Skip to main content

6/20/24 Southfield Sun

Page 1

GARDEN WALK TO EXPLORE ‘OASIS’ NEIGHBORHOOD — 3A

$

35 OFF ANY PLUMBING,

POOL HEATER MAINTENANCE

$

99

(ONE TIME SERVICE)

COOLING OR HEATING SERVICE WITH THIS COUPON. EXCLUDES ALL OTHER OFFERS.

0264-2414

LIMITED TIME OFFER

JUNE 20, 2024 • Vol. 21, No. 13

Photos by Patricia O’Blenes

LEFT: Santa Barbara Street, just south of 10 Mile Road, in the Washington Heights neighborhood, is undergoing a $16.5 million investment funded by Southfield’s local street fund and water and sewer bond money. ABOVE: The Washington Heights watermain and road improvements project began in November 2023 and is anticipated to be completed by November 2024. Pictured is another angle of Santa Barbara Street.

Local road plans see financial obstacles ahead BY KATHRYN PENTIUK

kpentiuk@candgnews.com

SOUTHFIELD — For the past several months, Larry Barnett, who has lived in Southfield since 1975, has had local road repairs on his mind. “Right outside of my door, Evergreen Road, between Winchester and 12 Mile Road

— they didn’t have enough funds when they did it. So they kind of did a cheap fix, and they said that at the time; they weren’t dishonest about it. And now it’s starting to crumble. It’s actually because the underlay of the road isn’t substantial. So the road is just kind of caving in. So there’s no real stopgap measure, and it has to be redone,” Barnett said. See ROADS on page 7A

2024 Subaru Outback

Woodward Ave. N. of 8 Mile • FERNDALE HodgesSubaru.com • 248.547.8800

0095-2425

*Manufacturer Offer. No down payment required. Financing for well-qualified applicants only. Length of contract is limited. Subject to credit approval, vehicle insurance approval and vehicle availability model OUTBACK RDF, RDG, RDH, RDI, RDJ, RDL. From dealer stock by 6/30/2024


Turn static files into dynamic content formats.

Create a flipbook
6/20/24 Southfield Sun by C & G Newspapers - Issuu