Campbell River Mirror, January 22, 2016

Page 1

HOT OFF THE PRESS

northislandnissan.ca NI Nissan Se

nd NorthnIsUla eils v n Nissa 2X1.5

e page 6 for details.

NEW D! TITAN X

Campbell River’s Discovery Guide promotes Campbell River’s visitor attractions. P5

1-855-291-4335

PROCESS

2700 N. Island Hwy., Campbell River

Campbell RiveR miRRoR DL# 40069

First issue 1971

View our eEditions online Newsstand 85¢

FRIDAY, JANUARY 22, 2016

www.campbellrivermirror.com

Elk Falls provided quite a show on Tuesday

No replacement for sick engineer cancels last sailings of day Kristen Douglas Campbell RiveR miRRoR

Six sailings between Campbell River and Quadra Island were cancelled Monday night as BC Ferries was unable to fill a key staffing position onboard the Powell River Queen. Darin Guenette, manager of public affairs for BC Ferries, confirmed that the last three round trips of the night had to be cancelled, starting with the 7 p.m. sailing leaving Quadra Island. “At that point, one of our engineers on board, a licensed, certified position, was unable to continue due to illness and we couldn’t get a replacement,” Guenette said. Area C Director Jim Abram said it was the second time within about a month that sailings were cancelled due to a staffing shortage. He said the incident on Monday left people who live on Quadra but work in Campbell River stranded and shoppers with cars full of groceries had to leave their food overnight. Abram said while BC Ferries did provide a water taxi, that didn’t help with the vehicles. “There’s no excuse for this to happen, it’s completely inexcusable on the operations side,” Abram said. “We have, on Quadra Island, at least four recently retired skippers that all keep their certification current and they pay every year to maintain the ability to run the ferry for emergency purposes.”

But Guenette said BC Ferries needed an engineer with an engineer’s certificate – a Transport Canada requirement under BC Ferries’ crewing regulations. “His position is called a third engineer,” said Guenette. “With these positions you have to have the same licensing.” Guenette said it was the same situation in early December – an engineer became ill and sailings had to be cancelled. “Obviously it’s not ideal, but illness happens,” Guenette said. “We do our best to find the nearest employee to fill in. It’s unfortunate, certainly, we never want any customers to be inconvenienced when we can’t sail. We always try to have the right people on our vessels.” Abram said some of the staffing challenges could be solved if BC Ferries committed to more local hires. “They’re hiring more and more people from off Island and it becomes limiting to people working, especially when the ferry leaves from (the Quadra) side,” Abram said. “The situation on Quadra Island is there are more than enough people working, and they’re ticketed to work on the ferry, and they’re not being hired.” Abram said the Ferry Advisory Committee for the Campbell River/ Quadra/Cortes run will get a chance to air its grievances when it meets with BC Ferries’ general manager of operations for the northern routes on Feb. 1.

MiKe Davies Campbell RiveR miRRoR

E

Mike Davies/CaMpbell RiveR MiRRoR

Water thunders over Elk Falls on Tuesday after BC Hydro opened the floodgates and allowed 10 times the normal flow through the John Hart Dam. See a video of the falls at www.campbellrivermirror.com.

Tyee Chev 2012 GMC SIERRA DENALI Was: 40,995 $

Now:

CREW CAB/6.2L/ COMPLETELY LOADED

38,800

$

STK #T9064A

ven the weather couldn’t keep away the hundreds of people who made their way up to Elk Falls on Tuesday. They made the trip to see our natural wonder flowing at 10 times its normal volume as BC Hydro diverted flow from its penstocks at the John Hart Dam and sent them down the canyon instead. The flow was increased in order to deal with grass and wood debris that collects behind the dam. This debris needs to be removed a few times per year, as it restricts the water flow into the penstocks. Only once per year, however, do they need to reduce flows into the penstocks in order to do the work, diverting the water down the canyon, and producing the spectacular show at the falls. The public will only get two more chances to see the falls at this kind of velocity. After the completion of the new generating station, there will no longer be a need to divert the flow to clean the water intake because of the way the new generating station works, so next year and 2018 will be public’s last two chances to see this kind of power flowing over Elk Falls. Head over to campbellrivermirror.com for a video of the falls on Tuesday.

TYEE

7x2.5 PROCESS

CHEVROLET | BUICK | GMC 570 – 13th Avenue

250.287.9511

SEE DEALER FOR DETAILS

tyeechev.ca DL#10790


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Campbell River Mirror, January 22, 2016 by Black Press Media Group - Issuu