City Manager’s Weekly Report
To: Mayor and City Council
From: Robert Ranc, City Manager

JULY 17, 2026

UPCOMING EVENTS
July 17: Live & Local Entertainment Series (6:30 - 9:00 PM, Downtown Patio)
July 18: Fire Station #3 Open House (10:00 AM - 1:00 PM, Fire Station #3)
July 25: Clean Sweep (8:00 AM - 12:00 PM, 10165 CR 106)
July 29: Coffee with the Contractors (9:00 AM, 112 N. Arizona Dr)
CITY UPDATES
UPCOMING CONSTRUCTION ON COIT RD.
Beginning Monday, July 20, Coit Road between FM 455 and Sunset Boulevard will be closed to local traffic only as part of the City of Celina’s Capital Improvement Program (CIP) roadway reconstruction project.
Detour routes will be available via FM 455, Sunset Boulevard, and Preston Road. The closure is expected to remain in place for approximately three weeks, with all work anticipated to be completed before the start of the school year.

This project is part of a two-phase roadway improvement effort in the area, with both phases expected to be completed prior to the start of school.
This phase of the project includes full-depth roadway reclamation followed by a new asphalt overlay, helping improve the long-term durability and quality of the roadway.
ROAD CLOSURE NOTICE FOR COUNTY ROAD 53
As part of the City of Celina’s commitment to maintaining high-quality infrastructure, the Public Works Streets Division team will temporarily address dust control on County Road 53. These repairs require the closure of County Road 53.
The closure is scheduled for Wednesday, July 15, 2026, at 7:30 AM through Friday, July 24, 2026, at 6:00 PM, weather permitting.

During the closure, all traffic will be directed to use the east entrance of County Road 53 off W. Outer Loop. The City of Celina Public Works team will actively manage traffic control throughout the project to help ensure safe travel.
ANNUAL STREET MAINTENANCE: UPCOMING IMPROVEMENTS
ASPHALT SPOT REPAIRS
• Beech St (Oklahoma to N Texas) (775 LF) with Culvert Replacements & Light Ditch Grading
• N Texas (Pecan to Malone) (1265 LF)
• W Main St (Illinois to W End) (820 LF)
• W Main St (Louisiana to Illinois) (1400 LF)
• Beech St (Colorado to Illinois) (640 LF) With Culvert Replacements & Light Ditch Grading
• N Illinois (Pecan to Maple) (715 LF) With Culvert Replacements & Light Ditch Grading
• E Walnut (Oklahoma to Louisiana by RR) (688 LF) (Design provided in original Contract)
• N Mexico Dr (Pecan to Malone) (1040 LF) With Culvert Replacements & Light Ditch Grading
• N Arizona Dr (Pecan to Maple) (700 LF) With Culvert Replacements & Light Ditch Grading
• Maple St (N Ohio to Illinois) (1200 LF) With Culvert Replacements & Light Ditch Grading
• Ohio (Beech to Maple) (315 LF) With Culvert Replacements & Light Ditch Grading
• CR 127 (Custer to Sunset) (1400 LF)
• GA Moore Pkwy (Spot Repairs)
• CR 134 (Adjacent to High School) (Spot Repairs)
FDR REPAIRS
• N Florida (WWTP North Property line to south) (1890 LF)
• Lynn Stambaugh (Preston to CR 97) (4812 LF)
SURFACE TREATMENT REPAIRS
• N Florida (WWTP North Property line to CR 57/FM 455 Intersection)
• Harvest Glen (PressurePave) (Includes Cul-de-sac) (480 LF)
• GA Moore (PressurePave) (Preston to Louisiana) (4398 LF)
• CR 134 (Adjacent to High School) (PressurePave) (2345 LF)
RESTRIPING REPAIRS
• Wells Road (Frontier to Ownsby)
• Roseland (Waterview Trail to Bold Ruler Rd)
CONCRETE PANEL REPAIRS
• Punk Carter (West of CR 50)
SIDEWALK
REPAIRS
• W Walnut (Between S Arizona and S Colorado)
CELINA POLICE DEPARTMENT TAKES HOME THE HOMERUN HEROES SOFTBALL GAME AGAINST CELINA FIRE DEPARTMENT
The Celina Police Department and Celina Fire Department recently hosted the annual “Home Run Heroes” softball game, a public relations initiative designed to foster positive community relations and strengthen interdepartmental camaraderie. This year, the Celina Police Department secured the victory, returning the ceremonial Golden Glove trophy to Police Headquarters.
The event drew strong attendance from local residents, serving as an effective platform for community engagement and public support for our first responders. The activation was made possible through a strategic partnership with the Celina Police Foundation, which provided event support, and Celina ISD, which graciously permitted the use of their softball facilities. This successful joint effort highlights the ongoing collaboration between City departments, the school district, and community stakeholders to create meaningful communal spaces.

STAFFING AND PROMOTION UPDATES
The City continues to invest in building a strong and talented workforce through strategic hiring and professional development. This reporting period included the addition of a new team member to the Public Works Department and Parks & Recreation Department, as well as a well-deserved promotion in the IT Department.



DALLAS NORTH TOLLWAY PHASE 4A PROJECT: LANE CLOSURE NOTIFICATION
As part of the continued progress on the DNT Phase 4A project, construction crews will soon implement targeted lane closures to support key project activities. These closures are necessary to facilitate the transport of topsoil, conduct mass haul operations, perform area cleanup, and set structural beams. It is important to note that full closure of the left lanes is not anticipated. Monday, July 20 through Saturday, July 25:
• The northbound and southbound left lane of Dallas Pkwy from First St to FM 428 will be closed daily from 6:30 AM to 6:30 PM.
ROAD CLOSURES RESIDENT MAP
The City‘s Road Closures Resident Map serves as a crucial tool for residents to remain informed about ongoing projects and associated road closures within the city. This comprehensive resource empowers individuals to plan their travel routes effectively, minimizing disruptions caused by construction activities. By clicking on the map or accessing the link above, residents gain access to the full interactive map, ensuring easy navigation and timely updates on the evolving infrastructure projects throughout Celina.