 110 0
61 0
0
27
42 0
16 0
60
490
680 71 0
79 0 60
17 0
12 0
13 0
12 0
41 0
10 0
50 0
0 144
70
50 320
190
170
170
210
50 200
21 0
13 080
21 0
60 0 44
77 0 38 0
710
16 0
850
39 30
63 0
480 99 0
0 249
10 16
790
530
310
22
590
70
680
630
72
700
890
0
0 108
460
54 0
570
83 50
300
580
510
310
570
30
0
110
120
0
25 0
40
6130
12
550
66 0
70 72
120
80
620
190
670 10
830
500
1400
30
0
1130
19
0
70
120
0
11
0
1010
61
15
640
34
540
0
1240
90
0
810
340
72
60 60
0 52
13
50
0
820
613
1140
61
118 0
21
53 0
560
90
64 0
70
120 70 50
90
180 70
21 0
330
290
230 25 0
25 0 28 0
16 0 20 0
18 0
37 0
720 720
39 30
120
60
80 33 0
220
62 0
220
56 0 31 0
48 0
480
50
77 0
50
32 0
17 0
32 0
12 0
16 302290
77 0
3916 0 30
42 0
720
1360
80
220
120 46 0
36 0
50
152330 0
46 0
650 470 170
46 0
50 21 29 0
21 30
480 48 0
48 0
1430
480
35 0
350 41 0
41 0 540
48 0
46 0
590
530
730
20 70
730
20 20 0 110
60 15 0 48
48 0
15 60 1440 1960
19 60
3530
3530
2156 0 0
0 19 50 27
340
20 80 50
21 70
70
2080
450
87 0
17 00
60
18 0
33 0 95 0
11 80
32 0
14 50 170
20015 00
18 80
21 60 50
60
66 0
810
10 0
54 0 51
10 0
20 0
0 39
60
16 40
200
860
520
60 20 90
0 59
100
15 50 20 0
300
0
59
130
18 0 14 0 50
0
60 370
250
0
40 10
280
140
16 50
840
520
106 410
160
230
180
39 0
0 53
0 38 55 0
41 0
250
210
14 0
0
26 0
50
24 0
40
11
249 0
12
810
500
1230
89 0
810
36 0
0
98 0 95 0
80
90 11
60
540
160
0
43 0
60
380
530
39 0
0 12
60 80
727
0
1120
70
200
56 0
450
710
690
11
0 57
0 92
380
14 0
45 0
80
140 230
36 0
34 0
240
90
280
310
130
270
0 10
90
10 0
760
66 0
70 0 720
650
320
110
620
0 68
0 49
160
0 57
0 0 92 11
0
60
240
17 10
50
390
550100
220
0 58
0 71
39
0 33
470
690 163
290
390
50
46 0
20 960
1580
50
520
90
50
25 50 0 22 31 0
Colour Bands 0.00 100.00 500.00 1000.00 2000.00 4000.00 6000.00
11 0
50
44
80
590 770
0
130
290
660
52
72 0
910
0 40
0 24
16 0
1250
580
0
72 0
0
90
540
40
79 0
Bandwidths = 1250./mm
0 61
1140
500
80
0 71
0
0
1100
0 15
16 0
14 0
40
0 88
11 0
0
1170 127
93 0
0
550
80 60
0
0 11
1050
20 44
95
80 1080
107 1170
0 37
22
0 12
50
61 700
1170
0 24
21 0
90
14
0 12
70
40 24
0
19 0
90 19 23 0
60
130
530
60 16
270 1540
890
0
1000
14 40 0 32 0
0
80
47 40
360
50 11
0 35
41
38
20
0 23
0 46
90
40 55
260
353 410 0
100
61
47
33
0
0
55 40
12 440 0
0
11 10
43 0
1010
500
50
0 61
590
640
570 750
0
550 190
1
90
10
590
530 50
0
58
0
26
59
16
79 0
55
18
90
640
10
0
0
68 0
0 37
350
450
160
10 10
10
13 10
82
0 26
690
10
75
14 0
560
100
60
0
35
430
230
60
10 10
42
480
0
240
580
52 0
1610
440 1010
0
00 22
0 21
0
0 45
550
610
3930
75 0
70
380 0 49
80
54 0
550
990
0 76
86
0
90
0 71
60
42
52 0
690
44 0
0 96
0 26
12
550
90
0 70
280
0
70
420
13 0
790
170
1440
70
0
110
14 0
160
0
0 353
0
720
72
560
69
12
80
0 94
16 0
730
0
81 0
0 26
300
820
93
610 82 0
60
0
850
17
0
690
900
81
92 0
0 17
16
Demand flow
0
900
00
92
00 11
74 0
90
0
0
620
450 3930
520
0
0
640
380
510
160
0 58
60 460
60
90
510
0 26
460
190
630
11 10
0 58
120
46
170
3530
630
117 0
4
0
630 480
0 15
0
50
680
890
0 12
0
111
69 0
0 70
0 24
200
120
63
490
0 11
430
103 0
0
12
400
3530
90 70
57
0
39 39
23
680
15
740
0
510
49
150 43
0
92 0
0
410
790
0 101
70
45 45
23
110
670
0 62
32 0
72
0
064 15 0 10 60 1 70
410
670
470
480
1960
400
63 0
0
50
0
15
60
480
0 45
10 34
790
33 0
0
15 60 0
28 0
90
15
74 0
50
70
0
0
34 0
14
75 0
0
750
1070
450
130
0 48
80
220
740
52
190
750
210
21 0
79
30
150
59 0
90 22
750
0
60
20 0
910
70
11
310
240
520
90
60 13
10
110
220
0
34
70
600
730
0 36
70
29
130
50
36 0
0
0
510
80
420
69
60 0
74 0
470
29
26 0
1070
100
80
72 0
270
0 28
0 36 0 28
200
0
11 0
600
340
16 20 0
80
65
0
0
500
640
50
140
0
100
Link Annot:
0
0 13
45
66
45
370 0 43
0 46
250
0
61 0
36 0
0 10
0 39
36
0 52
70
22 90 60 13
0
50 30
700
510
0
110
50
45 0
0 15
35
20 20 0
43 0
50
16 0
81
380 0 50
0
160
22900 136
3860
50
40 0
21 30 0
33 0
250
0 10
0
0
45 0
22 0
37 0
50
130
0 18
50
86
760
0 53
0 580
230 0 18
41 0
170
0
60
10 0
46 0
520
0
29
53 0
20
160
60
60
90
30 0
0
0 14 460
230
30 0
24 0 48 0
130
25
78
47 60 0
50 0 230
110 46 0
0
30
0
190
62 0
0
80
0
120 19 0
190
22 0
210
28
90 0
0 60
60
53 0
69
73
520
76 0
630
37 0
25 0
87 0
0 43
800
0
460
47
60
88 0
17 0
Scale 18061
950
120
26 0
70
16 0
50 0
30 0
70 0 72
650
0 69
0
17 0
67
120
70 60
28 0
120
670
90
690
69 0
890
680
630
21 0
200
42 0
0
60
50
690 950
950
0 55
750
58
640
71
140
80
70
52 0
640
49 0 0
230
3860
530
70
16
90
18 0
290
33 0
990
800
24 0
61 0
50
0
0 54
0
620
690
140 910
500
700 0
34 160 0
1170
160
890
90
1190
1130
2290 1950
12
49
0
11
42 0
940
110
740
94
60
0
140
840
41
13
690
570
490 43 0
11 270 640 270 0
670
0
560
90
880
150
770
130
690 51
840
1080
680
630
810 960
28 0
0
35 0 50
770
330
13 0
91
60
60 0 137
710
1950 2290
3860
0
860
70
60
180
70 0
90
630
870
0 16
60
80
0 18
54
0
22
10
1230
60 1370
0
630
60
80
70
180
600
0
370 0 126 60
110
1950 2290
3860
950
710
1290
1260 60
1290 60
980
80
670
10
140
1290
1290
200
170
60
70
710
70 0 420
0 42
690
460
200
90 1230
72 0
0
0 386 60 38
21 0
300
60
70
82
00 13
11 012
50
50 2290 19
60
0 69
410
0 900
19
38
0 41
470
60 1060
90
300
170
10 19 0
680
30
820
100
50
270
0 26
59 0
50 90 19 22
109 0
730
60 170 70
10
386 0
15 0
70
360
170
470
27 0
70
109 0
110
49 50
650
980
80
10 0
200
310
100
210
190
520
1295 290 0 103 0
4950
400
24 0
620
97 0
80
1_fin21_CRL_ Basecase.ufs
490
100
11 90
21 0
590
190
40
0
230
90
50
495 0
23 0
750
140
160
80
480
70
170
510
110
11 0
50
52 40
600
Atkins Ltd / DVV / ITS
52
0 42
190
80
640
Auckland CBD Model: 2021 IN Peak: Basecase 18-11-15
73 80
18-11-15 AECOM AUSTRA
70
44
16 20 0 3 26
90
940
0
40
21
92
404040
2170
130
2630
6110
SATURN
40 40 217 0
13 0
950
0 94
444 25 900
Atkins Ltd / DVV / ITS
80
62 10
0 74
230
260
18 0
60
12 0
10
0
15 0
37 0
62
13
87 50
170
160
0
110
67 0
22 0
10 0
70
10 0
12 0
80
70
13 0
660
12 0 140
410
420
73 0
68 0
1370
130 15
0
240
14 0
70
75 0
13 0
75 0
970
1180
81 0
50
72 0
60
173 0
0 50
80
0 73
228 0
60 680
22 50
810
34 60 79 0
90
0 44
13 60
80 850
14
18 50
114 0
0
50 0
1220
82 0
7912 0 50 110
18 50 12 20
12 50
930 960
125 0
960
93 0
109 0
265 0 940
930
60
10 0
0 10 680
810
64 0 0
0 45
11 90
60 17
138 0
90
70 0
1340 11
26 0
10 50
93 0
720
106 0
510
76 0
12 20
410
1220
780
200
450
130
590
0 113
1250
26
940 0
660
220
70
60
88
550
470
230
80
0
0 150
430
83 0
1030
10 37 0
550
360
58
660
69 0
70 88
620
350
0
60
20
70
38
590
260
130
300 700
800
1170
580
1190
820
12 0 14 0
70
0 76 100
780 50 0
330
19 860
7 10
10 80
1340
47 0
15 30 57 0
37 0 1000
1080
840
250
1190
80
690
60
1190
190
1570
121 0
80
50 50
50 220
52 0 760
14 30
0
92 150
310 200
420 590
290 400
4 60
73 0
15 00 55 0
10 00
50
470
370 0 100
90
90
210
70
11 0
110
140
180 220
70
140
200
370
21 0
1430
620 0
94 90
11 0 15 0
50
1160
770
1120 11 90
13 40
10 00
47 0
22 0
21 0
90
21 0
58 0
14 0
84 0
0 273
1570
240
1150 160
650
110
380
350 0
10
1570
812
80
1380
81
1160
1550
0
850
0
220
60
118 0
50
0
0
79
0
20 81
18
1030
520
0
720
1110 110
0 11
21
0 119
70
64
0
0
180
1220
950
50 19 0
50
220 36 0
230
49 0
230 190
110
220
220
430
200 310 43 0 21 12 00
43 0
80
37 0 30 0
13 10 13 10
1470
870
1860
52 00
52 00
1480
760
73 0
21 403030
76 0
5180
5180
760 78 0
0 255
00 13
40 0
680
320 540
80 0
36 0 200
430
280 30 0
30 0
94 0 320
28 0
55 0
85 0
770
330
130
40 0
13 60
39 0
91 0 54 0
0 83
920
11 00 70
50
45 0
720 440
55 0
75 0 21 20
186 0
630
68 0
380
1633 300
79 0
34 0
340 0
29 030 0
29 030 98 0
106 0
69 0
10 29 58 0
29 80
76 0
1630
1990 00
1020
72 0
800 840
25 40
840
103 0
50
18 80
1990 820
760
40 12 0 76
76 0
12 40 1490
3930 39 30
80
12 90
28 0
15 30 230
200
20 90 49 0
36 0 25 30
170
0 10 25 90
60
22 70
90
86 0
370
40 0 24 0
0
0 22
48 011 80
0 22
20016 10
19 40
50
22 10
60
80
1740
180
26 0
0 64
70 12 160
430 11 0
19 10
40 10
19 20
1140
940
380
73
110
60
14 0 610
340
140 530 0
270
340 1120
940
39 0
0 14
190
350
0
87 0
78 0
190
310
16 0
0
36 0
61
255 0
10
70
11
43 0
610
1110
20 0
72 0
0
920
29 0
70
0
1060
1180
10
100
670
80
450
80
30 0
88
212
1040
30
0
86 0
11 30
690
59
80
160 260
14
1220
103 0
0
676
50 11 0 45
950
0 87
10 50
1010
11
780
16 50
32 0 50
60
18 70
73 0
0
90
0 73
10 0
94 0
0 49
73 0
16 80
850
Colour Bands 0.00 100.00 500.00 1000.00 2000.00 4000.00 6000.00 10000.00 0.00 0.00
16 50
71
30
70 0
0 111021
160
20
0
1030
80
180
11 70
340
12 00
1160
50 11
340
70
590
888
1130 0 137
11
62 0
Bandwidths = 1250./mm
10
106
0
340 720
0 34
0 33
21 0
2200
12
650
650
0
00 11
50
1680
0
700
34
12 40
60
70
950
0 113
130
0
60
64
70
17
0 122 110
117
11
60 10
0
0
0
10 0
40
0 46
1150
1390
14 90
730
90
0
1360 150
1190
0 45
107
20 10
70 64
90
1090
10 70
78
13
1130
14 0 70 26 63 0
90 0
10 60
46 170 0
Demand flow
0
480
78 50
80
80
0 80
0 63
13 0
1730
12 00
400
80 18
34 0
50 26
90
70
70
14 0
15 0
0 39
26
0 44
50 78
15
0 22
90
1490
0
0 12
1950
50
160
0 60
42
20
690
18
0 11
10 15
0 29
0
0
1020
0 20 60 73
0 58
0 27
60
27 0 700
30 32
50 22
60 17
00 65
00 13
540
460
1280
0
0 27
120
60
100
0
310
0 24 8 0 18
690
310
0
80 11
1000
840
580 518
80
0 11
0 16
0
760
0
58
320
0 0 58 10
0
64
65 00
109
56 0
12 30
330
0 79
50 15
0
0 82
70 0
430 570
00
84
0
0 33
12
260
00
0
14 60
670
69
700
180
1300
470 1000
00 10
13
0
0
50 100
5200
60
0 10
70 0
50
79
60
50
460
78 0
5
0 18
20 0
420
700
680
70 0
0
29
150
230 110
11 0
80
0 57
90
50
1790
450
10 10
80
10
420
0
0 39 0 10
630
110
30 12
30
200
0 40
38 0
60
80
0 65
680
780
00
10
42 60
0 46
990
360
0
2730
50 0 518
100
0
10
72
6 42
0 89
18 0
110
0
13
0 55
0
23 0
220
920
73
780
10
15
23 0
260
820
5200 400
0
0 99
80
0
70
14 0
630
50
0
12
0 15
0 96
53
20
60
10
820
310
1140
1100
80
96
13 50
0 58
1
120
0
0
820 770 10 70
780
0
26
14 0
760
109
10
13 70
0 25
70
32
0
460
190
640
570
0
760
350
490
0 40
60 510
90
110
720
51
510
210
1030
16 20 0 46
0 44
0
12 60
0
0
25
150
30
0 103
5180
0 103 146 0
0
1100
290
0 17
50
150 10
144 0
0 14
650
0 12
0
1100
5180
70 129 0
0
21
500
0
00
1400 90
0 14
11
0 60 50 26
10 80
310
60
870
85
19
90
77
94
260
0 126
0 132
70
128 0
0
10
10 30 0
0
60 130
220 67
0
18 18
90
260
62 0
1110
10 10
41 0
50
24 0
1110
60
28 0
60
17
0 76
280
690
3930
30 54
0 42
0 143
330
0
11
Link Annot:
90
1860
0
31 0
120
70 77 0
11
0
32
0
79 0
24
90
50
730
15 0
20
790
860
190 0 46
160
860
70
50
0
310
11 20
30
80
19 0
860
210
24
0 50
90
35 0
95 0
180
10 10
24 0
490
0 50
0
0 57
260
250
510
30 30
11 0
50
900
17 0
30 16
54
70
120
160
0
97 0
39
60
1230
950
79 0
360
12 0
21 0
0
41
540
24 0
180
80
40
88 0
570
50
200
0
250
370
0 11
0
86 0
17 70 40
810
1020
780
660
19 36 0
70
280
31 0
90
46 0
55 0
0 15
0 86
0 79
28 28 0 0 0
67 0 70
50 0
0 14
50
130
0 42
35
270
70
620
12
80
10 0
90
13
0 50
420
90
44 0
0
350
10 0
30 30 0 3 16
00
660
19
190
3030 0 163
21 0 56 0
41
340 0 16
17
0 11 0 48
0
12
0
5820
11
170
90
55 0
15 0
36 0
38 0
39 0
140
120
0 16
310
11 40
480
0
45
890 0 60
70
80
310 70
0
40 0
270
10 70
43 0
45 0 86
90
140
45 0
0
99 0 10
38 0 250
24
230
80
24 0
0
0 17 500
200
36 0
34
20
0
160
46 50 0
90
220
10
0
80
13
32
89
270
180
55 0
190
270
78
3030 2080
5820
900
130
95 0
12 0
80
150
50 0
18 00
80
20 0
200
120
54 0
39 0 46
70
450
760
150
Scale 18061
10 30
720
780
860
920
41 0
23 0
0
60
90
610
67 0 0
840
13 80
1640
0 56
33
860
220
50 70
21 0
1200
1570
86
0 56
37 0
570
330
60
16 0
1210
90
1700
50
1200
50 0
1220
90
1000 58 0
10
1730
70
18 0
1520
1200
210
60
810
720
940
990
0
950
140
1020
1150
130
1150
130
1320
250
800 69
1310
1090
14 0
280
150
840
0
19 0
11 0 49 0
1140
14
0
60 147
70
920
27 0
35 0
35 0
1450
1210
70
15 0
11 0
60
3030 2080
5820
0
30840 0
28 0
330
160
0 59
64
0
29
00
220
2620
2620
140
0 1260 34
26 0
60
590
880
0
220
1000
1850
80
780
12
1000
1300
760
2400
340
113
1420
1140
70
60 0
2350
220
1070
1580
120
10 30
200
1020
60
200
140
71
18 0
0
10
0
18
1520 150
1520 150
2450
10
41 0
19 0
18 0
230
320
300
72 0
31 0
810
350 10 0
210
0 31
0 98
0
1520
290
00
1570
0 29
10
19 20
0
73 0 600
0 60
1110
530 0 152 150
1650
22
18 0
340
150
14
290
30
1410
60
0
0
2330
1500
70
15
150
520
250
101
200 90 15
15
3030 2080
70
0
35 0
29
50
210
90 11 0 10 0 1190
70
280
14 0
200
30
270
60
0
460
60
05820 582 20 58 20
10 11
540
90
3030 20 80
60 0
58
0 54
530
23
70
240 12
11
840
111 0
70
240
120
30 0
720
30 0 30208
133 159 0 0
11
430
70
180
860
200
130
13 159 3 00
87 50 582 0
137 0
240
119 0 8750
430
1200
15 50
220
3 208030 0
33 0
920
1000
240 630
13 0
875 0
50 0
180
250
28 0
1_fpm21_CRL_ Basecase.ufs
670
50
18 0
70
13 0
62 0 68
72
900
210
170
230
390
70
810
120
62 10
160
850
180 62 10
1150
111
0 87
Auckland CBD Model: 2021 PM Peak: Basecase 18-11-15
18-11-15 AECOM AUSTRA
-8 1
55
3
-7 8
-1 98
-1 0
-2 2
5
-2 4
6
-7 9
-4
87
3 -1
43
-4 3
SATURN
81
-4
-22
-7
1
8
-1 06
-24
35
-106
-7
-4 6
-317 -2 60
-6 0
14 5
-1
39
6
-3 3
70
-1 6
137
52
175
10 5
-6
-3
13 7
1
4
43
5
70
-3
1
-5
26 53
-1
2
5
54
48
24
1
13
-1
18
65
11 7
45
-27
-9
1
4
20
1
2 10
93
1
16
21
22
75
67
21 1
6 75
2
-2 2 35
19
75
26
67
6
65 90
9
8
-12
-1 9
38
-2
29
17
10
53
2
14 37
25
-2 3
25
9
-17
37
1
38
13
57
29
-2 12
83
29
36
8
7
-4
18
54
29
2
3
-61
13
-6
-1 3
-1
81
-5 3
39
10 9
10 9
-3
-15
30
-2
13
21
1
10 945 123
16 2
12 9
92 -1 1
-2 3
30
7
6
1
6
197 47 -114
12
39
-5
51
14 3
-9
-5 1
-9
-1
1 -2
-121
-14
-1
20
32
1
143
45 109 14 3
-246
6
-17
-29 9
-27-1 7 48
-2 41
1
-2 -1 19
-5 6
27 6 -1 -3
-1 20
64
10 64 40
40
13
5
-10
-71
-48
12
15 51
11
10
-3 73
-6 -33 2
-26
44 8
-1 21 6
326 66
108 1 -1
10 8
8
69
10
10 8
47
-1 1
10 8
17
19
46
-11
2
91
-11
24
3
47
88
14
36
-42
8 -4 2
9
-62
40
10
51
1
7
5 14
14
9
7
34
-2
76
-6
27
-99
75 75
40
-4
13
13
16 34
-2 73
11 7
-4 38
4 -24
-321
47 47
-3 56
14
6 -5 80 44 8
-51 0 -36 9 -36 9
32 5
27
-12
-42
-80 9
13
-2 23 -2 27
96 -1 -196
39
45
-1 21-1 78
-2
31 7
-2 31 5
6
-2 1
77
43
53
9
4
25
31
1
2
40
52
-1 7 -3
-2
-1
-6 7
64
7
66
8
108
7
-1
-11
-9 -3
14 2
-11
8
36
93
2
77
36 6
4
8
36
8
33 -5 2
-203 75
10
13 9
17 2
-6
93
16 0 93
-6 8
5
-6
-3
-5
17 2
74
-3 3
37
-72
107
3 -2
41
6
4
7
5
96
11
15
35
96
11
8
32
22
5
3
-1
16
-28
-12
93
63
2 -4
34
-15
-1
38
19
12
37
6
60
8 13
66
4
13 60
47 -1 1
31
6 10
43
10 6
-4 5
74
19
1 -1
-4
7
14
12
-2 1
5
12
7
57
13
-16 59
4
6
53
1
12 -6
64
-11
-64
2 5
2
93
-1
-1 7
108
27
2
77
9
53
-2 5
-9
51
2
18
52
-7
69
13
-6
-4
93
12
7
1
-2 4
20
13
77
-45
7
-4
43 1
64
13
11
1
-3 5
-1
21
42
5
20
34
34 17
110
35
48
4
17
-42
-2
6
-5 21
43
10
-5
64
74
12
-6 4
-7
6 -1
64
-45
10
54
16
12
23
110
-8 -6
14
1
52
47
-3
-2 4
-4 1
45
6
-4 -24
-2
-1 74
-91
12 8
59 6
25
4 -3 46
74
23 -6 1
74
8
-5
-1 0
141
-1
48
24
63
111
-2
2 -3
89
-5 6 5 -4
1
40
1
15 145
Bandwidths = 100./mm
6 -33
1
-54
4
17
85
2
50
39 -1
48
-6
0
4
0
10
3 -2
22
-7
-3 4
6
-26
Differ: 2-1
28
9
2
1
69
-11
49
105
-3
-30
55
48
2
22
5
9
-42
20
12
-16
62
6
5 -1
14
-2
-27
7 -60 -52
-3
-12
-101
-6
-1
8
+ Demand flo - Demand flo
6
-13
1
2
-101
108
-60
-3
86
-1
-2
2 -2
43
43
-1 2
1
-11
5
-3
-3
2
1
3
-10
5
-7
1
15
21
86
10
58
-75
5
58
106
110
17 7
-2 0
1
66
8
5
-6
107
0
-2
-1
2
26
133
-6
-3
100
6
5 10 5 -1 34
2
2
21
54
1
58
26
58
106
1 11
-8
106
3
-1
-3
116
-4
108
-77
47
125
-9 13
13 5
11
1
11
-2
86
1 17
7
2 13
23
0
2
8
-8
48
-9
-4
9
29
-5
-1 34
47
10
26
5
6
9
-7
-3
54
-6
14 0
91
-62
26
14
56
9
29
26
-62
10
-1 8
-2
12
-62
37
95
1
-57
1
5 -6
121
87
2
1
61
-6
-61
69
47
-25
8
Link Annot:
-8 3 -1
-3
-22
28
9
20
-3
-27
-4
5 -1 3
8
85
-2 1
204
-3
-7
56
-1
15
99 2
-38
-5 2
107
87
6
2
15
17
5
-11
1
-6 17
-3 18 9
2 14
1 7 -1 7
1
-2
-3
40
37
7
-2
69
-21
2 -231
30
36
-1 04
8
36
2
-3
-276
-3
-7
-1 04
-25
3
20
-14
-3 6
-2 49
-44 8
52
2
69
44
-2 6
-2
10 5
-217
14 -8 2 -2 76
-2 78
2
-7
-29
3
-1 59
6
2
28
33 -2
1
-1 11
-3 91
6
10 8
5
-73
-50
Scale 14449
-1 -4
45 -2
43
31
1
-73
14
7
-6
68
5 -6
10
-7
2
-8
104 7
-4 -2 8
-7 -167
-1
1
-2
-6 7
1
-1
108
23 -1
2
44
9
87
-4
3 31 -34 -7 1-5
-1 4 -6 8
15
-6
37
67
17
-2
117
-1 99
1
61
44
3
-1
-10
90
56
-6
-4 1
-1 30 11
-11
5
-4
30
4
88 -2
4
35 -1
7
-3
83
37
16 10 3
-1
1
16
-3
-243
2 -1
-243
16 2
25
-2
-5
1
28
-5
-6
-3
-5
-4
-6
-143 9
15
26
-3
16
-209
6 -3 -5 4
-36
-1
-23
2
-2 15
4
49
0
149
-138
18 -1
1
15
5
-93
-37
26
-29
-6
-1
1
89
-2 35
-5
-2
12
5
42
-32
1
12
-1 14
-1
37
4 35
25
-6 23
58
6
53
-5
12
-2 7
-4
-14 1
53
63
-4 2
-16
-12
6
-4
-2 45
63
4
33
-22
-65
-135
-110 -3
-33
-103
-129
-135
-123
-2 13
1 65
12
1_fam21_CRL_ Basecase.ufs L_Scenario4D
-9
57
44
3
23
10
1
54
8
9
-1
-5
65
10 9
3 27
5
7
-13 56
99
-8
-89
-29
-47 1
-13
10 5
33 -2
61
44
-1
-9
-22
-5 1
-87
-6
16 3
-2 55 -2 03
1
-140
-4
183
2
-10
32
10
18
4
17
-42
24
17
24
16 7
21 43
17
2 15
8
22
3
17
26
-4
1 -1
-2
17
-42 92
Auckland CBD Model: 2021 AM Peak: Basecase 23-11-15
7
1
1 -2
-1
2
2
-17
-1
2
23
-17 -10
15
-7
24
2
29
22
22
-13
48
23
4
82
157
-13
-4
1
-2
2 -2
-1 -401
-100
190
-120 -87
3
6 -2
-96
-23
-120
43
-160
-73
6
-63
-1 27
-2 3
-1
92
1 -1
1
-3
-33
-60
22 6
5 -5
136
1
43 -95
-69
209
1
18
-26
-1 9 9
70
45 80
22 9
-7 1 -1 87
-6 2
-22
-30
-1024
19 3
34
1
61
44
7 -2
45
-140
25
10
04 -2
7
-259
106 -11
-11 106
-26
121
29 9
-1
33
-2 61
106
36 2
-1 1
1
51
6
-77 -106 -181
-106
-41
10
95
-11
-1
-77
-26
-344
11
4 -204
33
44
153
-106 -196
-16
-1 48
84
-5
2
-77 -261 6 -10
-127
-3 2
-39 341
-55
-185
-153
183
-75
231
-265
-86
-262
1
11 8
39 -5 1
-51
-43 153
-78
-77
-180
-27
-2
77
51
91
-56
-2
16
8
28
1 10 5
80
-112
-2
61 -83
1
-123
-153
-184
22
-1 62
261
Atkins Ltd / DVV / ITS
3
1
304
-11
-124
9
1
-38
-77
61
-1
44
-2
9 34 -119
30 34
-92
181
24 9
-111
-120
-94
11
20
68
44
-1
30 5
-14
-132
61
11
-9
-1 -1 22
-20
19 2
-4
-2 92
-89
61
07
28
236
42
94 -1
-24 2
406 -3 9 96
8
-2
244
138
8
12 51 23 2
6
48
-2 8
2
61
-8
-41
-3
236
27 86
-2 5
-1 0
-22 -1
-13
191
20 4
-6
44
53
191
105
12 1
8
-24 2
41
39
6
6-17 10 7
68
8
14
-1 98
616
-12
-43
-1 16
-8 6
46
35
-19
-1
-4 3
87
-43
8
-198
29
2
-416
-1
-61
-19 8
-10
54
-4 6
11
92
-79
46
2
87
6
-2
1
7
1
7 1
-2
23-11-15 AECOM AUSTRA
-2
-1
1
-3
9
-1
2
3
7
-2
-1 -7 -7
-3 -1
7
-2
-1 05
-24
1
-105
-1
-2
-6 6
85
-2
8 13 1
106
-8
35
13 1
-9
59
118
10 6
35
-1 0
5
2
5
1 13 3
-2
7
-3
24
117 -2
2
89
10
18
59
-29
-3 9
6
-2 87
2
6
60
3
45
151
90
84
4
55
-3
151
90
32 4
15 7
-3
90
-2
21
56
4 18
32
-4
90
30
87
-1
11
11
21
11
17
37
-5 5
-8
22
-3
54 37
3
2
29
-15
22
10
-7
59
22
9
87
8
-8 42
10
-1 3
-1
35
-1 4
13
78
-1
1 -2 8
21
1
36 83
24
96
15
-5 5
31
20
19
-9
-1
-2
96
-8 1
-1
84
-6
2
69
-8
6
-2 3
10
14
-6
14
-4
25
3
7 -10
69
3
59
36
-3 46
-2 -32 5
-42
10
-28 1
-18 -1 0 01
-2 10
-2
-3 7 -1 18
18 4
-3 1 4 18 6
18 3 15
84
15 84
1
2 -13
7
-18
29 36
69 -267
-23 3 29 6
-23 3
71
71
-63
64 3 -4
64
77
64
18
64
-4 3
31
19
64
68
-43
24
8
-43
58
3
-10
-4 9 6
-41 -90
-160
01 -3 -259
-4 87
13
-281
-3 58 29 6 -32 2
53
20 20
-3 41
13
52
-17
11 9
17
78
1 -2 78
42
79 -2 -279
11
13 9
33
-22
-5 6
39 39
-34
-6 4
64 7
-6
50 6 50 6
-5
43 39 2
43
58
54
-1 1
-1 1
17
27
2
7
2
4
2
10
-9 5
17 6
10 9 42
-126
44 39
84
7
-1
6
78
18
-3
66
24
5
89
78
66
55
84
10
10
-3
78
2
55
57
4
-2 0
67
-5
-39
67 -2
18
-4 71 -10
1
17 6
23 13 6
79
1
63 -2
-1
9
-2
98 20
2
9
11
25 31
10
8
1
1
-4 10
-8
-27
-8
94
31
-7
6
8
18
-4
2
-4 1
42
16
-2
-1
-2
-6
-2 6
84
5
17
8
78
10 7
27
11
-3
52
36
-6
-1
64
1
-43
-2
26
78
1
-2
36
-5
-8
42
20
2
19
-3
-3
-6
21
14
-5
83
83
75 85
-8
82
2
75
13
25
5
1
8 -31
-1
-1 14
51 -1
45
1
74
13
Bandwidths = 100./mm
54
10
-7
3
-3 1
6
-26 -3 -30
7
4
-1 5 9
1
77
-43
4
26
-1
8
-19
77
64
-26
-4 -8
15
-3
77
-2
4
4
1
-4
2
-3
-7 -11
37
66
58
6
3
-11
-43
-3
20
84
Differ: 2-1
16 14
4
4
3
-7
45
16
90
1 2
-9
1
6
6
-3
46
-8
95
12
94
-2
-7
4
7 15
28
2 -1
152
2
-1
14
5 84
0 -1
2
-5
59
1
-1
-1
13 0
1
11
69 55
1
7
-2
4
6 -3
46
37
-2
5
1
24
-3
152
11
20
-3
57
11
17
-1
6
3
-8
14
-1
59
-3
-1
-1 18
-1
3
61
2
59
24
11 5
3
7 -1
2
+ Demand flo - Demand flo
38
-2
-3
6
57
94
3
33
43
-1 16 9
64
20
18 18
83
4
-10
-13
18
51
77
11
44
-3 5
73
13 2
31
28
-2
2
-6
18
-1
8
0
-1
216
-12
124
12 4
42
-2 3
42
134
3
5
18
70
-45
7 14
-1
47
11 77
24
35
19
-45
6
7
2
-13 -45
29
1
11
26
19
85
12 4
-1
77 -31
3
45
42 3
35
13
63
52
-3 -5 -5
-2
3
0 -1
55
21 28
16
-8 9
Link Annot:
3
2
-1
-35
-2 0 -1
5
1
14
-1
Scale 14449
-3
27
42 2 -2
38
74
17
-159
11
77
20
-5
-2 1
11
7
-5 6
21 4
4
6
-1
11
1520
4
-5 6 59 -1
-42
-1 6 33
-2
-1 94
-7 6 -1 43
5
2
13 -1 04
-1 67
10 86
1 -81
86
16
-1 5
-1 7
9
28
82
18
-5
-1
-5 2
-3
74
13 5
20
19
15
0
39
17
96
-7
13 1
7
5
6-24
6 -6
1
-1
1
1 -3
-3
-7 -18
-6
-81
13
2
11
96
-2
-16
44
-1
-1 75
-1
45
20
1
-5
4 -2
89
1 -3 03
3
30
1
-2 53
10 8
82
69
-10
-8 1
-24
8
-16
1
84
15
28
-8 0
42
34
14
-12
-5 1
0
1
30
-1
6
8
-2
-5
-9
-1
3 13
10 -1
9
1
-20
2
9 -1
60
11
-3
-3
6 -3
23
-1
88
-5 2 -1
-2
13
-86
4
64
-6
50
30
-18 3 30
1
7 -8
9
-6
3 -4-1
29
1 42 20
-1
11
-1
-5
4 -1
-88 119
-30 -3 47
-9
13
26
8
-7
-88
26
2
-2
38
-2
20 2 7
43
7
18
-109
7
-5 44 10
-38
-115
-93
-1 77
193
47
35
1_fin21_CRL_ Basecase.ufs L_Scenario4D
-2 8
-1
32
284
39
-39 5
23
9
-3 47
-12
56
16
-47
-22
109
23
-21
-48
36
-51
-28
-49
-7
7
-128
1
-114
2 -59
-4
-128
18
36
3
45
20
-4
-4 4 16 2
1
-3 59
-3 6
-2
114
-200
100
18
100
-87
09
32
-1 0
11
1
-11
9
17
-5
77 -5
-1
94 7
17
7
17 -4
4 64
3
11
73 12
2
-25
-4
7
24 41
17 12
81
28
5
1
-31
-4
25
4
10
139
14
14
4
14
34
-31
-28
-13
11
151
18 3
20
-28
7
16
11
2
3
32 12
1 -1
77
14
17
19
84
26
73
28
76
-2 0
1
-4 4
17
30
5
65
107
16
7
3
30
20
81
17
7
65
76
3 -4
16
8
7
0
4
-2
-2 5
2
3
73
-4
20
30
42
-20
3
-4
31
-10
5
17
1
42
-43
18
-44
10
16
64
-1 1
17
5
-8
31
11
78
-1
27
17
8
-2
10
10 -1
4
-4
-1
2
2
-4
5
6
-31
25
-5
-1
90
-4
9
-6
14
-3
-2
13
2
9
14
-28
10 -1
20
-1
5
6
1
82
-2
23
-431
-36
-34
-4 1
-2 6
-120
-8 -9
7
-3 0
-1
28
28
23
-148 -120
1
27
272
-6 5
22
327
-87
-1 7
-5 6
8
147
-3 5
18
-8 2
-82
-62
-135
72
70 3
16
4 -1
73
2 -7
-1
1
-34
74
86
22
26
85
-12
-58
21 9
15 2
-147
-148
-12 -22
346
-1 46
-14 71
5
-234
-12
-248
-161
3
-3
66
71 -14
-7 8
-1 10
13 0
-5
186
4 -1
70
20 8
71
4
29 -112
2
-1 5
-3 9 -107
1
-14
31
26
-54
27 -1
33
4
-30
9
29
-14
-1
45
20
24
1
-127
321
-181
-14
14
-40
-181
-181 -107
-6
-2
12
9
-1
36
-97
20
-194 1 -18 -14
-194
-91
24
29
1
200
32
44
-105
194
-14
29
-32
-6
-87
-235 4
-104
44
-40
-78
-25
13
58
16
3
99
-33
-16
-166
-1
-279
-2
-94
5
-85
-48
-4 1
-10 2
-14
-7 4
1
405
-41
97
-67 123
45
20
85
112 10 8
5
-75
-1
32
10 6
-121
-6 0 -60
36
34
44
-8
7 39 -9 6
-142
323
-86
40 5
2 -1 54
-3
20
4
-44
189
5
3
-24
-61
-4
56
-112
3
17 5
110
-7 -8
563
-1 1
2
-1 3
-5
23
132
17 3 110
45
-16
24
1
58
-3
132
4
-45
2 20
-2 3
-1
-3
45 7 -16
11
-2 -3
4
Atkins Ltd / DVV / ITS
1
28
-1 0
-11
4
-1 12
5
-2
2
23
-8
-1 42
-1
53
7
1 4
52
2
53
4
1
-7
-3 2
-2
7
0
-1
-7
SATURN
1
-1 6
2 -6
-17
7
4
6
7
-1
7 3
-7
-2
25
21
Auckland CBD Model: 2021 IN Peak: Basecase 23-11-15
23-11-15 AECOM AUSTRA
40
-3 9
-1
-3 52
-3
3
1
-4 8
-3
-4 1
4 -4
50 -5 0
1 37
-12
-3
2 -4
-3
25
52
37 5
42
-126
-293
-1 78
34
-26
10 8
-6 6
76
-2 7 275
-17
209
-5
3
-2
-3
58
-9
-2 8
101
34
18 0
21 8
34
82
4
-5 7
1
11
1
-22
-4
23
-4 7
62 7
-8
5
9
-2
44
6
-9
-2
38
-105
84 163
126
42
19
10 8
-1
-1
-1 7
6
41
6 12
42
61
11 1 34
72
3
-120
-5
39
-1 6 3 12
-11
99
67
37
-2 53
38
-1
-1
7
-5 4
-1
-1 15 04 9
30 7
25 3
45 18
22
22 10
-22
26
33
-2
2
-7
-3
77
11
1
-3
33
42
25 3
7
-2 2
10
48
-12
33
-1
11 -4 1698
71
-4
130
3
15 9
-1
163
-39 4
-34
36
1
-21 3
-259
-1 03
8
-9 0
19 2 -8
1
-3 1 1
67
-3
1 130 16 0
16 0
4
92 49
-4 88
-30
-44 6 -18
-8 5
22 2
-43 7
4 19
-1 0
254 164
-31
2 16
375
-3 1
16 2
-3 1
162
162 283 1 -2
56
12
0
-1 8
-22 12
-1
278
-19
56
26
27
27
-1 6
14
18
2
-31
-5
12 2
-4 12 6
45
-4
-609
60
29 8
25 3
-1
79
-2
271
103 69
92 49 45
60
-7
-56 9 22 5
-2
25
79
-43 7
172 9
-1
4 -2
20 9
1
-3
10 4 68 66
-4
29
-4 8
68
60
17 -5 73
-7 2
-1 24
77
12
39
-1
-159
-73
-448
20 20
4
41
-1
49
51
162
51 29
13 39 44 150
-10
-5 15
19 3
-48
-5 -32 53 3
-2 36 -236
-166
-6 67
-2 5
-5
-8 7
-1 68
-4
29 8
-1 5
-4 2
-1
69
21 3 14
26 2 96
19 6
24 3 -1 5
42
37
280
7 -6
78
8
-19
-4 51
28
29 8
96
14 6
-3
1 10
4
-6
12
3
68
2
2 19
-4
16 0
1
-1
27
25
0 16
7 18
2
8 27
4
-4
-5
-1
283 4
30
27
-4 -5
-26
-4
3
31
82
13
77
6 13
2
50
18 7
17
-1 7
3
43
74
162
3
2
8
14
-31
7
113
1
-14
-4
56
4
0 18
3
-2 -2-1
113
2
-26
-6
78
53
29
-2 79
-1 0
21 3 13
7
133
-40
-108
-1 34
69
2 2
-108
67
4
74
3 -1
2
67 28 3
3 11
11
5
-3 2
4
8
4
64
76
-9
-24
31
5
52
9
1
28
131
6 2 -3
-3
62
-1
10 7
7 -1
-1
10
162
4
13
160
1
1
46
47
9
28
160
-1 4
17
9
46
1 -1
27
3
1
-2
0
1
42
-16
4 10
-19
4
-3 -50
1
-27
7
84
56
-52
-2
Bandwidths = 100./mm
13
67
1 57
Differ: 2-1
3
33
-4 7
1
10 0
3
-9
-1
-19
-71
1
1
-2
-116
8
162
32
-51
6
-126
24
-31
32
-1 -5
-4 3
55
2
53
54
-1 3
32
7
55
6
+ Demand flo - Demand flo
3
62
22
1
-126
24
7
-1
18
69
-17 19 2
34
-2 1
4
-2
-17
-3
-6
8
-3 5
162
55 29 29
14 0
-4
2
29 33
-3
27
-1
4 -3
4
-2 2
28
102
174
31
31
4 10
-6
57
28
29
44
2 10
17
-1
-5
-111
1
45 186
8
1
3 -2
157
205
-1
12
17
10
0
6
5 27 1
58
75
75
-23
53
-2
58
34
12
8
1
1
-3
9
6 12
47
-5
157
-23
102
55
14
37
33
32
-7
1
33
-1 09
0 18
1 -20
10
16
6
-6
14
8
1 14 3 -2
12 2
20
55
21
-2
1 -3
-27
5 37
186
82
1
52
24
5
22
63 -8
19 4
66
19
7
44
-8 4
33
73
-
69
19 -1 07
-4
73
81
-1 07
81
-72 73
-6
6
-1 2
82 -3
82
81
13
73
10
41
10 9
1
65
2
13
196
22
8
1
81
4
13
35
-2
2
41
76
-1 2
26
-13
67
37 5
129
1 -6
-2
135
-16
9
69
-26
-5
10
-1 03
43
-1
66
78
247
8
-29
43
12
36
-14
66
10
10 3
15
-4
7 -15
-1 74
23
29 29
3
78
154
91 2
6 -6
8
-48
6 -3
31
7 -5
95
-30 34
22 7 21
-12 3 3
33
164
1
11 8
-1 3
64
7 -9
-5 3
-1 74 -1
-2
-6
-6 0
-18
-3 85
-5
77
1
2 17 1 31
3
2
-8
-3 5
12
Link Annot:
12
196
102
28
28
-4 20
12 8
67
-1
13
-7
-5
06
2
17
9
-2
-5
15
5
9
-2
8
-2
3
1
-228
483
-3
-4 09
12
7 14
Scale 14449
33
69
26
-73
3
4 81
13 0
1
7
7
-40
-1
-35
2
-1
60 -1
-3
-1 09
88
25
-58
4 -6
20
89
7 14
-104
-4 6
-195
15
2 -2 5
67 1
1
27
-33
4
-64
22 0
-8
-103
32 26
9 -3
29
2 -1
18
-2
9
91 74
1
1 -29 1
-29
29
2 49
49
7
2 2
3
-6 1
12
-7 4
22 5
-9
2
9
14
-2
3
0 -4
105 -2 7 4
86
-8
8
39 48
-6 1
-7 1
14
4
15
156
-2
24 1
39
6
2
76
6 30 -1 -14 -1-2
-3
-59
60
6
229
39
-4
8 18 -3
-10
280
1
76
483
-2 63
3
22
86
-4
7 -1
-8
44 -2
-1
09
15
4 -2
5 18
-2
15
-6
3
125
20
30
-
88
44
19 53
2 19
-21
88
-3 70
183
-3
136
32
32 -2
21
47
4 -4
4 84
38 7
2
108
-1 25
-28
-268
-291 -4
-2 -8
4
107
94
5
91
2
-19 -2
10 7
85
-3
3
-12
-1 03
-105
137 -2
44
-16 9 4
173
34
-3
-1
-7
1
3
4
-28 -23
49
69
-28
28
7
-8
-5 1
-7
5
9 -1
8 -7
1
76
483 -59
-71
-3 03
-168
-10
-4
49
-221
-181
110
-3 -472 92
-30
-21
10 0
19 0
-2 50 3
33
-17 16
82
5
1
-2
-1
6
40
21
8
22
7
-2
9
250
35
2
-4
-2
63
13
50
29
50
3
131
-1
61
25
4
7
17
62
66 3
36
18
-1
2
50
-18
78
40
0 -3
22
23
-17
-5
15
7
-2 8
9
19
2
4
-9
-10
-11
5
-4
21
5
-3
-9
9
-4
13
6
-8
-4
33
1
2
5
-4
-4 7
60
7
-9
11
-23 136
10
31
-2 2 81
135
8
3
7
64
7
5
-16
13 36
17
17
Auckland CBD Model: 2021 PM Peak: Basecase 23-11-15
-14
6 -4
-5
-199 -189
-221
55
1
5
21
8
26 17 4
149
10 8
-5 1
-49
-245
1_fpm21_CRL_ Basecase.ufs L_Scenario4D
-7 6
-472
-7 41
50
17
-4
1 -4 -75
21
-46
-1 41
-235
-1
29 8
26 17 6
4
-1 1
-4
13
100
-45
-3
47 5
23
4
9
-2 0
17
-295-52
11 7
-4 2
12
-46
75
35
-763
-56
75
-30
-136
4 -7
66 -3
19 0
13 2 -1 22
-76
-389
-114
1
-1 90
-5 0
-2 0
67 2
-1
23
-225
-72
105
19 9
-3 17
-46
-50
21
6
1
149
9
-7
-346 -52
91
4
6 -5
15
-1
73
1
-74 -7
1
76
483
14
-1
-169
2 -235
9
-122 8
-481
79
0
-134
-178
-360
4 -76 -8
-1 34
-156
-156 -74
14
27
-74 -156
-54
61
36 2
-180
-13
-54
-84
18 8
26
-209
98
43
-99
129
-13
-376
8
-113
-13
-17
-383
-683
-1 84
81
435 -247
-4
356 -182
-129
181
-173 6 -24
-246
-3 89
-37
-113
287
-1
-1 4
-7
51
149
-29
-309
-204
6
43
-247
10 5
25 -2 5
-25
-25
-185
129
-50
10 1
25 131
-2 5 143
9
-32
-109
-77
66
91 43
-3
15 9
-394
28 7
2
20
-9 8
-9
291 -15
-1 84
5
-1 99
20
36
1
-148 33 2
14
75
-15
-129 -184
-478
483
37
-64
35
180
-36427 9
1
3 48
-13
78
96
3
-4
8 34 -178
34
-157
112
30 8
-194
76
-1
-50
-9
94
97-52 -200
1
-11
-1
51
48
662
292
450
-38
-1 96
-1 337
260
47
-3 09
475
222
1
0
-47
-2 0 -10
-8
23
-3
-8
76
483
822
25 24 8
9
-6 6
292
129
73
10
66
22 1
375
-19
-3 -97 6
25
24 4
12
225
332
52
-80
18
225
91
-43
1
50
22
-3 1 5 76 2
-45
101
97
9
37 5
-28
Atkins Ltd / DVV / ITS
-3
8
64
-8 -8
-31
-6 6
-2
-48
-30
40
42
50
-3
5
52 -31
SATURN
39
11
3
4 4
-1
4
23-11-15 AECOM AUSTRA
-8 2
-1
36
3
50 -7 7
-7
-1 2
4
-1
8
4
-2 4
6
-1 9
50
-2
39
-4 0
SATURN
82 87
50
-1
-19
1
-1 50
6
-1 43
-314 -2 16
30
14 5
47
-9 1
9
6 -9 6
-1 6
229
198 62
-1 06
5
22 9
10 2
1
-2
-7
1
75 78
24
32
74 79
-11
5
3
-1
1
7
21
-104
137
52
56
-1 -5 3
1
2
50
60
2
39
-5
71
2
51
-52
2
28
-1 6
81
4
5 16
51
28
61
27
-7
13 5
35
31
-2 1
-2
28
21
53 -12
4
-3
12
30
1
73 34
17
-6
82
3
11 9
67
49
31
12
59
-6
71
-4
64
-5
8
-3 2 -6
36
3
2
52
-48
-8 0
74
90
14 6
11 9
-2
-3
-1 2
53
-5
43
-64
-4
-4 59
3
-5
5
-4
15
-5
59
73
19
5
20
-7 0
38
-4 -8 -5 6
58
56
69 109 172 17 2
13 7 9
17
65
9
6 -1
-3
54
175 1
5
83
154 15 4
10 969 135
21 0
14 2
11
20
-1
5 -2
-1 07
-14
-1
-1
2
3 14
-78 -6
9 20
10
-176
75 12 8
12 8
15 4
-9
6
7
-10
-31 9
-30-139 3
-2 56
2
-4 -2 12
-1 06
62
33
-20 62
-5
42
42
-13
11
14
6 -1 7 -11
-17
-207 -2 61 -261
63 63
-3 70
13
10
-258
-4 18
-6 -1
-37 3 -26
51 9
-1 06 7 33 -1
-1 00
33 7
-4 4
369 149
38 62
38 38
150
38
136 62
38
62 62 131
15
-2 83
64
-1 6
70 -1
-1 12-1 81 9
-1
-35 2 -35 2
36 4
-3
11
58
25 -1 69 -4 9
22 -259
121
121 19 3
-170
53
10 2
6 -1 52 0
-50 7
36 9
10
-1 1
2
-1
-6 -79
-80 20
59
64 4
82
-6
-5 0
27 -1
36 9
-1
-5 80
-1 -1 0
-3
78 4
8 11
2
29 -5 2
-203 14 7
55
01 -2
9
23 -2 60
27 -2 8
50
-25
102
8 20
4
2
-3
7 10
9
12
11
17
9
11
127
67
11
10
20
19
19
12
98
15
62
13 3
11
15
-4 4
12
-2 1
4
34
19
6
12 3 13
93
12
7 12
131-6
55
46
68
-4
19
5
7
61
7
62
-7
5
39
38
-1
19
59
-4 3
80
2
3 15 7
73
-6
1
86
15
45
12
22
1
-16
5
123
102
-74
-6 9
-1 1
1 11
-5 2
-6
53
298
-106
10
01
-3
99 -15
-37
-185
-154
33 9
-20
-13
-2 0 79
-2
9
-2 1
37
75
-1 -2
-2 8
58
8
61
-75
-7 5
12
-2 2
11
19
14
18
12
1
-44
11
59
29 63
10
1
19
57
18
3
-3 9
13
2 64
7
62
-1
37
98
3
10 2
37
5
-4
46
-44
7
-1 3
48
-1
55 32
45
51
4
77
10 3
10
10
165
26
-11
-4
6
192
27
14
1
25
45
26
-38
37
15
22
-2
-1
26
-38
2
25
2
4
29
-2
19
4
22
22
15
-4
1
8
4
1
26
-38
Auckland CBD Model: 2021 AM Peak: Basecase 23-11-15
-3
-9
3 2
37
3
5
-1
-11 3
1
-10
16
10
90
2
38
22
30
34
2
-12
41
12
2
-2
-109
1
24
19
7
7
-2
-1 -8
155
7
16
-1
-15
19
1
-5
19
5
31
42
63
13 1
-1
58
-2
28 2 31
-1
56
7
65
57
-9
-9
11 3
-1
36
16 7
-2
32
44
28
4
6 -1
-1 21
33
10 7
12
62
42
62
2
34
32
4 -3
16
24
-3
7
3 77
-8
31
10 3
100
17
81
6
-5 7
44
5
0 16
