C1/C2 Community Liaison Group Meeting August 2020


Agenda • • • •

C9 Britomart East Te Komititanga C1 Britomart & Lower Queen Street C2 Albert Street

2


C9: Britomart East Maria Hernandez-Curry


City Rail Link project

4


C9 Britomart East • Futureproof Britomart Station for increased patronage

• Ensure station can accommodate 9car trains up to 24 times / hour

• Already contained within funding envelope

• Construction partners include KiwiRail

• Construction to start late this year, completed in early 2024

5


C9 Britomart East – Scope • Track infrastructure in Britomart East junction

• Platform and concourse works • Segment of tunnel wall relocated, with consequent roof beam strengthening works

• Utility relocation • New Chief Post Office basement

rooms to house equipment, control and driver accommodation

6


C9 Britomart East - Surface works

Stair works

Beam Strengthening

7


Construction impact • Majority of works underground • Some surface works in particular locations will impact neighbours • Aboveground works on Britomart Place / Scene Lane will require traffic management for six to eight months

• No streetscape enhancement

8


Te Komititanga Maria Hernandez-Curry


Te Komititanga •

• •

•

Name gifted by Ngāti Whatua Ōrākei and endorsed by the CRL Mana Whenua Forum Komiti in Te Reo Māori can be translated into English as ‘to mix’ or ‘to merge’ The name reflects that the square will be a place where people can come together in formality, celebration and parade. People will also travel through, mix and meet within the square as they move between transport modes, the harbour, Commercial Bay and mid-city The name also reflects that the square is a place where the waters of Waitematā and Wai Horotiu had merged

10


C1: Britomart / Lower Queen Street Jhon Aragon and Andrew Swan


C1 – COVID-19

Alert Level 3

• Covid during March / April / May has resulted in a delay. The CPO will now be reopened towards the end of February 21. • At Alert Level 3, controls will continue to be maintained including safety briefings, physical distancing, enhanced cleaning and work bubbles. • Face masks have been mandated on site • Only relevant personnel to the work are currently onsite • Office based staff are working from home where possible • Utilising the ‘back-shift’ to smooth out resource on site • We are still fully productive

Lower Queen Street

The north tunnel – breaking through to Britomart Station

12


C1 – Building works

13


C1 – Building works

Lower Queen Street

The north tunnel – breaking through to Britomart Station

14


C1 – Streetscape enhancement works Seawall Discovery

Lower Queen Street

The north tunnel – breaking through to Britomart Station

15


C1 – Streetscape enhancement works Tree Pits

Lower Queen Street

The north tunnel – breaking through to Britomart Station

16


C1 – Streetscape enhancement works Service Reconnection

Lower Queen Street

The north tunnel – breaking through to Britomart Station

17


C1 – Streetscape enhancement works Structural concrete & Paving

Lower Queen Street

The north tunnel – breaking through to Britomart Station

18


C1 – Streetscape enhancement works

December 2020 Mid 2021 Plaza works Scope differed to a later stage as part of CRL C3 scope of works

Lower Queen Street 19


C2: Albert Street Lucas Nikkel


C2 Recent Milestones • Customs Street intersection completed • All new street trees now planted • Final footpath concrete pour completed Target completion date for all remaining work on C2 is October 2020

* Some finishing works deferred beside private developments, these will be completed by Auckland Council later this year.

21


C2 – Wyndham to Swanson (West)

Lower Queen Street

The north tunnel – breaking through to Britomart Station

22


C2 – Wyndham to Swanson (East)

Lower Queen Street

The north tunnel – breaking through to Britomart Station

23


C2 – Swanson to Wolfe (West)

Lower Queen Street

The north tunnel – breaking through to Britomart Station

24


C2 – Swanson to Mills (East)

Lower Queen Street

The north tunnel – breaking through to Britomart Station

25


C2 – Wolfe to Customs (West)

Lower Queen Street

The north tunnel – breaking through to Britomart Station

26


C2 – Mills to Customs (East)

Lower Queen Street

The north tunnel – breaking through to Britomart Station

27


Turn static files into dynamic content formats.

Create a flipbook
CIty Rail Link C1/C2 CLG Meeting Presentation - August 2020 by City Rail Link Ltd - Issuu