CAPITAL IMPROVEMENTS PROGRAM
![]()


CAPITAL IMPROVEMENTS PROGRAM
Channel Improvements from W Pioneer Drive to Alan-a-Dale
COMMUNITY MEETING #2
OCTOBER 18, 2022

2 1
INTRODUCTIONS & BACKGROUND
PROJECT OVERVIEW
3
4
DESIGN UPDATES
Q&A AND BREAKOUT

Existing Channel Upstream of Conflans





▪ Drains 15%+ of the City south of SH-183- over 3 square miles!
▪ Runs for 3+ miles from Wyche Park at Pioneer Road to outfall south of Oakdale Road
▪ Constructed in the 1960s
▪ Inadequate to meet current standards for 100-year flood capacity
▪ City reinvesting in the MDU

▪ Issuing bonds backed by fee increase
▪ #1 City Council priority for MDU
▪ Project expected to cost $90+ million
▪ MDU program provides opportunity for a long-term fix
▪ Comprehensive Study completed 2021


Current Project

Future Phase

Future Phase
Future Phase

▪ City may be awarded grant and 0% loan from Texas Water Development Board (TWDB)
▪ Provides funding for the first 2 phases
▪ Application in progress
▪ May result in impacts to project schedule



▪ Improvements similar to recently completed Delaware Creek
▪ Provide 100-Year Capacity
▪ Increase Detention at Wyche Park
▪ Reconstruct Channel with Vertical Walls
▪ Increase Capacity with Minimal Footprint
▪ Replace or Add Fencing
▪ Improve Aesthetics

Delaware Creek


Single Span Bridge Delaware Creek

Existing Crossing
▪ 5 Bridge Replacements
▪ Replace Small Culverts with Large Single Span
▪ Improve Aesthetics
▪ Evaluate Traffic Impacts
▪ Replacing 3400’ Wastewater Main Beneath/Parallel to Channel
▪ Adjusting 5 Water Line Locations
▪ Adjustments To Be Made Before Channel Work
▪ Minimize Service Disruption
▪ Provide Capacity for Future Needs
▪ Other Water, Wastewater, and Paving Work Between Conflans and Yorkshire Recently Completed

Wastewater Bore Delaware Creek
▪ Deepen Park by approx. 8 feet
▪ Permanent Pond to Provide Water Quality
▪ Provide Forebay and Trash Collection
▪ Natural Edge to Provide Wetland Habitat





▪ Vertical Walls for Deeper Channel
▪ Fits In Narrow Easement Behind Residential Lots
▪ Construction Footprint Wider Than Finished Wall
▪ Relocation or Shoring May Be Necessary for Sheds, Storage Buildings, etc. Within or Adjacent to Easement
▪ Channel Area To Be Fully Fenced with Gates for City Maintenance
▪ Homeowner Fence To Be Replaced As-Is Along Property Line
▪ Safety Rail To Be Provided Along Channel
▪ Ornamental Rail To Be Provided At Public-Facing Locations


▪ Access To Properties Adjacent To Channel Will Be Required For Construction
▪ Shoring Will Be Implemented To Protect Structures
▪ Letters Have Been Sent To Affected Residents
▪ If you received a letter and haven’t responded yet, please speak with Real Estate Services (Cheryl Elgin)!

▪ Wyche Park Concept Has Been Developed
▪ Potential for Future Amenities: Trails, Trees, Lookout Area, etc.



▪ New Entrance To Wyche Park At Lawrence
▪ Potential Connection To Future Trail Extensions


▪ New Connection To Rock Island Road Bike And Pedestrian Trail

Community Meeting #1
Field Survey Work
Engineering Plans
Property Coordination

Community Meeting #2
Bid and Award

Community Meeting #3
Construction
▪ Design completed by Q1 2023
▪ Construction expected to begin Q3 2023
▪ Assumes no schedule impacts due to TWDB grant




Sherwood Forest within Phase A