3
-6
95
-62
60
17
-2
34
12
33
60
95
45
81
6
-67
2
4
4
82
-3
-1
30
77
-1
30
61
-24
-2
-9
-2
21
40
3
-20
7
87
53
-6
-1 2
-6 7
3
155
62
121
-2
10 1
4
2
-20
6 -63 -56
-8
8
2
12
1
38
-2
-8
73
-5
-63
87
3 -2 8
15
-4
30
7
-23
Bandwidths = 100./mm
0
1
-9
-108
-2 -8
82
59
4
5
-1 2
13
-6
-8
130
-1
-13
-107
7
98
-1
28
-10
2
2
-107
62
121
68
-1
-6
3
7
-8 129
-2
6 -1
41
5 -1
52
-6
1
98
-5 -5
5
21
2
-11
41
8
-85
122
-1 -5
3
-1
4
4
-8
17
5
112
10
1
21 161
52
5
68
122
3 12
-2
17
45 17 -1 28 2
Differ: 2-1
3
49
8
2
-2
14
37
43
-5
+ Demand flo - Demand flo
7
8 16 -2
7 -2
-11
-3
58
17
8
8
59
6
-1
27
13
88
-5
38
-87
102
6 13
14
2 16
11
8
7
-5
1 7 17 3
37
4
9
88
23 2
-2
-1
3
30
-6
-7
20 -1 61
54
14
14
26
-1 00
37
-6
91
-2
108
-2
-2
-4
38
-9
1
154
0 -2
40
-66
16 4
37
14
48
9
10
-61
-2
-1 30
25
-66
-2
11 55
28
16
230
-2
-66
21
78
-4
6
-2
Link Annot:
-9 155
11 11 -4
97
-2
2 -1 150
13
4 -3 -12
99
5 -30
7
2
-4
-23
19
31
2
2
-7
5
-40
-1
87
-5 21
-1
-1 06 -6 10
20 8
63
-1
17
21
-2
-59
0
13
113 33
5 -3
36
73
34 -1
-2
-18
-3 -17
17
0
78
64
1
-5
15
-7
33
1
-3
-2
2
-11
49
54
4
-1 06
-26
54
-2 58
-6
-2
57
-1
13
-2 80 -2
-5
-1 -1
-2
13 0
-4
-11
-2
-267
12 9
44
43
-20
Scale 14449
-5
6
26
2
28
13
1
6
-44
8
-7 1 -2 67
10
-4
-3 83
-1 25
-109
-2
1
3
5
44
-3
1
-1 75
-1 0
1 -20
2
11
-78
80
83
-20
26
9
42 -3
108
77
-6 4
-217
1
83
150
-20
141
-3
1
2
93
-1
15
-1
-4
1 -2 4
84
102
-2
23
54
84
7
-3 82
-4
86
34
5
78
-2 14 -2 2
6
31
-4 8
1
-4
2 33 -23 -8 2-6
-1 0
-1
1
5
-1
-11
102
26
-1
-2 5
-5 498
13
138
-20
141
-4 15
-3
4
9
24
-23
2
22
1
-220
26
-3
42 -6
52
90 -2
34
-1
64
-50
-17
12
4
-1
10 2
-1
85
1
0
-7
-6 -6 19
-1
2
-1
15 4
-2
262
-36
-2-2 6 17
-2 24
-240
4 -1
-229
-148
9
-87
-3
-201
1 -3 -5 0
-31 15
4
-19
-8 7
-9
-39
32
2
-37
-9 5
-1 1
-118
21 -1
-1
-107 -39
-2 72
-1
-1
5
-39
-25
-9
76
7
-76
7
0
-1
-9 2
-3
6
-3
-1 0
-2 20
-263
6 -3
-14
14
14
4
-1
8
3
-102
28
-25
-28
9
-43
-85
-65
-2 45
-9 18
-378
4
7
-4
1_fam21_CRL_ Basecase.ufs L_Scenario5A
-1 12
-7
-78
88
7
-1
-94
-168
139
-6 -9
-4
-2
-135
-135
-7 6
-164
1
-188 -36
-36
-399 -3
-5 -9 0
-1 83 18 2
36
38
6
-416
27
-125
1
-168
-148
-4
-3 -1
-6
-1 40
28
-1
138
-20
141
1
-221
-5
-3 13
4 -2
-28
-143
-73
-2 16
-2
-51
71
-50
16 3
-5 08 -1 28
-1
-19
-6
-464
-188
38
-1
9 -1
-1 7
-24
3 99
-53 21
-222
-4 39 79
65
-1
2
23 6
120
-408
67
-30
4
-2
41
84
-6
16
38 3
64 21 2
69
24
87 -1
1 28
-6
9
87
42
24
-116
-187
-4 10
-21
63
16
5
-82
65 -6
-239
58 3
10
0 10
10 7
47 -5 2 183
154
-5
3
-1
-214 -78
-113
-6
-20
-2
4 -21 -78 -267 -214 -78 -181
-239
-2 7
38
-214
138
141
-2
-82
224
2 -1
-52
-51
2
-424
-223
-20
90
52
95
-4 7 95
-56
-3
1
34
-74
154
10 6
233 -78
-3
-2 21
141
0 -2
-65
-80 -154
84
1 -3 14
-20
-3
74
181
8
-177
312
-124
1
Atkins Ltd / DVV / ITS
-127 1 -96
-10
-1 1 31 16
27 29
-184
72
-78
13 8
85 -185
-14
-127
21 9
2 -270
10 31 3
26
-1
411
194
-2 92
-9
-4
-1
-3 1 1 14
-70
31
2
247
16 3
72 -272
141
-47
127
-2
0 -2
-21 5
31
224
36
8 13
68
6
-1 69
42
13 52 23 5
3
-3
-2
96
224
62
-416
87
-2 5
-1 1
-23
-4
8
8
-2
-3 1
21 1
-2
626
33 -1 0
-2
27
197
106
67
2
8 141
-24
-2
197
-42
19 4
-13
47
48
-26 8
138 -2 6 0
15
-1 00
10
-7 4
-21 5
21
-143
40
-1 59
-1
-1
-38
8
-18
8
-1
20
1
-21
-2
39 -1 50
6
-74
-1 74
8
-2
13
-12
-74
-24
36
53
-2
-77
42
1
2
1
15 14 2
1 1
23-11-15 AECOM AUSTRA
1
-1
-1
69
7 2
4
1
-7
-3
-1 69
-6
3
-1
-7
1
-7
7
-2
32
SATURN
7
-1 -7
-169
-8
5
1
7
1
2
-7
-1
-1
-6 7
-1
1
-20
3
1
3
5
-1 1
32
5
7
7
-2
1
-1 69
7
-67
Atkins Ltd / DVV / ITS
5
-6
48
-2 3
55
13
-2 4
29
2
8
7
137
18 6
-1 1
132
9 13 7
5
-5
132
3
80
26
-27
80
27
8
48
-2
6
1
37
-2
-32
61
80
-7
-2
6
52
2
4
9
83
54
11
9
4
98 54
18 4
87
87
99 18
87
19
33
92
-3 8
1
14
-6
-3
16
60 94
4
2
96 38
15
55
82
41 -6
79
18
-3 0
8
-1
59 -1 0
61
1
-2 3
40
63
46
42
-4
33
60
94
19
3 -23
-3
80
46
14 16
-1
-2
56
4
17
-2
186
-4 9
33
12
6
22
-2
43
154
43
56 12 8
56
-3
-4
19
-7 7
-1
-1 3
81
-1
18
1
-2 8
4
55
22 0 19
22 0
56
-8
14 0
18 7
-2 7 18
-4
40
-50 6
12
1
-5 0
9
72
-1
68
-29 17 -73 5
4 -11 6
220
20 91
91
13 3
1 -1
-2
-20
-8 2
-3 2
-82 -14
2 -13
-36
72
63 -4 98 19
10
17
-2 19
-1
-3 5 -1 11
-1
125
28
11
1 -278
-3 61
-11 -33 8
-43
12
-29 9
-19 -108 1
-5 6
4 23 -1 9
23 3 20
4
71
-13
4
-160 28
-3 39
-276
-3 63
-1 26 4 -32 7 -1 26 4
-23 8
13 7
139 9
104 23
10 4
2
9
9
96
79 1
50
77
-5 87
46
34
-2
-5
7
1
41
-7
33
11
-6
3
-9
36
-3
-2
4
19
20
10 2
81
7
-9
71
23
33
-62 2
-5 2
18
-259 60 -1
-260
17
10 0
37 12 8
-23 8
-1 10
10 4
77
78
-160
-54
22
62 4
21
-7 1 -7 8
-2
60
29 0 39
81
10 3
-1 2
-1 2 12 9
3
-17 -1
11 2
11 3
19
27
-11
44 8
12 3
39
-58
-3
50
-5 6
-1 09
3
3 -1
41 53 0 -1 2
44 8
18
92 17
29
1
-1 32 4
11
-1 5
3 -1
1
12 3
-68
-97 -111
65 42 26
7
7
1
23
13
27
3
10 4
1
60
59
60
23
Bandwidths = 100./mm
55
80
14 3
1
23
88
2 10
5
-4
-1
-18
Differ: 2-1
63
10
43
-5
3
63
43
10
5
56
80
33
-3
-5
42
-32
36
-1
-8 1
14
27
67
80
7 13
1
2
-4
56
10
31
-4 5
-7
84
4
2 -5 10
32
20
-5 19
8 15
64 15 3
57
1
-3
10
17
-1
-7 17
66
-7
33
10 2
-2
-71
2 -1
-6
15
81
46
2
-7
1
56
61
102
52
23
5
7
33
40
40 7 -2
13 7
-2 0
8
-7
-5
3
-3
104
17
11
41
-63
-3
81
6
17
42
136
-5
27
68
1 4
6
57
80
3
5 -2
19
4
39
5
51
46
53
1
-10
14
-5
71 -5
-8
31
-9 23
-3
47
7 73
-3
90
80
14
12
30
52
7
-29
1
23
30
10
1
81
-1
2
16
41
-1
10
23
-1
39
42
32
48 32
64
20 -13
26 13 3
178
24
2
-7
-1
-28
-17
5
76
26 30 2 -1
15
28
80
-1 6
2
-4 7
15
73
13
90
10
23
73
1
64
15
5
76
23
30
-1
10
6 11
-1
-2 9
5
23
76
-4
1
66
1
73
-16
33
14
53 -5
13
31 -3
52
33
-47
42
1
15
31
-7
104
31
8
15
4
2 10
102
76
33
14
-1
7 7 80
2
-14
5
-7
80
-1
27
87
5
5
-2 3
39
2 -1
5
1
1
-1
6
-3
1
6
-2
-2
49
6
14
4
-3
-4
104
-3
16 8
1
5
-3
5
-15 -4 -18
-22
87 -6
0
56
-
22
3
-16
-3 -15
-48
-4 5
11
15
-48
-48
2 -1
-16
-6
35
29
194
11 24 9
1
-7
8
+ Demand flo - Demand flo
5
1
1
5
20 -2
23
3
5
5
-7 -4
-2
4
2
-2
2
-1
-7
23
42
-2
-2
82
13
0
-1
82
46
2
215
-4 20
1
-1
5
34
142
-17
54
16
1
142
-17
33
-8
6 13
-2
205
1
19
104
14
77
31 -3
-4
46
17 8
-1
43
-2 6
1
5
0 -2
2
27
31
16
-2
-1
19
4
34
85
1
5
1
33
41
-4
9 11 2
81
7 5
2
-9
13 0
92
3
84
1
3
2
-1 7
11 9
91 15
13 5
17166
-1
11
18 8
91
-7 5 5
5
1
-17
-1
135
-10
62 -2
Link Annot:
7
3
2
15
42
227
-2
104
-10
-10
-1
-4
-2
84
-2
-1
16
152
1
71
24
23
13 -1 5
5
5
0
49
10 7
77
-54
44
-2
-2
-8 0
8
16
14 0
41
2
8
21
156
41 -1
0
-1
-4 4
0 -1
60
-3
21
-2
27 -1
7 -5
10
24
22 8
1
-2 3
20 31
1
-17
2 -1
54
1
-4 4 59 -1
-43
-6 2
71
-1 7
34
-21
-3
14
-10
-2
Scale 14449
-8
-2
-8
29
59
-21
-2 -8 0
-1 33
-1
43 50
3
-1
26
-1
-1 67
-1 7
-2
31
20
-57
-4
-4
3 33
-2
-159
11
71
93
1
11 -9 2
-5 7 -1
5
8
3
8
1 19
-1 68
-1 5
14 0
7
-1
-3
9 42
-1 40
-8
11
6
49
-7 -16 7 -1
-5
39
1 -1
-1
-3
3
8 -1
-6
11
9
5
-6
-4 7
-2
156
17
-205
5
9
0
-5
2
1 -5
-24
-28
-1
170
27
-1
2
12
5
3 31
1
-1
-122
76 -3
23
-1-1 8 28
3
181
-36
-1
6
-4
-31 -3
-3 6
167
27
11
2
11
22
-2
-23
65
14
1
-3
33
1 -2 -1
-2 42 89 15 7
-7
-57
-1
-2 71 -1
-1
45
93
14
12 8
30
-7
-2
-25
-5
3
32
2 151 -1
89
37
-2
8
-1 06
68
35
90
-1 87
30
14
-1
-91
12
5
91
-1
75
-12
-1 4
-1
11 17
1
-2 59
-6
92 33
18
23
-767
18 -1
-93
92
23
1 -3
-105 5
23
-4 1
1_fin21_CRL_ Basecase.ufs L_Scenario5A
-5 9
-48
-8
-46
3
-35
-71
-1
19 8
-41
-116
-115 -48
-44 -5
-11
-5
-5
-13
-136
-11
-167
5
-35
38 -75
-69
-17
9
71
-108
-1
-3 39
-5
1
-6
-3
-92
92
-105 39
-1
-141
-5 6
-1 70 20 7
8
-120
-40
-63
-42
-3
14
-34
11
-1
-2
-162
19
9
-162
-133
1
-3
-33
-1 21
1
-3 47
-29
-106
-1 62
158
-192
-115
14
88
2
-2
45
93
-65
1 8
26 -2 2
74
75
2
-1 09 -499
-133
-52
-1 2
-109
13 6 -2 81
-9
51
1
-3
22 2
-3 54
-36
-30
5
-254
-16
14
-14
26
-83
4
-4 27
14
-1
-8
-213
1
1
82
-38
-84
63 -1
2
-2 53
-37 -41 -13
-40 -13
-16
22 9
55
17
-13
3
1
41
-1
-263
-14
-67 -163
5
-14
-1
45
93
-1
-94
55
5
51
-41
-64
-97
37
93
13
31
2
11
10
-1
1
4
2
-4
17
2
-1
Auckland CBD Model: 2021 IN Peak: Basecase 23-11-15
-5
-4
26
-28
-17 94
-1
6
26
32
-4
14
1 -8
6
-5
-5
15
13
20 -1
18
7
-2
15
6
31
-13
66
156
6
-1
7
-2
15
29
1
19
23
-28
-17
-8
32
-7
-2
-1
37 17
-3 8 -135
2 4 -26-185
-264
-168
-1
-71 372
-94
1
-19
189 -263
-1
82
-248
2
-3 7
-26
14
49
-28
-97
-346
-14
-1
-152
13
-3
4
2
-33
-14
-2
8
4 3
97
92
64
-68
113
-318
82 -31
-41
-36
-41
93 66
-1 40
439
32
-14
45
-1
40
37
100 98
-118
-126
-16
6 43
-96
-173
310
96
1
26
-1 54
-43
179
63
9366
-1
35 -235
41
44 0
7
67
-2
59
-24
1
14
-1 3
120
-2
-2
597
3
16 5
100
-21 19
122
49
100
45
-60
24
1
16 3
57
3 93
-2 3
-1 3
-15
122
3
1
-1
-2
-3
45 7 -60
13
1
-21 4
3
32
-1
-1
-2 -3
52
-1
27
57
12 0
-1 1
-16
4
5
-1
3
-8
-2 11
32
-1
23-11-15 AECOM AUSTRA
51
-2 5
-1
4 62
-1
4
-4 8
15
-2 8
3 -3
-9
49 -4 9
SATURN
25
-9 4
29
-124
30
-9
-4 7
2
-7 2 17
12
206
-1 24
41
11
78
12
-2 2 276
3 20 6
-2
-6
105 52 16 1
-5
-4 1
9
-9
-130
90
14
-2 7
69
-1
-1
-4 -1
10 1 51
55
-31
-1 7 64 -9 3
59
-4
-53
11 0
-9
59
-12
59
-4
-41
0 -19 -57
29
87
47
74
-4 -3 6
16 5
4
4
87 47
-3 5
74
74
1
4 15
92
2
199
-32
170
16 2
97
14 0
63
11 2 1
18
145
17
0
43
-3
97
82
12 1
-10
-9 6
30
199
71
74
22 -5
-2 9
90
20
4
6
-5 36
28
25
28 0
10 -4 1545
37
-10
26
30
-19
11
42
42 -12
23
1
27 7 17
-4
10 25
-23
-4
10 3
-3 -2
2
2
-5
-4
-4 5
2
1
10 3 -1 -3
40
27
28 0
11 46
-1 0
64
-11
32
24
13 7
63
16
40 9
74
1
-1
272
39
93
64 -4
0 -22
-13 17
-6 54
17
-589
-40 1
-26
-2 55
13
-3 5
-99
-12
15 9
15 9
Bandwidths = 100./mm
29
5
-1 21 17
95
-2
17 5 95
-5
64
-1
-1
12
-1 3 -9 7
14 6 -1 2
1
-1 4 4
82
-1
-16
-1 4
189
265
163
-10
135
-4 7
-28 -451
28 28
7
-2
-5 08
-30 -1
-21 3
-264
9 14 -2
-121
-2 32
-1 77 -177 -119
-41 2 -1 18 9
-1 14
28 3
285 179
-14
8 18
388
-14
18 8
59
48
36 -15 2
-2 92 -1 72
27 9
196
74
-1 60 -1 43
13
-1
-53 4 19 1
-3
27
33 4
-41 2
-46 -20 4
-1 5
-4 33 4
-6 33
-2 7 73
-1 7 72
-5
-2 1 4 16
-5
-4 6
-2
291
5
2
3
5
78
16
1
15 9
-8
-2
19
56
9 15
90
25
27
20
14
265
2
1 29
8 17
-25
2
1
35
-14
4
18
6
21
-5
9
5
3
8
74
-2 8
17 8
15
60
-1
189
3
3
-7
72
-1 4
3 -16
-22 78
2
4 16 78
19
90
0 -1
87
-3 -2-3
-13
72
-9
57
19
-18
34
-1 4
15
45
3
-14
77
189
Differ: 2-1
-2 4
-2
93
81
78
-1 04
-39 -70
-136 30
14
-27
19 0
23 5 -1 0 23 5 -9
16 8 19 8
28 5 -1 5 -4
3
-6
165
25
333
1 -6
72
8
-1
8
19
-292
-1 41
-1 90
-5 0
-225 43
91
13 51 6
-3 28
4 -7
1
16 8
3 -9
-97
1
196
-8 2
13 9
-2
-1
76
-8
4
86
-4
-1 6
3
-3
-2
-2
53
-132
45
10
-28
54
13
58
-1 30
-193
+ Demand flo - Demand flo
84
71
13
3
207
3
2 32 1
60
8
16
9
-27
-4
78
74
-28
21
10
22
4
18
-1
73
37
21 15
64
-9
-5
-7
14
24 94
2
-9
-3
32 38
259
3
-5
2
33
10
35
159
12
4
15
37
-2 7
2
-11
3
7
-5
33
-5
2
-3 8
-1
26
10 34
36
36
Auckland CBD Model: 2021 PM Peak: Basecase 23-11-15
-5
5
-7
-4
-1
6
-7
12
-6
9
5
15
8
-9
-1
8
73
16 130
-1 39
4
-28
-1
10
69
-1
-12
7
12
-2 2
3
90
4
-2
16
68
38
81
-1
83 30
-1
-2
8
88
13 38
14
17
15
80
60
69
96
2
-21
18
10
19
20
64
13
4 16
93
-32
6
13
129
2
57
0 -8
35 -1
-9
-4
75
5
97
52
-7
8
17
11 4
46
0 -1
26 5
-9
-2
47
41
-30
5
-6
17
46
9
48
4
1 -1
1
2 11
0 -2
-2
-5
-2
3
159
2
39
14
2 -3 7
3 -3
-4
66
6 11
-1
30
-3
24
4
0
31
2 11
41
-5
2 -2
-135
21
90
5
2
-6
24
-39
30
3
189
3
10
-2 20
-3
9
0 17
60
-15
45
-35
35 10 5
5
96
7 11
28
1
-146
1
-1 10
-7 6
93
38
90
-5
0 -1
-1 4
-6
17
1
-1
96
26
8
3
-146
45
30
159
0 -1
-2
2
12
87
86
56
-5
-3
25 5
4 -2
-130
72
189
30
3
23
17
2
-14
-4
-5 8
5
4
4
9
15
-1
4
-71
10
15
-4
54
53
83
1
-2
-33
-64 24
-1 33
2 16
53
63
-1 83
1
1
2
52
53
8
29
41
5
9
-64 1
-13
7
-26
36 15
54
-15 22
32
41
84
38
-3
1
4
18 6
-2 3
36
-15
22
14 7 -5
27
-1
207
22
17
-1
9 15-2 4
1
-9
36
-
4
1 -1
-64
170
189
51
-4 22
54 11
3
-2
2
86
34
3
15
22
83
34 -1 00
-3
82
170
36
104
194
-1
-1 00
37
10
232
106
7
22
95
6
167
35
4 -1
75
5
-1
208
-2 -2
63
1
-1
-12 5 5
-3
12
12
13
30
18 7
74
4 116
51
104
22 5
13
-1 2
24
-7
6 -1
-15
8 38
188 22
5
3
5
-1
-1
-1
-32
30
69
11 0
-6
12
76
7
20
1
74
Link Annot:
12
7
2
16 11 6
108
-1
-2
24
118
11
301
73
8
-1
-1
96
16
-1
-1
74
17
48
-1
-4 4
95
0 -3
26
82
-6
38
126
0 -5
-1
5 16
Scale 14449
-1
-6
1 -27
12
59
5 16
33
97
-1 68
54
11
-17
-1
97 -1
73
-6
121 2
11 1
1
-77
-5
39
42
96
96
30
24
41
-2
-1 69 -1
-19
-39
6
150
30
-2 2
-4 6
-31 26
3 -5
-7
-1
-46
-1
15 5
33
63
57
8
19
-3 80
27 6
46
-1
-2
-1 2
2
-1 5
-2
-4
-1
54
-2
-4 18
-1
82
5 16 4 33
62
20
-1
76
-6
2
16 2
-1 5
22
26
-57 6 -4
-57
57
-143
-60
2 -7
11
-24
6 -4
64
22
-4
-1
-4 07
16
-2
-2 7
6
8 -1
2
7 84
-220
82
-16
499
163
-42
2
2 -2
48
48
-5
3 16
-4
-1 06
85
27
200
20
32
-1
-195
14
3
-2 7
-21
-4
-186
15
-9
4
4
-79
41
-2
2 25 0
-8
2
2
25 7 67
0 10
11
-7 4
-3
2
11
21
9
-6
2
48
3 2
2 19
4
-7
-144
2
82
-1
2 22
7
-7
17 6
1
-5
31
-28
-1
61
41
5
-6 1
-79
-7
-4 281
32
13
-1 59
-9 0 -1
7
-1 7
8 41 -3 8 32 -13 -14 -1-2
69
-19 -2
-7 9
-13
2
-206
1
32
3
4
-74 -2
14
152
122 -2
-3 81
3
334
84
-16
499
-2 59
47
-2 30
-1
-279
7 -3 76
85
-1 10
-100
1_fpm21_CRL_ Basecase.ufs L_Scenario5A
-7 9
-279
-43 5
90
-1 44
20 4
69
37
-4
-2 26
43
73
-1 -2
-47
4
-1
24
14
1 -4 -1 1
-209
16
19
16 0
175
-1 -2
09
-202
19
-61
94
37
76
37 -2
-281
85
-1 63
-1
103
-288
-284 2
-8
-184
-196
0
6
9
-2
1
-1
12
-38
71
1
82 -27
-30
36
-2 97
2
-1 33
12
-1
7
-157
-349
-196
82
-3
-3
-9
-8
-
-198
9
12
-254
11 7
-4 96 -6 3
-45
3
-1
-250
-89
-64
-1
20 3
-1 83
-1
84
-16
499
-259
-32
11
-72
2
-312 552
9
6 -7
-274 -270
-259
-226
99
-205
20 4
-3 1
13
-1
-389
-114
5
-4 6
4 -7
57
71
32
-59 20
-389
63 -3
6 44
-9
1
-160
-2
0
-219 20 8 63
61
-1 1
3 04 -1
-1 80
43
41545
-73
-178
-150
177
150
-9
-34
-5 34 3
37
38
92 -2 7
-27
-33
-175
82
13 0 33
27 126
-3 3 144
6
67
-108
-24
0 -7
9 -92 -9
44 9
5
-280
-88 -74
-29
12
-381 -349
141
2
52
-99
25
-3
-13
86
15
1
-88 -88 -74
-345
-81
-751
-76
-1
-9
-2 79 -74
-177
-14
-4
-1
-1 2
-46
4
25
-55
-14
-7
5 -5 -1
150
-4
322
-5
Atkins Ltd / DVV / ITS
4
-204
-137
1 -29 -188
-14
84
499
22
-1
55 -16
-4 03
110 -291
-293 418 -293
32 2
-1 4
-150
-15
-361
22
-3
-18
-60
-1 5 -476
499
37
-460
263
1
5
-126
177
-15
86
9 49
-13 -86
-1
15 2
76
-430 25 1
-1 84
-11
55
9
-4
144
28 8
-6
7 40 -165
40 41
-189
49
-49
70 -270
-6 7
95 43
-2
84 -16
55
-1
706
295
4
5
-8
61
6 10 -52 -203
-21
-1 55
-1 337
472 265
1
-9 8
27 25 3
51
514
428
852
84 6 -1
499
-3 7 -18
-9
-6
31 2
67
6
-6 7
295
132
75
18
14
-29
-10-3 68
33
23 0
355
-55
49
15
62
-137
312
21
-1
236
-15
33
26
236
92
-44
6 8 2-1 4 161 6
-62
-3
31
15
35 5
-1
-32
81 79
-1
-1
5
-2 9
15 18
61
5
-9 4
35 5
7
12
26
62
-1
-2
-48
-18
52
-11
-9 4
15
-1
-3
2
49
5
62
-1
29
35
10
2
1 1
-2
5
23-11-15 AECOM AUSTRA
-8 7
49
3
-1
-1 6
5
8
41
-2 4
-2
-2 1
1
-7 9
-4
69
3 -1
42
-4 2
92
1
1
-21
-4 1
8 39
79 79
-2
-4 1
-3 -311 02
-2 4
44
-6 4
1
175
76
-1 6
-6 6
17 5
3 76
-5
1
-3
-5
21
26
5
4
-2
20 141 19 143
13 3
13
-37
6
41
100
5
9
-2
5
1
25
2
1
6 10
131
17
51
1 65
2
60
69 2
77
4
-2
29
-2
19
50 5 3
4
12 39
59 26
53 67
40 25
6
-1 1224
-2 12
78
26
22
35
-2
18
-6
31
56
2
3
84
-6 7
16 8
53
-7
-1 5
50
-4 -1 -5
102
64 9 18
84
1
-19
-5
41
10 2
20
63
-1
36 -7
60
10
13 9
197 55
55
177
7 4
9 15
10
-1 26
-2
1
1 65
-12
1
4
-49
31 -1
-59 -6 3
-2
57
18
-1 -1 0
60
24
4
160 41
40
14
18
78
16
102
6
-60
20
21 41
19 1 14
63
12
64
21
0
84
90 11
-6
47
-2 2
46
18
65
-3 3
17
10
93
14 1
9
7
21
38
-6
8
78
46
6 7
64
36
60
39
6
-7
9 18
-1 8
-4
56
6
16
63
-9
10
21
-8
53
23
65
37
42
64
-2 4
38
10
1
15
1
20
14
34
93
21
-6 0
16
32
64
20
18
1
8
-33
52 1
1 -1
2
46
48
10
61
53
46
11
26
71
-6
65
8
-33
15
1
12
-1
58
28 27
1 -2 1
41
7
7
-3
-5
13
1
-57
22
164
43
44
4
23
-2
-117
-1
-15
25
-1
3 70
1 57
57
-110
10 7
65 139 15 1
13 9 64
-9
18 4
17 1
3 23 -5
-1 5
-1 06
70
60
16
10
151 76
76
6
-3
1 -1 05
-5 3
32 6
11 0
-1
1
-2
347
120
60 46
60 60
161
90 46
60
46 46 90 1
11
6
-15
8 -21
28 13
-3 57
12 -247
-4 3
-35 1 -26
-6
-27 -156 5
-2 51
11 2
-1 07 7 32
-15
-30 7
34 6
-7
9
68
-23
-63
10 -3
-229
59 59
-1 91 -3
-3 95
-36 0 -36 0
50 8
4
14
24
-66 -1
26 8
-28
78
17 15
50 8
-51 5
33 8
4
-1 9
39 6
8
9
-1 74
-5 2
-203
83
-2 03
-1 79
-179
84
7
-1 05
-1
33 9
-1
-5 87
-4
-3
-1 50
-23
9
16 1 9
-9 0
-1 1
27
5
4
50
99
0 -2 -2
7 14
8
18
16
67
62
71
5
-13 2
1
55
44 65
28 10
-49
57
-1
65
22
31 51
21
13
4
24
10
-49
6
7
48
243
15 7
25
203
20
-16
-4
3
3 18
14
36
2
1
3
11
2
Auckland CBD Model: 2021 AM Peak: Basecase 23-11-15
25
25
-1
-3
10
-16
28
1
2 11
12
4
3
4
-15
-1
-11
20
8
23
-49
2
32
2
37
39
3
-16
92
-1
20
88
113
10
91
14
76
-14
46
-4
9
-1
90
-3
-38
-31
66
91
14
-68 83
-2 56
2 12 3
-2 5
14 0 14 0
10 4
-1 8
45
-55
69
-1 78
34
16 5
4
17
1 -1
10 4
25 -6
5
-4
-4 0
-5 2
41
106
-5
3 -4
80
0
55
1
14 6
-3
-1 6
9
-1
-5 80
62
58
56
13
4
-13
57
9 32
5
7 -5
34
-2
-16
3
76
-9 17
11 2
-1 1
35
-63
-3
32
2
4
102
3
60
9
124
12
112
26
35
3
-1
1
10
-59
11
43
-6
59
11 2
7
-1
-1
36
-105
51
111
-9
-6 0
1
0
-1
-1 0
52
112
-16
-1
21
33
2
4
76
71
50
6
7
-6
9 -72 -63
4
5
8
2
12
-11
2
160
46
3
96
4
2
2
60
-72
8
15
5 12
2
-2
36
-107
-7
3
3
Bandwidths = 100./mm
8 34
-2
15
-1 2
-107
114
111
Differ: 2-1
1
3
1
46
61
112
118
71
-4 10
-11
-1
7
-48
46
46
1
-7
6
-5
2
84
2
4 -1
-84
2
6
58
4
3
4
49
11
1
-7
105
-7
6
3
60
66
-7
11 4 -1 22 2
70
23
126 122
34
-1
2
-2
+ Demand flo - Demand flo
7
21
70
23
62
113
6 10
-3 -4
4
-2
6 -2
60
-74
90
115
-8 13
2
3 125
8
4
37
36
2
84
-1
0
38
17
1
20
22
44
8
24 9 18 8
-1
-3 0
88
9
-3
54
68
68
-3
-1 52
55
11
15
8
-7
26
7
46
-3
1
7
38
-5
1
12
3 16
4
1
17 9
3
85
-61
31
2
97
10
1 38
35
-61
7
10
-65
9
-61
23
-7 29
1
10
-6
-1
44
-2
135
26
29
8
88
-1 8 161
90
6 -6
253
-1 -33
13 1
1
46
91 1
-21
-5
17
27 74
-1
-6
3
-44
2
90
-3 23
1
63
30
15
6 -6
36
-3
-3
22 1 -8
-5 6
-56
-1 03 -6 15
108
9
15
40
1
6
-1
3
-24
20
17
1
51 39
2
Link Annot:
-10 121
-5 -5 -7
31
1
-7
9 12
16
-3
-2
4
22
57
47
-8
-1 03
-25
-1
-2 45
9
14
-1
-260
4
-2 82
1
9
1
161
3
90
-2
11 3
19
53
-4
-7
-6 1 -2 60
4
11 6
13 53
-217
13
-82 -4
63
-29
3
-1 64
-4
0
48
48
0 -148
-1 20
Scale 14449
-1
-9
-1
-3
-49
-7
7
38 -1
4
1
47
1
-2
6
89
-3 1
5
2 13 -1
-1
-3
32
-1
2 13
17
74 1
13
-1
1
-5
97 0
16
6
100
22
-4
16
49
-6 5
2 6
-3 73
-3 7 16
-5
-15 -4 9
75
81 -1 90
4
44
-4
92
42
-6
-2
4 33 -38 -7 1-5
-1 5
8
-4
-1
-4 4
-3 33 11
-10
3
156
90
-4 9
32
4
83 -2
-7
37 -1
16
-2
78
-4
-4
6
-19
3
-1 9
-1
-5
96
14
31
11
1
31
14
-6
25
12 9
-265
1
16 8
-36
6
-285
4 -1
-247
-168
4
203
0 -2 -4 4
-20 17
1 12
5
-20 -1
6
1 -1
-100
-139
16 -7
12
3
100
-6 4
0
-4
99 -8 -2 12
-1
184
-3
-2 20
-5
-3
8
-41
222
-2-2 3
165
2
-20 -37
-7
36
-12 2 16 5
89
5 -1
17
15
28
-10
14
1
-16
-14
14
-13 8
6
15 8
1
18
-24
25
7
-3
-2 51
-2 21
39
1
3
-44
1_fam21_CRL_ Basecase.ufs L_Scenario6A
-5 0
-86
-4
-6
18 5
-18
24
-90
-144
4
80
-6
-5 8
11
9
4
7
-3
3
-2
3
156
90
-118
-92
-144
-126
-8
-1 24
-4
-21
10
-1
-2
12 6
1
-6 -89
-173
1
-2
1
-1
-133
5
3 -2
3
-73 -3
-129
-170
-129 -58
-58 -9
-5
-4 5 -2 09
-440
-59
-7
22
2
24
-27
-138
-61
6
-416 -300
44 3
1 5 -4 73
1
17 0
-1
93
2 32
34
-216
-129
11
48
-56
0
1
7
48
-6 5
-266
59
10
-5 7
16 4
15
47
-1
-186
-142
150
14 4
7
-18
35
-4
8
-2
-25
-43
-31 176
-2 46
-25
-1 8
118
-2
101
-2 5
-23
25
18 3
-1
5 -2
15
-251
-16
87
1
3
90
15
73
16
-2 18
108
-11 107 -11 107
25
72
106
-1 57
11 2
-7
-32
322
-5
-2
16
8
-11
-1
156
-77-143
25
-130
-2 9
-18
-143 -77 -182
142
-143 -228
10 7
-5
11 4
41 -5 0
-50
-69
225
-77 -255 2 -14
-212
-26
184
-343
-4
1
90
6 -2
-67
83
50
96
-4 1 96
-45
-76
-77
73
2
-1 96
2
-119
-142
142
-35
10 6
80
249
-189
3
-8
90
29
-77
-79
-183
-4
182
23 6
15 6
48 -148
63
-5
-124
3
-96
-233
-9
-1
3 -96 33
29 32
-56
-3
2
21
18 0
-3
90
-14
-115
18
90 -8 2
-78
404
5
4
-8
3
-1
32
235
47
00
32
1
-2
239
Atkins Ltd / DVV / ITS
5
1
-2 92
414 41
11
15 50 22 7
2
-190
-11
41
9
-3 2
145
-9
-40
0
-2 5
-1 7
-19
-11
8 -5
3 10
100
-2
6 15
-23 0
33
-3
235
40
42
20 3 106
90
48
190
3
3
8
-23 0
190
48
13
92
-1
5
156 -20 -2 0
-1 10
-15
13
-1 41
47
38
45
3
-39
8
-21
-141
28
15 1
-1
43
-14 1
-16
49
-2
-24
76
-79
45
3
SATURN
87
-4
-3
1
2
10 9 1
-4
23-11-15 AECOM AUSTRA
-1
-1
1
-3
7
8
17 3 -6
-1
2
3
-1
-7
7
-2
-1 -7 1
-7
-1
7
-2
12 8
-22
3
1
128
-1
8
-206
-158
1
32
64
23
72
-4
35
-13
8
26
69
-4 9
68
43
98
6
68
3
-1
-1 3
1
19117
-1
-6
145 1819 1
24
5
1
36
143
6
12 7
2
-1
45
3
20
-1
-2
25
77
46
10 1
-3 4
143
4
100
-2
6
13 1
2
3
10 0
4
47
168
2
4
73
13
-8
79
-23
162
132
18 4
85
-2
19 8
19 0
-2 3
57
82
8 19 54
18
85
33
-3
-2
-5
5 1
30
89
12
-1
15
63
-8
19
-3 2
-1
50 63
14 19
39
-13
34
31
77
20
8
13582
97
13
-3 2
2
80
1
80
-1
73
34
-1 2
1
-2 7
33
34
43 -14
-3 1
16
35
94
30
-8
-1
-2
97
-86
-1
13 0
44
-21
6
-1224 2
25
-64
54 62
14 3
14 3
6
53
11
36
-2 18
-1
-4 0 -1 27 1
26
-4
2
76
28 -3 2
3
-19 57
1
24
1
130
-1 00
-82
-50 -2 35 -13 -97
50
-62
-116
0 -16
21
-4 79
12
13 -259
-3 52
-2 -32 8
-43
8
-28 9
-18 -108 1
-2 3 7 16 18
16 7 19
99
-7 3
-248
-255
-9 8
16 9
-8 1 -81 21
-3 48
-287
-3 66 27 9 -32 5
-23 7 27 8
-23 7
12 0
121
9
44 29
44 44
214
19
-1
99
91
35
98
11 3
2
-4 50
-1 31 37
64 -2 -264
7
15 1
38 10 9
10 9
-17
14 5
42
44
29
6
8
44
45
14
214
29
81
93
30
-5
-37 81
93
29
1
50
9
2
5
-3 8
-1
-7
11 1
Bandwidths = 100./mm
78
68
2
-1
29
74
-2
-3 32
3
-34 15 2 -34
78
74
-1 1
-1 1
17
30
-30
-1 36
-7
19 0
20 4
11 2
5
1
-3 6
4 -1
14 0
89
4 14 21 9
-1 0
19 0
23 103
-116
36 43
10
7
7
1
3
111
74
3
7
89
10
-3
-1
77
21
53
19
43
29
4 11
-9
8
1
88
14
15
68
-34
67
-6
10
68
3
26
4 24 3
3
-1 5 61 -1
20 4
93
-102 14 3
64
1
84
9
-1 4
19
1 38
12
1 -14
11 6
3
35
25
-3
-2 4
-1
-1
6
1
-4 1
34
4
-2
3
-14
29
99
9
29 -2
116
66 9
43
47
-1
-1
-7
83
25
39
5
29
-1
44
1
-31
24
2 35
12
-4
4
1
10 7
-3
4
29
38 -1
-3
3
5
14
15
43
-9
-2
5
77
5
32
-9
79
-5
11
63
47
1
60
6
-10
68
78
-1
-1 3
74
93
13
87 -1
Differ: 2-1
6 -2
6
-1
8
-1
-1
24
-35
9
21
10
-6
1
13
-26
85
1
-24
3
-33 -2
29 8
5
0
10
13
-3
44
5
31
4
-1
1
-3
88
-3
7 114
1
10
4
-10
-3
0 19
14
59
-8
-10
8 -33
1 -1
4
16 9
2
-3
5
5
-5
7
1
1
29
25
43
68
0
14
11
3
12
1
1
5
1 -1
-1
107
2
122
-3
-3
5
106
68
-2
9
159
-9
66 56
9
5
38
-2
-1
3
40
-1
40
6 3
9
-9
25
7
79
8
+ Demand flo - Demand flo
45
1
80
83
71
1
-2
-1
3
-1 -1
75
30
45
4
59
2
42
39
-3
2
-5
-9
12
-9
38
13 5 20
159
21 18
9
20
3 -1
5
6
-2
-7 19 8
44
20
45
9
-1
-11
-16
42
-5 7
3
69
66 3
51
36
11 2
12 6
119
717
-1
242
27
123
1
24
-6
12 3
2 -3
2
7
24
4 21
93
-74
-3 -1
-3
43
2
44
Link Annot:
3
2
-1
52
13
42
36
24
18
-74
15
9
2
-10
-74
26
9
13
25
25
84
12 3
16
4
-30
5
9
-4
21
30
12
9
9
-1
-5
13
99
28
214
40
96
73
Scale 14449
-7
-6
4
1 -1
58
22 25
-8 1
-5
-2 -8
28
23
16 0
63
-1
-4 7 59 -1
-43
22 0
1
1139
-13
-5
-1 5
42 24
61
8
-4 7 37
-3
2
0
24
-6 9 -1 19
12
73 0 -3
96
-159
11
12 -8 2
43
1
22
-2
-5
-9
-1
-9
3
1
7
22
22
-1 7
16
-16
11
2
-1 70
-1 4
-1 51
17
39
39
14 -2 50
-2
2
-2
13
-9
25
-3
39
51
1
-2
96
17
30
05
12
2
40
96 14 0
-7 -1
2
11
1
-1 50
-5
-7 6
-1
-2 32
10 9
97
-7
-3
7
50 95
28
1 -23
36
96
2
41 -3
94
-3
5
7 -9
3 33
1
-1
3
4
-5
-107
67
2 -3
6
23
-1
29
-1
192
43
18
21
-1
-1
-2 14
185
-18
-5 1
-22 3 30
1
212
-1
-9
-1
32
-1
2
454
-4 -46
175
152
28
13 27
-30 -3 17 5
22
3 -1
-2
27
15 0
-3 39
06
11
9
-1
-51 10
1
-1
-2
8
16 2 2
48
-218
-183
-1 0 96
-148
96
-1 84
1
14
39
-44 8
-9 2
1
39
-138
-8 9
1_fin21_CRL_ Basecase.ufs L_Scenario6A
-6
131
44
-9
8
25
76
-1
-13
13
13
-71
11
48
-53
-54
25
8
-94
-22
-112
112
-25
-6 -5
-8 9
3
24
4
5
-4 1
-1 4
-83
-8
-20
134 -8
-61
15 3
-5 4
3
-3 59
-4
47
-114 -83
-42
38
-220
-61
1
-30
11
9
-92
-6 9
1
-2
192
43
-56
-48 -5
127
1
24
21 9
-1 50
12
42
-6
214
29
1
-8
9 25
35
17
-8
44
9
17 -3
79
-4
50
8 78
1
80
92
17
36
22
66
1
-28
7
6
17
22
21
16
34 -9
36
39 25
87
5
23
-2
194
15 8
21
9
-4
-32
-30
5
11
32
35
29
18
-6
99
24
79
26
53
92
-2 2
-1
-4 8
17
9
80
21
9
53
-5
87
17
6
79
29
22
12
21
2
5
-2
-2 8
3
9
53
-22
-5
9
1
3
35
-6
44
1
43
29
25
-48
66
34
44
44
-1
5
116
5
-1
52
-15
17
-9
44
-9
12
-2
187
15
3
-1
9
11 -1
1
3
48
-1
-2
88
15
19
-32
20
31
-30
21
5
5
8
-5
-1
-2
Auckland CBD Model: 2021 IN Peak: Basecase 23-11-15
-2
-4
28
-32
108
-1
-1
29
28
-5
15
-7
7
-2
-2
18
8
1
9
20
-30
8 -1
-1
31
4
-138
-5 2
-4 7
-1
29
-138
-128
-144
-61
-453
-37
-4
-11
-22
171
-114
11
152
41 29
-44
-23
179
78
-1 18
154
31
-1119
-18
54
-101
189
154
69
0
-9 9
-3
1
8
26
14
189
-14 189 -14
20
54
-36
-1 3
5 11
4
-14 -102
26
41
-1
43
192
-118
29
-5 3
-14
4
43
-14
-34
29
19229
-86
-234
41
63
-79
-8 2
1 -3 7 -104
-74 355
1 3 -23-188 -14
-233
-234
11
44
-1
-1
30 4
69
186
-319
-14
-8 6
-1 27
34
244
1
-95
10 1
-1
-117
19 2
47
-8
43
7
-18
-14
217
-85
5
-37
120
-291
-30
4
-74
4
-94
45
4347
-7
51
-210
-9
14
-56
9
0
-41
-100
115 10 6
-44
-4
3
-3 9
-35
12
35
10 4
10
-93
-66 -157
21 7
-6
-2
39
52
3
-1
99 92
-147
320
-1 54
1
-1
36 2 42
-43
186
96
2 19
-27
-4 369
3
-29
4
17 2
51
96
-1 5
-1
5
125
17 0
33
2 43
29
1
-1 1
-5
-11
125
2
-27
-2 3
-1
-3
-19 8 2
15
17 192
32
11 -3 -4
62
-8
-13
5
5
-8
-1
2
33
41
Atkins Ltd / DVV / ITS
11
-1
28
1 17
-5
-1
-7
-6
8 17
SATURN
1
-1 4
6
7
-1
7 3
-7
-2
-1
23-11-15 AECOM AUSTRA
43
-4 6
-1
-8 53
-4 4
-2 0
-3
3
-4 8
-3
22 3
27
53
-20
-309
-3 7
2
-22
10 2
-4 2
47
39
-2
41
-1 24
54
222
28
12 12
3 22 2
-1
261
265
1 13 8
-3
-5
-2 7
-4
12 5 70
8
-1 0
78
54
-9
112
-2 0
-107
-6
90
-4
71
-3 4
-1 0
14 2
4
2 16 198
-5
134
40
21 3
142
94
13 9
112
14
2
42
-5
94
98
1 90
7
-2 84
198
63
24 9
40
93
2
-6 3
3
13 5
8
18
2
61
-22
13 44
-1
-5
46 -1
29
22
26 7
1
48
10 7
15 -7257 7
-2
-19
4
12
46
-2
3
-8
-4
90
26
1
-5
55
45
9
-4 7
3
13
10 7
9
59
26 7
11
3
57
-17
41
1
-3
33
75 125
-2 34
-4 5
101 52
25
25
71
-10
12 4
31
42
-1
-1
10
-8 2
-1 44
-2
-3
-1 16 16 0
130
-3
16 0
-1
2
10
-9 8
20 6 -1 0
2
-3 7 -3
7
164 1 130 16 1
16 1
284 1
-2 0
-2
7
91
-3 0 27 2
7
-2
293
-16
91
26
44
-20
31
-1 9
17
2
-37
-4
28
53
10
-50
71
-7 -6 20 -591
-9 3
-30
-45 -20 3
-36
-39 9
-24 5 -230
-1 13
8 20
-1 3
301 216
-37
1 22
385
-3 7
22 1
-3 7
221
221
51
-9
37 -1312 2 16 -136
-3
2 -25
-367
21 21
4
-1 0 -4 96
17 8
-43 5
30 1
-2
79
51
-7 2
38
-3
135 -4
-50
54
162
-68
-86
-124 102
15
46 144 61
19
94
-36 -99
-1 51 -1 23 -138
-6 50 -55 4 18 0
37 0
-1
45
94
-43 5
171 7
-3
-3
-3
58 -1 90
-5 0
-225 -2 39
77
13 1 -1 27
9 -9
56
41
6
-1 37 0
-1 5
-291 -2 28
-389
-3 56
-1 01
-2 02
18 0
-16
50
50 23 4
24 7
32 1 -1 5 -1
1
-1
0
-4 5
-3
-1 8
18 0 31 9
-2 7
16
-96
408
3 -6
61
7
2 9
9 13
-7
3
14
11
2 27
2
4
4
-3
44
25
4
53
11
55
20 6
22
-2 1
5
7
14
-4
2
-2
3 29
6 20
15
284 5
29
32
9
1
-28
2
0
31
-37
-7
221
2
-10
91
-6
108
2 16
3 10 8
-3 -2-2
2 16 2
7
38
54 -2
7
14
32
99
54
11 12
72
7
9
22
-8
25
7
33
7
42
-2 6
-6
9
5
26
5
-1 3
-7
9
-6
-11
-14
-7 -3
2 2
2
Auckland CBD Model: 2021 PM Peak: Basecase 23-11-15
2
28
13
28
-1
5
-12
5
-4
28
-4
18
10
14
-10
7
5
-7
-6 37
59
-27 -11 151
35
14
87
185
10
-3
15
30
74
5
9
-14
34 40
303
4
-7
5
-2
3
59
15
14
5
19
85
29 -2
97
130
15
-21
-2
105
6
7
20
22
99
23
12 40
59
11 0
48
9 -1
-30
11
3
6
30
72
8
3 19
10
10
4
-4 4
5 4
108
-2
-30
10
74
61
33
-110
-7
3 24 9
-3 -7 82
-6
31 9
10 11 8
137
-300
1 11
-1 6
4 33 1 -7 -3 6
6 32
4
14 6
-33
6
26
2 -1 39
85
3
34
87
-9
103
4 -1
28 4
164
7
8 10
10
74
49 -19
51
4
71
62
17
9
130
161
0
2
-3
-6
14
0 -3
-4
66
81
-2
37
9
43
8
-20
16
5
4 -3
50
161
9
31
61
5
9
-2
221
4 12
14
-1
2 31 1
-1
9
-20
5
90
51
-45
54
11 5
12
1 55
Bandwidths = 100./mm
14
-1 3 13
58
-4 7
-1
11 9
3 -1
65
-38
10 1
-50
14
1
Differ: 2-1
2
164
221
53
-85
2
-2
-118
16
-37
53
-43
-1 07
-2
7
1
-130
4
68
5
1
-1 5
56
8
68
-1 3 -4
5
2
2
-130
11
6
-2
22 29
101
-3
2
66
66
-1
-1
3
11
221
50
108 -1
+ Demand flo - Demand flo
3
-3
-2 2
-13
21
-1
4
-16 19 3
10
14
-1
8
-16
7
14 2 12 18
9
-9
9
7
0
19
2
7
33 18
19
8
2
9
7
181
-2
-110
56
193
33
97
97
2 -2
7
158 1
40
-8
-1
1
-2
16
2 11
158
7
212
84
-2
67
65
6
108
50
61
-7
78
39
49
17 2
22
1 56
-24
-4
1 16-2 2
1
0
3 21
17
-6
7 -3
-15
5 38
174
1
50
9 -1
41 10
1
5
5 -2
36
30
1
36
13
18
-5
2 11
8
80
-1
38
-1 12
2 14
-5
-9
-3
-4 21 5
6 10
11
107
93 15
97
10 2
15 2
1 10 7
99
-5
1
5
74
93
35
80
-9
144
1 1
35
3
-
-7
25
5
10 7
9
35
24
33
24
-2
38
126
3 -5
49
26
-5
99
8
4 16
0
9
9 3 13
6
94
-1
-20
-9 0
6
29
10
9
10 9
241
10
12
5
-1 1
25
20
-2
28
0
-6
60
-1
151
101 2
7 -5
10
41
45
-1 66
1 -3
21
10 8
-79 23
43
-50
-3036
20 5
17
-6
94
1
14 4
-2 2
62
34
-224
-4 5
95
-10
98
41
302
-7
4
76
3
-1 66 -1
-18
12
-3 49
0 -7
2
03 -1
16
0
1 17 3 32
7
2
37
14
-3 89
17 4
-11 3 3 12
72
-1
-1
-2
2
-4 4
-5 5
Link Annot:
11
23
9
155
32
Scale 14449
-3
9
302
10
90
-8
12
-44
29
38
20 -2 6 -1
-2
-195
4 10 8
-3 78
24 90
-25
6
-8 1
-212
164
0
10
1 17
-1 4
10
76
1 17
35
-38
-2
67
45
173
2 -105
8
72
-2
1
15
1
-4 5
1
3
495
-2
-117
-7
-104
16
80
34
-4 7
16
-7 2
9 29 0
64
-7 3
27
16
41 35
12 -34
-34
34
-1
-7
-1 2
-26
2
1
30 0
66
2
-9 13
13
12 -14
-26
44
-2 8
2
1
7 -11 -2
15
153
101
-
45
-4364
2
27
-1 2
-59
9 -9
35
-4
-7 9
4
-2 3
23 3
-8
7 25 -3 8 32 -19 -16 -1-2
292
51
46
46 8 -1
27
7
3
3
408
1
495
173
-2 41
32 39
-18
100
15
13
4
51 -2
21
6
7
28
3
29
23
11
-1 0
158
-4 -2
14
-4
24 6
68
2 18
92
24
136
131 86
12
361 18
7 24
-1
-309
-306
-8
6 -3-1
14 119
4
90
109
2
2
90 -3
-2 85
45
5
-1 79 11
89
-18 -2 11 9
29
76
4
-1
1
89
64
4
11 9
26
97
26
-3
24
8
-8
-9
-1
-82 -22
41
85
27
-2 87
-187
3
12
21
-177
4
14 9
135
46
0
10
-27
-218
-308
-4 13
47
27 -1
1
173
495
-218
-209
-4 7
29
4 -1
0 -4
40
-1
-308
38
149
-6 0
1
1 -4 -129
-1 1
27
1
34 -27
1_fpm21_CRL_ Basecase.ufs L_Scenario6A
-365
-183 12
-54
-235
-171
-1 4
16 1
-169
8
3
50 0
-32
187
-1 73
-169
78
78
-18
-160
0
13
-334 -407
1
-3
88
-224
-133
34
-3 6
-211
-2 0
-60
5
-1 32
52
39
-1
17 5 -62
-3
-110 134
1
-7
-778
-40
-15
-7
4
1 -5
13
2
-6 1
1
495
-4
-1
28
-10
-221 20 7
2 11
-7
-133
-74 -133
-167
-352
20 67 21
-74
-182
-13
-133 -74
-4
-1 79 61
0 38
117
-41
-485
-492
-299
21
-3
-190 -13
-41
47
73
300
40
-100
-184
-117
183
117
6
2
15
34
11 5
99
87 -3 3
-33
-26
-168
-33
-13 -368
21 1
50
47
33 125
-2 6 170
10
-106
54
-5 4
-59
-3 5
72
13 2
-1
-39
-11
146 -336
-204
-1 4
-47
-117
-211
-338 428
0
3
4
6
216
89
-338
55
-3 76
30
-44
-480
295 -15
184 18
-11 64 29
28
-180
182
173
37
-44
-200
-182
-471
495
-13
17 3
5 49
-48
-451 28 3
-15
55 71
98
5
-4
29 6
1
-1
49
668
-1 0
444
258
-3
-1 84
5 10 -52
26
24 6
-1 0
-2
1
-1 98
-1 337
-45
284
98 -298
-48
-42
82
-84
88 43
-1
-5 4
284
27
-1 5 -7
-7
26
32 4
-35
3 17
495
822
33
21 5 10
366
-51
Atkins Ltd / DVV / ITS
43 -128
140
79
7
54
-9 4
-169
53
324
-10-3 54
26
-1 3
220
16
1
-1 7
220
102
-43
173 53 18 2
-1 28
24
-2 0
36 6
-27
64 60
11
8
66
223
-8
18
36 6
-44
-40
-8
-2
10 52 0
-4
2
-9
53 -20
44
50
47
-8
36 6
SATURN
46
8
-4
-43
47 -4 7
14 29 -2
2
23-11-15 AECOM AUSTRA
-8 5
38
3
-7
-1 5
5
8
0
-2 4
7
-1 8
-7 8
-3 2
34
-2
39
-3 9
91
-3 2
8
-24
-15 37
22
-262
39
-3 -312 02
-416
58
8
13 8
-6 6
3
197 53
42
-57
6 -6 8
-1 6 8
78
5
170
54
175
-6 8
3
17 0
15
2
6
3
35
5
-4
11
11
-51
34
115
11 7
16
1
78
-1
-6
-6
1
29
-2
19 147 17 150
12 13
6
12
8
-15
11 5
-1 12
-4
1
