Skip to main content

McIlwaine Park Foreshore Upgrade - reshaped terrace landscape designs

Page 1

AM TT TT

DRAWN DATE DESIGNED:

EB/TT

DRAWN:

AM 27/03/23 28/02/23 CHECKED: 20/01/23

EB 03

DATE:

03/20

DATE:

03/23

DATE:

27/03/23 AH 28

APPROVED:

EB

APPROVED:

EB

APPROVED: 26

GENERAL NOTES 1. Do not scale off drawings. Follow written dimensions. If in doubt obtain written advice from the Superintendent. 2. Verify all dimensions on site. 3. Refer to legend for all symbol and code keys. 4. Read in conjunction with the specifications 5. Read in conjunction with all Civil, Marine, Hydraulic and Electrical Engineer drawings and specifications. 6. Read in conjunction with all associated drawings

7. Drawing needs to be printed in colour.

SURVEY NOTE: Bathometry in Fort Denison scale -0.925 for AHD 24

0 2 .0

2

0. 0

2

1 8 .9

3.

4 938 .1

-0 .0 7

5

4. 55

4. 52

2 8 .1

2

GRAS S

MET A L

4 1 4 .4 3 /.4 /1

CONCRE TE

4 88 / .1 .2 /1 0

22

93

33

4.

3.

4.

58

57

2 1 .4

4.

4.

4.

40

GRAS S

3.

15 4. 59

2 6 .8

69

4

9

4. 1

4 1 4 .3 8 /.4 /1 5

CO .74 TE NCR E

5 DP 0 7520 2 23

2 7 .2

3 1 4 .7 2 /.4 /1 0

4.

BRAYS

1 9 .9

PLAYGOUN D

4 9 .1

56

53

4.

65

58

4 5 141 4 .6 /.4 /

58

4.

4.

4.

4 6 / .6 6 .2 /1 0

72

4.

68

28

73

2. 35

2 0 .6

4.

4.

76

67

70

4.

4.

2. 98

2 8 .2

3 2 .1

02

85 4.

4.

80

83 4. 80

4. 65

4. 68

2 2 .5

PLAYGOUN D

4.

4.

2.

2 4 .9

42

0

2.

TABL E

4

PA H T

3.

79

BAY

WATERL INE/TOE OF WALL OBSERV ED AT 10 AM 17/09/18

2.

03

80

4.

4.

5 DP 0 7520 2 23

4.

4 1 4 .7 3 /.4 /1 5

87

4 18 / .8 .3 /8

4.

87

75

75

4.

4. 74

67

73

4.

4.

4.

2. 34

3. 86

68

2.

2

5

03

3.

65

3.

03

84

4. 64

SEATI NG

4.

66

4. 65

3.

4 1 6 .7 8 /.5 /1 0

2 8 .4

08

3 2 .1

2 9 .2

77

4.

0

3.

66

4 1 6 .7 8 4. /.5 83 /1

GRAS S

3 0 .4

4.

4 1 6 .8 4 /.5 /1 0

3 2 .1 09

66

3.

4.

2 8 / .2 9 .3 /8

2.

PLAYGOUN D

85

52

-0 .0

2 1 .0

3.

6

4 11 6 .0 /.6 / 20

4.

63

66

2 7 .2

2 6 / .7 0 .2 /5

4.

4 1 .9

4.

WAL L

69

2 5 .4

3 1 0 .8 6 /.3 /1 0

4 2 0 .4 8 /.6 /2 0

44

09

2.

3.

4. 87

4 S 1 6 .5 9 /.6 /1 0

55

4.

56

K

63

4.

55

4.

36

D FD HW

S

4.

38

28

4 9 .1

12

1 9 .9

2 7 .2

BA N

5 8 .1

6

4 62 0 .1 /.6 /

2.

20

3

4 8 / .0 6 .3 /8

2.

22

/.4 4 . 8/1 1 0

4.

73

4.

5 1 0 .1 3 /.3 /1 0

4.

39

4 1 .1

P 03 T PO IN

4 4 / .9 6 .1 5/ 5

5 1 6 .1 6 /.5 /1 0

1 DP 9 792101

4.

