N6
ATION )
N1
NoR (SUBSURFACE DESIGN
8380
8400
5950
4630
5700
N5
N4
N3
N2 PB
PC
EXTENT OF WORKS KRD
... | DRG | 2162
NoR (SUBSURFACE DESIGN
ATION )
ACTIVE PLATFORM START
13440
1
2
PLATFORM EDGE
4102
4102
TACTILE INDICATORS
01
Room Schedule - B7 Platform Plan North
CRL UP
END OF PLATFORM GATE
P1
cL TRACK
476
HELP POINT
EXTENT OF HANDRAIL ON EMERGENCY WALKWAY WITHIN STATION SHOWN DASHED
SEATS
ACCESS HATCH
115 PLATFORM 1 SOUTH BOUND FFL 33743
SEATS
HELP POINT
544
2000
526 526 526 526
DRAFT RELIEF OVER
LIN
701 TVS OVER
495
440
700
UP
NC
215
SEATS
B7 - PLATFORM LANDING FFL 33743
482
PROFILE OF FUTURE ESCALATORS (STAGE 03)
20420
441
EMERGENCY EGRESS SCISSOR STAIR
SEATS
REFUGE x4
HELP POINT
250
ACCESS HATCH
ACCESS HATCH
477
467
508 LINE OF WALER OV
P2
105 LOWER CONCOURSE FFL 33743
SEATS
PROFILE OF FUTURE ESCALATORS (STAGE 03)
ER
4000 CLEAR
TVS CONNECTING ADIT TO PLATFORM
109
4101
LIFT 3
107
111
OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
112
114
VARIES
7650
ACCESS HATCH TO SUMP BELOW PLATFORM LEVEL VERTICAL TVS FAN
460 1450
216
3000
OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
526 UP
E OF WALER OVER
6400
CAT LADDER TO ACCESS UNDER PLATFORM LEVEL
526 526
ENCLOSED SPACE
VERTICAL TVS FAN
CONNECTING ADITS TO PLATFORM REFER TO STRUCTURAL DOCUMENTS
520
REFUGE x2
- STAGE 1
TVS OVER
251
2
526
4000 CLEAR
4101
526
526
4000 CLEAR
1
4000 CLEAR
464
NB
ACCESS HATCH
14 m² 12 m²
113
TVS CONNECTING ADIT TO PLATFORM
NA
SEATS
Area 109 m² 25 m² 41 m² 616 m² 62 m² 16 m² 16 m² 16 m² 9 m² 2 m² 7 m² 9 m² 4 m² 26 m² 14 m² 2 m² 9 m² 22 m² 256 m²
FALL 1:100
ACCESS HATCH
FALL 1:100
466 291
FALL 1:100
CRL UP
Room No Room 107 LOWER CONCOURSE 113 PLATFORM ADIT 114 PLATFORM ADIT 116 PLATFORM 200 CIRCULATION/CORRIDOR 215 FIRE EGRESS STAIR 216 FIRE EGRESS STAIR 250 LOBBY 291 STATION PLATFORM STORE 440 ELECTRICAL CPBDS 460 COMMS SPLICE 464 COMMS NODE 466 COMMS SPLICE (UP) 477 SIGNALLING EQUIP ROOM 495 TUNNEL SERVICES LV 508 FAN COIL UNIT (FCU) 520 PRESSURISATION RISER 526 MEP RISERS 544 DRAFT RELIEF AND TUNNEL VENT PLENUM 700 SUMP 701 SUMP PUMP ACCESS ROOM
110
END OF PLATFORM GATE
116
SEATS ACCESS HATCH
PLATFORM 2 NORTH BOUND FFL 33743
SEATS
HELP POINT
FALL 1:100
SEATS
ACCESS HATCH
FALL 1:100
HELP POINT
FALL 1:100
4000 CLEAR
EXTENT OF HANDRAIL ON EMERGENCY WALKWAY WITHIN STATION SHOWN DASHED
ACCESS HATCH
CRL DOWN cL TRACK
P3 NoR (SUBSURFACE DESIGN ATION )
16240
CRL DOWN
EXTENT OF WORKS KRD
TACTILE INDICATORS
PA
ACTIVE PLATFORM START
11450
PLATFORM EDGE
PD PE NoR (SUBSURF AC
E DESIGNATI
PF
ON )
Filename: C:\Revit\CRL_KRD_ARC_000_MD3_STATION_R15_VE2_JHR.rvt
01
... | DRG | 2162
ROOM COLOUR LEGEND
Office:
BOH BUILDING SERVICES
Plot Date: 5/07/2016 7:16:06 a.m.
PUBLIC TVS/OTE
ISSUE FOR AT REVIEW 0
2.5
5
7.5
10
CLIENT
12.5m
N
SCALE 1:250 AT A1 SCALE 1:500 AT A3
REV DATE REVISION DETAILS 3 04-07-16 VE2 ISSUED FOR AT REVIEW 2 07-04-16 VALUE ENGINEERING 2 CHANGES REFERENCE DESIGN D 04-04-16 VE2 ISSUED FOR VERIFICATION REVIEW C 14-03-16 ISSUE FOR COORDINATION 0. B 05-02-16 VE2 DESSIGN FREEZE - ISSUE FOR A.T. REVIEW 1. 1 31-12-14 ISSUE FOR A.T. REVIEW 0. A 19-12-14 ISSUED FOR VERIFICATION REVIEW
APPROVAL C. JACK C. JACK C. JACK C. JACK C. JACK C. RITTER C. RITTER
SIZE
1 : 250
A1
DRAWN
20mm
40
60
80
100
200
300
400
KARANGAHAPE STATION VE2 PITT STREET, AUCKLAND CBD B7 - PLATFORM PLAN NORTH
PROJECT APPROVED
Jasmax/Grimshaw
DATE
DESIGNED
04-07-16
TITLE
Eduardo Velásquez / James Raimon CHECKED
Liam Wythes
Chris Jack
ORIGINAL SIZE 0
SCALE
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
REVISION
CRL
KRD
ARC
000
DRG
2161
3
700
800