1
2
12 9
14 51 5
93
20
13
-4
38
152
121
12 9
16 6
1 66
14
7
-4
42
96
29 51
1 22
66
7
44 2
94
1
85
6
-5
26
16
-5
9
-2
-2 1
40
8
36 6 -9
43
68
23
18
68
-3
-6
50
-3 2
30
41
1
1
2
21
-5
-1 2
64
64 -6 1 131
-1 9
68
28
8
25
1 42
1
-5
-27
51
2
24
6
11 0 -1
2
86 14
-3
-43
-4
-4
21
-26
-1
7
49
45
1
-116 12
68
5
129
51 145 74
74
15 9
5
-2 58
-1
1 -6 4
-2
-127
-15
-1
-1
2 43 21
13
12
-82 -3
-31 -28
-68
-223
30 10
-3 63
11 -254
-3 6
-9
-6
-34 8 -26
6
-15
-31 4
-31-142 2
-1 16 2 25 1
-3 -1 14
25 2 -1 2
-1 15
43
59
21
12
10 2
28 7 10 8
2
55 1 -2
-235
55
55
-1 42-1 59 27
-3 89
-35 9 45 1
-35 9
28 9
290
81
59 59 59
170
98 59
98
25
42
-1
62
2
41
115
1
5
-203
-2 92
-1 43
01
-2 -201
39
34
-2 45 1
-48 9
24 7
1
-2 5
59
-6
-68 71
22
15 8
7
20
-4 -1 85
-2 5
14 1 14 1
-24
6
16 0 6
-1 32
-4 9 -1
-1
24 9
-5 59
-1
-3
-1 74
-5 2
20 -4 75
-1 67
1 -1
87
-1
10 6
10 6
-4 9
36
-63
83 -1 32
4
4
4
4
8
5
-2 2
-296
9
-2 0
3 -7
16 0
52
-2
-34
26 53
78
-2 6
2
-65
56
38
38
21
15
20
37
21
-19
1
21
89
1
2
1
-7
-2
-4 7
43
7
-1
30
2
52
19
1
-2
42
-4
7
10
17
56
4
-9
59
47
32
3
-4
-1
9
-2
7
9
13
15
35
10
10
87
27
13
-54
-23
35
87
77
-6
46
-2
-3 7
-6 8
34
49
69
21
1
3
-1 8
18
42
-108
84
51
11
-1
38
-16
41
84
2
4
8
-1
-37
-9
-1 6
52
-34
52
7
-3
-1 -3
75
1
24
-1
38
0
-34
58
56
36
26
18
3
10 -71 -61
18
-1
2 9
8
1
170
22
93 -3
5
2
6 12
1
15
-106
8
59
-70
0 -4 69
1
1 4
-2
2
-106
22
22
56
Bandwidths = 100./mm
2
-9 -8
1
-7
112
88
-40
26
-1
-1
0
1 -4
1
7
55
55
0 -1
-3
-7 0 10
1
3
-76
116
52
93
29
-11
-7
81
1
8
41
8
8
0
54
11
41
20 7
79
48
120
-7
8
22
29
54
35
2
-5
116
28
-4
6 126
79
48
52
117
77
14
1
70
-11
11 0 -1
1
Differ: 2-1
1
3
-2
1 -2
-6 10
20
0
-1
+ Demand flo - Demand flo
7
63
-2
26
5
32
17
-2
0
59
-81
110
98
14
18
86
-4 8
-8
48
8
63
0
9 6 16 4
-4 4
9
6
10
-4
6
30
3
-6
-1 29
46
28
3
5 17
44
2
-6
14
16
43
-6
20
2
-9 22
1
-3 0
16 2
57
-66
14 8
28
22
19
86
20
3 30
26
-66
1
92
1
88
20
-66
29
12 84
1
-54
4 -4
130
Link Annot:
-10 139
-3 -3
-9
32
-1
230
32
-3
98
-12
94
97
-2 4 170
-25
1
-3 0
-1 4
-71
6
-35
8 -7
17
-6
80
-7 29
-4
-6 15
-3 -1 6
-6 20
5
59
20
5
61
4 -4
20
59
-5
-2
-2
20 5
-19
6
8
31
-1 02 39
2
6
2
25
5
44
0
-7
5
6
-2
45
17
-3
-1 02
-25
-3
-46
-2 6
-2 50
6
-1 5
-2 75
85
-8
-2
97
-297
1
-2
3
10 -1 15
-5
-26
0
27
29
8
29 6
-1 51
-1 53
89
1
92
-2
5
-91 -3
4
-5
6
32
29
Scale 14449
-2
8
68
-3 4
1
8 12
4
-1
2 51
-9 6
-217
1
170
63
98
-4
11
1
8 12
19
66
36
-4 26
-12
66 -4
18
13
-67
-8
3
32
-5
61
18
40
-5
-5
6
49
1
-1 09
1
-1
9
1
3
-38 -6 1-5
68
15
-1 39
2
1
18
-1 5
21
71
33 12
-6 0
-13
83
-13
-11
4
95 -2
-3
26 -1
-2
88
-6
-1
2
5
90
34
23
-10
6
-1
-288 90
-1
2
-4
-1 -13
23
-6
55
1
-14
10
166
98
24
-2
4 -1
-248 -297
1
9
-30
-8
4 -6 3
18 8
2
-2 7
-5
-172 3
-8
6
-54 19
3
104
178
6
12
6
14 -1
-2 11
-1
-3
0 -1
1
-69
-83
-36
182
1
94 8
1
-15
-7
-1-1 2
175
0
-2
9
-2 15
-7
-5
-1
8
46
121
17 5
96
2
17
33
-11 2
17 0
-37
10
35
-10
14
1
-18
-14
14
-21 7
4
0 -1
49
-26
-49
-5
-2 31
22
2
9
-4 6
-2
-124
-5
1
13
00
5
7
-8
9
-1 7
6
26
7
-103
-50
-2 45
-1
23
2
-2
166
98
0
-133
-59
-2
13
-93
-133
-121
-2
-7
-19
12
-81
-6 -100
-200
1
1_fam21_CRL_ Basecase.ufs Scenario6A_S
-7 0
-148
-22
49
50
23
1
170
3
98
33
9
40
17
38
-1 0
20
-47
21
12 41
16
61
49 40
1
58
8
16
13
-2 7
40
-1 6
11
15
14
7 48
-4
89
98 16
-9
15
7
33
1
1 11
1 7
34
59
3
13
4 19
33
1
15
-9
50
1
23
18
-7
-1
12
-6
-1 -9
40
22
48
7
-27
17
48
19
4
60
37
52
-4 7
-1 7
40
12
16
1
22
20
-27
1
34
41 24
65
21
87
24
3
4
-36
34
53
27
60
5
38
28
48
7
15
43
11
25
48
43
49
1 -1
23
58
23
21 11
63
1
7
4
60
-9
8
7
31
11
5
1
-14
2
3
88
65
2
8
23
4
-36
63
16
18
23
4
19
5
4 4
28
4
Auckland CBD Model: 2021 AM Peak: Basecase 25-11-15
-2
-15
-36
-16
5
5 16
16
3
3
65
-11
-1
97
70
2
9
19
29
2
-3 -15
18
1
24
16
0 -2
-5
-200
-4
-163 -82
-156
-61
-5
18 1
1
-80
-9
-2 33
-1
-12
-1
8 -1
-133
-163
46
46
-6
1
-408
-40
-25
-11 4
1
0
-1 98
23
-18
-2 0
118
-50
12
14
2
-2 7
1
70
1
58
33
-7
-20
20 3
-18
-2
0
1
-1
166
98
-8 82
217 -56
140
-212
20
66
12
-2 14
98
97 -11
-11 97
20
2 85
12
5
-11
1
-153 -77 -181
144
-77-153
-240
-270
20 9
-2
-28
302 -25
-77 -256 3 -15
-153
-5
-1
-70
91
-2 6
-112
-20
-1
-1 56
11 1
223
-186
183
-357
-77
92
1 43 7
9
11 0
43
-50
-47
-74
144
240
-204
-3
2
32
98
-2 07
-224
-20
-78 -144
82
98 -6
0 -2
-40
82
50
97
-55
-3
2
32
20
10 6
64
-77
66
181
-183
-3
30
-164
-20
-124
6
-133
-259
-9
22 8
16 6
62 -162
6 -95 31
27
-31
20
3
-13
-110
21
-6 98
-1
2
-4
06 -206
-35
-2
17 0
-2 92
413 41
-6
-16 8 -16
-50
222 32
45
98
402 -5 0
1
-2
237
-4 3 91
8 -2
93
6 16
-1
141
-8
-39
10
15 50 22 5
2
-144
9
-3 2
20 1
222
34
-3
29
8 98
39
43
13 2
-2 5
-1 5
188
-2
-26
188
106
53
-16 8
8
1
2
166 -19 7 8
23
-15
10
-7 0
-1 09
42
37
11
91
2
-41
9
-16
8
-8
Atkins Ltd / DVV / ITS
39
-3 2
-70
23
11
39
7
-3
42
-70
37
-18
36
7
1
-78
42
2
1
SATURN
85
-3
-1
2
7
1
7 1
1 1
25-11-15 AECOM AUSTRA
-2
-1
1
-3
7
8
21 2 -5
-1
2
4
-1
-7
7
-2
-1 -7 1
-7
-1
7
-3
14 9
-22
2
1
-7
-5
-2
8 21
SATURN
1
-1 4
5
7
-1
7 3
-7
-2
149
1 8
-206
59
36
1
25
-6
38
72
-13
31
69
8
-8
10 2
6
83
31
-4 9
1
2
3 83
146
5
146
11 3
1
88
-3 5
43
19 -1
-2
45
20
1
12 8
-2
6
13 2
2
4
54
176
4
4
78
13
-9
65
98
-21
182
24
134
4
21 8
82
-2
1
26
20 176
1
17518
-1
-5
25
-1 1
-1020 9
2
44
-1
152
5 101 15 2
10 2
3
15 2
9
19 7
-2 1
70
8
10 8
21
24
-5
33
85
13
-1
-1
60
-1 7
-1 3
66
39
82
1
1
-2
-4
-7
20
1
40
33
-13
19
-5
20
42
33
92
13
21
84
-1 8
25
60
91
-8
-1
-2
8
156 84
5
25
75
-2 2
49
71
32
4
22
-3 1
1
79 -15
-87
-1
34
6
-6 -91
55
-55
-101
-49
57 67
-248
10
42
-2 19
-1
-4 0 -1 28
21
-1
-4 48
71
42
-1
-1 2
91
97
71
110
91
-5 -3
4
11 7
-1
29
-3
27
2
13 2
32
-18
-7 5
19 2
3 -15
24
15
-300
-3 43
-2 -31 3
-37
8
-31 6
-20 -108 8
-2 6 7 19 15
19 6 -1
1
2
92
2 92
132
76
34 -3 2
14
-7 5
-1 00 -8 2
-82
-50 -2 29
30
52
3
-7 9 -75 25
15
40 -3 75
33 5 -33 5 -25 3 -25 3
20 4
204 76
45 96
45 45
219
96
45
50
10 3
-158
-248
-256
-4 52
-1 02 44
1
-2 37 -237
10
19 0
-3 59
-4 66
19 1
19 1
-17
15 6
33 5
7
1
-3 07
2 -31 14 7 -31
12 3
12 0
-1 1
-1 1
17
30
-13
-1 08
-6
18 4
21 4
11 2
97
1
7
-5 0
4 -1
14 2
76
5 14 20 9
-1 0
18 4
23 96
-116
43 45
48
-2
45
11 5
4 -4
96
1
-5
90
3
-1
11 4
34
12
5
96
82
3
3
114
82
10
7
-1
-3
90
26
88
43
58
42
91
14
40
82
-35
85
19
21 24 3
4
-2 2 5
58 -1
4
1
86
-102 14 3
70
4
20
1 23
-1 5
48
14
-4
14
4 4
40
4
3
219
29
1
11
48
34
-4
-2 2
-2
-1
-4 1
36
4
-2
4
66
177
26
29
92
8
54 -4
-15
89 8
42
42
96
-1
34
91
-15
6
45
-1
24
17 7
-15
-1
5
79
-5
36
45
16 77
9 -1 63
1
35
86
7 11
7
87
-6
91
-36
-7
7
8
5
5
-42
219
45 96
-1
44
-1
86
19
-1 3
-4 2
-2
1
40
8
-33
-2
91 -1
-1
1
87
-3
65
22
Bandwidths = 100./mm
2 -4
0
-1
2
13
1
-1 -1
6
-3
7
-37 -2 -39
-37
1 12 24
-1
4
-6
1
-41
26 7
-42
82
12
4 -1
-8
1
6
-5
-3
-37
1 12
-1
-1
-5 1
-41
-41
-8
4
1
91
17
96
45
38
110
3
1
61
11
2
125
-3
8
33
4
17 4
20
-3
1 -1
145
-39
62 123
8 117
3
-1 5
7 19
1
1
5
61
40
-1
-1
86
6
10
44
79
6
-5
-4
-8
-1
3
-1
2
-1
-3
Differ: 2-1
1
37
-3 2
22 9
22
4
12
52
86
3
-39
145
24 18
3
12
4
-3
-1
22
4 -1
2
5
5
-2
-6 40
45
20
50
40
65
37
14 2
14 1
-1 8
31
-14
32
1
13 9
+ Demand flo - Demand flo
45
-1
37
94
76
-8
250
-3
139
32
69
74
50
52
36
44
41
39
-2
2
11 4
93
-43
31
-39
28
23
9 21
32
21
-43
64 3
2
45
14 8
50
-10 -43
25
5
0
3
28
85
13 9
74
15
24 -32
2
9
13
3
67
-2
42
-6
-5
-2 9
82
-2 -1 -1
17 16 9
Link Annot:
2
1
-4
21
30
663 -1
36
96
69
Scale 14449
5
35
4
0 -1
51
21
5 10
-159
11
219
53
-7
-2 -8
-2 5
29
-1
-4 9
22 1 22
27
-1
-7 9
-4
-2
63
76
-1
-1
-5
-5
36
73
10
-4 9 59 -1
-37
12
7
6 34
2
9
6
33 36
18
-6 4 -1 20
5
8
-1 54 -1 7
-6
18
20
15
15 5
-17
6
2
-1 52
-1 7
23
-1
24
-1 29
-2 48
5 -3
24
8 34
-5 13
-2
2
-1
42
1
-2 2
39 -2
48 90
24
-5
2
89
3
25
1
-3
2
11
1 -2
3
3
4
4
55
2
1
-2
90
-4
24
4
-2 38
-3 9
2
1
25
15
27
10
-5
9 -1
-3
11
16
-17
-5 3
-23
43
96
17
37 98
60
-1
-4
-1
191
53
36
93
-3
4
38
54
-1
93
13 9
-1
33
8
-3 35
-3
14
7 -5
22
-6
25 08
-1 88
10 8 -7
141
61
90 -2
28
89
-92
6 -6
-1
11
5
-7
203
2 -1
99 4
-156 5
-1
67 3 30
1
216
-2 9
99
-219
-186
10
29
18 5
-26
-5 -68
162
33
29
67
26
11 2
-138
-6
-4
-5
-1
-74
1
41
-56
-55
-30 -3 16 2
13 6
-7
5
6
1 1
1
-12
12
12
9
-5
45
16 9
-9 2
-89
-21
-112
112
-21
-27
-55
-52
-1 85
-1
3
23 -40
-45 -5
-75
8
1_fin21_CRL_ Basecase.ufs Scenario6A_S
-1
141
31
1
0
-134
25
75
8
14 6
-8 5
-2
191
53
-134
-120
25
52
12
1
-8
8 26
2
48
17
49
5
9
-4
53
4
94
-1
1
11
-3
-8
54
-21
89
1
10
48
73
96
49
46
-44
34
-2
36
45
-1 0
49
11
177
5
-1
54
-16
72
-8
49
-7
81
14 0
9
54
-8
10
92
36
69
96
17
95
94
31
8
12
1
21
-2 7
2
-1
-2
31
21
0 14
-3
-4 4
7
62
21
34
3
-1 4
96
36
7
82 12
17
92
8
-27
68
94
-2 1
71
95
-4
89
68
55
10
-8
31
84
17
39 23
92
77 271
-2
-6
18 4
23
19
-29
279
14
61
5 7
-2
-2
Auckland CBD Model: 2021 IN Peak: Basecase 25-11-15
-1
-19
9
19 20
4
5
-3
-4
-29
-32
-1
1
22
24
-19
9
-4
5
-6
27
8
80
1
6
21 102
22
3
18
14 -1
83
1
-6
88
-4
-3
21
80
32
-32
2
74
4
-29
10
-13
-32
10
22
33
-4
-31
-49
-5 6
10
-4 1
-5
-81
-8
-20
-92
-6 4
1 3
-94 -81
146 -8
-48 -8 8
36
-3 56
135
-48
22 4
-1 45 -4 2
-197
-137
1
20
1
-467
-33
-44
-5 2
76
-1
25
25
33
171
11
7
169
40
149
-94
11 -11
-22
-2
179
-96
-1 13
-13
-1115
-18
67
209 11
1
21 4
8 14
4
22
149
75
7
-9 4
180
5
67
-3
120
-1
53
191
181
-14 180 -14
16
23
-5 6 39
-14 -108
22
24
-14
8
53
-14
40
69
234
-91
-235
-124
-2 1
4 -95
-68 355
2 -181 5 -23 -14
-235
-235
40
-31
-1
-64 -1 3
-70
-1 28
34
30
-98
-2
231
11
41 -3 4
16
1
-31
56
10 1
184
-324
-14
-9 1
75
-15
-117
-8
19 1
-2
53 48
8
5
-34
119
-296
-14
21
-94
-23
-41
-50
1
-97
117 10 5
7
9
41
5348
-8 0 -80
14
4
-3 9
-30
11
35
10 2
11 -211
-8
-95
-45 -142
23 1
3
-2
52
3
-2
99 92
38
-1 54
1
-1
-136
317
367
36 1 42
-43
186
101
1 19
-32
4
-27
5
17 1
56
101
-21
-1 4
-1
5
127
16 9
30
2 53
27
1
-1 3
-5
-11
127
2
-32
-2 3
-1
-3
-19 8 2
26
11 9
-4 -5
21 191
Atkins Ltd / DVV / ITS
53
-9
-13
5
5
-2
2
31
26
-7
67
-1
27
21
-1
25-11-15 AECOM AUSTRA
-2 5
1
6 0
-3
-1 41
2
-3 9
-3
-1 3
4
-2 6
52
0
-15
-13
3
18 7
-39
-13
-1 0
26
18 2
-297
58
-20
10 2
-1
-4 7
-1 2
54
-2
41
-7 2
8
162
53
-4
-1 24
8
211
37
8
3 21 1
-1
-2 5
-3
218
221
-3
-3
98
9
37
120
-9
-115
-52
60
-3 3 5 14
-2 7
139
20
80
10 3
174
8
16 8
16 7
174
8
-1 01
16
-8 6
60
8
16
26
-3
3 53 30
15
24 6
11 -9 230 1
21
13
-27
6
10 40
-59
8
47
-5
27
90
23
53
60
48
-1
3
-8
-1
-2
10 4 70
-5
103 75
-5 -1 5
10 3
5 -9 103
95
12 -5
-1 4
42
-13
-3
-3 9
16
39
-2
44
8
61
-1 5
39
89 88 39
15
15
57
16
11 1
-3 9
53
10
-174
3
24 6
4
6
30
-16
-1
46
1
-6 1 71
10 -61 10
273
4
142
2
2
3
-2
6
-3
-12
2
-7
-15
67
-12
24
98
-4
3
13
9
1
-36
3 27
277 10
-1
8
-4 6
29
127
2
-55
71
-6
1
98
24
-2
2
0 24
24
-1
13
98
98
-2 -2-2
-58
71
-15
-3 3
-1
-7 6
0 24
-3
68
2 -1
-4
-1 6
1
-12
44
-3 5
-72 -90
132 -46
-4
29
36
70
44 44
74 10 5 1
11 7 -6
-1
13
-1 07
24
-1 25
118
-12
24
35
28 26
-1 8
-8 -7 09
18
18
44
11 2
-10
-1 15
24
1
11
-1 02
31 6 -1 1
1
-1 2 -1
2
142 -1 118 23
23
-9
-43 0
-22
-1
-24 4
-278
-2 71
6 31
-1 0
215 131
-12
7 12
381
-12
12 7
-1 2
127
127 277 1
-1
-140
-54
15 16
-5 40
-31
-50 -11 7
51 8
-36 7
-1 13
21 5
-1
75
-12
65
10 -46
99
-3
8 -389
-24
-42
-1 0
-54
-629
51 8
-36 7
175 6 -2
-2
-1
-124 102
16
-1312 8 31
-1 07
57 8
-4
2
62 9
77 45 1
-9 1
-1 88
-1 2
23 4
-1 3 23 4
-48 0
-2
16
28
-1 90
-5 0
-225 -2 33 46
10 9
-1 15
7
66
66
17 7
-1 3
-5 68
-1 6
57 8
23 2
-2 0
-37
25 0
2
-9
-291 -2 28
-389
4
54
-5 2 7
7
183
5 -3
7
6
-2
-2 7
8
-1 8
5
2
10
68
34
6
-119
7
-288
-4 30 7
7
22 5 4
28 5
-7
51 9
23 2
-47
-58
-120
-8 8
36
14
2
51
3
7
87
-1
29
-9
27 7
-8
-1 5
33
23
8
91
13
78
-1 7
4
-4
1
1
13
38
24 78
1
-1
4
-17
-4
26
-4 4
-15
28
10
62
91
35 18
4 -1
78
13
118
1
8
39 13
16 35
14
24
23
35
49
1 -4
-76
-15
-46
6
-13
86
33
40
20
3
86
15
2
67
41
23
8
8
21
-5 3
16
83
-1
15
-17
27 35
-1 1
-6
22
-5
2
87
38
-5
26
-4
15
71
-42
28
2
2
-1
-1
1
-3
21
13
1
41
1
76
70
1
34
12 1
4
Bandwidths = 100./mm
-27
-8
-7
-1
-33
-9
-5
-1
-8
11
-1 16
92
10
8
41
118
9
-5
1
Differ: 2-1
5
11 -8
1
127
-2
24
23
3 -1
4
15
-8
71
2 -8
-8
11
-12
11
-34
1
+ Demand flo - Demand flo
55
14
2
8 14
-1 9
4
41
23
-38
65
9
-2
-59
-50
41
-64
-35
-2
90
-1
3 -1
3
-68
-24
1
9
-1 4 -3
5
-6
21
-1 5
14
-39
3 -2
-2
13
69
-3
142
127
31
27
-3
8 26
9
-2
85
-1
-3
-5
31
29 13
9
-39
-13 10
16 7
9
1
-12
-13
-7
-5
-2
-68
127
29
36
-
-7
-7
29
65
-1 3
35
54
60
8
-1
8
-10
35
13
28
30
0
65
-1
12
-24
35
-7
8 16
1 71
-13
31
11
-62
18
1
6
11 3 -1
13 1
25
90 -3
70
-1
11
1
3
75
65 54
60
16
19
0
10
0
51
75
36
29
34
-4 7
-8
90
15 9
14
4
2 -3
11
31
32
8
54 10 9
20
2 -1
-4
1 38
45
-1
-5
90
-1
25
7
3 10
41
-1 08
0
6 19 6
25
-1 08
-3
30
-5
-1
83
41
1
297
32
10 2
-7 4
9
9
-1 19
-5
31 64
12 9
32
97
12
33
8
-1 2
73
-1
46
-7
97
3
24
-7
32
-7
13
-11
83
20
0
2 14
-1
1
-13
-7
19 47
6 16
25
350
27
38
9
13
109
13 1
-63
47
40
5
6
9 -1
-35
271
10 38
48
42
10
-7
71
-10
121
27
-1 78
30
-29
-3
-1
-51
5 -2
19
-211
95
-31 22
25 7
4
28
34 4
-9
32
3
72
5 -2
88
16
8
-1
-3
69
-11 3 3 11
119
2
14
5 -7
14
5 17 2 31
-7
-3
-1 7
-1 78 -1
-10
Link Annot:
11
-2
19
-2 7
-3 72
13 -1
-9
2
3
-5 1
-249
88
0 13
81
25
49
-3 71 21
27
27
58
-195
13
-1
142
487
93
-2
-3
81
271
-36
3
36
-9
-2
73
-3 36
16 -2
-2
-61
34
-10
36
-3 26
86
-1 6
1
-60 -8 5
Scale 14449
26
15
80
-55
4
12
9
27
8
3 -9
13 -2 2 -2
-2
9 8 -1
9 12
2
-1
-1
14
26
-61
-34
-18
-6 9
18 0 -1
-4 5
18
13
14 -26
-26
26
53
53 8 -1
25
1
53
-13
245
-1 3
-16
31
15
19
38
13
23
2
8
-17
60
-17
46
21
11
-5
-9 8 2
11 9
-4466
31
10
-9 6
1
184
-4 0
-53
-6 2
69
3
27
-1
140
487
-2
-2
12 8
9
-6
-1 32 -3
-53
-3
2
2
3
2
-1
11
1
119
7
25
3
26
32
54
2 18
84
-1 2
16 8 -1
13
-2 08
221
20
144
89
40
2 -2-1
22 145
-1
-1
55-3 2
55 -1
-18 -2 14 4
6 21
-81
14 1
62
3
-244
-275
-5
23 6
1
1
-1
5
51
-1
20
20
-167
3
66
70
35
1
122
11 7
-2 87
30
1
-316 -4 32
14 7
24
1_fpm21_CRL_ Basecase.ufs Scenario6A_S
-5 7
50
-35 3
17
-1
3
17
-81
-24
5
-8 7
9
-1 27
146
27
-7
-1
1
5
51
-2 64
-155
5
5
7
-121
5
-153
20
-20
-176
-153
-132
12
22
-50
-137
1 -4 -150
-1 1
-316
20
15 5
-2 37
585
20 -7
-1
140
487
-184
-397
29
-1 9
-159
-190
2
2 -2
4
-6
Auckland CBD Model: 2021 PM Peak: Basecase 25-11-15
-39
-15
-1
15
6
-16
24
-3
25
25
-16
11
-1
-42
-21
2 15
54
15
-19
-5
23 -3
38
16
71
-12 112
-5
-2
-19
21
-14
-9
7
-144
86
-30
-18
20
26 2 -1 77
-665
7
-122
20 5
88 -3
4 -7
1 3 -7
51
-275
-7
-9
-60
5
-190
86
-175
-1 4
-9 9 -99
-243
-1
-1
1
11
-300 -446
1
-7
12
-5 3
-2 4
-7
-108
14 -98 8
-276
-275
-74
24 7
155
-108
-185
65
4
2
-470 -454
2
2
-74
-7
-6
487
-1
140
-13 -74
-6
-7 75
-2 05
56
1
-175
21
-13
-4 73
-15
27
6 -3 92
147
2019
27
33
436 -549
-513 -455
-17
-324
-1 4
-85
-13
-1 7
7
285 -177
-147
176
9 -30 -178
-311
2
40
11 4 47
-130
76
-25
-157
120
5
-309
-311
-4
4
-14
-204
-67
-147
147
-454
327
-15
14
11 8
72
-7 6
25 111
162
7 -24
-8 2
51
51
-104
175
-172
49
487
37
-30
-425 31 5
-15
14 0
7 48
-13
23
7
-5
-1
48
2
14
-1
665
53
32 7
17
-17 27 63
1
-78
-11
-7
174
6-52
27 28
66
-1 23
-1 337
-35
-2 5
-7 358
83 -283
164
-103
-2
12 -202
407
-12 4
-1 84
156
-64
358
49
-5 3
-17
77 43 -1
-1
818
252
Atkins Ltd / DVV / ITS
4 -76
116
-1 2 -6
-7
0 14
487
-40
-9
-76 24 0
7
76
-275
41
27 8
12
-82
-7
20 5
321 -5 3
55
6
25
53
-8 9
207
278
-1 04
-3 2
207
99
140 41 14 9 -1
10
12
-3 2
-43
32 1
-12-46 0
1
-84
24
29
-71
29
-1
7
-7 6 52
11
-1 0
-32
70
187
41
32 1
-1
143
-5
7
29
1
-1
32
13 41
-32
SATURN
25
54
3 -5
52 -5 2
12 13 -6
1 1
25-11-15 AECOM AUSTRA
-9 3
4
4 8
93
0
-1
-50
-21
8
60
-3 -321 02
15
7
30
10
205 54
153
70
-2
15 4
70 -1
4
-5
18 132
1
1
3
99
9
11
6
29
53
5
1
-5 -3
-2
1
3
83
-3
2
2
64
22
-1
118
85 85
1 37 -14
-1
78
34
2 17
37 -14
80
48 -1 5
-4 8
1
-1 -1
28
-2
-1 2
30
7
-2 6
31 3
63 57
30
24 7
19
11
-11 3 55
-1 4
37
-3
22
11
30
14
23
8
-1 9
-1
-5
-1
2
-19
27
-1 1
8 81
51
93
34
81 81
63 64
-1 9
23
-1
-5 4
2
-7
6
-1 -1 6 13 -6 -11 3
4
19 129
87 -37
36
101 33 94
105
13 1
-1
10 9
55 57
9 7
60
-1 23
2
186
70 42
60
31
24 -5
41
37
-7
-1 8
42
-5 3
-40
14 1
53
-1 0
49
-18
-1 8
-5
45
45 -11
9
2
3
-56
-2
13 2
-3
7
-3
1
-2
7 93
44
1
3
-1
49
3
49
42 70
103
3
-41
3
49
-1
-2
79
2
-1
-2
3
42
82
-1
39
105
-39
2
88
-10
-18
-10
7
75
88
45
49
78
1
2
17
-2
-4
-40
-1 5
58
2
-1
-5
46
5
21
1
0
51
6
10
-40
42
-3
4 28
-4 5
-1
47
110
1
-4
13
50
184
23
4
10 8 -13
-56
2 -25
67 98
10 1
42
-5
-4
-10
7
-22
-12 -788
-1 16
1
-1 0 -1 38
24 7 6
2 2
42
20
21 7
-1
10 2
1
21 -2
-216
43
98 -1 11 -96
-82
-1 43 7 24 -1 -6
-3
286 126
-17
-1 41
58
-1
43
14 -1 74
12
-55
-131
-59 4 24 8 -47 3 24 8
-47 3
28 4
-6
-1
11 2
54
-1 06
10 1
26 2
6
-8
-12
11 6 -12
-158
37
78
-2 40
-1
26 3
-1
-6 77
-6
-5
40
-21
17 -1 23
-4 4
74
30 13
5
1
6
1
8
11
16
19
-2 48
11 2
-2 5
30
-3 7
-9
-42
76
12 3
-1 -1
-5
7
5
13
15
9
2
3
89
-8
95
23
9
-33
76
30
-1
-9
-1
-4 4
89
39
4 10
16
33
7
-42
-2
27
26
4
-1
33
-3 1
2
41
31
2
5 -1
11
105
44
-32
-4
-4 1
-1
4
3
-1
10
1
6
0
3
-1
2
13
19
1
188
42
1
34
76
72
5
18
1 4
7
-40 11 -29
-11
-1
-1
-9
2
-1
-12
59
1
-40
Bandwidths = 100./mm
4
2
-7
1 -9
-4
-1
-1
-100
-1
-12
-12
Differ: 2-1
-1 -1
1
-113
77
62
-1 2
29
82
-6 14
-1
4
5
-7
-113
42
59
111
-1
-1
0 -2
50
50
-64
4 -1
29
-5
-5
2 -1
-2 68
0
-5
36
72
4 10
-34
3 18
5
6
-90
-4
-5
78
38
29
-8
39
-11
84
-2
3 -5
-10
2
37
-1 1
40
5 -2
-3 75
31 -2
-7
2
2 30
3
25
80
-7
29
64
20
33
83
1
36
25
31
59
111
30
11
5
-1
96
1
-5
-1
8
22
-7
68
-2
-2
-7
50 31
+ Demand flo - Demand flo
4
-7
67
75
-1
19
78
-1
2
65
-84
70
77
17
9
-1
96
1 0
83
10
-1
6 10
10 -1
83
-1 14
10
67
31
1
63
-1
8
-9
45
-1
4
78
-1 32
40
-1
-4
4
-8
15
-8
83
3
8 8
15
31
22
-1
-1
-1
34
-7 8
-82
1
64
24
34
33
-82
62
71 1
65
16 1
1
Link Annot:
-9 -4 -4
69
11
-66
-7
7
-82
-1
-5
-6
-1
5 8
-1
7
6
-21
2 -3
45
5
-8
2
-8
76
77
-5
-1
320 -1
18
-5 22
2
-9 186
70
-34
26
55
48
31
100
-1
-41
5
-1
-9 -6
-45
22
-7
5
6
11
6
1
6
40
-1 0
-12
17-1 3
22 53 -1
-5
41
-48 2
-34
-1 31
8
3 -3
-52
-8
-1
29
-25
-3
18
-5
-5
6
-1 -1
-2 21
-1
-6
-2 -1
79
0
-2
-261
6 80
6
25
14 61
-7 1
38 -1
42
32
1
-52
-153
1
1
-7 2
-1 12
21 8
-2
36
-9 9 -1 18
-6
-3
-5
8 4
72
186
69
-7
-1
-4
83 -1
-1
7
10
77 -5
-2 5
83
20
-8 5
-1
21
-1
19
4
Scale 14449
-25
3
36
6
-8
18
14
-6
-4
17
-9
2
-1
12
44
3
52
-3
1
10
65
-26
-1
5 33
14
1
6
-21
12
75
18
-1 6
-1
-4 7
-8 3
5
-2 16 -1
-17
25
-1
-1
13
-6
11
6
5
-1-4
7
-1
-1
36
47
54
2 23 11
-19
-7
10
32
4
-2
18
-1
-1
1
-5
82
33
51
2
127
-9
-27
9
-2 6
-273
-266
1
14
1 -2
1
-1
178
69
6
-1
4 -1
-228
5
18 6
1 31
-1
188
1
80 -4
-1 -7 -2
6
-5
-146
0
8
51
17 1
26
-55 19
-1 76
-5
-2
4
-51
-2
-31 -1
17 1
-2
6
-18
-6
3
-97
1
-5
18
9 -8 5
171
11 1
1_fam21_CRL_ Basecase.ufs L_Scenario7A
-5
-2 9
-2 26
67
-12
22 1
-77
4
-19
-51
-61
-30
-2 40
-15
15
-55
14
-2
-1
-77
5
2
-72
-5
-23
-1 9
37
-6
7
5
-5
-30
-37
6
-9
-107
-80
-62
-34
-1
-1
-1
-9 2
10
1 2
-5
1 20
4
7
-3 -61 -18
92
-4
-3
-1 03
45
0
31
5
3
-42
-2
14 7
-68
-109
-18
-4
-121
-107
-52
-8
37
-1
-3
-7
178
69
-3
-9
-85
-426
-166
-84
-103
- 5 -1
1 -2
-1
-6
-45
24 -2 40
-2
-104
-56 21
77
-2
1
-2 25
-1 30 -3 01
15
-24
-3 3
58 -1 74
-203
-1 75
-68 -6 6
149 46
0 18 0 -8
38
-8 2
-84
40
-103
-107
-4 5
1 -1
-61
160
12
19
-12
6
37 4
-154
1
81 1
-8 4
-1
21 -2
7
1
40 -86
-18
167
3
-1
-21
-73 3
8
-131
43
3
-2 3 -1
-1 99
1
231
-416
2
5
12 7 20
-41
-186
-143
28
5
7
-79
6
-2 72
-18
-1
13
-86
-1 9
136
-29
7
-4
80
29
-266
-1
-1 3
-21
13
1
3
32
9
24
51
7
17 42
4
25
66
70 18 2 14
57
45
3
13
-4 2
3
-2 3
7
30
26
7
42
14 2
64
37
15
2
-1
59
30
-1
-1
51
-2 4
11
45
3
1
16
39
-1
64
34
-42
40 1
-1
-1
63
1 -2
88
42
-1
77
2 -1 41
8
58
-1
16
49
2
53
14
50
64
26
-3 5
24
30
8
50
-42
-1
7
-1
-1
9
-2
48 -3
-2
78
14
8 26 5
50
-35
3
5
75
-4
17
2
36
88
-7
-1
12
44
-3
1 21
66
13
13
-2
-1
17
4
-1 -9
23
188
44
70
-1
4
59
2
52
157
26
-9
-5
4
2
9
24
-2 2
20
10
-2
-1
3
7
-4
4
Auckland CBD Model: 2021 AM Peak: Basecase 23-11-15
-4
8
2
7
7
2
15
-1
25
-10
37
-6
4
-47
2
23
14
24
2
-9
78
-2
7
25
54
4
-1
27
6
4
-47
14
-1
12
18 41
229
11 5
-2
-1
61
20
-47
2
18
107
-1
136
-70 19 2
-1
8 -1
-21
-329
-185
-13 -170
8-1
101
-2 69
63 62 -11
-8
59
-10
-37
78
-1
-77 -182
1
-1
143
-1162
-8
8
-11
-1
-7
1 -2
-18
-272
-208 -192
-1
2 -27 -77 -248
-272
15
-129
-77
178
69
8 -1
-4
61
32
-30
221 -272
69
-18
184
-78
12 7
-77
-4
-63
-1 0
-9 9 -1
5
-1
-1
-124
-1
-7 -1 50
-444
7
-2 2
1
-107
-143
143
-59
12 5
9
257
-193
-4
69 70
-18
-291
-77
17 8
-107
-11
-1
07
23
9
27
6970
-1
12
49
29
-3
182
24 5
-25
-90
54
1
-9
-36
-7
-3
28 -113 9 24
20
-3 0
101
-3 2 55
32
-3
18 8
89 -289
-16
-15
-2
287
-90
-56
43
71
32
225
372
2
-1
236
1
-2
21
17
29 22 4
1
-1
7
125
-2
8 17
-37
-3 2
19 9
225
-2 92
67
-2
-8
-2 6
-2 2
-36 20
8 69
-4
187
8
-1
187
39
8
32
-1
-7
-37
-1
1
178 -22 19 1
-1
99
9
Atkins Ltd / DVV / ITS
-23
-17
32
107
-1 27
25
30
23
-1
-2 4
1
-48
20
8
-1
60
-5 0
32
11
-5 2
-1
32 19
-3
6
32
-24
-2
4
19
-1
-1
4
2
-80
25
3
SATURN
99
-5
-3
-1
32
-2 1
5
-2 4
19
-1
0
-8 0
-5
8 -2
-2
21
-2 1
2
11 11 1
-3
23-11-15 AECOM AUSTRA
-1
-1
-7 1
-3
8
3
1
-7
7
-2
10 7
1 -2 8
-75
77
39
37
-7 1
10 8
85
24
105
28
8 -4 9
61
59
15 0
8
-8
18 0
8
59
23
180
96
22
15 0
-3 2
-13
-35 67
5
-39
61
-1
-3
36201
102
-1
-2
-9
93
20
12 0
-3 0
-1
24
8
13 6
-1 26
2 113
-1
7
14 0
1 11 4
3
52
137
1
27
-1
4
71
14
-11
116
-1 141
17 4
21 2
-1 1
70
-3
14 9
-1 5
2
8
4
-1
102
-1
-1 5
1
2035 0
9
9
-2
27
-12 -1 2 -5
-3 5
38
9
40
14 -1 3
17
70
34
-2
63
6
-2 -1 0
30
31
-28
-6
31
11
30 8
3
21
39
73
28
51
-2 5
49
-1
-9
-26
24
38 -17
-5 6
11
25 30
22
-4
40
21
21
-1 2
67
-3
1
-1 4
40
-5 6 -1
1 -1
-1 9
-5
-2
42
-1
-2
7
-10
74 77
-1 2
77
66
-28
1
18
-8
-2 9
21
-5
16
-8 2
-82
-50 19
19
-17
-15-7 8 41 -161
8
-17 23
-2 26
9
21
-106
-1 04 -10 -2 0 -10 7 -56 -51
-9 4 -1
-2
-3 7 11
18 8 9
99
9 99 43
94
1
11 2 -9
7
15
1
-162
-119
-6 5
-4 07 1 -80
0
-4 -40 24
-3 46
-287
-3 71 16 9 -34 9 -28 1
16 9
-28 1
-2 6 8 18
-15
-2 -2
58
-2 46
-54
-246
87
67 -4
17
1
-38
36 8 -1
36
36
239
25 36 -1 8
-1
-1
14
-20
7
-1 7
43
80
36
-1
3
10
-18
1
29
59
25
-18
7
40
4 12
4
-2
-13
12
59
Bandwidths = 100./mm
-16
100
2
102
4
1
-1 00
-248
-1 58
-1
-1 07
11 2
-54
85
1
-4
16
40
2
12
93
5
-2 47
14 1
-1 41
74
-2 7
-4 1
-1 1
-1 1
-17
99
-36
20 3
4
-5
-1 18 4 -1
-8 4
17 6
14 1
-1 2
19
10 2 80
-122
18
29
3
6
-3 8
72 70
-106
45 21
77
7
-5
-1
4 -1
3
13
78 13 2
72
3
-1
7
127
40
3
95
8
4
-6
-1
9
16
93
-5
58
59
24
-5
88
-30
70 9
-8
36
-1
59
11
-1
100
12
-1
84
-5
4
4 21 12
49
-4
-9
3
5
-9
14
-9 -17
-3
41
10 6
-9
18
-5
-4
43
-3 8
-6
-4
43
6
-2
4
-6 37
239
-1
-1 3
7
-6
68
-6
-1
4 28
45
-5
30
97
-1
2
85
78
-1
57
9
3
69
96
5
85
8 -1
-5
9
22
7
8
-2
-1 9
2
-6
33
-1 0
8 -27 -4
-5
43
68
-13
45 3
-1
-9
8
1
43
-18
-49
-3
10
45
43
36
-1 1
45
106
9
-1
43
5
12
81
36
70
-10
33
-1
-6
6
-1 1
9
-19
-7
6
38
-5
-1
22
-2 7
-4 9
8
53
10
-1
-1
99
2
96
44
11 24
85
46
13
20
69
97
-5
22
-1
70
33
8
56
14
-1
6
106
28
33
7
99
-1
6
21
-17
18
4
36
2
48
47
-5
97
14
-15
-29
1 95
26
-1
93
-1
Differ: 2-1
9
59
1
100 83
-1
-18
-2 -1
6
7
81
-4
46
2
-5
38
175
38 -4
1
29
1
-9
-10
-4
-1
-3
-4
-28
-3
2
-1
107
5
-1 -10
-9 -9
38
1
-1
17
-5
12
3
1
10
15 -1
1
-5
2
-2
44
-1
-5
83
-7
1
15
191
19 3
13
-4
10
42
-3
-28
-2
17
-11
-1
-3
-28
12
-2
30
3
-7
9 -2
25
4
83
75
-1
-4
28
-6
27
97 75
9
43
11
-2
2 -38
-1
9 14
-1 14
-4
1
11
8
14
49
9
10
-2 8
-3 8
-1
239
-18
-15
63
3
-26
1
-1
25
-15
-2
27
-8
36
-2
-20
16 5
-7
-1
10
28
-3
-1
-229
-6
-8
-2 29
26
-1 -1
-3
2
29
-20
-20
-49
70
5
-2
6
-18
-9
0
2 21
13
6
-4
-9
26
-12
23
71
0 -1
-1
80
-1
-1
5
-8
9
5
30
-9
-2
82
1
1
6 -7
1
-4
129
-21
41 35
2
14
27
-2
-1
129
-21
25
-13
-1
-2
18
-1
36
1
-7
10
-7
-4
76 7
8
1 -1
8
-2
-6
-2
49
13
-2
8
-9
-1
2
27
95
-2
-2 14
36
21
5 1
59
27
88
25
17
-1
-1
38 16 6
8
18 53
1
30
-7
68
-1
33
14
20
-8
12 3
+ Demand flo - Demand flo
33
-3
-7
14 12
28
49
-2
28
102
10 2
52
-1 9
52
29
32
2
10
33
1
27
27
3
3
139
-28
9 23
63
-40
-1
42
-1 8
1
4
23
-1 -2
1
47
-6
56
-40
22 -40
24
10 2
-17
-1
139 0
59
90
25
-38
-1
42
0 -2
36
58
3 -3
-38
96
27
-1
26
-1
-1
59
-3 -1
6
67
18
1 -6 24
Link Annot:
1
3
59
-2
37
-2 3
1
29
2
4
8
-2
1
-5
-2
-27
29 21
-3 5
9
7
1
12
99
-3 4
29
8
66
-3
-1 80
-1
-9
Scale 14449
-17
-1 8
42
9
-4
36 5
28
6
-3
-7
1 -101
3
-61
23
29
67 6 -3
82
-1 -1
11 1
-22
-1
-1
-4
1
-1 0
11
239
-1 15
-3 87
5
9 96
-1 7
7
15
-1 83
40
-6 1
-7
47
-4
-8
15 -1
17
12 7
36
-2
-1
31
-3
7
-3
16
-4
37
1 36
1
-3 -3
15
47
80
-7
5
15 21
-2
-101
-1 61
1
2
6
66
-2
9
98
82
-7 -3
-2
32 1
36
-1 74
9
73
4
4
14
11
-1
-1
-1 6
-1
107 108
-17
-27
45
80
2 16
45
10
-1
-2 49 -1 1
-1
31
213
1
59
14 82
4
1
207
-1 72
-22
-7 -132 -2 32
180
32
-2
-3
-3
-2
3 -4
5
-1
-1
-1 2
-1 -1
23
213
9
-192
-244
3 -1
37
11
4 51
1
-130
70 -3
-2-2 6
-1
-1
82
1
222
18 2
3
-3 29
-180
28
-1
-4
3
-214
90 38
90
19 2
-1
83
-51 -4
18 1
-5
50
-1 93
1 1 -4
1
-13
14
29
7
-6010
-2 5
171
-1 27
-107
-102
-17
102
-112
50
59
-25
59
10
182
19 5
13
38
19
-28
28
-72
8
78
81
-1
9
-37
-16
-9 6
-1
-1
19
5
-1 1
-61
-18
-4
1 2
-3 51
78
214 -10
-110
-59
-8 1
-4 3
-1
56
-245
1
-112
-48
3
-1
4
-126
-110 -1 34
1_fin21_CRL_ Basecase.ufs L_Scenario7A
28
-80
49
02
-1
213
31
-1
-2
-126
257 -7
-105 -80
-8
35
-127
-1
1
-105
2
0
-4 1
365
17
33
-4 9
-466
-94
-89
-33
-2 17 -2
-1
-22
3
-1
23
1
-1
-36
19
-5 0
-2 37
-27 23
-1
-1 6 -2 31
117
34
2 -15
7
153
117
3
-217
-1
5
55
-3 3
-1
34
255
28
6
1
34
-1
-1
-14 141
-14 142
10
37
-2 13
143
1
1
2
31
-1
-1
-14 -102
7 -141
5
122
213
-118
-1 4 -1
-14
-10
-3 0
-14
-2
-18
374
8 16 6
-14
55
243
-8
-180
90
-376
-1 30
249
14
-94
6
-1
1
-37
193 -375 -375
-14
-1
30
5
-101
-12
31
34
11
20
26 10
21
53
-19
-98
13
-43
-45
57
85
78
-214 -435
24
-6
-41
130
-7 2
-29
-126
128
-358
-13
-407
12 9
4
29
-2 86
-3
-1
-79
4
-94
54 43 -2
5
-118
21 3
51
-9
31
7
25
91
10 8
-14
8
-1
9
-59
28
0 -64 34
30
10 5
1
-44
-120
297
57
31 51
-5
177
-3
20 -320
-10
8
-4 0
2 3
96
86
39 -204
-1
-5
3 21
-8
34
15 5
105
-1 54
284
-4
105 -2
7
-18
20
-1 8
-12
2
119
57
-2
1
15 2
25
2 31
-5
-8
Atkins Ltd / DVV / ITS
137 -28
-1
2
119
-8
18
-7
-3
213 28 6 5
-2 0 -34
-2 3
-1
1
28
1
23
-1 5
-13
2
5
-8 2
25
107
-1
-7 3
2
5
1 23
258 03
2
-24
3
1
-7
-1
-7 3
-5
-1
5 23
81
3
7
-1 -7
73
-7
-1
2
-8
SATURN
1
-1 5
3 -5
-1
5
23
5
7
3
7 3
-7
-2
10
9
-1
-7
Auckland CBD Model: 2021 IN Peak: Basecase 23-11-15
23-11-15 AECOM AUSTRA
-8 5
52 3
-8 5
0
-4 6
-4
85
-9 5
-1
-157
38
-3 8
99
41
-7 2
97
15
-1 24
228
98
4
-6
15
14
22 8
-3
218
59
-2
-1
-3 3
-3 -4
12 1 55 28
119
221
1
-4
5
86
59
80
2
91
-9
-3 1
123
9
17
59
-1
91 101
-1 146
9
8
91
21 5
10 1
68
-49
32
-95
-1 3
-5 4
91
5
81 58
96 10 6 1
48
-1
8
81
1
-1
87
-9
14
1
17
52 7
-3 63
36 10
23 6
14 2 -7 84 4
-3
-44
29 29
37
58
- 26
-2
-41
1
-2
-15
-1 35
52
-2
56
-8
-3
-62 2
-6 9
10
2
4
-38
-3
77
10
40
-6 0
-4
74
26 -4
-2
-11
1
28
-1
-8 1
75
28 5
77
-1
-2
18 3
146
58
56
-1
8
28
-8
1
-39
2 -10
13 5
1
-1
-9
23 6
8
-1 5
17
29
-28
19
-4 3
-3
27
11 9
276
-1
8
-1 1 -6 7
98 5 13
-8 2
102 -16 102 11 9
155
4
1
-1
5
11
-1 8
18
1
-2
-44
16
119
-18
85
26 -43
273
-1
27 5
2
2
-2
97
8 29
-8
11 9
-1 -1
-1
57
-1 1
-1
-6
-1
-7
-1
3 27
6 17
275
8
47
42
-2
3
2
1
-2 8
-1
9 11
8 14
155
1
1
0
37
-48
-1
17
-18 97
-36
85
97
16
-1 7
3 97
3
37
8 -2
8 14
11
-2 -2
201
-3 1
26
85
57
-1 1
-1
29
-6
-3 3
37
5
15
97
-1
40
28
1
-40
1
-1 29 0 8
-6
-1
3
155
-48
29
25
170
18
22
21 9
14 9
59
29
-1 17
-9 4
81 57 37
51
-17
-7 7
-20
11 0
-82 -94
140 -57
-2
-12 -38
42
-19
37 36
36
37 -6
47
-21
60
-12 1
-148
-49
3
-3 83 2 -36
-351
10 3
-2 45
-7
-200
12
-24 126
-35 7
-7 9
-7
47 46
-6 19 20
-1 68 -1 33 -24
-1 62 -35 7
28
0 10
-105
-49
3
-1 26 -126
19 8
20 1
202 161
-48
4 15
-4 8 8
196
-4
374
-4 8 15 4
-4 8
-5
2
155
-124 102
14
-2 90 -43
-2 -2
-1 43
-6 96 -6
58
-1 17
29
-46 5
-4
28
48
74
-294 -2 28
-5 0
-225 -1 05
-1 25
33 -2 85
83
-22
13 1 15 4
-1 5
19 8
-1 5
-5 83
-2 8
175 7
-3
13
-7
-5 2
7
-9 -4 41
41
83
-2 4
3 -3 6
-124
17 9
4
-8
47
344
3 -4
45
7
-3
-1 4
9
-1 3
2
68
13
13
60
-8
-7
-98
68
44
26
21
13
-1 90
12 6
4 -7
15
-2 0
10
-5
4 -7
-3 07
-134
-132
-194
-7 0
96
-1
144
2
-4
-9 4
-13
-28
3
-5
-18
3
41
1 -1
4
15
2
Bandwidths = 100./mm
19
119
5
Differ: 2-1
53
63
1
-3
-2
81
8
-1 2
38
-4
1
8
3
25
88
1
-2
10
-2
-4
60
7 -2
84
0 -5
3
-55
23
87
62
-3
-37
14 2
-4 8
13
-1
10
-1
71
28
7
-1
-21
-3
-1
2
61
-48
-35 -1 4 -3
13
-6
61
52
2
49
50
-1
4
85
4
52
-1
2
-4 -1
-55
23
1 6 7
+ Demand flo - Demand flo
5 26
0
26
-65
-1
-7
201
42
2
26
-1
-1
4 4 21
1
-2 10
-48 155
-2
54
102
3
40
-1 1
58
2
33
155
62
92
-2
20 5
8
86
-3
1
1
34
-3 9
86
-1 10
1 -1
-1
-5
31
1
5 21
84
22
1
-2
-1
31
7 -3
-5
1
32
6
9
10
31
1
42
33
-5
55
-17
-1
64
-87
2
-24
-2 31
42 -5
-5
7
-3
6 10 1 -1
-56
130
239
-1
-1
-1 01
91
32
5
55
1
-8
42
222
25
9
10
3 11
65
-1 12
3
-56
130
92
62
8 -2
-13 228
-2
3
44
93
20
4
-8
8310
-48
-7
-51
4 37
185
15 4
8
-2
18
93
9
1
1
6
10
20
11
1 12
-1
3
9
-2
-1
47
64
-1
1
-5
1
52
46
61 -4
46
-1
-8 6
76
47
55
1
61
10
46
-1
-1
10
39
33
46
10
10
-1
-76 12
-4
24
-4
-11 6 -1
-1
-1
-25
7
-9
83
47
317
30
43
17
10
44
92
-7
11
9
135
-1
43
-13
70
10
-1 2
204
48 196
-9
-31
7 -9
37 4
-1
-1
-10 3 3
12
149
-1
Link Annot:
10
-2
9
2
2 -5
-3
8 -23 5
-61
5
83
11
9
42
10
6
11
86
-30
25
30 2
4
48
-8
153
1
-7
03 -1
9
22
-24 17
19 5
-1 1
9 -4
6
17 3
-2 1
70
6 -8
-1
57
5
0
-20
6
5 17304
11
-2
19
-8
-9
1
-3 1 5
89
9 7 13
Scale 14449
9
9
317
-9 43
28
-5
-1 47
1
1
2
-41
9
27
12 -2
-1
32 9
95
7 13
34
-1 -1
16 -2 83
16 1
-171
26
-90
29
24 -2
9 -1
17
-6 1
3 -2 73
-4 11
63
-4 4
6
5 -3 -18 5 -3
-18
17
-169
08 -1
92
-1 63
-21
-2 61
-1
19
54
28
160
-3
-229
-2 8
41
7
3
4
15
196
9
-16
479
-4
-100
2 7
-5
-6 3
-1 -6
3
-6 -30
-22
35 33
-2 15 -1 1
29 -1
23 0
-7
-6 -1 76
23 9
38
-7 3
-2 1
-15
5 -1-3 6 9 34 -22 -9 -1 2
-2
15
1 -1 53 -10
34
-1
25
344
-16
191
479
155
6 -8
3 72
-27
-2
-366
-2 61
10 1 55
18
2
-5
-5
2
-2
14
47
3
47
31
-4
3
270
-57
31
-6
-1 30
-3 0
3
7
47
1
33
-6
109
-63
2
8
2
-3 20
-4
8 -7
1 -7
-9
115
13
-19
118
-92
0 11
3 31
121 -2
5 24
-226
5
-9 19
3
115
-150
-9 -4
5
16 116
9
4
-6
108
-31 -3 11 5
-15
29
62
16 -5
-38
6 -1
8
-17
-21
4
25
-3
32 5
-3
58
4
2
10
-2 31
-4
-77
22
92
-4
-1
-3 -4 69 08
7
4
13 4
-2 5
10 7
4
-3 11
-204
-75
-1
-2
-226
1
3
-1
-7
-13
-329
-64
6 -1
-3 7
-1
-363 -356
-334
36
-372
-36
-372
-368
38
-7
-40
-3
191
-16
479
112
-1
-2 4
-1
-17
7
2
47
47
1_fpm21_CRL_ Basecase.ufs L_Scenario7A
-4 3
-369
1 -4 -1 1
-39
-4 0
26
-1
-1
-70
-3
-160
8
-70
-1
36
4 -1
3 -14
-41
-232
-1
98
70
-3 6
-1
73
47
3
-1
-1
-160
73
-18
-7 0
-1
14 8
13 0
-845
-258 5
1
-1 99
-2 48
7 -5
0 11
70
42 -170
-2 72
-292
-489
-1
13 3
53
-2 22 07
-4 -74
-1 70
-291
-421
-144
-60
55
-2 0
-1
-5 4
-144
-222
0
18
-61
-144
-2
195 85
30 0 -1
5
-2 3
220
-505
-1-73 87
-1 -2 0 23
-9 8
84
-143
-181
-265
265
180
-144
11 0
21
-292
-74
-389
3
42
12 2
60
12 5