4.

CONCRE TE

3 1 2 .9 4 /.4 /1 5

5 1 0 .0 8 /.3 /1 0

73

84

4.

3.

3 1 2 .2 3 /.3 /1

05

2 1 0 .5 9 /.4 /1 0

4.

DIS H

5

96

5 1 .1

2. 00

32

3.

-0

2.

4.

.0 5

09

79

22

6/

46

2. 67

10

72

3 1 6 .0 8 /.6 /2

/.3 3 . /1 8 6 0

5

60

3.

53

3. 56 3.

75

ESS

3 4 / .7 5 .1 5/ 5

3. 5 B 7 N I 3. 52

3. 76

3 1 .4

0

52

4

4

2.

2.

2 1 .8

3.

30

3.

36

2. 47

S

25

.2 2 . /1 9 5 0

2. 75

3 2 0 .2 0 /.6 /2 0

6/

53

25

5

3.

3.

59

3 2 0 .4 3 /.6 /1

3.

2 1 2 .7 9 /.3 /1 0

05

3.

S

WATER LINE OBSER /TOE OF WAL VED AT 10AM L 17/09/ 18

1 9 .9

GARDEN

3 1 6 .6 4 /.6 /2

3 1 2 .5 0 3. 5 8 /.4 / 10 3 B .5 7 R UB B LE

3 S .5 8

45

S

3.

20 DP 792101

TO P

4 1 4 .5 4 /.5 /2 0

.2 3 .7 /1 5 0

3.

3.

ACC

4 1 0 .3 5 /.3 /1 4 0 16 / .4 .2 /5

4 1 0 .6 6 /.3 /1 0

4.

3.

3 1 2 .7 8 /.4 /1 0

3.

DRAI N

37

14

2 8 / .5 2 .3 /6

4.

90

S FD SM

89

TABL E2.

BI N

3.

3.

3 16 / .8 .2 /5

88

3.

2. 87

37

2.

86

76

2.

2 6 / .8 3 .2 /1 0

2 6 / .9 5 .2 /1 0

2.

3 1 .2

3 1 2 .2 9 /.4 /1

08

-0 .0 6

2 1 .4

0

75

76

2.

2.

3.

68

2 8 / .3 2 .3 /6

2.

/2

2.

0

95

5

86

1 7 .9

2.

2.

S

9

78

-0

89

2.

75

3 S .0 9

2.

S

3

7

2.

67

86

66

2.

2 B .8 0 N I

.0

2 4 .3

78

2.

2.

2 .5

2.

2 8 / .7 3 .2 /6

D FD HW

2 6 / .6 6 .2 /5

2.

2. 95

CO NC RE T1E 1 .9

2 8 / .5 0 .3 /6

54

90

2. 86

2.

2.

90

79

TAB LE

2 8 / .9 3 .3 /8

2.

98

3 6 / .0 8 .2 /8 3 66 / .1 .1 /8

09

2.

3 6 / .3 3 .3 /8

3.

95

TABL E

2 6 / .5 5 .2 /5

2.

89

2.

2 6 / .8 4 .2 /5

2.

54

2 8 / .3 0 .3 /6

2.

2 2 0 .9 2 /.8 /1 0

64

73

2.

94

2.

2.

.0

6

2 9 .2

89

2. 89

86

S

3 16 / .2 .2 /8

2. 93

74

70

2.

2.

94

3 6 / .2 5 .2 /8

3.

2 2 .8

00

73

79

4.

1 7 .8

2.

4 .2 .4 /8 6

74

6/

28

3. 06

62

2 9 .1

3.

2.

4/ .1

77

2.

78

4 51/ .5 5

4 6 / .0 0 .2 /8

2.

2 1 .6

IN 0 .4 V 5 75 0

3 S .0 2

3 1B O .0

97 S

L

2.

/8

5

P 6/.2.38

4

4 74 / .1 .1 5/

2 6 / .9 0 .2 /5

2 1 .8

KIOS K

1.

94

2. 75

64 2 6 / .5 2 .2 /5

2. 77

3 1 0 .8 3 /.3 /1 0

46

2 0 .1

E

TA BL

GRAS S

2.

