

![]()



This project will provide a feasibility study and recommended designs for the rehabilitation of 6 km of sea defences and ancillary waterfront development between the capital city of Georgetown and Ogle Outfall, and the reconstruction of the ferry terminal and market at Stabroek and Vreed-en-Hoop. The project will provide the Government of Guyana with shovel-ready designs and cost estimates to reduce flooding and erosion and improve climate resilience along the waterfront; and to improve access to safe transportation at the Stabroek Market for persons travelling along the Demerara River.
UKCIF grant
£0.6mn (US$0.8mn)

Technical Assistance phase approved Design consultant engaged
This project has been made possible through a grant from the United Kingdom Government under the UK Caribbean Infrastructure Fund (UKCIF), which provides grant funding for climate-resilient infrastructure projects to encourage growth and to support improved livelihoods, poverty reduction and safer conditions for residents. UKCIF is administered by the Caribbean Development Bank (CDB).
Contacts
Contacts
Ministry of Public Works,Work Services Group
Contacts Caribbean Development Bank
Maitland Stewart, Project Coordinator Email: mir_stewart@yahoo.com


Head, Infrastructure Partnerships, Office of the Vice-President Operations: Andrew Dupigny Email: dupigna@caribank.org
Andrew Dupigny, Head, Infrastructure Partnerships, Office of the Vice-President (Operations) Email: dupigna@caribank.org