-1 5 147
-17
38
-179
-14
265
-14
-143
50
-4 0
15 186
8
-86
-93
-6 2
76
23
-71
6 -344 23
1 16
1
453
4
-1
-147
-7
0 -5 -1
29
38
47
-2
-19
49
6
8 14
15
6
47
28
17 6
-1 4
10
-3
7
1
-1 10
29 6
1
7
-14
-1
48
-2 6
8
-1
14
121
28
-1
107
90
-1
97
137
12
10
-1 8
1
6
4
17
28
143
9
6
52
141
-8 12
11
13
-10
15 5
9
-9
-27
-1
-1
49
4 74
-7
18
21
-18
-2
4
-15
-1
-5
-7
7
-1
-2
4
21
Auckland CBD Model: 2021 PM Peak: Basecase 23-11-15
3
-8
7
6
-1
1 1
1
-14
16
-3
-7
-3
18
-8
2
-1
-4
18
7
1
2
-7
-8 -1
48
14
-27
166
15
11
53
-13
-1
20
19
-1 3
-1
266
-5
41
-11
77
-3
14
7
-27
12
-25
12
50
-1
7
12 1
3
-27
-1
100
-1
-226
0
-1
-16
479
2
-2
-43
40 -430
-431
-74
2
-50
-431
191
-4 83
12
-1
336
-15
-14
-544
-1
-7 8 -1
17
-11
-541
-15
59
479
37
-1
27
44
19
-41
-303 -594
-39
-1 3
5
-1
-3 9
8
-204
-191
9 47
-13
33
9
-5
-16
47
-45
59
-1
660
-265
13
179 32 4
19 1
-1 33
-1 337
-511
-156 7 18
1
90 1
7
138
6-52
18
-143
128
32 7
13 -203
401
34
-3 4
-60
-49
356
-9
-63
260
124
6 -3 81 -381
-9
-1 84
-1
38
-9 6
-8
73
33 7
33
87 43
70 35
-242
122
-3
-6
1 19
817
-40 24 8
8
-3 4
-71
-2
Atkins Ltd / DVV / ITS
-2 42
34
22 6
-62
22
-1
337
6 -1
479
57
1
15
253
380 -2
-13-46 2
-1
-1 6
103
191 27 73 0
106
-3 9
253
-7 3
-4 0
-44
38 0
15
-199
-1
89
11
7
-71
-46
16
5
-40 29
-29
139
-9 5
38 0
-1
13 9
18
73
-3
-1
-1 -1
-76
53
-13
-9 5
-5
-4
0
50
0
73 -40
89
38
10
-1
71
SATURN
-1
-5
73
-3
5
-40
-9
50 -5 0
11 12 -9
8 8
23-11-15 AECOM AUSTRA
-9 2
47
3
SATURN
-1
8
-1 35
-2 0
2
-4
-1
5
-2 3
6
-8 0
-8
75
-2
24
-2 4
92
-8 97
6
-2
-1 2
-1
-20
8
23
-8 6
-3 4
80
-1 21
58
11
33
9
13 9
-1
198 53
14
72
-2
14 9
7
72 -1
6
-3
-1 -1
-8
-7
4
2
96
18 18
97
54
4
4
18
-5
40
-1
-45
-11
19
39
46
-1 19
-4
1
3
1
35
1
24
85
-3
-8
20
38
59
26
1 -7
20
-17
-3
52
59
63 -7 -17
11 -1 8
11
-2
-2 2
-2 4
1
-1 -1
13
-1 5
6 7
29
2
11
10
17 11
12
34
1216
17
42
3 -1
9
11
6
4
45 -14
-2
25 13
3
-57
7
57
-5 9
42
-5
-1 2
11 6
45
-1 5
8
-33
-1
-7
11
-2 9
-1
-1
148
-1 6 1
-2
2
6
-1 -3
21
179
53
-117
2
16
15
8
35
31
-1 2 -2
-1
32
94
58
7
-1 0
-2 9
12 8
5
12 35
1
-9
-75
1
35
16
-1 2
16 72
-1 3
5
2
19 -39
-7 -6 78
-1
2
84
38
-3
8 -15
16
-12
292
-1
-3 0
-3
-2
-1
-4 6 -1 4
-2 26
-8
-1 8
78
25
35
-63
-5 2
-203
-68 49
44
-10 -59
-1 -1
17 1
14
-8 2 -16
-46
-1 0
95
91 -1 0 12
30
-23 4
34
31 -40 -53
5 5 14 8
14 5 -4
25
126
25
-333 02
-416
-1 58
-1 8
-8 8
-1
6
-34
91
22
-1 16 377
13 7
13 7
-21 1
20 5
207
129
25 0 10
43 10 0
25
100
100
85
43
0
-4
11
-5
-2 31
3 -1 73
61 -2 3 61
-23
-34
32
-1 20
-5 8 -1
15 3
-1 15 1
-21 1
10
-1 9
1 73
-7
-7 2
-3 5
-51 -2
17
18
-2 73
1 -1 7
-2
1
-2 9
1
1 -2
14 9
10
0 -1
1
-7 0
2
63
5 -2
10
1
1
1
85
96
5
4
49
-7
-66 -14
-121
-9
-21
-1 15
95
3 -15
40
-1
24
35
-14
-15
7
67
19 7
-4
60 1
-3 9
-1
1
3
15
30
5
5
103
24
25
-5
-3
61
5
76
6
3 2
10 3
-2
-1
-1
16
7
8
61
6
-44
-37
15
-7
2
6
-4 5
-5 7
46
20
-4
-22
-2
7
2
-33
-4
7 -4
-46
-5 5 5 -5
38
-25
25
30
-1
17
-1
0
128
30
7
19
-5
-1
27
10
9
-4
-1 -7
17
30
43
62
5 15
20
100
20
43 13
27
0 10
30
3
5
37
13
66
32
13 0
24
1
-1 8
12
-1 5
16
17
14
-2
0 13
8
-4
22
-1
-2
27
14
12
40
9
-4
3
62
-18 5
24
20
7
27
5
67
35
25
-6
-1 103
-6 5
21
-3
9
5
13
-18
-5
-1
1
-1 6
-1 8 -1
16
1
23
-5
-18
-1
1
-1
6
17
3
19 10
10
0
13
10
-1
18
-6 22
10
76
-1
24
27
14 26
0
2
13
32
1
66
24
1
17
-1
-1
9
-4
10
4
-1 -1
1
15
-5 5
51
82
-30
11 9
-3
12 -1
100
-3
1 7
2
12
44
18
11
1
40
6
5
29
35
-25
-4
62
24
19
-1
-1
75
-1
5
81
44
6
20
1
18
71
3
37
38
-1
19
71
40
-26
87
-5 -37
19
128
25 100
-1
2
1 -1
27
4
28
-37
-1
5
7
77
17
20
8
2
11
-2
-3 6
5
34 2
27
14
20
-36
1
40
Bandwidths = 100./mm
5
-9
2
4
-28 2
2
7
-9
-1
6
-2
-1
-1
-28
-7 12
85
1
-1
-8
-36
-2
2
2
87
75
-9
-24
43 22
-75
7 -1
11
-8
-5
100
25
22
-1
52
-4
11
-7
1
2
-1
-1
9
1
-1
1
20
Differ: 2-1
11
11
3
6
-2
75
5 85
-8
11
-8 10
1
1 -12
10
8
-7
-1
1
-1
3
10 1
19
-11
-15
26
-2
1
5
10
-3
2
7
-11
19
23
25
2 -2
-11
41
-2
6
-7
7 10
40
-3
35
8
75
-1
25
-29
4 7
-3 7
-7
34
7
9
43
24 -1
-1
1 10
-4
0
59
63
-1
9
0
64
2
1
-1
67
75
2
-21
52
-1
-3
1
20
-2
9
+ Demand flo - Demand flo
1
-1
-1
-2
18
-1
73
20
-1
6
1
-2 9
-6 -3 2
14
34
34
-8
58
9
9
75
20
22
74
67
20
-2
6 12 -1
-1
63
24
18
43 9
-34
-1
-6
32
67
38
25
-2
6
-34
8
18 -2 -1
-19
-34
-1
2
-1
-2
Link Annot:
-8 -4 -4
-8
50
-3 2
-2
9
-1
-44
-33
2 -1
-3
-6
4 -4
-1
22
6 -30
-1
12
31 10
-20
-8
-40
-27
-9
2
1
2
4
-27
2
1
-5
7
19
84
74
23
-1 8
2 -1
-1
-6 -3 2 -2
-9 -3
6
31
1
17-1 3
Scale 14449
80
-8
17 4
-2 21
-1
-6 1
-16 -8
18 54
-14
-53 1
45 18
38
54
-2
1
-1
-2 88 -1
12
-18
-1 -1
-62
-2
-7
-8
11 4 97 -2
-2
-1
51
73
2
55
13
10
-4
-3
-5
31
5
-1 92
17
73 41
-297
-1 7
40
1
4
-12
3
6
1
41
-6
126
79
4 -3 0
1
3 10 -1
-1
1
4
4
-1
53 6
-1
9
-2
-3
68
3 10
27
-1
-2 13 1
-1
16
4 -4
16
81
-1 -2
-2
19
45
30
20 5
4
8
14
-1
-1 26
22
1 30
4
4
3
84
1
-7 1
61
0
-1
-9
6 32 -17 -20 -2-2
-1 2
11
-6
-3 3
-35
48
65 -2
48 -2
27
36
11 5
31
61
148 -9
9
2
64
66
-35
8 185
-23
-6
8
-53 -1 -8
143
33
32
4
-5
-4
133
21 24 2
32 -1
2
14 3
-2 2 -14
20 4
60
136
41
-32
-20
-1
155
-3 6
-1
47
-3
-1
36
14 8
-129
12 1
-2
1
3
-8
1
-115
7
-2 41
29
6
-4
65
-5 6
1
4
2
-61
71 -47
-141
-2
-1 6
1_fam21_CRL_ Basecase.ufs L_Scenario8A
-1 4
6
-4
-141
-5
1 5
1
-162
-56
-2
-133 3 14
-9
-121
-130
7
-4
9
-39
-26
-4
-2
-27
-3
3
-1
-4
20 6
-87
-80
-6
-145 -16
60
3
-140
-45
24
-2 3
-4
-55 5
-45
35
-35
2
-1
-112
-70
-7 8
-66
-6
-129
-80 -121
-8
-1 39
17
-80
39
48
94
-2
29
163
-150
-61
2
-6
-2
-61
-1
1
-2 25
-4 6 -3 68
45
-2
-6
4
-122
-122 -2
136
41
-112
31
-8 0 -3 34
-307
6
-70
3
-6 7
35
4 -1
21
-18
54
-11
-4 5
-1
0 -5
-1
37
-5
-280
-1
-1
-1
-1-60 73
37
5
39
-1 9
64
2
-1
-112
-1
0
148 40
-2
6
16 -1
72 -23
-1016
18
-1
-184
182
-140
21
25
-10
-2 86
-3
-31
-9 2
-17
36 2
-2 1
-4
-23
-10
-100
51
-4
-244
-1 75
20
49
-1
-10 -4 -10
16
-50
-1
-51
-56
-358
-125
2
77 12 3
-64
27
-6
-35
-1
-77 -180
-215
-31
-5 1
-9 9
8
-236 -77
0
-1
0
-1
-6
-1
-32
-320
-146
-77
136
41
7 -1
30
8 28
16
13
55
11
232
19
4
-1
24
-25
4
16 -2
-3
5
3
3
-1
18
9
4
6 11
25
7
2
1
7
7
-25
Auckland CBD Model: 2021 AM Peak: Basecase 23-11-15
-3
-3
5 7
8
3
3
6
-7
5
16
15
-1
94
3
-4
4
-1
13
10
3
-5
81
54
1
-1
155
7
-4
4
6
-1
2
16
18
24
-25
-5
22
24
-1
-52
140
-14
-1
0
40 29
-3
-56
94
218 -320 -320
-199
-50
-17
-6
103
2
32
-22 -77
303
-77
14
-96
-2
-124
-140
140
11 6
-3 3
-420
-6
41
0 -5
-1
-49
-76
-21 -1
-9
3
-2
4
-1
-6
-8
-1 34
13
64
180
29 1
-266
-77
13 6
-6
41
-84
7 17
7
-1 1
23 1
-5
24
-101
-104
-192
-9 2 -92
347
33 -2 9
-3
2
207
59
41 -8 3
-3
66 -266
1
244
-14
4 19 5
71
-6
-2
32
248
42
16
17
4
12
-3 2
3
-80
-2
6 13
-17 6
-2 92
68
-10
-2 5
-2 1
-34
-3
-5 -7
34
248
28 -2
10
29
16 9
8
-1 2
155
116
11
8 41
42
155
-1
-17 6
10
-1
7
1 -1236 -21 6 -6
22 5
15
-1 34
-113
3
-34
-17
82
24
-1 74
97
-6
-1
-1
Atkins Ltd / DVV / ITS
23
8
-56
-134
-1
37
-4
-1
24 -1 2
-2
27
-13 5
-4
47
-8 6
-23
-1
78
-80
27
2
2
6
2
7 1
1 1
23-11-15 AECOM AUSTRA
-2
-1
-7
7 3
1
3
-7
-3
-1
3 -7
-5
-1
3
2
3
-8
7
-2
-1 -7 1
-7
7
-2
9
-7
-17
3
-1
-7 3
-12
-2
5
SATURN
1
-8
9
5
7
5
-2
55
1 -1
55
76
1
75
24
28
8
1 53
105
16 1
1
28
36
-1 -1 -6
-1
-2
-8
53
18 6
43
91
-6
7
53
1 33
8 -6
-2
7
-1 0
42
8 0 131
73 11
28
42
4
-4
7
-11
9 7 1
4
-1 2
-2 -2
7
-5
-21
21
23
-1 7
4
-1 6
50
-1
26
12
-1 3
-3
52 -22
-6 1
6
105
50
2 116
11
-6 7 -6 4
-1
38
22
42
80 -1 11 6
2 11 6
11
2
-3
91
10 15
38
-6 1
-1
1 -1
-25
-6
48
1
25
-100 -2
49 61
-9 6
9
-16
-1
21
-8
16 7 -2
-1
-5
-2
103
4 160
62
4
2 4
-1 00
4
-1 00
-5
23
-2
-20
-13 3
-4 0 1
-1
-3 5 32
-5 96 30
1
10
94
11 3
9 -11
2
-82
1
-11
50
160 2
38 -171
7
2 2
-7 29
3
-9 -16 0
88
-16 0
-4 84 32 -1 4
84 -1 4 -1
186
96
-1 4
161
-4 9
167
8 52
3 17
3
52
-37
-6 7
3
-1 7
89
-1
83
-69
16
-6 26
-7 7
-2 13 -84
-4
-1 96 -19 6
-7 2
-5 7
-57
-48
64 7 -2
64
64
9 64 -2 7
30
5
186
-27
55
77
-1
3
79 -1 7
4
7
-1
-13
6
-2 2
30
22
-4
-27
16
-18
-2
2
-2
-13
75
64
11
10
3
84
1
64
-27
-1
67
9
-13
-27
54
-3 2
-10 -23 62
9
2
-1
-37
14 6
-2 -2
11 7
49
-1
-149
-2 13
-3 6
13
38
88
-24 -17 5
-1 66 -4 3
-42
90 -42
-9 4
-8 2
-166 -8 2
-82 7
-3 72
16 8
13 9
-1 1
-9
13 9
-6 2
10 1 -7 2
-17
96
-3
-50
-1 39
-1
-1 13
1
4 -1
13 -1 4
-1 4
17
27
-16 7
2
-1 00
-119
2
-1 81
4 -1
-5 0
10 4
98
4 -6 3
-23
-133
-13
-147
44 32
66
7
-78
-248
14 3
1
-2
-4 2
99 15
-1
-95
51
32
12 -1 -96
-35
-88 -64
1
16
-1
-4 9
-58
13
21
3
85
41
2 10
72 10 1
70
-1
5
2
-1
-1
7
-1
10 4
14
2 11
-1
-1
-4
56
78
19
11
80
-8
19
103
67
1
1 -2
14
5
-1
-7
79
25
98
42
-1
-8
-16
1
29
-4 14
20
-20
67
2 23 11
16
81
-11
-3 -29
78
-1
7
1
81
-11
-2 9
56
3 6
5
-1
22
-22
10 2
-1
-10
9
44
-2 3
-3 8
-3
30
-1
36
-1 3
-2
-6
-4
102
20
4
18
3
-4
-22
11
4
96
-1
6
14
-1
76
13 8
64
9
-27
-1
5
56
13
1
11
37
5
3
2
3
3 -2
-2 1
6
31
24
19
3
4
4
-1
36
-5
56
Bandwidths = 100./mm
-1
-28
-1
-1
-2
6
-5
1
-1
10
21
-3
35
5
39 -6
24
-5
-3
1
5
-55
53
-5
-1
1
-27
15
-19
-2 35
6 18
-8
-5
-5
-9
35
-54
5
-6
1
-1
57
56 35
-58
-1 1
13
-1
17
-58
5
-2
75
-82
-3
-7
29
35
8
-58
1
-2
18
-9 -5
44
18
3
13
-1
75
-82
15
-19
42
9
-9
-2
-1
-1
-5
40 28
-1
35
4
52
18
-2
-4
10
-2
5
-5
-1
1
Differ: 2-1
-3
-2 73
1
1 -7
-7
-20
30
75
64
21
-4 1
12 6
-6
11
9
17
-1
-1
-1
73
19
1
-4 -7
-11
47
11 4
12
28
82
4
21
+ Demand flo - Demand flo
33
1
8
-5
25
-1
94
40 -7
94
30
5
2
47
67
-28
58
40
-28
3
63
6 18
9
10
10
-1
67
-9
1
1
28
-2
5
94
-25
-28
-1
48
27
-28
24
4
50
90
19
94
25
14
-1
-19
-1 -38
2
20
43
87
96
27
21
-1
13 148
-7
0 -1
20
-6
44
-2
6
22
-2 3
-1 -2 -2
-2
48
-3
-3 4
24
-1
46
Link Annot:
1
-2 18
-20
1
1
6
-7
5
23
46
7
49
6
14
61
13
-3
2
-2
18
27
24 6 -1
-1
57
-2
-1
-7 7
-2 8
18
157
2
-37
-5 65
4
13
186
9
-1 39 -1 7
5
21
-1 -1
16
0
2 21
13
5
1 90
9
Scale 14449
-28
-2
99
-2 9
84
-2
61
17
12 3
-1
-5
39
-1 37
72
-7
8 68
37
7
90
2
-15
8
9
3
3
45
9
1 -1088
-10
9
68
-1
-3 0
4
108 20 2
10 1
15
35
96
63
-7 -1
-1
2
13
-15 -2 11
-23
44
14
24
12
4 -3
88
107
25
-1
-8
2 32
-2
-7 -2 6
20 2
32
28
-12
-1
9
-1
-2
3 -3
-3
45
43
72
92
2
9
166
-1 21
-32
6
14
32
-1
-3
5
2
-4
10
20
5 -4
-1
19 6 -1
13
-6
81
-3
-3
3 -4
1 -1
64
21
36
83
83
55
3
29
49
2
-20
21
34
36
-2
-1
25
34
-3 3
6
-4 -8
27 2
-54
2
6
207
15 4
18
-1
-1
51
-6
27
-34
-42
-1
33
15
7
170 1
-1
-11 -72
-6
-3-2 1 -6
-107
-101
11
11
262
17 6
-1
1
19
-7
19 6
176
20 1
1
-5
-96
16
-34
-49
-1
31
-12
101
65
1 -34
-9 9
-5 4
-1
-2 09
-1
3
46
-60
-53 5
1_fin21_CRL_ Basecase.ufs L_Scenario8A
-3 7
124
52
12
-1
-1
-1
13
2
2
-60
-56 12
-25
-3
-114 -3 4
-9 6
-1
166
9
2
-23
-4
-114
-3 9
49
10 34
-12
34
-152
33
01
13
-2
127 -24
17
33
-1
-331
34
-200
2
-1
-1
8
-1
-21
-40
-4 1
159
-92 -200
36
-8
-65
-33
-2 17
11
-5 0
8
13
-7
-2
-1
257
9
117
29 -1
-1 3
4
186
-2
79
-6
4 20
-1
-1 8 51
-1
74
2
1
17
37
-29 -4
0 -1
-3
3
18
-2
-1
13
-13
30
81
3
44
-27
-42
-2 3
14
18
36
64
-1 9
18
8
-2
102
-5
30
-1
17
18
-20
-1
-5
25
66
74
-2
65
7 -2
-2 4
4
6
9
-1 6
-2
-2
-18
17
12
82
36
82
-1
66
6
-1 8
-25
-1
25
37 48
2
-1
1
82
-8 -6
43
5
-18
-1
7
-28
12
2
-1
4
-16
7
51 2
35
10
-2
-1
96
44 4
14
74
1
47
65
-2 9
-4 2
138
-25
25
-1
82
17
3
176
5
20 3
-27
5
7
-28
4
39
51
5
176
39
5
31
Auckland CBD Model: 2021 IN Peak: Basecase 23-11-15
-2
-3
-1
1
2
-12
-28
7
2
-1
99
1 -27
-24
-12
52
-2
9
2
6
30
17
1
6 -1
27
17
-2
29
-1
-6
83
1
-3
52
17
-2
-26
-1
-1
9
-2 64
8
12
-182
-22
2
-2 49
-1
-92
12 -21
9
-54
-3 3
-228
-10 -14
-24
-220
36
16
-1
-18
-7
155
-5 8
6
-2 27
-14
9
7
16
-1
-10
-1 4 -1
166
-11
-14 -113
7
-1
42
3
-3 3
16
-1 8
-2
-19
2
2
15
52
72
22
-2
287
-14
9 -129
-7
163
-14
-14
-18
-1 15
13
24
-68
-370 15
-44
-195
-2 87
-3
49
9
-174
47
-20
-41
0
-430
-43193 0 -430
-14
-43
-273
47
-94
99
-111
-10
-413
-2
16
-34
1
2
2
-296
146
-6 2
-18 -1
-4
-88
-385
-14
16 6
-2
78
10 7
38
49
-10
16 63 91 -2
10 5
-3
20
-84 4 19
-108
282
32
9
-4 9 -49
202 -43
174
-1
6 16
39
-2 -1 54
-9
26
13 5
41
-2
119
105 -2
-3
2
13 3 105
04 -304
-9
9
1
Atkins Ltd / DVV / ITS
80 -90
-1
2 9
-2 3
-1
-3 119
-1 6 -26
-5
5
9 166 -23 9 5
-9 0
-1 5
-20
2
29
2
15
-8
53
-7 3
-2
5
1 9
12 12 -1
23-11-15 AECOM AUSTRA
-7 6
9 4
9
-4 7
-3
SATURN
-1
8
-9
-7 6
-4
9
-60
-7
55 -5 5
76
-7 80
-1
-47
86
-141
-295 -2 28
58
3
-17
10 7
-5 1
1
87
41
-7 2 -1 24
52
96
225
-62
-3
10
-1
3 22 5
-1 -3
-2 -2
221
-3
85
82
-9
-130
28
-3 2 63
94
11
1 -3
64
-1
84 69
-1 91
-31
-50
-3 1 -3 1
84 62
16
40
16 7
69
4
-3
84
34
35
-2 7
30
1
-3
224
-1
59
50
26
55
-1 45
10
-1
62
-7
41
52
-16
13
25
48
36 -205
9
47
-11
30 21
21
30 15
-3
13
-17
7
-78
9
-1 6
9
24 68 88
-225
1 17 1
1
14
-25 1
40
-19 7 -19 7
-7
-17 2 6
14 3
-2 -2
12 2
70 36 -1 20 21
32
-7 6 152
-43
-3 84
-1 1 -1 1
15
8
95
3
140
34
-92
-124 80
14
-1 80
-2 21 -1 97
2 2
-54
18
-7 6
32
29
-1 83
23
73
42
91
4
27 -2 4
16
19
17
2
-3
2 2
-18
-38
32
24 1
9 -1206 9
-66
-15
32 18
27
- 14
51
-5
-3
-17
- 53
-3 -47
1
3
-30
16
1
-2
29
-30 -3
-9 5
10
-2
2
-53
-1
20
19
1
-17
-17
2
32
-4
3
-5 -1
-1 09
-1 -1
1
21
32 -14
-3
60
10
78
4
11
4
9 11
-39
107
11 9
24 1
-1
4
-1 3
14
11
16
-31
1
-31
-1
-1
3
2
41
7
-2
16 3
24 5
15 7 -2 0
-2 5 -2
5
112 -16 107
-5
10 4
7
10 4
-1
20
-4 114 102
-25
7 12
364
-25 12 7
27
21
1
-1 7
21
4 21
-17
267
-1
1
-1
83
-1 83
1
13
76
4 10
-2 5
31
-25
8
-2 7
4 21
98
128
-1 23
2 -1
1 -1
-4
7 26
1
5
-7
3
-1
266
0 18
7 2
29
98
45
-1 0
48
-8
29
4
73
38
87
4 12
12
18 0
-8
1
11
7
2
-1
-32
22
3 -1
-2
10 4
-13
83
4 -1
1 -1
98
98
-1 -1
2
116
7
-1
16
83
76
-2 4
-3 0
-6
38
13 26 6
16
83
13
31
-3 4
13
-1
37
7
102
-6
0 -1
104
-16
128
-1
19
14
6
-3
3 27 1
-1
-2
-2 5
67
14
-1
7
-4 4
Bandwidths = 100./mm
13
128
-9
5 -1
3
-1 4
13
128
87
-38 -1
6 -1
0 -3
6
16
266
-32
7
4
1
-2
6
16
104
-2
Differ: 2-1
14
31
-7
-1
-1 4
7
7
74
3
2 -1 14
116
59
30
-3
-2
-25
10
-80
167
37
-1 90
-5 0
-225 26
-1 44
5 51
96
14
97
15
26 10 8 26
-1 4
-1 4 73
5
-14
11 3
-14
-5 12
-4 9
-389
-4 55
0 12
4 -7
30
31 88
98
14
-4
186
-2
4 -7 -1 5
14 -4
23 6 -1
2 -1 2
-80
-216
221
6
-9
27
12
-3
12
-127
14
-2 24
83 75
11 5
82
-141
-142
-264
141
-90
-154
84
13 6
42
12 1
61
13 2 56
56
-15
-195
4 -7
52 -8 8
37
-1
-2
-1
62
68
51
-1 1
-1 6
3
61
6
9
-1
+ Demand flo - Demand flo
2
42
86
-4
-15
-134
39
-3
-32
19
2
-1 4
-1 31
3 -23
-2
1
3
226
31
10
-1
2
25
6
3
4 -1
15
0
-7
-1
3
29
-4
1
0 -2
16
-1
4
1
9
19
26
1 4 -1
5
-25 128
-2
25
1
-3
60
86
9
7
22
5
7 -7
23 -1
36 -2 3 -1
94
-1
-6 7
-30
-1
33
130
6
0 -3
7
3
-24
79
128
28
66
-2
25
-20
18
29
-2
3
13
3
29
48
84
41
-1
-1
79
-22
80
4 -1
-3
42
2
-23
20
-1
44
-6
-3 3
18
2
1
-21
-2
1
-5
7
43
-5
-1
-1
-18
4
-16
20
-7
-1 7
29
2
27
28
-3
7
-1
-3
-27
-2 8
5
73
3
-24
127
-8
6
29
-7 9 1
24
14
72
-1
25
5 -2
66
28
22 17
11 0
12
-6
-5
7 16
3
-3
24
18
-7
17
4
10 4 -1 10
18
17 -17
-1
75 59
-1
-1
9
21
3
7
4
-1
-7
-1
4
17
114
91 30
46
18
-18
-7 9
80
31
4
15
-2
-11
113
23 62
9 12
55
41
3
7
-1
-2
-67 62
-5
72
51
44
-9
71
81
226
-6
18
11 9
75 -4
-52
4 36
120 5
13
3
20
68
-1
73
58
6 -1 75
-1
-1
-12 3 3 12
-6
24
Link Annot:
12
-1
23
2
4
-3
89
-1
21
-76 -3 5
Scale 14449
-3
40
11
12 2 11
-4
36
-3
-32
-6
-1 37
-35
-3
-1
46
-2
11
1
8
1
70
19 2 11
2
6
20
2
-1 2
60
56 -1
-1
30
-11
110
98
-1
-1
25
2
-7
12 -4
-23
8 -8
6
84
-1
-39
9 -8
-159
-1
2
-1
-1
-18
-2 7
1 -4
11
79
19 19
-61
9 -8
160
-1
4
68
11
108
1
49
10
-21
-4 0
6
-17 -1
02 -1
0 -1
-2-8 7
13 1
-3 1
3 69
11
-1
-1 78
16 8
-2 4
88
3
23
45 1 -1
2
147
-3 9
-14
-4
2 11 33
20
-1 -1
-249
-4
66 1827
33
35
1
-3 33
208
28
47
38
-5 5 -2 49
13 6
4
28 -49
-49
47
58
-86
14
112
-16
463
2
1 -4
21
-3 20
5
3 55
-1
9
18 -1
-4
11
25 2
-1
45
-80
23
10
117
1
-2 47
97
-1 4
7
38
16 6 -1
30
-5 14 4
5 7
6
49
14
-1 -20
24
17
-4
-1
109
3
-19
9 -1-3 8 3 32 -3 -17 -1 2
-2
14
95
-1
-50 17 2
2 -1
3
81
71
32
-1
19
221 -1
17 6
30
-12
5 67
-2 09
72
3
-6
14 6
51
117
-16
463
-51
-
-36 25 2 -8 1
-3 -2
14
-3
-7
3
8 17
66
3
-1 68
7
3
-1
86
39
29 63
5
-4
2
-1
1 -4
66
4 68 -3
40
-13
62
153
4
24 4 -1 17
-7
-5
-1
15 3
188
71
42
-2
11
18 1
-1 7
28 3
-2
-10
-3
-145
-168
1
-2
3
62 -1
17 3
78
-1 63 25
48
1
93
17 1
-65
12
2
-1
-12
18
48
34
-1
-7 1
-7 0
-2
117
-16
463
-1 -105 31
-67
4
-1
-32
9 -2
-1
-4 -395 32
-147
31
21
8
71
-11
-79
6
25
-82 2 8
11 3
1_fpm21_CRL_ Basecase.ufs L_Scenario8A
-3 4
-395
-4
-46
-70 98
70
-3 6
-1
-113
-183
1 -4 -1 1
-57
-1
-7 0
-1 99
-161
-317-458
93
-1
-118
1
-19
-18
-1
-161
70
70
-13
-1 0
-1
-1
24
23
57
-1
12
-8
-183
3
14
-389 -452 5
24
7 -2
-602
-167
-9 3
5
55
-5 7
13 -1 3 141
6
62
-6 3
-115
-67
-97
76 43
-2 6
45
51
1
4
-567
-1
67
-8
-2 87
-3 08 24 0
-337
-60
18
-177
31 -206
-336
-2 2
-1
-8
-1
-202
-1
-337
22 6
-351 -249
50
-7
8 -3
-74
-120
-621
-3 7
-74
-74
-583
4
-2 06
-1
-16
463
-8
-1
-140 -14
264
-14
-120
17
-1
-100
-1 16 -8 3
16 -38
08
-86
-409
-113 -204
-17
-11
7
-1
-14
117
-4 61
-43
48 -437
-438
-1 13
72
-7 8
-133
-438
76
83
42
-525
361
-15
-50
-275
-292
32
-27
-1 1
9
-3 2
31
88
-6
1
-1
63
9
-10
-1
4
77
5 -2
90
4
-1 11
12
-1
102
-1
-8
11
4
89
0
48
7
18
89
2
-2
-6 -1
5
49
6
1
-1
-6
-21
52
29
-4
4
-5 -16
4
8
-14
-14
Auckland CBD Model: 2021 PM Peak: Basecase 23-11-15
-3
3
-1
-7
-3 5
-13
5
26
-33
5 -5
-2
-6
3
110
-5
-4 5
-1
-8
24 4 18
-3
12
-11
15
1
-1
-5 -1
1
73
11
6
-1
185
28
-4
8
5
-33
11
-5
-11
-1
271
61
31
-33
73
9
53
86
13
-10
-7
-1
-1
-1
-264
53
-1
72 -159
-7
140 34 9
-52 1
-134
-2
-1 84
-1
240
-495
-249
115
-5
82
454 -540
14 -202
136
35 0
-1
-38
348
-38
-8
-2
236
-15
40
463
37
-1
373 -6
11 7
3 46
-13
-12
8
18
3
-5
-16
46
-37
-3
-1
678
-3
15 -315
-1 18
-1 337
-18
-73
373
80
173
-6
31 9
-57 22 4
6
-2 49
-6
-2
62
-9 7
-267
8
-26
7 11
835
-1
56
1
13
16 9
-6 3
6 -1
463
-14
-2
-5 0
167
318
1
-1
167
361
-24
Atkins Ltd / DVV / ITS
69 -14-42 3
-1
117 18 -1 8 0 6
-8 1
-3 9
-44
36 1
109
-1
-1
13
-10
-35
80
12
-1
7
65
86
-7 9
-39
264
-1
16 8
36 1
-1
-1
-7 9
-77
10
-39
-9
8
-6
0
-1
-3
55
1
9
36
-1
-2
-1
9 9
23-11-15 AECOM AUSTRA
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix E
Travel Time Bar Graphs
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
AM Eastbound and Northbound Travel Times (s) NoR Routes 1100 1000 900 800 700 600 500 400 300 200 100 0 Wellesley Street
Victoria Street
Customs Street
Quay Street
Nelson Street
Queen Street
New North Road
Mt Eden Road (partial)
Khyber Pass Road
Newton Road
EBD
EBD
EBD
EBD
NBD
NBD
NBD
NBD
EBD
EBD
Base Case
Scenario4D
Scenario5A
Scenario6A
Scenario6A_S
Scenario7A
Scenario8A
AM Westbound and Southbound Travel Times (s) NoR Routes 1100 1000 900 800 700 600 500 400 300 200 100 0 Wellesley Street
Victoria Street
Customs Street
Quay Street
Hobson Street
Queen Street
New North Road
Mt Eden Road (partial)
Khyber Pass Road
Newton Road
WBD
WBD
WBD
WBD
SBD
SBD
SBD
SBD
WBD
WBD
Scenario5A
Scenario6A
Base Case
Scenario4D
Scenario6A_S
Scenario7A
Scenario8A
IN Eastbound and Northbound Travel Times (s) NoR Routes 1100 1000 900 800 700 600 500 400 300 200 100 0 Wellesley Street
Victoria Street
Customs Street
Quay Street
Nelson Street
Queen Street
New North Road
Mt Eden Road (partial)
Khyber Pass Road
Newton Road
EBD
EBD
EBD
EBD
NBD
NBD
NBD
NBD
EBD
EBD
Base Case
Scenario4D
Scenario5A
Scenario6A
Scenario6A_S
Scenario7A
Scenario8A
IN Westbound and Southbound Travel Times (s) NoR Routes 1100 1000 900 800 700 600 500 400 300 200 100 0 Wellesley Street
Victoria Street
Customs Street
Quay Street
Hobson Street
Queen Street
New North Road
Mt Eden Road (partial)
Khyber Pass Road
Newton Road
WBD
WBD
WBD
WBD
SBD
SBD
SBD
SBD
WBD
WBD
Scenario5A
Scenario6A
Base Case
Scenario4D
Scenario6A_S
Scenario7A
Scenario8A
PM Eastbound and Northbound Travel Times (s) NoR Routes 1100 1000 900 800 700 600 500 400 300 200 100 0 Wellesley Street
Victoria Street
Customs Street
Quay Street
Nelson Street
Queen Street
New North Road
Mt Eden Road (partial)
Khyber Pass Road
Newton Road
EBD
EBD
EBD
EBD
NBD
NBD
NBD
NBD
EBD
EBD
Base Case
Scenario4D
Scenario5A
Scenario6A
Scenario6A_S
Scenario7A
Scenario8A
PM Westbound and Southbound Travel Times (s) NoR Routes 1100 1000 900 800 700 600 500 400 300 200 100 0 Wellesley Street
Victoria Street
Customs Street
Quay Street
Hobson Street
Queen Street
New North Road
Mt Eden Road (partial)
Khyber Pass Road
Newton Road
WBD
WBD
WBD
WBD
SBD
SBD
SBD
SBD
WBD
WBD
Scenario5A
Scenario6A
Base Case
Scenario4D
Scenario6A_S
Scenario7A
Scenario8A
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix F
Travel Time and Volume Graphs
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
Wellesley St EBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Wellesley St EBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Wellesley St EBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Wellesley St WBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Wellesley St WBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Wellesley St WBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Victoria St EBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Victoria St EBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Victoria St EBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Victoria St WBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Victoria St WBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Victoria St WBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Customs St EBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Customs St EBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Customs St EBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Customs St WBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Customs St WBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Customs St WBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Quay St EBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Quay St EBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Quay St EBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Quay St WBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Quay St WBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Quay St WBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Nelson St NBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Nelson St NBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Nelson St NBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Hobson St SBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Hobson St SBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Hobson St SBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Queen St NBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Queen St NBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Queen St NBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Queen St SBD - AM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Queen St SBD - IN Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
Queen St SBD - PM Peak TRUE
P:\603X\60344327\4. TRUETech work Area\WPP14B - Traffic Management Modelling\Python\P
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix G
Signal Phasing & Node Graphics
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
Albert / Customs Street Intersection Node Graphics Rev1 Base Case 2001
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Albert / Wolfe Street Intersection Node Graphics Rev1 Base Case 4037
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Albert / Swanson Street Intersection Node Graphics Rev1 Base Case 2126
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Albert / Wyndham Street Intersection Node Graphics Rev1 Base Case 2062
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Albert / Victoria Street Intersection Node Graphics Rev1 Base Case 2041
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Hobson / Wellesley Street Intersection Node Graphics Rev1 Base Case 2025
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Albert / Wellesley Street Intersection Node Graphics Rev1 Base Case 2057
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Victoria / Federal Street Intersection Node Graphics Rev1 Base Case 2045
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Halsey / Fanshawe Street Intersection Node Graphics Rev1 Base Case 2040
AM Peak
IN Peak
PM Peak
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Rev2 Nodes
Lower Albert Street / Quay Street Intersection 2070
AM Peak
IN Peak
PM Peak
Rev1 Base Case
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
Rev2 Nodes
Lower Queen Street / Quay Street Intersection 2010
Rev1 Base Case
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
AM Peak
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
IN Peak
PM Peak
Rev2 Nodes
Gore Street / Quay Street Intersection 2054
Rev1 Base Case
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
AM Peak
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
IN Peak
PM Peak
Rev2 Nodes
Commerce Street / Quay Street Intersection 3127
Rev1 Base Case
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
AM Peak
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
IN Peak
PM Peak
Rev2 Nodes
Queen Street / Tyler Street Intersection 4866
Rev1 Base Case
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
AM Peak
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
IN Peak
PM Peak
Rev2 Nodes
Commerce Street / Tyler Street Intersection 4868
Rev1 Base Case
Scenario 4D
Scenario 5A
Scenario 6A
Scenario 7A
Scenario 8A
AM Peak
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
IN Peak
PM Peak
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix H
Intersection VC Plots
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
SATURN Atkins Ltd / DVV / ITS 1_fam21_CRL_ Basecase.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: Basecase 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fam21_CRL_Sc enario4D.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: C2 SP1 + Scenario4D 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fam21_CRL_Sc enario5A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: C2 SP1 + Scenario5A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fam21_CRL_Sc enario6A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: C2 SP1 + Scenario6 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS m21_CRL_Scen ario6A_S.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: C2 SP1 + Scenario6A_S 25-11-15
25-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fam21_CRL_Sc enario7A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: C2 SP1 + Scenario7A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fam21_CRL_Sc enario8A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 AM Peak: C2 SP1 + Scenario8A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS 1_fin21_CRL_ Basecase.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: Basecase 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fin21_CRL_Sc enario4D.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: C2 SP1 + Scenario4D 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fin21_CRL_Sc enario5A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: C2 SP1 + Scenario5A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fin21_CRL_Sc enario6A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: C2 SP1 + Scenario6 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS n21_CRL_Scen ario6A_S.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: C2 SP1 + Scenario6A_S 25-11-15
25-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fin21_CRL_Sc enario7A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: C2 SP1 + Scenario7A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fin21_CRL_Sc enario8A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 IN Peak: C2 SP1 + Scenario8A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS 1_fpm21_CRL_ Basecase.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: Basecase 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fpm21_CRL_Sc enario4D.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: C2 SP1 + Scenario4D 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fpm21_CRL_Sc enario5A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: C2 SP1 + Scenario5A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fpm21_CRL_Sc enario6A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: C2 SP1 + Scenario6 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS m21_CRL_Scen ario6A_S.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: C2 SP1 + Scenario6A_S 25-11-15
25-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fpm21_CRL_Sc enario7A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: C2 SP1 + Scenario7A 23-11-15
23-11-15 AECOM AUSTRA
SATURN Atkins Ltd / DVV / ITS fpm21_CRL_Sc enario8A.ufs Scale 15203 Node data: V/C % Multi-Colour by user-set ranges: 0- 60 60- 85 85- 100 100- 150 Bndwdh units = 15.00/mm
Auckland CBD Model: 2021 PM Peak: C2 SP1 + Scenario8A 23-11-15
23-11-15 AECOM AUSTRA
AECOM
Auckland CRL Enabling Works City Rail Link Enabling Works Traffic Modelling
Appendix I
Travel Times Against Observed Travel Times
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\C2-Sp1 Report\C2_SP1_ModellingReportV1.docx Revision A – 04-Nov-2015 Prepared for – Auckland Transport – ABN: N/A
Travel Times Compared Against Observed Travel Times Morning Peak Travel Times
Wellesley Street (EBD) Wellesley Street (WBD) Victoria Street (EBD) Victoria Street (WBD) Customs Street (EBD) Customs Street (WBD) Quay Street (EBD) Quay Street (WBD) Nelson Street (NBD) Hobson Street (SBD) Queen Street (NBD) Queen Street (SBD) New North Road (NBD) New North Road (SBD) Mt Eden Road (NBD)** Mt Eden Road (SBD)** Khyber Pass Road (EBD) Khyber Pass Road (WBD) Newton Road (EBD) Newton Road (WBD)
Observed (seconds) Base Case
Resource Consent Trigger (+10min)
402 348 444 450 330 342 228 300 180 276 510 474 186 144 150 120 132 120 144 126
1002 948 1044 1050 930 942 828 900 780 876 1110 1074 786 744 750 720 732 720 744 726
Scenario 4D Forecast Forecast Increase Time (s) (%)
45% 43% 57% 35% 39% 16% 30% 14% 23% 31% 7% 23% 1% 0% -1% 0% 2% 1% 4% 1%
580 500 700 610 460 400 300 340 220 360 550 580 190 140 150 120 130 120 150 130
Trigger Time (s)
760 680 910* 790 640 580 480 520 400 540 730 760 370 320 330 300 310 300 330 310
Scenario 5A Forecast Forecast Increase Time (s) (%)
49% 54% 64% 56% 38% 75% 29% 37% 28% 30% 2% 4% 1% 0% -2% 0% 2% 1% 7% 2%
600 530 730 700 460 600 290 410 230 360 520 490 190 140 150 120 130 120 150 130
Trigger Time (s)
780 710 950* 910* 640 780* 470 590 410 540 700 670 250 180 200 160 170 160 200 170
Scenario 6A Forecast Forecast Increase Time (s) (%)