6/

2 W .7 2 M

83

3. 16

2.

3 6 / .9 7 .2 /1 0

4 6 / .0 7 .2 /1 0

-0

.0

5

2 1 .1

2 1 2 .6 2 /.4 /1 5

OF

3 6 / .7 8 .1 5/ 5

1 6 .9

20

66

2.

2.

4 6 / .2 0 .2 /1 0

3 4 / .8 8 .1 /5

2 S .8 7 H M

L

L

O

4.

05

F

O

GRAS S

4 6 / .2 9 .2 /1 0

10

OF

10

3.

1

3 5 .2

2 1 0 .9 3 /.4 /1 0

2. 72

02

05

3.

1

3.

3 9S .3 H M

&

3. 53

2 1 0 .7 2 /.3 /8

2.

40

4 1 0 .5 2 /.3 /1 6/ 0 .2 4 . 1/1 0 5

GARD EN

3 6 / .6 2 .2 /1 0

2 1 0 .8 8 /.4 /1 0

GRASS

2 K .8 8 P I

2 11 0 .9 /.4 /

3.

2 B .8 9 O

30

3 11 0 .7 /.3 /

B

2 2 .9 C .9 6 8 M O

2 S .8 3 H M

74

2 B .8 3 O

2.

2 1M .9 LI

99

L

2.

3 7 .3

D

2 1 4 .8 2 /.3 /1 0

3 1 0 .4 2 /.3 /1 0

74

22 DP 2. 75 S 21 79 01 S

78

2 S .8 5 IP

2.

.2 4 . /1 0 8 0

2 S .9 4 H M

2.

502 DP 752023

4 1 .0

4 4 / .0 2 .1 5/ 5

4 1 0 .4 6 /.3 /1 0

2.

83

O F

3 3 .2

2. 2 9 S .9 5 E M 2 R H M K

99

3 F L .0 9

00

2.

3 0 .1

D

PU M P H O U SE

BITUME N

84 2.

2 F L .9 3

2 1 .8

2.

3.

OR

3 H .0 2 D Y

NC

03

3.

2 K .7 9 P I 2. 97

CO

2 T .8 3 2 S .0 L E 9 T B .8 8 M S 2 P L O B 2. L O T 89 P T 2 SL E H .9 4 I P D Y 2 S .9 5 2. H H M D Y E 98 K MR 2 SI 1 .P8

2 8 / .4 6 .3 /6

2 6 / .5 7 .2 /5

3 0 .1

BOOS T

75

02

2 16 / .9 .2 /5 2 6 / .8 6 .2 /5

2.

3.

4 14 / .5 .1 5/ 4 5 4 / .4 4 .1 5/ 5 TO

2 1 .1

59

88

87

2.

3 6 / .2 2 .2 /8

3 1 4 .3 5 /.5 /1 5

90 2 1 .9 2. 77

2.

2 8 / .7 4 .3 /6

00

2 S .9 6

2 6 .8

20

0

4.

4 1 0 .5 9 /.3 /1

2 18 / .5 .3 /6

2.

73

S

3.

2 B .7 9 L O 2 B .8 6 L O

2.

3 6 / .2 4 .2 /8

3 1 4 .2 5 /.5 /1 5

3 1 .0

3 6 / .2 3 .2 /8

61 DP 668894

2.

2.

3 1 .1

D FD HW

2.

S

89

2.

98

88

75

2.

2.

2.

BAY

-0

05

ML I D

3.

2 7 5 2 ..7 4 K 68 P I

CONC .

IL1 . 93

Ø375

KER B

2.

ROAD

2.

FO H OTP AT

KER B

2 5 .4

2.

R

70

2 B .8 3 U B B LE

2.

2 1 .8

2 6 / .8 9 .2 /1 0

2 1 4 .9 0 /.4 /1 5

77

63

29

3 6 / .2 2 .3 /8

3.

MEMORIAL

97

2 B .7 9 B Q T 2 .7 A 9 P

TAB LE

69

2.

76

BI N

2.

