Skip to main content

2025 FD3 002 3-phase pad spec

Page 1

TRANSFORMER PAD FARGO, ND

REV. 0

DATE

DESCRIPTION

BY

06/06/2025 ISSUED FOR CONSTRUCTION

8"

CASS COUNTY ELECTRIC COOPERATIVE FARGO, ND

5'-0"

PAD OPENING

6" CLASS 5 OR CRUSHED CONCRETE 5' LONG 1'Ø CONCRETE FORM TUBES (TYP.) 1

S2

SECTION

NOTE: OPENING AND PIER REINFORCEMENT OMITTED FOR CLARITY. -

2 SECTION S2

4" CLR. PAD OPENING

5'-0"

5'-0"

(8) #3 @ 12" O.C. W/ (2) BARS IN TOP 2" 4" CLR. (TYP.) 1'-0" TYP.

3" MIN. CLR.

1'-0" TYP.

E .) T E P R (TY C N E SEE PLAN FOR O UB C " T HOOK ORIENTATION 12 RM FO 4 FORM TUBE PLAN VIEW S2

.

6" CLASS 5 OR CRUSHED CONCRETE

6" CLASS 5 OR CRUSHED CONCRETE

3 SECTION S2

ISSUED FOR CONSTRUCTION

LR

(4) #4 B2 BAR (TYP.)

(4) #4 BARS

C

PLACE BOTTOM MAT ON CONCRETE FORM TUBES

B2 (TYP.)

2"

2025-02-06

#4 @ 12"

2" CLR.

8" 4"

#4 @ 12"

8"

#4 @ 12"

#4 @ 12"

TRANSFORMER PAD REINFORCING VIEW

DESIGN BY: TK DRAWN BY: NWL

THREE PHASE TRANSFORMER CONCRETE PAD ASSEMBLY S2 (45-2000 KVA)

DRAWING NUMBER:

REVISION:

FD3-002_CCEC

0


Turn static files into dynamic content formats.

Create a flipbook
2025 FD3 002 3-phase pad spec by Cass County Electric Cooperative - Issuu