City Manager's Weekly Report (July 31, 2026)

Page 1


City Manager’s Weekly Report

To: Mayor and City Council

From: Robert Ranc, City Manager

JULY 31, 2026

UPCOMING EVENTS

August 1: City Council Special Called Meeting (9:00 AM, Council Chambers)

August 3: City Council Budget Workshop (5:00 PM, Council Chambers)

August 7: Friday Night Market (6:00 - 9:00 PM, Downtown Square)

August 8: Bobcat Tailgate (8:00 AM, Bobcat Stadium)

August 10: Glendenning Pkwy Public Meeting (6:00 PM, Council Chambers)

August 11: City Council Meeting (5:00 PM, Council Chambers)

August 15: City Council Special Called Meeting (9:00 AM, Council Chambers)

August 19: Home Depot Board Cutting Ceremony (4:15 PM, 3245 S. Preston Rd)

August 21: Movie Night at the Park (7:00 PM, Old Celina Park)

August 26: Coffee with the Contractors (9:00 AM, 112 N. Arizona Dr)

CITY UPDATES

BOBCAT TAILGATE TO KICK OFF THE 2026 FOOTBALL SEASON

The Celina Chamber of Commerce will host the annual Bobcat Tailgate on Saturday, August 8, at 8:00 AM at Bobcat Stadium, bringing the community together to celebrate the start of the 2026 football season. The event provides an opportunity for residents to show their Bobcat spirit, meet coaches and student-athletes, purchase new season merchandise, and connect with fellow fans ahead of the upcoming season. Approximately 70 local businesses are expected to participate in support of the event, further demonstrating the strong partnership between the business community, Celina ISD, and the City. The Bobcat Tailgate continues to serve as a valued community tradition that celebrates school pride while fostering connections among residents, businesses, and student-athletes.

ANNUAL STREET MAINTENANCE PROGRAM CONTINUES ON GA MOORE PKWY

The 2026 Annual Street Maintenance (ASM) Program is underway as crews perform asphalt repairs on GA Moore Pkwy between Preston Rd and Business 289. This preventative maintenance project preserves pavement conditions, improves roadway safety, and extends the service life of the City’s transportation infrastructure. Construction began on July 27, and is anticipated to be completed by August 12, weather permitting.

CURRENT CONSTRUCTION ACTIVITIES

• Asphalt spot repairs are underway along GA Moore Pkwy between Preston Rd and Business 289.

• Crews continue roadway maintenance operations throughout the project corridor.

TRAFFIC IMPACTS

• Resident and emergency vehicle access will be maintained throughout construction.

• Only local traffic is permitted within the active work zone.

• Through traffic is encouraged to use Business 289/E. Carthage Rd or CR 95 as alternate routes.

• Celina ISD staff should access the Elementary and Middle Schools from Louisiana Dr.

• Flaggers remain on-site to safely direct traffic, and the contractor continues to actively manage traffic control throughout the project.

The Annual Street Maintenance Program is a proactive investment in Celina’s roadway infrastructure, helping preserve existing pavement, improve driving conditions, enhance public safety, and reduce long-term maintenance costs. These improvements ensure the City’s transportation network continues to reliably serve residents, businesses, and visitors while supporting the community’s continued growth.

[ CLICK HERE FOR MORE INFORMATION ON THE

ANNUAL STREETS MAINTENANCE PROGRAM

]

COIT RD IMPROVEMENT PROJECT ADVANCES TO NEXT PHASE

Construction continues to progress on the Coit Rd Improvement Project between Vest Ln and Choate Pkwy as crews prepare to transition to the next phase of roadway reconstruction. Beginning Friday, July 31, traffic will be shifted onto the newly constructed concrete pavement, allowing work to begin on the opposite side of the roadway while maintaining two-way traffic throughout construction.

CURRENT CONSTRUCTION ACTIVITIES

• Traffic will transition to the newly constructed concrete pavement beginning July 31.

• Reconstruction of the opposite side of Coit Rd will begin following the traffic shift.

• Crews will enlarge the Ownsby Pkwy roundabout to improve turning movements for larger vehicles.

TRAFFIC IMPACTS

• Two-way traffic will be maintained throughout construction using temporary traffic configurations.

• Traffic control measures will remain in place to provide safe travel through the work zone.

• Motorists are encouraged to use caution for construction crews and changing traffic patterns.

The Coit Rd Improvement Project will reconstruct the corridor as a four-lane concrete roadway with curb and gutter, enclosed drainage, landscaping, irrigation, and street lighting. Additional improvements include enhanced intersections at Vest Ln and new roundabouts at Punk Carter Pkwy and Ownsby Pkwy, providing increased roadway capacity, improved traffic operations, and enhanced safety to support Celina’s continued growth.

WELCOME NEW TEAM MEMBERS & STAFF PROMOTION

The City of Celina is pleased to welcome several new team members who have recently joined the organization, bringing valuable experience, talent, and a shared commitment to serving our community. We are also proud to recognize a well-earned promotion within our organization, reflecting the City’s dedication to developing internal talent and investing in the professional growth of our employees. Together, these additions and advancements strengthen our ability to deliver exceptional service and support Celina’s continued growth.

DALLAS NORTH TOLLWAY PHASE 4A PROJECT: LANE CLOSURE NOTIFICATION

As part of the continued progress on the DNT Phase 4A project, construction crews will soon implement targeted lane closures to support key project activities. These closures are necessary to facilitate the transport of topsoil, conduct mass haul operations, perform area cleanup, and set structural beams. It is important to note that full closure of the left lanes is not anticipated.

Monday, August 3, through Saturday, August 8:

• The northbound and southbound left lane of Dallas Pkwy from First St to FM 428 will be closed daily from 6:30 AM to 6:30 PM.

Logan Brossette EDC Business Development Associate
Morgan Gossett Accountant
Michael Kim Parks Planning Manager
Felicia Paredes Library Assistant
Johnny Parker Streets Maintenance Worker

ROAD CLOSURES RESIDENT MAP

The City‘s Road Closures Resident Map serves as a crucial tool for residents to remain informed about ongoing projects and associated road closures within the city. This comprehensive resource empowers individuals to plan their travel routes effectively, minimizing disruptions caused by construction activities. By clicking on the map or accessing the link above, residents gain access to the full interactive map, ensuring easy navigation and timely updates on the evolving infrastructure projects throughout Celina.

[ CLICK HERE TO VIEW THE ROAD CLOSURES MAP ]