West Irving Creek Channel Improvements Update, Jan. 25, 2022

Page 1


CAPITAL IMPROVEMENTS PROGRAM

WEST IRVING CREEK

Channel Improvements from W Pioneer Drive to Alan-a-Dale

COMMUNITY MEETING #1

JANUARY 25, 2022

1

2

INTRODUCTIONS & BACKGROUND

3

PROJECT OVERVIEW Q&A AND BREAKOUT

MEETING AGENDA

1.

INTRODUCTIONS & BACKGROUND

Confluence Near Tipton Road

PROJECT TEAM

Walter Thomas, PE City Engineer
Garry Fennell, PE, CFM
Floodplain Manager
Brent Redd MDU Programs Manager
Justin Oswald, PE, CFM
Project Manager
Freese and Nichols, Inc.

WHAT IS WEST IRVING CREEK?

▪ Drains 3+ square miles – 15%+ of the City south of SH-183

▪ Runs for 3+ miles – from Wyche Park to outfall south of Oakdale Road

▪ Constructed in the 1960s

▪ Inadequate to meet current standards for conveyance of 100-year flood events

WEST IRVING

Channel Near Capacity at Bowman Street

▪ History of street and home flooding

▪ Portions not mapped by FEMA

▪ Urgent improvements underway:

▪ Wyche Park Detention

▪ Construction begins soon

▪ Hogbottoms Outfall Debris Collector

▪ Completed in 2021

MUNICIPAL DRAINAGE UTILITY

▪ City reinvesting in the MDU

▪ Issuing bonds backed by fee increase

▪ #1 City Council priority for MDU

▪ Project expected to cost $90+ million

▪ MDU program provides opportunity for a long term fix

▪ Comprehensive Study completed 2021

Current Project

Future Phase

Future Phase

PHASED CAPACITY IMPROVEMENTS

Future Phase

PROJECT OVERVIEW 2.

Delaware Creek Construction

PROJECT BENEFITS

CAPACITY

▪ Similar to recent Delaware Creek Project

▪ Additional Detention

▪ Reconstruct Channel with Vertical Walls

▪ Minimize Footprint

▪ Replace or Add Fencing

▪ Improve Aesthetics

▪ Provide 100-Year Capacity

Delaware Creek

CHANNEL

SECTION

▪ Narrow easement behind residential lots

▪ Vertical walls for deeper channel

▪ Construction footprint larger than the finished wall

▪ Private structures may be within or adjacent to easement

▪ Relocation or shoring may be necessary

CHANNEL

BRIDGES

Existing Crossing

▪ 4-5 Bridge Replacements

▪ Replace small pipes with large single span

▪ Improve aesthetics

▪ Evaluate traffic impacts

Single Span Bridge Delaware Creek

WATER &

▪ Approx. 15 conflicts

▪ Adjusted before channel work

▪ Minimize service disruption

▪ Provide capacity for future needs

▪ Other Water, Wastewater, and Paving work on-going between Conflans and Yorkshire

WASTEWATER

Wastewater Bore Delaware Creek

WYCHE PARK

▪ Deepen Park by approx. 8 feet

▪ Pond for water quality and amenity

▪ Provide forebay and trash collection

▪ Natural edge for water quality, erosion and safety

▪ Other amenities such as trails, trees etc.

SIDEWALK CONNECTIONS

▪ New entrance to Wyche Park at Lawrence may be considered

▪ New connection to Rock Island Road Bike and Pedestrian Trail may be considered

PROJECT SCHEDULE

Community Meeting #1

Field Survey Work

Engineering Plans

Property Coordination

Community Meeting #2

Bid and Award

Community Meeting #3

Construction

▪ Design completed by Q1 2023

▪ Construction expected to begin Q3 2023

3. QUESTIONS & ANSWERS

Before and After on Delaware Creek