50% 50% 66% 35% 53% 30% 37% 24% 27% 26% 7% 13% 1% 0% -1% 0% 2% 1% 13% 1%
600 520 740 610 500 450 310 370 230 350 540 540 190 140 150 120 130 120 160 130
Trigger Time (s)
780 700 960* 790 680 630 490 550 410 530 720 720 250 180 200 160 170 160 210 170
Scenario 6A_S Forecast Forecast Increase Time (s) (%)
45% 45% 63% 42% 48% 28% 34% 21% 26% 21% 5% 14% 1% 0% 0% 0% 0% 1% 6% 1%
580 500 720 640 490 440 310 360 230 330 530 540 190 140 150 120 130 120 150 130
Trigger Time (s)
760 680 940* 820 670 620 490 540 410 510 710 720 250 180 200 160 170 160 200 170
Scenario 7A Forecast Forecast Increase Time (s) (%)
26% 35% 67% 27% 56% 22% 40% 17% 11% 20% 7% 19% 1% 0% -1% 0% 2% 1% 13% 1%
510 470 740 570 520 420 320 350 200 330 550 570 190 140 150 120 130 120 160 130
Trigger Time (s)
690 650 960* 750 700 600 500 530 380 510 730 750 250 180 200 160 170 160 210 170
Scenario 8A Forecast Forecast Increase Time (s) (%)
20% 12% 14% 10% 52% 16% 36% 16% 5% 13% 1% 28% 0% 0% -2% 0% 0% 0% 10% 1%
480 390 510 500 500 400 310 350 190 310 510 610 190 140 150 120 130 120 160 130
Trigger Time (s)
660 570 690 680 680 580 490 530 370 490 690 790 370 320 330 300 310 300 340 310
**The SATURN model only covers the northern half of the Mt Eden Road route. (The forecast time has still been factored up, so it is a forecast travel time of the entire route)
25/11/2015
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\Rev2 Appendices\Appendix I - Travel Time Tables Against Observed Times\Travel Time Tables - Observed, Scenarios4D-8A Consent Reqs.docx Data from P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\Python\Travel Time – Model Rev2.xlsx
Interpeak Travel Times
Wellesley Street (EBD) Wellesley Street (WBD) Victoria Street (EBD) Victoria Street (WBD) Customs Street (EBD) Customs Street (WBD) Quay Street (EBD) Quay Street (WBD) Nelson Street (NBD) Hobson Street (SBD) Queen Street (NBD) Queen Street (SBD) New North Road (NBD) New North Road (SBD) Mt Eden Road (NBD)** Mt Eden Road (SBD)** Khyber Pass Road (EBD) Khyber Pass Road (WBD) Newton Road (EBD) Newton Road (WBD)
Observed (seconds) Base Case
Resource Consent Trigger (+10min)
438 324 450 570 312 348 246 252 168 288 588 624 168 132 174 180 114 102 132 120
1038 924 1050 1170 912 948 846 852 768 888 1188 1224 768 732 774 780 714 702 732 720
Scenario 4D Forecast Forecast Increase Time (s) (%)
17% 23% 65% 45% 14% 16% 28% 19% 40% 9% 13% 33% -1% 1% -1% 0% 1% 0% 2% 1%
510 400 740 830 360 400 320 300 240 310 660 830 170 130 170 180 120 100 130 120
Trigger Time (s)
690 580 960* 1080* 540 580 500 480 420 490 840 1010 350 310 350 360 300 280 310 300
Scenario 5A Forecast Forecast Increase Time (s) (%)
20% 29% 68% 73% 14% 78% 30% 52% 42% 10% 11% 18% -1% 1% 0% 0% 1% 2% 2% 6%
520 420 760 990 360 620 320 380 240 320 650 730 170 130 170 180 120 100 130 130
Trigger Time (s)
700 600 990* 1290* 540 810* 500 560 420 500 830 910 350 310 350 360 300 280 310 310
Scenario 6A Forecast Forecast Increase Time (s) (%)
21% 26% 68% 46% 22% 31% 33% 39% 41% 8% 13% 23% 0% 1% 0% 0% 1% 1% 2% 4%
530 410 760 830 380 460 330 350 240 310 660 760 170 130 170 180 120 100 130 130
Trigger Time (s)
710 590 990* 1080* 560 640 510 530 420 490 840 940 350 310 350 360 300 280 310 310
Scenario 6A_S Forecast Forecast Increase Time (s) (%)
19% 25% 70% 48% 23% 34% 34% 35% 42% 9% 13% 22% 0% 1% 0% 0% 4% 2% 6% 4%
520 410 760 840 390 470 330 340 240 310 670 760 170 130 170 180 120 100 140 130
Trigger Time (s)
700 590 990* 1090* 570 650 510 520 420 490 850 940 350 310 350 360 300 280 320 310
Scenario 7A Forecast Forecast Increase Time (s) (%)
14% 7% 71% 45% 33% 20% 35% 31% 33% 8% 16% 41% 0% 0% -1% 0% 2% 0% 4% 1%
500 350 770 820 420 420 330 330 220 310 680 880 170 130 170 180 120 100 140 120
Trigger Time (s)
680 530 1000* 1070* 600 600 510 510 400 490 860 1140* 350 310 350 360 300 280 320 300
Scenario 8A Forecast Forecast Increase Time (s) (%)
10% 5% 13% 9% 24% 12% 32% 30% 25% 6% 11% 39% 0% 1% -1% 0% 3% 0% 4% 0%
480 340 510 620 390 390 320 330 210 310 650 860 170 130 170 180 120 100 140 120
Trigger Time (s)
660 520 690 800 570 570 500 510 390 490 830 1040 350 310 350 360 300 280 320 300
**The SATURN model only covers the northern half of the Mt Eden Road route. (The forecast time has still been factored up, so it is a forecast travel time of the entire route)
25/11/2015
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\Rev2 Appendices\Appendix I - Travel Time Tables Against Observed Times\Travel Time Tables - Observed, Scenarios4D-8A Consent Reqs.docx Data from P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\Python\Travel Time – Model Rev2.xlsx
Evening Peak Travel Times
Wellesley Street (EBD) Wellesley Street (WBD) Victoria Street (EBD) Victoria Street (WBD) Customs Street (EBD) Customs Street (WBD) Quay Street (EBD) Quay Street (WBD) Nelson Street (NBD) Hobson Street (SBD) Queen Street (NBD) Queen Street (SBD) New North Road (NBD) New North Road (SBD) Mt Eden Road (NBD)** Mt Eden Road (SBD)** Khyber Pass Road (EBD) Khyber Pass Road (WBD) Newton Road (EBD) Newton Road (WBD)
Observed (seconds) Base Case
Resource Consent Trigger (+10min)
468 402 540 600 378 492 288 348 216 438 714 660 180 144 168 126 210 156 150 162
1068 1002 1140 1200 978 1092 888 948 816 1038 1314 1260 780 744 768 726 810 756 750 762
Scenario 4D Forecast Forecast Increase Time (s) (%)
41% 66% 74% 23% 18% 24% 26% 5% 26% 49% 9% 31% -2% 0% -1% 4% 0% 2% 3% 26%
660 670 940 740 450 610 360 370 270 650 780 860 180 140 170 130 210 160 150 200
Trigger Time (s)
840 870* 1220* 920 630 790 540 550 450 830 960 1040 230 180 220 170 270 210 200 260
Scenario 5A Forecast Forecast Increase Time (s) (%)
39% 69% 93% 62% 18% 73% 27% 22% 41% 55% 9% 38% -1% 1% -2% 5% 0% 4% 4% 26%
650 680 1040 970 450 850 370 420 300 680 780 910 180 140 160 130 210 160 160 200
Trigger Time (s)
830 880* 1350* 1260* 630 1110* 550 600 480 880* 960 1180* 230 180 210 170 270 210 210 260
Scenario 6A Forecast Forecast Increase Time (s) (%)
35% 70% 92% 48% 40% 41% 41% 12% 35% 48% 8% 30% -2% 1% 0% 4% 0% 2% 6% 4%
630 680 1040 890 530 690 410 390 290 650 770 860 180 140 170 130 210 160 160 170
Trigger Time (s)
810 880* 1350* 1160* 710 870 590 570 470 830 950 1040 230 180 220 170 270 210 210 220
Scenario 6A_S Forecast Forecast Increase Time (s) (%)
26% 41% 76% 31% 36% 20% 36% 21% 33% 6% 7% 18% -2% 1% 3% 7% 0% 2% 2% 3%
590 570 950 790 510 590 390 420 290 460 770 780 180 140 170 130 210 160 150 170
Trigger Time (s)
770 750 1240* 970 690 770 570 600 470 640 950 960 230 180 220 170 270 210 200 220
Scenario 7A Forecast Forecast Increase Time (s) (%)
48% 38% 121% 22% 43% 14% 40% 7% 24% 34% 3% 14% -1% -1% 0% 4% 1% 1% 9% -1%
690 560 1190 730 540 560 400 370 270 590 730 750 180 140 170 130 210 160 160 160
Trigger Time (s)
870 740 1550* 910 720 740 580 550 450 770 910 930 230 180 220 170 270 210 210 210
Scenario 8A Forecast Forecast Increase Time (s) (%)
50% 7% 15% 18% 29% 10% 35% 7% 13% 27% 2% 18% 23% -1% -1% 0% 1% -1% 4% -1%
700 430 620 710 490 540 390 370 240 550 730 780 220 140 170 130 210 150 160 160
Trigger Time (s)
880 610 800 890 670 720 570 550 420 730 910 960 400 320 350 310 390 330 340 340
**The SATURN model only covers the northern half of the Mt Eden Road route. (The forecast time has still been factored up, so it is a forecast travel time of the entire route) Forecast increase is between modelled scenario and modelled base case. Forecast time is base case factored up by forecast increase. Trigger time type is based on observed base case and forecast time. Additional mitigation measures are required if monitoring indicates that the travel time exceeds the trigger time. The trigger times are calculated as per Condition 15 of the Main Decision regarding the monitoring requirements: - If the modelled forecast time is less than or equal to 4 minutes above the observed base case time, the trigger time for that route is defined to be 3 minutes greater than the forecast time. - *Else, if the forecast time is more than 4 minutes above the observed base case time, the trigger time is defined to be 30% greater than the forecast time. The routes for which this condition applies are marked with an asterisk in the travel time tables. 25/11/2015
P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\CRL main enabling works Report\Rev2 Appendices\Appendix I - Travel Time Tables Against Observed Times\Travel Time Tables - Observed, Scenarios4D-8A Consent Reqs.docx Data from P:\603X\60344327\4. Tech work Area\WPP14B - Traffic Management Modelling\Python\Travel Time – Model Rev2.xlsx
Appendix H:
Cut and Cover Pipejack and Britomart Modelling Report – Rev 0
technical note PROJECT
CRL PIPE JACKING
SUBJECT
FROM
SCENARIO TESTING CHRIS BIRD, MIGUEL MENEZES, JENNY CHU, SCOTT ELWARTH, RICHARD JENKINS, LAURENCE JONES (AT); MATTHEW HOYLE, BRUCE KASSIR (JTOC); MARCUS WILLIAMS (AECOM), PAULO NAITITI (XIGO) MICHAEL JONGENEEL
REVIEWED BY
IAN CLARK
DATE
31 JULY 2015
TO
The following technical note documents the outputs of traffic modelling tests of the proposed temporary traffic management associated with the Pipe Jacking works within Auckland’s city centre. The assessment uses the 2021 Auckland City Centre SATURN model (so as to remain consistent with previous traffic modelling of the pipe jacking works, as well as that of the wider City Rail Link (CRL) works). The technical note compares six scenarios, as follows:
Base Case – Representing the existing city centre traffic network as at July 2015
Base Case + Bus Phase 1 – A scenario representing approximately October 2015 traffic conditions, following the first phase of bus priority measures intended to mitigate the effects of the CRL construction
Pipe Jacking Test 1 – A November 2015 traffic scenario, with work commencing at the first thee pipe jacking work sites
Pipe Jacking Test 2 – A January 2016 traffic scenario, with work being undertaken at all four pipe jacking work sites, and with the second phase of bus priority measures operational
Pipe Jacking Test 3 – A February 2016 traffic scenario, with conditions as per Test 2 but with the Quay Street cycleway under construction and one pipe jacking work site reopened to traffic
Pipe Jacking Test 4 – A July 2016 traffic scenario, as per Test 3 but with additional works associated with the CRL enabling works at Britomart, Albert Street and at the Downtown Shopping Centre.
During each of the above six scenarios, various other ‘background’ projects are also anticipated to affect the city centre traffic network. A full record of which projects are included within each scenario is included on Table 1 the following page. Below this, Table 2 provides details of the Albert Street intersections with Victoria Street and Wellesley Street.
2 Table 1: Summary of Temporary Traffic Management Scenarios
Base Case
Base Case + Bus Phase 1
Pipe Jacking Test 1
Pipe Jacking Test 2
Pipe Jacking Test 3
Pipe Jacking Test 4
Pipe Jacking Works Swanson Street shaft
Work site in operation
Victoria Street west shaft
Work site in operation
Victoria Street east shaft
Work site in operation
Wellesley Street shaft
Work site in operation
Bus Projects Bus Phase 1
Bus lanes on Wellesley Street, Victoria Street, Hobson Street, Halsey Street and Mayoral Drive; Bus routes shifted off Albert Street (north of Victoria Street), some North Shore services shifted to Wellesley Street
Bus Phase 2
Bus lanes on Queen Street and Customs Street/Beach Road; Bus routes shifted off Queen Street (Customs Street to Quay Street)
Other Projects Beach Road cycleway
Nelson Street cycleway
Under construction (two traffic lanes each way, shared right turn and through lanes) Stage 1 under construction (one lane closed from Union Street to Victoria Street during commuter peaks, two lanes closed off peak)
Stage 1 operational
Stage 1 operational;
(one lane closed from Union Street to Victoria Street)
Stage 2 under construction (Lower Hobson Street southbound service lane closed)
Quay Street cycleway
Wynyard Quarter closures
Under construction (two lanes each direction during the commuter peaks, with a shared right turn and through lane; one eastbound lane off peak with right turns banned except at Queen Street) Halsey Street closed (Fanshawe Street to north of Gaunt Street)
Halsey Street closed (Gaunt Street to Pakenham Street)
Halsey Street bus only (Victoria Street to Fanshawe Street)
City Rail Link works
Construction Traffic
Lower Albert Street northbound only from Customs Street to the HSBC building access; Double left turn from Lower Albert Street into Quay Street; Queen Street closed (Customs Street to Quay Street), except to construction traffic; Wyndham Street (east) closed at Albert Street One westbound through lane removed on Customs Street at Albert Street intersection 66-81 trucks/day to Wynyard Quarter
81-117 trucks/day to Wynyard Quarter
40-74 trucks/day to Wynyard Quarter; 15 trucks/day to CRL CPO site; 8-23 trucks/day to Precinct site
3
Table 2: Summary of Temporary Traffic Management Scenarios
Base Case
Base Case + Bus Phase 1
Pipe Jacking Test 1
Pipe Jacking Test 2
Pipe Jacking Test 3
Pipe Jacking Test 4
Same as Test 2
Same as Test 2
Albert Street Intersections Victoria Street
Wellesley Street
Same as Bus Phase 1
Same as Test 2
In the above intersection plots, bus lanes are generally represented by solid red pavement marking, and bus only movements are represented by pink arrows. Some bus lanes on Albert Street however have been represented by separate links. These links should not be confused with the service lanes running parallel to Albert Street, which are not represented in the SATURN models.
4 It should be noted that the bus priority works and revised bus routes associated with Bus Phase 2 are scheduled to take some four months to implement before becoming fully operational (December 2015 to April 2016). This transition period has been simplified in the modelling sequence, with Bus Phase 2 assumed to be fully operational from pipe jacking Test 2 onwards (January 2016). As a result, Tests 2 and 3 may each underestimate effects for buses, as the Bus Phase 2 bus lanes may not yet be operational at that time, and the existing (generally longer) bus routes may still be operating.
1 FLOW DIFFERENCE PLOTS Traffic flow difference plots are appended to this technical note. The plots illustrate the predicted traffic effects of the various scenarios assessed, by comparing the modelled traffic flows of each scenario with those of the Base Case. In these plots, green bands indicate increases in traffic flows due to the option, while blue lines indicate decreases in flows. The flows displayed are what SATURN terms “demand” flows, which are the traffic flows that wish to pass through each link, but may or may not be able to due to upstream bottlenecks. In congested networks, demand flows are higher than “actual” flows, which represent the traffic flows which are able to pass through each link, and the assessment of journey times in the following sections are based on these “actual” rather than “demand” flows. Note that the flow difference plots show an apparent decrease in traffic on streets that have bus lanes added as part of either the Bus Phase 1 or Bus Phase 2 works. In these instances the bus lanes have been represented as separate links in the scenario models. SATURN shows the reduction in traffic on the original link due to buses shifting onto the bus lane link, but is unable to show an increase on the bus lane link itself as these links are not in the Base Case network. In general, Bus Phase 1 is predicted to result in the least significant traffic redistributions, with no large increases predicted. Tests 1, 2, 3 and 4 are generally predicted to result increasing levels of traffic redistribution, with the following noted:
Increased pressure on Nelson Street in the morning peak, and increased pressure on Hobson Street in the evening peak, in all scenarios
Increased traffic on Gaunt Street due to the reopening of that route in Test 1
Relatively large increases in traffic on Beaumont Street in Tests 2 and 3, due to the closure of Halsey Street to all traffic except buses
Increased pressure on the motorway network in Test 4, particularly the evening peak.
2 SUMMARY STATISTICS Table 3 and Table 4 present the network wide travel times and travel distances for the scenarios modelled, for general traffic and for buses, respectively. These summary statistics are compared to the July 2015 Base Case. The travel times presented are in person-hours. This has been done in order to present a meaningful comparison between the predicted effects on general traffic users and those predicted for bus
5 passengers. To determine these, an average car occupancy of 1.2 persons per vehicle has been applied, as well as an average bus occupancy of 30 people. Little weight should be given to the absolute values presented in the following tables, as the total travel times and distances are largely dependent on the size of the network modelled. The statistics however provide an indicative measure of the potential disruption to traffic caused by each modelled scenario, relative to each other. Table 3: Summary Statistics – General Traffic (including Construction Trucks)
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Travel Time (person-hours) Morning Peak
8,590
8,590 (-)
8,520 (-70)
8,590 (-)
8,870 (+280)
9,060 (+470)
Inter Peak
5,500
5,590 (+90)
5,600 (+100)
5,690 (+190)
5,850 (+350)
5,850 (+350)
14,290
14,360 (+70)
14,090 (-200)
14,220 (-70)
14,690 (+400)
15,810 (+1,520)
Evening Peak
Travel Distance (vehicle-km) Morning Peak
173,100
173,000 (-100)
172,200 (-900)
172,200 (-900)
173,600 (+500) 174,100 (+1,000)
Inter Peak
142,900
143,000 (+100) 142,500 (-400)
142,800 (-100)
143,600 (+700) 143,900 (+1,000)
Evening Peak
191,300
191,600 (+300) 190,100 (-1,200) 191,100 (-200)
192,400 (+1,100) 193,500 (+2,200)
Bus Phase 1, Test 1 and Test 2 are predicted to have relatively modest impacts on general traffic, with some improved network travel times predicted in part due to the reopening of Halsey Street between Fanshawe Street and Gaunt Street. Test 3 and Test 4 are predicted to have larger impacts on general traffic due to the restrictions on Quay Street to construct the cycleway on this route. Test 4 in particular is predicted to result in relatively large traffic effects in the evening peak period, due to the cumulative effects of the Quay Street cycleway and the wider CRL construction works. Unusually, traffic effects during the inter peak are predicted to be greater than the commuter peaks for some modelled scenarios. In these tests, additional inter peak lane closures on Nelson Street (and on the Nelson Street off ramps from the Southern and Northwestern motorways) to support the Nelson Street cycleway construction, and on Quay Street to support that cycleway, are predicted to result in increased inter peak travel time effects. Table 4: Summary Statistics – Buses
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Travel Time (person-hours) Morning Peak
4,200
3,840 (-360)
3,960 (-240)
4,040 (-160)
4,170 (-30)
4,220 (+20)
Inter Peak
1,760
1,670 (-90)
1,730 (-30)
1,750 (-10)
1,780 (+20)
1,770 (+10)
Evening Peak
5,700
5,400 (-300)
5,480 (-220)
5,540 (-160)
5,770 (+70)
5,940 (+240) 1
1
Bus travel times corrected at Fanshawe Street on ramp, where the bus priority lane is not represented in the model
6 Table 4: Summary Statistics – Buses
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Travel Distance (vehicle-km) Morning Peak
2,140
2,020 (-120)
2,020 (-120)
2,020 (-120)
2,020 (-120)
2,020 (-120)
Inter Peak
1,020
970 (-50)
970 (-50)
970 (-50)
970 (-50)
970 (-50)
Evening Peak
2,170
2,020 (-150)
2,040 (-130)
2,010 (-160)
2,010 (-160)
2,020 (-150)
In terms of bus effects, both travel times and travel distances are predicted to reduce for most time periods and most scenarios. This is due both to the new bus lanes proposed as mitigation, but also due to the shorter bus routes. Relatively large increases in bus travel times are predicted under Test 4, particularly in the evening peak. Significant delays for buses under this scenario are predicted on Anzac Avenue at the intersection of Waterloo Quadrant/Alten Road, where increased general traffic queues from Grafton Gully are predicted to affect this intersection. SATURN is a “mesoscopic” level traffic model, while the modelling of bus priority measures at closely spaced signalised intersections would correctly require a more microscopic level of analysis. As a result, the SATURN models predict zero bus benefits due to some bus priority measures, and in some instances dis-benefits. An example of this is on Albert Street, under tests 1 to 4, where the northbound bus lane will merge into the general traffic lane approximately 20 m short of the Victoria Street intersection. Within the SATURN models, all of the delay associated with the northbound queue is incurred at the Victoria Street intersection, and by stopping 20 m short of the intersection, the bus lane provides zero benefit. In reality of course, buses would bypass much of the northbound queue and be subject to a shorter delay than queued general traffic. As a result, the above assessment of overall bus travel times is somewhat conservative.
3 JOURNEY TIMES 3.1 General Traffic For each modelled scenario, journey times on six key city centre routes have been assessed as follows (see Figure 1 below):
Route 1: Wellesley Street between Victoria Street and Princes Street
Route 2: Victoria Street between Wellesley Street and Princes Street
Route 3: Customs Street/Fanshawe Street between Nelson Street and Tangihua Street
Route 4: Quay Street and Lower Hobson Street between Fanshawe Street and Tangihua Street
Route 5: Nelson Street/Hobson Street between Pitt Street and Fanshawe Street
Route 6: Queen Street between Mayoral Drive and Customs Street
7 Figure 1: Journey Time Routes Victoria Street Wellesley Street Quay Street
Queen Street Customs Street Nelson/Hobson
The above routes are consistent with those referred to in the Resource Consent for the Albert Street Stormwater Main Realignment Project. Condition 15 of these Consent Conditions set out a maximum permissible increase in journey times on the above routes of ten minutes, as a result of any temporary construction works. Table 5 to Table 7 present the modelled journey times for the six routes assessed. While the journey times given are generally for general traffic (ie not buses), it is noted that Wellesley Street westbound from Mayoral Drive to Lorne Street is bus only. As a result, the Wellesley Street westbound journey time shown is a bus journey time. Forecast changes in journey times in the tables below have been colour coded, in order to more clearly illustrate trends and compare scenarios. The following scale has been used: Journey Time Increases
Journey Time reductions
Increases under 30 seconds
Reductions under 30 seconds
Increases between 30 seconds and 1 minute
Reductions between 30 seconds and 1 minute
Increases between 1 and 2 minutes
Reductions between 1 and 2 minutes
Increases over 2 minutes
Reductions over 2 minutes
8 Table 5: Morning Peak Journey Times
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Wellesley Street Eastbound
6:20
6:50 (+0:30)
6:50 (+0:30)
7:10 (+0:50)
7:15 (+0:55)
7:20 (+1:00)
Westbound
6:45
7:20 (+0:35)
7:55 (+1:10)
8:40 (+1:55)
8:55 (+2:10)
9:25 (+2:40)
Eastbound
7:00
7:40 (+0:40)
9:15 (+2:15)
9:05 (+2:05)
9:10 (+2:10)
10:25 (+3:25)
Westbound
8:35
8:35 (-)
9:20 (+0:45)
9:40 (+1:05)
9:40 (+1:05)
11:30 (+2:55)
Eastbound
3:30
3:30 (-)
3:30 (-)
4:25 (+0:55)
4:45 (+1:15)
4:55 (+1:25)
Westbound
4:50
4:50 (-)
4:50 (-)
5:10 (+0:20)
5:30 (+0:40)
5:45 (+0:55)
Eastbound
3:05
3:00 (-0:05)
3:00 (-0:05)
3:00 (-0:05)
3:45 (+0:40)
3:50 (+0:45)
Westbound
4:45
4:30 (-0:15)
4:25 (-0:20)
5:00 (+0:15)
5:30 (+0:50)
5:25 (+0:40)
Victoria Street
Customs Street
Quay Street
Nelson Street/Hobson Street Northbound
5:35
5:00 (-0:35)
5:10 (-0:25)
5:00 (-0:35)
5:10 (-0:25)
6:00 (+0:25)
Southbound
4:05
4:10 (+0:05)
4:10 (+0:05)
4:45 (+0:40)
4:50 (+0:45)
4:40 (+0:35)
Northbound
8:30
8:30 (-)
8:40 (+0:10)
9:00 (+0:30)
9:15 (+0:45)
9:10 (+0:40)
Southbound
8:10
8:05 (-0:05)
8:10 (-)
10:00 (+1:50)
10:20 (+2:10)
8:20 (+0:10)
Queen Street
Table 6: Inter Peak Journey Times
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Wellesley Street Eastbound
5:45
6:05 (+0:20)
6:10 (+0:25)
5:55 (+0:10)
6:05 (+0:20)
6:10 (+0:25)
Westbound
6:35
6:50 (+0:15)
7:00 (+0:25)
7:55 (+1:20)
8:00 (+1:25)
8:05 (+1:30)
Eastbound
6:35
7:00 (+0:25)
8:45 (+2:10)
9:05 (+2:30)
9:10 (+2:35)
9:25 (+2:50)
Westbound
7:00
7:25 (+0:25)
7:55 (+0:55)
9:15 (+2:15)
9:20 (+2:20)
9:55 (+2:55)
Eastbound
4:00
4:00 (-)
4:00 (-)
4:20 (+0:20)
5:05 (+1:05)
5:00 (+1:00)
Westbound
4:55
5:00 (+0:05)
5:05 (+0:10)
5:15 (+0:20)
5:20 (+0:25)
5:45 (+0:50)
Eastbound
3:15
3:15 (-)
3:15 (-)
3:15 (-)
4:50 (+1:35)
4:45 (+1:30)
Westbound
4:30
4:30 (-)
4:30 (-)
5:20 (+0:50)
5:55 (+1:25)
5:40 (+1:10)
Victoria Street
Customs Street
Quay Street
9 Table 6: Inter Peak Journey Times
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Nelson Street/Hobson Street
Northbound
3:00
4:05 (+1:05)
4:10 (+1:10)
3:40 (+0:40)
3:40 (+0:40)
3:45 (+0:45)
Southbound
3:20
3:20 (-)
3:20 (-)
3:35 (+0:15)
3:25 (+0:05)
3:25 (+0:05)
Northbound
7:45
7:45 (-)
7:55 (+0:10)
8:45 (+1:00)
8:50 (+1:05)
8:20 (+0:35)
Southbound
7:45
7:45 (-)
7:45 (-)
10:20 (+2:35)
10:30 (+2:45)
8:50 (+1:05)
Queen Street
Table 7: Evening Peak Journey Times
Base Case
Base Case + Bus Phase 1
Test 1
Test 2
Test 3
Test 4
Wellesley Street Eastbound
8:40
10:30 (+1:50)
9:55 (+1:15)
8:25 (-0:15)
10:15 (+1:35)
10:15 (+1:35)
Westbound
8:05
9:05 (+1:00)
9:55 (+1:50)
10:25 (+2:20)
10:45 (+2:40)
11:00 (+2:55)
Eastbound
7:05
7:25 (+0:20)
10:35 (+3:30)
9:30 (+2:25)
10:00 (+2:55)
10:10 (+3:05)
Westbound
12:30
12:45 (+0:15)
12:40 (+0:10)
12:40 (+0:10)
13:20 (+0:50)
14:25 (+1:55)
Victoria Street
Customs Street
Eastbound
3:55
3:55 (-)
4:00 (+0:05)
4:30 (+0:35)
4:40 (+0:45)
5:15 (+1:20)
Westbound
5:40
5:50 (+0:10)
5:55 (+0:15)
5:55 (+0:15)
6:15 (+0:35)
6:25 (+0:45)
Eastbound
3:15
3:15 (-)
3:15 (-)
3:20 (+0:05)
4:15 (+1:00)
4:15 (+1:00)
Westbound
4:25
4:25 (-)
4:20 (-0:05)
5:10 (+0:45)
5:45 (+1:20)
5:20 (+0:55)
Quay Street
Nelson Street/Hobson Street
Northbound
4:55
5:00 (+0:05)
5:00 (+0:05)
5:10 (+0:15)
5:15 (+0:20)
5:25 (+0:30)
Southbound
9:40
9:00 (-0:40)
8:55 (-0:45)
9:00 (-0:40)
9:15 (-0:25)
9:55 (+0:15)
Northbound
9:55
10:00 (+0:05)
10:15 (+0:20)
10:50 (+0:55)
11:05 (+1:10)
10:05 (+0:10)
Southbound
11:40
11:30 (-0:10)
11:30 (-0:10)
13:10 (+1:30)
13:40 (+2:00)
12:35 (+0:55)
Queen Street
In general, no travel time increases over four minutes are predicted, with most increases being two minutes or less. The routes most affected are Victoria Street and Wellesley Street, which are directly affected by the pipe jacking work sites. Smaller increases are predicted on all of the routes assessed. Understandably, Quay Street and Customs Street are predicted to be most affected in scenarios where the Quay Street cycleway is under construction. Queen Street is most affected from Test 2 onwards, when bus lanes remove one lane of traffic from this route.
10 Notably, Nelson Street during the inter peak is predicted to be subject of delays of approximately one minute when the Nelson Street cycleway is under construction. Commuter peak delays on this route are however predicted to be negligible. Eastbound journey times on Wellesley Street during the evening peak are predicted to be variable between tested scenarios. Here, right turning traffic from Wellesley Street into Hobson Street and Mayoral Drive receive only short right turn lanes. While demand for these right turns varies only slightly between the various scenarios, in some cases the right turn queues are predicted to extend back into the single eastbound through lane, delaying through traffic.
4 SIGNAL PHASING 4.1 Pipe Jack Intersections The following tables document the signal phasing applied at the three intersections directly affected by the pipe jacking works, namely the Albert Street intersections with Victoria Street, Wellesley Street and Swanson Street.
11 Table 8: Signal Phasing – Albert Street and Victoria Street
Base Case and Bus Phase 1
Tests 1, 2, 3 and 4 2
Morning Peak
Barnes Dance
Inter Peak
Barnes Dance
Barnes Dance
Evening Peak
Barnes Dance
Barnes Dance
Barnes Dance
Table 9: Signal Phasing – Albert Street and Wellesley Street
Base Case, Bus Phase 1 and Test 1
Tests 2, 3 and 4 3 Slip Lane Phase
Morning Peak Slip Lane Phase
Barnes Dance
2
Southbound left turn into Victoria Street banned in Test 1 to allow site establishment
3
Southbound left turn into Wellesley Street banned in Test 2 to allow site establishment, and in Test 4 for disestablishment
12 Table 9: Signal Phasing – Albert Street and Wellesley Street
Base Case, Bus Phase 1 and Test 1
Tests 2, 3 and 4 3 Slip Lane Phase
Inter Peak Slip Lane Phase
Barnes Dance
Slip Lane Phase
Evening Peak Slip Lane Phase
Barnes Dance
Table 10: Signal Phasing – Albert Street and Swanson Street
Base Case, Bus Phase 1, Test 3 and Test 4
Morning Peak
Tests 1 and 2 North & south pedestrian phases
+ South ped phase
13 Table 10: Signal Phasing – Albert Street and Swanson Street
Base Case, Bus Phase 1, Test 3 and Test 4
Inter Peak
Evening Peak
Tests 1 and 2 North & south pedestrian phases
North & south pedestrian phases
+ South ped phase
+ South ped phase
The following tables document signal phase changes applied elsewhere within the city centre, as a result of background construction programmes.