3. 03 2 S .9 9

2. 80 2 1 4 .8 2 /.4 /1 5

0

S

2 1 0 .7 7 /.3 /1 0

3 1 6 .0 6 /.6 /2

83

3 0 .1

2.

2 DP 1 792101

3 6 / .2 5 .2 /5

GRAS S

BRAYS

2.

2 8 / .7 3 .2 /6

2.

TABL E

20

3 S .2 8

3 21 6 .1 /.6 /

3 1 7 .1

95

2 1 .8

3 2 0 .2 5 /.6 /1

2.

D FD HW

3 1 .2

O F

2 1 4 .8 7 /.4 /8

05

MINI GOLF COURSE

TAB L E

3 1 0 .0 3 /.3 /1 0

3.

O F

.0

2.

00

2 1 6 .7 5 /.5 /1 5

B K AN

2.

3

3 06 / .1 .1 /5

1 9 .8

75

4 6 / .5 4 .1 5/ 5

0

79

3.

2.

4

1

2 1 0 .8 7 /.4 /1

5

3.

3 5 .1

2.

28

35

4.

3.

3 6 .3

22

5

69

4 1 2 .0 9 /.4 /1 5

3.

5

2.

88 87

2. 97

2.

68

14

3 6 / .9 2 .2 /1 5

2 1 .8

4 1 0 .0 0 /.2 /6

16 0

5

2 1 0 .5 7 /.3 /1 0

4.

3 6 / .9 6 .2 /1 0

3 1 2 .2 0 /.2 /1

2 1 4 .8 5 /.4 /1 0

2 6 / .8 4 .1 /5

2.

D FD HW

02

1 9 .8

34

80

2

2 1 0 .9 8 /.3 /1 0

30

37

2 6 / .8 4 .2 /5

2.

85

3 K .2 4 P I 3. 42

3 2 .6

L

36

WA L

2.

3 1 2 .2 3 /.4 /1 5

46

-0

.0

5

2 1 0 .7 7 /.4 /1 5

65

15

2.

3 01 0 .1 /.5 /

2 8 / .8 4 .2 /8

3 4 / .3 9 .1 /5

3.

3 8 .4

7

4

3 61 4 .1 /.4 /

57

2.

2 6 / .7 9 .2 /1 0

15

3.

3 1 0 .0 5 /.3 /1 0

36

94

3.

1.

8

3.

9

3 3 .5

63

2.

1 0 .9

2 8 / .4 8 .3 /6

54

3.

34

2 1 2 .6 0 /.5 /8

3.

T9 .4 L E

REN DER ED

-0

.0

)

3.

6

8

7

7

6

3 6 .7

KER B

2 S .9 0 H M

2 8 / .8 8 .2 /8

2 8 / .5 5 .5 /1 0

GRAS S

1 3 .9

-0

.0

1 7 .9

5

94

28

2 2 .2

2.

5

4.

4

0

2

4. 0

3 K9 .8 IP

1.

97

4 6 .4

2.

P

2 P .9 3 I

1 5 .8 1. 8 G 4 I

8 5T

3 1 6 .5 7 /.7 /1

26

5

2.

1.

95

2.

55

TE RE NC CO

PREPARED FOR:

49

4 4 .4

75

32

0.

2.

4 1 0 .4 9 /.3 /1

1 7G .9 I

L

1.

94

3 4 / .5 0 .2 /5

P

4 0 .6

0

4 1 0 .4 5 /.3 /1 0

1 8 .8

P

4 6 .4

4 6 .6 4 1 .5

4 S5 .3 H M

4 4 .4

PALING

28

1 0 .9

1 5 .8

4 65 / .4 .2 /5

4 7 .4

32

4.

4.

WA LL 4 9 .5

FO OT PAT H

DP

4.

56

1 24 / .8 .1 /5

1 .5 1

IN 0 .5 V 9 45 0

1 34 / .8 .1 /5

2.

05

1.

84

4.

4.

76

4 6 .8

4.

1 8 .8

1 2C .9 D LI 1 0 .9

S

69

GRAS S

72

65

4.

00

1 66 / .7 .3 /8

2.

