C1 and C2 CLG meeting C2 Public Realm Reinstatement Addendums: - Transport, Access and Parking Delivery Work Plan - Social Impact and Business Disruption Delivery Work Plan 19 June 2018
Contract 2: Public Realm Reinstatement Overview Construct: • new stormwater catchpits • tree pits • new road pavement • new footpath pavements As well as: • Landscaping • Installation of street furniture
2
Contract 2: Public Realm Reinstatement Overview • Urban design of Public Realm Reinstatement (PRR) was completed in 2017. • • • •
Council’s Urban Design Panel City Centre Advisory Board Mana Whenua Community Liaison Group and other stakeholders.
• Outline Plan for the PRR is expected to be submitted to Council for review in July. • The first section of public realm reinstatement works is anticipated to begin in November 2018.
3
CRL Delivery Works Plans/Management Plans Construction Environmental Management Plan
Communication and Consultation Plan
Social Impact and Business Disruption DWP
Historic Character DWP
Trees and Vegetation DWP
Travel Management Plan
Public Art DWP (not included as part of Project)
Urban Design DWP
Bluestone Wall Management Plan (not included as part of Project)
Transport, Access and Parking DWP
Construction Noise and Vibration DWP
Groundwater and Settlement Monitoring and Contingency Plan
Contamination DWP / Contaminated Soils Management Plan
Air Quality DWP / Air Quality Management Plan
Erosion and Sediment Control Management Plan
Industrial and Trade Activity Environmental Management Plan
Chemical Treatment Management Plan
Spill Response Plan
Site Specific Construction Noise and Vibration DWP
4
Transport, Access and Parking Delivery Work Plan Tim Brown - AECOM Ngan Truong - AECOM
Traffic and Urban Realm – Lower Albert Street • Purpose: address the impacts of construction on transport, pedestrian safety and amenity, parking and property access and set the framework for the Temporary Traffic Management Plan (TTMP).
• Associated with the PRR phase of the construction works on Lower Albert Street that are not covered in the existing Delivery Work Plan. •
PRR works on Albert Street (between Customs Street and Wyndham Street) remain consistent with the existing Delivery Work Plan.
6
Lower Albert Street - Construction Stage 1/2 (late 2018 – late 2019)
7
Lower Albert Street - Construction Stage 3 (late 2019 – early 2020)
8
Traffic Addendum – Lower Albert Street • Public Transport Access •
Temporary changes in direction for Stage 2 of construction.
• Traffic Access •
Temporary no access on Lower Albert Street (except Construction Traffic).
• Pedestrian Connection and Property Access •
Shop access and footpath still available.
• Emergency Services •
Can access Lower Albert Street and service lane west of AMP and PWC Buildings. 9
Traffic Addendum – Lower Albert Street • Communication requirement • • • • •
Auckland Transport Operating Centre – Manage traffic signals. AT Metro. Emergency Services. Stakeholders – Local property occupiers and bus passengers. Variable Message Signage (VMS).
10
Social Impact and Business Disruption Delivery Work Plan Matthew Kerr-Ridge, AECOM Alan Howard-Smith, Connectus
Social Impact Addendum - Purpose • Purpose: addresses the potential for social impacts and business disruption associated with the PRR phase of the construction works that are not covered in the existing C2 DWP. • Key change to existing: PRR works on Lower Albert Street.
12
Social Impact Addendum – Methodology • Consultation •
Community Liaison Group and additional parties (Lower Albert Street)
• Implementation Planning •
DWPs / Management Plans and additional measures
• Ongoing Implementation •
Existing DWP
• Complaints Management •
Existing DWP 13
Social Impact Addendum – Consultation • How many private vehicles do you estimate need daily access to your parking • • • • • •
entrances? How many service vehicles need daily access to your freight parking areas? How many businesses and guests need daily access to your building entrances? How many bicycles need daily access to your building? Who might regularly need building access afterhours – e.g. security firms and cleaners? Are you planning a major fit out or alterations to your buildings between late 2018 and end-2019? Are there any other matters that we need to have regard to in terms of your business’ operation?
14
Social Impact Addendum – Consultation
PWC Building
Sushi Pac Jade Centre Global Culture Aotea Gifts / Avoca
AMP Building
Commercial Bay Development (Precinct Properties)
15
Social Impact Addendum – Implementation Plan • Noise and Vibration •
Site Specific Construction Noise and Vibration Management Plan – PRR Works
• Air Quality •
CRL C2 Air Quality Delivery Work Plan - PRR Addendum
• Transport, Access and Parking (TAP) •
TAP DWP Albert Street Addendum and TAP DWP Lower Albert Street Addendum
16
Social Impact Addendum – Implementation Plan • Disruption to Business • • •
Businesses visibility - signage advertising the location and ongoing operation. Business Support Programme. Albert Street Businesses Promotion.
• Amenity Impacts • •
Daily work site maintenance: rubbish clearance and construction materials stored / stockpiled. Screening of construction areas.
17
Social Impact Addendum – Ongoing Implementation • In accordance with existing DWP. • • • •
Ongoing consultation. Communication lines. Complaints records. Construction monitoring.
18
Social ImpactAddendum – Complaints • In accordance with existing DWP. • •
CRL Hotline 0800 CRL TALK (275 8255). Complaints Process • • • •
Contact Acknowledgement Resolution Monitoring
19