14 Table 11: Signal Phasing – Halsey Street and Fanshawe Street
Base Case and Bus Phase 1
Test 1 and 4
Tests 2 and 3
(Halsey closed north of Fanshawe)
(Halsey open )
(Halsey open to buses only, Victoria to Fanshawe)
4
+ NE ped phase
Morning Peak
+ NE ped phase
Inter Peak
Same as Test 1
+ NE ped phase
Evening Peak
4
Except north of Gaunt Street, Test 1
15 Table 12: Signal Phasing – Fanshawe Street and Beaumont Street
Base Case, Bus Phase 1, Test 1 and Test 4 (Halsey open, Victoria to Gaunt)
Tests 2 and 3 (Halsey open to buses only, Victoria to Fanshawe; Two right turn lanes from SH1 off ramp into Beaumont)
Morning Peak
Inter Peak Cycle time extended to match Halsey Street intersection
Evening Peak
Table 13: Signal Phasing – Halsey Street, Victoria Street and Wellesley Street
Morning Peak
Base Case, Bus Phase 1, Test 1 and Test 4
Tests 2 and 3
(Halsey open, Victoria to Gaunt)
(Halsey open to buses only, Victoria to Fanshawe)
16 Table 13: Signal Phasing – Halsey Street, Victoria Street and Wellesley Street
Base Case, Bus Phase 1, Test 1 and Test 4
Tests 2 and 3
(Halsey open, Victoria to Gaunt)
(Halsey open to buses only, Victoria to Fanshawe)
Inter Peak Evening Peak Table 14: Signal Phasing – Customs Street and Queen Street
Base Case, Bus Phase 1 and Test 1
Tests 2 and 3
Test 4
(Bus Phase 2 in operation)
(Bus Phase 2 + CRL Britomart works) Barnes Dance
Morning Peak
Barnes Dance
Barnes Dance
Barnes Dance
Inter Peak Barnes Dance
Barnes Dance
17 Table 14: Signal Phasing – Customs Street and Queen Street
Base Case, Bus Phase 1 and Test 1
Tests 2 and 3
Test 4
(Bus Phase 2 in operation)
(Bus Phase 2 + CRL Britomart works) Barnes Dance
Evening Peak
Barnes Dance
Barnes Dance
Table 15: Signal Phasing – Customs Street and Commerce Street
Base Case, Bus Phase 1 and Test 1
Tests 2, 3 and 4 (Bus Phase 2 in operation)
Morning Peak
Barnes Dance
Inter Peak
Barnes Dance
Evening Peak
Barnes Dance
Barnes Dance
Barnes Dance
Barnes Dance
18 Table 16: Signal Phasing – Quay Street and Lower Albert Street
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Lower Albert in inter peak, shared right turn and through lane in commuter peaks; Double left turn into Quay in Test 4)
Morning Peak
Barnes Dance
Inter Peak
Barnes Dance
Evening Peak
Barnes Dance
Barnes Dance
Barnes Dance
Barnes Dance
Table 17: Signal Phasing – Quay Street and Queen Street
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turn filter into Queen during inter peak for construction traffic only; Shared right turn and through in commuter peaks)
Morning Peak Inter Peak Evening Peak
No change in phase times Barnes Dance
Barnes Dance
No change in phase times
19 Table 18: Signal Phasing – Quay Street and Commerce Street
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Commerce in inter peak, shared right turn and through lane in commuter peaks)
Morning Peak
No change in phase times
Inter Peak Evening Peak
No change in phase times
Table 19: Signal Phasing – Quay Street and Gore Street
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Gore in inter peak, shared right turn and through lane in commuter peaks)
Morning Peak
20 Table 19: Signal Phasing – Quay Street and Gore Street
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Gore in inter peak, shared right turn and through lane in commuter peaks)
Inter Peak
Evening Peak
Table 20: Signal Phasing – Quay Street and Britomart Place
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Britomart in inter peak, shared right turn and through lane in commuter peaks)
Morning Peak Inter Peak
No change in phase times
21 Table 20: Signal Phasing – Quay Street and Britomart Place
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Britomart in inter peak, shared right turn and through lane in commuter peaks)
Evening Peak
No change in phase times
Table 21: Signal Phasing – Quay Street and Tangihua Street
Base Case, Bus Phase 1, Test 1 and Test 2
Tests 3 and 4 (Quay Street Cycleway; Right turns banned into Tangihua in inter peak, shared right turn and through lane in commuter peaks)
Morning Peak Inter Peak Evening Peak
22 Table 22: Signal Phasing – Customs Street and Albert Street
Base Case, Bus Phase 1, Tests 1, 2 and 3
Test 4 (CRL Britomart works)
Morning Peak
Inter Peak
Evening Peak
23
5 EFFECTS OF TRIP SUPPRESSION Beginning with the current closure of Halsey Street between Fanshawe Street and Gaunt Street, and culminating with the major CRL construction phases, the city centre will be subject to multiple temporary road closures and restrictions over a period of several years. Given these conditions, some quantity of trip suppression can be expected, driven by a combination of mode shift away from private vehicle travel, shifting of trips from peak to off-peak times, diversion of non-essential trips away from the city centre, and other factors. Acknowledging this, a series of sensitivity tests has been run that assesses the traffic effects of supressed traffic on the pipe jacking Test 4. The sensitivity test has been run on this scenario, as this is the scenario with the greatest traffic impacts. The tests have been run by supressing 5%, 10% and 15% of all trips to and from zones bounded by the city’s motorway cordon. Through traffic on the motorway network and on other external routes has not been reduced. The results of the sensitivity tests, in terms of network travel times for general traffic and buses, are shown in Table 23. Note that the travel times shown are for all traffic collectively (buses, trucks and general traffic), and are represented in PCU-hours. Table 23: Network Wide Travel Times with Trip Suppression – All Traffic (pcu-hours)
Base Case
Test 4 No Trip Suppression
Test 4 5% Trip Suppression
Test 4 10% Trip Suppression
Test 4 15% Trip Suppression
Morning Peak
7,440
7,840
7,040
6,420
5,880
Inter Peak
4,710
5,000
4,710
4,450
4,230
12,290
13,610
11,940
10,700
9,580
Evening Peak
The above table indicates that overall travel times within the city centre are very elastic in relation to demand reductions. This is not unexpected given the generally congested nature of the city centre, where small increases or reductions in demand or supply can have disproportionate effects. In the evening peak in particular, a 5% demand reduction is predicted to result in a 12% travel time reduction overall, relative to Test 4 without any trip suppression. By comparing the network overall, the above table however hides local effects. To give a more complete picture of the expected effects, Table 24 to Table 26 below go on to present the modelled journey times on Victoria Street and Queen Street under each trip suppression scenario. Reporting has been limited to Victoria Street and Queen Street, acknowledging that these are the most significantly affected east-west and north-south routes, respectively.
24 Table 24: Morning Peak Journey Times with Trip Suppression
Base Case
Test 4 No Trip Suppression
Test 4 5% Trip Suppression
Test 4 10% Trip Suppression
Test 4 15% Trip Suppression
Eastbound
7:00
10:25 (+3:25)
10:20 (+3:20)
9:10 (+2:10)
8:45 (+1:45)
Westbound
8:35
11:30 (+2:55)
9:35 (+1:00)
9:00 (+0:25)
8:50 (+0:15)
Northbound
8:30
9:10 (+0:40)
8:40 (+0:10)
8:20 (-0:10)
8:05 (-0:25)
Southbound
8:10
8:20 (+0:10)
8:15 (+0:05)
8:10 (-)
8:10 (-)
Victoria Street
Queen Street
Table 25: Inter Peak Journey Times with Trip Suppression
Base Case
Test 4 No Trip Suppression
Test 4 5% Trip Suppression
Test 4 10% Trip Suppression
Test 4 15% Trip Suppression
Victoria Street Eastbound
6:35
9:25 (+2:50)
9:05 (+2:30)
8:40 (+2:05)
8:05 (+1:30)
Westbound
7:00
9:55 (+2:55)
9:20 (+2:20)
8:55 (+1:55)
8:30 (+1:30)
Northbound
7:45
8:20 (+0:35)
8:10 (+0:25)
8:00 (+0:15)
8:00 (+0:15)
Southbound
7:45
8:50 (+1:05)
8:35 (+0:50)
8:25 (+0:40)
8:20 (+0:35)
Base Case
Test 4 No Trip Suppression
Test 4 5% Trip Suppression
Test 4 10% Trip Suppression
Test 4 15% Trip Suppression
Eastbound
7:05
10:10 (+3:05)
9:05 (+2:00)
8:55 (+1:50)
8:40 (+1:35)
Westbound
12:30
14:25 (+1:55)
14:55 (+2:25)
10:50 (-1:40)
10:55 (-1:35)
Northbound
9:55
10:05 (+0:10)
9:20 (-0:30)
9:10 (-0:55)
8:50 (-1:15)
Southbound
11:40
12:35 (+0:55)
11:10 (-0:25)
10:15 (-1:15)
9:50 (-1:50)
Queen Street
Table 26: Evening Peak Journey Times with Trip Suppression
Victoria Street
Queen Street
The above tables demonstrate that the 5%, 10% and 15% trip suppression applied across the network is predicted to go some way towards mitigating the traffic effects of the various construction programmes across the city centre. The success of any trip suppression however will vary across the city centre network, depending on specific intersections, routes, and times of day. While trip suppression will likely improve the performance of the city centre network overall, delays on specific constrained corridors, such as Victoria Street, may well remain.
Reference: S:\atmp\032 CRL Lower Albert\TN4C150731 Pipe Jack Scenario Testing.docx - Michael Jongeneel
25 Table 27: Demand Flow Difference Plots (Compared to Base Case)
Test 1
Bus Phase 1
Morning Peak
Inter Peak
Evening Peak
26 Table 27: Demand Flow Difference Plots (Compared to Base Case)
Test 3
Test 2
Morning Peak
Inter Peak
Evening Peak
27 Table 27: Demand Flow Difference Plots (Compared to Base Case)
Test 4
Morning Peak
Inter Peak
Evening Peak
Appendix I:
Auckland City CBD TDM Overview
Auckland City CBD TDM Plan Overview The following early overview has been supplied by the AT TD Unit. The AT Travel Demand (TD) Units’ role within the CRL project (including the pipe jack Project) is to make best use of existing multi-modal transport networks in order to reduce single occupant vehicle (SOV) trips (i.e. private motor car use) to the Central Business District (CBD) by 10% in the morning peak. The area shown in Figure 1 is the target destination area for promoting travel to, and within the CBD, by alternative modes of transport other than single occupant vehicles. The TD plan will benefit congestion mitigation for both the CRL enabling works projects and that associated with the large scale developments occurring across the CBD simultaneously (e.g. the NDG Auckland Centre and other private developments) The TDM planning and implementation is currently underway and will form an important part in mitigating network congestion. Figure 1: The area of Auckland CBD targeted for the TD Plan
The need for a TDM Programme for CRL Due to the disruption of the Auckland inner city street network which will be caused by the enabling works for the CRL project, approximately 4,000 SOV drivers will need to change their travel mode in the morning peak in order to maintain the current network functionality within the CBD. It is feasible that TDM initiatives (including expanded PT capacity through electric trains, expanded ferry services, double decker buses and the new bus network) can accommodate 4,000 trips if a combination of initiatives are implemented simultaneously e.g. encouraging people to change the time
they travel, work from home occasionally, and change mode from SOV trips to walking, cycling, bus, train, ferry and carpooling. Table 1 gives an indication of the type of TDM measures that could potentially be implemented in the CBD. Table 1: Examples of TDM Measures Mode
TDM Hard Measures
TDM Soft Measures
Walking
Improved footpaths
Walk in to work out – awareness raising events
Dedicated walking routes from parking areas and residential areas
10,000 step challenges
Way-finding signage showing direction, time and distance to destinations
Advertising and promotions
Prioritised pedestrian signals in the CBD to reduce delays
Competitions and events
City centre walking maps
Expos for business, towerblock, residents and students
End of trip facilities: lockers, drying rooms, showers
Walk to work month
Resource consents that require the provision of trip end facilities Cycling
Dedicated segregated cycle ways
Cycle training events
Way-finding signage showing direction, distance and time
Guided Cycle Rides showing people safe routes
End of trip facilities: secure covered cycle parking, lockers, showers and drying rooms
Route maps
Business and tower block expos Advertising and promotion Cycle to work month events Bus Transport
New bus network services
HOP card marketing
personalised journey planning (PJPs) Bus hubs
Events and expos
High quality bus shelters
Advertising campaigns
Bus priority lanes Bus priority signals Train Transport
Ferry Transport
Carpooling
Electric trains
Hop card marketing PJPs
New stations
Events and expos
Ferry terminals
Hop card marketing PJPs
Priority parking for people who carpool to catch the ferry
Events and expos
Dedicate public carpools spaces
Guaranteed ride home schemes promoted by businesses or Transport Management Associations
Dedicated carpool spaces in private/workplace car parks
Marketing and publicity
AT carpooling website, promotions and competitions Flexible working
Business hubs (e.g. SBN feasibility study for Hobsonville)
Working with businesses to promote flexible working
Advertising and promotion Tele-working
Provision of company laptops
Working with businesses to promote working from home Advertising and promotion
Soft measures can be implemented by working directly with the travelling public, either at the origin of their trip (generally at home), at the destination (generally at work or tertiary establishment) or enroute by encouraging companies to become part of the AT Commute Programme, or by working directly with people, one-on-one. In developing the TDM plan for CRL the aim is to reach as many of the travelling public who will be affected by disruption in the CBD as possible. The most effective way to do this is through Expos and Events, company and tertiary travel plans and by running mode specific targeted marketing campaigns, events and promotions.
A different mode of transport will be the focus for marketing each quarter to ensure messages are kept ‘fresh’ and relevant. Next Steps: 1.
Estimate the number of trips to be accommodated by each mode and set targets.
2.
Map the PT routes and services that have excess capacity to enable the promotion of PT to areas where it will be most effective for the travelling public.
3.
Map the cycle routes and walking routes that can be promoted to the travelling public (Note: liaise with the walking and cycling team as there are some published maps for walking routes in the CBD that could be updated).
4.
Link with the timetable for the construction of cycle paths accessing the CBD (3 year plan).
5.
Liaise with Waterfront Auckland and AT parking management to establish dedicated carpool car parks spaces in city centre car parks to link in with the carpool promotions.
6.
Link with the Transport Management Association at Wynyard Quarter.
7.
Prepare action plans showing what measures we are going to promote, when and by whom.
8.
Establish a monitoring strategy to monitor effectiveness of TDM measures and make changes accordingly.
9.
Further liaise with CRL communications advertising campaigns.
Appendix J:
Pedestrian Assessment
AM 15 minute Peak
Existing Tyler North Footpath Tyler South Footpath Tyler Total
136 25 Eastbound
Mass Balance Side Doors Tyler Side Door From/To West From/To East Entering 0 74 Leaving 210 0 Total Side Door 284
25 51 76 Inbound
North Door Centre Door South Door
72 25 124
CPO
Eastbound Galway North Footpath Galway South Footpath Galway Total CHECKSUM with B2_1 Total at McDs Implied from other sources Reassigned Tyler North Footpath Tyler South Footpath Tyler Total
63 37 100 700
Eastbound 25 135.5 160.5
Galway Side Door Entering Leaving Total Side Door Total
From/To West From/To East 43 0 0 17 60 1171
New Side Door Entering Exiting Total Side Door
From/To West From/To East 85 0 378 0 462
C2_1 Tyler North Footpath Tyler South Footpath Tyler Total
Westbound Eastbound 13 26 124 260 137 286
C2_2 Centre Door (Assume all in/out)
Inbound
C2_3
Westbound Eastbound
81
Galway Total
102
Outbound 94
57
C2_1 Tyler North Footpath Tyler South Footpath Tyler Total
Westbound Eastbound 13 26 124 260 137 286
C2_2 Centre Door
Inbound
C2_3
Westbound Eastbound
Inbound North Door Centre Door - 50/50 split South Door
0 0 0
CPO
Eastbound Galway North Footpath Galway South Footpath Galway Total
New Side Door From/To West From/To East Entering 180 0 Exiting 264 0 Total Side Door 443 Total Entering / Exits 1171
63 173.5 236.5
Total WB Existing Total WB New
Total EB Existing Total EB New
Bottleneck Analysis Galway St South Footpath Tyler St South Foothpath New Galway St side door New Tyler St side door New station entry
Ped Per Minute 45 26 32 34 20
Required Width for LoS C 1.1 m 0.6 m 0.8 m 0.8 m 0.5 m
Available Width 4.5 m 4.0 m 8.0 m 4.0 m 8.0 m
Galway Total
155
102
Outbound 111
57
PM 15 minute Peak
NB To Harbour Diagonally to Ferry
Existing Tyler North Footpath Tyler South Footpath Tyler Total
Westbound
Eastbound 32 30 62
Outbound North Door Centre Door South Door
Inbound 185 4 569
CPO
Eastbound 49 31 80
130 37 167 949
To Harbour
Galway Side Door Entering Leaving Total Side Door Total
From/To West From/To East 117 148 0 0 265 2140
New Side Door Entering Exiting Total Side Door
From/To West From/To East 187 0 192 0 379
C2_1 Tyler North Footpath Tyler South Footpath Tyler Total
Westbound Eastbound 31 14 569 151 600 165
C2_2 Centre Door (Assume all in/out)
Inbound
C2_3
Westbound Eastbound
140
Galway Total
228
Outbound 71
50
972 23 Westbound
Eastbound 32 149 181
Outbound North Door Centre Door - 50/50 split South Door
17 262 279
Westbound
0 0 0
CPO
Eastbound 49 207 256
Total WB Existing Total WB New
437 Total EB Existing 437 Total EB New
New Side Door From/To West From/To East Entering 688 0 Exiting 176 0 Total Side Door 864 Total Entering / Exits 2140
130 608 738
Westbound Eastbound 31 14 569 151 600 165
C2_2 Centre Door
Inbound
C2_3
Westbound Eastbound
826
Galway Total
1017 1017
Ped Vol / 15 min Ped Per Minute Max Flow per Metre 994 73 40 411 30 40 864 63 40 379 28 40 897 66 40
Quick Check - Precinct Walkway Width PM Peak Peds Flows Per Minute LoS C Requirement Required Width of Walkway
C2_1 Tyler North Footpath Tyler South Footpath Tyler Total
Inbound 0 0 0
Galway North Footpath Galway South Footpath Galway Total
Bottleneck Analysis Galway St South Footpath Tyler St South Foothpath New Galway St side door New Tyler St side door New station entry
Mass Balance Side Doors Tyler Side Door From/To West From/To East Entering 0 538 Leaving 73 0 Total Side Door 611
17 75 92
94 50 151 Westbound
Galway North Footpath Galway South Footpath Galway Total CHECKSUM with B2_1 Total Inbounds to CPO and Ferry Other Pedestrian Sources Reassigned Tyler North Footpath Tyler South Footpath Tyler Total
208 24
Required Width for LoS C 1.8 m 0.8 m 1.6 m 0.7 m 1.6 m
799 59 40 1.5
Realistically a 2 metre walkway will be required after accounting for side friction due to cones, barriers, signage, etc
Available Width 4.5 m 4.0 m 8.0 m 4.0 m 8.0 m
Assume Galway North will be materials Storage - huge pile of spoil North Door traffic goes down Tyler, then to Side Door Centre Door split 50/50 between Tyler and Galway South Door traffic goes down Galway then to Side Door Side Door traffic initially from East goes through the centre door in reassignment 10% Peaking Factor to convert to per minute flows 40 ped/min assumes nice flat concrete, not wooden boards, mud, etc Bus Arrivals / Departures on Galway excluded
228
Outbound 71
50
Appendix K:
Bus Changes Phase 1 and Phase 2
E RD
U
QUEE
N ST RE
ET
ST
WA YS TRE ET CUS TOM SS TRE ET
EET
EET
GAL
STR
RS TR
CE
RE
TYL E
TITLE
DRAWING No.
REVISION
COM MER
T ES
ET
LOW ER ALB ERT STR EET
CITY RAIL LINK - BUS PRIORITY WORK
C2000 TO C2001
COVER SHEET AND OVERVIEW PLAN
A
C2100 TO C2106
QUEEN STREET
A
C2200 TO C2211
CUSTOMS STREET
A
C2300 TO C2304
STURDEE STREET
A
C2400 TO C2408
LOWER ALBERT STREET
A
C2800 TO C2816
BRITOMART
A
C3000 TO C3005
DETAILS
A
LOCALITY PLAN N.T.S
CONSTRUCTION
FEBURARY 2016
CIVIL REV.A 4205003
EET
T
RE STR EET
02
TOM EET
C210
MS TRE ET
03
EET
EAS
T
C22
04
GO R
FOR
T ST REE
STR
ES TR
EET
HA
C22
CUS
QUE KIN
EET
C22
ST
GO
WE
C2
YS TR
3
EET STR
NS TRE ET
C210 2
ND
GAL WA
MER 802 ECE STR EE
EET
SH
WY
T
COM
01
STR
EN S TR
T
EE E STR
AW FANSH
ERT
SO
ALB
AN
FED ERA LS TRE ET
SW
RS TRE E
RQ
TOM
HO BSO NS TRE ET
3 C2
C22
CUS
ST
LOW E
T
E RE
T ES DE UR
01
C28 UEEN ST R EE 01 T
C24 0
1 ER ALB ERT ST R
3 C2
Y ST REE T
TYL E
LOW
02
QUA
T
OR
TLA N
DS TRE E
T
GS
RIA
STR
EET
T T WES STREE
WE
EN S TR
ST
EET
IA S T
STR EET
RT
EEN
ALB E
HO
BSO
QU
NS TRE ET
EET STR ON NEL S
QUE
OR
STR
WE ST
HO
YS TRE ET
LS TRE ET
SLE
VIC T
FED ERA
WE LLE
NEL
BSO NS TRE ET
SO
NS TRE ET
C210 1
EET
VICTO
TON
REV. A
DESCRIPTION ISSUE FOR APPROVAL
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/01/16
DESIGN CHECK
PM
21/01/16
APPROVED
DM
17/02/16
STATUS STAMP
CONSTRUCTION
CRL - BUS PRIORITY WORK DATE STAMP TITLE Traffic & Transportation Engineers Ltd Level 2, 12 O'connell Street, Auckland 1010, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
OVERVIEW PLAN
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
C20 01
REV.
A
CITY RAIL LINK - BUS PRIORITY WORK
CUS
MER
ET
WE
ST CUS
COM
ER ALB ERT
SS TRE
CE
TOM
TOM
SS TRE
ET
EAS
T
STRE E
SH
EET QUE 1 EN S TREE T
QUE EN
SHE ET 2
T
SHE
ET 3
LOW
GO RE STR EET
STR
STR E
ET
EET
QUEEN STREET, AUCKLAND CBD
LOCALITY PLAN N.T.S
DRAWING No.
REVISION
TITLE
C2100
COVER SHEET AND LOCALITY PLAN
A
C2101 TO C2103
GENERAL LAYOUT PLAN - AERIAL : (3 SHEETS)
A
C2104 TO C2106
ROAD MARKINGS & SIGNAGE PLAN - NO AERIAL : (3 SHEETS)
A
FEBURARY 2016
CIVIL REV.A 4205003
STREET VICTOR IA EXTEN
EXTENT OF WORK
EXTENT
OF WO RK
NEW BUS LANE
JOIN LINE E
DURHA M STRE ET
T OF W ORK
NEW 'BUS LANE AHEAD' 'QUEEN ST' SIGN
VICTOR IA STRE ET
QUEEN STREET
NEW BUS LANE
JOIN LINE E
EXTEN T OF W ORK
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/12/15
DESIGN CHECK
PM
12/02/16
APPROVED
PD
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK QUEEN STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 1 OF 3
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2101
A
WYNDH AM STR EET
JOIN LINE F
JOIN LINE E
NEW BUS LANE
EXTENT OF WORK
3m 3m
QUEEN STREET
3m
3.4m
JOIN LINE E
NEW BUS LANE
SHORTLA
JOIN LINE F
ND STRE ET
EXTENT OF WORK
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/12/15
DESIGN CHECK
PM
12/02/16
APPROVED
PD
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK QUEEN STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 2 OF 3
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2102
A
JOIN LINE F
CUSTOM S STRE ET WES T
REFER TO CUSTOMS STREET CONSTRUCTION PLAN
NEW BUS LANE
3m 3m
3m
3m
OF WO RK
3.1m 3.1m
3m
3.2m
3.1m 3m 3.1m
QUEEN STREET
3.3m 3.3m
EXTENT
3.4m
5.7m
EXTENT OF WORK
S STRE ET EAS T
NEW BUS LANE
CUSTOM
JOIN LINE F
FORT STREET
EXTENT OF WORK
REFER TO CUSTOMS STREET CONSTRUCTION PLAN
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/12/15
DESIGN CHECK
PM
12/02/16
APPROVED
PD
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK QUEEN STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 3 OF 3
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2103
A
STREET VICTOR IA
NEW 'BUS LANE AHEAD' 'QUEEN ST' SIGN SEE SHEET C3003, REF. A2
T OF W ORK
20.5m
NEW TAPER LINE
OF WO RK
5.6m
REMOVE LANE LINE MARKING
REMOVE LANE LINE MARKING
10m
EXTENT OF WORK
10m
22.7m
6.3m
10m
EXISTING 'BUS STOP' SIGN
1m
39.9m
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A
2.7m
10m
16.9m
EXTENT
15.8m
JOIN LINE E
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A
WHITE AND GREEN CONTINUITY LANE LINES, 1m STRIPE, 2m GAP NEW 'BUS LANE AHEAD' SIGN SEE SHEET C3003, REF. A1
DURHA M STRE ET
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL B
EXTEN
QUEEN STREET
10m GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001,DETAIL A
61.3m
EXISTING 'BUS STOP' SIGN
JOIN LINE E
25.7m VICTOR IA STRE ET
NEW 'BUS LANE AHEAD' 'QUEEN ST' SIGN SEE SHEET C3003, REF. A3
REMOVE STRAIGHT THROUGH ARROW WHITE AND GREEN CONTINUOUS LANE LINES AND TIE INTO EXISTING SOLID LANE LINE
EXTEN T OF W ORK
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
PROPOSED ROAD MARKING
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING NSAAT
REV. A
DRIVEWAY / VEHICLE CROSSING.
PROPOSED NSAAT
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
EXISTING BUS SHELTER
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/12/15
DESIGN CHECK
PM
12/02/16
APPROVED
PD
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK QUEEN STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 1 OF 3
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2104
A
WYNDH AM STR EET
JOIN LINE E
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL C
REMOVE STRAIGHT THROUGH ARROW
REMOVE STRAIGHT THROUGH ARROW REMOVE STRAIGHT THROUGH AND LEFT ARROW GREEN CONTINUOUS LANE LINE
16m
7.1m
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A
EXISTING 'BUS STOP' SIGN
7.1m
10m
JOIN LINE F
REMOVE LANE LINE MARKING
10m
REMOVE LANE LINE MARKING
62.5m
EXTENT OF WORK
10m
SETOUT POINT FROM LIMIT LINE
3m 3m
QUEEN STREET
3m NEW TAPER LINE
3.4m 10m
65.1m
JOIN LINE E
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A
10m NEW TAPER LINE
EXISTING 'BUS STOP' SIGN WHITE AND GREEN CONTINUOUS LANE LINES AND TIE INTO EXISTING SOLID LANE LINE
8.2m
EXTENT OF WORK
SETOUT POINT FROM PEDESTRIAN CROSSING LINE
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL C
SHORTLA
NEW 'BUS LANE AHEAD' 'QUEEN ST' SIGN SEE SHEET C3003, REF. A4
JOIN LINE F
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL C
REMOVE LANE LINE MARKING
EXISTING SIGN
LEGEND:
6m
ND STRE ET
6m
25.7m
10m
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
PROPOSED ROAD MARKING
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING NSAAT
REV. A
DRIVEWAY / VEHICLE CROSSING.
PROPOSED NSAAT
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
EXISTING BUS SHELTER
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/12/15
DESIGN CHECK
PM
12/02/16
APPROVED
PD
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK QUEEN STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 2 OF 3
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2105
A
JOIN LINE F WHITE AND GREEN CONTINUOUS LANE LINES AND TIE INTO EXISTING SOLID LANE LINE
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A EXISTING 'BUS STOP' SIGN WHITE AND GREEN CONTINUOUS LANE LINES AND TIE INTO EXISTING SOLID LANE LINE
SETOUT POINT PEDESTRIAN CROSSING LINE
GREEN CONTINUOUS LANE LINE
10m
4.2m
34.8m
CUSTOM S STRE ET WES T
NOTE: REFER TO CUSTOMS STREET CONSTRUCTION PLAN
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL A REMOVE ARROWS
10m
SETOUT POINT FROM EXISTING LOADING ZONE MARKING
72.1m
35m
10m
3m
REMOVE LEFT TURN ARROW
WHITE CONTINUOUS LANE LINE
10.1m
3.1m 3.1m 3m
3m
2.0m
3m
OF WO RK
3m
3.2m
3.1m 3m
15m
5.7m SETOUT POINT FROM EXISTING LIMIT LINE
23.2m
EXTENT OF WORK
14.8m
7.5m 10m
10m
NEW LEFT TURN ARROWS
EXTENT OF WORK
JOIN LINE F
EXISTING 'BUS STOP' SIGN
NEW RIGHT TURN ARROWS
EXISTING 'BUS STOP' SIGN REMOVE LANE LINE MARKING WHITE AND GREEN CONTINUITY LANE LINES, 1m STRIPE, 2m GAP
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001, DETAIL B RELOCATING WHITE CONTINUOUS LANE LINE AND NEW GREEN CONTINUOUS LANE LINE
EXISTING '30' SPEED LIMIT SIGN
RELOACTING CENTRELINE MARKING
NEW 'BUS LANE AHEAD' SIGN SEE SHEET C3003, REF. A1
NOTE: REFER TO CUSTOMS STREET CONSTRUCTION PLAN
CUSTOM
REMOVE LANE LINE MARKING
REMOVE LANE LINE MARKING NEW TAPER LINE
FORT STREET
REMOVE STRAIGHT THROUGH AND LEFT ARROW
S STRE ET EAS T
GREEN CONTINUOUS LANE LINE
3.1m
QUEEN STREET
3.3m 3.3m
EXTENT
3.4m
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
PROPOSED ROAD MARKING
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING NSAAT
REV. A
DRIVEWAY / VEHICLE CROSSING.
PROPOSED NSAAT
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
EXISTING BUS SHELTER
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
21/12/15
DESIGN CHECK
PM
12/02/16
APPROVED
PD
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK QUEEN STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 3 OF 3
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2106
A
CITY RAIL LINK - BUS PRIORITY WORK RT STR EET
CUSTOMS STREET, AUCKLAND CBD QUA
ST
CE S TR EET
SHE
STR EET
WE
ET 2
GO RE
SS TRE ET
MER
ET 1
COM
TOM
QU
SHE CUS
EEN
LOW
STR EET
ER ALB E
YS TRE ET
CUS
TOM
TE AST
SHE
ET
3
EN S TREE T
SS TRE E
SHE
4
QUE
ET
LOCALITY PLAN N.T.S
DRAWING No.
REVISION
TITLE
C2200
COVER SHEET AND LOCALITY PLAN
A
C2201 TO C2204
GENERAL LAYOUT PLAN - AERIAL : (4 SHEETS)
A
C2205 TO C2208
ROAD MARKINGS & SIGNAGE PLAN - NO AERIAL : (4 SHEETS)
A
C2209
EXISTING AND PROPOSED TRAFFIC SIGNAL
A
C2210
EXISTING AND PROPOSED SIGNAL GROUPS AND PHASING
A
C2211
TRAFFIC ISLAND REINSTATEMENT DETAIL
A
FEBURARY 2016
CIVIL REV.A 4205003
QUEEN STREET
JOIN LINE A
LOWER ALBERT STREET
AREA OUTSIDE PROJECT SCOPE AND SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
EXTENT OF WORK
EXTENT OF WORK
EXTENT OF WORK
CUSTOM STREET EAST CUSTOMS STREET WEST
EET QUEEN STR
ALBERT STREET
NEW BUS LANE
JOIN LINE A
EXTENT OF WORK
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 1 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2201
A
COMMERCE STREET
JOIN LINE B
QUEEN STREET
JOIN LINE A
EXTENT OF WORK
NOTE: REFER TO BRITOMART CONSTRUCTION PLAN
EXTENT OF WORK
CUSTOMS STREET EAST
EXTENT OF WORK
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
COMMERCE STREET
QUEEN STREET
JOIN LINE B
JOIN LINE A
EXTENT OF WORK
NOTE: REFER TO QUEEN STREET RESOLUTION ID:13124
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 2 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2202
A
JOIN LINE C
COMMERCE STREET
JOIN LINE B
NOTE: REFER TO BRITOMART CONSTRUCTION PLAN
NEW CYCLE BOX
BUS STOP EXTENSION
EXTENT OF WORK
EXTENT OF WORK
CUSTOMS STREET EAST
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
EXTENT OF WORK
APP'D
JOIN LINE C
JOIN LINE B
COMMERCE STREET
EXTENT OF WORK
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
NEW BUS PARKING AND TAXI STANDS
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 3 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2203
A
JOIN LINE C
OF EXT ENT
CUSTOMS STREET EAST
WO
RK
EXTENT OF WORK
JOIN LINE C
EXTENT OF WORK
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
NEW BUS PARKING AND TAXI STANDS
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 4 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2204
A
JOIN LINE A
NOTE: REFER TO BRITOMART CONSTRUCION PLAN
EXISTING 'BUS STOP' SIGN SETOUT POINT FROM BUS STOP MARKING
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001 DETAIL B
QUEEN STREET
LOWER ALBERT STREET
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
GREEN PANEL FOR BUS LANE SYMBOL SEE SHEET C3001 DETAIL A
EXTENT OF WORK
EXTENT OF WORK
2.5m
7.5m
A
C2211
10m
9.5m
10m
1m
CUSTOM STREET EAST
CUSTOMS STREET WEST
2.5m
NEW RIGHT TURN ARROW
EXISTING 'BUS STOP' SIGN
EXISTING 'P10' '8AM-10PM MON-SUN & PUB. HOL' SIGN
ALBERT STREET
EXISTING 'P10' '8AM-10PM MON-SUN & PUB. HOL' SIGN
JOIN LINE A
EXTENT OF WORK SETOUT POINT FROM LIMIT LINE
LEGEND: EXISTING ROAD MARKING
EXISTING SIGN
NEW ROAD MARKING
NEW SIGN
EXISTING ROAD MARKING (TO BE REMOVED)
EXISTING SIGN (TO BE REMOVED)
NOTE: REFER TO QUEEN STREET CONSTRUCTION PLAN
EET QUEEN STR
REMOVE EXISTING TRAFFIC ISLAND AND REINSTATE PAVEMENT SEE SHEET C2211 FOR DETAILS
EXISTING BUS SHELTER
EXISTING NSAAT
EXISTING KERB
PROPOSED NSAAT
PROPERTY BOUNDARY
EXISTING NSAAT (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING
EXISTING STREET LIGHT NEW CYCLE LANE MARKINGS
AREA OUTSIDE PROJECT SCOPE
NEW BUS LANE MARKINGS
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 1 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2205
A
LEGEND:
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
EXISTING 'BUS STOP' '3PM-6.30PM MON-FRI' AND 'P5 LOADING ZONE' '5MIN MAXIMUM GOODS VEHICLES ONLY' 'AT ALL OTHER TIMES' SIGNS
EXISTING ROAD MARKING
EXISTING SIGN
NEW ROAD MARKING
NEW SIGN
EXISTING ROAD MARKING (TO BE REMOVED)
EXISTING SIGN (TO BE REMOVED) EXISTING BUS SHELTER
EXISTING NSAAT
EXISTING KERB PROPERTY BOUNDARY
EXISTING NSAAT (TO BE REMOVED)
EXISTING 'BUS STOP' '3PM-6.30PM MON-FRI' AND 'P5 LOADING ZONE' '5MIN MAXIMUM GOODS SERVICE VEHICLES ONLY' 'AT ALL OTHER TIMES' SIGNS
QUEEN STREET
DRIVEWAY / VEHICLE CROSSING
EXISTING STREET LIGHT NEW CYCLE LANE MARKINGS
AREA OUTSIDE PROJECT SCOPE
NEW BUS LANE MARKINGS
EXISTING 'BUS STOP' SIGN REMOVE LANE LINE MARKING LEFT TURN ARROW
EXTENT OF WORK
COMMERCE STREET
EXISTING 'P TOUR COACHES 15MIN MAX' 'AT ALL TIMES' SIGNS
JOIN LINE B
JOIN LINE A
PROPOSED NSAAT
NOTE: REFER TO BRITOMART CONSTRUCTION PLAN
EXTENT OF WORK
CUSTOMS STREET EAST
EXTENT OF WORK
JOIN LINE B
46.5
50.5
JOIN LINE A
EXTENT OF WORK
REMOVE NO RIGHT TURN SIGN FROM OVERHEAD SIGNAL POLE
EXISTING 'BUS STOP' SIGN EXISTING 'NO ENTRY' SIGN
EXISTING 'TAXI STAND' '8PM-7AM' 'MON-FRI' 'SAT-SUN & PUBLIC HOLIDAYS' 'P5 LOADING ZONE' 'AT ALL OTHER TIMES' SIGNS
NOTE: REFER TO QUEEN STREET CONSTRUCTION PLAN
COMMERCE STREET
QUEEN STREET
EXISTING 'CLEARWAY 4PM-6PM MON-FRI' 'BUS STOP' SIGN
EXISTING 'CLEARWAY 4PM-6PM MON-FRI' 'TAXI STAND' '8PM-7AM' 'MON-FRI' 'SAT-SUN & PUBLIC HOLIDAYS' 'P5 LOADING ZONE' 'AT ALL OTHER TIMES' SIGNS
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 2 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2206
A
NEW 'BUS STOP' SIGN SEE SHEET C3003, REF. A7
EXISTING CYCLE BOX INSTALL GREEN PANEL AND CYCLE SYMBOL SEE SHEET C3001, DETAIL D STRAIGHT THROUGH AND LEFT ARROW
NEW 'BUS STOP' SIGN SEE SHEET C3003, REF. A6
EXTENT OF WORK
GORE STREET
REMOVE EXISTING 'BUS STOP' 'MAXIMUM TIME 10 MINUTES' 'AT ALL TIME' SIGN
JOIN LINE C
COMMERCE STREET
JOIN LINE B
NOTE: REFER TO BRITOMART CONSTRUCTION PLAN
EXTENT OF WORK 12m
10m
CUSTOMS STREET EAST
EXTENT OF WORK
JOIN LINE C
JOIN LINE B
EXISTING 'BUS STOP' SIGN
EXISTING 'TAXI STAND' '11PM-6AM' MON-SUN' 'BUS STOP' 'AT ALL OTHER TIMES' SIGN
GORE STREET
COMMERCE STREET
EXTENT OF WORK
LEGEND: EXISTING ROAD MARKING
EXISTING SIGN
NEW ROAD MARKING
NEW SIGN
EXISTING ROAD MARKING (TO BE REMOVED)
EXISTING SIGN (TO BE REMOVED) EXISTING BUS SHELTER
EXISTING NSAAT
EXISTING KERB
PROPOSED NSAAT
PROPERTY BOUNDARY
EXISTING NSAAT (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING
EXISTING STREET LIGHT NEW CYCLE LANE MARKINGS
AREA OUTSIDE PROJECT SCOPE
NEW BUS LANE MARKINGS
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 3 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2207
A
LEGEND: EXISTING ROAD MARKING
EXISTING SIGN
NEW ROAD MARKING
NEW SIGN
EXISTING ROAD MARKING (TO BE REMOVED)
EXISTING SIGN (TO BE REMOVED) EXISTING BUS SHELTER
EXISTING NSAAT
EXISTING KERB
PROPOSED NSAAT
PROPERTY BOUNDARY
EXISTING NSAAT (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING
EXISTING STREET LIGHT NEW CYCLE LANE MARKINGS
AREA OUTSIDE PROJECT SCOPE
JOIN LINE C
NEW BUS LANE MARKINGS
EXISTING 'P$ ZONE' AND 'BUS STOP' SIGNS
EXISTING 'CLEAR WAY 4-6PM' 'BEGINS' 'P$ ZONE' SIGNS PARKING METER TO BE REMOVED BY OTHERS. ALLOW TO REINSTATE FOOTPATH FOLLOWING REMOVAL
WO RK
REMOVE EXISTING 'BUS STOP' SIGN
EXT E
NT
OF
EXTENT OF WORK
EXISTING 'CLEAR WAY 4-6PM' 'ENDS' SIGN ON STREET LIGHT POLE
CUSTOMS STREET EAST
JOIN LINE C
EXTENT OF WORK
REMOVE EXISTING 'BUS STOP' '3PM-6PM MON-FRI' 'SCHEDULE SERVICES ONLY' SIGN NEW 'P15 AT METRO BUSES 6AM-11PM MON-SUN AND PUBLIC HOL.' AND 'TAXI STAND' 'AT ALL OTHER TIMES' INSTALL ON NEW POLE SEE SHEET C3003, REF. B1
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
REMOVE EXISTING 'P$ ZONE' 'BUS STOP' '3PM-6PM MON-FRI' 'SCHEDULE SERVICES ONLY' SIGN
REMOVE EXISTING 'BUS PARKING' 'SCHEDULED SERVICES ONLY' '15MIN MAX' '7AM-7PM MON-SUN & PUBLIC HOLIDAYS' SIGNS
PROJECT
1:500 (A3)
17/02/16
NEW 'P15 AT METRO BUSES 6AM-11PM MON-SUN AND PUBLIC HOL.' AND 'TAXI STAND' 'AT ALL OTHER TIMES' INSTALL ON NEW POLE SEE SHEET C3003, REF. B2
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 4 OF 4
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2208
A
QUEEN STREET
9
QUEEN STREET
10 11
10
G
1
1
2
2
3
3
CUSTOM STREET EAST
CUSTOM STREET EAST
8
7
9
8
4
7
CUSTOM STREET WEST
5
STANDARD TRAFFIC SIGNAL NOTES:
EXISTING TRAFFIC SIGNAL PLAN
1. 2.
LEGEND:
3.
EXISTING SIGNAL
4
5m TRAFFIC SIGNAL POLE TRAFFIC SIGNAL OVERHEAD MAST POLE 200mm LED ASPECTS - OPEN VISOR 200mm LED ASPECTS - CLOSE VISOR 300mm LED ASPECTS - OPEN VISOR 300mm LED ASPECTS - CLOSE VISOR 3 ASPECTS DISPLAY WITH THREE ARROWS MASK PEDESTRIAN ASPECT INDUCTANCE LOOP - STOP LINE LOOP AND LOOP NUMBER
4. 5. 6. 7.
8. 9. 10. 11.
100mm DUCT 32mm DUCTING
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
12. CHECK PM
APP'D
6
5
DATE
SCALE
PROPOSED TRAFFIC SIGNAL PLAN
TRAFFIC SIGNAL EQUIPMENT AND INSTALLATION SHALL COMPLY WITH THE NATIONAL SPECIFICATION. POLE POSITIONS ARE INDICATIVE ONLY. FINAL POSITIONS TO BE DETERMINED ON SITE WITH THE ENGINEER. THE CONTRACTOR SHALL LIAISE WITH THE SERVICE AUTHORITIES TO DETERMINE LOCATIONS OF SERVICES PRIOR TO ANY EXCAVATION. SERVICES PLANS PREPARED BY OTHERS. THE CONTRACTOR SHALL ALLOW FOR THE TESTING OF THE E-PROM IN THE CONTROLLER THAT IS TO BE INSTALLED AT THE SITE. DUCTS BETWEEN CHAMBERS SHALL BE 100MM DIAMETER. DUCTS TO KERB SIDE JUNCTION BOXES SHALL BE A MINIMUM OF 32MM DIAMETER IF THRUST ONLY ONE 100MM DIAMETER DUCT SHALL BE INSTALLED. IF THE DUCT IS TO BE OPEN CUT THEN TWO100MM DIAMETER DUCTS SHALL BE INSTALLED. THE CONTRACTOR SHALL INSURE THAT THE NUMBER OF DUCTS WILL ALLOW THE CABLES TO BE PULLED WITHOUT DAMAGE TO THE SHEATHING. ALL LANTERNS INCLUDING PEDESTRIAN DISPLAYS SHALL BE APPROVED LED TYPE. ALL LANTERN BODIES AND BACKING BOARDS SHALL BE ALUMINUM BODIED. ALL 5 METER POLES SHALL BE POWDER COATED PRIOR TO INSTALLATION. IF TACTILE GROUND SURFACE INDICATORS (TGSI) ARE USED THEN THE TYPE USED SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION. DIRECTIONAL TGSI SHALL BE INSTALLED ON THE END OF THE ROW OF INDICATOR PAVERS SO THAT VISUALLY IMPAIRED ARE DIRECTED TOWARDS THE PUSH BUTTON. PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
EET QUEEN STR
4
EET QUEEN STR
6
CUSTOM STREET WEST
LEGEND: PROPOSED SIGNAL CHANGES
4
5m TRAFFIC SIGNAL POLE TRAFFIC SIGNAL OVERHEAD MAST POLE 200mm LED ASPECTS - OPEN VISOR 200mm LED ASPECTS - CLOSE VISOR 300mm LED ASPECTS - OPEN VISOR 300mm LED ASPECTS - CLOSE VISOR 3 ASPECTS DISPLAY WITH THREE ARROWS MASK PEDESTRIAN ASPECT INDUCTANCE LOOP - STOP LINE LOOP AND LOOP NUMBER 100mm DUCT 32mm DUCTING
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
EXISTING AND PROPOSED TRAFFIC SIGNAL PLAN
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2209
A
EXISTING SIGNAL GROUPS
EXISTING SIGNAL PHASING 4
4
4
8
8
6 1
8
2 5
2 5
8
8
8
6
6 1
8
8
8
6 3
8
8
2 5
A
B
C
D
E
Z+
F
Z-
8
3
PROPOSED SIGNAL PHASING
PROPOSED SIGNAL GROUPS
5 10
8 2 4
8 2
5
1 7
10
10
8
10
9 6 9 6
9
10
A
8 2 4 10
10
B
1 7
C
D
E
F
Z+
10
10 10
10
10
9 6
G REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
ZPROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
EXISTING AND PROPOSED SIGNAL GROUPS AND PHASING
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2210
A
REMOVE VEGETATION EXISTING PAVEMENT EXISTING PAVEMENT SEAL WITH 40mm MIX 14A/C TO MATCH PAVEMENT LEVELS AND MAINTAIN EXISTING CROSSFALL
DIG OUT AND REMOVE TOPSOIL TO ESTIMATED 500mm DEPTH BELOW ADJACENT SEAL
PLACE AND COMPACT GAP40 LAYERS, MAKE UP METAL OVER EXISTING PAVEMENT LAYERS TO MATCH EXISTING ROAD LEVELS (MAX LAYER THICKNESS FOR COMPACTION 200mm)
SAWCUT AND REMOVE EXISTING A/C AND KERB/CONCRETE APRON
CUSTOMS STREET TRAFFIC ISLAND REINSTATEMENT
A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
AS SHOWN
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
20/01/16
DESIGN CHECK
PM
25/01/16
APPROVED
DM
17/02/16
A C2205
SCALE 1:10
REV.
SAWCUT AND REMOVE EXISTING A/C AND KERB/CONCRETE APRON
CITY RAIL LINK - BUS PRIORITY WORK CUSTOMS STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
TRAFFIC ISLAND REINSTATEMENT DETAIL
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
C22 11
REV.
A
CITY RAIL LINK - BUS PRIORITY WORK STURDEE STREET, AUCKLAND CBD STR
EET
SH
T EE
2
LOW
ER ALB ER
TS TRE ET
QUA Y
CUS T
OM SS TRE ET
WE
ST
T EE
R
ET
STR EET
NS TRE
1ST
ALB
ERT
HO B
SO
SH
T EE
T ES
DE UR
LOCALITY PLAN N.T.S
DRAWING No.
REVISION
TITLE
C2300
COVER SHEET AND LOCALITY PLAN
A
C2301 TO C2302
GENERAL LAYOUT PLAN - AERIAL : (2 SHEETS)
A
C2303 TO C2304
ROAD MARKINGS & SIGNAGE PLAN - NO AERIAL : (2 SHEETS)
A
FEBURARY 2016
CIVIL REV.A 4205003
JOIN L INE G
OF WOR K
T OF WORK EXTEN
EXTENT
ET STURDEE STRE
NEW BUS PARKING AND TAXI STAND
NEW BUS STOP AND TOUR BUS PARKING
JOIN L INE G
FANSHAWE STRE ET
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
19/01/16
DESIGN CHECK
PM
19/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK STURDEE STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 1 OF 2
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2301
A
EXTEN T
OF WO RK
JOIN L INE G
STURD
REV. A
DESCRIPTION ISSUE FOR CONSTRUCTION
EXT
ENT
JOIN L INE G
OF W ORK
EE ST REET
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
19/01/16
DESIGN CHECK
PM
19/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK STURDEE STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
GENERAL LAYOUT PLAN - AERIAL : SHEET: 1 OF 2
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2302
A
EXISTING 'BUS LANE 6AM-10AM 3PM-7PM MON-FRI' SIGN
EXISTING 'BUS LANE 6AM-10AM 3PM-7PM MON-FRI' 'BEGINS' SIGN EXISTING 'BUS STOP' SIGN
ET STURDEE STRE
92m
EXTEN T OF WORK
EXTENT OF WOR K
JOIN L INE G
EXISTING 'BUS STOP' SIGN
4.3m
40.9m
NEW BUS STOP MARKING
50m PARKING METER TO BE REMOVED BY OTHERS. ALLOW TO REINSTATE FOOTPATH FOLLOWING REMOVAL
REMOVE EXISTING 'P$ ZONE' SIGN
NEW BUS STOP MARKING
FANSHAWE STRE ET
NEW 'P15 AT METRO BUSES 6AM-11PM MON-SUN AND PUBLIC HOL.' AND 'TAXI STAND' 'AT ALL OTHER TIMES' SIGNS SEE SHEET C3003, REF. B1
PARKING METER TO BE REMOVED BY OTHERS. ALLOW TO REINSTATE FOOTPATH FOLLOWING REMOVAL
NEW 'P15 AT METRO BUSES 6AM-11PM MON-SUN AND PUBLIC HOL.' AND 'TAXI STAND' 'AT ALL OTHER TIMES' SIGNS SEE SHEET C3003, REF. B2
NEW 'P15 AT METRO BUS 7AM-8PM MON-SUN AND PUBLIC HOL.' AND 'TOUR BUSES' 'AT ALL OTHER TIMES' SIGNS SEE SHEET C3003, REF. B4
JOIN L INE G
SETOUT POINT FROM EXISTING ROAD MARKING
NEW NSAAT NEW 'P15 AT METRO BUS 7AM-8PM MON-SUN AND PUBLIC HOL.' AND 'TOUR BUSES' 'AT ALL OTHER TIMES' SIGNS SEE SHEET C3003, REF. B3
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
PROPOSED ROAD MARKING
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING NSAAT
REV. A
DRIVEWAY / VEHICLE CROSSING.
PROPOSED NSAAT
EXISTING BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
EXISTING BUS SHELTER
DESCRIPTION ISSUE FOR CONSTRUCTION
REMOVE EXISTING 'P$ ZONE' SIGN
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
19/01/16
DESIGN CHECK
PM
19/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK STURDEE STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 1 OF 2
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2303
A
EXTEN T
OF WO RK
JOIN L INE G
EXISTING 'BUS LANE 6AM-10AM 3PM-7PM MON-FRI' 'ENDS' SIGN
STURD
EE ST REET
OF W ORK REMOVE BUS STOP MARKING
ENT
NEW NSAAT
EXT
JOIN L INE G
50m
REMOVE EXISTING 'P BUS PARKING SCHEDULED SERVICES ONLY 7AM-8PM TOUR COACHES ONLY 8PM-7AM' SIGN
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
PROPOSED ROAD MARKING
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING NSAAT
REV. A
DRIVEWAY / VEHICLE CROSSING.