AL W L

O

1 9 .9

KER B

4 2 .8

4 9 .7

6

1 5 .8

1 8 .8

C D LI

2 DP 3 792101 GRAS

4 4 / .7 2 .1 5/ 8

60

TE

4.

7

4.

5 5 .2

DP 52214 52 4

1 1 .2

L

5

4 1 .6

4 4 .7

)

( V C

5

4 K .4 6 P I

7

4.

4 4 9 .6 6 .7

5 1 .2

379139

1 D2P 530949

0.

22

No .9

93

4.

STR IP

3 1 0 .7 3 /.4 /1 0

4.

4 1 .3

4 5 .3

4 0 .2

GR ASS 4 O 2 .1F

4 4 1 4 .2 9 T .0 /.6 L E 8 /2 0

4 4 .2

4 6 .2 4.

GRAS S

2 1 0 .6 3 /.4 /1 0

2 1 4 .9 2 /.5 /1 5

4 7 .0

3 1 0 .5 2 /.3 /1 0

3.

4 3 .1

BA R RIE R

3 8 / .2 5 .2 /8

76

3 2 / .0 8 .2 /5

3.

2 1 0 .6 9 /.3 /1 0

2 DP 530418

85

4 8 / .0 7 .4 /1 5

2 6 / .5 3 .2 /5

DP 399950

B

88

3 1 0 .5 9 /.3 /1 0

3.

3.

4 5 .1

4 1 .2

4 1 GR ASS 4 5 .0

REN 4 DER 1 .0 ED GR ASS

AD

18 DP 527623

2 1 4 .2 8 /.4 /1 5

2 1 0 .8 6 /.4 /8

2 8 / .8 0 .3 /1 0

2 1 4 .9 7 /.4 /1 5

8

3.

3 5 .8 3 2 .8

4 3 4 .9

RO

3.

( V C

3

P

3 L 1 .9

4 0 .4

FO OT PAT H

3 1 0 .2 3 /.4 /8

63

3 7 .7

WA LL GR AS GR CO S ASS 3 NC RE 2 .4 T E 3. 3

3 5 .5

3 9 .3

TO P 3 K1 .2 IP

DP 724123

3.

3.

3 0 .3

3 2 .5

WIR E

3 8 / .5 9 .2 /1 0

3 1 0 .0 3 /.3 /8

10

15

3 61 4 .1 /.4 /

3 11 6 .3 /.5 /

3.

3 1 .6

( V C

3.

3 1 0 .5 2 /.3 /1 0

ME DIA N

3 8 .2

502 DP 752023

4 1 2 .3 6 /.4 /1 5

3 1 2 .3 7 /.4 /1

2.

3 3 .4

1 DP 724123

2 1 0 .9 5 /.4 /1 0

2 1 4 .7 8 /.4 /1 0

BA N K

3 6 / .0 8 .1 /5

1

2 E .9 0 P L

14

2 6 / .8 5 .1 /5

3.

2

3.

0

3.

3 8 .1

)

1 DP 0 523474

0 2 . .2 6 21

2.

OF WALL WATERLINE/TOE OBSERVED AT 10AM 17/09/18 23

.0

00

2 1 .2

3 8 / .2 0 .2 /1 0

3 8 / .5 3 .2 /1 0

3 8 / .9 0 .2 /1 0

75

L

62

5

4.

4 6 / .8 2 .2 /5

CON TE CRE

4.

4.

90

KER B

4.

3.

/1

4

2.

0 2 .0

-0

2.

2 8 / .6 4 .2 /1 0

3 8 / .6 7 .2 /1 0

3 8 / .9 5 .2 /1 0

3 8 / .8 3 .2 /1 0

3.

P

4.

4. 7 75 10/ 8 .3 /1

4.

4.

4 45 .9 5 .8

4 2 0 .7 7 /.6 /1 5

90

00

4.

4 1 4 .8 4 /.4 /1 5

15

4.

75

73

91

20

BA N

24

02

2

IN 0 .2 V 5 90 IN 0 .2 V 7 0 90 0

3 8 / .5 4 .2 /1 0

2 8 / .8 7 .2 /1 0

3 8 / .3 6 .2 /1 0

3 8 / .6 7 .2 /1 0

3 18 / .3 .2 /1 0

5

GRAS S

73

98

5.

