West Irving Creek Initial Design Public Meeting, April 6, 2021

Page 1


Register Your Attendance on the website: www.cityofirving.org/ WestIrvingCreek Register your attendance on the website: www.cityofirving.org/ WestIrvingCreek

▪ Allparticipantmicsaremuted

Allparticipantvideoisoff

SubmitquestionsinchatforQ&A ▪ Direct all questions and comments to Emily Sestak (Host)

APRIL 6, 2021

INTRODUCTIONS & BACKGROUND

PUBLIC Q&A 3 2 1

PROJECT OVERVIEW

1.

INTRODUCTIONS &BACKGROUND

Confluence Near Tipton Road

PROJECT TEAM

Walter Thomas, PE City Engineer
Garry Fennell, PE, CFM Floodplain Manager
Brent Redd MDU Program Administrator
Justin Oswald, PE, CFM Project Manager Freese and Nichols, Inc.

WHAT IS WEST IRVING CREEK?

▪ Drains 3+ square miles – 15%+ of the City south of SH-183

▪ Runs for 3+ miles – from Wyche Park to outfall south of Oakdale Road

▪ Constructed in the 1960s

▪ Inadequate to meet current standards for conveyance of 100-year flood events

WEST IRVING

HISTORY

Channel Near Capacity at Bowman Street

▪ Recent home flooding

▪ Piecemeal improvements over time

▪ Urgent improvements underway:

▪ Wyche Park Detention

▪ Currently designing capacity increase. Complete May 2021.

▪ Hogbottoms Outfall Debris Collector

▪ Currently in construction. Complete July 2021.

▪ MDU program provides opportunity for a long term fix

MUNICIPAL DRAINAGE UTILITY

▪ City reinvesting in the MDU

▪ Issuing bonds backed by fee increase

▪ #1 City Council priority for MDU

▪ Project expected to cost $80-$90 million

▪ First step: a comprehensive planning study

PROJECT OVERVIEW 2.

Delaware Creek Construction

WEST IRVING CREEK

CHANNEL OVERFLOWS

PUBLIC IMPACTED

250 PROPERTIES FLOODED $70 million FLOOD DAMAGES

CAPACITY

▪ Reconstruct Channel with Vertical Walls

▪ Minimize Footprint

▪ Replace or Add Fencing

▪ Improve Aesthetics

▪ Provide 100-Year Capacity and Eliminate Flood Insurance Requirements (if possible)

▪ Similar to recent Delaware Creek Project Delaware Creek

TYPICAL SECTION

▪ Narrow easement behind residential lots

▪ Vertical walls for deeper channel

▪ Construction footprint larger than the finished wall

▪ Private structures may be within easement

BRIDGES

▪ Approx. 15 Bridge Replacements

▪ Replace multi-span with single span

▪ Improve aesthetics

Live Oak Drive
Delaware Creek

CREEK AREAS

▪ Project limits include nearly a mile of natural channels

▪ May require regrading to protect property and road crossings

▪ May require erosion protection

▪ US Army Corps of Engineers Permitting may dictate solution Stream Bank Reconstruction

WATER&

▪ Approx. 54 conflicts

▪ Adjusted before channel work

▪ Minimize service disruption

▪ Provide capacity for future needs

▪ Other on-going replacement work in the area

WASTEWATER

Wastewater Bore Delaware Creek

PARKS

▪ Evaluate trail, park amenities, and water features

Wyche Park
Markwood Park
Shady Grove Trail Park

DEBRIS COLLECTION

▪ Debris deposits in parks and downstream areas

▪ Existing debris baskets in upstream channel

▪ Screen and baskets at the outfall

▪ Evaluating large scale collection within watershed

Debris Screen and Baskets at Outfall

PROJECT SCHEDULE

Data Collection

Community Meeting #1

Engineering Analysis

Concept Design

Community Meeting #2

Finalize Report

▪ Design of first phase expected to begin Q1 2022

▪ Construction of first phase expected to begin Q2 2023

PROJECT SCHEDULE

CONSTRUCTION

Planning Study

Design Phase 1

Design Phase 2

Design Phase 3

Design Phase 4

Construction Phase 1

Construction Phase 2

Construction Phase 3

Construction Phase 4

▪ Design and Construction expected to proceed sequentially

▪ Community meetings to be held throughout design

▪ Construction of each phase expected to occur over 2 years after bid and award

▪ Phases 3 and 4 construction pending final identification of funding source

3. QUESTIONS &ANSWERS

Before and After on Delaware Creek

Register Your Attendance on the website: www.cityofirving.org/ WestIrvingCreek Register your attendance on the website: www.cityofirving.org/ WestIrvingCreek

▪ Allparticipantmicsaremuted

Allparticipantvideoisoff

SubmitquestionsinchatforQ&A ▪ Direct all questions and comments to Emily Sestak (Host)

WEST IRVING CREEK

Turn static files into dynamic content formats.

Create a flipbook
West Irving Creek Initial Design Public Meeting, April 6, 2021 by City of Irving - Issuu