PROPOSED NSAAT
EXISTING BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
EXISTING BUS SHELTER
DESCRIPTION ISSUE FOR CONSTRUCTION
CHECK PM
APP'D
DATE
SCALE
PROJECT
1:500 (A3)
17/02/16
NAME
DATE
DESIGN
PM
01/12/15
DRAWN
HC
01/12/15
DRAWING CHECK
SD
19/01/16
DESIGN CHECK
PM
19/01/16
APPROVED
DM
17/02/16
CITY RAIL LINK - BUS PRIORITY WORK STURDEE STREET, AUCKLAND CBD
STATUS STAMP
CONSTRUCTION DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
ROAD MARKINGS AND SIGNAGE PLAN - NO AERIAL : SHEET: 2 OF 2
17 FEBURARY 2016
PROJECT No.
4205003
DWG No.
REV.
C2304
A
NS T
E ST NSHAW
879
WY
R12 ND
HA
ST
877
SH O
MS TRE ET
T ST
RTL AN DS T
KIN
R12 889
EST ST W
R01
R02 NS T
R12
891 R04
WE ST
ERT
ST EEN QU
R12 888
R03
HO BSO NS T
91
8 12
R04
R
WE LLE
SLE YS T
YO
CO
OK ST
L RA
DR
WE ST
R
02
ST
IA S T
ALB
NS T
R12 888
NEL SO OK
TOR
891
R02
CO
VIC
R04
ST
ERA L FED
888
R12 889
R12
ST
HO
R12
R02
R01
ST
890
ST SALE
ST WE
R12
EY
R03
BSO NS T
NEL SO
889
R12 888
WE LLE SL
ST
R03
RIA VICTO
GS TON
R12
R12879
R04
9 R1288
R01
HALSEY ST
R01
R12 890
R03
R12879
R02
FOR
QUE
EN S T
FA
ST
ST
SO
TOM
GOR E
R12
AN
CUS
COM MER ECE
R01
ALB ERT ST
BSO
SW
HO
ES T
VICTORIA ST WEST
ST
79
HAW
FED ERA L
NS T
R12 8
FAN S
R
01
R
12 89 1
MA
A
DESCRIPTION
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
02/07/15
SCALE
PROJECT
1:500 (A3) NAME
DATE
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
02/07/15
DESIGN
K
WA
878 D ST R12 EFIEL
R01
R LD RA
YO MA
REV.
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
DESIGN CHECK
PM
02/07/15
APPROVED
DM
02/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL DATE STAMP TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
OVERVIEW PLAN
PROJECT No.
4205003
02 JULY 2015 DWG No.
REV.
A
SHEET
R01
0. 0
NOTE:
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
m .5 41
'A 1' RELOCATED '50' SPEED LIMIT SIGN REMOVE EXISTING 'P$ ZONE' SIGN
39 4 .5 43 1.5 .0
5m 1.
RELOCATE EXISTING '50' SPEED LIMIT SIGN
'B
58 .0
m
15
PROPOSED 'P15 BUS PARKING' AND 'NO IDLING' SIGN
1' 7m
EXISTING '30' SPEED LIMIT SIGN
65 .
0
'A 2' 77 .5
m
.5
12
EXISTING 'P$ ZONE', 'P60 MON-FRI' AND '120 SAT-SUN & PUBLIC HOLIDAYS' SIGN
'B m
15
W
REMOVE EXISTING 'P$ ZONE' SIGN
2'
AK E
ST R
'A
3'
VE
T
RA
m
LD RI
EE
33
QUEEN STREET
NOTE: RESTRICTIONS COVERED BY AUCKLAND COUNCIL RESOLUTION ID:8961, JUNE 2010
D
92
EL
PROPOSED ' P15 BUS PARKING' AND 'NO IDLING' SIGN
.5
FI
125.5
MA
YO
EXISTING 'P$ ZONE', 'P60 MON-FRI' AND '120 SAT-SUN & PUBLIC HOLIDAYS' 'GOODS SERVICE VEHICLES ONLY AT ALL TIMES' SIGN
EXISTING 'P$ ZONE', 'P60 MON-FRI' AND '120 SAT-SUN & PUBLIC HOLIDAYS' SIGN
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING
EXISTING 'P$ ZONE', 'P60 MON-FRI' AND '120 SAT-SUN & PUBLIC HOLIDAYS' SIGN
PROPERTY BOUNDARY
REDUNDANT DRIVEWAY
EXISTING NSAAT
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED NSAAT EXISTING NSAAT (TO BE RESOLVED) EXISTING NSAAT (TO BE REMOVED) REV.
A
DESCRIPTION
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
26/06/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
02/07/15
DESIGN CHECK
NM
02/07/15
APPROVED
PM
02/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12878 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
WAKEFIELD ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
02 JULY 2015 DWG No.
AT/12878/WLB
REV.
A
SHEET
R01
NOTE:
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
PROPOSED 'P15 BUS PARKING' AND 'NO IDLING' SIGN REMOVE EXISTING 'DISABLED PARKING AT ALL TIMES' 'MAX 20 MINS' 'CAR TOWED? PHONE 3792020' SIGN
EXISTING 'P$ ZONE' SIGN PROPOSED 'P15 BUS PARKING' AND 'NO IDLING' SIGN
'B2'
78m
22.5m 128.0
109.0 110.0
31.5
8.5
'A2'
18m
150.5
23m
154.5
'A1'
'B1' 0.0
REMOVE EXISTING 'P5 LOADING ZONE' 'AT ALL TIMES' SIGN
'A6'
EXISTING NO LEFT TURN PARKING
9.5m
EXISTING SIGN PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING
6m
'A4' CCPZ
6m
9m
RELOCATE EXISTING 'P$ ZONE' SIGN
0.0
5.5
15.5
24.5
30.5
51.0
20.5m
6m
'A5' 'MP1'
PROPOSED 'P120 DISABLED PARKING AT ALL TIMES' SIGN
FEDRAL STREET
EXISTING 'P10' PARKING SIGN
57.0
72.5
66.5m
LEGEND:
63.0
75.0
8.5
HOBSON STREET
0.0
WYNDHAM STREET
10m
'LZ1' 'A3' CCPZ
PROPOSED 'P5 LOADING ZONE' 'AT ALL TIMES' SIGN
PROPERTY BOUNDARY
EXISTING NSAAT NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED NSAAT EXISTING NSAAT (TO BE RESOLVED) EXISTING NSAAT (TO BE REMOVED) REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
NM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12877 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
WYNDHAM ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12877/WLB
REV.
A
SHEET
R01
NOTE:
0.0
NOTE: RESTRICTION COVERED BY AUCKLAND CITY COUNCIL RESOLUTION ID:12136, MARCH 2009
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
EXISTING 'BUS, MOTORCYCLE AND CYCLE LANE' SIGN
DAL
DY STR EET
0.0
EXISTING 'BUS LANE' SIGN
79m EXISTING 'BUS LANE' SIGN
12m
'BS
1'
FAN
SHA
WE
STR
174
1'
.5m
JOI
'BL
NL INE A
' 130 .0
39m
130 .0
'B1
118 .0
EXT
7 9 .0
ENT
OF WO RK
PROPOSED 'BUS STOP' SIGN
EET
'BL
1'
NOTE: RESTRICTIONS COVERED BY AUCKLAND CITY RESOLUTION ID:12136, MARCH 2009
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
PROPOSED BUS SHELTER
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
NL INE
A
EXISTING KERB
PROPOSED NSAAT
JOI
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
FOR CONSULTATION
EXISTING BUS LANE MARKINGS REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
SD
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12879 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
FANSHAWE-HALSEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12879/WLB
REV.
A
SHEET
R01
LIN E JOI N
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
HAL SEY STR EET
NOTE:
FAN
SHA
WE
STR
EET
L1
4. 5m
1'
'
JOI N
LIN
EA
'BL
17
'B
'S1'
T
TREE AWE S
FANSH
200.5
PROPOSED SIGN
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
PROPOSED BUS SHELTER
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
0.0
JOIN LINE B
'A2'
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
27m
EXISTING ROAD MARKING
HALSEY STREET
EXISTING SIGN
LEGEND:
'BL1'
61.5m
'A1'
EXISTING CYCLE ROUTE SIGN
JOIN LINE B
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
EXISTING BUS LANE MARKINGS REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
SD
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12879 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
FANSHAWE-HALSEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12879/WLB
REV.
A
SHEET
R02
NOTE:
JOIN LINE B
JOIN LINE B
'A2'
27m
PROPOSED 'BUS LANE' SIGN
'BL1'
'BL1'
61.5m
27.0
174.5m
'A1'
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
REMOVE EXISTING 'CLEARWAY 7-9AM & 4-6PM MON-FRI' SIGN,'P$ ZONE' SIGN
139.0 137.0
47.0
304.5
REMOVED EXISTING 'CLEARWAY 4-6PM MON-FRI' ENDS' & 'P$ ZONE' SIGN PROPOSED 'BUS LANE' 'ENDS' SIGN PROPOSED 'BUS LANE' 'ENDS' SIGN
59.5
PROPOSED EXTENSION TO BUS STOP
HALSEY STRE ET
'BL2'
101m
'B2'
36m
'BL2'
REMOVE EXISTING 'CLEARWAY 7-9AM & 4-6PM MON-FRI' SIGN,'P$ ZONE' SIGN & 'BUS STOP AT ALL OTHER TIMES' SIGN
REMOVE EXISTING 'CLEARWAY 7-9AM & 4-6PM MON-FRI' SIGN PROPOSED 'BUS STOP' SIGN
95.5
PROPOSED 'CLEARWAY 7-9AM & 4-6PM MON-FRI' 'BEGINS' SIGN & 'P5 LOADING ZONE' '9AM-4PM MON-FRI 8AM-6PM SATURDAY' SIGN
15m
EXISTING SIGN
LEGEND:
'LZ1/ ' 'CW1'
103.5
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER (TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
JOIN LINE C
118.5
JOIN LINE C
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT PROPOSED NSAAT
EXISTING 'CLEARWAY 7-9AM & 4-6PM MON-FRI' 'ENDS' SIGN & 'P5 LOADING ZONE' '9AM-4PM MON-FRI 8AM-6PM SATURDAY' SIGN
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS SHELTER REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
SD
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12879 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
FANSHAWE-HALSEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12879/WLB
REV.
A
SHEET
R03
NOTE:
JOIN LINE C
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
JOIN LINE C
118.5
'BS2'
EXISTING 'PEDESTRIAN CROSSING WARNING' SIGN
36.0
'A3'
64m
46m
PROPOSED 'BUS LANE BEGINS' SIGN
'A4'
DOCK
46.0
T STREE
HALSEY STRE ET
17.5m
101m
'BL2'
REMOVE EXISTING 'CLEARWAY 4-6PM MON-FRI' 'BEGINS' SIGN & 'P$ ZONE' SIGN RETAIN 'BUS STOP' SIGN
'B3'
63.5
EXISTING 'GIVEWAY' SIGN EXISTING 'GIVEWAY' SIGN
0.0
3m
0.0
.5 182 .5 185
'Z1' EXISTING BELISHA BACON
VICTORIA STREET WEST EXTENT OF WORK
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER (TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED) PROPOSED BUS SHELTER REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12879 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
FANSHAWE-HALSEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12879/WLB
REV.
A
SHEET
R04
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
NELSON STREET
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:12774, MAY 2015 PROPOSED 'BUS LANE' SIGN
PROPOSED 'BUS LANE' 'AHEAD' SIGN
'BL1'
PROPOSED 'BUS LANE' 'BEGINS' SIGN
317.5m 88.5m 0.0
88.5
0.0
EXISTING 'P$ ZONE' SIGN
JOIN LINE D
NOTE:
'A1'
EXTENT OF WORK
0.0
11.0
88.5
146.5
127.5
116.5m
'BL1'
'FM1' WELLESLEY STREET WEST
EXTENT OF WORK EXISTING 'BUS STOP' SIGN
NOTE: RESTRICTION COVERED BY AT RESOLUTION ID:10714, JAN 2013
EXISTING 'BUS STOP' SIGN EXISTING 'BUS STOP' SIGN
ET
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER (TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:12774, MAY 2015
EXISTING KERB
JOIN LINE D
EXISTING SIGN
LEGEND:
NELSON STREET
LE SA
RE ST
DRIVEWAY / VEHICLE CROSSING
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
CONTROLLED BY TMP REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12888 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
WELLESLEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12888/WLB
REV.
A
SHEET
R01
REMOVE EXISTING 'NO STOPPING 7-9AM 4-6PM MON-FRI' AND 'P5 LOADING ZONE 9AM-4PM MON-FRI ALL DAY SATURDAY' '5MIN MINXIMUM GOODS VEHICLES ONLY' SIGN
EXISTING NO LEFT TURN SIGN PROPOSED 'BUS LANE' SIGN
PROPOSED 'BUS LANE' SIGN
REMOVE EXISTING 'P$ ZONE' SIGN
EXISTING NO LEFT TURN SIGN
'BL1'
HOBSON STREET
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
JOIN LINE E
JOIN LINE D
NELSON STREET
NOTE:
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:12774, MAY 2015
317.5m
'A2' 123.0
115.0
15.5
8.5
0.0
114.5m
EXTENT OF WORK
'BL1' WELLESLEY STREET WEST
'FM2' 'BL2'
PROPOSED 'BUS LANE' 'ENDS' SIGN
15m 157m
'BL2'
'B1'
0.0
13.0
'S1'
22.5m
'A7'
EXISTING 'BUS STOP' SIGN
EXISTING NO LEFT TURN SIGN PROPOSED 'BUS LANE AHEAD' 'WELLESLEY ST' SIGN
JOIN LINE E
'A6'
157.0
JOIN LINE D
NELSON STREET
83m
22.5
120.5 118.5
37.5
EXTENT OF WORK
PROPOSED 'BUS LANE' SIGN
REMOVE EXISTING 'P$ ZONE' SIGN NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:12774, MAY 2015 EXISTING SIGN
LEGEND:
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER (TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
HOBSON STREET
PROPOSED SIGN
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
CONTROLLED BY TMP REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12888 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
WELLESLEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12888/WLB
REV.
A
SHEET
R02
FEDERAL STREET
PROPOSED 'BUS LANE' SIGN EXISTING 'BUS PARKING''TOUR COACH ONLY AT ALL TIMES' SIGN
NOTE: REFER TO MAYORAL DRIVE RESOLUTION ID:12891 NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:11154, AUG 2013
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:11154, AUG 2013
EXISTING 'BUS STOP' SIGN
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:11154, AUG 2013
EXISTING 'BUS STOP 3-7PM MON-FRI' AND 'P5 LOADING ZONE' '5MIN MAXIMUM GOODS VEHICLES ONLY' 'AT ALL OTHER TIMES' SIGN
PROPOSED 'BUS LANE' 'ENDS' SIGN
'BL1'
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
317.5
317.5m
ALBERT STREET
PROPOSED 'BUS LANE AHEAD' 'WELLESLEY ST.' SIGN
JOIN LINE E
NOTE:
JOIN LINE F
HOBSON STREET
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
EXISTING 'ONE WAY' AND '10' SPEED SIGN
70.0
13.0
0.0
EXISTING 'BUS STOP' SIGN
EXTENT OF WORK
EXTENT OF WORK
5.4m
'BL1'
'FM4'
WELLESLEY STREET WEST
'FM3'
'BL2'
WELLESLEY STREET WEST
'BL3'
'S1'
PROPOSED 'BUS LANE' 'BEGINS' SIGN
EXISTING 'P5 LOADING ZONE' SIGN ADD 'AT ALL TIMES'
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER (TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
PROPOSED 'BUS LANE' 'BEGINS' SIGN REMOVE EXISTING 'P$ ZONE' SIGN
NOTE: REFER TO MAYORAL DRIVE RESOLUTION ID:12891 NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
0.0
'BL3'
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
0.0
'A10'
DRIVEWAY / VEHICLE CROSSING
PROPOSED NSAAT
JOIN LINE F
'LZ2'
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
EXISTING KERB
EXISTING NSAAT
3.5
15.5
45.5
42m
50.5m PROPOSED 'BUS LANE' 'ENDS' SIGN
EXISTING 'STOP' SIGN
9m
15.5
'A9'
EXISTING SIGN
LEGEND:
54.5
'A8' 66.0
15.0m
REMOVE EXISTING 'P$ ZONE' AND 'CLEARWAY 4-6PM MON-FRI''ENDS' SIGN
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
66.0
69.5
0.0
3.0
57.5
63m
REMOVE EXISTING 'P$ ZONE' AND 'CLEARWAY 4-6PM MON-FRI' 'BEGINS' SIGN
'BL2'
EXTENT OF WORK
MAYORAL DRIVE
157m
15.0
15m
0.0
0.0
JOIN LINE E
HOBSON STREET
66.0
EXTENT OF WORK
CONTROLLED BY TMP REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12888 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
WELLESLEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12888/WLB
REV.
A
SHEET
R03
NOTE:
AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
JOIN LINE F
EXISTING 'NO U TURN' SIGN
EXISTING 'P5 LOADING ZONE' '5MIN MAX AT ALL TIMES' SIGN
EXISTING 'P$ ZONE' SIGN
PROPOSED 'P5 LOADING ZONE 8AM -6PM' AND 'TAXI STAND 6PM-8AM' 'MON-SUN AND PUBLIC HOLIDAYS' SIGN REMOVE EXISTING 'TAXI STAND' AND 'LOADING ZONE' '5MIN MAX GOODS SERVICE VEHICLES ONLY 6AM-6PM MON-SUN & PUBLIC HOLIDAYS' SIGN
EXISTING '30' SPEED LIMIT SIGN REMOVE 'TAXI STAND', 'P5 LOADING ZONE AT ALL TIMES', SIGN
PROPOSED 'P5 LOADING ZONE 8AM -6PM' AND 'TAXI STAND 6PM-8AM' 'MON-SUN AND PUBLIC HOLIDAYS' SIGN
REMOVE EXISTING 'LOADING ZONE' '5MIN MAX GOODS SERVICE VEHICLES ONLY 6AM-6PM MON-SUN & PUBLIC HOLIDAYS' SIGN
'A4' 'LZ1'/'TS1'
'A3'
5.5m
QUEENS STREET
ALBERT STREET
NOTE: REFER TO MAYORAL DRIVE RESOLUTION ID:12891
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
'A5' 40m
17m
0.0
13.5
53.5
70.5
64.0
EXISTING 'P5 LOADING ZONE AT ALL TIMES' SIGN
EXTENT OF WORK
EXTENT OF WORK
0.0
28.5
76.0
35.5m
WELLESLEY STREET WEST
CONSTRUCTION AREA
MAYORAL DRIVE
EXISTING 'P5 LOADING ZONE' '5MIN MAXIMUM PRIVATE VEHICLES AND GOODS VEHICLES ONLY (NO COMMERCIAL OR SERVICE VEHICLES EXCEPT GOODS VEHICLES) SIGN
EXISTING 'BUS STOP' SIGN EXISTING '50' SPEED LIMIT SIGN
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
EXISTING 'BUS STOP' SIGN
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:10713, JAN 2013
NOTE: REFER TO MAYORAL DRIVE RESOLUTION ID:12891
QUEENS STREET
JOIN LINE F
EXTENT OF WORK
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER (TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
CONTROLLED BY TMP REV.
A
DESCRIPTION
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12888 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
WELLESLEY ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12888/WLB
REV.
A
SHEET
R04
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
HAM
ST R EET
HARDINGE STREET
NOTE:
GRA
PROPOSED 'BUS LANE' 'BEGINS' SIGN
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:10758, JAN 2013
LI
'A1'
NE
54.0
12.5
41.5m
G
'BL1' 0.0
PROPOSED 'BUS LANE' 'AHEAD' SIGN
PROPOSED 'BUS LANE' 'ENDS' SIGN
EXTENT OF WORK
N JO I
61.0
54.0
12.5
0.0
50.0
61m
'BL1' VICTORIA STREET WEST
EXISTING 'P$ ZONE' SIGN
EXISTING 'P$ ZONE' SIGN
EXISTING 'BUS STOP' SIGN
NE
G
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:10626, DEC 2012
JO
IN
LI
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:12774, MAY 2015
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER ( TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
RE
ET
EXISTING ROAD MARKING
LS ON
ST
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING.
NE
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
CONTROLLED BY TMP REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12889 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
VICTORIA ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12889/WLB
REV.
A
SHEET
R01
EXISTING 'BUS STOP' SIGN
28.5m
'BS1'
39.5m
EXTENT OF WORK
0.0
13.0
13m
61.5
20m
'A4'
23.5m 85.0
' 'A2
'B2'
'A3'
'B1' 33.0
JOIN LINE G
EXISTING 'BUS STOP' SIGN
EXISTING 'BUS PARKING' 'SCHEDULED BUSES ONLY' SIGN
124.5
NELSON STREET
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
EXISTING 'BUS PARKING' 'SCHEDULED BUSES ONLY' SIGN
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
JOIN LINE H
HOBSON STREET
NOTE:
'FM1'
57m
25.5m
36m
'A5'
'B3'
'A6'
EXISTING 'BUS STOP' SIGN
NELSON STREET
EXTENT OF WORK
0.0
6.0
42.0
'S1'
JOIN LINE H
.5 124
67.5
VICTORIA STREET WEST
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:12774, MAY 2015
JOIN LINE G
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER ( TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
EXISTING KERB
HOBSON STREET
EXISTING SIGN
LEGEND:
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
CONTROLLED BY TMP REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
SD
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12889 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
VICTORIA ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12889/WLB
REV.
A
SHEET
R02
FEDERAL STREET
EXISTING 'P$ ZONE' SIGN PROPOSED 'BUS LANE' 'ENDS' SIGN
PROPOSED 'BUS LANE' 'BEGINS' SIGN
EXISTING 'BUS STOP' SIGN
'BL2'
PROPOSED 'P5 LOADING ZONE' '5MIN MAX GOODS VEHICLES ONLY' 'AT ALL TIMES' SIGN REMOVE EXISTING 'BUS STOP 7-9AM 4-6PM MON-FRI' AND 'P5 LOADING ZONE' '5MIN MAX GOODS SERVICE VEHICLES ONLY' '9AM-4PM MON-FRI 8AM-4PM SAT & PUB. HOL' SIGN
65.0
16.0
0.0
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
EXISTING '50' SPEED LIMIT SIGN
52m
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
JOIN LINE I
NOTE:
EXISTING NO LEFT TURN SIGN
ALBERT STREET
HOBSON STREET
JOIN LINE H
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
PROPOSED TEMPORARY MERGE RIGHT SIGN REMOVE EXISTING 'BUS STOP' SIGN
EXTENT OF WORK
'BL2'
EXTENT OF WORK
CONSTRUCTION AREA
EXISTING 'NO ENTRY' AND NO RIGHT TURN SIGN
EXISTING 'BUS STOP' SIGN
15m
38.5m
'B4'
0.0
4.5
11.0
EXISTING '50' SPEED LIMIT SIGN
6.5m
'B5'/'LZ1' 'A7'
JOIN LINE I
JOIN LINE H
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:11154, OCTOBER 2013 PROPOSED 'BUS STOP 6AM-10AM'AND '3PM-7PM MON-FRI' AND 'P5 LOADING ZONE AT ALL OTHER TIMES' SIGN REMOVE EXISTING 'BUS STOP 7-9AM 4-6PM MON-FRI' AND 'P5 OTHER TIMES LOADING ZONE' '5MIN MAX GOODS VEHILCES ONLY' 'MON-SAT' SIGN
PROPOSED 'BUS LANE AHEAD' 'HOBSON ST.' SIGN
FEDERAL STREET
NOTE: REFER TO HOBSON STREET RESOLUTION ID:12890
EXISTING SIGN
LEGEND:
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER ( TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
NOTE: REFER TO ALBERT STREET RESOLUTION ID:12891
ALBERT STREET
HOBSON STREET
EXISTING 'BUS STOP' SIGN
26.0
EXISTING NO LEFT TURN SIGN
'S1'
EXTENT OF WORK
'BS2' 64.5
0.0
EXTENT OF WORK
13.0
VICTORIA STREET WEST
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT PROPOSED NSAAT
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
CONTROLLED BY TMP REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
SD
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12889 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
VICTORIA ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12889/WLB
REV.
A
SHEET
R03
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
JOIN LINE I
TREET QUEEN S
ALBERT STREET
NOTE:
REMOVE EXISTING 'BUS STOP 3-7PM MON-FRI' AND 'P5 LOADING ZONE 8AM-3PM MON-FRI 8AM-10PM SAT & PUB. HOL' SIGN
EXISTING 'BUS STOP' SIGN
REMOVE EXISTING 'BUS STOP' SIGN EXISTING 'BUS STOP' SIGN EXISTING SIGNALISED PEDESTRIAN CROSSING
CONSTRUCTION AREA
WORK EXTEN OF
EXTENT OF WORK
VICTORIA STREET WEST
'TI1'
'FM2'' 'FM1
EXTENT OF WORK
EXTENT OF WORK
NOTE: REFER TO ALBERT STREET RESOLUTION ID:12891
PROPOSED TEMPORARY TRAFFIC ISLAND
REMOVE EXISTING 'CLEARWAY 4-6PM MON-FRI''ENDS' AND 'P$ ZONE' SIGN
JOIN LINE I
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:10021, JUNE 2012
REMOVE EXISTING 'CLEARWAY 4-6PM MON-FRI''BEGINS', 'P$ ZONE' EXISTING '50' SPEED LIMIT SIGN
EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER ( TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
KERB (TO BE REMOVED)
EXISTING KERB
EXISTING NSAAT
PROPOSED KERB
PROPOSED NSAAT
PROPERTY BOUNDARY
EXISTING NSAAT (TO BE RESOLVED)
DRIVEWAY / VEHICLE CROSSING
EXISTING NSAAT (TO BE REMOVED)
PROPOSED CYCLE LANE MARKINGS
CONTROLLED BY TMP
PROPOSED BUS LANE MARKINGS
DESCRIPTION
DRAFT ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
ELLIOT STREET
ALBERT STREET
PROPOSED SIGN
A
EXISTING 'BUS STOP' SIGN
EXISTING SIGN
LEGEND:
REV.
PROPOSED 'KEEP LEFT' SIGN
PROPOSED 'KEEP LEFT' SIGN
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
SD
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12889 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
VICTORIA ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12889/WLB
REV.
A
SHEET
R04
TREET QUEEN S
ALBERT STREET
11.00
1.25
6.55
11M-TRUCK
meters
Width Track Lock to Lock Time Steering Angle
: : : :
JOIN LINE I
2.50 2.50 6.0 37.4
CONSTRUCTION AREA
11M-TRUCK
WORK EXTEN OF
EXTENT OF WORK
K 11M-TRUC(NZ)
D NEW ZEALAN
VICTORIA STREET WEST
NEW ZEALAND (NZ)
11M-TRUCK
NEW ZEALAND (NZ)
EXTENT OF WORK
EXISTING SIGN
LEGEND:
ELLIOT STREET
JOIN LINE I
EXTENT OF WORK
ALBERT STREET
PROPOSED SIGN EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
BUS SHELTER ( TO BE RESOLVED)
EXISTING ROAD MARKING (TO BE REMOVED)
EXISTING KERB KERB (TO BE REMOVED)
EXISTING NSAAT
PROPOSED KERB
PROPOSED NSAAT
PROPERTY BOUNDARY
EXISTING NSAAT (TO BE RESOLVED)
DRIVEWAY / VEHICLE CROSSING
EXISTING NSAAT (TO BE REMOVED)
PROPOSED CYCLE LANE MARKINGS
CONTROLLED BY TMP
PROPOSED BUS LANE MARKINGS
DRAFT
BUS PRIORITY WORK FOR THE CITY RAIL LINK VICTORIA STREET WEST TRUCK TRACKING Staus Stamp
FOR CONSULTATION
Date Stamp
15/05/2015
SCALE (A3)
DO NOT SCALE
1:500
Drawing No.
4205003-CS1321aT
Rev.
B
WELLESLEY STREET WEST
NOTE:
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
EXISTING SIGN
LEGEND:
PROPOSED SIGN
NOTE: REFER TO WELLESLEY STREET RESOLUTION ID:12888
EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING.
PROPERTY BOUNDARY
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT PROPOSED NSAAT EXISTING NSAAT (TO BE RESOLVED) EXISTING NSAAT (TO BE REMOVED)
PROPOSED 'P15 BUS PARKING' AND 'NO IDLING' SIGN PROPOSED 'P15 BUS PARKING' SIGN
'B1'
'A2'
'B2'
'A3'
9m
28m
8m
17m
29m
65.5
82.5
29.5
8.0
20.5
12.5m
'A1'
57.5
CCPZ
0.0
PROPSOED 'P15 BUS PARKING' AND ' NO IDLING' SIGN REMOVE EXISTING 'P5 LOADING ZONE' '5MIN MAX GOODS SERVICE VEHICLES ONLY' 'MON-SAT' SIGN
JOIN LINE J
PROPOSED 'P$ ZONE' SIGN
HOBSON STREET
0.0
8.5
70.0
61.0
52.0
41.0
29.0
26.5
6.5 8.5
'BL1'
22.5m
11m
9m
'A6'
'A7'
'A8' 224m
'BL1' PROPOSED 'BUS LANE' 'ENDS' SIGN
EXISTING 'BUSES MAY ONLY PROCEED THROUGH FROM THE LEFT LANE' SIGN
PROPOSED 'BUS LANE' SIGN
42.5m CCPZ
EXISTING 'P$ ZONE' SIGN
PROPOSED 'BUS LANE AHEAD' 'WELLESLEY ST.' SIGN
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
NOTE: REFER TO WELLESLEY ST. RESOLUTION ID:12888
REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
JOIN LINE J
WELLESLEY STREET WEST
EXTENT OF WORK
PROPOSED 'P15 BUS PARKING' AND 'NO IDLING' SIGN
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12890 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
HOBSON ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORIY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12890/WLB
REV.
A
SHEET
R01
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
JOIN LINE J
PROPOSED 'P15 BUS PARKING' AND 'NO IDLING' SIGN
EXISTING SIGN
LEGEND:
PROPOSED SIGN
VICTORIA STREET WEST
NOTE:
EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING KERB
EXISTING ROAD MARKING (TO BE REMOVED)
DRIVEWAY / VEHICLE CROSSING.
PROPERTY BOUNDARY
PROPOSED BUS LANE MARKINGS
EXISTING NSAAT PROPOSED NSAAT EXISTING NSAAT (TO BE RESOLVED) EXISTING NSAAT (TO BE REMOVED)
PROPOSED 'P5 LOADING ZONE' '5MIN MAX GOODS VEHICLES ONLY' 'MON-SAT' SIGN EXISTING 'P$ ZONE' SIGN
29m
15m
36m
'LZ1'
'A5' 8.5m 186.5
162.5
24m
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:11529, JAN 2014
199.5
'A4'
195.5
'B3' 126.5
'A3' 111.5
NOTE: REFER TO VICTORIA STREET RESOLUTION ID:12889
CCPZ
EXTENT OF WORK
EXTENT OF WORK
HOBSON STREET
'BL1'
'BL1'
'A9'
'A10'
0.0
4.5
14.5
30.5
10m
224m
'BL1' JOIN LINE J
CCPZ
NOTE: RESTRICTIONS COVERED BY AT RESOLUTION ID:11173, AUG 2013
PROPOSED 'BUS LANE' 'BEGINS' SIGN
PROPOSED 'BUS LANE AHEAD' 'HOBSON ST.' SIGN
EXISTING 'TAXI STAND 6PM-8AM MON-SUN' AND 'P5 LOADING ZONE' '5MIN MAX GOODS SERVICE VEHICLES ONLY' '8AM-6PM MON-SUN' SIGN
EXISTING 'BUS PARKING 1PM-7PM MON-FRI' 'NO IDLING' 'P$ 8AM-1PM MON-FRI 8AM-6PM SAT' SIGN
NOTE: REFER TO VICTORIA STREET RESOLUTION ID:12889
274.5
42.5m
6.5m
224.0
112.5
37.0
EXTENT OF WORK
EXISTING 'LOADING ZONE' SIGN PROPOSED 'BUS LANE' 'AHEAD' SIGN EXISTING 'BUS PARKING 1PM-7PM MON-FRI' 'NO IDLING' 'P$ 8AM-1PM MON-FRI 8AM-6PM SAT' SIGN NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
EXISTING 'TAXI STAND' SIGN
REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12890 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
HOBSON ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD BUS PRIORIY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12890/WLB
REV.
A
SHEET
R02
EXISTING SIGN
LEGEND:
PROPOSED SIGN
PROPOSED 'BUS LANE' SIGN
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING BUS SHELTER TO BE RESOLVED
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
2 BS
'
EXISTING KERB
PROPOSED NSAAT
'
EXISTING NSAAT (TO BE REMOVED)
CYCLE MARKINGS (TO BE RESOLVED)
CONTROLLED BY TMP
PROPOSED BUS LANE MARKINGS
m .5 7 0
'
EXISTING 'KEEP RIGHT' SIGN
4
E IV
.0
LI N
76
IN
Y MA
JO
DR AL R O
EXISTING 'BUS STOP 6AM-10AM MON-FRI' 'BUS PARKING SCHEDULED SERVICES ONLY' REMOVE EXISTING '4HOURS MAX AT ALL OTHER TIMES' SIGN REPLACE WITH 'P15 AT ALL OTHER TIMES' SIGN
EJ
.5 65
' 2 'B .5m
EXISTING 'BUS STOP' SIGN
EN T AO RANC TEA E CEN TO TRE
20
' 1 B
' 1 L
'
18
'B
.0
7
'A
0 68.
'
.5m 0 7 '
'F
.0
5m
. 36
1 BS
PROPOSED 'BUS LANE' 'BEGINS' SIGN
' 1 M
45
'
EXISTING 'BUS STOP' SIGN
56
1 BL
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
4.0 11
3' 'B .5m
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT
'
2.5
EXISTING SIGN (TO BE RESOLVED)
13
EXISTING ROAD MARKING
K OR
18 .
0
T EN
OF
W
T EX
m
0.
'C
0
CO
OK
' 1 L
62
8. 5
0.
0
STR
EET
PROPOSED 'BUS LANE AHEAD' SIGN
EX
TE
N T
6.
0
O
F
W
0. 0
O
RK
NOTE:
AL
VI N
OR
CE
AY
NT
M
ST RE ET
33 .5
I DR
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
VE
REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12891 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
MAYORAL DR - ALBERT ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12891/WLB
REV.
A
SHEET
R01
EXISTING SIGN
LEGEND:
WE LL
ESL E
PROPOSED SIGN
YS TRE ET
EXISTING ROAD MARKING
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING BUS SHELTER TO BE RESOLVED
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
JOI NL INE K
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
WE ST
EXISTING KERB
NOTE: REFER TO WELLESLEY ST. AT RESOLUTION ID:12888
CO
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT PROPOSED NSAAT
NST
RUC T
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED)
ION
ARE
A
EXISTING NSAAT (TO BE REMOVED)
CYCLE MARKINGS (TO BE RESOLVED)
CONTROLLED BY TMP
PROPOSED BUS LANE MARKINGS
219 .0
JOI NL INE K
EXISTING 'ROAD NARROWS' SIGN
WE
'A1
' 86. 5m
LLE
YS TRE ET WE ST
EXISTING 'BUS LANE' '6AM-10AM 3PM-7PM MON-FRI' 'BEGINS' SIGN
YO RA LD RIV E
.5m
'BL 1'
EXISTING 'BUS STOP' SIGN
407
MA
PROPOSED 'BUS LANE' SIGN LOCATED ON EXISTING LAMP POST
SLE
175
.0
EXISTING 'BUS LANE' '6AM-10AM 3PM-7PM MON-FRI' 'AHEAD' SIGN
EXISTING 'BUS STOP' SIGN
N
I JO LIN EJ
REMOVE EXISTING 'BUS PARKING AT ALL TIMES' 'TOUR BUS PARKING ONLY 4 HOURS MAX 8AM-6PM' SIGN REPLACE WITH 'BUS PARKING SCHEDULED SERVICES ONLY P15. 7AM TO 7PM'. TOUR BUS PARKING 7PM-7AM' SIGNS
EXISTING 'BUS LANE' SIGN
2.5
13
NOTE: BUS STOP RESTRICTIONS COVERED BY AT RESOLUTION ID: 10553, NOV 2012 NOTE: BUS LANE RESTRICTIONS COVERED BY AUCKLAND CITY RESOLUTION ID: 12143, MAR 2009
'B S3
'
EXISTING PID
EXISTING 'BUS LANE' 'ENDS' SIGN
8.5
13
EXISTING 'BUS STOP' SIGN
IN
JO NOTE:
EJ
LIN
REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
7
5m 4.
' 7 'A
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12891 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
MAYORAL DR - ALBERT ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12891/WLB
REV.
A
SHEET
R02
EET
EXISTING SIGN
LEGEND:
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING BUS SHELTER TO BE RESOLVED
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
EXISTING NSAAT (TO BE RESOLVED)
ERT ALB
NL INE L
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING. PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE REMOVED)
CYCLE MARKINGS (TO BE RESOLVED)
CONTROLLED BY TMP
PROPOSED BUS LANE MARKINGS
JOI
PROPOSED 'BUS LANE' SIGN REMOVE EXISTING 'BUS LANE' '6AM -10AM, 3PM-7PM' 'MON-FRI' SIGN
NL INE
4.5 m
PROPOSED NSAAT
JOI
'A3 ' 3
EXISTING NSAAT
STR
PROPOSED SIGN EXISTING ROAD MARKING
L
52.0
PROPOSED 'BUS LANE' SIGN REMOVE EXISTING 'BUS LANE' '6AM -10AM, 3PM-7PM' 'MON-FRI' 'BEGINS' SIGN
EET STR ALB ERT
'BL
49m
'A2
'
1'
407
.5m
'BL 1'
49.0
38.0
16.5
'A6
31m
'
0.0
7.0
JOI
NL INE K
NOTE: REFER TO WELLESLEY STREET AT RESOLUTION ID:12888
CO
NST
RUC TIO
NA REA
NOTE: AREA SUBJECT TO CRL ENABLING WORKS TMP CONDITIONS. INDICATIVE ROAD MARKINGS AND SIGNAGE CHANGES ONLY
REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
JOI
NL INE K
NOTE:
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12891 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
MAYORAL DR - ALBERT ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12891/WLB
REV.
A
SHEET
R03
EXISTING SIGN
LEGEND:
199 .
PROPOSED SIGN
195 .
EXISTING SIGN (TO BE RESOLVED)
PROPOSED ROAD MARKING
EXISTING SIGN (TO BE REMOVED)
EXISTING ROAD MARKING (TO BE RESOLVED)
EXISTING BUS SHELTER TO BE RESOLVED
EXISTING ROAD MARKING (TO BE REMOVED)
PROPERTY BOUNDARY
NST
EXISTING 'BUS, CYCLE AND MOTORCYCLE LANE' '6AM-10AM, 3PM-7PM' 'MON-FRI' 'AHEAD' SIGN
m
EXISTING KERB
DRIVEWAY / VEHICLE CROSSING.
EXISTING NSAAT
CO
0
'A5 ' 20
EXISTING ROAD MARKING
5 TIO
NA REA
VIC
TOR
IA
EXISTING 'BUS STOP' SIGN
PROPOSED NSAAT
RUC
STR EET
PROPOSED CYCLE LANE MARKINGS
EXISTING NSAAT (TO BE RESOLVED) EXISTING NSAAT (TO BE REMOVED)
CYCLE MARKINGS (TO BE RESOLVED)
CONTROLLED BY TMP
PROPOSED BUS LANE MARKINGS
PROPOSED 'BUS LANE' 'ENDS' SIGN REMOVE EXISTING 'BUS LANE' '6AM-10AM , 3PM-7PM' 'MON-FRI' SIGN
175
.0
425
.5
163
.0
'B5
29. ' 5m
NOTE: REFER TO VICTORIA STREET AT RESOLUTION ID:12889
EXISTING 'BUS STOP' SIGN
145
STR ALB ERT
'BL
1'
'A4
13m 5
NOTE: RESTRICTIONS COVERED BY AUCKLAND CITY RESOLUTION ID: 12057, APR 2007
36m
'B4 '
'BL
407 1' .5m
132 .
EET
.5
'
EXISTING 'BUS STOP' SIGN
EXISTING 'BUS STOP' SIGN
PROPOSED 'BUS STOP' SIGN REMOVE EXISTING 'BUS STOP' '6AM-10AM','3PM-7PM' AND 'P5' 'LOADING ZONE' '5MINS MAX GOODS SERVICE VEHICLES ONLY' 'AT ALL OTHER TIMES'
102
.5
JOI
NL IN
EL 5
34.
'A3
5m '
86.
NOTE:
JOI
NL INE L
REV.
DESCRIPTION
DRAFT A
ISSUE FOR RESOLUTION
CHECK
APP'D
DATE
PM
DM
03/07/15
THE SECTION OF ROAD SHOWN HERE IS WITHIN THE CITY CENTRE PARKING ZONE (CCPZ)
PROJECT
SCALE NAME
DATE
DESIGN
PM
25/05/15
DRAWN
HC
25/05/15
DRAWING CHECK
MW
03/07/15
DESIGN CHECK
PM
03/07/15
APPROVED
DM
03/07/15
NOTE: ALL MEASUREMENTS HAVE BEEN ROUNDED TO THE NEAREST 0.5m.
STATUS STAMP
RESOLUTION
BUS PRIORITY WORK - CRL
ID:12891 DATE STAMP
TITLE Traffic & Transportation Engineers Ltd Lower Ground Floor 77 Grafton Rd, Grafton, Auckland, New Zealand T: +64 9 921 4190 F: +64 9 921 4191 E: t2@engineers.co.nz W: www.t2engineers.co.nz
MAYORAL DR - ALBERT ST, AUCKLAND CBD, WAITEMATA LOCAL BOARD, BUS PRIORITY WORK - CRL
PROJECT No.
4205003
03 JULY 2015 DWG No.
AT/12891/WLB
REV.
A
SHEET
R04
Appendix L:
Quay Street Cycleway Consultation Plan
Appendix M:
Indicative (DRAFT) Monitoring Trigger Times
Observed (seconds)
Scenario 4d
Base Case
Resource Consent Trigger (+10min)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Wellesley Street (EBD)
402
1002
45%
580
760
49%
600
780
50%
600
780
26%
510
690
20%
480
660
Wellesley Street (WBD)
348
948
43%
500
680
54%
530
710
50%
520
700
35%
470
650
12%
390
570
Victoria Street (EBD)
444
1044
57%
700
910*
64%
730
950*
66%
740
960*
67%
740
960*
14%
510
690
Victoria Street (WBD)
450
1050
35%
610
790
56%
700
910*
35%
610
790
27%
570
750
10%
500
680
Customs Street (EBD)
330
930
39%
460
640
38%
460
640
53%
500
680
56%
520
700
52%
500
680
Customs Street (WBD)
342
942
16%
400
580
75%
600
780*
30%
450
630
22%
420
600
16%
400
580
Quay Street (EBD)
228
828
30%
300
480
29%
290
470
37%
310
490
40%
320
500
36%
310
490
Quay Street (WBD)
300
900
14%
340
520
37%
410
590
24%
370
550
17%
350
530
16%
350
530
Nelson Street (NBD)
180
780
23%
220
400
28%
230
410
27%
230
410
11%
200
380
5%
190
370
Hobson Street (SBD)
276
876
31%
360
540
30%
360
540
26%
350
530
20%
330
510
13%
310
490
Queen Street (NBD)
510
1110
7%
550
730
2%
520
700
7%
540
720
7%
550
730
1%
510
690
Queen Street (SBD)
474
1074
23%
580
760
4%
490
670
13%
540
720
19%
570
750
28%
610
790
New North Road (NBD)
186
786
1%
190
370
1%
190
250
1%
190
250
1%
190
250
0%
190
250
New North Road (SBD)
144
744
0%
140
320
0%
140
180
0%
140
180
0%
140
180
0%
140
180
Mt Eden Road (NBD)*
150
750
-1%
150
330
-2%
150
200
-1%
150
200
-1%
150
200
-2%
150
200
Mt Eden Road (SBD)*
120
720
0%
120
300
0%
120
160
0%
120
160
0%
120
160
0%
120
160
Khyber Pass Road (EBD)
132
732
2%
130
310
2%
130
170
2%
130
170
2%
130
170
0%
130
170
Khyber Pass Road (WBD)
120
720
1%
120
300
1%
120
160
1%
120
160
1%
120
160
0%
120
160
Newton Road (EBD)
144
744
4%
150
330
7%
150
200
13%
160
210
13%
160
210
10%
160
210
Newton Road (WBD)
126
726
1%
130
310
2%
130
170
1%
130
170
1%
130
170
1%
130
170
Morning Peak Travel Times
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Interpeak Travel Times
Observed (seconds)
Scenario 4d
Scenario 5a
Scenario 6a
Scenario 7a
Scenario 8a
Base Case
Resource Consent Trigger (+10min)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Wellesley Street (EBD)
438
17%
510
690
20%
520
700
21%
530
710
14%
500
680
10%
480
660
17%
Wellesley Street (WBD)
324
23%
400
580
29%
420
600
26%
410
590
7%
350
530
5%
340
520
23%
Victoria Street (EBD)
450
65%
740
960*
68%
760
990*
68%
760
990*
71%
770
1000*
13%
510
690
65%
Victoria Street (WBD)
570
45%
830
1080*
73%
990
1290*
46%
830
1080*
45%
820
1070*
9%
620
800
45%
Customs Street (EBD)
312
14%
360
540
14%
360
540
22%
380
560
33%
420
600
24%
390
570
14%
Customs Street (WBD)
348
16%
400
580
78%
620
810*
31%
460
640
20%
420
600
12%
390
570
16%
Quay Street (EBD)
246
28%
320
500
30%
320
500
33%
330
510
35%
330
510
32%
320
500
28%
Quay Street (WBD)
252
19%
300
480
52%
380
560
39%
350
530
31%
330
510
30%
330
510
19%
Nelson Street (NBD)
168
40%
240
420
42%
240
420
41%
240
420
33%
220
400
25%
210
390
40%
Hobson Street (SBD)
288
9%
310
490
10%
320
500
8%
310
490
8%
310
490
6%
310
490
9%
Queen Street (NBD)
588
13%
660
840
11%
650
830
13%
660
840
16%
680
860
11%
650
830
13%
Queen Street (SBD)
624
33%
830
1010
18%
730
910
23%
760
940
41%
880
1140*
39%
860
1040
33%
New North Road (NBD)
168
-1%
170
350
-1%
170
350
0%
170
350
0%
170
350
0%
170
350
-1%
New North Road (SBD)
132
1%
130
310
1%
130
310
1%
130
310
0%
130
310
1%
130
310
1%
Mt Eden Road (NBD)*
174
-1%
170
350
0%
170
350
0%
170
350
-1%
170
350
-1%
170
350
-1%
Mt Eden Road (SBD)*
180
0%
180
360
0%
180
360
0%
180
360
0%
180
360
0%
180
360
0%
Khyber Pass Road (EBD)
114
1%
120
300
1%
120
300
1%
120
300
2%
120
300
3%
120
300
1%
Khyber Pass Road (WBD)
102
0%
100
280
2%
100
280
1%
100
280
0%
100
280
0%
100
280
0%
Newton Road (EBD)
132
2%
130
310
2%
130
310
2%
130
310
4%
140
320
4%
140
320
2%
Newton Road (WBD)
120
1%
120
300
6%
130
310
4%
130
310
1%
120
300
0%
120
300
1%
Observed (seconds)
Scenario 4d
Base Case
Resource Consent Trigger (+10min)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Forecast Increase (%)
Forecast Time (s)
Trigger Time (s)
Wellesley Street (EBD)
468
1068
41%
660
840
39%
650
830
35%
630
810
48%
690
870
50%
700
880
Wellesley Street (WBD)
402
1002
66%
670
870*
69%
680
880*
70%
680
880*
38%
560
740
7%
430
610
Victoria Street (EBD)
540
1140
74%
940
1220*
93%
1040
1350*
92%
1040
1350*
121%
1190
1550*
15%
620
800
Victoria Street (WBD)
600
1200
23%
740
920
62%
970
1260*
48%
890
1160*
22%
730
910
18%
710
890
Customs Street (EBD)
378
978
18%
450
630
18%
450
630
40%
530
710
43%
540
720
29%
490
670
Customs Street (WBD)
492
1092
24%
610
790
73%
850
1110*
41%
690
870
14%
560
740
10%
540
720
Quay Street (EBD)
288
888
26%
360
540
27%
370
550
41%
410
590
40%
400
580
35%
390
570
Quay Street (WBD)
348
948
5%
370
550
22%
420
600
12%
390
570
7%
370
550
7%
370
550
Nelson Street (NBD)
216
816
26%
270
450
41%
300
480
35%
290
470
24%
270
450
13%
240
420
Hobson Street (SBD)
438
1038
49%
650
830
55%
680
880*
48%
650
830
34%
590
770
27%
550
730
Queen Street (NBD)
714
1314
9%
780
960
9%
780
960
8%
770
950
3%
730
910
2%
730
910
Queen Street (SBD)
660
1260
31%
860
1040
38%
910
1180*
30%
860
1040
14%
750
930
18%
780
960
New North Road (NBD)
180
780
-2%
180
230
-1%
180
230
-2%
180
230
-1%
180
230
23%
220
290
New North Road (SBD)
144
744
0%
140
180
1%
140
180
1%
140
180
-1%
140
180
-1%
140
180
Mt Eden Road (NBD)*
168
768
-1%
170
220
-2%
160
210
0%
170
220
0%
170
220
-1%
170
220
Mt Eden Road (SBD)*
126
726
4%
130
170
5%
130
170
4%
130
170
4%
130
170
0%
130
170
Khyber Pass Road (EBD)
210
810
0%
210
270
0%
210
270
0%
210
270
1%
210
270
1%
210
270
Khyber Pass Road (WBD)
156
756
2%
160
210
4%
160
210
2%
160
210
1%
160
210
-1%
150
200
Newton Road (EBD)
150
750
3%
150
200
4%
160
210
6%
160
210
9%
160
210
4%
160
210
Newton Road (WBD)
162
762
26%
200
260
26%
200
260
4%
170
220
-1%
160
210
-1%
160
210
Evening Peak Travel Times
Scenario 5a
Scenario 6a
Scenario 7a
*The SATURN model only covers the northern half of the Mt Eden Road route. (The forecast time has been factored up to represent the entire route)
Scenario 8a
The forecast increase is the difference between the modelled scenario and modelled base case. The forecast time is derived by factoring the base case up by forecast percentage increase. The trigger time type is based on observed base case and forecast times. Additional mitigation measures are required if monitoring indicates that the travel time exceeds the trigger time. The trigger times are calculated as per Condition 26 of the CRL designation regarding the monitoring requirements: - If the modelled forecast time is less than or equal to 4 minutes above the observed base case time, the trigger time for that route is defined to be 3 minutes greater than the forecast time. - *If the forecast time is more than 4 minutes above the observed base case time, the trigger time is defined to be 30% greater than the forecast time. The routes for which this condition applies are marked with an asterisk in the travel time tables.