5 11 4 .0 /.4 /

4 1 .9

4.

4.

TOP

3 6 / .9 5 .3 /6

4 DP 142 528

2.

0 2 .0

0 3 .0

0 9 .1

1 6 .9

3 8 / .3 4 .2 /1 0

3 78 / .1 .2 /1 0

3 1 2 .8 6 /.4 /1

4 1 2 .0 4 /.3 /1 0

4.

4.

00

98

95

80

4 S .0 7 H M

3.

. IL 1 15

6 DP 197 524 8 DP 85 5271

0 9 .3

2.

04

2.

2 8 / .2 5 .2 /1 0

2 8 / .5 4 .2 /1 0

3 8 / .0 8 .2 /1 0

3 8 / .3 0 .2 /1 0

3 8 / .2 5 .2 /1 0

2 8 / .9 3 .2 /1 0

3 8 / .4 9 .2 /1 0

3 1 2 .5 0 /.3 /1 0

85

66

L

5.

4.

4.

83

4.

ROAD

3 .5

0 2 .0

0 1 .0

2.

2 8 / .3 2 .2 /1 0

2 8 / .1 4 .2 /1 0

2 8 / .3 9 .2 /1 0

2 8 / .7 7 .2 /1 0

3 8 / .0 3 .2 /1 0

2 8 / .8 0 .2 /1 0

3 38 / .1 .2 /1 0

65

20

0

3.

3 1 2 .4 3 /.3 /1

3.

4 1 2 .6 0 /.3 /1 0

4 1 2 .6 7 /.3 /1 0

4.

P

99

87

4.

1 DP 8 792101

SE A

2.

07

10

0 6 .4

2 72 0 .1 /.6 /

40

2 8 / .2 0 .2 /1 0

39

2.

57

63

2 8 / .9 5 .2 /1 0

2 8 / .9 8 .2 /1 0

3 8 / .0 4 .2 /1 3 0 8 / .0 0 .2 /1 0

CO N RET C E

3 L2 .1

36

55

4 43 .9 1 .8

4.

4.

77

IC BR K

0 5 .2

29

2.

2 1 4 .3 3 /.4 /1 5

43

2.

2 1 .5

S

2.

2 18 / .7 .2 /1 0

2 18 / .8 .2 /1 0

P

3.

3.

4.

90

5 6 .1

05

4.

SIT EB OU ND ARY

2.

06

2.

S

20

S

2.

S

2.

83

2 8 / .9 8 .2 2. /1 77 0

2.

3 8 .0

87

S

4.

4 45 .7 9 .8

28

5 S8 .1

15

1 DP 7 792101

S

5 91 4 .1 /.4 /

FE NC E

2.

42

20

1

32

42

5

63

79

90

0

3 6 .0

3.

24

4 1 .8

5 49 .0 8 .9

26

5.

03

02

5.

5.

K

2 9 .1

2.

2.

7

2.

2.

.5

2.

2 1 .7 2. 67

2 1 .7

2.

5 02

2.

3.

9

4.

4 6 / .9 6 .2 /5

00

4 55 .9 7 .0

5.

5 66 / .1 .2 /8

5.

5 6 / .7 3 .2 /5

15

15

PATH @ 1:20

56

2 1 .5

2.

2 3 .1

29

45

GRAS S 2

2 1 .6

65

85

FOOTP AT H

50

2 2 .1

06

DI H S

I

2.

2.

2.

57

2.

87

2.

3 2 .2

4

3.

4 S .6 7

5 6 / .0 2 .2 /5

5 86 / .1 .2 /5

66 / .1 .2 /5

22

5.

5 61 4 .1 /.4 /

POTENTIAL FUTURE

2.

G

2 1 .2

DRA I N

P

2.

44

2.

80

2.

00

3.

3.

(P C

4 1 4 .6 9 /.4 /1 5

5 6 / .0 8 .2 /5

15

5 6 / .2 3 .2 /5

5.

