CAPITAL IMPROVEMENTS PROGRAM
![]()


CAPITAL IMPROVEMENTS PROGRAM
Channel Improvements from W Pioneer Drive to Alan-a-Dale
COMMUNITY MEETING #1
JANUARY 25, 2022

1
2
INTRODUCTIONS & BACKGROUND
3
PROJECT OVERVIEW Q&A AND BREAKOUT






▪ Drains 3+ square miles – 15%+ of the City south of SH-183
▪ Runs for 3+ miles – from Wyche Park to outfall south of Oakdale Road
▪ Constructed in the 1960s
▪ Inadequate to meet current standards for conveyance of 100-year flood events

Channel Near Capacity at Bowman Street
▪ History of street and home flooding
▪ Portions not mapped by FEMA
▪ Urgent improvements underway:
▪ Wyche Park Detention
▪ Construction begins soon
▪ Hogbottoms Outfall Debris Collector
▪ Completed in 2021
▪ City reinvesting in the MDU

▪ Issuing bonds backed by fee increase
▪ #1 City Council priority for MDU
▪ Project expected to cost $90+ million
▪ MDU program provides opportunity for a long term fix
▪ Comprehensive Study completed 2021


Current Project

Future Phase

Future Phase
Future Phase



▪ Similar to recent Delaware Creek Project
▪ Additional Detention
▪ Reconstruct Channel with Vertical Walls
▪ Minimize Footprint
▪ Replace or Add Fencing
▪ Improve Aesthetics
▪ Provide 100-Year Capacity

Delaware Creek


▪ Narrow easement behind residential lots
▪ Vertical walls for deeper channel
▪ Construction footprint larger than the finished wall
▪ Private structures may be within or adjacent to easement
▪ Relocation or shoring may be necessary



Existing Crossing
▪ 4-5 Bridge Replacements
▪ Replace small pipes with large single span
▪ Improve aesthetics
▪ Evaluate traffic impacts
▪ Approx. 15 conflicts
▪ Adjusted before channel work
▪ Minimize service disruption
▪ Provide capacity for future needs
▪ Other Water, Wastewater, and Paving work on-going between Conflans and Yorkshire

▪ Deepen Park by approx. 8 feet
▪ Pond for water quality and amenity
▪ Provide forebay and trash collection
▪ Natural edge for water quality, erosion and safety
▪ Other amenities such as trails, trees etc.



▪ New entrance to Wyche Park at Lawrence may be considered

▪ New connection to Rock Island Road Bike and Pedestrian Trail may be considered

Community Meeting #1
Field Survey Work
Engineering Plans
Property Coordination

Community Meeting #2
Bid and Award

Community Meeting #3
Construction
▪ Design completed by Q1 2023
▪ Construction expected to begin Q3 2023




Before and After on Delaware Creek