Appendix N:
CLG and Independent Peer Review Comments & Response
Community Liaison Group Comments Comments received from the CLG are as follows: Date
CLG Member
Comment
Response
15th December 2015
Ross Boswell
How will GPS monitoring be undertaken?
NZTA undertake continuous, confidential and anonymous GPS monitoring across the Auckland Region – this data will be used to monitor impacts on traffic flow in the wider network as a result of the Project. AT operates a Bluetooth data mining system which provides real time performance data for the key routes within the City Centre. AT uses a similar system to NZTA for the wider network in conjunction with signal control and other systems. Monitoring is outlined in Section 7 of the DWP – no change required.
15th December 2015
Tim Coffey
For pedestrian redirection routes will there be signage or human faces to direct pedestrians? Will it be clear for workers where to cross the street?
AT Ambassadors will be present on the streets within and surrounding the Project area at the start of any major changes to key routes. Wayfinding signage will be installed along key pedestrian routes within and adjacent to the Project area, along with line treatments painted on the ground to assist with wayfinding. Wayfinding will remain in place for the duration of construction. If wayfinding measures are not working, AT will change the measures so they are more effective. Refer Section 4.16.1 of the DWP. All pedestrian crossings will be fully marked and signed to normal standards, providing clear guidance to all pedestrians as to designated crossings points. AT has tried to reduce the number of changes required to pedestrian and transport networks during the Project – for example changes to pedestrian crossings in Tyler and Galway Street will remain throughout the duration of the
Date
CLG Member
Comment
Response Project. No change required to DWP.
15th December 2015
Ross Boswell
How will changes in local foot traffic patterns impact local business and have you sought feedback from such businesses?
The Project will not result in any footpaths being closed and aims to spread pedestrian movements over a greater area. Pedestrians will be provided with wayfinding information and will be able to make their own choices about which route they wish to take. The team is undertaking a Social Impact and Business Disruption (SIBD) DWP to engage with businesses surrounding the Project area in order to understand such impacts – refer to the SIBD DWP. No change required to DWP.
15th December 2015
Kathy Ross
Will there be changes to buses that currently leave from Galway Street?
Buses that currently arrive and depart from Lower Queen Street, Galway and Tyler Streets will be relocated prior to the commencement of the Project. AT will be rolling out an information campaign in February 2016 outlining the changes, information will be provided at bus stops and on the AT website and by AT Ambassadors on-site in the first days following the change in service routing and stop relocation. No change required to DWP.
15th December 2015
Ross Boswell
The redirection of traffic through the city will result in changes to green light phases and increase congestion
Network management is focused on maximising the safety and efficiency of operation main roads (e.g. Customs, Quay, Queen, Victoria and Wellesley streets) and connections throughout the CBD while and reducing impacts on key minor connections to the extent practicable. Traffic will be continuously monitored on key routes and local phasing changes made as required to minimise congestion. AT run their network through a joint traffic operations centre with NZTA who control motorway on and off ramps in order to cooperatively manage congestion across he wider combined network. No change required to DWP.
Date
CLG Member
Comment
Response
4 May 2016
Cooper and Company
Table 1.1 TAP conditions, BTC Designation Conditions footnote 1 the date of the confirmation notice is 17 March 2016 not 16 March 2016.
Table 1.1 footnote updated to the state the correct date of confirmation notice 17 March 2016.
4 May 2016
Cooper and Company
Table 1.1 TAP conditions, BTC Designation Condition 24.3(b) does not correctly reflect the final AT version and needs to be updated
Condition 24.3(b) updated to reflect AT final decision on the BTC Designation Conditions.
4 May 2016
Cooper and Company
Section 3.2.1 in the last bullet point references “Barnes’ Dance Phases”. While this term is defined in the definitions section at the front of the plan it would be useful to define in the text of the plan too – (eg dedicated pedestrian cycles or similar) the first time this is used. This is the approach taken with other defined terms.
Section 3.2.1 text updated to include Barnes Dance definition.
4 May 2016
Cooper and Company
Figure 3.2 Cycle infrastructure lists Commerce Street as a route with space for cyclists. However, with the closure of lower queen this is now a main bus route. Cooper and Company are concerned that there is potential for bus and cycle conflict in Commerce Street. Tangihua and Britomart Place are the main cycle routes and in Cooper and Company’s view should remain so.
Figure 3.2 Cycle infrastructure, is the City Centre Cycle Network map advertised on the Auckland Transport website. CRL team will suggest to Auckland Transport Cycling team to have the map amended to remove Commerce Street as a cycle route. Section 4.16.2 text has been amended to include measures to encourage cyclists who are heading to the Britomart station to dismount and access the station via foot. Signage to this effect will be placed around Britomart station.
4 May 2016
Cooper and Company
Section 4.1.1 Objective notes that cumulative effects of project with others within CBD likely to be “significantly greater than previously noted” and that if the traffic effects are “less palatable than anticipated, then more restrictive traffic management measures may be required”. Is this saying cumulative effects have been underplayed in the recent designation hearings or does this relate to CRL hearings? If the effects are going to be significantly greater then why aren’t the traffic measures being deployed now?
Section 4.1.1 text has been updated to clarify this statement.
4 May 2016
Cooper and Company
Section 4.2 Utilities says Vector planning to install new trench for 22 KW line upgrade in December 2015. Has this occurred? Paragraph should
Yes, Vector has already installed the new trench for 22KW line upgrade. Section 4.2 wording has been updated to reflect this.
Date
CLG Member
Comment
Response
be updated that it has occurred or new timing if not yet undertaken. 4 May 2016
Cooper and Company
Table 4.1, Traffic Management, features notes for Stage 1 there will be a temporary partial closure of Commerce Street to remove a bus stop, install SCATs loops and road markings, install new bus stops and undertake kerb cutbacks, remove pram crossings and street furniture, and install new signalised crossing opposite the temporary station. No indication is given of timing for Stage 1 or that notification will be given to affected parties in advance of these works. Some kerb work is already being undertaken – can we get a list of when these works are proposed together with a commitment of at least 72 hours advance notice of work start dates.
Section 4.3 and Section 4.12.1 text has been updated to confirm that local businesses and affected parties will be given at least 48 hours’ notice prior road closures.
4 May 2016
Cooper and Company
Section 4.9.2 mentions that hoardings may be able to provide signage promoting local businesses and that the signage will be developed by the JV and AT in accordance with the urban design and social impact and business disruption DWPs. Cooper and Co have previously requested involvement in signage design (which AT and JV indicated would be possible) and it would be good to have this reflected in the appropriate plan(s).
Section 4.9.2 text updated to confirm AT will engage with Cooper and Company on the design of any signage required in relation to the Britomart Precinct.
4 May 2016
Cooper and Company
Section 4.11.1 notes that project construction trucks will be banned from using Tyler and Galway Streets east of Commerce Street but that other non-project trucks cannot be banned. Cooper and Company previously raised the issue of having a bylaw enacted to prohibit non-AT buses from using the Precinct (other than on the set bus routes). In Cooper and Company’s view such a bylaw could be used to ban all such trucks from using these roads.
AT has taken on board the suggestion of the bylaw but given the process involved it would not be possible to have a bylaw in place prior to commencement of construction works. AT is addressing this matter through other means.
4 May 2016
Cooper and Company
Section 4.11.2, residential zoned land and educational facilities, states that regular consultation and forewarning of changes to traffic controls will be
Section 4.11.2 text updated to include businesses and landowners located within the Project area.
Date
CLG Member
Comment
Response
provided to stakeholders in the project area. For clarity it should be noted that stakeholders are not just limited to residential and educational facilities but include others, such as businesses and landowners located within the project area. 4 May 2016
Cooper and Company
Section 4.12.2, alternative parking arrangements, states that where parking is unavailable to residents / businesses during the works AT will make parks available at Downtown or Britomart carpark and will lease a number of parks for this purpose. Cooper and Company has not been approached as yet to discuss this. The carpark is nearing or at capacity at sometimes so early consultation is recommended if AT wish to secure carparks.
A member of the DSBJV project team will contact Tim Ellis the Britomart carpark manager to discuss.
4 May 2016
Cooper and Company
Section 4.16.1, pedestrian measures, notes that wayfinding signs will be installed at key decision points to advertise the location of the new entrance to Britomart. It also indicates that the form of the signage will be confirmed by AT through the Urban Design DWP. Cooper and Company would like to be consulted on any signage within the Britomart Precinct
As mentioned in Section 4.9.2 of this DWP and in section 6.3.2.3 of the Urban Design DWP, AT will engage with Cooper and Company on the design of any signage required in relation to the Britomart Precinct.
4 May 2016
Cooper and Company
Section 4.19, sets out potential further mitigation measures to address traffic issues. There are no specific measures listed for the Britomart Precinct – with the exception of restricting construction deliveries/spoil removal during peak hours and encouraging light construction vehicles to avoid critical intersections such as Commerce/Customs Street. Are there other measures that could be considered to ease traffic congestion in this area?
Section 4.19 has been updated to include additional traffic mitigation measure that can be implemented to ease traffic congestion in the Britomart Precinct area.
4 May 2016
Cooper and Company
Section 7.3.3, monitoring of local road traffic conditions and temporary traffic controls, notes the monitoring under the BTC designation conditions to be undertaken by an independent person. Comment made that the monitoring required includes the 1 –
Section 7.3.3 text amended to provide additional clarity on this matter.
Date
CLG Member
Comment
Response
2 week settling periods and traffic studies during this time are poor practice as they will not provide representative data to base decisions on. Does this mean that AT will be challenging any directions made by the independent reviewer on this basis? 4 May 2016
4 May 2016
Cooper and Company
Cooper and Company
Section 8.1, general, and section 8.3, temporary traffic management coordination and process, notes that the TAP has been developed in conjunction with the listed parties. One of these is the Traffic Management Coordination Group (TMCG) which includes representatives of Precinct redevelopment, NZTA, AT, CCI (city centre initiatives) and ATEED. Is this group to continue during the construction period? Cooper and Company would like more information about this group and be invited to attend a couple of meetings to determine whether it is something they consider it would be useful for them to be a member of. This section also contains a list of parties for early and on-going consultation in regards to traffic matters. This includes NZTA, AT buses, affected businesses and residents using Tyler Street accesses, and for Galway Street Mercure and McDonalds. This list does not include all the potentially affected businesses within the area of the Precinct affected by the works and nor does it include Cooper and Co. Tenants will not only be affected by access routes but also by closures which might affect emergency evacuation gathering points etc. At the least Cooper and Co should be listed here so that they can act as a liaison with their tenants.
The Traffic Management Coordination Group only consists of representatives of Site Traffic Management Supervisors group. Section 8.1 text has been updated to provide clarity on the members of this group.
Section 9 Reviewing and updating the DWP notes that any material changes to the DWP will require approval from Council. However it should also note that any material changes also need to be
Section 9 text has been updated to refer to the requirement to notify the CLG of any material changes made to the DWPs.
A new subsection 8.2 has been inserted to reference the requirement for ongoing, regular consultation with other stakeholders in regards to traffic matters throughout construction of the Project.
Date
CLG Member
Comment
Response
notified to the CLG under condition 8.7. 4 May 2016
Cooper and Company
Appendix A – Workforce Travel Plan section 4.2, physical infrastructure notes that the CPO building will be used for office space to house 10 to 30 staff. As noted in prior feedback Cooper and Company would like to be kept informed of all proposals of how the upper floors of the CPO will be used.
Engagement with Cooper and Company will be undertaken prior to the site office being located in the CPO building.
4 May 2016
Cooper and Company
Overall comment, there are a lot of measures and changes proposed. It is important that key stakeholders like Cooper and Company are kept informed of these. While there are some references to prior notice of certain stakeholders it would be helpful if there was a separate section which listed who would be notified, about what, and when. From Cooper and Company’s perspective an indicative list of timing for various measures and 48 hours prior notification (wherever possible) of the implementation of these measures would be appropriate.
All other stakeholders within Project area will be consulted with in regards to traffic matters on a regular, ongoing basis throughout construction of the project. A new Section 8.2 has been included to cover this requirement. Sections 4.12.1 and 4.12.3 have been updated to require all affected parties to be provided with a minimum of 48 to 72 hours prior notification to temporary disruption to property access or road closures.
19th May 2016
Cooper and Company
Table 2.1 why has footpath widening and pedestrian crossing on Tyler, Galway and Commerce Streets and reversal of traffic flow on Tyler street been deleted from the table?
19th May 2016
Cooper and Company
Table 2.3 why has footpath widening and pedestrian crossing changes been deleted from stage 1 of the table?
Reference to these works were deleted as they were undertaken by AT or Precincts Properties to allow for the redevelopment of the Downtown Shopping Centre and the Albert Street section of the CRL. Table 2.1 has been updated to include these works and note have been made where these works are to be undertaken by other, prior to the commencement of the Britomart section of CRL works. Further a footnote has been added for additional clarity.
19th May 2016
Cooper and Company
Section 4.16.2 second bullet point – typo – extra “Cyclists” at the end of the bullet point.
Section 4.16.2 text updated to correct typo.
19th May 2016
Cooper and Company
Other. Bus flyer / plan showing ban on heavy traffic, including buses, on Gore, Galway and Tyler streets to be inserted into plan.
No heavy traffic flyer / plan inserted as a figure 4.6 in section 4.11.1.
Independent Peer Review Comments An Independent Peer Review of the draft Transport, Access and Parking DWP was undertaken by Tony Innes from Commute Transportation Consultants, with peer review comments received on 21st February 2016. The comments received are as follows: Condition No.
Section of DWP1
Comment
Response
The DWP outlines where and how the NZTA will be engaged and it is noted that they are also reviewing the documentation. This is a critical element of the successful management of the traffic effects as a one network response is critical. Particularly given that a significant portion of traffic is re-routing from the local road network to the motorway network in the mode forecasts. I would like to see a stronger emphasis on this in the document, and suggest in addition to the measures proposed that there is also engagement at higher levels within AT and NZTA, with this project a standing agenda item on the regular meetings between NZTA and AT. This will be a very high profile project and the effects will need to be managed by all parties.
As noted in the DWP, NZTA have been a party to the TMCG during the development of this document, supplied baseline GPS derived journey time data and have indicated in meetings and correspondence that they do not oppose the project and will work cooperatively with AT to manage and further develop planning for management of the wider network. NZTA are continuing to assess and develop potential active management and mitigation measures for the motorway network using diverted traffic volumes from the CRL modelling as well as observed and expected (e.g. from the Waterview project next year) rapid changes to motorway volumes.
CRL Designation Conditions CRL 18.1
9.1 Appendix O
The CBD Tactical Operations structure proposed is jointly staffed by AT and NZTA and will consist of a Steering Group, PCG and Tactical Operations Plan (TOP) Working Group. Monthly reporting on CBD and associated traffic management (including the motorway network and CMJ) is expected to be reported on monthly through this structure or as needed by particular event. As with all groups and projects within AT and given the high profile of the works it is expected that the steering group members will report to their respective boards as appropriate.
1
C1 Transport, Access and Parking Revision 3
Condition No.
Section of DWP1
Comment
Response The structure, roles, composition and expected reporting structure of this group has been further described in the DWP in sections 7 and 8. The final written response from NZTA summarised in the peer review comment here has been included in the DWP as an Appendix O. It is agreed that the issues raised by NZTA and the aligned comments peer reviewer regarding traffic management of the CBD for this project and the multitude of concurrent projects will be addressed at a wider city level by the TOP organisation; while this DWP provides suitable control and management structures and measures for this Project. Liaison with Ports of Auckland and Auckland Hospital are expected as part of the activities of the TOP group and wider Project communications plan. It is confirmed that the TDM campaign referred to in the NZTA final written response has been underway since prior to the start of the Pipe Jack works in November 2015 and has been significantly increased in scope and prominence since early 2016 as noted in the following response to condition 25.2(a) below. The response to this condition also notes the additional public transport capacity introduced by AT since April 2015 and further capacity increases expected in 2016. Additional interventions and capacity will be considered and developed as required through the TOP group. It is understood that network operating plans have already been developed and used to establish optimisation measures
Condition No.
Section of DWP1
Comment
Response in response to issues encountered as a result of the Pipe Jack works with benefits to delay and queues resulting. The proposal to develop motorway strategies such as amended ramp metering plans is supported and expected to be implemented through the TOP group as part of wider City traffic management measures during the construction of this and other projects, and subsequently to address population growth and development of the CBD traffic environment. No change to DWP.
CRL 20.1
Appendix A: Workforce Travel Plan
The DWP is considered to appropriately address this condition. A preliminary travel plan has been prepared that is considered appropriate (subject to further detail being provided once staff travel patterns are known). There are very few car parks provided for staff and a mixture of TDM measures are proposed to reduce the workforce dependence on the private vehicle. It is acknowledged however that given the construction nature of the project there will need to be contractors with tools that drive to work as is the case on many construction sites throughout the CBD. The needs of specialist staff can be covered in subsequent TMP documents.
No change to DWP or Workforce Travel Plan.
CRL 21.1(a)
4.11
The DWP is considered to appropriately address this condition. It is noted that the Lower Queen Street area in particular is heavily trafficked by pedestrians and will require monitoring to ensure the measures are working effectively (as will be undertaken through the standard monitoring approach for TTM)
Agreed, although it is noted that pedestrian volumes will likely decrease somewhat with the main station entry moving to the temporary station on Commerce, Galway and Tyler streets.
This is considered light in the DWP, however should be addressed in the CEMP. Road sweeping will help manage the effects if sediment escapes the site in significant amounts, however stopping this sediment leaving the site is the best method to manage this effect.
Agreed, there is insufficient space within the construction support areas to provide for drive through wheel wash instead there will be manual cleaning of trucks before they leave site. All water within the site is captured and sent to a treatment
CRL 21.1(b)
4.14
No change to DWP.
Condition No.
Section of DWP1
Comment
Response plant on the southern side of the Glasshouse as detailed in the CEMP and Erosion and Sediment Control DWP. No change to DWP.
CRL 25.1
This document
This is covered in the summary section in this report.
See following
CRL 25.2(a)
4.14-4.19
Significant planning has been undertaken by AT for shifting bus services within the Britomart Transport Centre to accommodate the CRL works. Additional bus priority works have also been identified and implemented. It is recommended that bus travel times are monitored continually to understand where delays are occurring and to maintain appropriate service levels. During construction, the transport priorities should be public transport, pedestrians and cyclists. Private vehicle travel should be managed as best as possible however the effects should be mitigated by clearly communicating that works are significant and delays should be expected. The interface with other significant projects in the CBD is an area of concern. The modelling undertaken confirms this concern. It is acknowledged that it is not practical to stop projects and ensure they do not occur in parallel. It is therefore recommended that further thought be given to the central coordination of the temporary traffic management associated with all public and private projects in the CBD and AT as road controlling authority set up regular (could be weekly) meetings with all of the projects to coordinate this critical activity and allow feedback and planning to be undertaken in real time to ensure a streamlined and best for city for outcome.
As noted in DWP AT will undertake continuous monitoring of bus travel times, patronage and kerbside management issues amongst others as ‘business as usual’ (BAU) and their KRA and KPI reporting to the AT Board and elsewhere. Additional bus priority facilities will be installed in mid-April before the start of the works including bus lanes on Queen Street which will address some recent issues. The AT TOP group and Tactical Response Team are and will actively monitor and optimise all mode movements with priority given to public and active transport consistent with the time of day network operating plans which promote people carrying productivity over vehicle movements. No change to DWP. As noted in the DWP, the modelling does not allow for trip rationalisation, mode shift (although this has been considered as a sensitivity test) or natural peak spreading. Along with other assumptions as to development traffic and controls, it therefore represents a conservative assessment and it is expected that there will be a degree of ‘natural’ peak spreading as drivers choose a travel time that allows them to experience what they consider to be an acceptable level of service. This is consistent with long term planning for the city which would maintain the current number of carparks but
Condition No.
Section of DWP1
Comment
Response reduces lane capacity to allow for more productive mode use (e.g. bus or cycle lanes) or creation of improved public realm. No change to DWP. As noted in the DWP a number of major public and private projects will occur in parallel with attendant traffic effects occurring in parallel. It is agreed that where possible short term traffic management events need to be coordinated to avoid enhancing the cumulative effects unnecessarily (such as closing adjacent cross-town routes at the same time on a particular night for discrete events). During the development of this document this role was performed by the TMCG to ease the network task of the Road Corridor Access team. The fortnightly TMCG included representatives of the various major developments in the CBD to understand the interaction of upcoming TMP activities; from now on this role will be undertaken by the TOP group which includes senior representatives of the RCA and network operations teams with provision for input from subject matter experts such as from the CRL construction team. No change to DWP. It is noted that a number of the potential additional mitigation interventions identified can be implemented at short notice with minimal if any design effort or infrastructure changes (i.e. turn bans or other signal amendments). It is understood that a number of other measures are being further investigated and planned on a continuing basis including motorway ramp management measures by At, NZTA and the Auckland Motorway Alliance (AMA). It is suggested that the wider AT organisation is encouraged to develop planning and physical
Condition No.
Section of DWP1
Comment
Response works early design through the TOP group. The TOP working group and Tactical Response Team should and is expected to be familiar with the DWP and requirements of consent and designation for this and associated Projects. No change to DWP
CRL 25.2(b)
4.12
The DWP addresses these matters however the generic proposed pedestrian routes and footpath closures during various stages of the project should be clearly identified on the DWP plans. It would useful to show the pedestrian routes (Figures 4.2 to 4.5) and heavy vehicle access routes (Figures 4.8 to 4.11) on one plan to better understand potential conflicts between pedestrians and heavy vehicles for different construction stages. Site specific TMPs would detail how these routes and closures would be implemented.
It is considered that the haul route diagrams and recognition that no pedestrian facilities are to be closed (other than temporarily for a very short period of minutes for driveway use) provides sufficient basis for TMP planning and preparation. The staging schematics presented note the need for pedestrian measures at the site access points and these plans have been clarified as have the truck access plans in section 4 of the DWP.
CRL 25.2(c)
4.12
See above. Property access points (pedestrian) would also be useful to identify on the plans.
Property access points added to schematics in section 4 of DWP
CRL 25.3(a)
4.13
Routes have been identified and are considered appropriate. The focus on arterial roads and the use of Grafton Gully (avoiding the need to cross the work area) is considered an appropriate approach. We note for subsequent sections of CRL that the modelling is forecasting a significant increase in traffic on the already congested motorway network and it is unclear how this will be appropriately managed.
The NZTA (via AMA) are currently modelling the motorway network under the various scenarios identified in this DWP and using the modelled changes to network traffic distribution. This modelling also includes recent unexpected increases in motorway traffic resulting from rapid population growth in the region as well as expected future events such as the opening of the Waterview connection. This modelling will determine ramp metering and other management strategies as is done on a BAU basis and as is needed for the management of other development and regional growth traffic. The findings of this continuing and on-going modelling and management planning will contribute to the joint TOP group activities of TA, AC and NZTA.
Condition No.
Section of DWP1
Comment
Response No change to DWP.
CRL 25.3(b)
4.13
See above. It is noted that Quay Street between Lower Albert Street and Britomart Place is not an over dimension vehicle route however an additional route to Customs Street East is considered appropriate to provide alternative construction routes to and from the site.
No change to DWP
CRL 25.3(c)
4.13
This review is in relation to the Britomart construction works and this condition is applicable to sites in following stages (from reviewer’s interpretation).
No change to DWP
CRL 25.3(d)
4.13
This condition is not specifically addressed; no educational facilities are known in the area but it is likely that there are residential dwellings. The assessment should be undertaken to assess whether the time restrictions proposed in 25.1 (d) (ii) are required
The condition relates to residential zoned land as opposed to residentially occupied properties and there are no local educational facilities imposing conditions (such as groups of school children) requiring additional controls or presenting additional risks beyond those of other office workers and other users. Additional commentary has been provided in a new section 4.11.2 of this DWP.
CRL 25.3(e)
4.12, 4.13
The DWP is considered to appropriately outline the means of addressing this condition however site specific TMP’s (as outlined in Section 1.3) can provide further clarity on these matters at various stages of construction. While the DWP gives a general overview, the TMP process is considered to be the appropriate means of addressing the details of this condition.
No change to DWP
CRL 25.3(f)
4.12
See comments for CRL 25.2.
No change to DWP
CRL 25.3(g)
4.12
The approach of the DWP is to provide sufficient warning so that this mitigation is not required. Whilst this approach is considered appropriate, events that are ‘unexpected’ should be better defined. For example, unexpected events could be defined as when property access is affected outside of the notified temporary closure period (as communicated to the affected parties within a TMP). However, when an affected party does not advise its staff internally of any closure, the closure should not be considered to be unexpected if a staff member fails to enter or exit the site.
Additional clarification added to section 4.12.2 of this DWP
Condition No.
Section of DWP1
Comment
Response
CRL 25.3(h)
4.12 4.15 - 4.17 4.20 6.1 -6.4
The DWP provides the details required for this condition. It is noted that the PT service relocations are due for completion 2-3 weeks before the works begin. It is considered that this provides time (as outlined in the DWP) for users to adjust to the new services, however we note this leaves little contingency if the date of the PT services changes take longer.
No change to DWP
CRL 25.3(i)
8.1
The DWP is considered to appropriately address this condition.
No change to DWP
CRL 25.3(j)
4.21
The DWP is considered to appropriately address this condition.
No change to DWP
CRL 26.1
4.17-4.19 7.1-7.4
Transport monitoring is proposed and the implementation of Bluetooth along the key routes will provide robust data before and during construction. It is noted that the assumed performance of the future network is based on 4000 SOV trips being removed from the network through TDM measures. A plan is in place to work towards achieving this, however it is noted that this is an ambitious target. Additional measures are outlined that could be implemented if this monitoring shows there is an issue. The additional measures are a mix of operational and physical interventions and are considered appropriate at this time. However many of these measures could take sometime to implement if required (weeks or months in some instances) and therefore advanced work is recommended on some of these to allow the response to be quicker if required. We also note that parking charges (increasing them) can be a powerful tool to create behaviour change for commuters.
To clarify, the assumed performance of the system as modelled / forecast does not assume that the TDM derived mode shift (including physical works such as extra PT service and bus lanes is achieved in predicting travel time changes. Nor does it include peak spreading or trip rationalisation in its calculation of expected travel times on the nominated routes and more widely in the network as required by NoR conditions 26 (et al). It is expected that the TDM measures will have a measureable effect on reducing demand and the potential impact of this has been considered through sensitivity testing (see section 5.3.3 of the DWP and the appended modelling reports). The forecast travel times are typically less or very close to the baseline plus ten minutes requirement of the conditions. The greater risk is political in response to community disquiet with the significant changes anticipated and resulting cultural change in travel mode and patterns. In this regard the TDM campaign and other mitigation measures such as physical interventions and additional PT capacity previously described above will be of great importance as noted. No change to DWP.
Condition No.
Section of DWP1
Comment
Response We agree that early planning, design, consenting and legal resolution of additional mitigations is best practice and should be pursued. Early assessment of additional mitigation works is understood to be underway by AT and NZTA as noted in the response to condition 25.2(a) above. Although considered to be outside the direct scope of this project and DWP, it is recommended that the carrot and stick measures described and importance of preplanning some additional mitigation works is passed onto and emphasised with the TOP group and Commute teams for further consideration and implementation. No change to DWP. It is outside the scope of this Project to impose increases on private parking charges. There have already been some changes to parking charges in AT operated carparks (such as the Downtown Centre) to encourage behaviour change as indicated and it is expected that this issue will be monitored and further changes made if required. No change to DWP.
CRL 26.2
7.1
The DWP is considered to appropriately address this condition.
No change to DWP.
CRL 26.3
7.2
The DWP is considered to appropriately address this condition.
No change to DWP.
CRL 26.4
7.2, 7.3
This is noted, however this will be difficult to quantify and greater clarity around what an 'incident' means. For instance, an accident on SH1 that cause congestion within the City Centre should be removed however localised congestion as a result of a crash within a CRL temporary traffic management site should not be excluded.
For the purposes of CBD traffic management monitoring and this DWP an incident is considered to be any event which is not expected in normal operation of the network and generates congestion or delay on the arterial network. In this case an event on a local road would not be considered an event until and if traffic queues spill back onto the main road network. It is considered that a crash within the CRL temporary worksite and TMP control area is not a normal
Condition No.
Section of DWP1
Comment
Response event and should not be considered in network and prescribed route performance monitoring; however it should and will be investigated by the Project team to learn lessons and potentially provide improved controls as described in the DWP. The definition if an incident is further clarified in section 7.2 of the DWP.
CRL 26.5
7.1
The DWP is considered to appropriately address this condition.
No change to DWP.
CRL 26.6
7.1 - 7.3 Appendix M
The DWP includes both criteria and provides a detailed method for developing the latest travel time forecast and the method outlined is considered appropriate. We also note that given the number of other projects being progressed in the CBD at the time, pinpointing the effect to this project will be difficult.
It is agreed that assigning responsibility for congestion to a particular project in the CBD will be difficult during the duration of the Project given that there will be multiple projects contributing to congestion and the effects may not be proportional to change (i.e. travel times change in a non-linear way as capacity is approached and there will be trip redistribution around the network). It is noted that the traffic impacts of this project and the other CRL enabling works on Albert Street will be the same or less than expected during consenting. No change to DWP.
CRL 26.7
4.19
A mix of operational and physical additional measures are proposed in the DWP and are considered appropriate at this time.
No change to DWP.
CRL 26.8
4.19
This is the outcome of the proposed additional measures identified above.
No change to DWP.
CRL 26.9
7.1
These routes are identified appropriately in the DWP.
No change to DWP.
CRL 26.10
7.1
The DWP is considered to appropriately address this condition.
No change to DWP.
CRL 27.2(a)
4.3, 4.4, 4.6, 4.15 - 4.19
This assessment has been provided in the DWP. There are a number of measures around the site in particular that have been adopted.
No change to DWP.
Condition No.
Section of DWP1
Comment
Response
Footpaths have been widened, new 'zebra' crossings and signalised pedestrian crossings as well as taxi stands and other features. The works are localised in the area around the station to try and reduce the impact on the east west movements identified in the condition. The proposed works are considered appropriate to manage these forecast effects CRL 27.2(b)
4.3, 4.4, 4.6, 4.15 - 4.19
This is provided in the DWP as above
No change to DWP.
CRL 27.2(c)
4.12
This is outlined in the DWP, with an approach of engaging and advising local property owners of works and the implications. This is considered appropriate for the project.
No change to DWP.
CRL 27.2(d)
4.12, 4.15 – 4.17
The DWP outlines how the construction works will be managed to minimise the impacts to users and operators of the surrounding road network. There will inevitably be issues that arise due to incidents etc. on the road network, however there is a process to manage these. Importantly there is considerable thought put into the pedestrian amenity and safety in the area. The DWP outlines that the effected businesses will be engaged with prior to construction. There is a risk that as this engagement has not been undertaken as yet, this engagement requires changes to the management plan, however this risk is considered low.
Engagement with the local businesses has been undertaken through the CLG forum and also engagement undertaken to inform the Social Impact and Business Disruption DWP. No change to DWP.
A further Independent Peer Review of the draft Transport, Access and Parking DWP was undertaken by Tony Innes to review the amendments made to the draft Transport, Access and Parking DWP as a result of Auckland Transport’s confirmation of the altered BTC designation conditions. A second round of peer review comments was received on 23rd May 2016. The comments received are as follows: Condition No.
Section of DWP
Comment
Response
BTC Designation Conditions BTC 19.1
Appendix A Workforce Travel Plan
As per overall CRL conditions assessment above.
No change to DWP or Workforce Travel Plan.
BTC 20.1
4.11 and 4.14
As per overall CRL conditions assessment above
Refer to comment above. No change to DWP.
BTC 24.1
This document
As per overall CRL conditions assessment above
Refer to comment above. No change to DWP.
BTC 24.2
Section 6.2 – 4.12, 4.15 -4.19
As per overall CRL conditions assessment above
Refer to comment above. No change to DWP.
BTC 24.3(aa)
Appendix C 2.3 4.3 4.3
The DWP is considered to appropriately address this condition.
No change to DWP
BTC 24.3(bb)
8.2
This is to be provided in the CEMP, which is considered appropriate.
No change to DWP
BTC 24.3 (a)
4.3 4.12
The DWP is considered to appropriately address this condition.
No change to DWP
BTC 24.3 (b)(i) and(ii)
2.3 4.3
The DWP outlines the traffic management of these areas. There is a strong focus on pedestrianisation of the area to provide greater pedestrian connectivity to the station through the revised entrance.
This condition requires details of road lane narrowing in Commence, Galway and Tyler Streets and outside the CPO related to widening of footpaths. Sections 2.3 and 4.3 provides information on these matters. Footpath widening is
a key design element to improve pedestrian connectivity to the station through the revised entrance. No change to DWP. BTC 24.3 (c)
6.4
The DWP is considered to appropriately address this condition.
No change to DWP
BTC 24.3(d)(i)(ii) and (iii)
4.9 4.16 6.2
The DWP is considered to appropriately address this condition.
No change to DWP
BTC 24.3(e)
4.3
The DWP is considered to appropriately address this condition through the text and streetscape plans provided.
No change to DWP
BTC 24.3(f)(i)(ii) and (iii)
4.12
As per overall CRL conditions assessment above, this will need more detail.
Section 4.12.1 states that pedestrian and cycle access to buildings adjacent to the Project area will be maintained at all times. The majority of streetscape elements outline in section 4.12.1 will be completed without short term street closures. The only closures required will be closer of Galway and Commerce street between the eastern façade of the CPO. A minimum of 72 hours’ notice will be provided to the affected parties when these planned closures exceed three hours in length, and vehicles will be detoured around the worksite via Customs Street or Quay Street. For closures of less than three hours, at least 48 hours prior notice will be given. Section 4.12.2 outlines alternative parking arrangements for the residents, staff and clients of adjacent buildings that will be provided where vehicular parking access to properties cannot be provided during discrete events. Parking will be provide in Downtown car park and Britomart car park. Based on the above, Section 4.12 provides sufficient information to adequately address condition BTC 24.3(f). No amendments made to DWP.
BTC 24.3(g)(i)(ii)(iii) and (iv)
6.1 – 6.4 4.12, 4.15 – 4.17 and 4.20
The DWP is considered to appropriately address this condition, the pedestrian modelling and analysis has shown there is sufficient width of footpath and pedestrian access provided to provide an acceptable
No change to DWP
LOS. Haulage routes and the relocation of taxi stands and parking spaces is outlined as required. BTC 24.3(h)
4.20
The DWP is considered to appropriately address this condition and includes shutting the site if required to assist in the management of pedestrian safety.
No change to DWP
BTC 24.3(i)
4.4 and 8.1
The DWP is considered to appropriately address this condition.
No change to DWP.
BTC 24.3(j)
8
The DWP is considered to appropriately address this condition.
No change to DWP.
BTC 24.3(k) (l) and (m)
7.3.3
The DWP in section 7.3.3 is considered to appropriately address this condition.
No change to DWP.
BTC 24.4
4.11
The DWP is considered to appropriately address this condition. Construction vehicles are limited, but access is not permanently closed.
No change to DWP
BTC 24.5
4.11
There is explanation at how Tyler and Galway will operate which is consistent with the intent of this condition. The specific number of closures is not referred to though.
Section 4.11.3 and 4.11.4 text updated to reference the requirement that temporary full width road closures of Tyler and Galway Streets will be limited to no more than 10 closures per annum per road and restricted to the length of Tyler and Galway Streets running between the eastern faรงade of the Chief Post Office and Commerce Street.
BTC 24.6
4.11
There is explanation at how Tyler and Galway will operate which is consistent with the intent of this condition. The specific number of closures is not referred to though.
Section 4.11.3 and 4.11.4 text updated to reference the requirement that temporary full width road closures of Tyler and Galway Streets will be limited to no more than 10 closures per annum per road and restricted to the length of Tyler and Galway Streets running between the eastern faรงade of the Chief Post Office and Commerce Street.
BTC 24.7
4.12.1
The DWP is considered to appropriately address this condition.
No change to DWP.
BTC 24.8
4.12.1
The DWP is considered to appropriately address this condition.
No change to DWP.
BTC 24.9
4.12.1
The DWP is considered to appropriately address this condition.
No change to DWP.
BTC 24.10
4.12.3
The DWP is considered to appropriately address this condition, with taxi vouchers explicitly discussed.
No change to DWP
BTC 24.11
8.2 and 8.3
As per overall CRL conditions assessment above
Sections 8.2 outlines the procedure for ongoing communication and consultation with other stakeholders throughout construction of the Project. Section 8.3 outlines
the complaints management process for dealing with complaints. Complaints will be investigated and if complaints are found to be justified then mitigation measures shall be put in place to ensure safe pedestrian movement is maintained throughout the Project. No amendments to DWP required. BTC 24.12
4.7.1
The DWP complies with this requirement.
No change to DWP
BTC 24.13
4.10
The DWP is considered to appropriately address this condition.
No change to DWP.
BTC 24.14
4.13
The DWP is considered to appropriately address this condition, with alternative routes clearly marked out.
No change to DWP
CRL Britomart to Wyndham Street Enabling Works Resource Consents R/REG/2010/5430, R/LUC/2014/5428, R/REG2014/5432, R/REG2014/5435, R/REG/2014/5436, R/REG/2014/5437 Regional Consent Condition 36
4.3, 4.12, 4.13, 4.15 – 4.19, 5.1, 6.1 – 6.3
This is covered in the summary section in this report
No change to DWP.
Appendix O:
NZTA Review
CRL Traffic Management
CRL Traffic Management Graham O’Connell 24th March 2016 VERSION 1
Good afternoon Chris, Thank you for the continued opportunity to provide feedback on the CRL Traffic Management reports. I apologise for the delay in responding to you. We have been working to understand the effects from not only the CRL project, but also the planned or committed development in the City Centre; and how this will impact inter-regional travel and access to key facilities such as the Port and the Hospital. The key issues for the NZTA: · · · ·
Maintaining reliable and effective access to and from the Port Maintaining reliable and effective access to the Hospital Managing safety risks associated queuing back into the motorway network Minimising the impact to people and freight travelling through the Central Motorway Junction
Our initial investigations through some additional modelling work and observations after the implementation of the Nelson Street cycle way indicate that there is a risk to the safe and effective operation of the motorway network between the Harbour Bridge and the Port (including the Central Motorway Junction) resulting from redistribution of traffic across the network, and queuing into the motorway network. We also understand that the safe and effective operation of the City Centre transport network during the construction of CRL is reliant on a 3,000 – 4,000 reduction in car trips. From our understanding, the CRL Project Team has not sought to identify how this reduction in vehicle demand could be achieved; hence if this is not achieved the NZTA considers that there is a serious risk to the safe and effective operation of the transport system as a whole. Whilst we recognise that the construction of CRL will have more than minor impacts to the travelling public, we consider that it is highly likely to be cumulative impacts from the CRL project and other projects in the City Centre, which are likely to further increase the risks to the safe and effective operation of the Central Motorway Junction and SH16 (Stanley Street). We are aware that Auckland Transport has started looking at the City Centre as a whole, rather than on a project-by-project basis with a view to developing a Network Operating Plan for the period of construction in the City Centre. As part of this work we understand that the team that has been established by Auckland Transport. This tactical Traffic Operations Planning team (TOP), of which the NZTA and CRL team is a part, is looking at interventions beyond what the scope of the CRL project to best manage the City Centre network for all modes of travel.
CRL Traffic Management
We therefore have the following recommendations for the TOP and CRL Project team, including for the purposes of implementing the CRL Transport, Access and Parking Delivery Work Plan: ·
Engage with the Ports of Auckland and Auckland Hospital to establish their needs for effective and reliable access to better inform the decisions around how best the manage the City Centre network during construction.
·
Develop and assess a wider demand management program that is effective in reducing vehicle demands to the City Centre – including interventions such as increasing passenger transport capacity potentially beyond what is currently committed.
·
Engage with the NZTA and Auckland Transport Network Performance teams to establish a Network Operating Plan to mitigate the effects of the wider City Centre Program.
·
Engage with NZTA’s National Journey Team to develop operational strategies and interventions (for example, developing a fit-for-purpose ramp signal strategy) to respond to traffic responding to the demand.
As a partner in the One Network approach, NZTA is happy to assist Auckland Transport to successfully deliver the City Centre program by enabling the safe and effective operation of the transport network during construction. Moving forward the NZTA believe that the Access and Parking Delivery Work Plan developed by the CRL project is continually updated to reflect wider City Centre works and delivered in partnership with the CRL team and TOP management structure. Appendix A attached is the findings of the modelling review carried out by the Auckland Motorway Alliance on behalf of the NZTA which will
Graham O'Connell
/ Principal Traffic Engineer
Appendix A
Appendix A Dave Rendell 24th March 2016 VERSION 1
CRL Traffic Management
To assist the CRL team and Auckland Transport in the wider management of transport in the City the Auckland Motorway Alliance have summarised the modelling review and identified a number of points for the CRL and TOP teams to consider in the coming months as the City centre works increases in scale and scope: 1. The model over estimates the available capacity on the SH network which surrounds the CBD. The assumptions mean that the assumed flows in and out of the CBD will cause greater congestion than suggested in the analysis. Both on-ramps and the network links around the CBD (e.g. SH16 Port to SH1 link currently hold significant queues on the SH16 /SH1 ramp, which are not reflected in the SATURN model). 2. Off-ramp capacities are known to be more constrained than modelled. For instance the SH16 and SH 1 Nelson Street off-ramps have recently been throttled due to downstream capacity reductions – this new impact has yet to be assessed.
3. The modelling makes no allowance for redistribution of SH traffic due to the opening of the Waterview Tunnel (expected in early 2017). This will be very difficult to predict with certainty but a factor the CRL and TOP teams will need to cognitive of and have a flexible response in place.
4. The analysis makes an assumption that there is a mode shift to public transport during the construction period, and this will offset (to some extent) additional traffic generated during the construction period. The relatively small additional flows (overall) appear to be the combination of a reduction due to mode shift to passenger transport, and an increase due to construction traffic. The analysis has make an assumption of mode shift by sensitivity testing of the model with 5%,10% and 15% reduction in central city trips. The Connectus report commented a mode shift of 5-15% is reasonably be expected in line with Auckland and international experience. While a sensitivity test is shown in Appendix I in the report, we are concerned that this may not eventuate. The CRL and TOP teams should consider strategies and options if that shift does not occur.
Appendix A
The SATURN model scenarios are as follows (extracted from the CRL modelling report): 1. Scenario 4d (TMP Stage 1): Represents the traffic conditions at the commencement of piling for cut and cover works along Albert Street (C2-SP1) 2. Scenario 5a (TMP Stage 3): Represents the period that has greatest traffic restrictions due to piling for cut and cover works along Albert Street (C2-SP1)
3. Scenario 6a (TMP Stage 8): Represents the period that has greatest traffic restrictions due to piling for cut and cover works along Albert Street (C2-SP1), similar to Scenario 5a but with further restrictions along Albert Street. 4. Scenario 7a (TMP Stage 10): Represents the period where piling is complete, and the trench along Albert Street (C2-SP1) restricts east-west traffic movements between Customs Street and Wyndham Street 5. Scenario 8a (TMP Stage 10): Represents the long-term traffic conditions that will exist with the trench and service lanes in place.
Appendix A
Our material findings based on the SATURN model outputs are summarised below. Overall the total changes in flows suggested by the CRL analysis are small, however redistribution effects will create congestion in particular locations which will need to be managed. Notable changes to flow in peak hours are predicted to be as follows:
·
The most significant changes occur on the Fanshawe St on ramps. A reduction of 250vph in the AM peak and 670 in the PM peak. This traffic is predicted to divert to Curran St (50%), Wellington St (10%) and the Port (40%). Currently the Curran Street ramp is metered to allow for the mainline traffic to flow. The reasons for the diversion of 50% of the traffic to Curran Street are not immediately obvious, and we are uncertain that the additional flow can be accommodated entering lane 1 at the base of the Harbour Bridge, rather than distributing between lanes 1 and 5 at the Fanshawe street on-ramp as at present.
·
In the SH1 southbound direction, Fanshawe St off ramp volume is predicted to reduce by 200vph in the AM peak and divert to Shelly Beach (25%) and the Port (75%). Both Shelly Beach Road and the link to the Port have sufficient capacity, therefore impact is limited. Note we have not confirmed this quantitatively at Alten Road and Beach Road, but simple inspection shows it should be satisfactory.
·
Demands on both Nelson St off-ramps and Hobson St on-ramps are predicted to be increased. The change is around +50~150vph. These additional traffic will cause capacity issues (additional queueing) on Nelson St Off ramp (from SH16) in the AM peak, as the off ramp is already at capacity during peak period with queues extending well back down the off-ramp.
·
Hobson St On ramp (to southern motorway) is currently at capacity in the PM peak, the further increase in demand would worsening congestion either by adding additional traffic to the motorway, or within the CBD by maintaining current ramp signal capacity. Our base model shows there are 110 vehicles queuing on Hobson Street during the evening peak, and this would need to increase.
·
The demand from the Port link is predicted to increase (50~300vph) in all peak periods, with most of the additional traffic heading north. The observed 2015 demand on the 2-lane section approaching the ramp signals is around 3100vph in the PM peak. While there is enough capacity to cater for the additional queuing traffic, additional delays will result.
·
Other on and off ramps on SH1 and SH16 (Newton Rd only) are predicted to have minor increases in demand (<50vph). The impact to these ramps should be limited.
·
There are only small demand variations between the 5 scenarios. AECOM explains the construction works mainly affect local road access and movement within the CBD. The main CBD through route affected is Quay Street. We note the comment that reductions in capacity due to cycleway construction on Quay Street (and other locations?) are also planned. We believe it is not prudent to further restrict capacity on CBD arterials during the construction phase due to effects on the CBD traffic (including buses) movement.
·
The CRL works results in additional traffic coming from the north-western and southern motorway into the CBD. AECOM explains these are construction traffic and normal traffic volume remains constant in all model scenarios.
Appendix A
At face value, if the additional traffic and it’s associated redistribution is similar to the scenarios provided (which are all similar to each other in terms of effects on the SH on/off ramps), then at a global level the demand for travel represents a small increase. This will have the overall effect of increasing congestion around the SH network surrounding the CBD and it’s approaches. Some of this will be more significant, but local effects. Some of this can be mitigated by restricting access to the SH network by the use of ramp signals, which will cause additional congestion in the CBD, and possibly affect the redistribution of traffic assumed by the CRL project team. However other congestion effects will occur within the highway corridor for traffic which is bypassing the CBD. These effects will not be able to be mitigated easily. We recommend the TOP and CRL teams work with the NZTA and AMA to establish critical network congestion points that will trigger appropriate mitigation measures.
Commentary The modelling assumes that the SH around the CBD effectively has unlimited capacity. We know that not to be the case. Congestion builds up in the afternoon to become the evening peak. We can model the impact on the motorway using the Cell Transmission Model (down to Wellesley Street on SH16). We advise Auckland Transport and the NZTA agree to ground rules on how the ramps will be operated, and the capacities maintained (or if altered, how).