07

15

5

LL WA 5 Ø37

DP 583588

1

IL

2 7 .1

2.

64

2.

82

14

)

5

4 6 / .8 9 .2 /5

4 1 4 .9 2 /.4 /1

5 81 4 .1 /.4 /

GRAS S 5

5 6 / .2 9 .2 /5

6.

5 91 4 .1 /.4 /

5 31 4 .1 /.4 /

3

2.

52

1.

2 9K I .1

2.

2.

88

2 S1 .7

2.

2.

3.

3.5 6

3 1 3 .9 6 .8

4 5 .1

4 S .6 6

5 6 / .2 6 .2 /5

6 6 / .4 2 .2 /5

4 .5

27

29

33 P 2. 33

2.

37

2.

2.

39

H

53

ME DI AN 50 2 M .4 0

2.

66

08

(PC BASE

2.

2.

55

S

79

3

3.

57

74

09

)

2.

2.

2.

05

.0 ED 2 BIT GE O UM F EN

3.

3.

3.

4.

88

29

CO RE NC TE

42

H

2 H M .5 8

2. 21. 7 79 2 M .6 5

96

04

S

4.

4 R .9 8 A T

5.

4 .5

T

2 1 .3

2 1 .2

2.

79

88

97

2.

4.

65

89

5 6 / .2 8 .2 /5

FO OT PAT H

2 1 .2

46

2. 2 K .5 9 P I

2.

2.

50

4.

4.

5 0 .1

TO IL BL ET OC K 5

RE NC CO TE

2.

73

88

3 1 .1

52

34

3.

3.

4 1 .1

0

62

4

83

4.

2 .5

2.

89

TE

ISSUE FOR COSTING ISSUE FOR CONSTRUCTION DRAFT FOR REVIEW L IN L

2.

2.

3.

4.

D F H4 63 D W .6

78

4.

4.

TA

4.

T

Y AR

94

06

84 L

4.

4.

4.8 7 4. R 7 T

SIG N

RE NC CO E T

C (P )

2.

44

3 1 .1

3.

4 S .0 0

3 M 9 .1

T

4 1 .9 4 0 .9

R

EDG E BITU OF MEN

M

H

S

A

STREE 3 .7 8

BAS E

4 .5

T TPA FOO H

83

4 .5

3.5

3

(PC )

4.

3 .5

TOP

3.04

3 .7 2

CONCRE TE 3

TO P

(CONCR E TE) CONCRE TE 3 .8 9

AMENDMENT (V C

3 .8 9

4 4 .9

W M

SS

FOOTPA T H TO P

T PA OT FO H

CE

RE NC CO TE

)

AC

EAST E AT GR

3

GA TE

C (P )

C (P )

FOOTPA T H RE NC CO TE

S BA E

4 L1 .9

O/H S/S EAD IGN

(VC )

O F

F

ISSUE 5

O

4.79.7 4 9

C B A TE L O F

OF GE ED UMEN BIT

P

CON TE CRE DRIV EWA Y

C (P )

T FOOTPA H

N BA K

C (P )

CON TE CRE DRIV EWA Y

DP 52393 1 1 7 .9

1 6 LL WA

E TO F

RESHAPED LANDSCAPE TERRACE 1

RESHAPED LANDSCAPE TERRACE 2

4

RESHAPED LANDSCAPE TERRACE 3

O F

WAL L

CONCRE TE

PREPARED BY:

Level 3 suite 3.01 22-36 Mountain street Ultimo 2007 Ph: (02) 9555 1033 Fax: (02) 98185292 Email: admin@epnsw.com.au ABN 53 088 175 437

PROJECT: DRAWING TITLE

Mcllwaine Park River Activation Project RESHAPED LANDSCAPE TERRACE - MASTERPLAN

DATE

APRIL 2023

SCALE

1:600 @A1 1:1200 @A3

N ISSUE

C

DRAWING NO.

EP-LD-PK1.GA.01


Turn static files into dynamic content formats.

Create a flipbook
McIlwaine Park Foreshore Upgrade - reshaped terrace landscape designs by cityofcanadabay - Issuu