TRANSFORMER PAD FARGO, ND
REV. 0
DATE
DESCRIPTION
BY
06/06/2025 ISSUED FOR CONSTRUCTION
8"
CASS COUNTY ELECTRIC COOPERATIVE FARGO, ND
5'-0"
PAD OPENING
6" CLASS 5 OR CRUSHED CONCRETE 5' LONG 1'Ø CONCRETE FORM TUBES (TYP.) 1
S2
SECTION
NOTE: OPENING AND PIER REINFORCEMENT OMITTED FOR CLARITY. -
2 SECTION S2
4" CLR. PAD OPENING
5'-0"
5'-0"
(8) #3 @ 12" O.C. W/ (2) BARS IN TOP 2" 4" CLR. (TYP.) 1'-0" TYP.
3" MIN. CLR.
1'-0" TYP.
E .) T E P R (TY C N E SEE PLAN FOR O UB C " T HOOK ORIENTATION 12 RM FO 4 FORM TUBE PLAN VIEW S2
.
6" CLASS 5 OR CRUSHED CONCRETE
6" CLASS 5 OR CRUSHED CONCRETE
3 SECTION S2
ISSUED FOR CONSTRUCTION
℄
LR
(4) #4 B2 BAR (TYP.)
(4) #4 BARS
C
PLACE BOTTOM MAT ON CONCRETE FORM TUBES
B2 (TYP.)
2"
2025-02-06
#4 @ 12"
2" CLR.
8" 4"
#4 @ 12"
8"
#4 @ 12"
#4 @ 12"
TRANSFORMER PAD REINFORCING VIEW
DESIGN BY: TK DRAWN BY: NWL
THREE PHASE TRANSFORMER CONCRETE PAD ASSEMBLY S2 (45-2000 KVA)
DRAWING NUMBER:
REVISION:
FD3-002_CCEC
0